20/04/02 - F.A. DMS/PS organisation 1
Proposal for tasks and schedule
- Coordination is needed- Tasks- Tools
- Topics- Which areas are not covered- Manpower versus needs- Complementary observations
- Tools and methods- End to end simulation- Prototype of reduction
![Page 2: 20/04/02 - F.A.DMS/PS organisation 1 Proposal for tasks and schedule -Coordination is needed -Tasks -Tools -Topics -Which areas are not covered -Manpower.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfa61a28abf838c980a1/html5/thumbnails/2.jpg)
20/04/02 - F.A. DMS/PS organisation 2
Questions (I)
•Selection function–Should we go fainter in magnitude (larger mass ratios)–In MBP/Spectro and in astro–Which choice in dense areas
•How to organise the future DMS data processing–Rejection from core processing–Various categories of DMS–Concurrential methods
![Page 3: 20/04/02 - F.A.DMS/PS organisation 1 Proposal for tasks and schedule -Coordination is needed -Tasks -Tools -Topics -Which areas are not covered -Manpower.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfa61a28abf838c980a1/html5/thumbnails/3.jpg)
20/04/02 - F.A. DMS/PS organisation 3
Questions (II)
•Impact of binarity on spectro design–Resolution and SB2 (simulation with correct instrumental effects - in progress)–Someone from the RVS group could come into the DMS group?
•Impact of binarity on MBP design–Interacting binaries–Classification of unresolved binaries–Need of interface with the photometric group?
![Page 4: 20/04/02 - F.A.DMS/PS organisation 1 Proposal for tasks and schedule -Coordination is needed -Tasks -Tools -Topics -Which areas are not covered -Manpower.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfa61a28abf838c980a1/html5/thumbnails/4.jpg)
20/04/02 - F.A. DMS/PS organisation 4
Overall mission schedule
2004 2012 2016 202020082000
Acceptance
Techno. development
Build, Test
Launch
Observations
Analysis
Catalogue
![Page 5: 20/04/02 - F.A.DMS/PS organisation 1 Proposal for tasks and schedule -Coordination is needed -Tasks -Tools -Topics -Which areas are not covered -Manpower.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfa61a28abf838c980a1/html5/thumbnails/5.jpg)
20/04/02 - F.A. DMS/PS organisation 5
Prio 1A: the satellite design
•On-board detection–Detection algorithm Arenou/Babusiaux -> SEPT 02
–Detection limits for multiple objects•Sample and patch study
–Optimise sampling windows and observing Söderhjelm–strategy(at different magnitudes) Söderhjelm
•MBP/Spectro simulations–Spatial resolution problems (large pixels!)–Binarity effects for the filter selections–Spectral resolution for efficient SB detection
•Random & systematics for bright stars–gain
(Short term: - september 2002, PDHE study)Long term: - early 2005, design frozen
(much before, because of testing)
![Page 6: 20/04/02 - F.A.DMS/PS organisation 1 Proposal for tasks and schedule -Coordination is needed -Tasks -Tools -Topics -Which areas are not covered -Manpower.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfa61a28abf838c980a1/html5/thumbnails/6.jpg)
20/04/02 - F.A. DMS/PS organisation 6
Prio 1B: multiple stars in simulations and reductions
•Galaxy model–Binaries/multiples in simulations
•Prototype single-star reduction–Rejection of multiples–Database principles (multiple star/individual component boundaries)
![Page 7: 20/04/02 - F.A.DMS/PS organisation 1 Proposal for tasks and schedule -Coordination is needed -Tasks -Tools -Topics -Which areas are not covered -Manpower.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfa61a28abf838c980a1/html5/thumbnails/7.jpg)
20/04/02 - F.A. DMS/PS organisation 7
Prio 2A: assessing the scientific capabilities
•Simplified reduction simulations–Semi-realistic astrometric errors S. Söderhjelm–BBP Photometric errors–Resolution limits–Curved proper motion detection limits–SB detection limits–Eclipsing binaries detection limits
•Galaxy modelling with multiple stars–Expected numbers and accuracies for multiple star observations with GAIA –Evolutionnary models
![Page 8: 20/04/02 - F.A.DMS/PS organisation 1 Proposal for tasks and schedule -Coordination is needed -Tasks -Tools -Topics -Which areas are not covered -Manpower.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfa61a28abf838c980a1/html5/thumbnails/8.jpg)
20/04/02 - F.A. DMS/PS organisation 8
Prio 2B: dedicated DMS reduction algorithms
•Reduction simulation with no a priori knowledge–Resolved doubles
•Reduction simulation with period-finding–Resolved binary orbits–Astrometric binaries orbits D. Pourbaix–SB orbits–Extrasolar planet orbits–Eclipsing binaries/transits N. Robichon
•Reduction simulations for multiple stars–Resolved multiples–Astrometric binaries in resolved binaries–Eclipsing Binaries in resolved binaries–(+arbitarily long list of special cases...)
![Page 9: 20/04/02 - F.A.DMS/PS organisation 1 Proposal for tasks and schedule -Coordination is needed -Tasks -Tools -Topics -Which areas are not covered -Manpower.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfa61a28abf838c980a1/html5/thumbnails/9.jpg)
20/04/02 - F.A. DMS/PS organisation 9
Prio 3: Science Case
•Uniqueness (or not) of the GAIA results–Stellar masses –Binary statistics –Binary origin and evolution– …
![Page 10: 20/04/02 - F.A.DMS/PS organisation 1 Proposal for tasks and schedule -Coordination is needed -Tasks -Tools -Topics -Which areas are not covered -Manpower.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfa61a28abf838c980a1/html5/thumbnails/10.jpg)
20/04/02 - F.A. DMS/PS organisation 10
Organisation
•Put names on task responsibilities
•Reference document (short term)
•Publication plan–technical–Scientific: increase Gaia visibility
•Next meeting–Parallel meeting in Monte-Rosa?–13-14 Sept
![Page 11: 20/04/02 - F.A.DMS/PS organisation 1 Proposal for tasks and schedule -Coordination is needed -Tasks -Tools -Topics -Which areas are not covered -Manpower.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfa61a28abf838c980a1/html5/thumbnails/11.jpg)
20/04/02 - F.A. DMS/PS organisation 11
Actions
•Activate PS web page–F.A.
•Give simulated data for orbit determination–First agree on protocol–F.A./C.B.
•Blind tests for orbits–Dimitri–Alessandro–Hans-H
•What people can give, what they request for simulations–All–Mario+Dimitri to agree on protocol and to contact Carine for simulations–ML: circulate a page
![Page 12: 20/04/02 - F.A.DMS/PS organisation 1 Proposal for tasks and schedule -Coordination is needed -Tasks -Tools -Topics -Which areas are not covered -Manpower.](https://reader036.fdocuments.us/reader036/viewer/2022083009/5697bfa61a28abf838c980a1/html5/thumbnails/12.jpg)
20/04/02 - F.A. DMS/PS organisation 12
Thanks
•To Annick Oger and Pascal Hammes for the logistics•To Staffan for the scientific organisation
•To your contribution (to be sent by email…)