British Columbia Hydro and Power Authority
2006 Integrated Electricity Plan (IEP) & Long Term Acquisition Plan (LTAP)
Project 3698419 .._---_._,_ ....._ .._--_ .._--_._--~---_._..__ ...-._-_ ...._~-_._-------_._-----_._ ....._--,-----_._ .._._--~-_._-_.~~--._------_.._-
2006 IEP/LTAP ALCAN - RELATED MATERIALS
1. Amended LTAP, Exhibit B1-E
(i) Amended LTAP, Section 8.4.5 (pages 8-28 to 8-32)
(ii) Appendix N - redacted version of Term Sheet• Confidential version filed with BCUC pursuant to Exhibit B1-0
2. Responses to Final Information Request (IR) Round, Exhibit B-17
(i) BCOAPO Round 3 IRs• 3.12.1, 3.12.2, 3.12.3, 3.13.1, 3.13.2, 3.13.3, 3.13.4, 3.13.5,
3.21.1
(ii) BCUC Round 4 IRs• 4.430.2, 4.430.5.4 (Table 2: 2006 IEP system energy load
resource balance with additional 2,500 GWh Iy of non-firm energysupply), 4.442.1,4.442.2,4.443.1,4.443.2, 4.443.3.,4.444.1(Confidential table filed with BCUC), 4.445.1, 4.445.2, 4.445.3
(iii) CPC Round 3 IRs• 3.4.1, 3.5.1
(iv) IPPBC Round 3 IRs• 3.2.1, 3.2.2, 3.3.1, 3.3.2, 3.3.3
(v) Kitimat Round 3 IRs• 3.1.2,3.1.3,3.1.4,3.1.5,3.1.6,3.1.7,3.1.8
(vi) SCCBC Round 1• 1.30.1 (Exhibit B-10)
B-2Reference BCH-IEP B-28