2 nd SUMOVER Workshop SUMOVER Project Status
-
Upload
fitzgerald-goodman -
Category
Documents
-
view
28 -
download
2
description
Transcript of 2 nd SUMOVER Workshop SUMOVER Project Status
2nd SUMOVER Workshop
SUMOVER Project Status
Peter Kirstein
Piers O’Hanlon
Socrates Varakliotis
2nd SUMOVER Workshop - Status
Technical details
• WLAN (DHCP and NAT’d)– SSID: INET6– WEP key: INET6
• Presentations– http://www.cs.ucl.ac.uk/research/sumover/workshops/w
orkshop-15-16jan07/presentations/– (or via SUMOVER workshop page)
2nd SUMOVER Workshop - Status
Overview
• Agenda• Lunch arrangements• SUMOVER project status
2nd SUMOVER Workshop - Status
Workshop – Draft AgendaMonday 15th January10am Coffee10:30 Meeting start: Sumover status update11:30 Software management systems12:00 Presentation from Colin Perkins (AVT Working Group chair) on IETF activities12:30 Lunch14:00 RAT15:00 Coffee15:30 VIC
Presentation from Barz Hzu (NCHC)16:30 Talk by Tom Uram (ANL – AG Tech lead) 17:00 Future
Project plansNew features (e.g. DCCP support, new codecs, SRTP etc)
18:00 Day end
Tuesday 16th January10:00 Coffee10:30 Open discussion on future11:30 Optional tool dev session
2nd SUMOVER Workshop - Status
Lunch
• AskPizza?
• Or something else– Indian, Italian, Asian etc…
2nd SUMOVER Workshop - Status
Workpackages
• WP1 : Project management• WP2 : Code management systems
– Source code versioning, Bug/feature tracking, checking/testing tools, project management
• WP3 : Common code base– Bring together source code under ‘one roof’
• WP4 : Tools support– Provide some support for tools
• WP5 : Workshops– Bring together interested parties and community
• WP6 : Tools development projects– Develop some new interesting stuff and publish
2nd SUMOVER Workshop - Status
WP1 : Project management
• Project plan and budget• Project progress report
– Two reports issued, next due end of February
• Website– Info/Docs: Workshop docs/report, Project plan– Code management – Trac & Subversion
• Email lists setup– Web based system - mailman
• Workshop organisation• Project presentations made at:
– OSS2006, AG retreat 06, AHM2006
2nd SUMOVER Workshop - Status
WP2: Software management systems
• Surveyed a number of systems– Source code versioning systems
• CVS, RCS, Git, Bitkeeper, Arch, Subversion
– Bug tracking systems• Bugzilla, Mantis, Trac
– Static analysis tools, Testing suites, Doc systems
• Now running selected system– Trac with Subversion– Imported all existing code and history– Local and external users (ANL) active
2nd SUMOVER Workshop - Status
2nd SUMOVER Workshop - Status
WP3: Common code base
Deliverable: D9: Common Code Base (May 06)• Surveyed existing patches
– ANL, VRVS, External (NCHC, Glasgow, ANU)
• Licensing– Staying with BSD style license– Re-organise code for external linkage of GPL components
• Have established collaboration partners– ANL, NCHC, Glasgow, ANU– Having regular AG based meetings
• Working towards convergence– First converged code base for AG (Early ’07)
2nd SUMOVER Workshop - Status
WP4: Tools support
Deliverable: D10: Tool Support (Oct 06)• Utilising new software management systems• Integrating in existing features
– E.g. H.264, MPEG4, Hardware Rendering, etc
• Coordinate with external developers– Direct email/conferencing, Sumover-dev mailing list
• Work with:– Users, AG-Tech, AGSC, inSORS
• Stimulate contributions from community– Code, Bugs, Features, Docs
2nd SUMOVER Workshop - Status
WP5: Workshops
• Organised and ran first workshop at UCL– Participants: 16 + 3 (AG remote)– Brought together ANL, VRVS, inSORS and others– Laid ground for continued collaboration– Discussed and ordered features list – on wiki– Platforms
• Support new Linux and WinXP versions, plus some OSX
• Second workshop is right here!– Continue on from first one.
2nd SUMOVER Workshop - Status
WP6: Tools development projects
• A lot of discussion at 1st workshop• Put up list of features/changes on Web
– Encouraging external input
• Selected a few new features as “dev projects”– Done: Logo sender, SSM, New codecs, GUI mods– Possible: Talk about that in Future section
• New video tool project– Collaborative effort with NCHC and ANU
• Most work being done in NCHC – Gstreamer based
– Regular meetings have enhanced SUMOVER collaboration
2nd SUMOVER Workshop - Status
Evaluation
• Internal evaluation– Progress reports (6 monthly)
• Two issued so far.
– Final project report
• JISC evaluation– JISC meetings– Project officer discussions
• Evaluation and steering advisory group (ESAG)– Hosted first evaluation meeting in
• Core workshop attendees and others