Page 1: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior
Page 2: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

c) Conflicts and Clarifications Interpretations,  corrections  and  changes  to  this RFP will  be made  by Addendum.    Proposers requesting clarification or  interpretation shall make a written request via email to contact  the person below: 

Don Beard, Project Manager E‐mail: [email protected] 

2. PROJECT BACKGROUND a) Location of Delivery 

Delivery of construction materials and supplies to be FOB to either the:   PWSAC Anchorage Distribution Center   6148 Neilsen Way   Anchorage, Alaska 99518 

         or 

  Lynden Transport   202 Industry Road   Cordova, Alaska 99574  

Deliver of construction equipment to be loaded on PWSAC’s landing Craft to be FOB to either the: 

  North Fill Boat Ramp   Cordova, Alaska         or   Smitty’s Cove Boat Ramp   Whittier, Alaska    

b) Budget PWSAC  has  not  established  a  Maximum  Allowable  Price  for  the  adult  salmon  fishway construction  and  accessories.   However,  to maximize  the  use  of  available  funds  and  provide overall  value,  Proposers  are  encouraged  to propose betterments  and  cost  efficiencies  to  the project.  

c) Completion Schedule Time  is of  the essence with  this project  as  the  adult pink  salmon will begin  to  return  to  the hatchery  in  late  July  and  the  egg  collection  period will  begin  in  late August.    Therefore,  the project schedule is as follows:   

Project Start Date: on or before June 1, 2014. 

Substantial Completion: by July 15, 2014, to avoid late penalties. 

Final Completion: by August 1, 2014, to avoid late penalties.  

3. PROCUREMENT PROCESS a) General 

PWSAC  has  elected  to  proceed  with  a  competitive  bid  process  with  an  open  invitation  to interested firms to submit proposals.    

   

Page 3: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

b) Method of Contracting PWSAC will  enter  into  an  Independent  Contractor Agreement with  the  successful  bidder.   A sample agreement is included within the RFP document.  The  successful  bidder  shall  submit  electronic  files  of  shop  drawings  of  the  material  to  be furnished.    Shop  drawings  shall  include  plans,  elevations,  sections,  and  details  of  metal fabrications  and  their  connections,  anchorage  and  accessory  items.   No work  shall  begin  on fabrications until PWSAC approves the shop drawings submitted.  

c) Selection Process and Schedule Proposals must be received not later than 4:00 p.m. (AKDT) on March 28, 2014, via email to the contact person below: 

Dave Reggiani, PWSAC General Manager E‐Mail: [email protected] 

 Proposals  shall  be  evaluated  based  on  price,  responsiveness,  and  the  qualifications  of  the bidder.   Contracts will be awarded to the  lowest responsive and qualified bidder.   PWSAC will determine whether a bidder is qualified based on: 

a) The skill and experience demonstrated by the bidder in timely performing contracts of a similar nature; 

b) The bidder’s record for honesty and integrity; and c) The bidder’s capacity to perform  in terms of facilities, equipment, bonding, personnel, 

and financial capability. 

PWSAC will provide an Intent to Award statement to all of the responsive bidders no later than 1:00 p.m. (AKDT) on April 4, 2014.  PWSAC may reject all bids or proposals submitted for procurement if PWSAC determines it is in the best interest of the Corporation. 

 4. PROPOSAL REQUIREMENTS 

The Proposer shall submit the following: a) Cover Letter 

Identify the firm and provide a list of all professionals, and subcontractors (if applicable).  

b) References Provide a minimum of two (2) owner references from previous similar construction projects that the Proposer and its professionals have completed.  Include contact information for the project owners.  

c) Schedule  Provide a milestone schedule indicating the start and completion of the construction project.  

d) Price Proposal Proposals shall include a separate itemized amount for each of the major construction elements (i.e.  cement,  aggregate,  rebar,  excavation,  formwork,  pouring,  equipment  costs,  raceway accessories costs, etc.).    

Page 4: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior
david
Line
david
Line
david
Line
david
Line
david
Text Box
Inside red lines indicates fishway boundaries. Yellow line indicates 10' clearing from fishway.
david
Callout
Existing Fishway Approach Channel
david
Callout
Existing Fish Ladder - AK Denil
Page 5: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

GENERAL

G-000 COVER SHEET - VICINITY MAP, LOCATION MAP, DRAWING INDEX AND GENERAL NOTES

G-002 ABBREVIATIONS AND BUILDING CODE ANALYSIS

ARCHITECTURAL

A-100 FIRST FLOOR DEMO PLAN

A-101 FIRST FLOOR PLAN

A-102 MEZZANINE

A-103 ROOF PLAN

A-201 ELEVATIONS

A-202 ELEVATIONS AND SECTIONS

A-401 ENLARGED PLANS

A-402 REFLECTED CEILING PLANS

A-403 STAIR SECTIONS, DETAILS

A-601 SCHEDULES

A-602 WALL TYPES

STRUCTURAL

S-001 STRUCTURAL GENERAL NOTES

S-101 FOUNDATION PLAN

S-102 FLOOR PLAN

S-103 STAIR TOWER PLAN AND SECTIONS

S-105 ADULT RETURN FACILITY PLAN

S-106 EQUIPMENT PLATFORM

S-107 FRAMING PLAN

S-201 STAIR TOWER ELEVATIONS

S-301 ADULT RETURN FACILITY SECTIONS

S-302 ADULT RETURN FACILITY SECTIONS

S-501 DETAILS

S-502 DETAILS

S-503 DETAILS

S-504 STAIR TOWER DETAILS

S-505 STAIR TOWER DETAILS

S-506 DETAILS

S-507 PIPE AND TROUGH SUPPORT FRAME

S-508 TROUGH SUPPORT FRAME

MECHANICAL

M-100 SYMBOLS AND ABBREVIATIONS

M-101 HVAC FIRST FLOOR PLAN

M-102 MEZZANINE HVAC PLAN

M-103 PLUMBING PLANS

M-104 MEZZANINE PLUMBING PLAN

M-501 MECHANICAL DETAILS

M-601 SCHEDULES

PROCESS PIPING

P-001 INCUBATOR STACKS LAYOUT

P-101 WATER DISTRIBUTION PLAN

P-102 INCUBATOR DRAIN PLAN

P-103 FRY COLLECTION PLAN

P-104 ADULT RETURN FACILITY

P-105 TOP LEVEL PUMP ROOM PLAN

P-106 MEZZ PROCESS WATER PLAN

P-301 SECT THROUGH HATCHERY

P-302 SECT THROUGH HATCHERY

P-303 SECTIONS AND DETAILS

P-901 WATER SUPPLY SCHEMATIC

ELECTRICAL

E-100 FLOOR PLAN - OVERALL BUILDING

E-201 FIRST FLOOR PLAN - POWER

E-202 FIRST FLOOR/MEZZANINE PLAN - POWER

E-203 PANEL SCHEDULE, SINGLE LINE DIAGRAM

E-301 FIRST FLOOR PLAN - LIGHTING

E-302 FIRST FLOOR/MEZZANINE PLAN - LIGHTING

E-303 LUMINAIRE SCHEDULE SCHEMATIC DIAGRAMS

E-401 FIRST FLOOR PLAN - LOW VOLTAGE

E-402 FIRST FLOOR/MEZZANINE PLAN - LOW VOLTAGE

E-901 SPECIFICATION

E-902 SPECIFICATION

SHEET INDEX

GENERAL NOTES

1. ALL WORK SHALL CONFORM TO THE CURRENT EDITIONS OF THE INTERNATIONAL BUILDING

CODE (IBC), INTERNATIONAL MECHANICAL CODE (IMC) AND INTERNATIONAL FIRE CODE (IFC),

AND AMENDMENTS AS ADOPTED BY THE STATE OF ALASKA FIRE MARSHAL.

2. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS.

3. CONTRACTOR SHALL LOCATE ALL EXISTING UNDERGROUND UTILITIES AND STRUCTURES WITH

HATCHERY STAFF BEFORE COMMENCEMENT OF WORK.

4. FIELD VERIFY EXISTING CONDITIONS & CONNECTION POINTS PRIOR TO STARTING WORK.

FULLY COORDINATE WORK WITH OTHER TRADES.

5. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS & COMPLY WITH APPLICABLE

FEDERAL, STATE AND LOCAL LAWS & REGULATIONS. TEMPORARY SHUTDOWNS OF BUILDING

SYSTEMS MUST BE COORDINATED & APPROVED WITH OWNER.

6. PROTECT ALL WORK WHICH IS INDICATED TO REMAIN, INCLUDING BUILDINGS, PAVEMENTS,

CURBS & THE LIKE ON THE SITE & ADJACENT.

7. ALL LINES ARE PARALLEL OR PERPENDICULAR TO THE LINES FROM WHICH THEY ARE

MEASURED UNLESS NOTED OTHERWISE. CONTRACTOR SHALL VERIFY ALL DIMENSIONS &

RELATIONS TO OTHER WORK PRIOR TO FABRICATION & INSTALLATION.

8. COORDINATES & WRITTEN DIMENSIONS SHALL PREVAIL, DO NOT SCALE DRAWINGS.

www.tetratech.com

CLIENT INFORMATION:PROJECT LOCATION:

PROJECT DESCRIPTION / NOTES:

Tt PROJECT No.: CLIENT PROJECT No.:

PRINCE WILLIAM SOUND AQUACULTURE CORPORATION

CANNERY CREEK FISH HATCHERY ADDITION

CANNERY CREEK FISH HATCHERY

VALDEZ, ALASKA

135-22542-10001

PRINCE WILLIAM SOUND

AQUACULTURE CORPORATION

VALDEZ, ALASKA

230 SOUTH FRANKLIN SUITE 212

JUNEAU, AK 99801-1364

PHONE: (907) 586-6400 FAX: (907) 463-3677

PERMIT SET

JULY, 2013

CONSTRUCT A NEW HATCHERY ADDITION OVER THE EXISTING EXTERIOR RACEWAYS.

THE NEW BUILDING ADDITION CONSISTS OF PRE-ENGINEERED STEEL STRUCTURES

ENCLOSING A NEW INCUBATION SPACE AND ADJACENT MECHANICAL ROOM, EGG TAKE

ROOM, AND MEZZANINE AREA. THE EXISTING WOOD FRAME HATCHERY BUILDING,

POWER GENERATING MODULE AND COVERED PARKING AREA SHALL REMAIN.

N

VICINITY MAP

PROJECT SITE

1

1

1

MARK DATE DESCRIPTION BY

-- JULY PERMIT SUBMITTAL

7-31-13 CONSTRUCTION CHANGES1

9-03-13 CONSTRUCTION CHANGES2

2

2

2

11-20-13 CONSTRUCTION CHANGES3

3

3

3

2-18-14 WATER SUPPLY SYSTEM UPDATED4

4

4

4

Page 6: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

ABBREVIATIONS

IBC 2009

MINIMUM INSULATION COMPONENTS TO BE PROVIDED - CLIMATE ZONE 7

BUILDING CODE ANALYSIS

FIRE PROTECTION

PROPOSED BUILDING NOT SPRINKLED

WALLS:

ROOF:GLAZING:DOORS:

BUILDING CODE:

R-15

R-19U=0.45U=0.50

CHAPTER 3 - USE AND OCCUPANCY CLASSIFICATION

SECT 302.1 INCUBATION, MECHANICALF-2

CHAPTER 5 - BUILDING HEIGHT AND AREATABLE 503

CHAPTER 6 - TYPE OF CONSTRUCTION

TABLE 601 PRIMARY STRUCTURAL FRAMEEXTERIOR BEARING WALLSINTERIOR BEARING WALLS

0 HOURS0 HOURS0 HOURS

INTERIOR NONBEARING WALLSFLOOR CONSTRUCTION

0 HOURS0 HOURS

ROOF CONSTRUCTION 0 HOURS

TYPE OF CONSTRUCTION

ALLOWABLE AREA/STORY

ALLOWABLE STORIES

GROUPVB

13,000 SQFT BASIC CRITERIA

2

F-2

ALLOWABLE HEIGHTPROPOSED HEIGHT

40'35'

PROPOSED STORIES - EXST BLDG 2

HATCHERY BUILDINGACCESSORY OCCUPANCIES-

PER 508.2 OFFICE AND STORAGE AREA ARE ACCESSORY TO MAIN OCCUPANCY F-2. PER 508.2.4 NO SEPARATION OF OCCUPANCY IS REQUIRED.

EXIT ACCESS TRAVEL DISTANCE < THAN STATED IN TABLE 1016.1EGRESS DOOR SWING PER 1008.1.2 OCC LOAD < 50

TYPE VB

IBC CHAPTER 5 TABLE 503, TABLE 1015.1EGRESS REQUIREMENTS - NEW HATCHERY BLDG

12,248INCUBATION

AREAPROVIDED(GSF)

AREAALLOWED(GSF)

AREA NAME ANDOCCUPANCYCLASSIFICATION

LOAD FACTORPER TABLE1004.1.1

OCCUPANTLOAD

34

EXITSREQUIRED

EXITSPROVIDED

TOTAL 37

1 6300(MECHANICAL)

MEZZANINE 2,070 100 3 1 2

19,110

EXST HATCHERY 6,455 SQFTPROPOSED HATCHERY ADDITION - FIRST FLOOR 10,178 SQFT

HATCHERY BUILDING - TOTAL 16,633 SQFT

6

EXST EXIT

1

PROPOSED MEZZANINE 2,070 SQFT

SECTION 505. 505.4 EXCEPTION 1 - OCC LOAD <10. EXITING - TABLE 1015.1

FEFIRE EXTINGUISHER, CLASS 2-A,MAX TRAVEL DISTANCE 75'SURFACE MOUNTED, SECTION 906.9.1

AB ANCHOR BOLT

ELEC ELECTRIC

JST JOIST SND

RWL RAINWATER LEADER

ACT ACOUSTICAL CEILING TILE

EQUIP EQUIPMENT

JT JOINT SND

SD SOAP DISPENCER

ADJC ADJACENT

EW EACH WAY

LAV LAVATORY

SECT SECTION

ADJ ADJUSTABLE

EWC ELECTRIC WATER COOLER

LLH LONG LEG HORIZONTAL

SFT STRUCTURAL FACING TILE

AFF ABOVE FINISH FLOOR

ELVR ELEVATOR

LLV LONG LEG VERTICAL

SHR SHOWER

AHU AIR HANDLING UNIT

EXH EXHAUST

LP LOWPOINT

SHT SHEET

ALUM ALUMINUM

EXST EXISTING

MAX MAXIMUM

SIM SIMILAR

BD BOARD

EXP JT EXPANSION JOINT

MB MARKER BOARD

SMS SHEET METAL SCREW

BFE BOTTOM FOOTING ELEVATION

EXT EXTERIOR

MECH MECHANICAL

SND SAN. NAPKIN DISPENSER

BITUM BITUMINOUS

FD FLOOR DRAIN

MFR MANUFACTURER

SNR

BLDG BUILDING

FDN FOUNDATION

MH MANHOLE

SP SPACE

BLK BLOCK

FHMS FLAT HEAD MACHINE SCREW

MIN MINIMUM, MINUTE

SPEC SPECIFICATION

BLKG BLOCKING MACHINE

FH FIRE HYDRANT

MIR MIRROR

S SK SERVICE SINK

BM BEAM

FLR FLOOR

MISC MISCELLANEOUS

SST STAINLESS STEEL

BOT BOTTOM

FLG FLANGE

MO MASONRY OPENING

STD STANDARD

BRG BEARING

FRPF FIREPROOF, FRAME

MTL METAL

STL STEEL

BUR BUILT-UP ROOFING

FTG FOOTING

MTD MOUNTED

STRUC STRUCTURAL

CPT CARPET

FTR FINNED TUBE RADIATION

NIC NOT IN CONTRACT

SUSP SUSPENDEDFRC FIBER REINFORCED CONCRETE

NS NEAR SIDE

T TOP, TILE, TREAD

CH BD CHALKBOARD

GA GAGE

OA OVER ALL

TB TACKBOARD

CEM CEMENT

GALV GALVANIZED

OC ON CENTER

TEMP TEMPORARY

CHAN CHANNEL

GI GALVANIZED IRON

OD OUTSIDE DIAMETER

TERR TERRAZZO

CJ CONSTRUCTION JOINT

GC GENERAL CONTRACTOR

OF. OUTSIDE FACE

T&G TOUNGE & GROOVE

CL CENTER LINE

GL GLASS, GLAZING

OPNG OPENING

TH THRESHOLD, THICK

CLG CEILING

GND GROUND

PR PAIR

TOD TOP OF DECK

CMU CONCRETE MASONRY UNIT

GR GRADE

PNL PANEL

TOJ TOP OF JOIST

CMT CERAMIC MOSAIC TILE

GRL GRILLE

PART PARTITION

TOS TOP OF STEEL

CO CLEAN OUT

GRV GRAVITY ROOF VENT

P/C PRECAST

TPD TOILET PAPER DISPENCER

COL COLUMN

GWB GYPSUM WALL BOARD

PLAS PLASTER

TR TROWELED, TREAD

COMP COMPRESSION, COMPACTEDPL PLATE

TS TUBULAR STEEL

CONC CONCRETE

GYP GYPSUM

P LAM PLASTIC LAMINATE

TYP TYPICAL

CONT CONTINUOUS

HORIZ HORIZONTAL

PT PAINT

UGRD UNDERGROUND

CONTR CONTRACTOR

HC HANDICAPPED

PREFIN PREFINISHED

UH UNIT HEATER

CONV. CONVECTOR

HDWD HARDWOOD

PRV POWER ROOF VENT

UNO UNLESS NOTED OTHERWISE

DBL DOUBLE

HHMS HEX HEAD MACHINE SCREW

PSF LBS PER SQUARE FOOTDET DETAIL

HM HOLLOW METAL

PTD PAPER TOWEL DISPENSER

VERT VERTICAL

DF DRINKING FOUNTAIN

H PT HIGH POINT

QT QUARRY TILE

VCT VINYL COMP. TILE

DIA DIAMETER

HNDRL HANDRAIL

R RADIUS, RISERDIM DIMENSION

HGT HEIGHT

RAD RADIATOR

W/ WITH

DISP DISPENSER

HR HOUR

RC REINFORCED CONCRETE

WC WATER CLOSET / TOILET

DN DOWN

HVAC HEATING, VENTILATION & AIR CONDITIONING

RCP REINFORCED CONCRETE PIPE

WD WOOD

DO DITTORD ROOF DRAIN

WDW WINDOW

DR DRAIN, DOOR

ID INSIDE DIAMETER

RECPT RECEPTACLEDWG DRAWING

IF INSIDE FACE

REINF REINFORCED

WNSC WAINSCOAT

DS DOWNSPOUT

INSUL INSULATION

RET RETAINING

WO WITHOUT

DWL DOWEL

INSTL INSTALLATION

RHMS ROUND HEAD MACHINE

WP WORKING POINT

EA EACH

INT INTERIOR

RHWS ROUND HEAD WOODRM ROOM

EF EACH FACE

RO ROUGH OPENING

EL ELEVATION

FOOD STORAGE BUILDINGFSB

REF REFER, REFERENCE

EPDM ETYLENE PROPYLENE DIENE MONOMER

F2EXISTING HATCHERY BUILDING

F2INCUBATION

EXITEXIT

EXIT

UP

NEW HATCHERY ADDITION

NEW INCUBATION BELOW

BOFFICE AREA

EXITEXIT

EXIT

FIRST FLOOR

MEZZANINE

EXSTEXIT

EXST EXIT

EXST HATCHERYNEW ADDITION

VB

SECTION 506.2 - FRONTAGE INCREASE If=0.47

F2

B - ACCESSORY OCC.

NEW ADDITION 1

REQUIRED

R-19

R-38U=0.40U=0.50

PROVIDED

19,110 SQFT

FF FINISH FLOOR

CJP COMPLETE JOINT PENETRATION

EXST EXIT

12,248

VB

EQIPPLATFORM

EXIT - EXIT PATH ,100' 1014.3, EXCEPTION 2, OCC LOAD <30EXIT TRAVEL DISTANCE - TABLE 2016.1 200'

MECH RM

1

ww

w.te

tra

tech

.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

12/

3/2

013

2:2

1:14

PM

-

P:\2

254

2\13

5-22

542-

1000

1\C

AD

\SH

EE

TF

ILE

S\G

-002

-AB

BR

CO

DE

AN

ALY

-CC

H.D

WG

- D

IMIT

RO

VA

, AN

GE

LIN

A

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

230

Sou

th F

rank

lin, S

uite

300

June

au, A

K 9

9801

Pho

ne:

(90

7) 5

86-6

400

Fax

:(907

) 463

-367

7

CA

NN

ER

Y C

RE

EK

FIS

HH

AT

CH

ER

Y A

DD

ITIO

N

1 2 3

G002

AB

BR

EV

IAT

ION

S,

CO

DE

AN

ALY

SIS

2

2

2

2

2

2 22

2

3

3

3 3

3

1HR FIRERATED WALL,TABLE 508.2.5

3

3

3

Page 7: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

1A-401

10.1 1.6 2.2 3.1 4.1 5.1 6.1

A

B

C

D

E

G

H.1

F

10.1 6 6.12 3 4 5

H.1

H

A

B

C

D

E

G

F

19'-10"18'-8"13'-2" 21'-8"11'-2"13'-10"1'-2"

99'-6"

10'

-0"

13'

-0"

1'-2

"1

8'-1

0"2

0'-0

"1

6'-1

1"2

0'-0

"4"

100

'-3"

20'-4"18'-10"18'-10" 21'-2"19'-2"1'-2"

99'-6"

EXST STORAGE RM

EXST GARAGE/SHOP EXST INCUBATION

3'-0"

BENCH

EGG TAKE ROOM

107

ENTRY

100MECH

106

LOCKERS

104

STAIR

108

17

UP

STO

RA

GE

5'-0

"

UP

EXST HEADBOX ANDPUMP ROOM

INCUBATION

101

EXST POWERGENERATING MODULE

103

TOILET

105

3A-202

1A-201

1A-202

2A-201

3A-201

2A-202

101A

101B

101D

101C

101F

100

100A107C

107

104

108A

100B108

106A 107B

105

20'-9" 25'-0" 14'-2" 39'-7"

10'-6" 31'-9" 10'-4" 6'-7" 7'-0" 7'-6"

4"

20'

-8"

20'

-8"

5'-2

"

CANOPY ABV

4"

4"

5'-6" 19'-6"

2'-6

"

2'-6

"

CANOPY ABV

ADULT COLLECTION FACILITY,REFER STRUC AND PROCESS PIPING

OVERFLOW DRAIN, TYP

4 ty

pA

-202

FOOT BATH, TYP @ INCUBATION DOORS

9'-4

"

CLRACEWAY

MTL GRATING, IF REMOVED FORREVISION ADD TEMP RAILINGSYSTEM @ THREE SIDES & DEADBOLT ADJACENT DOOR SECTION

ROOF LINE ABV

PILASTER AND COLUMN PER STRUC, TYP

GUARDRAIL AND GATE AROUNDTHE PLATFORMS,PER OSHA, TYP

GUARDRAIL ,PER OSHA, TYP

ACCESS OPENING W/GRATING PER P102, TYP

3'-6

"

2'-1

0"

CONC CURB, REF STRUC

SLOPESLOPE

1'8

"m

in

SLAB OPENING & FIXEDGRATING PER STRUC,TO REMAIN IN PLACE @ALL TIMES

STORAGE AREA TEMP RAILING SYSTEM

4A

-202 FOR EXTERIOR WALLS REFER WALL SECTIONS 4/A-202

FOR INTERIOR WALLS REFER WALL TYPES A-602

Egg

Tak

e R

m

4 typA-202

A-101

FIR

ST

FLO

OR

PLA

N

0

SCALE:

4' 8' 16'

1/8" = 1'-0 ''

FIRST FLOOR PLAN1_

SCALE: 1/8"=1'-0"

GENERAL NOTES:

1. ALL DIMENSIONS FOR EXISTING STRUCTURE ARE APPROXIMATE ANDARE TO BE VERIFIED IN FIELD.

ww

w.te

tra

tech

.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

12/

9/20

13 1

1:57

:06

AM

-

P:\2

254

2\1

35-2

2542

-100

01\C

AD

\SH

EE

TF

ILE

S\A

-101

FIR

ST

FLO

OR

PL

AN

.DW

G -

DIM

ITR

OV

A, A

NG

ELI

NA

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

230

Sou

th F

rank

lin, S

uite

300

June

au, A

K 9

9801

Pho

ne:

(90

7) 5

86-6

400

Fax

:(907

) 463

-367

7

CA

NN

ER

Y C

RE

EK

FIS

HH

AT

CH

ER

Y A

DD

ITIO

N

1 2 3

PLANNORTH

NEW WALLS

FLOOR PLAN LEGEND:

EXST WALLS

1

1

1

1

1

2

2

2

2 2 2

2

22 2

2

22

3

3

3

3

3

3

3

3

3

3

3

3

3

33

PLAN NOTES:

1. FOR EXTERIOR WALLS REFER WALL SECTIONS 4/A-2022. FOR INTERIOR WALLS REFER WALL TYPES A-602

3

Page 8: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

2'-0

"

100'-2"

21'-4" 16'-10" 42'-0" 20'-0"

20'

-8"

10.1 1.6 2.2 3.1 4.1 5.1 6.1

A

B

C

D

E

G

H.1

F

10.1 6 6.12 3 4 5

H.1

H

A

B

C

D

E

G

F

19'-10"18'-8"13'-2" 21'-8"11'-2"13'-10"1'-2"

99'-6"

10'

-0"

13'

-0"

1'-2

"1

8'-1

0"2

0'-0

"1

6'-1

1"2

0'-0

"4"

100

'-3"

20'-4"18'-10"18'-10" 21'-2"19'-2"1'-2"

99'-6"

EX

ST

SL

OP

E 5

:12

EX

ST

SL

OP

E 5

:12

EX

ST

EX

ST

SL

OP

E 5

:12

SLO

PE

2:1

2

SLO

PE

2:1

2

SLO

PE

2:1

2

SLOPE 2:12SLOPE 2:12 SLOPE 2:12

SLOPE 2:12

2'-0

"

5'-0

"

3'-0"3'-0"

54'

-7"

24'

-8"

82'

-3"

A-103

RO

OF

PL

AN

0

SCALE:

4' 8' 16'

1/8" = 1'-0 ''

ROOF PLAN1_

SCALE: 1/8"=1'-0"

NOTES

1. ALL DIMENSIONS FOR EXISTING STRUCTURE AREAPPROXIMATE AND ARE TO BE VERIFIED IN FIELD.

ww

w.te

tra

tech

.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

12/

4/2

013

4:0

6:31

PM

-

P:\2

254

2\1

35-2

2542

-100

01\C

AD

\SH

EE

TF

ILE

S\A

-103

RO

OF

PL

AN

.DW

G -

DIM

ITR

OV

A, A

NG

ELI

NA

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

230

Sou

th F

rank

lin, S

uite

300

June

au, A

K 9

9801

Pho

ne:

(90

7) 5

86-6

400

Fax

:(907

) 463

-367

7

CA

NN

ER

Y C

RE

EK

FIS

HH

AT

CH

ER

Y A

DD

ITIO

N

1 2 3

PLANNORTH

2

3

3

3

Page 9: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

EXST BLDGBEYOND,REMAIN

1 2 3 4 5 6

7'-0

"

1'-2"

19'-2"

100'-2"

4"

1'-6" 18'-10" 21'-2" 19'-2"18'-10" 1'-6"

7'-0

"

8'-0

"

10'

-0"

23

3 11

EXST BLDGBEYOND,REMAINS

NEW INCUBATIONBLDG ROOFBEYOND

CANOPY

INSULATED MTLWALL PANELSYSTEM

INSULATED MTLROOF PANELSYSTEM

CONC WAINSCOT WALL

35'-0" FF

0'-0" FIRST FF

4'-0" TOC

14'-0" FF MEZZ

7'-0

"

L5

8'-6

"

22 2 22

3'-6

"

OSHA GUARDRAILSYSTEM, TYP

L5

LOUVER, SEE MECH

NEW INCUBATION BLDGBEYOND

12.23.14.15.16.1

0"

13'-10"

100'-2"

4"

1'-6"13'-2"21'-8"19'-10" 18'-8"4"

EXST BUILDING, TO REMAIN

1.6

11'-2"

NEW BLDG STRUCTURE BEYOND

35'-0" FF

CONC WAINSCOT WALLBEYOND

H.1 E D C B A

7'-0

"

1'-2" 4"10'-0" 18'-10" 20'-0" 20'-0"16'-11"

7'-0

"

F

512

212

0'-0" FIRST FF

4'-0" TOC

G

13'-0"

212

512

212

14'-0" FF MEZZ

7'-0

"

EXST BLDGBEYOND, TOREMAIN

NEW INCUBATIONBLDG ROOF

MTL PANELS

CANOPY

CONC WAINSCOT WALL

35'-0" FF

L4

L3

LOUVER, SEEMECH

12'

-0"

12'

-0"

22

EXSTCARPORT,DEMOED VENT, SEE MECH

1'-0

"

A-201

ELE

VA

TIO

NS

0

SCALE:

4' 8' 16'

1/8" = 1'-0 ''

SOUTH ELEVATION1_

SCALE: 1/8"=1'-0"

ww

w.te

tra

tech

.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

12/

4/2

013

4:0

6:40

PM

-

P:\2

254

2\1

35-2

2542

-100

01\C

AD

\SH

EE

TF

ILE

S\A

-201

CC

HE

LEV

AT

ION

S.D

WG

- D

IMIT

RO

VA

, AN

GE

LIN

A

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

230

Sou

th F

rank

lin, S

uite

300

June

au, A

K 9

9801

Pho

ne:

(90

7) 5

86-6

400

Fax

:(907

) 463

-367

7

CA

NN

ER

Y C

RE

EK

FIS

HH

AT

CH

ER

Y A

DD

ITIO

N

1 2 3

NORTH ELEVATION2_

SCALE: 1/8"=1'-0"

WEST ELEVATION3_

SCALE: 1/8"=1'-0"

2

2

2

2

2

2

2

2

3

3

3

3

3

3 3

Page 10: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

212

123456

1'-2"

19'-2"

100'-2"

4"

1'-6"18'-10"21'-2"19'-2" 18'-10"1'-6"

7'-0

"

7'-0

"

8'-0

"

10'

-0"

212

212

INCUBATION

101 0'0" FIRST FF 0'-0" FIRST FF

4'-0" TOC

14'-0" FF MEZZ

3'-6

"

OSHA GUARDRAILSYSTEM, TYP

EXHAUST FAN,SEE MECH

10'

-6"

7'-0

"M

IN C

LEA

R

L1

7'-0

"

3'-6

"

GUARDRAILSYSTEM, TYP

EXST BUILDING

H.1EDCBA

7'-0

"

1'-2"4" 10'-0"18'-10"20'-0"20'-0" 16'-11"

7'-0

"

F

512

212

0'-0" FF

4'-0" FF

G

13'-0"

212

512

212

INSULATED MTLWALL PANELSYSTEM

INSULATED MTLROOF PANELSYSTEM

CONC WAINSCOTWALL

35'-0" FF

4'-0

"

7'-0

"

L2LOUVER, SEEMECH

12'

-0"

2 2

14

OSHA GUARDRAILSYSTEM, TYP

1 2 3 4 5 6

1'-2"

19'-2"

100'-2"

4"

1'-6"

14'

-0"

24R

@ M

AX

7"

18'-10" 21'-2" 19'-2"18'-10" 1'-6"

7'-0

"

8'-0

"

10'

-0"

7'-0

"

TY

PLAB

206

HALLWAY

200IT

207OPEN OFFICE

201

EGG TAKE ROOM

107

ENTRY

100MECH

106 STAIR

108

min3'-0"

0'-0" FIRST FF

14'-0" FF MEZZ

4'-0" TOC

CLEAR TO FACE OFSTAIR STRUCTURE

0'-0" FIRST FF

4'-0" TOC

14'-0" FF MEZZ

WALL GIRT, PER MTL BLDGMFG

14'

-0"

9'-0

"

0'-0" FIRST FF

4'-0" TOC

14'-0" FF MEZZ

14'

-0"

A-202

ELE

VA

TIO

N A

ND

SE

CT

ION

S

EAST ELEVATION1_

SCALE: 1/8"=1'-0"

ww

w.te

tra

tech

.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

12/

4/2

013

4:0

6:44

PM

-

P:\2

254

2\13

5-22

542-

1000

1\C

AD

\SH

EE

TF

ILE

S\A

-202

CC

HE

LEV

AT

ION

SS

EC

.DW

G -

DIM

ITR

OV

A, A

NG

ELI

NA

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

230

Sou

th F

rank

lin, S

uite

300

June

au, A

K 9

9801

Pho

ne:

(90

7) 5

86-6

400

Fax

:(907

) 463

-367

7

CA

NN

ER

Y C

RE

EK

FIS

HH

AT

CH

ER

Y A

DD

ITIO

N

1 2 3

BUILDING SECTION2_

SCALE: 1/8"=1'-0"

BUILDING SECTION3_

SCALE: 1/8"=1'-0"

WALL SECTION4_

SCALE: 1/4"=1'-0"

0

SCALE:

4' 8' 16'

1/8" = 1'-0 ''

0

SCALE:

2' 4' 8'

1/4" = 1'-0 ''

2

2

2

2

2

2

22 2

2

2

23

3

33

3 3

3

3

33

33

TYPICAL AT EGG TAKE ROOM

3

Page 11: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

2A-403

4A-403

5A-403

UP

1'-6" 19'-2" 18'-10" 21'-2" 18'-10" 19'-2"

10'-6" 12'-1" 19'-6" 7'-0" 7'-6"

100'-2"

20'

-8"

20'

-8"

5'-5

"5

'-10"

1'-6"

5"3

'-6"

2"

3'-6

"

5"

1'-1

1 1

/2"

8'-0

"

3'-10"

1'-6"

10'-4"31'-9"

9'-8

"1

1'-0

"

10'

-8 1

/2" 1

0'-8

1/2

"

9'-1

1 1

/2"

4'-8

"

34'-0"12'-1"8'-1"

23'-1" 4'-0" 11'-0"=12T@11" 7'-11" 14'-2" 39'-11"

5'-6" 14'-2" 5'-4"

EGG TAKE ROOM

107

ENTRY

100MECH

106

LOCKERS

104

STAIR

108

TOILET

105

9'-5

"

SLOPE

SLOPE

0'0"

0'0"

0'0"

0'0"

-0'1"

-0'1"

-0'1"

-0'1"

-0'3/8"0'0"

-0'1"

-0'1"

...

.

1"

9'-2"=11T@11" 3'-0"3'-9"

REF

STORAGE

DN

EQUIPMENT PLATFORM

2'-0

"

15'-10" 7'-3" 16'-0" 21'-2" 39'-11"

12'-2" 7'-0" 12'-2" 7'-0" 7'-6"

100'-2"

20'

-8"

9'-2

"6

'-0"

5'-6

"

20'

-8"

6'-2

"8

'-8"

5'-1

0"

1'-6" 1'-6"

1'-10" 15'-10" 6'-10" 1'-10"

11'-4" 8'-6" 6'-6"

3'-1"

5"3

'-6"

2"

3'-6

"

5"1

'-11

1/2

"

8'-0

"

7'-9

1/2

"1

2'-2

1/2

"

18'-1"

8'-9

1/2

"1

'-0"

3'-6

"6

'-10

1/2

"

1'-6" 19'-2" 18'-10" 21'-2" 18'-10" 19'-2" 1'-6"

JANITOR

205

WOMEN

204

MEN

203

EXHAUST HOOD,REFER MECH

4'-0" 11'-0"=12T@11" 11"

9'-2"=11T@11"3'-9"

4'-0"

1"

9'-7

1/2

"1

0'-4

1/2

"

21'-8"23'-8"9'-0"

10.1 6 6.12 3 4 5

10.1 6 6.12 3 4 5

A-401

EN

LAR

GE

D P

LAN

S

0

SCALE:

2' 4' 8'

1/4" = 1'-0 ''

FIRST FLOOR PLAN1_

SCALE: 1/4"=1'-0"

ww

w.te

tra

tech

.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

12/

9/20

13 1

2:38

:36

PM

-

P:\2

254

2\13

5-22

542-

1000

1\C

AD

\SH

EE

TF

ILE

S\A

-401

CC

HE

NLA

RG

ED

PLA

NS

.DW

G -

DIM

ITR

OV

A, A

NG

ELI

NA

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

230

Sou

th F

rank

lin, S

uite

300

June

au, A

K 9

9801

Pho

ne:

(90

7) 5

86-6

400

Fax

:(907

) 463

-367

7

CA

NN

ER

Y C

RE

EK

FIS

HH

AT

CH

ER

Y A

DD

ITIO

N

1 2 3

PLANNORTH

MEZZANINE2_

SCALE: 1/4"=1'-0"

1

1

11

2

2 2 2

2

2

2

3

3

3

3

3

3

3

3

Page 12: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

GENERAL STRUCTURAL NOTES

THESE NOTES SHALL APPLY UNLESS SHOWN/INDICATED OTHERWISE ELSEWHERE IN

THE STRUCTURAL DRAWINGS.

GENERAL

1. ALL MATERIALS AND CONSTRUCTION SHALL CONFORM TO THE 2009 EDITION OF

THE INTERNATIONAL BUILDING CODE (I.B.C.).

2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS

BEFORE STARTING WORK. DIMENSIONS OF (E) CONSTRUCTION WHERE

SHOWN ON THESE DRAWINGS ARE NOMINAL AND SHOULD BE FIELD VERIFIED.

SHOULD CONDITIONS EXIST WHICH ARE CONTRARY TO THOSE SHOWN ON

PLANS, THE ENGINEER SHALL BE NOTIFIED IN WRITING BEFORE PROCEEDING

WITH WORK.

3. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS

BEFORE STARTING WORK. SHOULD CONDITIONS EXIST WHICH ARE

CONTRARY TO THOSE SHOWN ON PLANS, THE ENGINEER SHALL BE

NOTIFIED IN WRITING BEFORE PROCEEDING WITH WORK.

4. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT

ALL ITEMS OF WORK ARE ADEQUATELY BRACED AND SHORED DURING

CONSTRUCTION.

5. UNLESS DETAILED, SPECIFIED, OR INDICATED OTHERWISE, CONSTRUCTION

SHALL BE AS INDICATED IN THE APPLICABLE TYPICAL DETAILS AND THESE

GENERAL NOTES. TYPICAL DETAILS ARE MEANT TO APPLY EVEN THOUGH

NOT REFERENCED AT SPECIFIC LOCATIONS ON DRAWINGS WHERE THE OCCUR.

6. THE CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED

STRUCTURE. THEY DO NOT INDICATE THE METHOD OF CONSTRUCTION. THE

CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO PROTECT THE

STRUCTURE, WORKERS AND PEDESTRIANS DURING CONSTRUCTION. SUCH

MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO BRACING, SHORING

FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, TEMPORARY STRUCTURES,

AND PARTIALLY COMPLETED WORK, ETC. OBSERVATION VISITS TO THE

SITE BY THE ENGINEER SHALL NOT BE CONSIDERED AS INSPECTION OF

SUCH ITEMS.

7. DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALES SHOWN ON DRAWINGS.

8. ALL WORK SHALL CONFORM TO THE PLANS AND SPECIFICATIONS IN ALL

RESPECTS AND SHALL BE SUBJECT TO APPROVAL BY THE ENGINEER.

9. ASSUMED DESIGN SOIL BEARING VALUE IS 3000 PSF AS PRESCRIBED IN

TABLE 1806.2 OF THE 2009 IBC. ASSUMED SOIL TYPE GW/GP (SANDY GRAVEL

AND/OR GRAVEL). THESE ASSUMED VALUES SHALL BE VERIFIED BY ACTUAL FIELD

TESTING BY THE PROJECT GEOTECHNICAL ENGINEER.

10. THE OWNER SHALL VERIFY LOCATION OF ALL SITE UTILITIES PRIOR TO

STARTING WORK, BOTH ABOVE GROUND AND BELOW GROUND, WHICH MAY BE

IMPACTED BY THE WORK SHOWN ON THESE DRAWINGS. ANY CONFLICTS SHALL

BE BROUGHT TO THE ATTENTION OF THE ENGINEER.

11. ALL ITEMS SHOWN ON THESE PLANS ARE NEW UNLESS NOTED (E), EXIST.

OR EXISTING.

REINFORCING NOTES

1. REINFORCEMENT FOR CONCRETE SHALL BE DEFORMED BARS

CONFORMING TO A.S.T.M. SPECIFICATION A615 (A706/A706M FOR

WELDED REINFORCING). GRADE 60 STEEL SHALL BE USED EXCEPT THAT

#3 BARS AND SMALLER MAY BE GRADE 40 STEEL.

2. ALL REINFORCEMENT, ANCHOR BOLTS, AND OTHER ANCHORAGES PLACED IN

CONCRETE SHALL BE ACCURATELY PLACED AND POSITIVELY

SECURED AND SUPPORTED BY CONCRETE BLOCKS, METAL CHAIRS, SPACERS,

OR METAL HANGERS, AND SHALL BE IN POSITION BEFORE CONCRETE

PLACING OR GROUTING IS BEGUN. DETAILING AND PLACING OF BARS

SHALL CONFORM TO THE A.C.I. MANUAL OF STANDARD PRACTICES.

3. BARS SPECIFIED AS "CONTINUOUS" SHALL EXTEND THE FULL LENGTH OF

THE MEMBER CONTAINING THEM.

CONCRETE NOTES

1. ALL CONCRETE SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE

STRENGTH OF 3000 PSI AT 28 DAYS. SPECIAL INSPECTION IS

NOT REQUIRED (DESIGN COMPRESSIVE STRENGTH IS 2500 PSI).

AGGREGATES SHALL CONFORM TO A.S.T.M. C33.

2. CEMENT FOR CONCRETE SHALL BE TYPE V PORTLAND CEMENT CONFORMING

TO A.S.T.M. C150. TYPES I OR II CEMENT MAY BE USED IF SOIL

SULFATE LEVELS AS DETERMINED BY A GEOTECHNICAL ENGINEER ARE

SUFFICIENTLY LOW.

3. CONCRETE COVER FOR REINFORCING BARS SHALL BE:

CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH = 3"

EXPOSED TO EARTH OR WEATHER: NO. 6 THROUGH NO. 18 BARS = 2"

NO. 5 BARS, W31 OR D31 WIRE, AND SMALLER = 1 1/2"

NOT EXPOSED TO WEATHER OR IN CONTACT WITH THE GROUND:

SLABS, WALLS, JOISTS: NO. 14 AND NO. 18 BARS = 1 1/2"

NO. 11 BARS AND SMALLER = 3/4"

BEAMS, COLUMNS: PRIMARY REINFORCEMENT, TIES, STIRRUPS,

SPIRALS = 1 1/2"

4. DRYPACK SHALL BE 1 PART CEMENT AND 3 PARTS SAND (BY VOLUME).

5. NO PIPES OR DUCTS SHALL BE PLACED IN STRUCTURAL CONCRETE UNLESS

SPECIFICALLY DETAILED.

6. THE LOCATION OF ALL CONSTRUCTION JOINTS NOT SPECIFICALLY NOTED OR

SHOWN SHALL BE APPROVED BY THE STRUCTURAL ENGINEER.

CONCRETE NOTES CONT.

7. ALL NEW CONCRETE SHALL BE CURED BY SPRAYING WITH A LIQUID CURING COMPOUND.

8. LIQUID CURING COMPOUND SHALL BE APPLIED IN ACCORDANCE WITH THE

MANUFACTURER'S PRINTED INSTRUCTIONS AT A MAXIMUM COVERAGE RATE OF 200

SQUARE FEET PER GALLON AND IN SUCH A MANNER AS TO COVER THE SURFACE WITH

A UNIFORM FILM WHICH WILL SEAL THOROUGHLY.

9. WHEN USING THE CURING COMPOUND, CARE SHALL BE EXERCISED TO AVOID DAMAGE

TO THE SEAL DURING THE 7-DAY CURING PERIOD. SHOULD THE SEAL BE DAMAGED OR

BROKEN BEFORE THE EXPIRATION OF THE CURING PERIOD, THE BREAK SHALL BE

REPAIRED IMMEDIATELY BY THE APPLICATION OF ADDITIONAL CURING COMPOUND

OVER THE DAMAGED PORTION.

10. WHEREVER CURING COMPOUND MAY HAVE BEEN APPLIED BY MISTAKE TO SURFACES

AGAINST WHICH CONCRETE SUBSEQUENTLY IS TO BE PLACED AND TO WHICH IT IS TO

ADHERE, SAID COMPOUND SHALL BE ENTIRELY REMOVED BY WET SANDBLASTING JUST

PRIOR TO THE PLACING OF NEW CONCRETE.

11. CURING COMPOUND SHALL BE APPLIED AS SOON AS THE CONCRETE HAS HARDENED

ENOUGH TO PREVENT MARRING ON UNFORMED SURFACES, AND WITHIN 2 HOURS

AFTER REMOVAL OF FORMS FROM CONTACT WITH FORMED SURFACES. REPAIRS

REQUIRED TO BE MADE TO FORMED SURFACES SHALL BE MADE WITHIN THE SAID

2-HOUR PERIOD; PROVIDED, HOWEVER, THAT ANY SUCH REPAIRS WHICH CANNOT BE

MADE WITHIN THE SAID 2-HOUR PERIOD SHALL BE DELAYED UNTIL AFTER THE CURING

COMPOUND HAS BEEN APPLIED. WHEN REPAIRS ARE TO BE MADE TO AN AREA ON

WHICH CURING COMPOUND HAS BEEN APPLIED, THE AREA INVOLVED SHALL FIRST BE

WET-SANDBLASTED TO REMOVE THE CURING COMPOUND, FOLLOWING WHICH REPAIRS

SHALL BE MADE AS SPECIFIED HEREIN.

12. PRIOR TO FINAL ACCEPTANCE OF THE WORK, ALL VISIBLE TRACES OF CURING

COMPOUND SHALL BE REMOVED FROM ALL SURFACES IN SUCH A MANNER THAT DOES

NOT DAMAGE SURFACE FINISH.

13. AS AN ALTERNATIVE TO CURING COMPOUND, NEW CONCRETE MAY BE MOIST CURED BY

COVERING THE CONCRETE WITH POLYETHYLENE SHEETS FOR AT LEAST 7 DAYS. ALL

EDGES OF POLYETHYLENE SHEETS SHALL BE SEALED. THE CONCRETE SHALL BE KEPT

MOIST WITH A FOG NOZZLE FOR THE ENTIRE CURING PERIOD.

13. SLAB CONTROL JOINTS SHALL BE 1/8" WIDE CONTINUOUS SAW CUT AT DEPTH EQUAL

TO 1/4 THE SLAB THICKNESS. FILL JOINT WITH ELASTOMERIC JOINT SEALANT.

13. EXCEPT AS OTHERWISE REQUIRED, EXPOSED CONCRETE CORNERS AND EDGES SHALL

HAVE 3/4" CHAMFERS.

CAST-IN-PLACE ANCHOR BOLTS

1. CAST-IN-PLACE ANCHORS SHALL CONFORM TO ASTM F1554 GR.36 OR BETTER,

UNLESS NOTED OTHERWISE.

2. LOCATE ANCHORS BASED ON THE ENGINEERED METAL BUILDING ANCHOR ROD

SETTING PLAN.

ENGINEERED METAL BUILDING

1. THE ENGINEERED METAL BUILDING SHALL BE DESIGNED BY METAL BUILDING,

SUPPLIER. THIS INCLUDES THE LATERAL LOAD RESISTING SYSTEM AND ALL PERTINENT

COMPONENTS AND CLADDING.

2. TETRA TECH IS NOT RESPONSIBLE FOR THE DESIGN OF ANY ASPECT OF THESE BUILDING

OTHER THAN THEIR FOUNDATION SYSTEMS. THE ENGINEERED METAL BUILDING

REGISTERED DESIGN PROFESSIONAL SHALL SUBMIT ALL DRAWINGS TO THE

CONTRACTOR TO ENSURE CORRECT ANCHOR ROD PLACEMENT.

ALUMINUM NOTES

1. ALUMINUM CONSTRUCTION SHALL BE IN ACCORDANCE WITH IBC CHAPTER 20.

2. STRUCTURAL SHAPES, BARS, PLATES, AND SHEETS INDICATED ON THE DRAWINGS SHALL

BE ALUMINUM MEETING THE ALUMINUM ASSOC, ALLOY 6061-T6 UNLESS OTHERWISE

NOTED. BENT PLATES SHALL BE ALLOY 5052-H34. BOLTS AND OTHER FASTENERS SHALL

BE STAINLESS STEEL. STAINLESS STEEL BOLTS AND THREADED ROD SHALL CONFORM

TO ASTM F593 ALLOY GROUP 2 CONDITION CW. STAINLESS STEEL NUTS SHALL CONFORM

TO ASTM F594 ALLOY GROUP 2 CONDITION CW. STAINLESS STEEL WASHERS SHALL BE

STAINLESS STEEL TYPE 316 MEETING THE DIMENSIONAL REQUIREMENTS OF ASTM F436.

HOLES FOR BOLTS IN ALUMINUM SHALL BE OF SAME DIAMETER AS BOLT +1/16" MAXIMUM

UNLESS OTHERWISE NOTED.

3. WHERE ALUMINUM IS IN CONTACT WITH CONCRETE OR MASONRY SURFACES, CONTACT

SURFACES SHALL BE COATED TO CREATE A DIELECTRIC SEPARATION.

4. ALL WELDING SHALL CONFORM TO THE LATEST EDITION OF THE AMERICAN WELDING

SOCIETY AWS D1.2, STRUCTURAL WELDING CODE FOR ALUMINUM. ALL WELDING SHALL BE

PERFORMED BY A CERTIFIED WELDER IN A BUILDING DEPARTMENT APPROVED SHOP.

WELD FILLER MATERIAL SHALL BE ALLOY 5356. ALTERNATIVELY FOR MATERIALS LESS

THAN OR EQUAL TO 3/8" THICK, WELD FILLER MAY BE ALLOY 4043.

5. MATERIAL MAY BE SHEARED, SAWED, CUT WITH A ROUTER OR ARC CUT. ALL EDGES WHICH

HAVE BEEN CUT BY THE ARC PROCESS SHALL BE PLANED TO REMOVE EDGE CRACKS.

CUT EDGES SHALL BE TRUE AND SMOOTH, AND FREE FROM EXCESSIVE BURRS OR

RAGGED BREAKS. RE-ENTRANT CUTS SHALL BE AVOIDED WHEREVER POSSIBLE. IF USED

THEY SHALL BE FILLETED BY DRILLING PRIOR TO CUTTING. OXYGEN CUTTING OF

ALUMINUM ALLOYS SHALL NOT BE PERMITTED. NO STRUCTURAL ALUMINUM MEMBER

SHALL BE CUT FOR PIPES, DUCTS, ETC. UNLESS SPECIFICALLY DETAILED AND APPROVED

BY STRUCTURAL ENGINEER.

DESIGN CRITERIA

FOOTING DESIGNS ARE BASED ON THE ENGINEERED METAL BUILDING COLUMN

REACTIONS REPORT PROVIDED BY STAR BUILDINGS DATED MARCH 23, 2013.

JOB NUMBER: 12-B-92335.

INCUBATOR TRAY WEIGHTS = 235 PSF

FLOOR LIVE LOAD = 100 PSF

DESIGN CODE: 2006 INTERNATIONAL BUILDING CODE

ASSUMED ALLOWABLE SOIL BEARING = 3000 PSF (PER TABLE 1806.2 OF 2009 IBC)*

* THIS ASSUMED VALUE SHALL BE VERIFIED BY ACTUAL FIELD TESTING BY THE

PROJECT GEOTECHNICAL ENGINEER

ww

w.tetratech.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

2/24/2014 4:26:29 P

M - P

:\22542\135-22542-10001\C

AD

\S

HE

ET

FILE

S\S

-001 G

EN

ER

ALN

OT

E.D

WG

- T

IP

TO

N, T

IM

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

Copyright: T

etra T

ech

230 S

outh F

ranklin, S

uite 300

Juneau, A

K 99801

Phone: (907) 586-6400 F

ax:(907) 463-3677

CA

NN

ER

Y C

RE

EK

F

IS

H

HA

TC

HE

RY

A

DD

IT

IO

N

1 2 3 4

ww

w.tetratech.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

2/24/2014 4:26:29 P

M - P

:\22542\135-22542-10001\C

AD

\S

HE

ET

FILE

S\S

-001 G

EN

ER

ALN

OT

E.D

WG

- T

IP

TO

N, T

IM

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

Copyright: T

etra T

ech

230 S

outh F

ranklin, S

uite 300

Juneau, A

K 99801

Phone: (907) 586-6400 F

ax:(907) 463-3677

CA

NN

ER

Y C

RE

EK

F

IS

H

HA

TC

HE

RY

A

DD

IT

IO

N

1 2 3 4

S-001

ST

RU

CT

UR

AL

GE

NE

RA

L N

OT

ES

TJT

TJT

TJT

JD

M

JD

M

4

Page 13: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

111'-8 5/8"

1'-8 5/8" 9'-6" 89'-6" 9'-4"

6

B

A

10'-3 15/16"

9'-4"

9'-4"

5'-0"

8"

8"

15'-4"

METAL BLDG PILASTER

AND COLUMNS

EXST RACEWAY WALL

DOWEL INTO EXST

RACEWAY WALL

1'-0"

6" 6"

110'-0"

8"

5'-6"

8"

83'-10" 9'-4"

8"

9'-4"

8"

8"

8"

30'-8"

4"

4"

4"

2"

2"

TOC EL 12.00, TYP

REMOVABLE SCREENS

PILASTER,

TYP 8 PLACES

CONTROL JOINTS, TYP

20'-0"

TYP

5'-4"

10'-0"

10'-0"

1

S-301

2

S-301

3

S-301

4

S-301

5

S-301

WEIR PLATE

WEIR PLATE

WEIR PLATE

WEIR PLATE

6

B

A

METAL BLDG PILASTER

AND COLUMNS

EXST RACEWAY WALL

REMOVABLE

SCREENS, SEE

DETAIL 6/S-301

BLDG SLAB NOT

SHOWN FOR CLARITY

FRP GRATING, SPAN AS

SHOWN, TOG EL 16.00 TYP

TOW EL 16.00, TYP

10'-0"

4 EQ SPACES

2'-0"

AL C10x5.28 GRATING

SUPPORT, TYP

TO PILASTER EL

16.50, TYP

2'-0"

2'-0"

AL C10x5.28 GRATING

SUPPORT, TYP

TOW EL 13.25

WEIR PLATE, SEE

DETAIL 1/S-302

TOW EL 14.00

TOW EL 14.75

WEIR PLATE, SEE

DETAIL 1/S-302

TOW EL 13.75

TOW

EL 13.67

TOW EL 14.25

WEIR PLATE, SEE DETAIL 1/S-302

GUARDRAIL, TYP

1'-2"

2'-0"

2'-0"

3'-8"

1'-0"

2'-0"

2'-0"

3'-8"

3'-8" 2'-0"

1

S-301

2

S-301

3

S-301

4

S-301

5

S-301

WEIR PLATE, SEE

DETAIL 1/S-302

CONTROL JOINTS, TYP

10

S-301

9

S-301

ww

w.tetratech.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

11/22/2013 12:18:32 P

M - P

:\22542\135-22542-10001\C

AD

\S

HE

ET

FILE

S\S

-105_R

AC

EW

AY

PLA

N.D

WG

- M

EA

DE

R, JA

CO

B

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

Copyright: T

etra T

ech

230 S

outh F

ranklin, S

uite 300

Juneau, A

K 99801

Phone: (907) 586-6400 F

ax:(907) 463-3677

CA

NN

ER

Y C

RE

EK

F

IS

H

HA

TC

HE

RY

A

DD

IT

IO

N

1 2 3

ww

w.tetratech.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

11/22/2013 12:18:32 P

M - P

:\22542\135-22542-10001\C

AD

\S

HE

ET

FILE

S\S

-105_R

AC

EW

AY

PLA

N.D

WG

- M

EA

DE

R, JA

CO

B

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

Copyright: T

etra T

ech

230 S

outh F

ranklin, S

uite 300

Juneau, A

K 99801

Phone: (907) 586-6400 F

ax:(907) 463-3677

CA

NN

ER

Y C

RE

EK

F

IS

H

HA

TC

HE

RY

A

DD

IT

IO

N

1 2 3

S-105

AD

ULT

R

ET

UR

N F

AC

ILIT

Y P

LA

N

RACEWAY BOTTOM PLAN1

_

SCALE: 3/16"=1'-0"

RACEWAY TOP PLAN2

_

SCALE: 3/16"=1'-0"

0

SCALE:

2'-8" 5'-4" 10'-8"

3/16" = 1'-0''

PLAN

NORTH

Page 14: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

#4@12

#6@12 EF

CONC WEIR

4'-0"

1'-0"

EXST CONC WALL

6"

12" DIA PIPE FLUSH W/

EXT WALL, SEE 1/P-101

SWELL STOP

WATERSTOP FLANGE

1'-8"

4'-0"

110'-0"

1'-0"

6"

TY

P

1" DEEP x 1" x 4" FRP GRATING

CONC PILASTER, TYP

AL C10 GRATING

SUPPORT, TYP

AL WEIR, SEE

DETAIL 1/S-302

#4@12 #4@12

#6@12 EF

AL C810 GRATING

SUPPORT

11

_

#4@12

#6@12 EF

AL WEIR, SEE

DETAIL 1/S-302

EXST FISH

LADDER

4'-0"

1'-0"

#4@12

#6@12 EF

#4@12

4'-0"

1'-0"

#4@12#4@12#4@12 #4@12

4'-0"

1'-0"

#6@12 EF

9'-4"

1'-0"

4'-0"

7

_

AL RT 2.5x2.5x0.250, TYP

CL

2'-4"1'-10"

AL NOMINAL 3/4" SCH 40 PIPE

(OD=1.05", T/WALL=0.113")

8

_

2'-4" 1'-10"

3/4"x8" LONG SLOT CUT

INTO BOTTOM OF FRAME

3/4"x8" LONG SLOT CUT

INTO TOP OF FRAME

8"

1" 2"

TYP

AL NOMINAL 3/4" SCH 40 PIPE

(OD=1.05", T/WALL=0.133")

1 1/4"

1 1/4"

AL RT 2.5x2.5

SST 1/2" DIAx3"

WHS @18" OC, TYP

1/4" AL BENT PLATE

#4@12

6"

3"

3/8" DIA BENT AL ROD

3/16

TYP

2"

VA

RIE

S

5/8" DIA SST THREADED ROD

W/ HILTI-RE 500-SD EPOXY

ADHESIVE W/ 4" MIN EMBED

3 1/2"

AL C10

1'-0"

8" C

ON

C W

ALL

AL BASE PL

X"

X"

X"

TYP

12

_

1/2" DIA SST BOLT

AL C10 BEAM

AL C10 BEAM

13

_

AL PL1/2

5"

1" FRP GRATING

1"

TOS EL 16.00

EXST CONC

WALL

1/4" MIN

1/2" MAX

CLEAR

3/8" DIA SST THREADED ROD

W/ HILTI-RE 500-SD EPOZY

W/ 4" MIN EMBED @ 18" OC

AL C10 BEAM

3"

1/2"

AL PL1/4x3 1/2x6 W/

2-1/2" SST BOLTS

1 1/2"

TY

P

1 1/2"

AL C10 BEAMAL C10 BEAM

3/16

3/16

CL

5"

1" FRP GRATING

TOS EL 16.00

CONC PILASTER

1/4" MIN

1/2" MAX

CLEAR

5/8" DIA SST THREADED ROD

W/ HILTI-RE 500-SD EPOZY

W/ 4" MIN EMBED

AL C10 BEAM

6"

ww

w.tetratech.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

11/22/2013 12:19:46 P

M - P

:\22542\135-22542-10001\C

AD

\S

HE

ET

FILE

S\S

-301_R

AC

EW

AY

SE

CT

IO

NS

.D

WG

- M

EA

DE

R, JA

CO

B

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

Copyright: T

etra T

ech

230 S

outh F

ranklin, S

uite 300

Juneau, A

K 99801

Phone: (907) 586-6400 F

ax:(907) 463-3677

CA

NN

ER

Y C

RE

EK

F

IS

H

HA

TC

HE

RY

A

DD

IT

IO

N

1 2 3

ww

w.tetratech.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

11/22/2013 12:19:46 P

M - P

:\22542\135-22542-10001\C

AD

\S

HE

ET

FILE

S\S

-301_R

AC

EW

AY

SE

CT

IO

NS

.D

WG

- M

EA

DE

R, JA

CO

B

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

Copyright: T

etra T

ech

230 S

outh F

ranklin, S

uite 300

Juneau, A

K 99801

Phone: (907) 586-6400 F

ax:(907) 463-3677

CA

NN

ER

Y C

RE

EK

F

IS

H

HA

TC

HE

RY

A

DD

IT

IO

N

1 2 3

S-301

AD

ULT

R

ET

UR

N F

AC

ILIT

Y S

EC

TIO

NS

SECTION2

S-105

SCALE: 1/2"=1'-0"

SECTION1

S-105

SCALE: 1/4"=1'-0"

SECTION3

S-105

SCALE: 1/2"=1'-0"

SECTION4

S-105

SCALE: 1/2"=1'-0"

SECTION5

S-105

SCALE: 1/2"=1'-0"

0

SCALE:

2' 4' 8'

1/4" = 1'-0''

0

SCALE:

1' 2' 4'

1/2" = 1'-0''

REMOVABLE SCREEN

ELEVATION6

S-105

SCALE: 1/2"=1'-0"

SECTION7

_

SCALE: 3"=1'-0"

0

SCALE:

2" 4" 8"

3" = 1'-0''

DETAIL8

_

SCALE: 3"=1'-0"

DETAIL9

S-105

SCALE: 3"=1'-0"

DETAIL10

S-105

SCALE: 3"=1'-0"

DETAIL11

_

SCALE: 3"=1'-0"

SECTION13

_

SCALE: 3"=1'-0"

SECTION12

_

SCALE: 3"=1'-0"

Page 15: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

9'-4"

AL L 3.5x3.5, TYP

1'-0"

2'-0"

OPGN

AL RT 3x3

4'-0"

AL PL

TOS EL 13.25

3'-8"

AL L 3.5x3.5, TYP

1'-0"

2'-0"

OPGN

AL RT 3x3

4'-0"

AL PL

TOS EL 13.75

7'-4"

2

_

2

_

SIM

9'-4"

AL L 3.5x3.5, TYP

1'-0"

2'-0"

OPGN

AL RT 3x3

4'-0"

AL PL

TOS EL 14.00

3'-8"

2

_

AL L 3.5x3.5, TYP

1'-0"

2'-0"

OPGN

AL RT3

4'-0"

AL PL

TOS EL 14.75

7'-4"

2

_

SIM

AL L 3.5x3.5, TYP

1'-0"

2'-0"

OPGN

AL RT 3x3

4'-0"

AL PL

TOS EL 14.25

7'-0"

2

_

SIM

TOS EL 13.92

TOS EL 13.25

TOS EL 15.08

TOS EL 13.17

TOS EL 14.75

TOS EL 13.08

TOS EL 14.17

AL L 3.5x3.5, TYP

1'-0"

2'-0"

OPGN

AL RT 3x3

4'-0"

AL PL

TOS EL 13.25

7'-4"

2

_

TOS EL 14.17

TOS EL 15.08

3

_

SIM

TOS EL VARIES

AL L 3.5x3.5, TYP

1'-0"

AL RT 3x3

4'-0"

AL PL

VA

RIE

S

WE

IR

O

PG

N

AL L 3.5x3.5, TYP

1 1/2"

AL L 3.5x3.5x1/2"

AL PL1/8"

3/8" DIA SST THREADED

ROD W/ HILTI-RE 500-SD

EPOXY ADHESIVE W/ 4"

MIN EMBED @ 18" OC

ww

w.tetratech.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

11/22/2013 12:19:51 P

M - P

:\22542\135-22542-10001\C

AD

\S

HE

ET

FILE

S\S

-301_R

AC

EW

AY

SE

CT

IO

NS

.D

WG

- M

EA

DE

R, JA

CO

B

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

Copyright: T

etra T

ech

230 S

outh F

ranklin, S

uite 300

Juneau, A

K 99801

Phone: (907) 586-6400 F

ax:(907) 463-3677

CA

NN

ER

Y C

RE

EK

F

IS

H

HA

TC

HE

RY

A

DD

IT

IO

N

1 2 3

ww

w.tetratech.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

11/22/2013 12:19:52 P

M - P

:\22542\135-22542-10001\C

AD

\S

HE

ET

FILE

S\S

-301_R

AC

EW

AY

SE

CT

IO

NS

.D

WG

- M

EA

DE

R, JA

CO

B

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

Copyright: T

etra T

ech

230 S

outh F

ranklin, S

uite 300

Juneau, A

K 99801

Phone: (907) 586-6400 F

ax:(907) 463-3677

CA

NN

ER

Y C

RE

EK

F

IS

H

HA

TC

HE

RY

A

DD

IT

IO

N

1 2 3

S-302

AD

ULT

R

ET

UR

N F

AC

ILIT

Y S

EC

TIO

NS

ALUMINUM WEIRS

ELEVATIONS1

_

SCALE: 1/2"=1'-0"

SECTION2

_

SCALE: 1"=1'-0"

SECTION3

_

SCALE: 3"=1'-0"

0

SCALE:

1' 2' 4'

1/2" = 1'-0''

0

SCALE:

6" 1' 2'

1" = 1'-0''

0

SCALE:

2" 4" 8"

3" = 1'-0''

Page 16: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

6

20'-4"

C

B

A

7'-6"

6

11'-8 5/8"

91'-8 5/8"

101'-4 5/8"

111'-4 5/8"

117'-0 5/8"

17'-6"

27'-6"

37'-6"

1'-8 5/8"

1'-0" T

YP

1'-0" TYP

2'-2 5/8"

12'-2 5/8"

6'-8"

37'-8"

PILASTER, TYP

10'-0" T

YP

9'-4"

REMOVABLE

SCREENS

+14.25

+13.75

WS ELEV = +14.25 ±

WS ELEV = +15.25 ±

WS ELEV = +15.25 ±

FF ELEV = +12.00 (TYP)

AL WEIR TYP

+14.75

2'-0" T

YP

+13.25

WS ELEV = +13.25 ±

WS ELEV =

+13.75 ±

FF ELEV =

+16.5 (TYP)

TOW = +16.0 (TYP)

+14.00

+13.67

10'-10"

6"

9'-10"

20'-2"

10'-0"

4'-0"

9'-4"

VA

RIE

S

2'-0"

AL WEIR PANEL TYP

RACEWAY WALL

RACEWAY WALL BEYOND

C

B

A

P-104

AD

ULT

R

ET

UR

N F

AC

ILIT

Y

ADULT FISH COLLECTION FACILITY PLAN1

_

SCALE: 1/8"=1'-0"

ww

w.tetratech.com

MA

RK

DA

TE

DE

SC

RIP

TIO

NB

Y

11/22/2013 6:19:27 P

M - P

:\22542\135-22542-10001\C

AD

\S

HE

ET

FILE

S\P

-104 A

DU

LT

RE

TU

RN

PLA

N.D

WG

- LA

PE

NT

ER

, B

RID

GE

T

1

A

B

C

D

E

F

2 3 4 5 6 7

Bar Measures 1 inch

Copyright: T

etra T

ech

230 S

outh F

ranklin, S

uite 300

Juneau, A

K 99801

Phone: (907) 586-6400 F

ax:(907) 463-3677

CA

NN

ER

Y C

RE

EK

F

IS

H

HA

TC

HE

RY

A

DD

IT

IO

N

1 2 3

N

TRUE

NORTH

PLAN

NORTH

RACEWAY PLATFORM PLAN2

_

SCALE: 1/8"=1'-0"

10'-0"

8'-11"

9'-1 1/2"

19'-1 1/2"

19'-1 1/2"

1'-5"

5

-

3

-

RACEWAY SECTION3

_

SCALE: 1/2"=1'-0"

PLATFORM

RACEWAY WALL

PLATFORM

PILASTER, TYP

1'-0"

4'-8"

9'-0"

1" FRP GRATE

PLATFORM SECTION5

_

SCALE: 1/2"=1'-0"

CONNECT TO AL

APPROACH

DETAIL TBD

4

-

RACEWAY SECTION AT WEIR4

_

SCALE: 1/2"=1'-0"

9'-4"

MIN WATER LEVEL +14.25

MAX WATER LEVEL +15.25

10'-1"

9'-4"

5'-6"

7'-2 5/8"

7'-2"

1'-0"

9'-3 1/2"

9'-3 1/2"

12'-0" 9'-4"

+12.00

6"

2'-0"

2'-0"

2'-0"

2'-2"

Page 17: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 1

INDEPENDENT CONTRACTOR AGREEMENT This Independent Contractor Agreement (“Agreement”), Made this ___th day of ________, between ____________ (“Contractor”) and Prince William Sound Aquaculture Corporation, of PO Box 1110, Cordova, Alaska 99574 (“PWSAC”) (collectively the “Parties”). Now, therefore, the Parties agree as follows:

1. NOT AN EMPLOYEE AND NO RELATIONSHIP. Contractor agrees to work with PWSAC as an independent contractor and not as an employee. None of the employees of the Contractor shall be employees of PWSAC. The relationship between Parties shall be that of client and independent contractor.

2. CONSTRUCTION SERVICES AND WORK. Contractor agrees to perform the work at PWSAC’s Cannery Creek Hatchery (CCH) as set forth and specified in Exhibits ____ and all attachments thereto (the “Scope of Work Documents”) (the “Hatchery Work”). The Contractor covenants that it is familiar with the scope of work, drawings, and plans referenced in the Scope of Work Documents and that the Hatchery Work is capable of construction and completion under these terms. PWSAC shall not be responsible for any inadequacy of the drawings or specifications in the Scope of Work Documents.

3. TIME OF COMMENCEMENT AND COMPLETION. The Hatchery Work to be performed under this Agreement shall be commenced on or before June 1, 2014, substantially completed by July 15, 2014 (the “Completion Time”), and finally completed by August 1, 2014. Time is of the essence in this Agreement and Contractor acknowledges that PWSAC will suffer specific and consequential damages should the Hatchery Work not be completed as set forth, and when set forth, in this Agreement.

4. EXPERTISE AND WARRANTY. Contractor represents that Contractor has

specific experience and expertise in the areas encompassing the Hatchery Work. Contractor shall perform all Hatchery Work in a workmanlike and professional manner and to the satisfaction of PWSAC. Contractor covenants with PWSAC to furnish its best skill and judgment and to cooperate to further the interests of PWSAC. Contractor further covenants and warrants that all work performed

Page 18: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 2

under this Agreement will conform with all current applicable laws, building codes, and ordinances and will meet or exceed best practices standards in every respect.

5. APPLICABLE CODES, STANDARDS, REGULATIONS. Throughout the Scope of Work Documents, codes, ordinances, regulations, and industry standards that govern the Hatchery Work may be referenced as a guide to the Contractor. However, any reference to codes, ordinances, regulations, and industry standards within the Scope of Work Documents are not to be considered all-inclusive. It is the Contractor’s responsibility to ensure all applicable codes, ordinances, regulations, and industry standards are ascertained and complied with. Unless otherwise noted, all editions referenced in this Agreement and the Scope of Work Documents are the latest edition current and in force at the time of this Agreement

a. Except where the Scope of Work Documents include other requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the this Agreement and the Scope of Work Documents. Such standards are made a part of this Agreement and the Scope of Work Documents.

b. Each entity engaged in design and construction of the Hatchery Work is required to be familiar with industry standards applicable to its design or construction activity. Copies of applicable standards are not bound with the Scope of Work Documents.

c. Where compliance with two or more codes, ordinances, regulations and/or

standards is required, and/or there are conflicting requirements, the stricter code, ordinance, regulation, and/or standard shall prevail.

d. The code and regulatory agencies having jurisdiction over the work

include, but are not limited to the following:

• The City of Cordova Alaska • The State of Alaska

It is the Contractor’s responsibility to ascertain and comply with any and all pertinent laws, codes, and regulations, including those not listed above.

Page 19: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 3

6. LICENSE AND BONDING. Contractor shall provide a performance bond and a

labor and materials bond, in an amount equal to the estimated project cost set forth above. Contractor shall provide proof of all bonding as required of contractors by the State of Alaska. Contractor License No. is ______. Contractor’s bond is _____ deposit ID. No. ________.

7. COMPENSATION. PWSAC shall pay Contractor a stipulated lump sum

inclusive of labor and construction materials FOB ______________ of $___________. OR PWSAC shall pay Contractor on a time and materials basis for the Hatchery Work.

a. The hourly rate for the on-site Hatchery Work will be paid at the rate of $____ per hour per contractor employee. Contractor needs prior approval from PWSAC to exceed ____ hours based on the schedule referenced in Exhibit A.

b. The hourly equipment and labor rates for the loading the Alaska Marine Lines landing craft and PWSAC’s landing craft in Cordova will be paid at the rate schedule referenced in Exhibit A.

c. PWSAC shall provide room and board (three meals per day) while the

Contractor is on-site and engaged in the Hatchery Work.

8. INVOICES AND PAYMENT.

a. Contractor will submit invoices to PWSAC as work is completed and

accepted by PWSAC. Contractor shall be paid within fifteen (15) days following receipt of invoice by PWSAC, unless PWSAC disputes the invoice in writing to Contractor, or unless PWSAC asserts in writing that the work is defective or otherwise not in accord with the terms of this Agreement.

Page 20: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 4

b. Nonpayment of an invoice, or any dispute regarding an invoice and/or sufficiency of work performed by the Contractor, shall not constitute grounds for Contractor to stop work or otherwise cease performance of all its obligations under this Agreement.

c. No invoice payment, nor any partial or entire use or occupancy of the

Hatchery Work by PWSAC, shall constitute an acceptance of any work that is not in accordance with this Agreement.

d. Contractor warrants and guarantees that title to all work, materials, and

equipment covered by an invoice, is free and clear of all liens, claims, security interests or encumbrances, hereinafter referred to as "liens"; that title to all work, materials, and equipment covered by an invoice will pass to PWSAC free of all liens upon receipt of payment; and that no work, materials, or equipment covered by an invoice will have been acquired by the Contractor, or by any other person performing the work at the site or furnishing materials and equipment for the Hatchery Work, subject to an agreement under which an interest therein or an encumbrance thereon is retained by the seller or otherwise imposed by the Contractor or such other person.

e. Upon receipt of written notice that the Hatchery Work is complete and

ready for final inspection and acceptance, and upon receipt of a final invoice, PWSAC will promptly make such inspection and, when it finds the Hatchery Work acceptable under this Agreement and the Agreement fully performed, it will authorize final payment. However, final payment shall not be made until either releases have been provided by all laborers, suppliers, and subcontractors, or, if applicable, 16 days after recordation of the notice of final completion with notice to all parties who have supplied work or materials to the project.

f. The final payment shall not become due until the Contractor submits to

PWSAC: (1) an Affidavit that all payrolls, bills for materials and equipment, and other indebtedness connected with the Hatchery Work for which PWSAC or its property might in any way be responsible, have been paid or otherwise satisfied: (2) consent of surety, if any, to final payment; and (3) if required by PWSAC, other data establishing payment or

Page 21: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 5

satisfaction of all such obligations, such as receipts, releases, and waivers of liens arising out of the Agreement, to the extent and in such form as may be designated by PWSAC. If any subcontractor refuses to furnish a release or waiver required by PWSAC, the Contractor may furnish a bond satisfactory to PWSAC to indemnify it against any such lien. If any such lien remains unsatisfied after all payments are made, the Contractor shall refund to PWSAC all moneys that the latter may be compelled to pay in discharging such lien, including all costs and reasonable attorney’s fees.

g. The making of final payment shall constitute a waiver of all claims by

PWSAC except those arising from: (1) unsettled liens; (2) faulty or defective work; (3) failure of the Hatchery Work to comply with the requirements of this Agreement; (4) terms of any special guarantees required by the Agreement; or (5) warranties provided by the Agreement.

h. The acceptance of final payment shall constitute a waiver of all claims by

the Contractor except those previously made in writing and still unsettled.

9. CHANGES IN WORK. PWSAC, without invalidating the Contract, may order changes in the work consisting of additions, deletions, or modifications, and the Completion Time being adjusted accordingly, if necessary. All such changes in the work shall be authorized by written change order signed by the PWSAC Representative. The Completion Time may only be altered by change order. The cost or credit to PWSAC from a change in the work shall be determined by mutual agreement.

10. COMMUNICATION AND REQUESTS FOR INFORMATION.

a. Communication and Coordination

i. Communication and correspondence shall be between the designated Contractor’s Representative and PWSAC’s Representative.

ii. Communications between subcontractors of any tier, suppliers, and vendors with PWSAC shall be through PWSAC’s Representative, however, subcontractors of any tier, suppliers, and vendors will endeavor to not contact PWSAC’s Representative unless necessary.

Page 22: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 6

iii. Contractor shall communicate questions or request clarification from PWSAC regarding the Hatchery Work only by using a Request for Information (RFI) form as set forth below. Failure to use an RFI form waives all claims related to any question or need for clarification of the Scope of Work Documents and/or Hatchery Work.

b. Requests for Information (RFI). When design and/or construction conditions require additional information, clarification or verification by the Contractor, a written RFI must to be submitted as follows:

i. RFI form shall be submitted to PWSAC’s Representative for approval prior to the start of construction and/or the element of the Hatchery Work that is the subject of the RFI; and

ii. Any Subcontractor RFI must be routed through Contractor and be transmitted to PWSAC’s Representative on the Contractor’s RFI form.

11. ACCOUNTING RECORDS. The Contractor shall check all materials,

equipment, and labor entering into the Hatchery Work and shall keep such full and detailed accounts as may be necessary for proper financial management under this Agreement, and the system shall be satisfactory to PWSAC. PWSAC shall be afforded access to all the Contractor’s records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to this Agreement, and the Contractor shall preserve all such records for a period of three years after the final payment.

12. SUBCONTRACTORS. Contractor has agreed to perform the Hatchery Work without the use of subcontractors and shall not employ any subcontractors and sub-subcontractors unless agreed-to in writing advance by PWSAC. OR Contractor shall not employ any subcontractors and sub-subcontractors unless agreed-to in advance by PWSAC. Contractor shall enter into a written agreement

Page 23: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 7

with each subcontractor that shall require the subcontractor to be bound to the Contractor by the terms of this Agreement and assume toward the Contractor all the obligations and responsibilities, including the responsibility to warrant all work free of liens, and the responsibility for the safety of the subcontractor’s work, which the Contractor, by the terms of this Agreement, owes PWSAC. Each subcontractor agreement shall preserve and protect PWSAC’s rights under this Agreement with respect to the work to be performed by the subcontractor so that the subcontracting thereof will not prejudice PWSAC’s rights, and shall name PWSAC as an intended beneficiary to preserve PWSAC’s rights against the subcontractor. Contractor shall ensure that each subcontractor complies with all applicable laws, codes, and regulations and performs work that meets or exceeds best practices standards. Contractor independently warrants all work performed by any subcontractor and shall defend, indemnify, and hold harmless PWSAC and its agents and employees from and against all demands, claims, damages, losses, and expenses including interest, costs, and attorneys' fees arising out of or resulting from the subcontracting agreement and the performance of the subcontractor’s work, regardless of whether these demands, claims, damages, losses, and expenses are caused in part by a party indemnified hereunder.

13. LICENSES AND EXPENSES. Contractor shall supply and pay all expenses

incidental to Contractor’s business, shall provide all labor and materials, and shall supply all necessary utilities, obtain all permits and licenses, pay all sales, consumer, or use taxes required by law, and otherwise undertake all other duties and responsibilities set out herein.

14. INSURANCE.

a. Contractor agrees to obtain and maintain all necessary licenses, certificates, and insurances for the conduct of its business and in all other ways, to fully comply with all applicable state and federal laws, rules, and regulations. Contractor shall provide PWSAC with copies of its Alaska business license and proof of required insurance set forth herein before Contractor commences any work.

b. The insurance coverage required under this Agreement shall be: (1)

workman’s compensation as required by Alaska law; and (2) general liability insurance as required by AS 08.18 with coverage up to $1,000,000

Page 24: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 8

with Contractor including PWSAC as an additional insured on this general liability policy. The above policies shall not be canceled or altered during the term of this Agreement until at least thirty days’ prior written notice has been given to PWSAC.

15. WORKERS’ COMPENSATION. Contractor understands and agrees that

PWSAC shall not provide any workers’ compensation insurance for Contractor or any of Contractor's employees. All obligations for complying with workers’ compensation requirements for Contractor and its employees shall be the sole responsibility of Contractor.

16. CONTROL. Contractor will operate a minimum of 10 hours per day six (6) days

a week (Monday-Saturday) while at the hatchery site. The Contractor may operate additional daily hours and/or days at the Contractor’s discretion consistent and in conformance with this Agreement. While on any PWSAC property or facilities, including hatchery grounds, Contractor and crew shall abide by the rules and regulations governing PWSAC hatchery employees as referenced in Exhibit A.

17. RECORDS AND REPORTING REQUIREMENTS. Contractor shall provide

PWSAC with reports of services provided to PWSAC every 7 days. Such records shall be the sole property of PWSAC. Contractor is not invited or required to attend staff meetings of PWSAC and its employees. All materials purchased by Contractor for PWSAC under this Agreement shall be and remain the property of PWSAC, provided that the compensation due to Contractor has been paid in full by PWSAC.

18. OTHER CONTRACTS. Contractor is free to contract for similar services and

provide such services to other individuals and businesses without the consent of PWSAC, expressed or implied. It is understood and agreed by the parties that the subject engagement is non-exclusive, and Contractor is free to simultaneously accept other engagements from any other clients, provided such work shall not interfere with the timely completion of this Agreement, or result in a conflict of interest.

19. NO FRINGE BENEFITS. Contractor acknowledges that Contractor and its

employees shall not be entitled to any of the benefits provided by PWSAC to its

Page 25: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 9

employees including sick leave, vacation, retirement, or pension contributions, or health and accident insurance coverage.

20. TRAVEL EXPENSES. PWSAC shall provide mobilization and demobilization transportation for Contractor’s tools, equipment, materials, and employees from Cordova to the hatchery site. PWSAC shall provide transportation/shipment of construction materials (as defined in Exhibit A) from Cordova to the hatchery site. During the construction period, PWSAC may provide Contractor’s employee(s) transportation between Cordova and the hatchery site on a space available basis, at no cost to the Contractor.

21. TAX PAYMENTS. Contractor shall provide the necessary IRS identification

number(s) to PWSAC before commencement of any work. PWSAC shall provide a Form 1099 for amounts paid to Contractor during the tax year. Contractor shall comply with all federal and state tax laws.

22. RISK OF LOSS. The risk of loss in the Contractor’s business shall be borne

entirely by Contractor.

23. TERM AND TERMINATION.

a. The term of this Agreement shall be _______. If this Agreement is terminated prior to the end of its term, Contractor shall only be entitled to payment for work completed in accord with this Agreement and shall have no claim to any consequential damages, including lost profits.

b. If the Contractor defaults by failing to correct defective work or failing to supply materials or equipment in accordance with this Agreement, PWSAC, without any prejudice to any other remedy it may have, may order the Contractor to stop the work, or any portion thereof, until the cause for such order has been eliminated.

c. If the Contractor defaults or otherwise neglects to carry out the work in

accordance with this Agreement or fails to perform any provision of this Agreement, PWSAC may terminate this Agreement. Without prejudice to any other remedies it may have, PWSAC may also remedy any deficiencies after seven days’ written notice to the Contractor. In such case an

Page 26: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 10

appropriate change order shall be issued deducting from the payments then or thereafter due the Contractor the cost of correcting such deficiencies. If the payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay the difference to PWSAC.

d. If the Contractor is adjudged a bankrupt, or if it makes a general assignment

for the benefit of his creditors, or if a receiver is appointed on account of its insolvency, or if it persistently or repeatedly refuses or fails, except in cases for which extension of time is provided, to supply enough properly skilled workmen or proper materials, or if it fails to make prompt payment to subcontractors or for materials or labor, or persistently disregards laws, ordinances, rules, regulations or orders of any public authority having jurisdiction, or otherwise is guilty of a material violation of a provision of this Agreement, then PWSAC may, without prejudice to any right or remedy it may have, and after giving the Contractor and its surety, if any, seven days’ written notice, terminate the engagement of the Contractor and take possession of the site and of all materials, equipment, tools, construction equipment, and machinery thereon owned by the Contractor and may finish the work by whatever method PWSAC may deem expedient. In such case the Contractor shall not be entitled to receive any further payment until the work is finished.

e. If PWSAC terminates the Contract, it shall pay the Contractor for any valid

unpaid invoices for work completed in accord with this Agreement. The Contractor shall, as a condition of receiving the payments referred to in this Agreement, execute and deliver all such papers and take all such steps, including the legal assignment of its contractual rights as PWSAC may require for the purpose of fully vesting in it the rights and benefits of the Contractor under such obligations or commitments. None of this, however, shall prevent PWSAC from deductions and set-offs for any damages caused by Contractor’s breach.

24. CONFIDENTIALITY. Information provided or made available to Contractor by

PWSAC as a result of Contractor performing services for PWSAC is confidential and sensitive, and is the property of PWSAC. Contractor shall not at any time, either directly or indirectly, disclose or communicate any information concerning any matters relating to the business of PWSAC.

Page 27: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 11

25. INDEMNIFICATION.

a. The Contractor shall defend, indemnify and hold harmless PWSAC and its

agents and employees from and against all demands, claims, damages, losses, and expenses including interest, costs, and attorneys' fees arising out of or resulting from the performance of the Work, regardless of whether these demands, claims, damages, losses, and expenses are caused in part by a party indemnified hereunder. The Contractor need not indemnify PWSAC for PWSAC’s sole negligence and comparative fault principles will apply.

b. In any and all claims against PWSAC or any of its agents or employees by

any employee of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this Paragraph shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for the Contractor or any subcontractor under workmen’s compensation acts, disability benefit acts, or other employee benefit acts.

26. HEALTH, SAFETY, AND ENVIRONMENTAL ACTIVITIES. Contractor

shall conduct its business in a healthy and environmentally safe manner. PWSAC reserves the right to audit Contractor’s activities and provide recommendation, and assistance to assure compliance with applicable health, safety, and environmental laws, rules, and regulations.

27. LAW. This Agreement shall be governed by the laws of the State of Alaska.

28. ASSIGNMENT. This Agreement shall not be assigned by operation of law or

through negotiated agreement by the Contractor without the written permission of PWSAC. However, Contractor may delegate performance of the services required under this Agreement to its qualified employees as long as Contractor adequately hires, supervises, and compensates such employees in accord with the terms of this Agreement.

Page 28: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 12

29. ENTIRE AGREEMENT. This Agreement contains all the terms and conditions agreed to by the parties. This Agreement shall be modified only by written amendment signed by both parties.

30. RULES OF CONSTRUCTION. The rule of strict construction of a document

against the drafter is waived in partial consideration for the other covenants contained herein, and all parties to this Agreement recognize that they have been represented by separate counsel or have been afforded that opportunity in this transaction, and all the terms and conditions have been negotiated at arm’s length.

31. HEADINGS. The headings in this Agreement are for reference only and do not

affect the interpretation of the Agreement.

32. NOTICES. All notices under this Agreement shall be sent in writing to the Parties’ designated representatives as follows:

PWSAC: The address specified above ATTN: Dave Reggiani (“PWSAC’s Representative”) Contractor: The address specified above ATTN: _____ (“Contractor’s Representative”)

Page 29: 2. - Prince William Sound Aquaculture Corporationpwsac.com/wp-content/uploads/2014/03/CCH-Fishway-Improvements-RFP.pdfm-101 hvac first floor plan ... relations to other work prior

Page | 13

33. EXHIBITS. 1. Scope of Work 2. Drawings 3. Construction Schedule 4. Hatchery Rules

Wherefore, the parties have set their hands and seals on this day and year. Date:____________, 2014 Contractor: By: _________________________ Its: _________________________ Alaska Business License No.

Tax Identification No.: Date:____________, 2014 PWSAC: Prince William Sound Aquaculture Corporation By: _________________________ David Reggiani, General Manager