2 x Dynamic Arms on 135 Post with C-Clamp · 11/19/2018 · AWMS-2-D13-C | Page 3 of 13 AWM-FC...
Transcript of 2 x Dynamic Arms on 135 Post with C-Clamp · 11/19/2018 · AWMS-2-D13-C | Page 3 of 13 AWM-FC...
AWMS-2-D13-C | Page 1 of 13
Installation Guide AWMS-2-D13-C
2 x Dynamic Arms on 135 Post with C-Clamp
COMPONENT CHECKLIST RANGE
CONTENTS
BAWM-ADDynamic Arm(x2)
DAWM-FCC-Clamp(x1)
AAWM-LCPost Clamp (x1)
CAWM-P13135 Post(x1)
C-ClampPage 2Page 3 135 PostPage 6Page 7
Post ClampPage 8Page 9
Dynamic ArmPage 10Page 11Page 12Page 13
AWM-FCComponent ChecklistClamp Installation AWM-P13Component ChecklistPost Installation
AWM-LCComponent ChecklistPost Clamp Installation
AWM-ADComponent ChecklistArm InstallationMonitor InstallationCable Management
AWMS-2-D13-C | Page 2 of 13
AWM-FCC-Clamp
AWM-FC Page 1 of 4
Installation Guide AWM-FC
C Clamp
COMPONENT CHECKLIST REQUIRED TOOLS
IMPORTANT INFORMATION! Please ensure this product is installed as per these installation instructions. ! This product is compatible with Atdec modular (AWM) products. ! The manufacturer accepts no responsibility for incorrect installation.
AC Clamp Bracket
(x1)
BC Clamp Plate
(x1)
CCover for Post
(x1)
DCover for Base
(x1)
E4mm
Allen key(x1)
F5mm
Allen key(x1)
• All tools supplied
AC Clamp Bracket(x1)
BC Clamp Plate(x1)
CCover for Post(x1)
DCover for Base(x1)
E4mm Allen key(x1)
F5mm Allen key(x1)
AWMS-2-D13-C | Page 3 of 13AWM-FC Page 2 of 4
1. C Clamp overview
2. Re-configure Clamp
1.1 Default - This is the “out of the box” configuration
MIN THICKNESS - 25mm ( 1”)MAX THICKNESS - 33mm ( 1 5/16”)
MIN THICKNESS - 18mm (11/16”)MAX THICKNESS - 25.8mm (1”)
1.2 Inverted - The C Clamp can be reconfigured for thicker surfaces
2.1 Slide pad off 2.3 Invert pad 2.3 Slide pad back on
Fastenerssuppliedwith post
TightenFirmly
!
3.2 Place in desired location 3.3 Slide the C Clamp bracket over the plate and position screw tips in the indents on the base plate
Note: You may need to un-screw the set screws out of the plate using the allen key
3.1 Attach plate to post
3. Post mount configuration
Desk ClampBracket
Mountingsurface
Pad
M8 x 16mmSet Screw
3.4 Check the set screws are mounted in position. Also check the desk clamp bracket is positioned tight up against the mounting surface edge
3.5 Tighten the set screws firmly and evenly on both sides of the desk clamp bracket.
AWMS-2-D13-C | Page 4 of 13AWM-FC Page 3 of 4
4. Installing the clamp cover to post
5. Base mount installation
4.1 Remove the cable cover by pulling it straight up and out of the post. Remove top cap if already installed
5.1 Attach plate to base
5.5 Tighten the set screws firmly and evenly on both sides of the desk clamp bracket
5.4 Check the set screws are mounted in position. Also check the desk clamp bracket is positioned tight up against the mounting surface edge
4.2 Locate the C Clamp cover over the post. Guide over the holes in the base plate and gently apply pressure on the cover until it clicks into place
5.2 Place the base and plate in desired location
4.3 Re-attach the cable cover by sliding it into the post channel. Fit the pole and cover caps back on.
5.3 Slide the bracket onto the base plate and position screw tips in the indents on the base plate
Note: You may need to un-screw the set screws out of the plate using the allen key
Fastenerssuppliedwith base
TightenFirmly
!
!
Desk ClampBracket
Mountingsurface
Pad
M8 x 16mmSet Screw
Click!
AWMS-2-D13-C | Page 5 of 13AWM-FC Page 4 of 4atdec.com | atdec.co.uk | atdec.com.au
No portion of this document or any artwork contained herein should be reproduced in any way without the express written consent of Atdec Pty Ltd. Due to continuing product development, the manufacturer reserves the right to alter specifications without notice. ©20180502D
6. Installing the clamp cover to base
6.1 Locate the Cover for Base over the base. Guide over the holes in the base plate and gently apply pressure on the cover unitl it clicks into place.
6.2 Installation CompleteTo continue with intallation of your monitor arm, refer to your monitor arm’s installation guide.
Click!
AWMS-2-D13-C | Page 6 of 13AWM-P Page 1 of 2
Installation Guide AWM-P
Post
COMPONENT CHECKLIST
REQUIRED TOOLS
IMPORTANT INFORMATION! Please ensure this product is installed as per these installation instructions. ! This product is compatible with Atdec AWM Series products. ! The manufacturer accepts no responsibility for incorrect installation.
• All tools provided
APost(x1)
CScrew
M8(x2)
FCable clips
(not supplied with all posts)
BPost Cap
(x1)
ECable Cover
(x1)(not supplied with all posts)
DCable Cover Cap
(x1)(not supplied with all posts)
AWM-PPost
APost(x1)
CScrew M8(x2)
FCable clips
(not supplied with all posts)
BPost Cap(x1)
ECable Cover(x1)(not supplied with all posts)
DCable Cover Cap(x1)(not supplied with all posts)
AWMS-2-D13-C | Page 7 of 13AWM-P Page 2 of 2
Rear of Mounting Surface
Rear of Mounting Surface
Rear of Mounting Surface
Rear of Mounting Surface
1. Attach Post to fixing (fixing sold seperately)
2. Check post placement & arm positions
4. Cable clips and cover
3. Cable cover position and post cap
2.1 Do not mount a monitor arm on the rear channel of a post when the post is fixed to the desk using an F Clamp, Heavy Duty F Clamp, or C Clamp.
4.1 Push the cable down into the cable clip.
4.2 Insert one side of the cable clip into the channel on the post assembly, then push in the other side.
3.1 To reposition the cable cover, pull it straight up and out of the post and insert it into any of the available channels
3.2 Optional cable cover positions 3.3 Fit post cap onto the top of the post
Note: The cable cover shown does not come with all posts
Note: Cable clips do not come with all posts. Additional clips sold separately.
atdec.com | atdec.co.uk | atdec.com.au
No portion of this document or any artwork contained herein should be reproduced in any way without the express written consent of Atdec Pty Ltd. Due to continuing product development, the manufacturer reserves the right to alter specifications without notice. ©20180518E
Cable Cover
Allen Key
Post Cap
Post
Note: An allen key may be stored in the Post Cap.
F Clamp
AWM-FF
Heavy DutyF ClampAWM-FH
C Clamp
AWM-FC
FCC Clamp
FBBolt
Through Kit
AC-GCGrommet
Clamp
FHHD F Clamp
FFF Clamp
FCC Clamp
FBBolt
Through Kit
AC-GCGrommet
Clamp
FHHD F Clamp
FFF Clamp
AWM Fixing options
Bolt ThroughKit
AWM-FB
F Clamp
AWM-FF
Heavy DutyF ClampAWM-FH
C Clamp
AWM-FC
GrommetClampAC-GC
1.1 Follow the installation guide provided with your fixing to attach it to the post and fit it to the worksurface.
4.3 Loop cable and insert into cable cover.
4.4 Feed remaining cable into the cover.
AWMS-2-D13-C | Page 8 of 13AWM-LC Page 1 of 2
COMPONENT CHECKLIST
Installation Guide AWM-LC
Post Clamp
IMPORTANT INFORMATION! Please ensure this product is installed as per these installation instructions. ! This product is compatible with AWM Series Arms, Posts and Wall Channels. ! The manufacturer accepts no responsibility for incorrect installation.
REQUIRED TOOLS• All tools provided
APost Clamp
(x1)
AWM-PPost Clamp
AWMS-2-D13-C | Page 9 of 13AWM-LC Page 2 of 2
1. Fix Clamp to Post or Wall Channel
3. Fit AWM Series arm to Post Clamp
1.1 Ensure knob is undone.
2.1 Remove plastic sleeve.
3.1 Push arm onto clamp.
1.2 Slide Post Clamp into channel.
2.2 Remove rotation ring
3.2 Ensure arm is fully pushed onto clamp.
Push knob to aid insertion
1.3 Hold clamp in desired position on post and turn knob to lock in place.
2.3 Place rotation ring in the desired position.
3.3 Tighten joint screw.
Note: Check the arm rotation is smooth after tightening.
Note: Arm sold separately
Note: Place the rotation ring depending on what post channel the arm will be attached to. The tag should always face towards the user.
1. Ensure Knob is undone
1. Remove plastic sleeve
Tip: push knobto aid insertion
2. Slide post clamp into channel
2. Remove rotation ring
1. Press
2. Lift
3. Hold clamp in desired position on post and turn knob to lock in place
3. Place the rotation ring in the desired postion
atdec.com | atdec.co.uk | atdec.com.au
No portion of this document or any artwork contained herein should be reproduced in any way without the express written consent of Atdec Pty Ltd. Due to continuing product development, the manufacturer reserves the right to alter specifications without notice. ©20180518A - E02
180°
360°
OR
DefaultPosition
FlippedPosition
Tag
1. Push arm onto clamp 2. Ensure arm is fully pushed onto clamp3. Tighten set screw
Tip: Check the arm rotation is smooth after tightening.
2. Set arm rotation to 180° (optional)Note: default arm rotation is set to rotate 360�
AWMS-2-D13-C | Page 10 of 13
AWM-ADDynamic Arm
AWM-AD Page 1 of 4
Installation Guide AWM-AD
Dynamic Arm
COMPONENT CHECKLIST
REQUIRED TOOLS
ADynamic
Monitor Arm(x1)
BVESA head(x1)
CScrew
M4x25mm(x4)
DScrew
M4x16mm(x4)
EScrew
M4x12mm(x4)
FSpacer(x4)
GSecurityscrew(x1)
H4mm
allen key(x1)
• Phillips Head Screwdriver
WEIGHT RANGE
IMPORTANT INFORMATION! Please ensure this product is installed as per these installation instructions. ! This product is compatible with Atdec AWM Series products.! The Dynamic Arm (AWM-AD) requires a Channel Clamp (AWM-LC, sold separately) for installation on an AWM Post.! The Dynamic Arm (AWM-AD) requires a Desk Base (AWM-LB, sold separately) for installation directly onto an AWM fixing.! The manufacturer accepts no responsibility for incorrect installation.
0 - 9kg (0 - 20lbs)
ADynamicMonitor Arm(x1)
BVESA Head(x1)
CScrewM4x25mm(x4)
DScrewM4x16mm(x4)
EScrewM4x12mm(x4)
FSpacer(x4)
GSecurityScrew(x1)
H4mmAllen Key(x1)
AWMS-2-D13-C | Page 11 of 13AWM-AD Page 2 of 4
1. Set arm rotation to 180° (optional)
2. Fit arm onto Base or Channel Clamp (sold separately)
Note: Check the arm rotation is smooth after tightening.
2.1 Push arm onto shaft. 2.2 Ensure arm is fully pushed onto shaft. 2.3 Tighten joint screw.
1.1 On the Base or Channel Clamp (sold separately)Remove plastic sleeve.
1.2 Remove rotation ring. 1.3 Place rotation ring in the desired position.
Channel Clamp Ring PositionWhen setting channel clamp rotation, orientate the ring depending on what post channel the arm will be attached to. The tag on the ring should always face towards the user.
180°
360°
OR
DefaultPosition
FlippedPosition Tag
1. Press
2. Lift
3.2 Attach VESA head onto monitor with provided screws.
3. Attach VESA head to monitor
100mm
75mm
100mm75mm
Flush
Too long Too short
Spacer
5mm 12mm
3.3 Be sure to use correct screw length3.1 VESA mounting compatibility
100mm
75mm
100mm75mm
Flush
Too long Too short
Spacer
5mm 12mm
Note: For other sizes, use a suitable adaptor plate (sold separately).
Note: Spacers may be required for curved, recessed or uneven monitor surfaces.
4. Mount monitor on arm
Monitor arm
4.2 Ensure that the VESA head sits flush within the monitor arm. There should be no gap.
4.1 Insert VESA head into the monitor arm 4.3 Push the lever down to secure it to the arm assembly
Gap No Gap
AWMS-2-D13-C | Page 12 of 13AWM-AD Page 3 of 4
5. Adjust tilt tension & install security screw
5.1 Use the allen key to adjust the tilt tension until the monitor holds in a vertical position at the end of the arm.
Note: Support monitor while adjusting.
Tighten
Loosen
Tighten
Loosen
5.2 OPTIONAL security screwTilt the head upwards to install the optional security screw.
7. Tension gauge
7.1 When installing multiple monitors of a similar weight, use the tension gauge to make installation faster.
1. Set up one monitor and record the position of the marker on the gauge.
2. When installing subsequent monitors, pre-tension the arm to the recorded amount, then fine-tune the tension by following steps 6.3 to 6.5.
Arm Tension Gauge
Marker
HeavierMonitor
LighterMonitor
6. Adjust arm tension
6.1 To accurately set the tension of the arm, position the monitor at 90 degrees
6.2 Use the allen key to adjust the arm tension to the weight of the monitor. Follow steps 6.3 to 6.5 to set the tension.
6.3 If the monitor sags or falls down, increase the arm tension by rotating the screw clockwise.
6.5 If the monitor floats or hovers in all positions the arm tension is balanced and does not require further adjustment.
6.4 If the monitor springs upwards from the bottom position, decrease the arm tension by rotating the screw anti-clockwise.
Monitor Falls(from top)
Increase Tension
Monitor ‘Floats’(all positions)
Balanced
Monitor Springs(from bottom)
Reduce Tension
90°
AWM-A46 Page 4 of 4
atdec.com | atdec.co.uk | atdec.com.au
No portion of this document or any artwork contained herein should be reproduced in any way without the express written consent of Atdec Pty Ltd. Due to continuing product development, the manufacturer reserves the right to alter specifications without notice. ©20180521C
Note: The cable cover shown does not come with all posts
7.4 To reposition the cable cover, pull it straight up and out of the post and insert it into any of the available channels
Cable cover
Cable Cover
DeskClamp
7.1 Push the cable down into the cable clip
Note: Cable clips do not come with all posts
7.6 Feed remaining cable into cover7.5 Loop cable and insert into cable cover
7.2 Push cable clip into post channel
7. Post cable management
7.3 Recommended post cable cover position for double or triple arm set-ups
NoteEnsure enough cable slack is given to allow for movement of the monitor
Push
6. Monitor arm cable management
6.1 Plug cables into the monitor and route the cables down the arm using the cable hooks and clips
Alternative cable cover positions
AWMS-2-D13-C | Page 13 of 13AWM-AD Page 4 of 4
8. Cable management
8.1 Plug cables into the monitor and route the cables down the arm using the cable hooks and clips.
atdec.com | atdec.co.uk | atdec.com.au
No portion of this document or any artwork contained herein should be reproduced in any way without the express written consent of Atdec Pty Ltd. Due to continuing product development, the manufacturer reserves the right to alter specifications without notice. ©20180727
See steps 8.2 to 8.4
8.2 Wedge cable into the central gap and slide it down the arm.
8.3 The cable should slip into the arm cavity 8.4 Slide the remaining loose cable from the central gap up the arm.
Important! Ensure enough cable slack is given in this area to allow for movement of the monitor.