2006 Bond Program Project Status - Dallas · 2006 Bond Program Project Status As of December 2013...
Transcript of 2006 Bond Program Project Status - Dallas · 2006 Bond Program Project Status As of December 2013...
2006 Bond Program Project Status As of December 2013
Propositions Bond Sale Authorized
Completed/ Cancelled or
Reprogrammed Under Award Remaining to be Awarded On Hold
Street & Transportation Improvements $ 390,421,920 89.6% 9.7% 0.4% 0.4% Flood Protection & Storm Drainage Facilities $ 334,313,043 65.9% 31.8% 0.0% 2.3% Park & Recreation Facilities $ 343,230,711 74.3% 18.4% 5.0% 2.2% Library Facilities $ 46,200,974 58.1% 38.7% 3.2% 0.0% Cultural Arts Facilities $ 60,857,189 53.6% 21.4% 21.4% 3.6% City Hall, City Service & Maintenance Facilities $ 34,747,501 73.5% 8.8% 14.7% 2.9% Land Acquisition $ 1,500,000 0.0% 0.0% 100%* 0.0% Economic Development $ 41,496,519 All Funds Allocated / Under Negotiation Farmers Market Improvements $ 6,636,760 5.0% 0.0% 95%** 0.0% Land Acquisition $ 22,551,771 31.2% 68.8% 0.0% 0.0% Court Facilities $ 7,944,968 0.0% 100.0% 0.0% 0.0% Public Safety Facilities & Warning Systems $ 63,621,395 52.5% 30.5% 16.9% 0.0%
2006 Bond Program Overall Project Status $ 1,353,522,751 80.5% 15.2% 3.2% 1.1% • • *Production volume reduced due to housing recession • **Funds reserved for privatization efforts.
2006 Bond Program Updateas of December 2013
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Alley Petitions
District 14 Alley PetitionsPB06U000 400,000 14 Completed 2/28/2009
Goodwin Av & Vanderbilt Av - Laneri Av to Glencoe StPB06U001 154,920 14 Completed 11/26/2011
Nebraska Av & Ramona Av - Maywood Av to Graceland AvPB06U002 54,881 4 Completed 12/15/2011
Thurston Dr & Wanebe Dr - Bombay Ave to Gilford StPB06U004 88,703 2 Completed 12/12/2011
Pringle Dr & Norco St - Canada Dr to Bernal StPB06U003 173,577 3 Canceled
Category: Alley Reconstruction
9th St & 10th St - Zang to MadisonPB06U005 100,394 1 Completed 11/21/2013
Aberdeen & Mimosa - Tibbs to TulanePB06U006 236,116 13 Completed 5/31/2008
Aberdeen Ave & Mimosa Ln - Tibbs to EdgemerePB06U007 234,839 13 Completed 6/30/2013
Azalea & Rex - Preston to "T" Alley1PB06U008 110,856 11 Completed 6/30/2013
Berkley & Newport - Waverly To RuggedPB06U009 225,532 1 Completed 11/21/2013
Carillon Dr (13908 - 14030) Peyton - Spring Valley to "T" AlleyPB06U010 178,642 11 Completed 11/20/2013
Carry Back Cir. & TU ROW - Pensive to T-alleyPB06U011 147,639 13 Completed 2/28/2013
Catamore (3144) & Woodwind - Dundee including "T"PB06U012 313,042 13 Completed 2/28/2013
Chattington (7606) & Rolling Acres-Tophill toCarriagePB06U013 324,592 12 Completed 1/21/2013
Cliffbrook(7019) &Gateridge-Hillcrest to CliffbrooPB06U014 420,413 11 Completed 1/20/2011
Colgate & Marquette - Boedeker to DurhamPB06U015 248,879 13 Completed 8/3/2012
Cromwell(11001) - Royal to CromwellPB06U016 311,290 13 Completed 2/28/2013
Monday, January 06, 2014 Page 1 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Alley Reconstruction
Eudora Dr (7110 - 7238) Mason Dells - St. Judes to Saint Michaels
PB06U017 290,996 11 Completed 6/30/2013
Image La (4406 - 4530) "T" Alley to Cockrell HillPB06U018 301,207 1 Completed 11/21/2013
Leameadow (7119) & Town Bluff - Hillcrest to WildvinePB06U019 327,042 12 Completed 9/13/2010
Marquette(7207) & Centenary - Airline to DurhamPB06U020 182,179 13 Completed 6/30/2013
Marsalis & Lancaster - 11th to JeffersonPB06U021 59,731 1 Completed 12/13/2013
Marsalis & Lancaster - E. Tenth To E. NinthPB06U022 118,501 1 Completed 12/13/2013
Mason Dells Drive & Yamini - Chicot to St. JudesPB06U023 175,057 11 Completed 6/30/2013
Meletio(5739) & Charlestown - Nuestra to JamestownPB06U024 299,803 13 Completed 6/30/2013
Paldao Dr (7311 - 7429) Spring Valley - Meandering to CarillonPB06U025 336,133 11 Completed 1/21/2013
Peyton & Sprucewood - Meandering to PaldaoPB06U026 452,340 11 Completed 11/20/2013
Rex Dr & Royal Crest Dr - Royalshire Dr east to "T" AlleyPB06U027 241,221 11 Completed 11/7/2008
Rolling Hills & Spring Grove - Coit to CarillonPB06U028 265,361 11 Completed 11/20/2013
Steinman Avenue (300-322) 8th - Patton to DenverPB06U029 75,302 1 Completed 11/21/2013
Tahoe & Brush Creek-Brush Creek to Roaring SpringsPB06U030 172,301 11 Completed 1/21/2013
Talisman Dr & Wildflower from Wildflower to CarawayPB06U031 207,949 13 Completed 2/28/2013
Tennant (509-517) Hampton - Jefferson to TennantPB06U032 35,736 1 Completed 12/13/2013
Whitehall & Jubilee Trail - Shans to CromwellPB06U033 425,087 13 Completed 2/28/2013
Category: Barrier Free Ramps
10th St & Oak CliffPB06U034 5,105 1 Completed 8/31/2008
13139 Blossomheath Ln @ Alpha RdPB06U035 7,658 11 Completed 4/30/2009
14019 Coit - Bus StopPB06U036 1,914 11 Completed 4/30/2009
Monday, January 06, 2014 Page 2 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Barrier Free Ramps
14740 Meandering WayPB06U037 7,658 11 Completed 8/31/2009
1631 S. Marsalis AvePB06U038 3,829 4 Completed 8/31/2008
2001 Deer PathPB06U040 1,914 4 Completed 8/1/2009
2100 N. Prairie Creek Rd & 9199 Bruton RdPB06U041 11,487 5 Completed 4/30/2009
2601 Prichard Ln @ Reva StPB06U043 7,658 4 Completed 4/30/2009
2901 MatildaPB06U044 7,658 14 Completed 4/30/2009
3145 Mcdermott AvePB06U045 3,829 7 Completed 4/30/2009
3423 Forest LnPB06U046 9,572 13 Completed 4/30/2009
3434 Forest LnPB06U047 3,829 13 Completed 4/30/2009
3525 Turtle CreekPB06U048 7,658 14 Completed 4/30/2009
3535 Forest LnPB06U049 1,914 13 Completed 4/30/2009
4001 Live Oak StPB06U050 11,487 14 Completed 8/1/2009
5619 Belmont AvePB06U051 7,658 14 Completed 4/30/2009
5723 Harvest HillPB06U052 22,973 13 Completed 8/31/2009
6015 Berkshire LnPB06U053 3,829 13 Completed 4/30/2009
6300 Elam RdPB06U054 34,460 5 Completed 4/30/2009
6500 S. Cockrell Hill RdPB06U055 1,914 8 Completed 8/31/2008
726 Edgemont AvePB06U056 9,572 4 Completed 8/31/2009
7575 Frankford RoadPB06U057 4,500 12 Completed 8/31/2009
8613 Old Hickory TrPB06U058 1,914 8 Completed 8/31/2008
900 W. Canty StPB06U059 7,657 3, 1 Completed 8/1/2009
Monday, January 06, 2014 Page 3 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Barrier Free Ramps
9th St @ Polk StPB06U168 7,658 1 Completed 8/1/2009
9th St @ TylerPB06U061 7,658 1 Completed 8/1/2008
Abrams Rd @ Meadowknoll DrPB06U062 12,763 10 Completed 8/31/2009
Anita (5500) @ McMillanPB06U063 5,743 14 Completed 4/30/2009
Applecross Ln @ Kilbridge LnPB06U064 7,657 12 Completed 8/1/2009
Applecross Ln @ Springcreek RdPB06U065 7,657 12 Completed 8/1/2009
Aqua Dr @ Northlake DrPB06U066 7,658 9 Completed 4/30/2009
Aqua Dr @ Waterview RdPB06U067 7,658 9 Completed 4/30/2009
Bandera Ave @ Thackery StPB06U068 3,829 13 Completed 8/31/2008
Beckley Ave (S) - W Jefferson Blvd to Sunset AvePB06U042 7,658 1 Completed 4/30/2009
Belt Line Rd @ Alexis DrPB06U069 7,658 11 Completed 8/1/2009
Bennett Ave at Live Oak StPB06U070 5,743 2 Completed 4/30/2009
Bishop Ave (S) @ W. Yarmouth StPB06U071 3,829 1 Completed 8/31/2008
Blue Creek Dr @ Horizon DrPB06U072 3,829 5 Completed 8/31/2008
Bonnie View Rd @ Highland Hills DrPB06U073 3,829 8 Completed 8/31/2008
Brentfield Dr @ Meadowcreek DrPB06U074 7,657 12 Completed 4/30/2009
Bristol Dr @ W. Saner AvePB06U075 1,914 4 Completed 4/30/2009
Bruton Rd - Prichard Ln to Buckner BlvdPB06U076 22,973 4 Completed 4/30/2009
Bryan St at N Fitzhugh AvePB06U078 5,743 2 Completed 4/30/2009
Bryan St at N Peak StPB06U077 3,829 2 Completed 4/30/2009
Bryan St at N Prairie AvePB06U079 7,658 2 Completed 4/30/2009
Monday, January 06, 2014 Page 4 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Barrier Free Ramps
Butler St @ Harry Hines BlvdPB06U080 7,658 2 Completed 4/30/2009
Camp Wisdom Rd @ Westmoreland RdPB06U081 3,829 8 Completed 8/1/2009
Clearwood Dr @ S. Polk StPB06U082 7,658 8 Completed 8/31/2008
Clearwood Dr @ Woodshire DrPB06U083 3,829 8 Completed 8/31/2008
Coit Rd @ Hwy 190PB06U084 6,400 12 Completed 8/31/2008
Dixon Ave @ Bourquin StPB06U085 7,658 7 Completed 4/30/2009
Dorrington Dr @ Ferguson RdPB06U086 7,658 7 Completed 4/30/2009
Ella Ave @ Alcorn AvePB06U087 7,658 5 Completed 4/30/2009
Ella Ave @ Capestone DrPB06U088 3,829 5 Completed 4/30/2009
Ella Ave @ Elam RdPB06U089 7,658 5 Completed 4/30/2009
Ferguson Rd @ Crest Ridge DrPB06U090 7,658 9 Completed 4/30/2009
Ferguson Rd @ Healy DrPB06U091 7,658 7, 9 Completed 8/31/2009
Ferguson Rd @ Highwood DrPB06U093 7,658 9 Completed 8/31/2009
Ferguson Rd @ Peavy RdPB06U094 7,657 7, 9 Completed 4/30/2009
Ferguson Rd @ Province LnPB06U096 7,658 9 Completed 4/30/2009
Ferguson Rd @ San Paula AvePB06U097 7,658 9 Completed 4/30/2009
Ferguson Rd @ Skyview DrPB06U098 3,829 9 Completed 4/30/2009
Ferguson Rd @ Woodmeadow PwyPB06U099 67,006 9 Completed 6/30/2009
Field St (N) @ Elm StPB06U100 3,829 14 Completed 8/31/2009
Field St (N) @ Patterson StPB06U101 1,914 14 Completed 4/30/2009
Frankford Rd - Hwy 190 to City LimitPB06U039 34,460 12 Completed 4/30/2009
Monday, January 06, 2014 Page 5 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Barrier Free Ramps
Garland Rd - Knob Oak Dr to N. Buckner BlvdPB06U107 13,401 9 Completed 4/30/2009
Garland Rd @ Alvin StPB06U102 5,743 9 Completed 8/31/2008
Garland Rd @ Fuller DrPB06U105 5,743 9 Completed 8/31/2008
Garland Rd @ Lochmond CirPB06U106 3,829 9 Completed 8/31/2008
Goldwood Dr @ Indian Ridge TrailPB06U108 10,042 5 Completed 8/31/2008
Grand Ave @ Jeffries StPB06U112 1,914 7 Completed 4/30/2009
Gus Thomasson Rd @ Aledo DrPB06U113 7,658 9 Completed 4/30/2009
Gus Thomasson Rd @ Casa View AvePB06U114 7,658 9 Completed 4/30/2009
Gus Thomasson Rd @ Desdemona DrPB06U115 7,658 9 Completed 4/30/2009
Gus Thomasson Rd @ Fern DrPB06U116 7,658 9 Completed 4/30/2009
Gus Thomasson Rd @ Hermosa DrPB06U117 7,658 9 Completed 4/30/2009
Gus Thomasson Rd @ Losa DrPB06U118 7,658 9 Completed 4/30/2009
Gus Thomasson Rd @ Newcombe DrPB06U119 7,658 9 Completed 4/30/2009
Gus Thomasson Rd @ San Felipe DrPB06U120 7,658 9 Completed 4/30/2009
Gus Thomasson Rd @ San Medina AvePB06U121 7,658 9 Completed 8/31/2009
Gus Thomasson Rd @ Woodale DrPB06U122 7,658 9 Completed 4/30/2009
Gus Thomasson Rd @ Zacha DrPB06U123 7,658 9 Completed 8/31/2009
Harlandale Ave @ Brightside DrPB06U124 7,658 4 Completed 8/31/2008
Hatcher St @ Bradshaw StPB06U125 3,829 7 Completed 4/30/2009
Hatcher St @ Electra StPB06U126 3,829 7 Completed 4/30/2009
Hatcher St @ Meadow StPB06U127 5,743 7 Completed 4/30/2009
Monday, January 06, 2014 Page 6 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Barrier Free Ramps
Hatcher St @ Roberts AvePB06U128 3,829 7 Completed 4/30/2009
Hatcher St @ Spring Garden DrPB06U129 3,829 7 Completed 4/30/2009
Hatcher St @ Verdun AvePB06U130 3,829 7 Completed 4/30/2009
Highdale Dr @ Forest LnPB06U131 3,829 13 Completed 4/30/2009
Hillcrest Rd @ Hillwood LnPB06U132 7,659 11, 12 Completed 4/30/2009
Holly Tree Dr @ Fox Fire DrPB06U134 1,914 12 Completed 4/30/2009
Idaho Ave @ E. Louisiana AvePB06U135 7,658 4 Completed 8/31/2008
Illinois Ave (W) @ S. Vernon AvePB06U136 3,829 3 Completed 8/31/2008
Inwood Rd - Forest Ln to Harvest Hill RdPB06U137 38,289 13 Completed 4/30/2009
Jamestown Rd @ Brookstown DrPB06U138 1,914 13 Completed 8/31/2009
Kelly Blvd @ Timberglen RdPB06U139 3,829 12 Completed 8/31/2009
Kings Hwy - N. Polk St to Timbergrove CirPB06U140 22,973 3 Completed 8/31/2008
Lake June Rd @ Whitley DrPB06U141 1,914 4 Completed 4/30/2009
Lamar @ MemorialPB06U142 7,658 2 Completed 8/31/2008
Lemmon @ DouglasPB06U143 5,743 14 Completed 4/30/2009
Lemmon @ Oak GrovePB06U144 3,829 14 Completed 4/30/2009
Lemmon @ WycliffPB06U145 1,914 14 Completed 4/30/2009
Lindsley @ Tenison MemorialPB06U146 12,763 14 Completed 8/31/2009
Lippitt Ave @ Lockwood BlvdPB06U147 7,658 9 Completed 4/30/2009
Masters Dr (N) @ Checota DrPB06U148 7,658 5 Completed 4/30/2009
Masters Dr (N) @ Muskogee DrPB06U149 7,658 5 Completed 4/30/2009
Monday, January 06, 2014 Page 7 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Barrier Free Ramps
Masters Dr (N) @ Tokowa DrPB06U150 7,658 5 Completed 4/30/2009
McCommas @ SkillmanPB06U151 7,658 14 Completed 8/31/2009
Meadow Rd @ Meadow Park PlPB06U152 3,829 13 Completed 4/30/2009
Meadow Rd @ Rambler RdPB06U153 7,658 13 Completed 8/30/2009
Meadow Rd @ Treehouse LnPB06U154 3,829 13 Completed 6/10/2009
Meandering Way @ La Sobrina DrPB06U155 3,829 12 Completed 8/31/2009
Montana Ave (E) @ S. Marsalis AvePB06U156 1,914 4 Completed 8/31/2008
Monte Carlo St @ W. Saner AvePB06U157 3,829 3 Completed 8/31/2008
N Fitzhugh Ave at Sycamore StPB06U158 3,828 2, 14 Completed 4/30/2009
N Prairie Ave at Sycamore StPB06U160 3,829 2 Completed 8/31/2009
Peavy Rd @ Cayuga DrPB06U161 7,658 9 Completed 4/30/2009
Peavy Rd @ Millmar CirPB06U162 7,658 9 Completed 4/30/2009
Peavy Rd @ Millmar DrPB06U163 7,658 9 Completed 8/31/2009
Peavy Rd @ Redondo Dr - Naylor StPB06U164 7,658 9 Completed 4/30/2009
Pickrell Dr @ Osborn RdPB06U165 1,914 7 Completed 4/30/2009
Polk St (S) @ Drury Dr - Clear Fork DrPB06U166 7,658 4, 5 Completed 8/31/2008
Preston Rd @ Highcourt PlPB06U169 7,658 11 Completed 4/30/2009
Preston Rd @ Regency PlPB06U170 7,658 11 Completed 4/30/2009
Ravensway Dr @ Church RdPB06U171 7,658 10 Completed 8/31/2008
Ridgeway St (702) @ Junius StPB06U172 3,829 14 Completed 8/31/2009
Ross Ave @ Summit AvePB06U173 3,829 2 Completed 8/31/2009
Monday, January 06, 2014 Page 8 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Barrier Free Ramps
Salado Dr. @ Carta Valley DrPB06U174 7,657 12 Completed 4/30/2009
Simpson Stuart Rd @ Bonnie View Rd.PB06U175 1,914 8 Completed 8/31/2008
Skillman @ EllsworthPB06U176 7,658 14 Completed 8/31/2009
Skillman @ KenwoodPB06U177 7,658 14 Completed 8/31/2009
Stoneport Dr @ Alcorn AvePB06U178 3,829 5 Completed 4/30/2009
Winding Ridge Dr @ Church RdPB06U179 3,829 10 Completed 8/31/2008
Woodwind Ln - Dundee DrPB06U180 3,829 13 Completed 4/30/2009
Wynnewood Dr - S. Polk St to W. Illinois AvePB06U181 22,973 3 Completed 8/31/2008
York St @ 2nd AvePB06U182 1,914 7 Completed 4/30/2009
York St @ Verdun AvePB06U183 7,658 7 Completed 4/30/2009
Category: Bridge Repair and Modification
Belt Line Rd. over Hickory CreekPB06U184 191,445 8 Completed 12/1/2011
Canada Drive over W. Fork Trinity RiverPB06U185 127,630 3, 6 Completed 12/1/2011
Colorado Blvd. over Coombs CreekPB06U188 76,578 3 Completed 12/1/2011
Continental Ave. over Trinity RiverPB06U189 127,630 6 Completed 12/1/2011
Duncanville Road over Five Mile CreekPB06U190 76,578 3 Completed 12/1/2011
E. Kiest Blvd over Lancaster Kiest Shopping CenterPB06U191 255,260 4 Completed 12/1/2011
Gayglen Dr. over Elam CreekPB06U192 102,104 5 Completed 12/1/2011
Kiest Blvd. over DART (BNSF) RRPB06U193 127,630 4 Completed 12/1/2011
Lake June Rd. over Prairie CreekPB06U194 114,867 5 Completed 4/12/2013
Lawson Rd. over Mesquite Br. Trib.PB06U195 51,052 8 Completed 12/1/2011
Monday, January 06, 2014 Page 9 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Bridge Repair and Modification
Marsh Lane Tributary Furneus CreekPB06L410 -00 12 Completed 12/1/2011
Morrell Avenue over Little Cedar CreekPB06L411 -00 7 Completed 12/1/2011
Ravenview Rd. over Hickory CreekPB06U198 51,052 8 Completed 12/1/2011
Simpson Stuart Rd. over Fivemile CreekPB06U199 159,538 8 Completed 4/12/2013
TI Blvd. over Floyd BranchPB06U200 95,723 10 Completed 12/1/2011
Cloverhill Road over Hickory Creek Trib.PB06U187 89,341 8 Canceled
Lawther (West) over White Rock CreekPB06U196 191,446 9, 10 Canceled
Category: Hike and Bike Trails
Trinity Strand TrailPB06P749 -00 CW Under Award - Construction 09/01/2005 9/12/2012 2/28/2014
Coombs Creek Trail Phase III (Stevens Park Tennis Court to Hampton Rd)
PB06P849 -00 CW Remaining to-be-awarded 2/28/2014 7/31/2014 10/30/2015
Category: Intergovernmental Partnership Projects
Cockrell Hill - IH 30 to Davis(Partnership project with TxDOT & Dallas County)
PB06U204 313,970 CW Completed 12/1/2000
Congestion Mitigation & Air Quality Intersection Imp(Partnership project with TxDOT & Dallas County)
PB06U207 638,150 CW Completed 12/1/2011
Dolphin Rd - IH 30 to Military Parkway(Partnership project with Dallas County)
PB06U211 1,531,560 2, 7 Completed 3/15/2009
IH 20 at Clark Road(Partnership project with TxDOT)
PB06U213 500,000 3 Completed 12/1/2011
IH 20 Frontage Roads from Bonnie View to JJ Lemmon(Partnership project with TxDOT)
PB06U214 4,722,310 CW Completed 8/15/2010
Jupiter Rd - Garland Rd to Centerville(Partnership project with TxDOT)
PB06U217 255,260 9 Completed 11/2/2008
Mountain Creek - Grady Niblo to Spur 408(Partnership project with TxDOT)
PB06U223 3,509,825 3 Completed 1/28/2011
US 75 at Bryan(Partnership project with Dallas County, TxDOT & DART)
PB06U233 1,148,670 14 Completed 12/31/2009
Monday, January 06, 2014 Page 10 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Intergovernmental Partnership Projects
Park Lane from Boedecker to US 75(Partnership project with TxDOT)
PB06U226 957,225 13 Canceled
Bonnie View Rd - Langdon to Wintergreen(Design, ROW & Construction managed by Dallas County)
PB06U202 7,913,060 CW Under Award - Construction 04/06/2009 07/09/2013 12/30/2014
East Dallas Veloway Ph II - Elm St to Parry AvenuePB06P692 -00 CW Under Award - Construction 01/28/2009 9/25/2013 9/25/2014
IH-30 Bridge Pedestrian and Bicycle ComponentsPB06P658 -00 CW Under Award - Construction 4/13/2011 2/1/2013 3/1/2017
Katy Trail Extension - Phase VIPB06P653 -00 CW Under Award - Construction 11/8/2006 6/22/2011 10/30/2015
La Prada from Millmar to Motley(Partnership project with Dallas County)
PB06U218 191,445 9 Under Award - Construction 10/01/2007 01/24/2014 3/31/2015
McKinney Avenue Trolley Downtown Extension(Partnership project with TxDOT)
PB06U220 3,828,900 14 Under Award - Construction 2/14/2007 8/25/2010 3/31/2014
Montfort from Peterson to Alpha(Partnership project with TxDOT)
PB06U221 510,520 11 Under Award - Construction 01/08/1997 04/15/2010 8/29/2014
Northwest Hwy - W. Lawther to Buckner(Partnership project with TxDOT & Dallas County)
PB06U224 1,340,115 9, 10 Under Award - Construction 7/5/1988 12/15/1907 1/31/2014
Sylvan Bridge from Irving to Gallagher - Amenities(Partnership project with TxDOT)
PB06U230 9,827,510 2, 6 Under Award - Construction 1/28/2004 8/8/1911 6/30/2014
CBD Fair Park Link- Hall St to I-30(Partnership project with DART and Baylor)
PB06U203 4,125,929 CW Under Award - Design 1/23/2008 3/26/2014 9/20/2015
Cockrell Hill - La Reunion to Singleton(Partnership project with Dallas County)
PB06U205 5,679,535 CW Under Award - Design 01/11/2010 12/12/2014 8/30/2016
Cockrell Hill from Davis to the City Limits(Project managed by Dallas County)
PB06U206 446,705 CW Under Award - Design 11/7/2012 8/15/2014 11/1/2015
Dallas County 2006 Call for ProjectsPB06U208 1,001,896 CW Under Award - Design various various various
Keller Springs at Westgrove RoundaboutPB06P655 -00 12 Under Award - Design 4/6/2011 01/07/2015 3/27/2016
Ledbetter / Grady Niblo Ext - Merrifield to Mt. Creek(Partnership project with Dallas County)
PB06U219 1,276,300 3 Under Award - Design 10/19/2004 12/30/2014 3/30/2016
Motor St - IH 35E to Medical Center Dr(Partnership project with TxDOT & Dallas County)
PB06U222 1,914,450 2 Under Award - Design 08/30/2011 09/01/2015 12/31/2016
Monday, January 06, 2014 Page 11 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Intergovernmental Partnership Projects
Park Lane from US 75 to Greenville(Partnership project with TxDOT)
PB06U227 957,225 13 Under Award - Design 1/8/1997 4/1/2018 12/3/2019
Riverfront Blvd - Cadiz St to Continental Ave(Partnership project with TxDOT & Dallas County)
PB06U215 5,488,091 2, 6 Under Award - Design 4/8/2009 3/26/2014 12/15/2016
Spring Valley at Goldmark(Partnership project with Dallas County)
PB06U229 382,890 11 Under Award - Design 06/01/2006 11/01/2014 12/1/2015
Valley View/Walnut - IH 635 to City Limits(Partnership project with TxDOT)
PB06U234 893,410 10, 11 Under Award - Design 1/0/1900 10/1/2015 12/1/2016
Walnut Hill - Malibu to Luna(Partnership project with Dallas County)
PB06U236 3,573,640 6 Under Award - Design 12/12/2007 1/31/2014 2/27/2015
Traffic Accident Reduction Roadway Improvements - On-Demand
PB06U232 395,653 CW In Progress various various various
Traffic Control and Safety TreatmentsPB06P730 -00 CW In Progress various various various
Alpha Rd - Noel to Preston(Partnership project with Dallas County)
PB06U201 4,467,050 11 On Hold TBD TBD TBD
Davis - Hampton to Westmoreland(Partnership project with Dallas County)
PB06U209 5,296,645 1, 3 On Hold TBD TBD TBD
SH 78 - Buckner (Loop 12) to IH 635(Partnership project with TxDOT)
PB06U228 191,445 9 On Hold TBD TBD TBD
Category: Multi-modal Transportation Facilities
Union Station - Systems renovationPB06U237 3,960,000 CW Completed 10/12/2010
Category: School Flasher Upgrades
School Flasher Upgrades - Citywide - Phase 1PB06U238 2,300,000 CW Completed 11/30/2011
Category: Sidewalk Improvements
Arapaho: Hillcrest to CoitPB06U240 12,763 12 Completed 11/30/2010
Arapaho: Preston to HillcrestPB06U239 15,954 12 Completed 11/30/2010
Beltline: Hillcrest to CoitPB06U241 223,353 12 Completed 11/30/2010
Campbell: Frankford to PrestonPB06U242 70,197 12 Completed 11/30/2010
Monday, January 06, 2014 Page 12 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Sidewalk Improvements
Campbell: Hillcrest to CoitPB06U243 47,861 12 Completed 11/30/2010
Campbell: Preston to HillcrestPB06U244 89,341 12 Completed 11/30/2010
Coit: Frankford to McCallumPB06U245 135,607 12 Completed 11/30/2010
Coit: McCallum to CampbellPB06U246 95,723 12 Completed 11/30/2010
Community from Webb Chapel Ext. to NW HwyPB06U248 130,000 6 Completed 2/7/2013
Hillcrest: Arapaho to BeltlinePB06U253 28,717 12 Completed 11/30/2010
Hillcrest: Campbell to ArapahoPB06U254 153,156 12 Completed 11/30/2010
Keller Springs: Dallas North Tollway to PrestonPB06U255 197,827 12 Completed 11/30/2010
Keller Springs: Preston to CampbellPB06U256 15,954 12 Completed 11/30/2010
Kelly: Old Mill to FrankfordPB06U257 44,671 12 Completed 11/30/2010
Marsh: Frankford to Trinity MillsPB06U258 22,335 12 Completed 11/30/2010
McCallum: Hillcrest to CoitPB06U259 15,954 12 Completed 4/1/2013
Midway: Frankford To Trinity MillsPB06U261 28,717 12 Completed 11/30/2010
Mixon Drive - Durango to CloverPB06U263 45,800 6 Completed 7/1/2011
Preston: Campbell to Keller SpringsPB06U264 239,306 12 Completed 11/30/2010
Preston: Frankford to CampbellPB06U265 207,399 12 Completed 11/30/2010
Preston: Keller Springs to ArapahoPB06U266 103,699 12 Completed 11/30/2010
Preston: President GB Tollway to FrankfordPB06U267 175,491 12 Completed 6/19/2012
Rosemead Marsh to MidwayPB06U268 111,676 12 Completed 11/30/2010
Rosemead: Midway to Dallas North TollwayPB06U269 15,954 12 Completed 11/30/2010
Rosewood Avenue from Lucas Dr. to Wycliff Dr.PB06U270 180,000 2 Completed 12/31/2010
Monday, January 06, 2014 Page 13 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Sidewalk Improvements
Sidewalk Replacement (01-2007)PB06U274 640,262 CW Completed 7/31/2008
Frankford: Campbell Road to PrestonPB06U249 12,763 12 Canceled/Reprogrammed
Frankford: Kelly to MarshPB06U250 31,908 12 Canceled/Reprogrammed
Frankford: Preston to CoitPB06U251 15,954 12 Canceled/Reprogrammed
Frankford: Rail line to KellyPB06U252 6,382 12 Canceled/Reprogrammed
Midway: Frankford to RosemeadPB06U260 19,145 12 Canceled/Reprogrammed
Midway: Rosemeade to Kansas City Southern RailroadPB06U262 54,243 12 Canceled/Reprogrammed
Trinity Mills: Marsh to MidwayPB06U275 248,879 12 Canceled/Reprogrammed
Waterview: Cullum to FrankfordPB06U276 127,630 12 Canceled/Reprogrammed
Sidewalk Improvements along Arterial Streets to be determined
PB06U271 4,031,560 1, 10, 11 Under Award - Construction various various 6/1/2014
Community from NW Hwy to Denton Road (R803)PB06U247 54,000 6 Under Award - Design 04/12/2006 04/09/2014 10/30/2015
Category: Sidewalk Petitions
Ewing Ave (S) - Clarendon Dr to 12th StPB06U278 38,289 1, 7 Completed 8/19/2011
Huttig Ave - Shortal Dr to Buckner Blvd (S)PB06U280 28,239 4 Completed 9/18/2011
Claymont Dr - Dangerfield Dr to 7233 Claymont DrPB06U277 158,261 4 Canceled
Category: Street Petitions
Bagley St (N) - Goodman St to Dead EndPB06U282 530,941 6 Completed 11/3/2010
Bainbridge Dr - Camp Wisdom to Cliffwood DrPB06U283 894,686 8 Completed 4/9/2013
Fairway Ave - Gill St to James StPB06U286 181,235 7 Completed 4/9/2013
Fowler St - Missouri Av to Illinois Av (E)PB06U287 109,762 4 Completed 4/9/2013
Goodman St. - N Bagley St. to Morocco Ave.PB06U288 390,548 6 Completed 11/3/2010
Monday, January 06, 2014 Page 14 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Petitions
Helena Ave - Elam Rd to Jeane StPB06U289 1,432,647 5 Completed 5/24/2013
Kimsey Dr - Maple Av to Dead EndPB06U290 491,848 2 Completed 6/17/2013
Laneri Ave - Merrimac Ave to Mercedes AvePB06U291 110,825 14 Completed 4/12/2013
Locust Ave - Dalton St to Dead EndPB06U292 435,661 4 Completed 4/9/2013
Missouri Av (E) - Fowler St to Illinois Ave (E)PB06U294 89,596 4 Completed 4/9/2013
Ninth St (W) - Westmoreland Rd (N) to Ravinia Dr (N)PB06U295 530,245 1 Completed 3/5/2010
Old Homestead Dr - Pleasant Dr to Holcomb RdPB06U296 809,174 5 Completed 4/9/2013
Oldgate Ln. - Garland Rd to Diceman Dr.PB06U297 1,923,563 9 Completed 4/12/2013
Pleasant Vista Dr - Elam to Silver Meadow (Alley)PB06U298 779,181 8 Completed 5/24/2013
Ranier Street - Mary Cliff Road - Montclair Avenue (N)PB06U299 268,023 3 Completed 7/26/2013
Riseden Dr - Winding Rose Tr to Hillcrest RdPB06U300 555,191 12 Completed 6/14/2013
St. Mary Avenue - Terry Street - Garland AvenuePB06U302 187,279 2 Completed 6/17/2013
Stedman Dr - Davenport Rd to ex Pavement N StedmanPB06U303 344,601 12 Completed 1/30/2011
Woodway Dr - Fountaindale Dr to Dead-EndPB06U306 288,920 8 Completed 7/29/2013
Fairport Rd - Murdock Rd to Dowdy Ferry RdPB06U285 784,925 8 Canceled/Reprogrammed
Cliffdale Ave. - Avon St. to Dead EndPB06U284 308,865 3 Canceled
Avon St. - Westmount Av. to Cliffdale Av.PB06U281 118,917 3 Under Award - Construction 8/25/2010 11/14/2012 12/30/2014
Marcell Av - Dacki Av to Hord AvPB06U293 650,913 1 Under Award - Construction 8/25/2010 11/14/2012 12/30/2014
Westmount Av - Davis St to Avon StPB06U304 926,721 3 Under Award - Construction 6/10/2009 11/14/2012 12/30/2014
Westmount Ave. - Avon St. to Fort Worth Ave.PB06U305 721,282 3 Under Award - Construction 6/10/2009 11/14/2012 2/28/2014
San Leon Av - Glencliff Dr to Dead EndPB06U301 554,942 5 Under Award - Design 9/9/2009 9/24/2014 12/31/2015
Monday, January 06, 2014 Page 15 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Reconstruction Local Streets
Beatrice St - Comstock St to Commerce StPB06U307 982,751 6 Completed 8/16/2013
Campbell Rd reconstruction at DART crossingPB06U309 135,000 12 Completed 4/1/2013
Forsythe Dr - Gayglen Dr to Komatty DrPB06U312 434,334 8 Completed 12/30/2013
Pueblo Street - Sylavan to BataanPB06U320 268,568 6 Completed 12/30/2013
Cantegral - Reconstruct pavement associated with the City Lights Development
PB06U310 299,999 CW Canceled/Reprogrammed
Englewood Road - Tilden to Oakenwald StreetPB06U311 232,826 CW Canceled/Reprogrammed
Oakenwald Street - Plowman Ave to Beckley Ave.PB06U315 413,225 CW Canceled/Reprogrammed
Oakenwald Street - Zang Blvd. to Plowman AvePB06U316 234,784 CW Canceled/Reprogrammed
Plowman Avenue - Oakenwald St to Zang AvePB06U318 215,350 CW Canceled/Reprogrammed
Plowman Avenue - Tilden to Oakenwald StreetPB06U319 319,439 CW Canceled/Reprogrammed
Boundbrook Ave - Stillwater Ave to Woodbrook DrPB06U308 879,408 10 Under Award - Construction 10/28/2009 9/25/2013 10/31/2014
Morris St. - Sylvan to TopekaPB06U314 175,000 6 Under Award - Construction 10/28/2009 12/11/2013 10/30/2014
Phantom Hill Rd - Bitter Creek Dr to Cheyenne RdPB06U317 550,155 8 Under Award - Construction 10/28/2009 9/25/2013 10/31/2014
Frankford at KellyPB06U313 218,247 12 Under Award - Design 8/25/2010 1/0/1900 12:00:00 AM
Category: Street Reconstruction Thoroughfares
Crowdus St (S) - Taylor St to St Louis StPB06U321 125,303 2 Completed 10/25/2010
Crown Rd - Emerald St to Goodnight LnPB06U322 1,114,782 6 Completed 5/1/2012
Dilworth Rd - Pagemill Rd to Hillguard RdPB06U323 1,276,300 10 Completed 11/28/2011
Dolphin Rd - Samuell Blvd to Merrifield RdPB06U324 319,075 2, 7 Completed 12/29/2011
Empire Central Pl - Empire Central Dr to Empress RowPB06U326 1,161,433 6 Completed 11/27/2010
Fitchburg St - Chalk Hill Rd to Weir StPB06U327 704,517 3 Completed 11/20/2012
Monday, January 06, 2014 Page 16 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Reconstruction Thoroughfares
Gordon St - Swiss Av to Live Oak SrPB06U329 446,705 14 Completed 6/30/2012
Irving Blvd (N Serv Rd) - Mockingbird ln to Woodall StPB06U332 2,125,040 6 Completed 4/1/2013
Lemmon Ave - Caddo St to N Haskell AvPB06U334 1,084,855 14 Completed 1/6/2012
Liberty St - Bryan St to Live Oak StPB06U335 308,865 14 Completed 2/28/2011
Lone Star Dr - Commerce St to Dead End (BNSF RR)PB06U336 427,561 3 Completed 4/29/2011
Petal St - 11000 BlkPB06U337 593,585 10 Completed 4/3/2012
Pinewood Dr - Gladwood La to Stults RdPB06U338 829,595 10 Completed 8/24/2012
Pulaski St - Irving Blvd to Halifax StPB06U339 1,249,498 6 Completed 5/28/2013
Rambler Rd - Walnut Hill Ln to 750' NorthPB06U340 751,967 13 Completed 1/28/2010
Regal Row - Viscount Row to UP RRPB06U341 2,393,063 6 Completed 4/16/2013
River Wharf Dr - Barge Ln to Sea Harbor RdPB06U342 391,824 6 Completed 11/20/2012
Samuell Blvd - Tennison Pkwy to UP RRPB06U343 1,604,309 2, 7 Completed 12/29/2011
Terre Colony Ct - Lone Star Dr North to 1200 ftPB06U347 1,033,803 3 Completed 4/29/2011
Texas St- Live Oak St to Florence StPB06U348 622,834 14 Completed 7/1/2011
Titan Dr - Empress Row to Governors RowPB06U349 1,410,312 6 Completed 5/28/2013
Webb Chapel Rd - Altman Dr to Regent DrPB06U350 1,276,300 13 Completed 8/23/2012
Westchester Dr - Luther Ln to Berkshire LnPB06U351 427,561 13 Completed 4/16/2013
Westmoreland Rd (S) - 9th St to Sheldon AvPB06U352 1,595,375 1 Completed 7/15/2011
Hobbs St - Haskell Av to Alpine StPB06U331 446,705 2 Canceled
Fordham Rd - Bonnie View Rd to Hale StPB06U328 4,300,863 4 Under Award - Construction 6/24/2009 6/8/2011 2/28/2014
Henderson Av (S) - Winslow Av to Oleander StPB06U330 707,070 2 Under Award - Construction 12/12/2007 5/25/2011 6/30/2014
Monday, January 06, 2014 Page 17 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Reconstruction Thoroughfares
Lake June Rd - Pemberton Dr to C F Hawn Frwy(Serv Rd)PB06U333 987,106 5 Under Award - Construction 10/14/2009 9/14/2011 2/28/2014
Southwell Rd - Ables Ln to Shady TrPB06U345 984,027 6 Under Award - Construction 6/9/2010 6/8/2011 2/28/2014
St Augustine Rd(S) - Old Seagoville Rd to CF HawnPB06U346 2,250,117 8 Under Award - Construction 10/14/2009 9/14/2011 2/28/2014
Category: Street Resurfacing
Abbott Ave. - Fitzhugh Ave. to Armstrong Pkwy.PB06U353 179,703 14 Completed 10/6/2010
Ables Ln. - Electronic Ln. to Southwell Rd.PB06U354 219,651 6 Completed 9/24/2009
Abrams Rd - Crestmont Dr. to Fisher Rd.PB06U355 89,852 14 Completed 8/10/2009
Adair St. - Race St. to ConcretePB06U356 37,906 2 Completed 9/2/2008
Alderson St. - Ellsworth Ave. to Winton St.PB06U357 46,074 14 Completed 6/16/2010
Allegheny Dr. - Carrizo Ln. to Brockbank Dr.PB06U358 187,744 6 Completed 11/20/2009
Anaheim Dr. - Northaven Rd. to Forest Ln.PB06U359 212,504 6 Completed 11/20/2009
Arapaho Rd. - Hillcrest Rd. to Meandering WayPB06U360 249,134 12 Completed 9/22/2011
Arapaho Rd. - Meandering Way to Coit Rd.PB06U361 451,810 12 Completed 8/5/2011
Argonne Dr. - Montclair Ave. to Lausanne Ave.PB06U362 22,208 3 Completed 8/31/2010
Arvana St. - Constance St. to Valley Ridge Rd.PB06U364 100,572 6 Completed 9/21/2010
Ballard Ave. - Colorado Blvd. to Eldorado Ave.PB06U365 110,910 1 Completed 7/23/2009
Bambi St. - Murdock Rd. to Dowdy Ferry Rd.PB06U366 144,094 8 Completed 8/22/2011
Barbarosa Dr. - Farola Dr. to Monterrey Ave.PB06U367 90,617 9 Completed 6/25/2010
Barret Dr. - Jim Miller Rd. to Bramlett Dr.@ Cul-dPB06U368 167,451 5 Completed 8/15/2011
Barry Ave. (N) - Columbia Ave. to Elm AlleyPB06U369 11,870 14 Completed 6/16/2009
Barry Ave. (S) - RL Thornton Frwy. To Phillip Ave.PB06U370 141,031 2 Completed 6/13/2008
Monday, January 06, 2014 Page 18 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Barry Ave. (S) - Ware St. to Haskell Ave.PB06U371 337,964 2 Completed 8/7/2008
Baxtershire Dr. - Hillcrest Rd. to St Michaels Dr.PB06U372 112,953 11 Completed 8/30/2010
Bayberry Ln. - Clark Rd. to County View Rd.PB06U373 54,498 3 Completed 8/13/2010
Baylor St. - Dawson St. to Dead EndPB06U374 54,243 2 Completed 5/9/2008
Beaumont St. - Akard St. to Wall St.PB06U375 28,844 2 Completed 6/16/2008
Beckley Ave. - 8th St. to 12th St.PB06U376 268,916 1 Completed 7/7/2009
Beckley Ave. (N) - 1909 Beckley Ave. to 2211 Beckley Ave.PB06U377 115,632 3, 6 Completed 6/12/2010
Beckley Ave. (N) - Commerce St. to Gulden Ln..PB06U379 232,542 6 Completed 5/1/2013
Belt Line Rd. (S) - Merrydale Dr. to Vida Ln.PB06U380 349,196 8 Completed 8/25/2009
Beltline Rd. (S) - 1803 Beltline Rd. to Kleberg RdPB06U381 374,722 8 Completed 8/12/2009
Bent Branch Ln. - Firelog Ln. to Flickering Shadow Dr.PB06U382 52,711 11 Completed 6/28/2011
Black Gold Dr. - Cash Rd. to Transport Dr.PB06U383 136,947 6 Completed 4/16/2011
Bluewood Dr. - Brierfield Dr. to Woodwick Dr.PB06U384 184,297 8 Completed 7/23/2012
Boedeker St. - Blairview Dr. to Lakehurst Ave.PB06U385 73,898 11 Completed 9/14/2010
Boisenberry Ln. - Country View Rd. to Bayberry Ln.PB06U386 63,177 3 Completed 8/16/2010
Bollero Ave. - Antler Ave. to Elam Rd.PB06U387 57,561 5 Completed 8/9/2011
Bomar Ave. - Forest Park Rd. to Maple Ave.PB06U388 138,606 2 Completed 5/7/2009
Bonnie View Rd. - Cardiff St. to Persimmon Rd.PB06U389 470,444 8 Completed 9/27/2010
Boundbrook Ave. - Stillwater Dr. to Gladwood Ln.PB06U390 386,719 10 Completed 4/29/2011
Bowman Blvd. - Park Ln. to Walnut Hill Ln.PB06U391 198,337 6 Completed 8/13/2010
Briargrove Ln. - Cobbler's ln. to Spyglass Dr.PB06U392 233,563 12 Completed 4/24/2013
Monday, January 06, 2014 Page 19 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Briarnoll Dr. - Carrolwood Dr. to Debbe Dr.PB06U393 62,922 12 Completed 6/14/2011
Bridal Wreath Ln. - Deerfield Ln. to Periwinkle Dr.PB06U394 36,119 3 Completed 9/8/2012
Bridges St. - Cul-De-Sac to Redkey St.PB06U395 171,407 5 Completed 7/14/2011
Brockbank Dr. - Merrell Rd. to Coogan Dr.PB06U396 302,738 6 Completed 11/12/2009
Broken Tree Tr. - Deerwood Dr. to Library Ln.PB06U397 35,864 5 Completed 9/2/2011
Browder St. - Griffin St. (E) to Blakeney Blvd.PB06U398 43,649 2 Completed 9/5/2008
Bryan St. - Central Expwy to Spenwick Ter.PB06U399 147,157 14 Completed 5/28/2008
Bryson Dr. - Giddings Cir. To Wallbrook Dr.PB06U400 161,197 10 Completed 10/19/2010
Buffalo St. - Austin St. to Cockrell Ave.PB06U401 30,376 2 Completed 6/23/2008
Burbank St. - Denton Dr. to Dead EndPB06U402 78,110 14 Completed 8/13/2010
Calvert St. - Quebec St. to Irving Blvd.PB06U403 141,031 6 Completed 6/9/2008
Camp Wisdom Rd. (W) - RL Thornton Frwy. To Woodwick Dr.PB06U404 556,722 8 Completed 10/25/2011
Caswell St. - R.B.Cullum Blvd. to Second Ave.PB06U406 15,698 7 Completed 6/1/2009
Cedar Crest Blvd. - Cadillac Dr. to Morrell Ave.PB06U407 38,800 7 Completed 5/11/2009
Chadbourne Rd. - Stanford Ave. to Caruth Blvd.PB06U408 207,909 14 Completed 10/14/2010
Chappel St. - Ft Worth Ave. to IH-30 Svc. Rd.PB06U409 32,290 6 Completed 7/20/2010
Chartwell Dr. - Pagemill Rd. to Plano Rd.PB06U410 470,955 10 Completed 10/7/2010
Cherry Laurel Ln. - Keenland Pkwy. To Sportsmans Pkwy.PB06U411 136,309 6 Completed 4/24/2013
Chireno St. - Bowman Blvd. to Walnut Hill Ln.PB06U412 182,128 6 Completed 8/20/2010
Clarendon Dr. (E) - Cliff St. to Corinth St.PB06U414 520,220 7 Completed 7/22/2008
Clarendon Dr. (W) - Zang Blvd. to Bishop Ave.PB06U413 92,300 1 Completed 7/28/2010
Monday, January 06, 2014 Page 20 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Clover Ln. - Marsh Ln. to Lakemont Dr.PB06U415 282,189 6, 13 Completed 10/2/2009
Cockrell Ave. - 1900 Lamar to 2700 LamarPB06U417 277,468 2, 7 Completed 7/28/2008
Coleshire Dr. - Greenspan Ave. to Highfall Dr.PB06U419 65,474 5 Completed 9/19/2011
Colorado Blvd. (W) - Beckley Ave. to Sylvan Ave.PB06U420 374,977 1 Completed 8/24/2009
Columbia Ave. - Beacon Ave. to Fulton St.PB06U421 41,990 14 Completed 7/26/2010
Congressman Ln. - Denton Dr. to Monroe Dr.PB06U422 102,232 6 Completed 7/21/2010
Corinth St. - Good Latimer Expy. To Bourbon St.PB06U423 45,436 2 Completed 7/16/2008
Corinth St. - Lamar St. to Gould St.PB06U424 55,519 2 Completed 7/3/2008
Country View Rd. - Ashcrest Ln. to Bluestem Rd.PB06U425 39,821 3 Completed 8/11/2010
Country View Rd. - Wheatland Rd. to Christie Ln. AlleyPB06U426 44,926 3 Completed 8/12/2010
Crawford St. (N & S) - Eighth St. to Twelfth St.PB06U427 163,877 1 Completed 6/8/2009
Crest Ridge Dr. - Wood Dale Dr. to Casa Oaks Dr.PB06U428 406,884 9 Completed 6/25/2010
Crowdus St. - Indiana St. to Canton St.PB06U429 128,651 2 Completed 9/15/2008
Crutcher St. - Washington Ave. to Haskell Ave.PB06U430 86,278 2 Completed 10/8/2008
Custer Dr. - Tacoma St. to Sunnyvale St.PB06U431 67,389 4 Completed 6/9/2009
Davila Dr. - Marsh Ln. to Lakemont Dr.PB06U432 293,932 6, 13 Completed 9/8/2009
Dawson St. - Good Latimer Expy. to Orleans St.PB06U434 131,969 2 Completed 7/7/2008
Delaware Ave. Bishop Ave. to Griffth Ave.PB06U435 110,655 1 Completed 4/24/2013
Delmar Ave. - Prospect Ave. to Llano Ave.PB06U436 209,951 14 Completed 7/23/2010
Denley Dr. (S) - McVey Ave. to Illinois Ave.PB06U437 208,547 4 Completed 6/26/2009
Denley Dr. (S) - Mentor Ave. to Kingsley Dr.PB06U438 208,803 5 Completed 10/7/2011
Monday, January 06, 2014 Page 21 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Dennis Rd. - Northaven Rd. to Forest Ln.PB06U439 208,930 6 Completed 10/2/2009
Denton Dr. - Hudnall St. to Denton Dr. Cut-OffPB06U440 166,174 2 Completed 7/29/2009
Denton Dr. - King Rd. to Minert St.PB06U441 107,082 2 Completed 1/11/2010
Denver St. (N) - Davis St. to Fifth St.PB06U442 230,245 1 Completed 5/28/2009
Dilido Rd. - John West Rd. to Senate St.PB06U443 198,465 7 Completed 6/25/2009
Directors Row - Cul-De-Sac to Profit Dr.PB06U444 283,466 6 Completed 6/18/2010
Dividend Dr. - Directors Row to John W. Carpenter Frwy.PB06U445 211,228 6 Completed 6/19/2010
Dunhaven Rd. - Marsh Ln. to Lakemont Dr.PB06U447 258,574 6, 13 Completed 9/23/2009
Durango Dr. - El Centro Dr. to Marsh Ln.PB06U449 141,797 6 Completed 8/31/2009
Eaton Dr. - Mixon Dr. to Wemdon Dr.PB06U450 117,547 6 Completed 10/15/2009
Edgecliff Dr. - Queenswood Ln. to Lynngrove Dr.PB06U451 45,819 10 Completed 9/22/2010
Edgefield Ave. (S) - Twelfth St. to Burlington Blvd.PB06U452 79,386 1 Completed 4/24/2013
Edgemere Road - Northwood Road to Northwest HighwaPB06P720 -00 13 Completed 4/24/2013
Edison St. - Hi Line Dr. to Stemmons Frwy.PB06U453 40,842 2 Completed 9/18/2008
Eighth St. (E) - Patton Ave. to RL Thornton Frwy.PB06U454 460,361 1 Completed 1/7/2011
El Centro Dr. - Webb Chapel Rd. to Manana Dr.PB06U455 416,074 6 Completed 10/16/2009
Elderberry Ct. - Elderberry Ln. to Cul-De-SacPB06U456 9,700 3 Completed 8/13/2010
Elderberry Ln. - Sugarberry Rd. to Wheatland Rd.PB06U457 99,551 3 Completed 8/13/2010
Electronic Ln. - Composite Dr. to Composite Dr.PB06U458 156,219 6 Completed 9/16/2009
Eleventh St. (E) - Cedar Crest Dr. to Eighth St.PB06U459 154,305 7 Completed 7/18/2009
Elsby Ave. - Lovers Ln. to Catawha Rd.PB06U460 87,171 14 Completed 6/9/2009
Monday, January 06, 2014 Page 22 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Emerald St. - Royal Ln. to LBJ Frwy.PB06U461 310,269 6 Completed 11/23/2009
Emily Rd. - Coit Rd. to Kit Ln.PB06U462 407,012 11 Completed 4/9/2011
Ewing Ave. (S) - Saner Ave. - Hobson Ave.PB06U463 39,565 4 Completed 5/21/2009
Fieldcrest Dr. - Spring Branch Dr. to Dartridge DrPB06U464 115,888 10 Completed 10/1/2010
Fifth St. (W) - Beckley Ave. to Elsbeth Ave.PB06U465 46,968 1 Completed 7/23/2009
Finnell St. - Lombardy Ln. to Rentzel St.PB06U466 197,571 6 Completed 7/22/2010
First Ave. - Exposition Ave. to Ash Ln.PB06U467 188,381 2, 7 Completed 5/9/2008
Five Mile Dr. - Yewpon Ave. to Frio Ln.PB06U469 222,586 4, 5 Completed 9/1/2010
Fleming Pl. - R.L. Thornton Frwy. to Jefferson Blvd.PB06U471 30,631 1 Completed 6/29/2009
Flora St. - Boll St. to Woodall Rodgers Frwy.PB06U472 43,139 14 Completed 5/27/2009
Florence St. - Cantegral St. to Liberty St.PB06U473 53,222 14 Completed 8/16/2008
Fontana Dr. - Larga Dr. to Marsh Ln.PB06U474 176,129 6 Completed 3/23/2010
Forest Park Rd. - Hawes Ave. to Empire Central Dr.PB06U475 102,104 2 Completed 5/7/2009
Forsythe Dr. - Loop 12 to Gayglen Dr.PB06U476 132,480 8 Completed 9/3/2010
Fort Worth Ave. - Edgefield Ave. to IH 30PB06U477 323,032 6 Completed 10/17/2011
Fouraker St. - Cedar Hill Ave. to N. Tyler St.PB06U478 135,415 1 Completed 7/27/2010
Foxwood Ln. - Pleasant Dr. to Oak Hill Cir.PB06U479 120,100 5 Completed 10/25/2010
Franklin St. (S) - Gladiolus Ln. to Cul-De-SacPB06U480 27,696 3 Completed 9/23/2011
Friendship Dr. - Rain Forest Dr. to Lake June Rd.PB06U481 38,544 8 Completed 2/7/2012
Furlong Dr. - Blue Grass Dr. to 145' N of Beau Purple Dr.PB06U482 98,658 6 Completed 7/20/2011
Gallagher St. - Chihuahua St. to Vilbig Rd.PB06U484 83,343 3, 6 Completed 7/15/2011
Monday, January 06, 2014 Page 23 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Gallagher St. - Westmoreland Rd. to Norwich St.PB06U483 230,627 3 Completed 9/19/2011
Garden Dr. - SM Wright Frwy. To Harwood St.PB06U486 42,373 7 Completed 7/28/2008
Gaspar Dr. - Larga Dr. to Lakemont Dr.PB06U487 284,870 6, 13 Completed 9/9/2009
Gentry Dr. - Canada Dr. to Bernal Dr.PB06U489 95,467 3 Completed 6/7/2011
Gladwood Ln. - Pinewood Dr. to Westfield Dr.PB06U490 150,093 10 Completed 4/29/2011
Glenfield Ave. - Tennessee Ave. to Westmoreland Rd.PB06U491 475,166 3 Completed 5/19/2009
Glover Pass - Scyene Rd. to Overlook Dr.PB06U492 240,200 7 Completed 3/8/2013
Goldmark Dr. - Midpark Rd. to Spring Valley Rd.PB06U493 313,587 11 Completed 4/16/2011
Good Latimer Expy. (S) - Canton St. to IH 30 BridgePB06U496 375,743 14 Completed 9/23/2008
Good Latimer Expy. (S) - Corinth St. to S. Central Expy.PB06U494 511,031 2, 7 Completed 12/30/2008
Greendale Dr. - Tonawanda Dr. to Bruton Rd.PB06U497 168,599 5 Completed 7/1/2011
Greenstone Dr. - Pinewood Dr. to Gladwood Ln.PB06U498 86,150 10 Completed 10/1/2010
Greenville Ave. - Winton St. to Mockingbird Ln.PB06U501 32,035 14 Completed 6/25/2010
Grissom Ln. - Royal Ln. to Forest Ln.PB06U502 559,530 6 Completed 11/13/2009
Gurley Ave. - Dead End to Stonewall St.PB06U503 70,707 2, 7 Completed 8/23/2010
Halifax St. - Iron Ridge St. to mockingbird Ln.PB06U505 377,274 6 Completed 7/23/2008
Hammerly Dr. - Bernal Dr. to Dead EndPB06U506 304,780 6 Completed 9/1/2011
Hampton Rd. (N) - Kraft St. to Trinity River BridgePB06U507 380,465 3 Completed 7/16/2009
Hampton Rd. (S) - Challenger Dr. to nMarvin D. Love Frwy.PB06U508 507,074 5 Completed 7/17/2009
Hampton Rd. (S) - Twelfth St. to Clarendon Dr.PB06U509 236,754 1 Completed 8/23/2010
Handley Dr. - Greenbriar Ln. to Stemmons Ave.PB06U510 60,241 3 Completed 10/30/2010
Monday, January 06, 2014 Page 24 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Hansboro Ave. - Pierce St. to Westmoreland Rd.PB06U511 182,894 3 Completed 5/19/2009
Happy Hollow Ln. - Bitter Creek Dr. to Cheyenne Rd.PB06U512 42,373 8 Completed 9/20/2012
Hargrove Dr. - Webb Chapel Ext. to Larga Dr.PB06U513 31,269 6 Completed 7/29/2010
Harlingen St. - Leath St. to Dead EndPB06U514 50,797 6 Completed 9/1/2011
Harrison Ave. - Logan St. to Coombs St.PB06U515 34,077 7 Completed 7/1/2008
Harwood St (S) - Concrete @ Coombs St. to Pennsylvania Ave.PB06U516 291,379 7 Completed 8/29/2008
Hawick Ln. - Marsh Ln. to Cul-De- SacPB06U517 52,328 6 Completed 10/15/2009
Hawick Ln. - Mixon Dr. to Wemdon Dr.PB06U518 227,054 6 Completed 3/4/2010
Hawkins St. (N) - Pacific Ave. to Live Oak St.PB06U519 83,598 14 Completed 7/25/2008
Heather Glen Dr. - Lake Placid Dr. to Marblehead Dr.PB06U520 153,411 5 Completed 9/21/2011
Herald St. - Lamar St. to Colonial Ave.PB06U521 58,582 7 Completed 7/28/2008
Hi Line Dr. - Edison St. to Oak Lawn Ave.PB06U522 211,866 2 Completed 10/11/2008
Hickory St. - Ervay St. to First Ave.PB06U523 627,940 2 Completed 9/30/2008
Hidalgo Dr. - Webb Chapel Rd. to Marsh Ln.PB06U524 323,414 6 Completed 8/27/2009
Hidden Valley Dr. - Carioca Dr. to Dead EndPB06U525 80,406 5, 8 Completed 4/24/2013
Highland Glen Tr. - Highland Heather to MeanderingPB06U527 33,822 12 Completed 6/28/2011
Highwood Dr. - San Marcus Ave. to Crest Ridge Dr.PB06U528 44,032 9 Completed 6/4/2010
Hillard Dr. - Traymore Ave. to Hillburn Dr.PB06U529 176,513 4, 5 Completed 7/17/2012
Holcomb Rd. - Tonawanda Dr. to Bruton Rd.PB06U531 143,584 5 Completed 9/3/2010
Holmes St. - Grand Ave. to Pine St.PB06U532 383,018 7 Completed 9/23/2008
Hyer St. - Lomo Alto Dr. to Dead EndPB06U533 72,877 14 Completed 8/13/2010
Monday, January 06, 2014 Page 25 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Idaho Ave. - Louisiana Ave. to Illinois Ave.PB06U534 96,999 4 Completed 5/7/2009
Indian Tr. - Royal Ln. to Denton Dr.PB06U535 378,933 6 Completed 10/27/2009
Insurance Ln. - Hester Ave. to Knox St.PB06U536 38,417 14 Completed 6/4/2009
Iowa Ave. (E) - Bruck St. to Corinth Street Rd.PB06U537 39,948 4 Completed 10/18/2011
Iron Ridge St. - Lakawana St. to Stemmons Fwy.PB06U538 187,233 6 Completed 9/3/2008
Iroquois Dr. - Dead End to Chippewa Dr.PB06U539 140,265 6 Completed 9/23/2011
Irving Blvd. Svc. Rd. (S) - Lakawana St. to Calvert St.PB06U540 300,441 6 Completed 4/28/2008
Jane Ln. - Mockingbird Ln. to Don Dr.PB06U541 108,868 6 Completed 6/14/2010
Jefferson Blvd. (W) - Hampton Rd. to City LimitsPB06U542 768,333 1 Completed 6/9/2011
Jerome St. - Beeman St. to Dolphin Rd.PB06U543 141,542 2 Completed 8/23/2010
Juniper Dr. - Seguin Dr. to Mixon Dr.PB06U544 112,953 13 Completed 9/21/2009
Kelly Blvd. - Frankford Rd. to Timber Oaks Dr.PB06U548 155,326 12 Completed 7/29/2011
Kelso Dr. - Beau Purple Dr. to 533 Kelso Dr.PB06U549 90,745 6 Completed 7/20/2011
Kessler Canyon Dr. - Kessler Pkwy. To Evergreen Hill Rd.PB06U550 65,474 3 Completed 6/18/2010
Kessler Pkwy. - Edgefield Ave. to Colorado Blvd.PB06U551 164,132 3 Completed 7/20/2010
Kessler Pkwy. - Evergreen Hill Rd. to Sylvan Ave.PB06U552 257,174 3 Completed 7/28/2008
Kidd Springs Dr. - Tyler St. to Sylvan Ave.PB06U553 25,398 1 Completed 8/20/2010
Kilburn Ave. - Corrigan Ave. to Haas Dr.PB06U554 284,998 5 Completed 7/16/2012
Kimballdale Dr. - Wenatchee Dr. to Oak Arbor Dr.PB06U555 52,455 3 Completed 9/23/2011
Kingsbury Dr. - Town North Dr. to Walling Ln.PB06U556 214,036 9 Completed 10/20/2010
Kingstree Dr. - Roundrock Dr. to D.E. @ Cul-de-SacPB06U557 66,368 12 Completed 4/24/2013
Monday, January 06, 2014 Page 26 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Kinkaid Cir. - Webb Chapel Rd. to Cul-De-SacPB06U558 10,849 6 Completed 10/19/2011
Kinmore St. - St Charles Ave. to Winfield Ave.PB06U559 114,612 2, 7 Completed 6/16/2009
Knight St. - Harry Hines Blvd. to Brown St.PB06U561 171,407 2 Completed 5/29/2009
Kristen Dr. - Cranfill Dr. to 294' east of CranfillPB06U563 25,526 5 Completed 9/1/2010
La Joya Dr. - Larga Dr. to Dunhaven Rd.PB06U564 408,416 6 Completed 9/29/2009
La Prada Dr. - Oates Dr. to Millmar Dr.PB06U565 355,322 7 Completed 8/10/2011
La Senda Pl. - Greenbrier Ln. to Shady Ln.PB06U566 17,230 3 Completed 7/28/2010
La Sobrina Dr. - Spring Creek Rd. to El Pastel Dr.PB06U567 63,177 12 Completed 5/3/2011
La Verdura Dr. - Alto Caro Dr. to El Pastel Dr.PB06U568 141,542 12 Completed 4/30/2011
Ladybird Ln. - Denton Dr. to Monroe Dr.PB06U569 120,355 6 Completed 7/21/2010
Lakawana St. - Quebec St. to Irving Blvd.PB06U570 137,330 6 Completed 5/22/2008
Lanarkshire Dr. - Lanarkshire Dr. to Lanshire Dr.PB06U571 44,415 10 Completed 8/16/2009
Larchfield Ln. - Lynbrook Dr. to Longmeadow Dr.PB06U573 49,138 10 Completed 9/28/2012
Larchwood Dr. - Plano Rd. to McCree Rd.PB06U574 144,350 10 Completed 8/17/2009
Larga Dr. - Hidalgo Dr. to Park Ln.PB06U575 152,263 6 Completed 8/20/2009
Lea Crest Dr. - Lancaster Rd. to Easter Ave.PB06U576 219,013 4 Completed 6/15/2009
Lear St. - S. Ervay St. to Park Ave.PB06U577 69,175 2 Completed 6/4/2008
Leigh Ann Dr. - Kirnwood Dr. to Wheatland Rd.PB06U578 346,133 8 Completed 11/19/2008
Lemmon Ave. - Inwood Rd. to Atwell St.PB06U579 122,014 2 Completed 2/9/2008
Library Ln. - Camp Wisdom Rd. to Dead EndPB06U580 63,304 5 Completed 9/2/2011
Linda Dr. - Larga Dr. to Marsh Ln.PB06U581 106,826 6 Completed 9/3/2009
Monday, January 06, 2014 Page 27 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Live Oak St. - Liberty St. to Peak St.PB06U582 836,998 2, 14 Completed 5/30/2008
Lively Ln. - Park Ln. to Lenel Pl.PB06U584 187,999 6 Completed 8/31/2009
Llewellyn Ave (S). - Obannon Dr. to Saner Ave.PB06U585 48,754 3 Completed 6/15/2009
Logan St. - Merlin St. to Myrtle St.PB06U587 45,181 7 Completed 7/1/2008
Longmont Dr. - Ferndale Rd. to McCree Rd.PB06U588 107,975 10 Completed 8/18/2009
Los Gatos Dr. - Kirnwood Dr. to Dead EndPB06U589 28,844 5 Completed 9/22/2011
Louise Ave. - S. Good Latimer Expy. to Malcom XPB06U590 128,651 2 Completed 7/28/2008
Lovedale Ave. - Harry Hines Blvd. to Mohawk Dr.PB06U591 184,042 2 Completed 7/28/2012
Madison Ave. (S) - Jefferson Blvd. to Clarendon Dr.PB06U592 234,073 1 Completed 7/30/2010
Main St. - Exposition Ave. to Commerce St.PB06U593 84,874 2 Completed 5/9/2008
Malcolm X Blvd. (S) - Elm St. to ConcretePB06U594 99,934 2 Completed 9/19/2008
Manana Dr. - Nekirk St. to Shady Tr.PB06U595 458,702 6 Completed 9/13/2010
Mary Cliff Rd. - Ranier St. to Kings Hwy.PB06U596 74,918 3 Completed 10/5/2011
Masters Dr. (S) - Grady Ln. to Cushing Dr.PB06U597 281,168 8 Completed 3/8/2013
McKee St. - Wall St. to Ervay St.PB06U598 174,343 2 Completed 6/20/2008
Mesita Dr. - Algonquin Dr. to Cul-de-sacPB06U599 58,072 5 Completed 9/28/2012
Metropolitan Ave. - Gertrude Ave. to Foreman St.PB06U600 167,451 7 Completed 6/10/2009
Mixon Dr - Northwest Hwy. to Van Ness Ln.PB06U601 384,804 6 Completed 11/13/2009
Modree Ave. - Underwood Dr. to C. L. Veasey Blvd.PB06U602 27,058 5 Completed 7/13/2012
Moffatt Ave. - Garrison St. to Aztec Dr.PB06U603 132,480 4 Completed 6/9/2009
Moffatt Ave. - Tacoma St. to Cul-de-sacPB06U604 218,503 4 Completed 8/12/2009
Monday, January 06, 2014 Page 28 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Monroe Dr. - Walnut Hill Ln. to Merrell Rd.PB06U605 431,645 6 Completed 11/13/2009
Monticello Ave. - Greenville Ave. to Alderson St.PB06U606 159,155 14 Completed 8/11/2010
Morris St. - Westmoreland Rd. to Furey St.PB06U607 65,601 3 Completed 9/22/2011
Munger Blvd. (N) - Bryan St. to Live Oak St.PB06U608 80,407 2 Completed 7/26/2010
Munger Blvd. (S) - East Side Ave. to Garland Ave.PB06U609 300,313 2 Completed 8/4/2009
Musgrave Dr. - Dead End to St. Augustine Rd.PB06U610 100,828 5 Completed 7/15/2011
Ninth St. (E) - Patton Ave. to Marsalis Ave.PB06U611 105,039 1 Completed 7/31/2009
Nomas St. - Furey St. to Esmalda Dr.PB06U612 113,207 3 Completed 11/7/2011
Norma St. - Diug Dr. to Jane Ln.PB06U613 124,567 6 Completed 5/3/2011
Northaven Rd. - Denton Dr. to Cromwell Dr.PB06U614 878,860 6, 13 Completed 10/3/2009
Oak Hill Cir. - Grovecrest Dr. to Holcomb Rd.PB06U616 213,653 5 Completed 4/16/2009
Odessa St. - Tumalo Tr. toDead EndPB06U617 386,591 6 Completed 7/8/2011
Overton Rd (E) - Idaho Ave. to Kushla Ave.PB06U618 138,096 4 Completed 6/8/2009
Owensons Dr. - Tyler St. to End of Circle DrivePB06U619 44,798 3 Completed 7/27/2010
Owenwood Ave. - Samuell Blvd. to Kinmore St.PB06U620 57,306 2, 7 Completed 6/19/2009
Page Ave. (W) - Zang Blvd. toMadison Ave.PB06U622 58,199 1 Completed 8/22/2012
Palacios Ave. - Gallagher St. to Homeland St.PB06U623 55,264 6 Completed 4/24/2013
Pauline St. - Crutcher St. to Simpson St.PB06U624 24,760 2 Completed 9/2/2008
Peabody Ave. - Malcom X Blvd. to Trunk Ave.PB06U625 30,248 7 Completed 6/12/2009
Peabody Ave. - SM Wright Frwy. to Dead EndPB06U626 125,588 7 Completed 8/27/2008
Peak St. (N) - Gaston Ave. to Live Oak St.PB06U627 159,155 2 Completed 7/3/2008
Monday, January 06, 2014 Page 29 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Pebble Valley Ln. - Dead End to Masters Dr.PB06U628 98,658 8 Completed 9/27/2011
Pemberton Dr. - Edgemere Road to Cul-De-SacPB06P719 -00 13 Completed 4/24/2013
Penguin Dr. - Rocky Ridge Rd. to Cul-De-SacPB06U629 38,800 5 Completed 7/21/2012
Penguin Dr. - Sumatra Dr. to Stratton Dr.PB06U630 131,969 5 Completed 4/24/2013
Perth St. - Harry Hines Blvd. to Cul-de-SacPB06U631 114,995 6 Completed 8/16/2011
Pickens St. - Gaston Ave. to Tokalon Dr.PB06U632 72,494 9 Completed 7/29/2009
Pinyon Tree Rd. - LBJ Frwy. To Dead EndPB06U633 47,478 11 Completed 9/15/2010
Plymouth Rd. (N) - Superior St. to Davis St.PB06U634 184,042 1 Completed 4/24/2013
Polk St. (S) - Camp Wisdom Rd. to Brogdon Ln.PB06U635 1,280,128 8 Completed 12/9/2011
Prather St. - Commerce St. to Jackson St.PB06U636 13,146 14 Completed 5/27/2009
Profit Dr. - Chancellor Row to Premier RowPB06U637 245,177 6 Completed 5/17/2011
Puget St. - Bayside St. to Angelina Dr.PB06U638 29,482 3 Completed 6/12/2009
Puget St. - Singleton Blvd. to Bickers St.PB06U639 304,525 3 Completed 6/12/2009
Purdue Ave. - Chadbourne Rd. to Devonshire Dr.PB06U640 121,248 14 Completed 8/20/2010
Rayville Dr. - Buckner Blvd. to Pleasant Dr.PB06U641 84,236 5 Completed 6/29/2009
Reading Ln. - Irving Blvd. to Quebec St.PB06U642 146,009 6 Completed 5/22/2008
Record Crossing Rd. - Stemmons Frwy. to Harry Hines Blvd.PB06U643 669,164 2 Completed 6/24/2009
Red Bird Ln. (E) - 160' W of Sunny Crest Ln. to Old Ox Rd.PB06U644 216,076 5 Completed 12/22/2011
Redfield St. - Lofland St. to Inwood Rd.PB06U645 249,389 2 Completed 5/20/2009
Rembrandt Ter. - Michaelanglo Dr. to Gainsboro Dr.PB06U646 166,557 12 Completed 9/19/2012
Richardson Branch Tr. - Club Meadows Dr. to Vista View Dr.PB06U647 75,302 10 Completed 10/1/2010
Monday, January 06, 2014 Page 30 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Riek Rd. - Ferguson Rd. to End of ConcretePB06U648 38,034 7 Completed 6/24/2010
Riverway Dr. - Riverway Bend Cir. To Bruton Rd.PB06U649 192,721 5 Completed 10/3/2011
Ross Ave. - Peak St. to Live Oak St.PB06U650 782,500 2, 14 Completed 7/27/2011
Royal Ln. - Emerald St. to Denton Dr.PB06U652 457,681 6 Completed 9/23/2009
Royal Ln. (WB) - Earlshire Dr. to Beauty Ln.PB06U653 333,497 13 Completed 9/9/2009
San Jacinto St. - Olive St. to N. Pearl St.PB06U654 16,847 14 Completed 5/30/2009
San Lucas Ave. - San Marcus Ave. to Materhorn Dr.PB06U655 59,986 9 Completed 6/4/2010
San Paula Ave. - Ferguson Rd. to Santa Garza Dr.PB06U656 295,336 9 Completed 6/18/2010
Sanden Dr. - Miller Rd. to Bekay St.PB06U657 205,101 10 Completed 10/15/2010
Sedalia St. - 51st St. to Dahlia Dr.PB06U659 72,366 5 Completed 4/24/2013
Senate St. - St Francis Ave. to Dilido Rd.PB06U660 241,731 7 Completed 6/18/2009
Sharp St. - Quebec St. to Halifax St.PB06U661 292,656 6 Completed 6/16/2008
Sheila Ln. - Northwest Hwy. to Timberline Dr.PB06U662 158,006 6 Completed 8/3/2010
Shiloh Rd. - Highwood Dr. to ferguson Rd.PB06U663 328,137 9 Completed 6/17/2010
Shorecrest Dr. - Harry Hines Blvd. to 445' W. of 3250 Shorecrest Dr.
PB06U664 758,250 2, 6 Completed 9/22/2010
Shorelark Dr. - Prairie Creek Rd. to Undercliff DrPB06U666 48,627 5 Completed 10/10/2011
Simpson Stuart Rd. - Bonnie View Rd. to Park Manor Dr.PB06U667 348,175 8 Completed 9/17/2008
Skillman St. - Adleta Ct. to Adleta Blvd.PB06U668 86,533 10 Completed 9/15/2010
Slocum St. - Hi Line Dr. to Stemmons FrwyPB06U669 299,803 2 Completed 12/3/2008
Sonnet Dr. - Jubilee Tr. To Dead EndPB06U670 146,519 13 Completed 8/31/2011
South Blvd. - Parnell St. to Ervay St.PB06U671 128,523 7 Completed 9/29/2008
Monday, January 06, 2014 Page 31 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Sovereign Row - Cul-De-Sac to Dividend Dr.PB06U672 286,657 6 Completed 5/17/2011
Spring Ave. - Hector St. to Hatcher St.PB06U673 336,816 7 Completed 6/15/2009
Spring Valley Rd. - Hillcrest Rd. to Coit Rd.PB06U674 553,786 11 Completed 4/24/2013
Springhaven Dr. - Gardenside Dr. to Amity Ln.PB06U675 67,006 5 Completed 2/19/2012
Spurlock St. - Beeman Ave. to Dolphin Rd.PB06U676 171,279 2 Completed 8/5/2009
St Augustine Dr. (N) - Grove Oaks Blvd. to Tamalpais Dr.PB06U679 521,751 8 Completed 7/9/2009
St Charles Ave. - Jerome St. to Samuell Blvd.PB06U677 79,258 2 Completed 6/18/2009
St Joseph St. - Gaston Ave. to Bryan St.PB06U678 287,168 14 Completed 6/10/2008
Stevens Wood Ln. - Oak Cliff Blvd. to Stevens Wood Ct.PB06U680 40,841 3 Completed 7/19/2010
Strickland St. - Denley Dr. to Fernwood Ave.PB06U681 70,835 4 Completed 10/13/2011
Sugarberry Rd. - Elderberry Ln. to Alley N of Christie Ln.PB06U682 23,994 3 Completed 8/13/2010
Sullivan Dr. - Wall St. to Ervay St.PB06U683 110,017 2 Completed 6/4/2008
Sumter Dr. - Timberline Dr. to Hargrove Dr.PB06U684 180,724 6 Completed 8/3/2010
Sunnyvale St. - Ledbetter Dr. to Fifty Second St.PB06U685 135,288 5 Completed 10/5/2011
Swiss Ave. - Apple St. to Carroll Ave.PB06U686 125,460 2, 14 Completed 8/1/2008
Sycamore St. - Peak St. to Fitzhugh Ave.PB06U688 248,367 2 Completed 1/10/2009
Tavaros Ave. - Garland Rd. to San Fernando WayPB06U689 39,821 9 Completed 6/22/2009
Taylor St. - Henry St. to Hall St.PB06U690 75,812 2 Completed 5/30/2008
Temple Dr. - Winnetka Ave. to Windomere Ave.PB06U691 48,116 3 Completed 6/23/2010
Tex Oak Ave. - Dead End to Butler St.PB06U692 129,800 2 Completed 5/20/2009
Thale Dr. - Aledo Dr. to Desdemona Dr.PB06U693 63,049 9 Completed 6/4/2010
Monday, January 06, 2014 Page 32 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Throckmorton St. - Maple Ave. to Holland Ave.PB06U694 431,006 2, 14 Completed 6/4/2009
Tillman St. - Prichard Ln. to N. Buckner Blvd.PB06U696 115,122 4 Completed 6/29/2009
Top Line Dr. - Blackgold Dr. to Irving Blvd.PB06U697 226,160 6 Completed 4/16/2011
Tower Tr. - Coral Hills Dr. to Modella Dr.PB06U698 133,500 13 Completed 9/15/2010
Townsend Dr. - Webb Chapel Rd. to Vinecrest Dr.PB06U699 541,789 13 Completed 1/27/2011
Transport Dr. - Black Gold Dr. to Irving Blvd.PB06U700 189,786 6 Completed 4/16/2011
Tumalo Tr. - Bernal Dr. to Cul-De-SacPB06U701 245,943 6 Completed 7/29/2011
Van Ness Ln. - Lenel Pl. to Dunhaven Rd.PB06U702 53,094 13 Completed 9/30/2009
Vesper St. - Bexar St. to Dead EndPB06U703 52,328 4 Completed 8/24/2010
Walton St. (N & S) - Elm St. to Taylor St.PB06U704 107,082 2 Completed 7/25/2008
Washington Ave (N & S) - Worth St. to East Side Ave.PB06U705 196,933 2 Completed 12/13/2008
Webb Chapel Rd. - Almazan Dr. to Walnut Hill Ln.PB06U706 1,036,252 6 Completed 4/24/2013
Webb St. - Central Expy. To Tracy St.PB06U707 49,903 14 Completed 6/4/2009
Wedgewood Ln. - Park Ln . to Cul-de-SacPB06U708 50,413 13 Completed 9/16/2010
Wichita St. - Industrial Blvd. to Slocum St.PB06U709 68,282 2 Completed 9/18/2008
Williamswood Dr. - Dickerson St.to Kirkham Dr.PB06U710 51,307 12 Completed 6/14/2011
Willow Crest Ln. - Boulder Dr. to Westmoreland Rd.PB06U711 64,580 3 Completed 4/24/2013
Willow St. - Exposition Ave. to Peak St.PB06U712 163,749 2 Completed 12/30/2008
Winding Creek Ct. - Davenport Rd. to Cul-de-SacPB06U713 288,189 12 Completed 8/2/2012
Winged Foot Ct. - Cromwell Dr. to Cul-de-SacPB06U714 80,535 13 Completed 9/24/2010
Winnetka Ave. (N) - Singleton Blvd. to Morris St.PB06U715 128,396 6 Completed 7/20/2010
Monday, January 06, 2014 Page 33 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Street Resurfacing
Winnetka Ave. (N) - Vecinos Blvd. to Canada Dr.PB06U716 15,316 6 Completed 7/20/2010
Woodmont Dr. - Loop 12 to Alcorn Ave.PB06U717 76,578 5 Completed 7/22/2011
Woodshore Dr. - Gladwood Ln. to Stults Rd.PB06U718 63,687 10 Completed 10/19/2010
Woodspan Dr. - Goldwood Dr. to Kirnwood Dr.PB06U719 114,484 8 Completed 10/30/2010
Worth St. - Washington Ave. to Haskell Ave.PB06U720 79,131 2 Completed 9/25/2008
Zang Blvd. (S) - Twelfth St. to Clarendon Dr.PB06U721 525,453 1 Completed 8/31/2010
Zodiac Ln. - Merrell Rd. to Dairy Milk Ln.PB06U722 90,745 6 Completed 10/23/2009
Zodiac Ln. - Virgo Ln. to Royal Ln.PB06U723 157,623 6 Completed 10/23/2009
Greenville Ave. - Bryan St. to Palo Pinto Ave.PB06U499 454,362 2, 14 Canceled/Reprogrammed
Arnold st. - S. Lamar St. to Austin St.PB06U363 17,996 2 Canceled
Doric St. - Abernathy Ave. to Cul-De-SacPB06U446 72,494 6 Canceled
Keeneland Pkwy. - Cavalcade Dr. to Merrifield Rd.PB06U545 116,270 3, 6 Canceled
Knoxville St. - Dead End to Old Spanish Tr.PB06U562 76,323 1 Canceled
Lancaster Rd. (S) - Morgan Dr. to LBJ Frwy.PB06U572 230,499 8 Canceled
Lofland St. - Harry Hines Blvd. to Redfield Dr.PB06U586 69,431 2 Canceled
Security Dr. - Conveyor Ln. to Conveyor Ln.PB06U658 100,572 6 Canceled
Cass St. - Motor St. to Dead EndPB06U405 97,382 2 Under Award - Construction NA 4/10/2013 4/15/2014
Keeneland Pkwy. - 670' E Walton Walker Frwy. To Walton Walker Frwy.
PB06U547 115,377 3 Under Award - Construction 12/31/1899 4/10/2013 4/30/2014
Category: Streetscape / Urban Design
Bishop Ave - Neely to ColoradoPB06U728 3,701,270 1 Completed 12/20/2012
Elm from Akard to ErvayPB06U734 1,727,630 CW Completed 6/25/2010
Monday, January 06, 2014 Page 34 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Streetscape / Urban Design
Greenville Ave - Belmont to RossPB06U737 818,705 14 Completed 10/30/2013
Houston School Rd @ LaurelandPB06U739 350,000 5 Completed 5/4/2010
Main Street from Market to GriffinPB06U743 1,816,971 CW Completed 11/16/2011
Manderville Lane from US 75 along the existing Manderville East/West to the existing Manderville Road running north and south
PB06U744 314,690 CW Completed 4/15/2010
Meadow from the Intersection of Meadow Road and Manderville Lane to US 75
PB06U745 800,000 CW Completed 2/16/2010
Meadow Road from the DART crossing to Rambler RoadPB06U746 699,999 CW Completed 1/28/2010
Museum of Nature and Science at Victory ParkPB06U747 1,000,007 CW Completed 11/8/2013
Rambler Rd. from the Intersection of Rambler Road and Walnut Hill Lane to Meadow Rd.
PB06U749 852,600 CW Completed 1/28/2010
Singleton Blvd. RevitalizationPB06U751 500,000 6 Completed 12/31/2010
Beckley Avenue - Tilden to Oakenwald StreetPB06U727 114,924 CW Canceled/Reprogrammed
Cantegral Street Streetscape (Cantegral by Citylights project)PB06U729 360,000 CW Canceled/Reprogrammed
Citylights Unnamed Street StreetscapePB06U731 400,000 CW Canceled/Reprogrammed
Commerce from Good-Latimer to HallPB06U733 1,743,681 CW Canceled/Reprogrammed
Good Latimer from Canton to ElmPB06U736 682,310 CW Canceled/Reprogrammed
Live Oak - Cantegral to Good LatimerPB06U740 290,000 CW Canceled/Reprogrammed
Live Oak - Cantegral to TexasPB06U741 125,000 CW Canceled/Reprogrammed
Main from Good-Latimer to HallPB06U742 1,705,775 CW Canceled/Reprogrammed
Pedestrian Way on Elm Street between Ervay and Stone StreetPB06U748 2,335,629 CW Canceled/Reprogrammed
Texas Street - Bryan to Live OakPB06U752 200,000 CW Canceled/Reprogrammed
Tilden Street - Beckley to Plowman AvePB06U753 72,716 CW Canceled/Reprogrammed
Monday, January 06, 2014 Page 35 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Streetscape / Urban Design
Twin Sixties Drive -US 75 Service Rd to WorcolaPB06U754 271,500 14 Canceled/Reprogrammed
Utility modifications (Cantegral by City Lights project)PB06U755 125,000 CW Canceled/Reprogrammed
Zang Avenue - Plowman Ave to Oakenwald StPB06U760 87,429 CW Canceled/Reprogrammed
Akard from Commerce to ElmPB06U724 960,000 CW Under Award - Construction 12/12/2007 9/22/2010 3/1/2014
Akard from Ross to Woodall RodgersPB06U725 2,326,677 CW Under Award - Construction 12/12/2007 9/22/2010 3/1/2014
Cedar Springs MedianPB06U730 3,840,000 CW Under Award - Construction 6/24/2009 11/7/2011 2/28/2014
Commerce from Akard to ErvayPB06U732 1,791,445 CW Under Award - Construction 9/25/2002 9/28/2011 4/30/2016
Elm from Good Latimer to HallPB06U735 1,781,587 CW Under Award - Construction 8/27/2008 10/24/2012 6/30/2014
Colorado Blvd - Beckley Area Sidewalk EnhancementPB06P791 -00 1, 3 Under Award - Design 6/12/2013 6/11/2014 7/30/2015
Griffin from IH30 to MainPB06U738 5,253,548 CW Under Award - Design 4/14/2010 2/26/2014 12/30/2015
Royal Lane @ Denton (S400)(ROW, Design & Construction managed by Dallas County)
PB06U750 499,999 CW Under Award - Design 07/02/2008 07/30/2015 12/30/2016
Walnut Hill @ Harry Hines (S400)(ROW, Design & Construction managed by Dallas County)
PB06U756 499,999 CW Under Award - Design 07/02/2008 07/30/2015 12/30/2016
Yale Blvd. - SMU to Greenville Avenue (P356)PB06U758 536,000 14 Under Award - Design 06/22/2011 06/25/2014 4/30/2015
Yale to Mockingbird Station (P356)PB06U759 230,800 14 Under Award - Design 06/22/2011 06/25/2014 4/30/2015
West End Plaza (Land Acquisition Only)PB06U757 4,467,050 CW In Progress NA NA NA
Alpha from Noel to Monfort (U201)PB06U726 1,999,999 11 On Hold TBD TBD TBD
Category: Target Neighborhood
Unamed Street from approximately 1500 feet south of existing Manderville East/West to the Roundabout, from the Roundabout to the existing Manderville Road, from the roundabout to US 75
PB06U767 972,641 CW Completed 3/26/2010
Phase IV streets surrounding the South Roundabout, including a South Roundabout Park
PB06U762 308,420 CW Canceled/Reprogrammed
Monday, January 06, 2014 Page 36 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Target Neighborhood
Phase V streets surrounding the North Roundabout, including a North Roundabout Park
PB06U763 283,581 CW Canceled/Reprogrammed
Unamed Street from the new DART crossing to the south Roundabout, from the south Roundabout to approximately 1500 feet south of existing Manderville East/West
PB06U768 701,962 CW Canceled/Reprogrammed
Unamed Street from the Unnamed Creek to the new DART crossing, includes demolition of a portion of the existing Treehouse Lane
PB06U769 499,999 CW Canceled/Reprogrammed
Unamed Street surrounding the Esplanade and the Roundabout, includes the Esplanade and the Roundabout Park
PB06U770 1,500,000 CW Canceled/Reprogrammed
Rio Grande Av from Blue Ridge Blvd to Kiest BlvdPB06U766 1,659,190 3 Canceled
Dickerson St - McCallum Blvd to Frankford RdPB06U761 4,709,547 12 Under Award - Construction 12/12/2007 9/26/2012 9/30/2014
Polk St (S) - Ferndale Av to Clarendon AvPB06U764 1,876,454 1 Under Award - Construction 8/26/2009 4/25/2012 7/22/2014
Polk St (S) - Wilbur St to Ferndale AvPB06U765 673,886 1 Under Award - Construction 8/26/2009 4/25/2012 7/22/2014
Category: Thoroughfares
Bachman Pedestrian Bridge(Conceptual & preliminary design only)
PB06U772 400,000 CW Completed 01/25/12
Bexar - Levee to MunicipalPB06U774 3,828,900 CW Completed 5/30/2013
Brockbank Dr - Lombardy Ln to 600' North of WheelockPB06U777 2,976,806 CW Completed 10/30/2013
Meadow from the DART crossing to the intersection of Meadow Road and Manderville Lane
PB06U792 250,000 CW Completed 1/28/2010
Routh - Ross to Woodall RodgersPB06U799 2,836,983 CW Completed 2/24/2010
Bonnie View -Langdon to Hutchins C.L.PB06U776 19,661,837 CW Canceled/Reprogrammed
Commerce Street - Levee to Hampton RoadPB06U782 2,000,000 CW Canceled/Reprogrammed
Deceleration lane on Good LatimerPB06U784 250,000 CW Canceled/Reprogrammed
Meadow Road to the Esplanade, Esplanade to the Unnamed Creek
PB06U793 499,999 CW Canceled/Reprogrammed
Monday, January 06, 2014 Page 37 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Thoroughfares
Oregon/Beckley connection to I-30 frontage RoadPB06U796 3,968,906 CW Canceled/Reprogrammed
Akard - Commerce to ElmPB06U771 280,000 CW Under Award - Construction 12/12/2007 9/22/2010 3/1/2014
Bexar - Brigham to MyrtlePB06U775 1,659,190 CW Under Award - Construction 12/12/2007 5/25/2011 6/30/2014
Cadiz St - Riverfront Boulevard to Union Pacific RailroadPB06U778 3,191,331 CW Under Award - Construction 6/11/2008 12/11/2013 8/30/2015
Central Boulevard - Commerce to Live OakPB06U779 12,619,900 CW Under Award - Construction 12/12/2007 9/28/2011 12/31/2014
Danieldale Rd - Old Hickory- Hampton- BeckleymeadePB06P757 -00 8 Under Award - Construction 1/0/1900 6/26/2013 8/27/2014
Federal -Akard to ErvayPB06U785 125,000 CW Under Award - Construction 12/12/2007 9/22/2010 12/29/2013
Field -Wood to ElmPB06U786 510,001 CW Under Award - Construction 12/12/2007 9/22/2010 12/29/2013
Goodnight - Joe Field to RoyalPB06U788 3,842,655 CW Under Award - Construction 6/10/2009 12/11/2013 12/31/2015
Houston -Young to ElmPB06U789 390,000 CW Under Award - Construction 12/12/2007 9/22/2010 3/29/2014
I-635 corridor (LBJ) - Approaches and Transitions from I35E to US 75 including I-35E. (R838)(Project is being managed/constructed by TxDOT)
PB06U790 10,000,001 CW Under Award - Construction 06/01/2010 06/01/2010 12/01/2015
Live Oak -Olive to Central BoulevardPB06U791 475,760 CW Under Award - Construction 12/12/2007 9/28/2011 12/31/2014
Patterson -Field to AkardPB06U797 109,999 CW Under Award - Construction 12/12/2007 9/22/2010 12/29/2013
Pearl -Commerce to Live OakPB06U798 4,336,191 CW Under Award - Construction 4/23/2008 9/28/2011 12/31/2014
Sylvan -I-30 WB frontage road to Fort Worth AvenuePB06U801 1,719,379 CW Under Award - Construction 12/13/2006 8/14/2013 6/30/2014
Telephone Road Phase IPB06P760 -00 8 Under Award - Construction 10/13/2010 12/12/2012 2/28/2014
Belleview from Akard to Ervay(Design & ROW only)
PB06U773 1,000,000 CW Under Award - Design 6/24/2009 NA NA
Chalk Hill - I 30 EB frontage road to SingletonPB06U780 6,630,449 CW Under Award - Design 1/23/2008 3/26/2014 12/31/2015
Chalk Hill Rd - Davis St to 800' south of IH-30PB06U781 9,183,365 CW Under Award - Design 1/23/2008 3/26/2014 12/30/2015
Continental - Industrial to IH 35EPB06U783 3,828,900 CW Under Award - Design 1/23/2008 3/26/2014 2/15/2016
Monday, January 06, 2014 Page 38 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 1: Street & Transportation ImprovementsCategory: Thoroughfares
Goodnight - Royal to North of HarcourtPB06U787 3,399,212 CW Under Award - Design 12/9/2009 6/11/2014 12/31/2016
Merrifield from the existing Merrifield Road to Grady Niblo - Design Only
PB06U794 1,945,000 CW Under Award - Design 08/11/2008 12/30/2014 3/30/2016
Motor Street from Harry Hines to Stemmons (U222)(Dallas County is administering the project)
PB06U795 2,647,550 CW Under Award - Design 08/30/2011 09/01/2015 12/31/2016
Routh St - Ross to San JacintoPB06U800 1,773,984 CW Under Award - Design 12/12/2007 2/26/2014 3/30/2015
Sylvan -West Commerce to SingletonPB06U802 2,552,600 CW Under Award - Design 2/27/2013 4/15/2014 6/1/2015
Telephone Road Phase IIPB06P767 -00 8 Under Award - Design 10/12/2010 2/27/2014 2/28/2015
Wheatland - Lancaster CL to Lancaster Rd @ PlazaPB06U803 5,295,618 CW Under Award - Design 4/9/2008 12/10/2014 5/16/2016
Category: Traffic Intersection Capacity & Safety Improvement
Left Turn Lane on Live OakPB06U804 175,000 14 Canceled/Reprogrammed
Signal modifications @ Live Oak/Good LatimerPB06U805 99,999 14 Canceled/Reprogrammed
Category: Traffic Sign Upgrades
Street Sign Pilot ProgramPB06U806 32,000 12 Completed 8/1/2009
Category: Traffic Signal Control Equipment Upgrades
Traffic Signal Control Equipment Upgrades - Citywide - Phase 1PB06U807 331,838 CW In Progress Various Various Various
Category: Traffic Signal Upgrades - Citywide
Campbell @ DavenportPB06U808 80,981 12 Completed 8/28/2010
Traffic signal @ Cantegral/TexasPB06U810 175,000 14 Canceled/Reprogrammed
Columbia @ FitzhughPB06U809 95,045 2 Remaining to-be-awarded 1/31/2013 3/30/2013 12/31/2013
Category: Warranted Signals and School Flashers
Warranted Signals and School Flashers - On-DemandPB06U811 3,560,877 CW In Progress various various various
$390,421,920Proposition 1: Street & Transportation Improvements
Monday, January 06, 2014 Page 39 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 2: Flood & Storm Drainage ImprovementsCategory: Erosion Control
6707 Cliffwood and 2617 BlackstonePB06P582 -00 3 Completed 08/31/12
Altadena @ AlleyPB03R690 -00 8 Completed 06/30/12
Ash Creek Trib 5B7 @ KiltartanPB06T451 140,393 9 Completed 12/31/09
Claremont 8022PB06T454 66,368 7 Completed 06/30/11
Clarksdale 2132 & 2126PB06T455 347,154 9 Completed 06/30/12
Cockrell Hill over Five Mile CreekPB06T457 165,919 3 Completed 06/30/11
Coolgreene 8220PB06T458 76,578 7 Completed 06/30/12
Cypress Hills Dr. 15012PB06T459 76,578 11 Completed 11/01/11
Deep Hill Circle 2631, 2635PB06T460 276,957 3 Completed 09/30/11
Deep Hill Circle 2647, 2651PB06T461 394,377 3 Completed 09/30/11
Deep Hill Circle 2695, 2699PB06T462 394,377 3 Completed 09/30/11
Dove Creek Way 4518PB06T463 102,104 3 Completed 10/31/13
Erosion Control Group 06-808PB06P723 -00 Completed 06/30/13
Five Mile Pkwy W. 2463PB06T464 134,012 3 Completed 04/08/09
Five Mile Pkwy W. 622PB06T465 191,445 4 Completed 10/26/09
Five Mile Pkwy W. 938PB06T466 306,312 4 Completed 10/26/09
Galway 9538, 9546, 9606, 9614, 9622PB06T467 903,620 9 Completed 11/04/09
Glen Oaks 906PB06T468 262,918 4 Completed 10/26/09
Glencliff Drive 1035PB06T469 268,023 5 Completed 08/05/10
Healey 2102 and 2103PB06T471 319,075 9 Completed 06/30/13
Holliday 3417PB06T472 107,209 4 Completed 10/31/13
Monday, January 06, 2014 Page 40 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 2: Flood & Storm Drainage ImprovementsCategory: Erosion Control
Holliday 3429PB06T473 107,209 4 Completed 10/31/13
Holliday 3509PB06T474 191,445 4 Completed 10/31/13
Holliday 3529PB06T475 91,894 4 Completed 10/31/13
Hunnicut 8165 & 8171PB06T476 102,104 7 Completed 06/30/12
Hunters View 5919PB06T477 182,511 4 Completed 10/26/09
Joes Creek @ Merrell RoadPB06T478 132,735 13 Completed 01/28/10
Justin over Arcadia CreekPB06T479 89,341 3 Completed 10/31/11
Los Alamitos 7740PB06T480 255,260 8 Completed 10/31/11
Matagorda 1404PB06T481 91,894 3 Completed 05/06/10
Millbrook Drive 2707PB06T482 229,734 3 Completed 05/06/10
Ripplewood 2804PB06T483 319,075 7 Completed 11/01/11
Ripplewood 2828 Erosion ControlPB06P675 -00 7 Completed 2/13/2008
Ripplewood 2832PB06T484 191,445 7 Completed 11/01/11
Rocky Branch @ Middle DownsPB06T485 214,418 10 Completed 11/01/11
Springwater 9203PB06T486 91,894 9 Completed 11/01/11
Summer Creek 6129PB06T487 127,630 13 Completed 12/01/11
Tranquilla Drive, 1231PB06T488 114,867 9 Completed 11/01/11
Walnut Hill Bridge @ Joes CreekPB06T489 76,578 6 Completed 12/31/09
Walnut Hill Bridge @ White Rock CreekPB06T491 331,838 13 Completed 12/31/09
Wheatland @ Woody Branch TribPB06T493 196,805 8 Completed 06/30/11
Williamson Rd. - Bridges @ McCommas BranchPB06T494 344,601 9 Completed 12/31/09
Monday, January 06, 2014 Page 41 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 2: Flood & Storm Drainage ImprovementsCategory: Erosion Control
Willowcrest Ln - 3423 to 3447PB06T495 704,518 3 Completed 04/30/10
Wixom Lane 881PB06T496 76,578 8 Completed 09/26/11
Beckley Club Branch @ 122 South ShorePB06T452 142,946 4 Canceled 01/23/08 12/08/10 06/30/11
Cavender 425PB06T453 102,104 1 Canceled
Clearbrook Ln. 10500 BlkPB06T456 99,551 9 Canceled
Hampton 3223 SouthPB06T470 153,156 3 Under Award - Construction 04/23/08 09/20/11 07/13/14
Category: Flood Management
Bachman Branch FPMS UpdatePB06T499 359,120 13 Completed 04/30/11
Dixon Branch Floodplain Management Plan UpdatePB06T503 250,000 9 Completed 04/30/09
Levee Drainage System - Pavaho SumpPB06T510 37,778,480 CW, 1, 6 Completed 11/30/12
Water Resources Development Act 2007PB06P508 -00 CW Completed
Levee Drainage System - Eagle Ford SumpPB06T508 2,424,970 CW, 6 Canceled/Reprogrammed
Levee Drainage System - Trinity-Portland SumpPB06T514 4,339,420 CW, 6 Canceled/Reprogrammed
Auto Trash Cleaners @ Pump StationsPB06T498 4,581,279 CW Under Award - Construction NA 06/13/12 NA
Elam Creek Channel - Seco to Umphress (Ph II)PB06T504 5,171,379 5 Under Award - Construction 10/31/09 10/26/11 12/31/13
Inland Port Area - Regional DetentionPB06T507 2,708,309 8 Under Award - Construction NA 12/11/13 05/31/15
Installation of Slurry Cut-Off WallsPB06T558 -00 CW Under Award - Construction
Installation of Slurry Cut-Off Walls; Dallas Floodway System Study
PB06P558 -00 CW Under Award - Construction 05/09/11 03/28/12 06/30/13
Levee Drainage System - Hampton-Oak Lawn SumpPB06T509 48,116,510 CW, 2, 6 Under Award - Construction 06/13/07 06/27/12 12/31/14
Ricketts Branch - Detention BasinPB06T516 3,956,530 3, 8 Under Award - Construction 10/22/08 03/28/12 09/30/14
Ash Creek - S Fork - Bridges @ LakelandPB06T497 4,309,482 9 Under Award - Design 05/13/09 01/22/14 02/28/15
Monday, January 06, 2014 Page 42 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 2: Flood & Storm Drainage ImprovementsCategory: Flood Management
Elmwood Branch Bridge @ FranklinPB06T505 373,489 1 Under Award - Design 06/10/09 01/08/14 02/28/16
Levee Drainage System - Pressure SewersPB06T512 14,720,921 CW, 1, 6 Under Award - Design 06/13/07 04/22/15 04/30/19
Levee Drainage System - Sump APB06T513 56,157,200 CW, 1, 2, 6 Under Award - Design 11/10/08 02/15/14 09/30/17
McCree Branch - White Rock Trail BridgePB06T515 1,192,290 10 Under Award - Design 06/10/09 01/08/15 12/31/15
Glen Oaks 326PB06T506 193,998 4 On Hold TBD TBD TBD
Category: Storm Drainage
Indian Ridge 7209PB06T519 255,260 8 Completed 06/30/13
Kiest Meadow Dr. 3900PB06T520 143,649 3 Completed 06/30/13
Kleberg Road 11700 blkPB06T521 255,260 8 Completed 08/31/13
Phase I Public Storm Drainage ImprovementsPB06T528 729,737 CW, 13 Completed 01/27/10
Phase II Public Storm Drainage ImprovementsPB06T529 148,307 CW, 13 Completed 06/30/10
Phase III Public Storm Drainage ImprovementsPB06T530 128,733 CW, 13 Completed 01/30/10
Phase IV Public Storm Drainage ImprovementsPB06T531 259,485 CW, 13 Completed 01/30/10
Phase V Public Storm Drainage ImprovementsPB06T532 701,444 CW, 13 Completed 06/29/10
State-Thomas @ Woodall Rodgers (Study)PB06T537 191,445 CW,2,6,14 Completed 06/13/07
Turtle Creek Effluence Capture Pilot SystemPB06T539 700,000 14 Completed 10/30/09
Van Buren (N), 824PB06T540 57,460 1 Completed 03/30/09
Northwest Highway (W) at Tulane (Eng, ROW, Util), (aka Royal Orleans Flood Gates)
PB06T526 900,000 13 Under Award - Construction 08/12/09 03/28/12 10/31/13
Rush Creek - Relief/Diversion SystemPB06T533 8,615,025 9 Under Award - Construction 09/26/07 06/22/11 01/31/14
State-Thomas - Antique District (Fairmount & Routh)PB06T534 1,084,855 14 Under Award - Construction 09/26/07 08/28/13 12/31/14
State-Thomas - McKinney Ave.PB06T535 3,931,004 14 Under Award - Construction 09/26/07 08/26/13 12/31/14
Monday, January 06, 2014 Page 43 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 2: Flood & Storm Drainage ImprovementsCategory: Storm Drainage
Ash Creek Estates @ Meadow WayPB06T517 416,583 7 Under Award - Design 09/09/09 03/27/14 05/31/15
Mercedes Ave 5500 blk @ WorcolaPB06T522 102,104 14 Under Award - Design 03/01/09 04/11/15 04/30/19
Middle Peaks Branch - Phase 1 - to Fair ParkPB06T523 22,340,355 CW, 2, 7 Under Award - Design 06/13/07 04/11/15 04/30/19
Middle Peaks Branch - Phase 2 - Fair Park to HaskellPB06T524 12,566,450 CW, 2, 7 Under Award - Design 06/13/07 04/11/15 04/30/19
Mill Creek Drainage Relief System - Phase IPB06T525 57,688,760 CW, 2, 7 Under Award - Design 06/13/07 04/11/15 04/30/19
Peavy @ Galway - FullerPB06T527 204,208 9 Under Award - Design 09/09/09 12/18/13 01/31/15
State-Thomas @ Woodall RodgersPB06T536 11,741,960 CW,2,6,14 Under Award - Design 06/13/07 04/15/15 04/30/19
Sylvan Avenue, 1667PB06T538 252,963 1 Under Award - Design 09/09/09 05/31/14
Trinity River Chain of LakesPB06N963 -00 CW Under Award - Design
West Dallas - Eagle Ford Sump BasinPB06T541 2,398,945 6 Under Award - Design 01/25/12 04/19/14 04/30/15
West Dallas - Westmoreland Hampton Sump BasinPB06T542 6,464,223 6 Under Award - Design 10/14/09 01/22/14 04/30/15
Yewpon - Kingsley AreaPB06T543 2,011,091 4 Under Award - Design 08/12/09 06/09/14 07/31/15
Zang to Illinois Drainage Relief SystemPB06T544 4,000,001 1 Under Award - Design 06/24/09 06/09/14 07/31/15
Conrad 216 - 221PB06T518 94,809 4 On Hold TBD TBD TBD
$334,313,043Proposition 2: Flood & Storm Drainage Improvements
Proposition 3: Park and Recreation FacilitiesAquatic Facilities
Kidd Springs ParkPK06T194 35,000 1 Completed 2/15/2013
Pleasant Oaks ParkPK06T258 185,000 5 Completed 5/15/2008
Tommie M. Allen ParkPK06T299 225,000 8 Canceled/Reprogrammed
Code Compliance, Safety and Security
Monday, January 06, 2014 Page 44 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesCode Compliance, Safety and Security
Arlington ParkPK06T006 65,901 2 Completed 4/14/2009
Beckley Saner ParkPK06T280 -00 4 Completed 12/30/2008
Bonnie View ParkPK06T280 -00 4 Completed 6/28/2009
Cedar Crest Land AcquisitionPK06T046 -00 4 Completed 7/16/2013
Cherrywood ParkPK06T039 -00 2 Completed 9/20/2010
Crown ParkPK06T046 1,000,000 6 Completed 3/1/2010
Deerpath ParkPK06T280 -00 4 Completed 12/29/2008
Gateway ParkPK06T280 -00 4 Completed 3/6/2009
Glendale ParkPK06T280 -00 3,4 Completed 5/28/2009
Harry Stone ParkPK06T278 -00 9 Completed 3/19/2013
Herndon ParkPK06T280 -00 4 Completed 8/22/2008
Kidd Springs ParkPK06T279 -00 1 Completed 3/26/2009
Lake Cliff ParkPK06T279 -00 1 Completed 7/31/2009
Lizzie Oliver ParkPK06T280 -00 4 Completed 6/4/2009
Martin Weiss ParkPK06T279 -00 1 Completed 3/25/2009
Mattie Nash - Myrtle Davis Recreation CenterPK06T046 -00 6 Completed 6/1/2010
Moss ParkPK06T279 -00 1 Completed 5/29/2009
NorthBark (Katie Jackson) ParkPK06T046 -00 12 Completed 5/1/2012
Oak Cliff Founders ParkPK06T279 -00 1 Completed 12/27/2007
Renner ParkPK06T280 -00 4 Completed 8/28/2008
Rochester ParkPK06T280 -00 4 Completed 3/27/2009
Monday, January 06, 2014 Page 45 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesCode Compliance, Safety and Security
Ruthmeade ParkPK06T279 -00 1 Completed 1/20/2009
Samuell Grand Recreation CenterPK06T278 -00 2 Completed 6/17/2013
Scotland ParkPK06T280 -00 4 Completed 6/16/2009
South Central ParkPK06T280 -00 4 Completed 6/9/2009
Tama ParkPK06T280 -00 4 Completed 7/25/2008
Umphress ParkPK06T280 -00 5 Completed 3/10/2009
Urbandale ParkPK06T280 -00 5 Completed 5/13/2008
Beckley Saner ParkPK06T278 -00 4 Under Award - Construction 4/16/2009 12/19/2011 2/28/2014
Pleasant Oaks Recreation CenterPK06T278 -00 5 Under Award - Construction 2/28/2014 5/31/2014
Tommie M. Allen ParkPK06T297 -00 8 Remaining to-be-awarded 7/31/2014 12/31/2014
White Rock LakePK06T330 -00 9,10 Remaining to-be-awarded 5/19/2011 6/30/2014 2/28/2015
Elm Fork Gun RangePK06T046 -00 6 On Hold 11/3/2011 3/9/2012 12/31/2013
Community Parks
Beckley Saner ParkPKP532 -00 4 Completed 5/25/2013
Cole ParkPK06T048 -00 14 Completed 6/22/2010
Wagging Tail ParkPK03K192 250,000 11 Completed 12/11/2009
Westhaven ParkPK06T279 -00 1 Completed 7/8/2011
Lake Highlands TrailPK03K205 94,110 10 Under Award - Construction 7/15/2007 12/9/2013 6/30/2014
Contract Management
Program ManagementPK06P466 -00 CW Completed 3/16/2013
Dallas Arboretum
Monday, January 06, 2014 Page 46 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesDallas Arboretum
Dallas ArboretumPK06T005 8,000,000 9 Completed 11/7/2013
Winfrey PointPK06T005 -00 9 Completed 11/7/2013
Dallas ArboretumPK06T060 -00 9 Canceled
Dallas Zoo
Dallas ZooPKSW4 -00 4 Completed 10/31/2012
Dallas Zoo Gorilla Holding BuildingPK06T065 2,500,000 4 Completed 7/27/2009
Dallas Zoo Bird and Reptile BuildingPK06T062 3,000,000 4 Canceled
Dallas Zoo Support Services ComplexPK06T068 2,000,000 4 Canceled
Dallas Zoo Zebra and WoodlandsPK06T069 3,500,000 4 Canceled
Dallas Zoo African Savanna / ElephantPK06T064 10,000,000 4 Canceled/Reprogrammed
Dallas Zoo African Savanna / StormwaterPK06T067 4,000,000 4 Canceled/Reprogrammed
Dallas Zoo African SavannaPK06T061 -00 4 Under Award - Construction 11/21/2008 11/21/2008 3/31/2014
Dallas Zoo Bird and Reptile BuildingPK06T066 -00 4 Remaining to-be-awarded 6/30/2013 9/30/2014 12/31/2014
Downtown Parks
Belo GardenPKBelo 6,500,000 CW Completed 5/10/2012
Klyde Warren Park (formerly Woodall Rodgers Plaza)PK06T342 20,000,000 14 Completed 10/27/2012
Main Street GardenPK03K004 7,500,000 14 Completed 11/13/2009
Pacific PlazaPK03A004 9,000,000 14 Completed 6/29/2010
Environmental Conservation
Beckley Heights ParkPK06T083 -00 3 Completed 8/10/2011
Lake Cliff ParkPK06T083 -00 1 Completed 7/31/2009
Monday, January 06, 2014 Page 47 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesEnvironmental Conservation
Luna Vista Golf Course (formerly LB Houston Golf Course)PK06T083 -00 6 Completed 6/1/2012
Simonds LakePK06T083 -00 CW Completed 4/26/2012
Stevens Golf CoursePK06T083 -00 3 Completed 8/9/2012
Fair Park
Fair Park Cotton BowlPKCotton 30,000,000 7 Completed 9/15/2008
Fair Park EsplanadePK06T097 13,800,000 7 Completed 9/29/2009
Fair Park Esplanade Sculpture Re-creationPK5989B -00 7 Completed 8/30/2007
Fair Park Grand Ave and ML King Jr BlvdPK03P418 -00 7 Completed 9/15/2008
Fair Park Interpretation ProgramPKPA08 -00 7 Completed 3/28/2012
Fair Park Observation TowerPK06Observ -00 7 Completed 11/6/2008
Fair Park Pan Am BuildingPKP579 -00 7 Completed 9/7/2012
Fair Park Parry Avenue GatePK06T120 3,500,000 7 Completed 9/29/2009
Fair Park Texas Discovery GardenPKDISCOV 3,000,000 7 Completed 11/16/2009
Fair Park Texas Discovery GardenPK06T123 -00 7 Completed 11/11/2011
Fair Park Conference CenterPK06T092 2,000,000 7 Canceled
Fair Park Embarcadero BuildingPK06T096 1,200,000 7 Canceled
Fair Park SignagePK06T121 1,500,000 7 Canceled
Fair Park Texas Music CenterPK06T124 500,000 7 Canceled
Fair Park-Site Lighting and FurnishingPK06T122 1,500,000 7 Canceled
Fair Park-Utilities, Infrastructure and Site ImprovementPK06T126 2,000,000 7 Canceled
Fair ParkPK06T099 600,000 7 Canceled/Reprogrammed
Monday, January 06, 2014 Page 48 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesFair Park
Fair Park Age of SteamPK06T091 2,750,000 7 Canceled/Reprogrammed
Fair Park Court of HonorPK06T095 2,000,000 7 Canceled/Reprogrammed
Fair Park Pan American BuildingPK06T119 4,500,000 7 Canceled/Reprogrammed
Fair Park Tower BuildingPK06T125 3,200,000 7 Canceled/Reprogrammed
Fair Park Cotton BowlPKPAP350 -00 7 Under Award - Design 6/20/2012 1/2/2013 9/23/2013
Fair Park Livestock Building and Sales ArenaPK06T098 6,000,000 7 Under Award - Design 3/16/2012 6/30/2014 9/30/2015
Historic Restoration
Stevens ParkPK03K266 200,000 3 Completed 12/13/2012
Sharrock - Niblo ParkPKGRADY 400,000 3 Under Award - Design 1/17/2007 4/30/2014 12/31/2014
Land Acquisition
Joey Georgusis Park (aka Pinnacle Park)PK95PINN 3,500,000 3,6 Completed 9/17/2012
Land Acquisition - Loop 12PK06T220 4,000,000 CW Completed 7/15/2008
Land acquisition (District 12)PK06T214 1,500,000 12 Completed 5/29/2009
Elm Fork Soccer ComplexPK03K005 3,000,000 6 Under Award - Design 7/14/2008 6/30/2014
Chalk Hill TrailPK06T038 3,000,000 3 Remaining to-be-awarded 2/28/2014
Reunion GatewayPK06T352 1,200,000 5 On Hold
Linear / Linkage Areas
Dixon BranchPK06T333 170,592 9 Completed 10/30/2009
Trinity River Standing WavePK06T046 -00 2,7 Completed 4/29/2011
Major Maintenance
East Regional OfficePK06T072 30,000 cw Completed 10/12/2009
Monday, January 06, 2014 Page 49 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesMajor Maintenance
Exline Recreation CenterPK06T087 484,837 7 Completed 5/10/2010
Fretz Recreation CenterPK06T142 1,352,185 11 Completed 3/5/2012
Fruitdale Recreation CenterPK06T146 300,000 4 Completed 6/8/2011
Grover C. Keeton Golf Course Club HousePK06T159 35,000 4,7 Completed 7/8/2010
Jaycee Zaragoza ParkPK06T179 2,191,298 6 Completed 5/15/2012
Kidd Springs Recreation CenterPK06T194 2,600,826 1 Completed 6/4/2012
Kleberg Rylie ParkPK06T202 1,617,220 Completed 12/1/2010
Light Pole InspectionPK06T010 -00 CW Completed 6/29/2013
Luna Vista Golf Course Club House (formerly LB Houston Golf Course)
PK06T218 70,000 6 Completed 10/26/2012
Martin Luther King Jr. Recreation CenterPK06T221 600,000 7 Completed 2/28/2009
Mildred L. Dunn Recreation CenterPK06T232 200,000 7 Completed 9/30/2011
Reverchon Recreation CenterPK06T354 493,010 2 Completed 5/30/2010
Samuell Grand AmphitheatherPK06T010 -00 2 Completed 3/27/2007
Samuell Grand Recreation CenterPK06T270 2,400,000 2 Completed 6/17/2013
Umphress Recreation CenterPK06T307 40,000 4 Completed 11/10/2009
Willie B. Johnson Recreation CenterPK06T336 990,340 10 Completed 6/4/2012
Fair Oaks ParkPK06T090 -00 13 Canceled/Reprogrammed
Anita Martinez Recreation CenterPK06T001 1,900,000 6 Under Award - Construction 4/15/2009 11/4/2013 5/31/2014
Beckley Saner ParkPK06T021 2,684,000 4 Under Award - Construction 3/25/2009 8/24/2011 2/28/2014
Cummings ParkPK06T058 2,150,000 4 Under Award - Construction 5/29/2009 12/14/2011 3/31/2014
Elm Fork Soccer ComplexPK06T010 1,000,000 6 Under Award - Construction 7/14/2008 8/16/2011 9/1/2013
Monday, January 06, 2014 Page 50 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesMajor Maintenance
Eloise Lundy Recreation CenterPK06T079 934,000 4 Under Award - Construction 10/24/2012 7/15/2013 3/31/2014
Martin Weiss Recreation CenterPK06T227 553,000 1 Under Award - Construction 8/15/2011 7/15/2013 3/31/2014
Tommie M. Allen Recreation CenterPK06T300 555,000 8 Under Award - Construction 10/24/2012 7/15/2013 3/31/2014
Walnut Hill Recreation CenterPK06T317 2,748,650 13 Under Award - Construction 8/16/2010 10/31/2012 1/2/2014
Arlington Recreation CenterPK06T007 1,217,595 2 Under Award - Design 4/11/2012 3/31/2014 9/30/2014
Bachman Recreation CenterPK06T013 1,969,105 6 Under Award - Design 6/6/2013 11/30/2014 6/30/2015
Janie C Turner Recreation CenterPK06T177 285,000 5 Under Award - Design 4/11/2012 3/31/2014 9/30/2014
Marcus Recreation CenterPK06T223 553,259 13 Under Award - Design 4/11/2012 3/31/2014 9/30/2014
Singing Hills Recreation CenterPK06T281 1,359,995 3 Under Award - Design 6/26/2013 8/31/2015 8/31/2016
Fireside Recreation CenterPK06T129 334,118 8 Remaining to-be-awarded 1/31/2014 6/30/2014
John C. Phelps Recreation CenterPK06T183 200,000 7 Remaining to-be-awarded 1/31/2014 6/30/2014
Major Recreation Facilities
LB Houston Golf CoursePK03P527 -00 6 Completed 5/15/2009
Luna Vista Golf Course (formerly LB Houston Golf Course)PKP685 393,541 6 Completed 10/26/2012
Major Recreational Facilities-Outdoor
Samuell Garland ParkPK06T268 500,000 9 Completed 4/6/2010
Samuell Grand Tennis CenterPK06T273 1,000,000 7 Completed 6/29/2012
Stevens Golf CoursePK06T286 3,000,000 4 Completed 11/4/2011
Tenison Glen Golf CoursePK06T290 2,500,000 CW Completed 8/23/2010
Elm Fork Gun RangePK06T073 500,000 6 Canceled/Reprogrammed
Joey Georgisus ParkPK06T257 4,000,000 3,6 Canceled/Reprogrammed
Monday, January 06, 2014 Page 51 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesMajor Recreational Facilities-Outdoor
Elm Fork Soccer ComplexPK06T075 11,200,000 6 Under Award - Construction 7/14/2008 8/16/2011 12/31/2013
Texas Horse ParkPK06T291 14,000,000 5 Under Award - Construction 12/12/2007 7/18/2013 9/30/2014
West Dallas GatewayPK06T322 1,800,000 CW Under Award - Construction 8/30/2011 5/22/2013 4/30/2014
Grover C. Keeton Golf CoursePK06T190 1,000,000 4,7 Under Award - Design 3/23/2009 3/31/2014
Metropolitan Parks
White Rock Lake West LawtherPK03K295 -00 9 Completed 10/29/2008
Neighborhood Park Facilities
J.W. Ray ParkPKP047 -00 14 Completed 12/15/2005
Preston Green ParkPK03K246 -00 12 Completed 10/25/2007
Rose Haggar ParkPK06T046 -00 12 Completed 2/7/2012
Partnership Match Funding
Griggs ParkPK06T238 -00 14 Completed 12/31/2013
Playgrounds
Apache ParkPK06T003 170,592 5 Completed 4/23/2012
Churchill ParkPK06T042 136,473 11 Completed 5/30/2007
Cochran ParkPK06T045 63,423 14 Completed 2/8/2012
Crown ParkPK06T057 170,592 6 Completed 3/1/2010
Everglade ParkPK06T085 80,775 7 Completed 10/20/2010
Friendship ParkPK06T144 170,592 10 Completed 8/30/2013
Fruitdale ParkPK06T145 170,592 5 Completed 7/15/2013
Glendale Park (District 4)PK06T153 170,592 4 Completed 12/21/2011
Monday, January 06, 2014 Page 52 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesPlaygrounds
Glendale Park (District 4)PK06T153 -00 4 Completed 12/21/2011
Glendale Park (District 5)PK06T154 170,592 5 Completed 12/21/2011
J.J. Lemmon ParkPK06T173 103,904 8 Completed 7/15/2013
J.W. Ray ParkPK06T174 45,000 14 Completed 10/30/2009
John C. Phelps ParkPK06T182 170,592 4 Completed 2/8/2012
Kiest ParkPK06T196 276,654 3 Completed 11/29/2011
Kiest Park / Fantasy LandingPK06P367 170,592 3 Completed 11/19/2009
Lake HighlandsPK06T210 170,592 9 Completed 4/23/2012
Lake Highlands North ParkPKP726 -00 10 Completed 11/15/2013
Lawnview ParkPK06T217 170,592 7 Completed 1/31/2011
Lochwood ParkPK06T219 165,085 9 Completed 5/15/2012
Miller Family ParkPK06T233 170,592 8 Completed 7/29/2009
Moore ParkPK06T234 170,592 4 Completed 2/8/2012
Opportunity ParkPK06T243 89,888 7 Completed 7/8/2010
Peavy-Van Dyke ParkPK06T250 170,592 9 Completed 3/29/2010
Pemberton Hill ParkPK06T252 119,197 8 Completed 10/22/2010
Preston Hollow ParkPK06T347 143,507 13 Completed 9/15/2009
Ricketts Branch ParkPK06T259 170,592 3,8 Completed 7/15/2013
Samuell Grand ParkPK06T272 170,592 2 Completed 5/29/2011
Sand Springs ParkPK06T274 170,592 7 Completed 4/23/2012
Scotland ParkPK06T276 170,592 4 Completed 12/21/2011
Monday, January 06, 2014 Page 53 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesPlaygrounds
Seaton ParkPK06T277 170,592 4 Completed 7/31/2013
Sugarberry ParkPK06T288 170,592 3 Completed 11/29/2011
Thurgood Marshall ParkPK06T292 170,592 3 Completed 9/15/2009
Walford ParkPK06T315 170,592 2 Completed 7/6/2011
Wheatley ParkPK06T326 170,592 7 Completed 7/8/2010
Wonderview ParkPK06T341 170,592 4 Completed 2/8/2012
Woodland Springs ParkPK06T343 120,592 8 Completed 3/18/2011
Indian Ridge ParkPK06T171 170,592 8 Canceled
Crockett ParkPK06T056 170,592 2 Canceled/Reprogrammed
Five Mile GreenbeltPK06T134 170,592 3,8 Canceled/Reprogrammed
Frankford ParkPK06T138 170,592 12 Canceled/Reprogrammed
Katie Jackson ParkPK06T185 102,355 12 Canceled/Reprogrammed
Salado ParkPK06T267 170,592 12 Canceled/Reprogrammed
White Rock Lake Nautical AreaPK06T334 170,592 CW Canceled/Reprogrammed
Willoughby ParkPK06T340 170,592 8 Canceled/Reprogrammed
Holcomb ParkPK06T169 170,592 5 Under Award - Construction 5/28/2009 5/10/2012 1/31/2014
J.P. Hawn ParkPK06T172 170,592 7 Under Award - Construction 5/28/2009 5/10/2012 1/31/2014
Cedar Run ParkPK06T037 80,000 7 Under Award - Design 1/18/2012 3/31/2014 5/15/2014
Recreation and Site Development
Westhaven ParkPK06T323 713,690 3 Completed 5/15/2010
Westmoreland ParkPK06T325 274,465 1 Completed 9/3/2012
Monday, January 06, 2014 Page 54 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesRecreation and Site Development
Gannon ParkPK06T147 68,237 1 Canceled/Reprogrammed
North Arcadia ParkPK06T239 286,594 6 Canceled/Reprogrammed
Recreation Facilities and Site Development
Alta Mesa ParkPK06T000 178,620 8 Completed 9/29/2008
Bachman LakePK06T012 275,883 6 Completed 12/31/2014
Bachman LakePK06T012 1,963,026 6 Completed 10/27/2011
Bachman LakePK06T012 -00 6 Completed 8/23/2013
Bahama Beach Water ParkPK06T249 -00 5 Completed 9/9/2011
Benito Juarez Parque De HeroesPK06T026 514,384 6 Completed 10/15/2009
Beverly Hills ParkPK06T028 118,609 1 Completed 12/21/2011
Butler Nelson CemeteryPK06T031 35,000 7 Completed 1/15/2012
Campbell Green Recreation CenterPK06T032 900,000 12 Completed 10/25/2012
Casa Linda ParkPK06T034 274,465 9 Completed 10/8/2013
Cedar Crest Golf CoursePK06T249 -00 4 Completed 10/31/2013
Cedar Crest Golf Course ClubhousePK069363 -00 4 Completed 6/30/2006
Cherrywood ParkPK06T321 196,719 2 Completed 4/4/2013
Churchill ParkPK06T043 2,903,963 11 Completed 4/15/2012
Cole ParkPK03K136 260,775 14 Completed 6/22/2010
College ParkPK03K137 15,000 8 Completed 3/27/2013
Cotillion ParkPK03K140 388,960 9 Completed 10/17/2011
Crawford Memorial ParkPK06T055 1,600,000 5 Completed 2/27/2012
Monday, January 06, 2014 Page 55 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesRecreation Facilities and Site Development
Elmwood ParkwayPK06T078 820,942 1 Completed 6/1/2012
Emerald Lake ParkPK06T082 372,112 3 Completed 3/21/2012
Exall ParkPKP779 -00 14 Completed 3/15/2013
Exall ParkPK06T086 -00 14 Completed 5/13/2011
Exall ParkPK06T086 -00 14 Completed 12/19/2011
Exall ParkPK06T086 220,860 14 Completed 7/1/2010
Ferris PlazaPKP627 -00 2 Completed 2/1/2011
Fireside ParkPK06T127 357,065 8 Completed 12/15/2011
Forest ParkPK06T135 10,000 7 Completed 11/15/2009
Fox Hollow ParkPK06T136 342,429 3 Completed 6/28/2012
Fretz ParkPK06T141.1 364,650 11 Completed 9/21/2011
Fretz ParkPK06T140 300,934 11 Completed 3/1/2012
Fretz ParkPK06T140 -00 11 Completed 3/29/2012
Glencoe ParkPK06T344 472,352 14 Completed 9/27/2013
Glencove ParkPK06T240 100,000 13 Completed 10/3/2008
Grauwyler ParkPK06T157 101,000 2 Completed 12/17/2009
Greiner ParkPKP755 -00 1 Completed 1/18/2013
Harry Stone ParkPK06T164 1,913,886 9 Completed 3/19/2013
Jaycee Zaragoza ParkPK06T178 400,000 6 Completed 11/27/2009
Juanita J. Craft Recreation CenterPKP384 -00 7 Completed 5/26/2010
K.B. Polk ParkPK06T184 488,155 2 Completed 6/30/2013
Monday, January 06, 2014 Page 56 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesRecreation Facilities and Site Development
Kidd Springs ParkPK06T194 -00 1 Completed 6/1/2012
Kiest ParkPK06T197 -00 3 Completed 9/13/2011
Kiest ParkPKP528 106,459 3 Completed 3/29/2010
Kiest ParkPK06T197 600,000 3 Completed 2/25/2009
Lake Cliff ParkPK06T206 272,000 1 Completed 4/24/2012
Lake Cliff ParkPK03K201 446,534 1 Completed 7/31/2009
Lake Highlands North ParkPKP660 -00 10 Completed 9/29/2011
Lake Highlands North Recreation CenterPK06T209 800,000 10 Completed 4/1/2011
Lakewood ParkPK06T213 610,000 9 Completed 3/28/2011
Martin Weiss ParkPK03K217 49,130 1 Completed 6/5/2008
Mattie Nash - Myrtle Davis ParkPK06T236 -00 6 Completed 6/1/2010
Mattie Nash - Myrtle Davis Recreation CenterPK03K226 4,270,578 6 Completed 6/1/2010
Meadowstone ParkPK06T230 84,000 8 Completed 5/16/2008
Meadowstone ParkPKP766 -00 8 Completed 9/1/2013
NorthBark (Katie Jackson) ParkPK06T186 450,000 12 Completed 5/1/2012
Oak Cliff Founders ParkPK06T242 370,000 1 Completed 5/15/2011
Park in the Woods ParkPK06T247 91,162 3 Completed 2/24/2010
Pecan Grove ParkPK03K240 100,000 3 Completed 7/10/2009
Pike ParkPK06T253 400,000 2 Completed 5/15/2013
Program ManagementPK06P551 -00 CW Completed 3/16/2013
Randall ParkPK06T350 677,619 14 Completed 4/29/2011
Monday, January 06, 2014 Page 57 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesRecreation Facilities and Site Development
Recreation Master PlanPK06T351 500,000 CW Completed 5/19/2009
Ridgewood ParkPK06T260 971,682 9 Completed 2/17/2012
Rochester (West) ParkPK06T262 70,625 7 Completed 7/12/2011
Rose Haggar ParkPK03K256 620,592 12 Completed 8/27/2009
Royal ParkPK06T265 724,200 13 Completed 10/14/2011
Security Lights - District 1PK06T279 400,000 1 Completed 5/29/2009
Security Lights - District 4PK06T280 1,400,000 4 Completed 6/9/2009
Swiss Avenue MediansPK03K270 100,000 14 Completed 8/24/2012
Tietze ParkPK06T294 352,536 14 Completed 2/16/2012
Tommie M. Allen ParkPK06T298 517,565 8 Completed 6/15/2012
Trinity River Standing WavePK98N966 1,000,000 2,7 Completed 9/21/2012
Turtle Creek ParkwayPK06T305 1,012,372 14 Completed 1/7/2012
Valley View ParkPK03A284 -00 11 Completed 3/1/2010
Valley View ParkPK03K284 653,321 11 Completed 10/14/2008
Webb Chapel ParkPK06T320 388,960 13 Completed 5/19/2012
White Rock Valley ParkPKP659 -00 10 Completed 8/18/2011
Willie Mae Butler ParkPK06T339 672,435 7 Completed 5/25/2013
Hulcy ParkPK06T170 303,875 8 Canceled
Preston Green ParkPK06T346 274,465 12 Canceled
Arapaho ParkPK06T004 384,135 11 Canceled/Reprogrammed
Casa View ParkPK06T035 154,893 9 Canceled/Reprogrammed
Monday, January 06, 2014 Page 58 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesRecreation Facilities and Site Development
Dealey Montessori SchoolPK06T070 594,884 11 Canceled/Reprogrammed
Kingsbridge ParkPK06T200 455,592 3 Canceled/Reprogrammed
Pike ParkPK06T254 207,750 2 Canceled/Reprogrammed
Preston Ridge TrailPK06T348 400,000 12 Canceled/Reprogrammed
Continental Pedestrian BridgePK06T051 2,000,000 Under Award - Construction 5/22/2013 7/31/2014
Griggs ParkPK06T158 300,000 14 Under Award - Construction 1/12/2011 3/17/2013 2/28/2014
Hillcrest ParkPK06T168 -00 11 Under Award - Construction 3/19/2010 11/15/2013 11/30/2014
Kidd Springs ParkPK06T194 -00 1 Under Award - Construction 3/31/2013 7/31/2014
Kidd Springs ParkPK06T235 397,291 1 Under Award - Construction 5/13/2010 7/11/2013 2/28/2014
Kiest ParkPK06T198 -00 4 Under Award - Construction 12/5/2011 6/12/2013 1/31/2014
McCree ParkPK06T011 352,197 10 Under Award - Construction 5/13/2010 9/26/2013 5/31/2014
Reverchon ParkPK03K251 600,000 2 Under Award - Construction 7/14/2006 3/30/2011 1/31/2014
Samuell Grand Tennis CenterPK06T249 -00 2 Under Award - Construction 9/15/2009 9/28/2011 3/31/2014
Stevens Park Golf CoursePK06T249 -00 3 Under Award - Construction 9/15/2009 9/28/2011 6/30/2014
Tenison Golf CoursePK06T249 -00 2,9 Under Award - Construction 9/15/2009 9/28/2011 6/30/2014
Valley View Park (West)PK06T312 -00 11 Under Award - Construction 3/19/2010 11/15/2013 11/30/2014
Elm Fork Soccer ComplexPK06T075PA -00 6 Under Award - Design 5/24/2012 6/15/2013 6/30/2014
Exposition PlazaPK06T089 234,000 2 Under Award - Design 10/15/2012 8/23/2010 1/31/2014
Freedman's Memorial CemeteryPK06T139 133,705 14 Under Award - Design 7/8/2010 5/31/2014 11/30/2014
Kiest ParkPK06T198 2,000,000 4 Under Award - Design 5/20/2011 2/28/2014 10/31/2014
Kiestwood TrailPKP743 -00 3,8 Under Award - Design 7/15/2013 7/31/2014 1/31/2015
Monday, January 06, 2014 Page 59 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesRecreation Facilities and Site Development
Luna Vista Golf CoursePKP761 -00 6 Under Award - Design 3/28/2013 12/31/2014 6/30/2014
Muchert CenterPKP762 -00 CW Under Award - Design 8/29/2011 10/31/2014 6/30/2015
Park in the Woods ParkPK06T245 300,000 3 Under Award - Design 3/18/2010 1/31/2014 7/31/2014
Pleasant Oaks Recreation CenterPK06T345 1,650,000 5 Under Award - Design 5/13/2009 2/28/2014 5/31/2014
Robert E. Lee ParkPK06T261 358,768 14 Under Award - Design 1/27/2011 6/30/2014 10/31/2014
Sargent ParkPK06T275 500,000 4 Under Award - Design 11/14/2012 5/31/2014 11/30/2014
South Central/Joppa Gateway (District 4)PK06T283 600,000 7 Under Award - Design 12/14/2011 10/31/2013 4/30/2014
South Central/Joppa Gateway (District 5)PK06T284 600,000 7 Under Award - Design 12/14/2011 10/31/2013 4/30/2014
Timberglen ParkPK06T295 1,686,565 12 Under Award - Design 2/17/2011 2/15/2014 11/30/2014
White Rock Lake East LawtherPK06T331 2,000,000 CW Under Award - Design 5/19/2011 6/30/2014 2/28/2015
White Rock Lake Mockingbird PointPK06T332 1,000,000 CW Under Award - Design 5/19/2011 1/31/2014 11/30/2014
District 2 Service CenterPKP764 -00 Remaining to-be-awarded 3/31/2014 3/31/2015 12/31/2015
District 3 Service CenterPKP765 -00 Remaining to-be-awarded 3/31/2014 3/31/2015 12/31/2015
District 6 Service CenterPKP763 -00 Remaining to-be-awarded 12/31/2013 3/31/2015 6/1/2014
District 6 Service CenterPKP763 -00 Remaining to-be-awarded 6/1/2014
Ferguson Road Development (White Rock Hills)PK03K209 5,000,000 9 Remaining to-be-awarded 6/30/2014
Fretz ParkPK06T141.0 -00 11 Remaining to-be-awarded 5/31/2014 7/31/2015
Hamilton ParkPK06T161 893,100 10 Remaining to-be-awarded 4/8/2010 5/31/2014 8/31/2014
K.B. Polk ParkPK06T184 -00 2 Remaining to-be-awarded 1/31/2014 4/30/2015 11/30/2015
Lakeland Hills ParkPK06T212 525,831 7 Remaining to-be-awarded 4/21/2010 4/30/2014 9/30/2014
Crawford Memorial ParkPK06T055 -00 5 On Hold 6/30/2015 6/30/2016
Monday, January 06, 2014 Page 60 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesRecreation Facilities and Site Development
Garrett ParkPK06T148 799,500 2 On Hold 5/9/2012 8/31/2013
Ignacio Zaragoza/Buckner ParkPK98N723 60,775 2 On Hold 6/30/2001
Katy TrailPK06T187 460,000 14 On Hold
Main Street GardenPKP722 -00 14 On Hold
Roof Replacement
Exline Recreation CenterPK06T087 200,000 7 Completed 12/29/2010
Pike Recreation CenterPK06T255 320,000 2 Completed 12/29/2010
Dallas Zoo Blue BuildingPKP735 -00 4 Canceled/Reprogrammed
Kiest Recreation CenterPK06T199 280,000 1 Under Award - Construction 10/24/2012 7/15/2013 3/31/2014
Special Use Areas
Dealey PlazaPK06T238 -00 2 Completed 1/27/2012
Fair Park AquariumPK03K006 -00 7 Completed 9/29/2010
Fair Park ColiseumPK03A006 -00 7 Completed 9/22/2010
Fair Park ColiseumPKP612 -00 7 Completed 9/22/2010
Zoo Wilds of Africa - Phase IPKP8906 -00 4 Completed 2/1/1991
Dealey PlazaPKP657 -00 2 Under Award - Construction 2/1/2012 11/6/2012 1/31/2014
Trail Development
Belleview/McKee Trail Connection to TrinityPK06T024 2,000,000 2 Completed 6/26/2012
Bernal TrailPK06T027 150,000 6 Completed 12/30/2007
Cedar Crest TrailPK06T036 200,000 4 Completed 1/7/2012
Coombs Creek TrailPK06T052 450,000 3 Completed 9/29/2010
Monday, January 06, 2014 Page 61 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesTrail Development
Cottonwood TrailPK06T054 250,000 10,11 Completed 5/29/2011
East Dallas VelowayPK06T313 1,084,855 2,7 Completed 6/25/2009
Katy TrailPK06T355 175,000 14 Completed 10/29/2009
North Dallas VelowayPK06T071 65,000 9,10 Completed 8/16/2012
Northaven Trail (Valley Dale Drive to Preston)PK06T241 1,300,000 11 Completed 5/27/2012
Trinity-Strand / Katy Trail ConnectionPKConnect 250,000 2 Completed 8/8/2011
White Rock Creek GreenbeltPK03K293 400,000 11 Completed 6/25/2009
White Rock Creek TrailPK06T327 -00 10,11,13 Completed 5/15/2013
White Rock Creek TrailPK06T327 940,000 10,11,13 Completed 5/15/2013
Elm Fork TrailPK06T077 200,000 6 Canceled/Reprogrammed
Runyon Creek GreenbeltPK06T266 200,000 8 Canceled/Reprogrammed
East Dallas VelowayPK06T314 1,084,855 2,7 Under Award - Construction
Old Trinity TrailPK03K234 1,500,000 2 Under Award - Construction 9/23/2005 11/20/2012 2/28/2014
Trinity StrandPKStrand 1,000,000 CW Under Award - Construction 11/20/2012 11/20/2012 2/28/2014
White Rock Creek TrailPK06T309 1,772,943 11 Under Award - Construction 3/19/2010 11/15/2013 11/30/2014
White Rock Trail ExtensionPK06T335 150,000 11 Under Award - Construction 3/19/2010 11/15/2013 11/30/2014
Five Mile Creek TrailPK06T133 2,300,000 3,8 Under Award - Design 10/29/2010 2/28/2014
Five Mile Creek TrailPK06T133 -00 3,8 Under Award - Design 10/29/2010 2/28/2014
Trinity Strand Trail ConnectionPKP632 -00 6 Under Award - Design 12/4/2010 3/31/2014
Timberglen TrailPK06T296 150,000 12 Remaining to-be-awarded 12/31/2015
Turtle Creek TrailPK06T306 300,000 14 Remaining to-be-awarded 6/30/2014 1/31/2015
Monday, January 06, 2014 Page 62 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 3: Park and Recreation FacilitiesTrail Development
Katy TrailPK06T189 20,000 2 On Hold
$329,517,903Proposition 3: Park and Recreation Facilities
Proposition 4: Library FacilitiesCategory: Library Facilities
Forest Green Branch Library - Site AcquistionPB06T635 3,088,646 CW Completed 1/1/2011
HighLand Hills Branch Library - Site AcquisitionPB06T637 350,983 CW Completed 9/1/2011
North Oak Cliff - Site AcquisitionPB06T639 510,520 CW Completed 4/1/2011
Polk-Wisdom Branch Library (Construction)PB06T642 3,934,521 CW Completed 4/13/2013
Polk-Wisdom Branch Library (Design Only)PB06T641 505,913 CW Completed 04/13/2013
Preston Royal Branch Library - Site AcquisitionPB06T643 5,000,000 CW Completed 3/1/2011
Vickery Meadow Branch Library - Site Acq.PB06T645 5,615,720 CW Completed 1/1/2009
White Rock Branch LibraryPB06T646 8,035,998 CW Completed 6/1/2012
Renner-Frankford Library Light PolePB06T644 12,700 CW Canceled
Highland Hills Branch LibraryPB06T638 600,000 CW Under Award - Construction 8/12/2009 8/14/2013 8/30/2014
Fretz Park Branch LibraryPB06T636 6,058,762 CW Under Award - Design 10/26/2010 12/14/2012
Park Forest - Site AcquisitionPB06T640 5,003,607 CW Under Award - Design 2/23/2011 N/A N/A
Category: Major Maintenance
Audelia Library- Boiler ReplacementPB06T647 200,000 CW Completed 10/1/2012
Forest Green Branch Library - Replace HVACPB06T649 181,280 CW Completed 11/21/2013
Highland Hills Library - Replace HVACPB06T650 197,625 CW Completed 5/1/2010
Kleberg-Rylie Library - New Fire Alarm/Security SystemPB06T651 41,631 CW Completed
Monday, January 06, 2014 Page 63 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 4: Library FacilitiesCategory: Major Maintenance
Lakewood Library - Replace HVACPB06T652 459,144 CW Completed 5/1/2011
Preston Royal Library - Replace HVACPB06T655 258,570 CW Completed 12/11/2013
Renner-Frankford Library - Electrical/HVACPB06T656 87,500 CW Completed 8/15/2013
Walnut Hill Branch Library - Replace HVACPB06T657 235,000 CW Canceled
Central Library - Main fire panelPB06T648 177,800 CW Under Award - Construction NA 11/1/2010 3/1/2014
Park Forest Branch Library - Electrical and HVAC ImprovementPB06T654 337,560 CW Under Award - Construction NA 2/11/2013 2/28/2014
North Oak Cliff Branch Library - Replace HVAC(Design In-house)
PB06T653 152,400 CW Remaining to-be-awarded NA 07/15/2014
Category: Renovation
Central Library - Renovate floors 2 & 6PB06T659 1,687,500 CW Completed 8/12/2012
Central Library - Downtown BranchPB06T658 2,200,000 CW Under Award - Construction 4/22/2009 9/28/2011 2/1/2014
Category: Roof replacement
Highland Hills Library - Roof ReplacementPB06T660 214,630 CW Completed 3/1/2011
Lakewood Library - Roof ReplacementPB06T661 130,000 CW Completed 6/1/2009
Preston Royal Library - Roof ReplacementPB06T664 353,004 CW Completed 3/1/2011
Skyline Library - Roof ReplacementPB06T665 84,240 CW Completed 3/1/2011
North Oak Cliff LIbrary - Roof ReplacementPB06T662 284,480 CW Under Award - Construction 10/24/2012 6/26/2013 2/28/2014
Park Forest Library - Roof ReplacementPB06T663 201,240 CW Under Award - Construction 10/24/2012 6/26/2013 2/28/2014
$46,200,974Proposition 4: Library Facilities
Proposition 5: Cultural Facilities
Energy Management - MeyersonPB06P599 -00 CW Completed
Monday, January 06, 2014 Page 64 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 5: Cultural Facilities
Meyerson - Exterior EnvelopePB06P489 -00 CW Completed
Women's Museum - Water infiltrationPB06P484 -00 CW Completed
Category: Cultural Arts Facilities
City Performance HallPB06T696 38,235,104 CW Under Award - Construction Jun-04 Apr-09 5/1/2012
Latino Cultural Center - Phase II - Priority 1 - Black Box TheaterPB06T698 2,807,860 CW Remaining to-be-awarded NA 10/01/2014 09/16/2015
Latino Cultural Center - Phase II - DesignPB06T697 957,225 CW On Hold TBD TBD TBD
Category: Major Maintenance
African American Museum - Exterior DoorPB06P492 -00 CW Completed
African American Museum @ Fair Park - Repair water infiltration
PB06T699 520,000 CW Completed 9/12/2007
African American Museum @ Fair Park - Replace HVACPB06T700 1,100,000 CW Completed 9/12/2007
Dallas Heritage Village (Old City Park) - Security and fire alarm system
PB06T701 225,000 CW Completed 4/30/2010
Dallas Theater Center - BoilerPB06P697 -00 CW Completed
Hall of State @ Fair Park - Renovate building/repair damage/chillers
PB06T707 7,485,000 CW Completed 9/24/2009
Latino Cultural Center Repairs (EBS)PB06P815 -00 CW Completed 9/18/2013
Majestic Theater Center - Replace boilerPB06T708 800,000 CW Under Award - Construction Jun-09 Aug-10 1/1/2012
Dallas Museum of Art - Design Fire alarm systemPB06T702 400,000 CW Under Award - Design Jan-11 Sep-11 12/1/2012
Dallas Museum of Art - Repair paving@Sculpture GardenPB06T703 2,000,000 CW Under Award - Design Aug-10 Dec-11 10/1/2012
Dallas Museum of Natural History @ Fair Park - Replace HVAC(Design In-house)
PB06T704 450,000 CW Remaining to-be-awarded NA 08/01/2014 02/28/2015
Dallas Museum of Natural History @ Fair Park - WaterproofingPB06T705 1,500,000 CW Remaining to-be-awarded 04/01/2014 01/15/2015 02/28/2016
Dallas Theater Center - Replace HVACPB06T706 900,000 CW Remaining to-be-awarded 04/01/2014 01/15/2015 02/28/2016
Monday, January 06, 2014 Page 65 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 5: Cultural FacilitiesCategory: Master Plan
Dallas Theater Center - Master PlanPB06T709 340,000 CW Completed
Category: Renovation
Dallas Heritage Village - RenovationPB06T710 100,000 CW Under Award - Construction 10/24/12 06/26/13 02/28/2014
Morton H. Meyerson Symphony Center - Extend existing stagePB06T711 1,400,000 CW Remaining to-be-awarded TBD TBD TBD
Category: Roof Replacement
African American Museum @ Fair Park - Roof ReplacementPB06T712 360,000 CW Completed 6/1/2009
South Dallas Cultural Center - Roof ReplacementPB06P365 223,000 CW Completed 6/1/2009
Majestic Theater Center - Roof ReplacementPB06T714 454,000 CW Under Award - Construction Jun-09 Aug-10 1/1/2012
Dallas Museum of Natural History @ Fair Park - Roof Replacement
PB06T713 200,000 CW Remaining to-be-awarded 04/01/2014 01/01/15 02/28/2016
Category: Study
Asian American Cultural CenterPB06T716 350,000 CW Completed 6/1/2011
Dallas Theater Center - Catwalk and Grid Study at Kalita Humphrey
PB06T717 50,000 CW Completed 7/15/2008
$60,857,189Proposition 5: Cultural Facilities
Proposition 6: City FacilitiesCategory: City Facilities
McCommas Heavy/Welding Shop - ImprovementsPB06T739 1,079,183 CW Completed 2/1/2012
McCommas Landfill Office - ImprovementsPB06T740 750,000 CW Completed 2/1/2012
Northeast Code Compliance - RenovationPB06T741 1,200,000 CW Completed 11/10/2012
Northwest Transfer Station - Install scalePB06T742 54,940 CW Completed 6/1/2012
Southeast Service Center - Design and ConstructionPB06T743 10,000,000 CW Under Award - Design 3/1/2012 TBD TBD
City Hall - Install automatic fire alarm (Project managed by EBS)
PB06T738 1,900,000 CW Remaining to-be-awarded TBD TBD TBD
Monday, January 06, 2014 Page 66 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 6: City FacilitiesCategory: Land Acquisition
Forest/Audelia/LBJ area community and multi-service facilityPB06T744 3,949,945 CW On Hold TBD TBD TBD
Category: Major Maintenance
McCommas Heavy/Welding Shop - RepairPB06T750 412,052 CW Completed 2/1/2012
McCommas Landfill Office - Entrance ImprovementsPB06T751 294,986 CW Completed 2/1/2012
McCommas Landfill Office - UpgradesPB06T752 425,000 CW Completed 2/1/2012
Northeast Transfer Station - RepairsPB06T754 58,865 CW Completed 8/1/2011
Northwest Transfer Station - RepairsPB06T755 626,580 CW Completed 6/1/2012
Southwest Transfer Station - RepairsPB06T758 58,865 CW Completed 8/1/2011
West Dallas Multi-Purpose - Replace HVACPB06T759 274,701 CW Completed 6/1/2012
Central Service Center - Convert to chilled water systemPB06T745 1,180,000 CW Canceled/Reprogrammed
Central Service Center - ParkingPB06T746 400,000 CW Canceled/Reprogrammed
City Hall - Expansion joint renovationPB06T748 1,200,000 CW Completed/Reprogrammed 12/1/2010
City Hall - Electrical system renovationsPB06T747 5,300,000 CW Remaining to-be-awarded 09/01/2014 05/01/2015 03/01/2016
City Hall - Tank replacementPB06T749 1,000,000 CW Remaining to-be-awarded 09/01/2014 05/01/2015 03/01/2016
North Central Service Center - ImprovementsPB06T753 750,429 CW Remaining to-be-awarded 09/01/2014 05/01/2015 03/01/2016
Oak Cliff Municipal Center - Replace air handler(Design In-house)
PB06T756 221,000 CW Remaining to-be-awarded NA 03/01/2014 09/01/2014
Category: Master Plan
City-Wide Multi Purpose Center - Master PlanPB06T760 450,000 CW Canceled/Reprogrammed
Category: Roof Replacement
Building Inspection - 542 E Jefferson - Roof ReplacementPB06T761 70,000 CW Completed 3/11/2012
Central Sanitation Collection - Roof ReplacementPB06T762 50,000 CW Completed 8/1/2009
Monday, January 06, 2014 Page 67 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 6: City FacilitiesCategory: Roof Replacement
Central Service Center - 3112 Canton - Roof ReplacementBP06T763 150,000 CW Completed 8/1/2009
Central Service Center - Communications Building- Roof Replacement
BP06T764 349,720 CW Completed 8/1/2009
Central Service Center - Fleet Maintenance - Roof ReplacementBP06T765 338,000 CW Completed 8/1/2009
Central Service Center - PBW Field Operations - Roof Replacement
BP06T766 125,000 CW Completed 8/1/2009
Southwest Sanitation - Roof ReplacementBP06T769 80,000 CW Completed 8/1/2010
Old City Hall - 2014 Main - Roof RepairsBP06T757 380,000 CW Canceled/Reprogrammed
People Helping People - Roof ReplacementBP06T768 100,330 CW Canceled
McCommas Heavy/Welding Shop - Roof ReplacementBP06T767 327,025 CW Under Award - Construction 10/24/2012 6/26/2013 2/28/2014
Southwest Service Center - Fleet Maintenance - Roof Replacement
BP06T770 365,880 CW Under Award - Construction 10/24/2012 6/26/2013 2/28/2014
Category: Study
City Facilities - Building Condition AssessmentBP06T771 825,000 CW Completed 8/1/2009
$34,747,501Proposition 6: City Facilities
Proposition 7: Land BankCategory: Housing / Land Bank Funds
Housing / Land Bank FundsVarious 1,500,000 CW Remaining to-be-awarded TBD TBD TBD
$1,500,000Proposition 7: Land Bank
Proposition 8: Economic DevelopmentCategory: Acquisition & Demolition
Housing - Acquisition and DemolitionVarious 20,000,000 CW In Progress various various various
Category: Infrastructure Support
Economic DevelopmentVarious 21,496,519 CW In Progress various various various
Monday, January 06, 2014 Page 68 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 8: Economic Development$41,496,519Proposition 8: Economic Development
Proposition 9: Farmers MarketCategory: Farmers Market Facilities
Farmers Market 6,636,760 CW In Progress various various various
$6,636,760Proposition 9: Farmers Market
Proposition 10: Land AcquisitionCategory: Land Acquisition
Cadillac Heights Land AcquisitionVarious 22,551,771 CW In Progress various various various
$22,551,771Proposition Z10: Land Acquisition
Proposition 11: Court FacilitiesCategory: Municipal Courts Facilities
Municipal Courts Building 7,944,968 CW Under Award - Construction 12/8/2010 3/9/2011 2/28/2014
$7,944,968Proposition Z11: Court Facilities
Proposition 12: Public Safety FacilitiesCategory: Emergency Warning Systems
Emergency Siren SystemPB06T835 3,359,860 CW Completed 6/1/2009
Category: Fire Department Facilities
Fire Station #10 Expansion - Frankford, 4451PB06T837 4,353,459 CW Completed 2/25/2009
Fire Station #37 Replacement - Greenville, 6742PB06T840 7,646,537 CW Completed 8/1/2013
Fire Station, Site Acquisition - W. Kiest Blvd., 6700PB06T842 446,705 CW Completed 9/1/2013
Fire Station, Site Acquisition-Mountain Creek Pkwy.,4300PB06T843 446,705 CW Completed 6/1/2012
Fire Stations - Storm Water ModificationsPB06T844 3,499,742 CW Completed 6/1/2011
New Fire Station - Keeneland & Walton WalkerPB06T845 6,763,380 CW Completed 6/1/2012
Monday, January 06, 2014 Page 69 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 12: Public Safety FacilitiesCategory: Fire Department Facilities
Fire Station #27 Replacement - Douglas, 8401PB06T838 8,319,051 CW Under Award - Construction 2/23/2011 2/27/2013 6/1/2014
Fire Station #32 Replacement - Benning, 7007PB06T839 5,510,904 CW Under Award - Construction 2/23/2011 8/14/2013 11/1/2014
Fire Station #06 Replacement - Harwood, 2808 SPB06T836 7,646,537 CW Under Award - Design 10/26/2010 TBD TBD
Fire Station #44 Replacement - Frank St, 4114PB06T841 5,510,904 CW Under Award - Design 3/9/2011 1/22/2014 1/22/2015
Category: Land Acquisition
Cadillac Heights Land AcquisitionPB06T846 1,193,791 CW Under Award NA various various
Category: Major Maintenance
Fire Maintenance Building 'C' HVAC - 5000 DolphinPB06T848 175,000 CW Completed 6/1/2013
Fire Station #03 Fence - 500 N Malcolm X BlvdPB06T850 100,000 CW Completed 12/1/2009
Fire Station #09 HVAC - 2002 Cool Mist LnPB06T853 31,750 CW Completed 9/1/2010
Fire Station #15 Foundation - 111 E 8th StreetPB06T855 23,742 CW Completed 9/16/2009
Fire Station #46 Sidewalks - 331 E Camp Wisdom RdPB06T857 22,860 CW Completed 9/1/2009
Fire Training Rookie Building 'B' Drainage - 5000 Dolphin Rd.PB06T861 152,400 CW Completed 6/1/2009
Fire Training Rookie Building 'B' HVAC - 5000 Dolphin Rd.PB06T862 295,000 CW Completed 4/1/2010
North Central Police - Emergency Generator & HVACPB06T863 298,000 CW Completed 1/1/2011
Northeast Police - Emergency Generator, HVAC & Parking lot lighting
PB06T864 566,268 CW Completed 6/1/2012
Fire Station #14 Fence - 1005 W 12th StreetPB06T854 322,077 CW Canceled
Central Police - Emergency Generator & HVAC Upgrade/bldg imp.
PB06T847 746,249 CW Under Award - Construction 1/1/2009 10/1/2011 2/28/2014
Fire Station Abatement - (Various Locations)PB06T860 300,000 CW Under Award - Construction NA various 6/1/2014
SE Police Parking P710 -00 CW Under Award - Construction NA 8/7/2012 5/1/2014
Monday, January 06, 2014 Page 70 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 12: Public Safety FacilitiesCategory: Major Maintenance
Southwest Police - Emergency Generator & HVAC/bldg improv.
PB06T868 358,419 CW Under Award - Construction 1/1/2009 12/5/2011 2/1/2014
Fire Museum Slab - 3801 Parry AvePB06T849 90,000 CW Remaining to-be-awarded 2/1/2014 12/1/2014 7/1/2015
Fire Station #05 Windows - 2031 S St Augustine RdPB06T851 60,000 CW Remaining to-be-awarded 2/1/2014 12/1/2014 7/1/2015
Fire Station #07 Parking - 6010 Davenport RdPB06T852 65,000 CW Remaining to-be-awarded 2/1/2014 12/1/2014 7/1/2015
Fire Station #29 Structural - 9830 Shadow WayPB06T856 35,560 CW Remaining to-be-awarded 2/1/2014 12/1/2014 7/1/2015
Fire Station #47 Windows and Doors - 7161 Envoy CourtPB06T858 12,954 CW Remaining to-be-awarded 2/1/2014 12/1/2014 7/1/2015
Fire Station #49 Windows - 4901 S Hampton RdPB06T859 50,000 CW Remaining to-be-awarded 2/1/2014 12/1/2014 7/1/2015
Northwest Police - Emergency GeneratorPB06T865 124,270 CW Remaining to-be-awarded NA 3/1/2014 9/1/2014
Police Facilities - Emergency GeneratorsPB06T866 320,000 CW Remaining to-be-awarded NA 3/1/2014 9/1/2014
Southeast Police - Emergency Generator & HVACPB06T867 338,366 CW Remaining to-be-awarded NA 3/1/2014 9/1/2014
Category: Roof Replacement
Fire Museum Roof - 3801 Parry AvePB06T869 162,800 CW Completed 3/1/2011
Fire Station #02 Roof - 4211 Northaven RdPB06T870 173,355 CW Completed 3/1/2011
Fire Station #04 Roof - 816 S Akard StrPB06T871 130,556 CW Completed 3/1/2011
Fire Station #07 Roof - 6010 Davenport RdPB06T872 295,243 CW Completed 3/1/2011
Fire Station #09 Roof - 2002 Cool Mist LnPB06T874 100,000 CW Completed 3/1/2011
Fire Station #16 Roof - 2616 Chalk Hill RdPB06T875 132,080 CW Completed 3/1/2011
Fire Station #19 Roof - 5600 E Grand AvePB06T876 210,000 CW Completed 3/1/2011
Fire Station #46 Roof - 331 E Camp Wisdom RdPB06T880 102,585 CW Completed 3/1/2011
Fire Station #52 Roof - 2504 S Cockrell HillPB06T884 101,700 CW Completed 8/1/2009
Fire Station #53 Roof - 1407 John West RdPB06T885 88,980 CW Completed 8/1/2009
Monday, January 06, 2014 Page 71 of 72
Project NameProject #Bond SaleAmount Council Dist Project Status
Est/ActualDesign Award
Est/ActualConstruction
AwardEst/ActualCompletion
Proposition 12: Public Safety FacilitiesCategory: Roof Replacement
Fire Station #54 Roof - 6238 Bonnie View RdPB06T886 105,264 CW Completed 8/1/2009
Fire Station #57 Roof - 10801 Audelia RdPB06T887 107,900 CW Completed 8/1/2009
Fire Training Administration Building 'A' Roof - 5000 Dolphin Rd.
PB06T888 50,000 CW Completed 8/1/2009
Motorcycle Garage - Roof ReplacementPB06T889 245,440 CW Completed 3/1/2009
Fire Station #08 Roof - 1904 N Garrett AvePB06T873 170,683 CW Under Award - Construction 10/1/2012 6/26/2013 6/1/2014
Fire Station #20 Roof - 12727 Montfort DrPB06T877 189,056 CW Under Award - Construction 10/1/2012 6/26/2013 6/1/2014
Fire Station #36 Roof - 3241 N Hampton RdPB06T878 132,969 CW Under Award - Construction 10/1/2012 6/26/2013 6/1/2014
Fire Station #43 Roof - 2844 Lombardy LnPB06T879 257,383 CW Under Award - Construction 10/1/2012 6/26/2013 6/1/2014
Fire Station #47 Roof - 7161 Envoy CtPB06T881 88,500 CW Under Award - Construction 10/1/2012 6/26/2013 6/1/2014
Fire Station #49 Roof - 4901 S Hampton RdPB06T882 223,609 CW Under Award - Construction 10/1/2012 6/26/2013 6/1/2014
North Central Police - Roof ReplacementPB06T890 260,000 CW Under Award - Construction 10/24/2012 6/26/2013 6/1/2014
Southeast Police - Roof ReplacementPB06T892 200,000 CW Under Award - Construction 10/1/2012 6/26/2013 6/1/2014
Southwest Police - Roof ReplacementPB06T893 386,500 CW Under Award - Construction 10/1/2012 6/26/2013 6/1/2014
Fire Station #51 Roof - 200 S St Augustine Rd 139,902 CW Remaining to-be-awarded
Northeast police - Roof Replacement 381,400 CW Remaining to-be-awarded
$63,621,395Proposition Z12: Public Safety Facilities
Monday, January 06, 2014 Page 72 of 72