Rig Assembled Conductor Platform (RACP)
DEA(e) 3Q06 Meeting, Milan
8/10/2019 20.0 Rig Assembled Conductor Platform
http://slidepdf.com/reader/full/200-rig-assembled-conductor-platform 2/12
www.uwg.co.uk
Agenda - RACP
• Introduction
• Design principals
• Installation
• Features
• In closing
8/10/2019 20.0 Rig Assembled Conductor Platform
http://slidepdf.com/reader/full/200-rig-assembled-conductor-platform 3/12
www.uwg.co.uk
UWG’s RACP:
• Rig Assembled Conductor Platform• Provides an offshore minimal facilities
installation
– 200 tonne total topside weight
• Metocean conditions constrained
– Installed in 20m water depth, 30m
designs prepared
• Avoids the use of heavy lift offshore crane
barge
– Can improve project logistics
• Uses a standard self-elevating MODU
Introduction
8/10/2019 20.0 Rig Assembled Conductor Platform
http://slidepdf.com/reader/full/200-rig-assembled-conductor-platform 4/12
www.uwg.co.uk
Design principals
EL 0.0m
EL -20.0m
EL +10.0m
• Design principals:
– Install safely and efficiently
– Use the well Conductors as the
structural elements
– Install using a self elevating MODU,no crane barges to be required
– Site specific design analysis
– Modular elements – Low cost
8/10/2019 20.0 Rig Assembled Conductor Platform
http://slidepdf.com/reader/full/200-rig-assembled-conductor-platform 5/12
www.uwg.co.uk
Installation
• UWG designed, manufactured and
installed the first RACP offshore Angola,
Morsa West location
• Commenced conceptual engineering Jan
2005
• Installation successfully completed (Dec.2005)
• No safety incidents
• 5 wells, 17m / 56ft MSL
• Topside structure 55T, manifold 11T
• ABS Certified class *A1 (offshore
hydrocarbon producing station)
8/10/2019 20.0 Rig Assembled Conductor Platform
http://slidepdf.com/reader/full/200-rig-assembled-conductor-platform 6/12
8/10/2019 20.0 Rig Assembled Conductor Platform
http://slidepdf.com/reader/full/200-rig-assembled-conductor-platform 7/12
www.uwg.co.uk
Drill top hole and run first
conductor to depth
3. Marine lift the Subsea Template
and suspend beneath MODU
port cantilever.
Installation contd.
4. Transfer Template to temporary
suspension beneath rotary table and
connect DP running tool. Capturefirst Conductor and run to mudline
8/10/2019 20.0 Rig Assembled Conductor Platform
http://slidepdf.com/reader/full/200-rig-assembled-conductor-platform 8/12
www.uwg.co.uk
5. Drill the top hole and install
the remaining Conductors.
Machine cut the tops of
the conductors.
6. Jack up the MODU and transfer the
Topside module into position above
the conductors
Installation contd.
8/10/2019 20.0 Rig Assembled Conductor Platform
http://slidepdf.com/reader/full/200-rig-assembled-conductor-platform 9/12
www.uwg.co.uk
7. Lower the Topside module and capture the
Conductors with the capture cones
8. Land the Topside
module on the no-go
rings. Make up
clamps etc.
Installation contd.
8/10/2019 20.0 Rig Assembled Conductor Platform
http://slidepdf.com/reader/full/200-rig-assembled-conductor-platform 10/12
www.uwg.co.uk
Features
Self supporting
1 installedMudline
support
Design
available
up to 20m / 65ft up to 30m / 98ft
• Modular design
• Around half the cost of anequivalent jacket based
installation
• Can improve project
logistics
• Ease of decommission
8/10/2019 20.0 Rig Assembled Conductor Platform
http://slidepdf.com/reader/full/200-rig-assembled-conductor-platform 11/12
www.uwg.co.uk
In closing
UWG’s RACP:
• provides a minimal facilities installation
• does not required an offshore heavy lift barge for
construction
• integrates with conventional drilled or driven conductor
installation
• requires site specific analysis to optimise conductor size
and grade
• is constructed from modular elements
8/10/2019 20.0 Rig Assembled Conductor Platform
http://slidepdf.com/reader/full/200-rig-assembled-conductor-platform 12/12
www.uwg.co.uk