THE AMERICAN UNIVERSITY IN CAIRO SCHOOL OF HUMANITIES AND SOCIAL SCIENCES DEPARTMENT OF POLITICAL SCIENCE THE INFLUENCE OF NATIONAL AID COORDINATION ON THE IMPACT OF AID PROGRAMS LENE SKRUMSAGER MOELLER A THESIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF ARTS IN POLITICAL SCIENCE MARCH/2006

Transcript of 2 List of Contents and Thesis

Page 1: 2 List of Contents and Thesis

THE AMERICAN UNIVERSITY IN CAIRO

SCHOOL OF HUMANITIES AND SOCIAL SCIENCES

DEPARTMENT OF POLITICAL SCIENCE

THE INFLUENCE OF NATIONAL AID COORDINATION ON THE IMPACT OF AID PROGRAMS

LENE SKRUMSAGER MOELLER

A THESIS SUBMITTED

IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR

THE DEGREE OF MASTER OF ARTS IN

POLITICAL SCIENCE

MARCH/2006

Page 2: 2 List of Contents and Thesis

This research is dedicated to the Egyptians and especially the people working within the

Egyptian authorities dealing with the planning and coordination of the country’s aid

activities.

The Egyptians interviewed in this research investigation have been incredibly kind,

trustful and helpful. I have met greater willingness among Egyptians to help me than I

have met in any other country I have been.

Page 3: 2 List of Contents and Thesis

ACKNOWLEDGEMENT

My foremost acknowledgement goes to my parents who supported my idea of moving to

Egypt to study my Master in the field of development. All the ballast I have gotten from

you made me able to make my dream come true by studying development in an

African/Middle Eastern country.

The next acknowledgement is to all the Egyptians that have welcomed me in their

country. The Egyptian warmth and caring have been fantastic and I wish this thesis on

how aid is coordinated in Egypt could be a constructive way of paying back. My aim is to

help the Egyptian system to increase its outcome of aid to the benefit of all Egyptians.

My period in Egypt would not have been so wonderful if it had not been for the

incredible friendship with Mohammed Ibrahim Regab Fahmy from the American

University in Cairo. I have never had a better friend and study partner.

Also all my professors, friends and fellow-students deserve the greatest thank you for the

two years at the American University in Cairo being such a challenging and valuable time

in my life.

Page 4: 2 List of Contents and Thesis

vi

CONTENTS

LIST OF ABBREVIATIONS ............................................................................................ VIII

1 NATIONAL AID COORDINATION ................................................................................. 1

INTRODUCTION ....................................................................................................................... 1 OUTLINE ................................................................................................................................. 3 THE RESEARCH PROBLEM ....................................................................................................... 3 HYPOTHESIS AND RESEARCH QUESTIONS ............................................................................... 3 LITERATURE REVIEW .............................................................................................................. 5

Theories of Aid Coordination ............................................................................................ 5 The Influence of National Aid Coordination on the Impact of Aid Programs ................. 11 Case study – Egypt and the Environmental Sector Program .......................................... 18

METHODOLOGY AND APPROACHES ...................................................................................... 20

2 NATIONAL COORDINATION OF AID IN EGYPT .................................................... 26

AID ACTIVITIES IN EGYPT ..................................................................................................... 27 PLANS, VISIONS AND STRATEGIES FOR DEVELOPMENT AND THE ENVIRONMENT IN EGYPT .. 30 MINISTRY OF PLANNING ....................................................................................................... 38

Goals, Visions and Objectives ......................................................................................... 39 The Process of Making Plans .......................................................................................... 40

ANALYSIS OF MINISTRY OF PLANNING ................................................................................. 43 Planning - Aspects of Concern ........................................................................................ 43 Follow-up ......................................................................................................................... 49 Participatory Approach ................................................................................................... 50

MINISTRY OF INTERNATIONAL COOPERATION ...................................................................... 53 Goals, Vision and Objectives ........................................................................................... 53 Structure and Functions ................................................................................................... 54

ANALYSIS OF MINISTRY OF INTERNATIONAL COOPERATION ................................................ 55 Execution of Plans ........................................................................................................... 55 Follow-up ......................................................................................................................... 59 Issues pertaining to Execution and Follow-up ................................................................ 62

PREREQUISITES FOR NATIONAL AID COORDINATION IN EGYPT ............................................ 66 CONCLUSIONS ....................................................................................................................... 72

3 ENVIRONMENTAL SECTOR PROGRAM - AND ITS INTERNAL NATIONAL

INVOLVEMENT ................................................................................................................... 75

ACCOUNT ON ENVIRONMENTAL AID TO EGYPT .................................................................... 75 THE ENVIRONMENTAL SECTOR PROGRAM ............................................................................ 78 ANALYSIS ............................................................................................................................. 84 FINDINGS AND CONCLUSIONS ............................................................................................... 88

4 ENVIRONMENTAL SECTOR PROGRAM – AND ITS SECTOR AND CROSS-

SECTOR NATIONAL COORDINATION ......................................................................... 90

MINISTRY OF STATE FOR ENVIRONMENTAL AFFAIRS, EGYPTIAN ENVIRONMENTAL AFFAIRS

AGENCY ................................................................................................................................ 90 Goals, Vision and Objectives ........................................................................................... 92 Functions.......................................................................................................................... 92 Structure ........................................................................................................................... 93 Issues pertaining to Coordination of Environmental Aid ................................................ 98 National Environmental Development Strategies .......................................................... 106

Page 5: 2 List of Contents and Thesis

vii

Follow-up ....................................................................................................................... 109 Participatory Approach ................................................................................................. 111 Sector-coordination of the Environmental Sector Program .......................................... 113

DEPARTMENT OF INTERNATIONAL COOPERATION IN THE MINISTRY OF STATE FOR

ENVIRONMENTAL AFFAIRS ................................................................................................. 116 Sector- coordination of the Environmental Sector Program ......................................... 116

MINISTRY OF PLANNING ..................................................................................................... 121 Cross-sectoral national coordination of the Environmental Sector Program............... 121

MINISTRY OF INTERNATIONAL COOPERATION .................................................................... 124 Cross-sectoral National Coordination of the Environmental Sector Program ............. 124

CONCLUSION ....................................................................................................................... 125

5 FINDINGS AND CONCLUSIONS ................................................................................. 132

BIBLIOGRAPHY ................................................................................................................ 137

APPENDIX ........................................................................................................................... 145

A: DETAILS ON SHORT, MEDIUM AND LONG TERM PLANNING DOCUMENTS IN EGYPT ...... 145 Development Objectives of “Long Term Development Vision 2022” ........................... 145 Strategic elements of The Fifth Five-Year Plan for Socio-Economic Development ...... 145 Focus of “The Economic and Social Development Plan for 2003/2004” ..................... 146

B: DETAILS ON RESPONSIBILITIES AND FUNCTIONS OF THE MINISTRY OF INTERNATIONAL

COOPERATION ..................................................................................................................... 147 MIC’s responsibilities according to Presidential Decree 303 of year 2004 ................. 147 The main functions of the MIC strategy to fulfill its mandate ....................................... 148

C: THE IMMEDIATE OBJECTIVES OF THE COMPONENTS IN THE ENVIRONMENTAL SECTOR

PROGRAM ........................................................................................................................... 149 D: COLLABORATION BETWEEN COMPONENTS AND PROGRAM MANAGEMENT UNIT &

BETWEEN PROGRAM MANAGEMENT UNIT AND PROGRAM COORDINATION COMMITTEE .... 150 E: TASKS THAT THE EEAA HAS TO UNDERTAKE TO REACH ITS OBJECTIVES ....................... 152 F: COORDINATION BETWEEN DEPARTMENT OF INTERNATIONAL COOPERATION AND THE

PROGRAM MANAGEMENT UNIT .......................................................................................... 153 G: ENVIRONMENTAL OBJECTIVES IN “THE ECONOMIC AND SOCIAL DEVELOPMENT PLAN FOR

2003/2004” ......................................................................................................................... 154 H: INTERVIEW GUIDE .......................................................................................................... 155

Page 6: 2 List of Contents and Thesis

viii

LIST OF ABBREVIATIONS

ACI Achieving Compliance in Industry (in ESP) ADB African Development Bank CAPMAS Central Agency for Public Mobilization and Statistic (in Egypt) CDFs Comprehensive Development Frameworks CEM Communication in Environmental Management (in ESP) CEO Chief Executive Officer DAC Development Assistance Committee DAG Development Association Group (in Egypt) DANIDA Danish International Development Assistance DCR Development Cooperation Report (in Egypt) DKK Danish Kroners DECODE Development Cooperation Data of Egypt (in MIC) DEM Decentralized Environmental Management (in ESP) DIC Department of International Cooperation (in EEAA) DMFA Danish Ministry of Foreign Affairs EEAA Egyptian Environmental Affairs Agency (in MSEA) EIB European Investment Bank EIMP Environmental Information and Monitoring Program (in ESP) EMG Environmental Management in the Governorates (in ESP) EMU Environmental Management Units (in Egypt) EPF Environmental Protection Fund (in Egypt) ESP Environmental Sector Program EU European Union GEAPs Governmental Environmental Action Plans GoE Government of Egypt IMF International Monetary Fund KIMA The Fertilizer and Ferrosilicon Plant (in ESP) MDG Millennium Development Goals MIC Ministry of International Cooperation (in Egypt) MOIC (once) Ministry of International Cooperation (in Egypt) MoP Ministry of Planning (in Egypt) MSEA Ministry of State for Environmental Affairs (in Egypt) NIB National Investment Bank (in Egypt) NEAP National Environmental Action Plan (in Egypt) NGO Non Governmental Organization NPI National Planning Institute (in Egypt) NSSD National Strategy for Sustainable Development ODA Official Development Assistance OECD Organisation for Economic Co-operation and Development PEMA Centre for Project Evaluation and Macro-economic Analysis PMU Program Management Unit (in ESP) PSU Program Support Unit (in ESP) PCC Program Coordination Committee (in ESP) RBO Regional Branch Offices (in Egypt) REAPs Regional Environmental Action Plans SDEM Support to Decentralized Environmental Management (in ESP) SPS Sector Program Support UN United Nations

Page 7: 2 List of Contents and Thesis

ix

UNDP United Nations Development Program US$ United States Dollars USAID United States Agency for International Development WB World Bank

Page 8: 2 List of Contents and Thesis

1

CHAPTER 1

NATIONAL AID COORDINATION

Introduction

The Millennium Development Goals (MDGs)1 aim to address the needs of developing

countries, and are scheduled to be accomplished by 2015. As the current efforts to meet these

commitments2 do not seem to be on track to achieve this, a new international aid agenda has

arisen. This agenda is led by development scholars and development entities, which have a

belief that aid coordination3 should be the responsibility of the partner countries4. In addition,

the agenda emphasizes the importance of donor harmonization5 in response to national

strategies and priorities. The proponents of the agenda anticipate that these changes in donor

and partner roles are essential to achieve ‘sustainable development’6 as outlined in the

1 The Millennium Development Goals (MDGs) are a set of goals and objectives derived from the United Nations Millennium Declaration that were agreed upon by 189

world leaders at the United Nations World Summit in New York in 2000. The MDGs are goals of development in the areas of poverty and hunger, universal primary

education, gender equality and empowering of women, child mortality, maternal health, combating HIV/AIDS, ensuring environmental sustainability, and building global

partnerships for development. http://www.un.org/millenniumgoals and http://unstats.un.org/unsd/mi/pdf/MDG%20Book.pdf (accessed November 16, 2005).

2 United Nations, The Millennium Development Goals Report (New York: United Nations Department of Public Information, 2005)

3 United Nations Development Program (UNDP) defines aid coordination as ”the planning and procurement by a recipient government of aid from its donor partners and its

integration into national development strategies”. UNDP. Aid Coordination and Aid Management by Government: A Role for UNDP. (New York: OESP Series on Lessons

Learned, 1996), v.

The main international donors state in the Rome Declaration “We attach high importance to partner countries' assuming a stronger leadership role in the coordination of

development assistance, and to assisting in building their capacity to do so.” World Bank, Rome Declaration on Harmonization (Rome: February 24 - 25, 2003), 1.

In some literature e.g. the Paris Declaration the word alignment is used to describe the donors’ overall role in national aid coordination, which of course is to align their

support to the national strategies. World Bank, Paris Declaration on Aid Effectiveness (Paris: February28 - March 2, 2005), 3.

4 Also referred to as national ownership. Ideally this means that the “partner countries exercise effective leadership over their development policies, and strategies and co-

ordinate development actions”. World Bank, “Paris Declaration on Aid Effectiveness,” 3.

5 Harmonization in the Rome Declaration: “Our deliberations are an important international effort to harmonize the operational policies, procedures, and practices of our

institutions with those of partner country systems to improve the effectiveness of development assistance, and thereby contribute to meeting the Millennium Development

Goals.” World Bank, “Rome Declaration on Harmonization,” 1.

6 Sustainable development is understood here according to its original definition in the Brundtland Commission from 1987; “Development that meets the needs of the

present without compromising the ability of future generations to meet their own needs. It contains within it two key concepts: the concept of "needs", in particular the

essential needs of the world's poor, to which overriding priority should be given; and the idea of limitations imposed by the state of technology and social organization on the

environment's ability to meet present and the future needs”. http://www.adrc.or.jp/publications/terminology/top.htm (accessed November 16, 2005).

Page 9: 2 List of Contents and Thesis

2

MDGs. In just five years, this group has taken full control over the international aid agenda.7

The inherent dilemma residing within this approach is that developing countries usually face

great difficulties of identifying their problems, and moreover to find efficient solutions.

However, there has been little in-depth analysis and practical scrutiny of what problems the

governments of developing countries actually face in planning and coordinating aid. This

research effort demonstrates that the practical implementation of national aid coordination is

highly complex and will take longer to achieve than expected by proponents of the new

international aid agenda. It will be shown that the prerequisites necessary for implementing

this agenda are not necessarily in place in developing countries. A detailed description of the

actual challenges pertaining to national aid coordination for a developing country is essential

for improving the practical implementation of this new approach to development.

The thesis analyzes to what extent national aid coordination takes place, and whether

it affects the outcome of aid programs. As most official development assistance activities are

part of larger sector programs, this research will focus on coordination of aid “programs”

instead of “projects”. National aid coordination is examined in the case of Egypt, looking at

the processes and mechanisms of aid coordination by the Ministry of Planning (MoP) and the

Ministry of International Cooperation (MIC). The Environmental Sector Program (ESP) is

reviewed within the Ministry of State for Environmental Affairs (MSEA) as a case study to

analyze in detail how national coordination affects the outcome of a particular program.

Extensive interviews of government officials were carried out to identify the official

procedures as well as the practical implementation and challenges of the national aid

coordination in Egypt.

7 World Bank, “Rome Declaration on Harmonization,” 1.

Page 10: 2 List of Contents and Thesis

3

Outline

This study is divided into five main areas. The first chapter presents the theoretical

framework of aid coordination, followed by a broader literature review that situates the topic

of the thesis in a multi-faceted context. Additionally, in Chapter I, the reasons for the

selection of the case study, as well the methodology, research problem, hypothesis and

research questions are provided. Chapter II presents the research on the national institutions

that deal with aid coordination in Egypt, answering in general terms whether Egypt has

national aid coordination. Chapter III provides a case study of the “Environmental Sector

Program”, showing the internal procedures of national aid coordination within this specific

program. In Chapter IV provides an in-depth analysis of the sector coordination within the

field of environment as well as the cross-sectoral national aid coordination and its impact on

the outcome of the ESP. The aim of this chapter is to answer whether Egypt in the specific

case of the ESP in actual fact has national aid coordination, and whether this coordination

enhances the intended outcome of the aid program. Finally, Chapter V offers the findings

concerning the extent to which national aid coordination exists, and whether it can support

the accomplishment of the intended impact of an aid program in the case of the current

research.

The Research Problem

To what extent does national coordination of foreign aid programs facilitate and support the

accomplishment of the intended outcome of an aid program?

Hypothesis and Research Questions

To provide an answer to the research problem, this research discusses the following two

hypotheses:

Page 11: 2 List of Contents and Thesis

4

i. Egypt has national aid coordination

ii. National aid coordination can enhance the intended outcome8 of an aid program in

Egypt.

To present comprehensive accounts as answers to both hypotheses, specific research

questions were formulated and used in the research. The following research questions have

guided this research in order to answer the first hypothesis: Is there an Egyptian authority

with the responsibility of coordinating foreign aid programs? How is the responsibility of

coordination of foreign aid programs taken care of by this authority, officially as well as in

practice?; Is the Egyptian authority that plans and prioritizes the overall national policies

responsible and in charge of the coordination of all foreign aid programs, including the

Environmental Sector Program (ESP)?; How do the Egyptian authorities plan, prioritize and,

thereafter, coordinate foreign aid? - Is there a national holistic development strategy/plan in

Egypt that it being used in the coordination of foreign aid? Who made it and how was it

made?; Is national coordination done in a state forum with a participatory approach to learn

from donors, society, international institutions; Did the Egyptian authorities make sure that

the ESP fits into a national holistic development plan?; And finally, Has the Egyptian

environmental authority, MSEA, coordinated and ensured that the ESP fits into a national

holistic environmental development plan?

The following specific research questions were used in the research in order to answer the

second hypothesis: Is the current internal coordination in the Environmental Sector Program

beneficial to the outcome of the ESP? If yes, how? - Does the ESP staff prioritize the

coordination of the ESP internally in the MSEA?; Is the present environment-sectoral

national aid coordination instrumented by MSEA beneficial to the outcome of the ESP? If

yes, how?; Does the Department of International Cooperation in MSEA have good relations

8 Intended outcome refers to the objectives that the owners of a program intend to reach as a result of the output of the program activities. The intended outcome is stated in the program documents.

Page 12: 2 List of Contents and Thesis

5

with the MIC and the MoP? - Does this influence how much money and to what activities

donor funds are being used in the field of environment?; and finally; Is the present cross-

sectoral national aid coordination, instrumented by MIC and MoP beneficial to the outcome

of the ESP? If yes, how? Does the way the ESP is coordinated at national and local levels

draw upon beneficial elements of the participatory approach?

Literature Review

This literature review deals with the most pivotal secondary sources that will be utilized in

the course of this research. Firstly, the literature of the theoretical framework on aid

coordination is provided, which deals with theories of aid coordination and the impact of aid

coordination on aid programs. Finally, a review of the literature concerning the chosen case

study on Egypt and the environmental sector program is presented.

Theories of Aid Coordination

A framework of concepts, theories and strategies of national aid coordination has been

collected from different development forums including the Development Assistance

Committee (DAC) in the Organization for Economic Cooperation and Development (OECD)

for bilateral donor agencies and multilateral as the European Union (EU), the International

Monetary Fund (IMF), World Bank (WB), and United Nations Development Program

(UNDP). The theoretical framework is divided according to the different aspects of aid

coordination, beginning with an introduction of the theoretical conceptualization of the term

aid coordination, and its role in the international agenda. Presented hereafter is the

theories/theorists that argue that aid coordination increases the intended impact of aid

programs. Subsequently, different ways of beneficial aid coordination regarding both

stakeholders and strategies are offered. Lastly, the core theory of this research is presented: it

Page 13: 2 List of Contents and Thesis

6

discusses the role of the local government with regard to aid coordination and how national

aid coordination can increase the impact of aid programs.

Coordination of Aid and its Role on the International Development Agenda

“Coordination occurs when two or more individuals (or organizations) with distinct skill sets

join to work together toward a shared goal.”9 In the book Aid Coordination and Aid

Management by Government: A Role for UNDP, the UNDP defines aid coordination as, ”the

planning and procurement by a recipient government of aid from its donor partners and its

integration into national development strategies.”10 The citation below serves to demonstrate

that coordination is not a concept that is alien or new to the world of development.

“Coordination and harmonization have become buzz-words that resonate through the corridors and meeting rooms of any gathering related to development cooperation. Coordination broadly refers to any activity between donors to mobilize aid resources or to harmonize their policies, programmes, procedures and practices so as to use those resources most effectively. Coordination is not a new concept in development. The Pearson Commission addressed the issue over thirty years ago in its report, “Partners in Development” (1970).”

11

Aid coordination plays a significant role in the academic field of development, the rhetoric

field and (somewhat more limited) in the practical field of development as well.

According to the article by Marc Claret de Fleurieu Towards more Effective

Development Cooperation: the EU’s Coordination and Harmonization Initiative there are

three levels of content and three degrees of intensity in coordination:

“Three content levels of coordination: (a) policies, principles and

priorities, (b) procedures, and (c) practices. The first is about harmonising goals and activities. The second is about formal institutional rules and regulations (including financial controls for disbursement, accounting and auditing). The third is less formal than procedures. Three degrees of intensity of coordination: (x)

consultation, (y) cooperation and (z) collaboration. Consultation is

9 (www.nonprofithub.com/coordination.htm (accessed November 16 2005). 10 UNDP, v. 11 Marc Claret de Fleurieu, “Towards more Effective Development Cooperation: the EU’s Coordination and Harmonization Initiative”, The Courier ACP-EU, no. 196 (2003): 18.

Page 14: 2 List of Contents and Thesis

7

about sharing information between parties. Cooperation involves discussing policies, priorities and principles in order to identify areas in which harmonisation is possible. Collaboration means agreeing procedures and practices in an effort to ensure smooth, shared implementation of agreed policies in line with agreed principles and priorities. Joint action is probably the highest form of collaboration.”

12

This division of coordination is in accordance with the division used by Arne Disch in Aid

Coordination and Aid Effectiveness13 and shows that coordination can take place at a variety

of levels and to different extents. This categorization is being used in the context of the

current analysis to structure and assess the different shapes and forms of aid coordination in

Egypt. In this research, the objective is to analyze the nature of the coordination on the

national as well as the sectoral (the environmental sector) level. That is, the focus of this

research is not on the coordination that occurs at the international arena within international

institutions as for example the DAC, but more directed towards the partner country level.

Practical Account on the Development of Aid Coordination

By and large, the focus on aid coordination began at the Rio Earth Summit in 1992 that

resulted in a major sustainable development strategy: Agenda 21 requested each country to

draw up a national strategy of sustainable development.14 In 1997, the Special Session of the

United Nations General Assembly set a target date of 2002, signifying “the formulation and

elaboration of national strategies for sustainable development that reflect the contributions

and responsibilities of all interested parties should be completed in all countries, with

assistance provided, as appropriate, through international cooperation, taking into account the

12 Claret de Fleurieu, 18-20. 13 Arne Disch, Aid Coordination and Aid Effectiveness (Oslo: Royal Ministry of Foreign Affairs, 1999), 18. 14 (http://members.tripod.com/sd_east_timor/contacts/Contacts_PROC.htm#_Publications_and_strategies (accessed November 15, 2005).

Page 15: 2 List of Contents and Thesis

8

special needs of the least developed countries.”15 In September 2000, the Millennium

Declaration with the MDGs followed this global initiative and encouraged further

coordination of aid activities.

In 2001, the DAC Ministerial Council took an innovative path by appointing the Task

Force on Donor Practices. In this forum, multilateral donors and developing countries

worked together on equal terms with the OECD members, to put forward recommendations

concerning donor harmonization. Furthermore, the international community asserted the

desire and willingness to increase aid coordination at the World Summit of Sustainable

Development in Johannesburg in 2002, held as a sequel follow-up to the Earth Summit in Rio

in 1992. After the United Nations Conference on Financing for Development in Monterrey in

2002, that introduced the global partnership for development, the DAC Task Force also

presented its recommendations on donor harmonization. These recommendations about

donor harmonization with partner country systems were approved by the DAC Ministerial

Council and adopted by the bilateral and multilateral donors at the High-Level Forum in

Rome in February 2003 known as the Rome Declaration on Harmonization. Following upon

that, and orchestrated by the French government, the World Bank, the Organization for

Economic Co-operation and Development (OECD) and other regional development banks

held a High Level Forum entitled "Joint Progress Toward Enhanced Aid Effectiveness:

Harmonization, Alignment, Results" in Paris in spring 2005. The Forum assessed the

progress achieved in making aid more efficient since the adoption of the Rome Declaration

on Harmonization and proclaimed the Paris Declaration on Aid Effectiveness, which stresses

15 “Report of the International Forum on National Sustainable Development Strategies”. International Forum on

National Sustainable Development Strategies. Accra, Ghana, 7-9 November 2001, http://www.nssd.net/pdf/ifnsds1.pdf

Page 16: 2 List of Contents and Thesis

9

the need for strengthening partner countries’ national development strategies and operational

frameworks as well as increasing donor alignment.16

At the latest United Nations World Summit in September 2005, the aid strategy of

national responsibility of national development strategies was further underlined in the 2005

World Summit Outcome:

“We reaffirm that each country must take primary responsibility for its

own development and that the role of national policies and development strategies cannot be overemphasized in the achievement of sustainable development. We also recognize that national efforts should be complemented by supportive global programmes, measures and policies aimed at expanding the development opportunities of developing countries, while taking into account national conditions and ensuring respect for national ownership, strategies and sovereignty.”

17

On aggregate, there is no doubt that the scope of coordination on the partner government

level has increased, at least in writing. However, as Arne Disch wrote in 1999, there is still

no clarity as to what the exact outcome of these coordination activities has been.18 These

observations still seem to hold true today.

Theoretical Explanation of the Changes of Aid Coordination

Theoretically, there are two conflicting views in the field of development today which

concern the readiness of the donors to actively engage in aid coordination, and the role that

could be played by this coordination within the developmental process in the post Cold War

era. The first view, presented in the book Allocation of Foreign Aid and Economic

Development: New Theoretical and Empirical Perspectives edited by B. Mak Arvin, suggests

that donors have more incentives to coordinate with each other after the end of the Cold War

due to three factors:

16 World Bank, “Paris Declaration on Aid Effectiveness” 17 “2005 World Summit Outcome,” United Nations General Assembly, 4.

http://www.unfpa.org/icpd/docs/2005summit_final_outcome.pdf (accessed November 15, 2005). 18 Disch, 7.

Page 17: 2 List of Contents and Thesis

10

“First, attempts by the International Monetary Fund (IMF) and the

World Bank—the two central international financial institutions (IFIs)— to maintain the integrity of the international financial system were generally supported by the assistance policies of bilateral donors, who provided assistance in support of IFI programs (Bird and Rowlands 1997; Bird and Rowlands 2001; Rowlands 2001). Second, the Organization for Economic Cooperation and Development (OECD), primarily through its Development Assistance Committee (DAC), promoted cooperation and coordination among its members in order to maximize their joint effectiveness and influence. Finally, the process of development planning promoted by the World Bank, and eventually embodied in the comprehensive development frameworks (CDFs), incorporated donors as participants and contributors in the process.”

19

Accordingly, Arvin conceives the 1990s as being perhaps the most favorable timeframe for

aid coordination. With the termination of the Cold War, donors are more actively pursuing a

common “Western” framework in their dealings with the developing countries. However,

the counterargument suggests that the contrary effect might take place with the demise of the

Cold War.

“Neorealist scholars of international relations, such as Waltz (1986),

might argue that the disappearance of the Soviet Union reduced the threat that had previously motivated and solidified the Western alliance. Instead of creating coordinating structures to strengthen their collective security and advance their common agenda, states within the Western “club” could now revert to more self-centered approaches to their international behavior without seriously compromising their security interests. Each could pursue its own narrowly defined interests, even at the expense of its allies.”

20

Apparently, the time could be mature for both much less or much more aid coordination with

these two divergent forces both pushing and pulling for it. This clearly highlights the need to

determine which one of these contradictory arguments is of greatest benefit in order to attain

sustainable development.

19 B. Mak Arvin, Allocation of Foreign Aid and Economic Development: New Theoretical and Empirical Perspectives. (Westport, CT, USA: Greenwood Publishing Group, Incorporated, 2002), 28. 20 Arvin, 49.

Page 18: 2 List of Contents and Thesis

11

The Influence of National Aid Coordination on the Impact of Aid Programs

The importance of aid coordination as a factor that may increase the intended impact of

donor funds has been demonstrated within the practical as well as the theoretical scope of the

field of development. First of all, the numbers speak for themselves: “According to studies

by the UNDP and other organizations, more than 60,000 donor-financed bilateral and

multilateral projects are currently underway in developing countries.”21 In fact, eighty-five

percent of these 60,000 projects actually represent investments of less than $1 million each.

However the number of reports requested and being produced about progress within each of

these small projects renders it a lot more as time-consuming for the local government to

administrate in comparison to a lower number of high investment projects. This means that,

for example, in the case of Mozambique, in which there were no less than 49 aid agencies

involved, the government had to be engaged in a huge number of annual reports and was

obliged to provide assistance to missions concerning appraisal, monitoring and evaluation.22

Eventually, all of these tasks become a massive burden on a developing country’s poor

administration. Lael Brainard states it this way: “One of the best-known pitfalls of foreign

aid is lack of coordination among donors, both at the policy-making level and at the

operations level in recipient countries, which places substantial burdens on host countries and

often undermines the effectiveness of assistance efforts.”23 Subsequently, the impact of aid

coordination on the outcome of aid projects is e.g. that it helps removing the administrative

burden of the partner country. However, in the case of aid programs where the scale of the

activities and their interference in policy issues is much larger, aid coordination could also be

21 World Bank, “Development Aid: Doing More and Doing It Better,” Noticias.info,

http://www.noticias.info/Archivo/2005/200503/20050301/20050301_50181.shtm (accessed November 16, 2005). 22 Oswald, Stefan, Knut Bäse, and Frerk Meyer, “Donor Harmonisation to Increase Efficiency” D+C – Magazine for Development and Cooperation. Edi. 2. (2004). http://www.inwent.org/E+Z/content/archive-eng/02-2004/tribune_art2.html 23 Lael Brainard et al., The Other War – Global Poverty and the Millennium Challenge Account (Washington D.C.: Brookings Institution Press, 2003), 4.

Page 19: 2 List of Contents and Thesis

12

the tool to make aid interventions coherent with the national holistic development strategies

and priorities. Coherence between the aid programs and the national development strategy

would increase the impact of the aid program and the chances of reaching sustainable

development. These matters were also stated as the primary concern that motivated the

development system when writing the Rome Declaration on Harmonization.24

Regarding the effectiveness of aid activities, the Canadian Minister of the

International Cooperation, Aileen Carroll stated that:

“We do know to a large extent what makes aid effective. (…) I would

like to touch on some key ingredients: harmonization, coordination, and governance. Harmonization and coordination are closely linked. (…) Different donor countries worked with different accounting

systems, used different fiscal years, and occasionally stressed contradictory priorities. (…) I think this illustrates clearly what we

must avoid.”25

Harmonization is in practice one of the most important phases in the process of aid

coordination on the donors’ side, as national coordination does not have an impact if donors

do not respect (and support) it. In actuality, Carroll touches here on the indispensable role

harmonization plays within the context of coordination:

“The key is (…) to harmonize our efforts so that we are moving in the

same direction, giving consistent advice. There are various ways for donors to move forward on harmonization effort (…) This inevitably means a more effective division of labour among donors. Donors need to understand what each is prepared to contribute, avoid unnecessary overlap, and ensure greater complementarity in our programming in individual countries. The most effective donor coordination, naturally, begins with locally owned objectives.”

26

24 “We in the donor community have been concerned with the growing evidence that, over time, the totality and

wide variety of donor requirements and processes for preparing, delivering, and monitoring development assistance are generating unproductive transaction costs for, and drawing down the limited capacity of, partner countries. We are also aware of partner country concerns that donors' practices do not always fit well with national development priorities and systems, including their budget, program, and project planning cycles and public expenditure and financial management systems. We recognize that these issues require urgent, coordinated, and sustained action to improve our effectiveness on the ground”. World Bank, “Rome Declaration

on Harmonization,” 1. 25 Aileen Carroll. 2005. The Canadian Minister of International Cooperation’s speech at University College,

Oxford for a meeting on "Exploring Aid Effective and Cooperative Aid Partnerships". Global Economic Governance Programme. Canada’s Aid Program:The Way Forward, March 9, 2005. 26 Carroll.

Page 20: 2 List of Contents and Thesis

13

When several donor nations and organizations want to support a specific country, sometimes

with conflicting objectives, problems of planning, coordination and capacity are likely to

occur. This dilemma was catapulted in the field of development within the wake of the 21st

century, and a multitude of donors, as well as partner countries, put the subject of Donor

Harmonization on top of the international agenda in the Millennium Summit and the

Monterrey Conference on Financing for Development.

Indeed donor harmonization could help reduce administrative time and minimize

effort, whilst at the same time ensure a sensible distribution of funds among regions and

economic sectors. Also, the need for donor coordination and harmonization of environmental

aid is recommended in the 2005 DAC Guidelines Environmental Fiscal Reform for Poverty

Reduction.

The next important aspect with regards to aid coordination is the beneficial strategies

by which aid coordination could take place, and the potential role that could be played by the

stakeholders in such a process.

Beneficial Aid Coordination – The Players and the Strategies

There are roughly three main categories of stakeholders in the field of aid coordination – the

local government, the local society and the foreign donors. The roles of all three entities will

be taken into account. However, as mentioned earlier, particular focus is placed on the

essential role of the partner government. In theory, most of the latest attempts to coordinate

aid activities at the international arena have had the same strategy concerning the issue of

who is supposed to head the coordinating process. Most - if not all - donors seem to agree

that the partner government should play a significant role in setting the strategies of the aid

activities. As summarized in a quote by Jeremy Carew-Reid:

“The donor community should be considered as participants in the

strategy from the very beginning of the process. Yet the principal

Page 21: 2 List of Contents and Thesis

14

lesson for donors – underlying all others – is that strategies must be led by the recipient country. This applies particularly to the coordination of donor participation.”

27

However, in practice this particular aspect of ownership of the process of aid coordination

causes a lot of problems. Stakeholders in the developmental field in developing countries

have many different agendas, intentions and goals, which make it challenging to find a

common strategy of coordination. This tough challenge of practical national coordination is

the focus of my investigations.

Practical national coordination is a huge task for the partner governments and to this

day it remains a big challenge for the governments in the developing world to fill-out the role

of the coordinating body.

“Yet, in order for governments to take the lead in donor coordination,

they require considerable resources and a firm commitment to cooperate by the external agencies. Permanent coordinating mechanisms are often lacking. (…). While this interaction between the external players is important and should be encouraged, ultimately the government must be supported to exercise the leadership role in coordination.”

28

Carew-Reid suggests some different components to ensure the success of aid coordination.

One is that the government empowers a central Ministry with the authority to establish

coordination mechanisms and procedures. This Ministry may be the strategy secretariat or,

even better, the official contact point for donors, such as the Ministry of Foreign Affairs or

Finance. The national planning authority, with its cross-sectoral role, could in some cases

turn out to be the best choice. Furthermore, Carew-Reid recommends that donors should

ensure that coordination is not undermined by lack of necessary capacity. Coordination

activities often require special skills of synthesis and facilitation that are commonly lacking

27 Carew-Reid, Jeremy, Robert Prescott-Allen, Stephen Bass, and Barry Dalal-Clayton. Strategies for National Sustainable Development: A Handbook for their Planning and Implementation. 1995. http://www.nssd.net/references/Reid/ch01.htm (accessed November 15, 2005). 28 Carew-Reid.

Page 22: 2 List of Contents and Thesis

15

in the partner governments in the developing world. In addition to the previously mentioned

role of the government, there is a possible and desirable role that could be played by the civil

society in coordinating a country’s aid activities. There is a common perception that local

non-governmental organizations (NGOs) and private sector representatives also need to be

brought into the aid coordination process at regular intervals.

Last but not least, the success of effective coordination depends greatly on the

bilateral and multilateral donor agencies. Donors could do much to ease the role of the local

government by improving information sharing among themselves on investment portfolios

and policies, as well as producing evaluation reports and other analyses of the situation in the

country. Donors should seek to minimize and simplify their interventions so that

coordination by government is less burdensome.29 Most important, development practitioners

as well as development theorists agree that donors should support and follow national aid

coordination.

Most bilateral and multilateral donors have shifted from providing their aid in

form of smaller projects to providing support for larger sector programs. Consequently,

donors have to be even more aware that their influential and often policy-interfering sector

programs complement the overall national strategy.

“An important aspect of donor coordination is division of financial

assistance according to the sectoral preferences of the donors. This issue needs to be addressed early on. At the same time, donors should take care to ensure that dividing assistance by sectors does not reduce the cohesion of the overall strategy. Donors should integrate their aid or lending programmes into the priorities set by the strategy. Regardless of the preferences of donors, support is needed for the process, and for priority sectors as determined through the strategy.”

30

Sometimes, the schedule of the process has for some reason been compressed. As a result, a

range of projects are produced as quickly as possible - usually too rapid for a coherent

29 Carew-Reid. 30 Carew-Reid

Page 23: 2 List of Contents and Thesis

16

strategy to be developed in a participatory manner. Other times, however, the donor simply

ignores the national strategy. Furthermore, during the phase of implementation, there is a

great danger of slipping back into a project approach or program approach, making it more

difficult for the country to retain control of its overall national strategy.31

The Role of the Local Government in the Coordination of Aid

Many strategies and country-level frameworks have been developed to outline how donor aid

activities should be coordinated.

“It is recognized that strategies are a way of improving and integrating

social, economic and environmental policies, and building national capacities to develop and implement such policies. But they can fulfill this role only if they are nationally-driven, participatory processes, and this takes time.”

32

As stated earlier, for many years, there has been a lack of country ownership with

regards to the coordination process. DAC lists the many different reasons behind this

deficiency: “Violent conflict (…), time pressures, the need to respond to external

requirements, the adherence to labels, development agencies wanting their own processes

and identifiable projects, lack of transparency and accountability in promoting these agendas,

and limited capacity in-country.”33 In practice, when the local government is not efficient in

coordinating aid activities or disagreement between donors and government arise on how to

set the strategy, the result is often that the local institutions get bypassed, which might lead to

‘policy and institutional inflation’ and an associated ‘capacity collapse’.34

Different concepts of the role of partner (recipient) countries have developed during

the last decade: one is recipient responsibility (introduced by the Norwegian Foreign

31 Carew-Reid 32 Carew-Reid 33 Development Assistance Committee (DAC). “Informal Workshop on Poverty Reduction Strategies,

Comprehensive Development Framework and National Strategies for Sustainable Development: Towards Convergence” (Paris: 29-29 November 2000. 34 Development Assistance Committee, workshop

Page 24: 2 List of Contents and Thesis

17

Ministry), and another one is partnership (more commonly used by donors). Recipient

responsibility gives the bulk of ownership to the partner country, as partnership is imagined

likely to become unequal, ultimately legitimizing too much donor interference in this case.35

As a matter of fact, there are many difficulties pertaining to giving the partner governments

the responsibility of setting their own agendas and priorities concerning aid activities in order

to ensure that donor funding fits into those frameworks:

“The partnership tends to be unequal as money comes from the public

purse in donor countries and there will always be a requirement for some kind of accountability. (…) It is important to respect and build

on countries’ existing processes and strategies, and help those to

develop, even if they are not perfect. To do this development agencies need to loosen their control and take a longer-term perspective. Development agencies may subscribe to this type of argument but putting it into practice is still a frontier. There needs to be a partnership agreement based on transparency, accountability on both sides and joint monitoring.”

36

It is important for the donors then to take on the role of facilitators, instead of manipulators

of national strategies. Definitely, it is a massive problem when donors support different

initiatives in countries that do not have the capacity to coordinate them. Thus capacity

building in strategies, planning and design, in how to analyze, how to prioritize, and

implement programs is highly recommended.

Additionally, there are many other factors that influence whether a partner

government takes on its responsibility in a partnership as a responsible recipient: political

will of the government, the willingness of donors to step back, and the organizational

capacity in the public sector to actually implement the program. The importance of these

factors will be obvious in the case study.37

35 Disch, 14. 36 Development Assistance Committee, workshop 37 Disch, 14.

Page 25: 2 List of Contents and Thesis

18

Stefan Oswald states that the German development institutions will focus on capacity

building when the partners system and institutions are not sound enough to manage full

responsibility for development activities.

“Some partners, however, have considerable problems concerning

capacity and resources. Local systems are not always sound. In these cases, German development policy relies on capacity-building. Due to specific experiences in technical cooperation, Germany can come up with valuable support to enhance local capacities.”

38

Generally speaking, the partnership phrase has become very dominant over the last decade,

referring to a step in the direction of a more equitable relationship between donors and

recipients. The concept stresses the centrality of the role of the partner government in such a

relationship. However there is, as Arne Disch writes, “a serious gap between rhetoric and

reality regarding the content of partnership concept where the resource rich partner has a

particular responsibility for not dominating and taking over the relationship.”39

Case study – Egypt and the Environmental Sector Program

The analysis of the case study is based on interviews supported by academic writings on the

political system in Egypt as well as on the country’s bureaucracy. Knowledge of these fields

helps us understand the kind of institutions, management structures, cultural heritage, work

ethics, capacity and legacy of administration and political culture that effect the national aid

coordination in Egypt.

The book Egyptian Politics – The Dynamics of Authoritarian Rule by Maye Kassem

provides a description of the political and institutional situation in contemporary Egypt.

Kassem describes the case of contemporary Egypt as one where the formal “democratic”

framework does not necessarily imply a change in the fundamental nature of authoritarian

rule under President Hosni Mubarak. The author concludes that the position of the president

38 Oswald. 39 Disch, 7.

Page 26: 2 List of Contents and Thesis

19

as the ultimate source of power and authority is intact and that this personal authoritarian rule

has become institutionalized in contemporary Egypt.40 This centralized characteristic of the

Egyptian political system highly affects the degree of collaboration and coordination between

Ministries as well as the limited use of a participatory approach to aid coordination.

The political system in Egypt is also characterized by the prevalence of weak

institutions and organizations. Kassem stresses that certain tactics and policies adopted by the

state over the years have been aimed at ensuring that these characteristics are preserved.41

The consequences of weak institutions responsible for coordinating foreign aid will be

obvious in the case study.

The features of the Egyptian bureaucracy are clear when compared to Max Weber’s

ideal bureaucracy. Therefore, original texts by Max Weber in Max Weber on Capitalism,

Bureaucracy and Religion as well as an analysis of Max Weber’s ideal bureaucracy by

Thomas Robb McDaniel; Two faces of Bureaucracy: A Study of the Bureaucratic

phenomenon in the thought of Max Weber and Franz Kafka is used as comparison to the

Egyptian bureaucracy: Weber’s bureaucracy is characterized by a standardized, categorical

(rather than individual), impersonal (rather than personal), rule governed and efficient

bureaucracy.42 The functions of the administrators and institutions in the Weberian

bureaucratic organization differ from the Egyptian bureaucracy and political system. The

difference is for example that the Weberian administrator is organized in a clearly defined

“hierarchy of offices, (…) candidates are appointed (not elected) on the basis of technical

qualifications assessed by examination and/or training, (…) and promotion is awarded by

superiors on the basis of achievement and/or seniority.”43 The Egyptian bureaucracy

40 Maye Kassem, Egyptian Politics: The Dynamics of Authoritarian Rule. (Boulder: Lynne Rienner Publishers, 2004), 167, 186. 41 Kassem, 49. 42 Thomas Robb McDaniel. 1992. Two faces of Bureaucracy: A Study of the Bureaucratic phenomenon in the thought of Max Weber and Franz Kafka, (Michigan: University Microfilms International (UMI), 1992), 35. 43 McDaniel, 35-6.

Page 27: 2 List of Contents and Thesis

20

functions in a more informal way than the ideal of the Weberian bureaucracy. For example,

qualifications that are not essential for ones effectiveness in a bureaucracy - such as former

military rank (which in Weber’s view are irrelevant for an administrators position in a

bureaucracy) often plays a significant role in the way the Egyptian bureaucracy functions.

Military ranks among bureaucrats make a parallel hierarchy of offices and administrators.

Also, as a result of the strong client-patron networks in Egypt, candidates can more easily be

elected and promoted as a result of their connections as opposed to technical qualifications.

Such differences between Weber’s bureaucracy and the Egyptian bureaucracy also help

explain the shape of national aid coordination in Egypt.

Background information for this research regarding Egypt’s environmental/

developmental challenges can be found in the recent World Bank report Arab Republic of

Egypt – Country Environmental Analysis (1992-2002) from 2005.

Methodology and Approaches

National aid coordination is, one of many variables that affect the impact of aid programs.

The arguments for focusing on this parameter in the present study are presented in this

chapter. It has to be pointed out that the author does not believe that all aid programs would

be beneficial by simply reaching their intended outcome. It is also acknowledged, that even

well planned programs may have unintended consequences because the elements involved

are complex as well as changing during the intervention.44 Another important point regarding

the focus of this research is that many other essential factors apart from national aid

coordination influence the impact of aid programs - on the donor’s as well as on the partner

country’s side.

44 Thomas W. Dichter, Despite Good Intentions: Why Development Assistance to the Third World has Failed. (University of Massachusetts Press. 2003) 290.

Page 28: 2 List of Contents and Thesis

21

On the donor’s side, many factors play a negative role on the impact of aid programs.

First of all, the official goals of a program might not always be the primary goal seen from

the donor’s perspective. Donors often have other agendas and priorities than promoting

development such as commercial, political, strategic and economic interests e.g. to increase

trade opportunities for donor country industries.45 This often decreases the developmental

impact of the aid program, as the developmental aspect is not the main focus in the process.

Also the fact that donor organizations need to disburse a lot of money can shift the focus of

some donor agencies from working towards the proclaimed developmental outcomes to focus

on disbursements.46 Other factors that can cause a program not to achieve its intended

outcomes are lack of knowledge of the country when designing the program, lack of know-

how in the process of implementation, poor fitting of a ‘best practice’ model to the local

context, deficient use of the participatory approach, or unqualified people in charge of the

program.

At the partner country level, many different social, political, and economic contexts

hinder the aid programs from reaching their intended outcomes.47 For example, Rider

declares corruption to be one of the main reasons for the outcome of aid programs to be less

successful than anticipated.48 Lack of willingness and interests in the political system to deal

with poverty reduction and development, lack of capacity to implement aid programs and

lack of funding to sustain a program’s activities are some of the other local factors that can

cause a disappointing outcome of an aid program. Many of these factors will be discussed in

the research as they influence national aid coordination.

In writing this thesis, advantage was taken of the availability of several primary

sources. The primary sources included a number of national documents on coordination in

45 Arvin, 134. 46 Dichter, 291. 47 OECD. Environmental Fiscal Reform for Poverty Reduction. (DAC Guidelines and Reference Series, OECD Publishing. 2005), 51. 48 Rider, Barry (ed.). Corruption: The Enemy Within. (The Netherlands: Kluwer Law International, 2003), 291.

Page 29: 2 List of Contents and Thesis

22

Egypt, ESP program documents, as well as conducted interviews. The theoretical framework

consisted of a variety of theories of coordination of aid from the aid literature, which were

applied in the analysis of the empirical case study of national coordination of the ESP in

Egypt. The methodology used was therefore deductive, since relevant theoretical work was

tested in practice by using interviews and other primary sources. The theories were about the

strength of national aid coordination and its constructive affect on accomplishing the

intended impact of aid programs. The dependent variable is consequently the intended impact

of aid programs and the independent variable is national aid coordination. The methodology

is consequently qualitative, since the national aid coordination in Egypt was analyzed by

using the conducted interviews and primary documents from Ministries.

The reasons for choosing the Danish International Development Assistance (Danida)

funded aid program “Environmental Sector Program” in Egypt as the case study are

attributed to the fact that Egypt portrays an example of a developing country that receives a

massive amount of aid, yet faces enormous problems and dilemmas relating to national aid

coordination. Because research on Egypt’s national aid coordination was very limited, an

analysis of these problems and issues could be useful to improve the intended impact of the

country’s aid programs. One additional reason for choosing this particular program was the

fact that it displays an immense amount of challenges pertaining to aid coordination,

especially when it comes to the collaboration of donors with the Egyptian authorities. Lack

of environmental coordination by the Egyptian authorities was probably one of the reasons

for the Danish Ministry of Foreign Affairs choosing to phase out the program by 2008.

Furthermore, the ESP, which is the biggest environmental aid program in Egypt,49 is a

complex environmental program that was designed to work on a multitude of levels. Such an

enormous program can illustrate a large number of aspects of national aid coordination.

49(ESP Coordinator, EEAA)

Page 30: 2 List of Contents and Thesis

23

Furthermore, the Egyptian Ministry of State for Environmental Affairs (MSEA) that

implements the ESP is a crosscutting Ministry of State in Egypt. The MSEA is a relatively

weak Ministry compared to bigger, richer, and older Ministries, which makes the MSEA

even more dependent on national coordination as it implements most of its policies through

other Ministries. Additionally, the ESP program was running in its second-half phase,

meaning that many adjustments and changes of the program already had been undertaken.

Yet, it was not finished, so it was possible to find energetic employees to interview.

The method by which the impact of the national aid coordination on the ESP was

analyzed was to investigate how the program was working internally and externally – that is,

as a program in itself and as a component in Egypt’s overall environmental activities and

policies. By examining the past and present challenges and difficulties of the program’s

ongoing implementation it could be asserted how national aid coordination affects the

implementation and output of the program.

To protect the many persons that were kind enough to allow me an interview and to

share critical observations and interpretations in the interviews, their names are kept

confidential. In the reference footnotes, the interviewed persons are therefore referred to with

numbers instead of names and positions. The first number of each reference indicates which

sector or institution the interviewee is from. Table 1 below provides the key for each entity.

The numbers after these respective initial numbers serve to distinguish between the

interviewees.

Ministry/Donor agency Key

MoP 1 MIC 2 MSEA/EEAA 3 Private environmental sector, environmental NGOs 4 Donor organizations in Cairo 5

Table 1: Key of each of the entities that interviewees can be coming from, which is used in footnote

references.

Page 31: 2 List of Contents and Thesis

24

The formally arranged meetings with senior officials in governmental authorities as

well as donor organizations provided me with more than 50 hours of interviews. Many of the

formal interviews were afterwards followed-up by informal meetings, emails and telephone

calls to clarify unresolved issues. Senior personnel in the Ministry of State for Environmental

Affairs, the Ministry of International Cooperation, the Ministry of Planning as well as key

players in the donor community, civil society and the private sector provided a broad and at

the same time in-depth practical understanding of the subject. In addition, the interviewees

provided access to necessary empirical written material. I am very grateful for the time all

these people devoted to me. Without their effort it would not have been possible to write this

thesis.

The interviews in the Ministry of Environmental Affairs were mostly conducted in

English. Three interviews were conducted in Danish, as it was the preferred language of the

Danida advisors and consultants. In two interviews in the MIC and the MoP, the Egyptian

interviewees had a translator by their side, in case of any language barriers. All interviewees

but the two that brought with them translators spoke perfect English.

Scientific Precautions

The interpretations of the oral responses to the answers that are raised in this research

investigation with regards to the two hypotheses and the research questions have some

limitations. First of all, the interviewees might have been less frank and honest in the

interviews to hide weaknesses and deficiencies in national coordination in Egypt, due to the

fact that they could be criticized by superiors for showing weaknesses of Egypt’s use of

donor funds. Also, coming from a donor country I might have been perceived as someone

who could have connections to or being a representative of the Danish Ministry of Foreign

Affairs and therefore negative information about the conditions of national aid coordination

Page 32: 2 List of Contents and Thesis

25

in one of Denmark’s partner countries could have negative consequences for the future

support coming from the Danish side. I tried to avoid the anxiety by introducing myself in a

letter to all interviewees as someone who would like to understand the scope of national

coordination in a developing country, and not an authority that was going to evaluate.

Furthermore, statements brought forward by the interviewees are quoted

anonymously in this research. My supervisor, Dr. Vikash Yadav, gave the permission to

leave the names out of the final paper after having seen the names, titles and affiliations of all

the interviewees. This should protect the interviewees from any negative consequences. As

previously stated, the topic of national coordination is somehow sensitive when it comes to

scrutinizing what is working and what is not.

To find out if answers and responses from my primary sources were truthful, I have

when at all possible checked the views given with other interviewees. Also, I have tried to

find concrete proofs and examples of the issues that were dealt with in the context of these

interviews. This was made possible based on the available national plans and ESP

documents. The information provided by the interviewees is also either backed up or argued

against by academic writings on specific Egyptian issues.

Although the topic of this research investigation is rather difficult to get a clear view

of, it is my thought, that an independent additional research investigation would reach the

same conclusions if doing research in the area of aid coordination in Egypt. If this kind of

research was taken on in different countries, other kinds of dilemmas and challenges of

coordination would show up and the detailed conclusions might thus be different.

Page 33: 2 List of Contents and Thesis

26

CHAPTER 2

National Coordination of Aid in Egypt

In this chapter I have examined whether and how the Egyptian authorities in general

undertake planning and coordination of aid.50 In essence, aid coordination is the planning and

the procurement by a partner government of aid from its donors, and its integration into

national development goals and strategies.51 The process of aid coordination is planning

international assistance so that it supports national goals, priorities and strategies, whilst

avoiding duplication and overlapping efforts as well as minimizing the burden of aid

integration into recipient institutions.52

In Egypt, the tasks and processes of aid coordination undertaken by the Egyptian

authorities have been delegated to the Ministry of Planning (MoP) and the Ministry of

International Cooperation (MIC). Also, the Ministry of Finance (MoF) plays a role in the

national coordination process. However, the MoF plays a minor role in comparison to the

Ministry of Planning and the Ministry of International Cooperation. Focus will therefore be

on the latter two Ministries.

Before focusing on the Egyptian authorities’ coordination of aid, a brief account is given of

the extent of aid and presence of donors in Egypt. This provides an overview of the potential

need for coordination. The needed tools for national coordination of aid include plans,

budgets, operations, institutions, and capacities.53 In the following section, the official plans,

strategies and visions for development in Egypt are presented, since these are the key tools

for national aid coordination. Firstly, the Ministry of Planning (MoP) is introduced, which is

50 This chapter is, to the best knowledge of the author, the first overview and analysis of the Egyptian authorities’ role in aid coordination. Many interviewees have helped providing the full picture of a field that has been, more or less, untapped. It is noteworthy here that the interviewees are not responsible for the author’s

interpretation or conclusions. 51 UNDP, ii. 52 UNDP, 4. 53 UNDP, ii.

Page 34: 2 List of Contents and Thesis

27

the primary institution for national planning in Egypt. In the second half of this chapter, the

role of the Ministry of International Cooperation (MIC) in coordinating aid activities is

described and analyzed.

In each of this chapter’s sub categories, the research distinguishes between the

official policies and formalities of the Egyptian government with regards to aid coordination

as opposed to actual real life practices. The information derived concerning each Ministry

was obtained both through interviews of internal employees in the Ministries as well as of

external parties. Furthermore, secondary sources on Egypt were used to explain the state of

national aid coordination. This research provided an overview of the official structure and

actual activities of the Egyptian administration, focusing on the degrees of coordination

undertaken on different administrative levels.

Aid activities in Egypt

A brief account of the extent of foreign aid and its distribution in Egypt is provided to show

the concrete need for coordination. Total disbursement of official development assistance

(ODA) to Egypt in 2002 was US$1,552.1 million, a drop of 4 percent as compared to 2001.

In 2003 there was a reduction by 2 percent in contrast to 2002. Assistance per capita dropped

to US$22.4 in 2003, from US$23.3 in 2002 and US$24.9 in 2001. This decrease over the last

three years is partly due to the decline in total disbursements and partly due to the 1.8 percent

annual population growth.54

54 Ministry of International Cooperation. Development Cooperation Report 2003. (Egypt: Ministry of International Cooperation, 2005), 10.

Page 35: 2 List of Contents and Thesis

28

Figure 1: Distribution of ODA by Type of Donor Organisation, 2001-2003.55

Figure 1 shows the distribution of ODA by type of donor organization. Bilateral donors gave

the largest proportion of ODA to Egypt in 2002. Accordingly, most aid activities in Egypt are

implemented by individual donors, increasing the need for coordination.

Figure 2: Distribution of ODA Disbursement by Donor, 2003.56

The concrete distribution of ODA disbursement by donor organizations is shown in

Figure 2. The United States Agency for International Development (USAID) maintains its

55 Ministry of International Cooperation. “Development Cooperation Report 2003”. 13. 56 Ministry of International Cooperation. “Development Cooperation Report 2003”. 11.

Page 36: 2 List of Contents and Thesis

29

top rank despite a 32% drop in its disbursement from 2002 to 2003, which is partly due to

USAID’s plan to reduce aid to Egypt by 5% annually as agreed with the Government of

Egypt (GoE).57

Figure 3: Distribution of ODA Disbursements by Main Sectors, throughout the period 2001-2003.58

Figure 3 shows the ODA disbursement to different sectors in 2003. It is difficult to assess

whether this distribution of funds reflects national strategies or donor priorities, since the

authorities have yet not provided clear national priorities.

57 Ministry of International Cooperation. “Development Cooperation Report 2003”. 10. 58 Ministry of International Cooperation. “Development Cooperation Report 2003”. 13.

Page 37: 2 List of Contents and Thesis

30

Figure 4: Distribution of ODA Disbursements by Geographic Location, 200359.

Figure 4 shows the distribution of ODA disbursement according to geographic

location in 2003. Obviously there is an unequal regional distribution of donor funds. MIC has

requested donors to compensate for the uneven distribution in their future assistance.60

Plans, Visions and Strategies for Development and the Environment in Egypt

The governmental plans below are the tools for national coordination in Egypt. As the

Minister of Planning stressed in the introduction to The Economic and Social Development

Plan for 2003/2004:

“The effectuation of development planning efforts through proper coordination and

cooperation among all stakeholders will ensure better living conditions for Egyptian people

and prosperity future for Egypt under the leadership of President/Mohamed Hosni

Mubarak.”61

59 Ministry of International Cooperation. “Development Cooperation Report 2003”. 24. 60 Ministry of International Cooperation. “Development Cooperation Report 2003”. 11. 61 Ministry of Planning. The Economic and Social Development Plan (2003-2004). (Egypt: 2003).

Page 38: 2 List of Contents and Thesis

31

Governmental as well as donor-produced visions, plans and strategies for development in

Egypt are provided below. Each document is briefly introduced with regard to development

objectives, the function of the particular publication and their in-between relations. The

numerous list of national plans show that the authorities in Egypt – the Ministry of Planning -

undertake formal and structured regular initiatives to produce a tool enabling coordination of

Egypt’s national cross-sectoral development, whereas the MSEA produces the plans for the

environmental field. Still this does not necessary imply that proper development planning

takes place or that the documents are used in practice. This will be dealt with in the analysis,

in which most of the listed documents will be referred to. The list below also functions as an

overview that shows the most recent 2004 updates concerning donors (WB, United Nations

(UN) and the African Development Bank (ADB)) assisting Egypt in making development

strategies.

1992: “The National Environmental Action Plan” (First NEAP)

By multiple donors and the MSEA

This first NEAP was a consequence of the demands of donors and donor strategies and

programs. The first NEAP has been criticized by civil society and employees in EEAA62 for

not responding to Egypt’s real environmental problems. Accordingly, in 2002 when MSEA

had matured another NEAP made with UNDP assistance was provided.63

1997: The long-term socio-economic development plan, known as “Vision 2017”

By the MoP.

In the document entitled “Egypt and the 21st Century,” the GoE sets forth the general

orientation and projected targets for the next two decades. This long-term action plan stresses

62 (3.10, 4.1) 63 (3.10)

Page 39: 2 List of Contents and Thesis

32

human development, with particular emphasis on education, healthcare, and the role of

women. Also underlined are the importance of the rule of law, the centrality of the private

sector and civil society, the endeavor towards an information-based community, and

conservation of water and the environment.64 The new document Vision 2022, was made

under the former Prime Minister Dr. Kamal El Ganzouri has now replaced Vision 2017 as a

general framework for donor interventions.65 Vision 2017 and Vision 2022 do not contradict;

the latter vision is only an extension to the first vision and a plan for five more years.66

Vision 2022 is referred to in the MoP plans, whereas Vision 2017 – the previous Vision

document - is referred to in both the MIC’s DCR 2002 from April 2005 as well as in the

latest DRC 2003 published in November 2005. It does not seem promising that the MIC uses

the old Vision 2017 as the guide for Egypt’s long term development priorities when sources

within the MIC have informed that the vision 2017 of the former government has been

replaced with Vision 2022.67

2001/2: “Long Term Development Vision 2022”

By the MoP.

This document functions theoretically as the current ‘policy framework and long-term

development visions’ in Egypt.68 The plan was made under the current government headed

by Prime Minister Dr. Atef Ebeid.69 The 5-year medium-term plans and annual plans are

implemented within this vision.70 The Vision outlines the Government’s strategy for

64 Ministry of International Cooperation. “Development Cooperation Report 2003”, 5. 65 (2.2, 2.5) 66 (2.5) 67 Ministry of International Cooperation. “Development Cooperation Report 2002”. 68 UNDP, 29. 69 (2.2) 70 African Development Bank. Arab Republic of Egypt 2005-2009 Country Strategy Paper (African Development Bank, Country Operation Department: 2004), 21.

Page 40: 2 List of Contents and Thesis

33

modernizing and integrating Egypt into the global economy through the process of

diversification and private sector-led economic growth.71

The above two tools for national coordination show that Egypt has had quite

extensive experience in the field of planning and visions. Also, its existence means that there

is a policy framework and long-term development visions in the country, at least at official

level. According to senior officials in MIC both Vision 2017 and Vision 2022 are kept in

MoP and the documents are not distributed to any Ministries.72

2002: “Poverty Reduction in Egypt: Diagnosis and Strategy”

By the MoP and the WB.

This report provides a diagnosis of poverty in Egypt, and aims to provide the foundation of a

future poverty reduction strategy.73 It is an example of the Egyptian planning authorities'

willingness to collaborate with a major donor, who has experience in the field of poverty

reduction.

2002: “The Fifth Five-Year Plan74 for Socio-Economic Development (2002-2007) & First

Year”,

By the MoP.

The current medium-term plan called “The Fifth Five-Year Plan for Socio-Economic

Development (2002-2007) & First Year” is divided as follows: It starts by summarizing the

Long-term Vision 2022 and continues by making a brief follow-up and evaluation of the

previous Five-year plan (1997-2002) providing indicators for the changes that took place in

the areas of concern regarding Egypt’s comprehensive development. After this the Five-Year

71 Refer to Appendix A for detailed objectives 72 (2.5) 73 Ministry of Planning and the World Bank, Arab Republic of Egypt – A Poverty Reduction Strategy for Egypt (The World Bank, 2004), v. 74 (The MoP produced the first Five Year Plan in 1982).

Page 41: 2 List of Contents and Thesis

34

Plan (2002-2007) is described, briefly outlining its strategy75 and objectives followed by a

relatively longer part on Economic Development; Population and Human Development; and

Spatial Development. Lastly, in the part Sectoral Development, the plan provides an

overview of certain specific sectors. The Plan emphasizes on economic development and

does not make strong emphasis on sustainable development as the environmental plans do.

2002: “Fifth Five-Year Plan (2002-2007)” [first environmental five-year plan]

By the Ministry of State for Environmental Affairs, Egyptian Environmental Affairs Agency.

This small document (19 pages) states the goals of the MSEA/EEAA’s summarized in the

strategic goal:

“Incorporating the environmental dimensions within development policy, national plans,

programs, projects, and public practices to ensure sustainable development through

controlling and reducing pollution sources to protect the public health, natural resources, and

promoting environmental awareness for all categories of society.”76

The Plan emphasizes sustainable development.

2002, Jan: “The National Environmental Action Plan 2002-2017” (NEAP)

By the Egyptian Environmental Affairs Agency (EEAA), UNDP, and Capacity 21 Program

Officially, all Ministries participated in this NEAP and it became obligatory to the whole

GoE. Critics have argued that the NEAP is not a plan, but more of a statement and a

proclamation of intentions and wishes as there are no priorities, timelines and budgets that

would set milestones and make it a detailed implementation plan to follow.77

75 Refer to Appendix A for details. 76 Ministry of State for Environmental Affairs/Egyptian Environmental Affairs Agency, “Fifth 5-Year Plan (2002-2007)”, 1.

77 (3.12, 4.1, 4.2)

Page 42: 2 List of Contents and Thesis

35

2003: “The Economic and Social Development Plan for 2003/2004”

By the MoP.

This one-year plan (the latest version of a one-year plan available in English) is designed

within the general framework of the Fifth Five-Year Plan (2002-2007), in accordance with

the long-term development vision until 2022. The 57 page long plan focuses on three kinds

of development: economic, human, and spatial development and launches ten investment

programs.78 The plan functions theoretically as the national document that provides ‘national

priorities and strategies’.79 The focus of this document is devoted to means to seek recovery

from the current economic slow-down.80

The plan’s chapter on Human Development provides objectives and policies relating

to the environment, although the environment was only mentioned once in the five-year plan

(2002-2007). The plan says: “Environment has become a vital component in Egypt’s

sustainable development.”81 The main objectives in relation to the environment are:

improving air quality; protecting the River Nile from pollution; protecting nature and

preserving biological diversification; expanding green areas and tree plantation; and

increasing public environmental awareness. The policies in achieving the objectives are

based on a pro-active approach, seeking to prevent pollution and environmental deterioration.

The first two policies mentioned to attain this is strengthening the environment management

systems and supporting the institutional capabilities of Environmental Affairs Authority and

its regional branches.82

The plan’s prioritizations in the field of environment is perfectly in line with the objectives

proclaimed in the Fifth 5-Year Plan (2002-2007) [Environment] the year before.

78 Subsequently, ten new programs, which were launched by the Prime Minister in 2004, seem to have replaced these investment programs. 79 UNDP, 29-30. 80 Refer to Appendix A for details 81 Ministry of Planning. The Economic and Social Development Plan (2003-2004). (Egypt: 2003), 33). 82 Ministry of Planning. “The Economic and Social Development Plan (2003-2004)”, 33.

Page 43: 2 List of Contents and Thesis

36

2004, Sep: “Arab Republic of Egypt, A Poverty Reduction Strategy for Egypt”

By the MoP and the WB.

This document provides the outline of a strategy for reducing poverty, contributing to the

refinement of a strategy to meet the objective “alleviation of poverty and attenuation of

income disparities” from Egypt’s long-run development plan (through 2022).83

This constitutes a positive example of donor alignment to national plans and agendas.

2004: “Millennium Development Goals – Second Country Report”

By the MoP and the UN.

This report tackles how far Egypt has gone in reaching its development goals within the

MDGs areas. Economic growth – seemingly the focus of the Five-year plan – is in this report

regarded as “a key factor in creating a supportive environment for achievement of the

goals.”84

The MIC writes in its DCR from 2002 that the MDGs represent a guiding framework for the

development priorities and targets for all countries. Egypt’s “2017 Vision” may encompass

some of the development concerns postulated in the MDGs however, certainly does not

encompass all.85

The pace of progress at achieving the MDGs varies between areas. Environmental as

well as partnership-related MDGs are mentioned as areas where progress is comparatively

slow. This report could play a strong agenda-setting role in the future regarding the priorities

of GoE and MoP, as there is much focus on the MDGs from the international community.

This might show in the coming five-year plan.

83 Ministry of Planning and the World Bank, v. 84 United Nations, and Ministry of Planning. Millennium Development Goals – Second Country Report Egypt 2004. (Egypt: 2005), 5. 85 Ministry of International Cooperation. “Development Cooperation Report 2002”. 7.

Page 44: 2 List of Contents and Thesis

37

2004, Dec: “Arab Republic of Egypt – 2005-2009 Country Strategy Paper”

By The African Development Bank.

The objective of the African Development Bank’s (ADB) assistance strategy to Egypt is to

support the implementation of Government’s Development Agenda in the vision 202286. This

could be another positive example of donor alignment to national plans and agendas.

2004, Dec: “Governmental Statement to the People’s Assembly”

By Dr. Ahmed Nazif, The Prime Minister.

As a consequence of the vision 2017 being very general, more specific action plans remained

essential. Egyptian Prime Minister Dr. Ahmed Nazif, in a December 2004 statement before

the People’s Assembly, delineated a comprehensive plan to guide GoE policy. This scheme

comprises ten inclusive developmental programs and a number of specific measures that the

government has prepared and already has started to execute. In the DCR 2003 from

November 2005 the MIC announces that these ten programs and targets should assist

aligning donor interventions to GoE priorities and goals.87 The eighth program is called

“Protection of Natural Resources” and its objective is to achieve sustainable development,

create environmental balance and efficiently use natural wealth.88

This speech could indicate that the agenda of sustainable development coming from

the MSEA/EEAA and the international community is influencing the national priorities and

plans in Egypt. It indicates that, at the official level, there is a notion of sustainability and

holistic approaches when it comes to developmental plans and strategies.

May 2005: “Report on the State of the Environment in Egypt”

86 African Development Bank. “Arab Republic of Egypt 2005-2009 Country Strategy Paper”, i. 87 Ministry of International Cooperation. “Development Cooperation Report 2003”, 6. 88

Ahmed Nazif, “Governmental Statement to the People’s Assembly,” 30-32.

Page 45: 2 List of Contents and Thesis

38

By the Egyptian Environmental Affairs Agency (EEAA) (yet only available in Arabic)

The Law 4 from 1994 states that this report should be produced annually to be presented to

Parliament, it should work as the foundation for an action plan.

2005: “Socio and Economic Development Plan 2005/2006”

By the MoP (yet only available in Arabic)

This is the current annual plan.

Expected Plans

The third stage of collaboration between GoE and the World Bank is expected to bring along

a more detailed poverty reduction action plan/Anti-poverty plan, made in collaboration

between the GoE and international development agencies.89 The donor community in Egypt

has requested that the GoE formulate an anti-poverty plan of actions that identifies the targets

and policy measures.90 Also, the MSEA is (at least officially) expected to publish “The State

of the Environment Report”, which should have been published annually since 1995. The

report should provide the necessary environmental information, on which national

environmental policies can be based.91

Ministry of Planning

This section presents the official processes involved in governmental policy making and an

analysis of this process in practice and the problems pertaining to it. The processes are

essentially the responsibility of the Ministry of Planning. The three main official plans and

subsequent analyses of them are discussed. As the MoP plays a minimal role in the execution

of the plans when it comes to foreign aid, the next section focuses on the official financial

89 Ministry of Planning and the World Bank, v. 90 Ministry of International Cooperation. “Development Cooperation Report 2002”, 7. 91 Tarek Genena, A Consultant Report on the Country Environmental Analysis (CEA). (Egypt: 2003), 53.

Page 46: 2 List of Contents and Thesis

39

follow up on donor activities, which is yet another responsibility of MoP. Lastly, the question

on partnership between the donor and GoE in form of MoP is tackled, looking at the official

policy as well as the practical implementation.

The Ministry of Planning plays the most important role in the process of outlining

developmental plans. However, the larger context or framework of the production of a plan

involves four entities, whose functions are summarized below:

1. Every line Ministry/agency is asked yearly by the MoP to provide proposals of

activities that the entity would like to have included in the plan for the coming year.

2. The MoP meets with MIC and the MoF in the so-called Steering Committee to study

and analyze the proposals. Hereafter, the MoP consults the Cabinet discussing

possible modifications of the plan.

3. The Cabinet receives the plan, and in subsequent discussions between the two

entities, amendments to the plan are made from both sides. The Ministry of Planning

selects the appropriate alternatives and sends it to Parliament for discussion and

approval.

4. Finally the Parliament discusses and approves the plan92.

Goals, Visions and Objectives

The Ministry of Planning, one of the oldest government Ministries, was founded in the sixties

by President Gamal Abdel Nasser. The Ministry has many obligations; it shall “support,

promote and evaluate investments” and “conduct economic and financial research and

studies required for the planning process”. The MoP’s primary role is to “prepare and follow

up [with the national] development plan”. In a presentation produced by the Ministry, it is

92 Ministry of Planning, Activation of the Planning Process, (A PowerPoint Presentation by Ministry of Planning), slide 6.

Page 47: 2 List of Contents and Thesis

40

stated that the three duties of the MoP are to prepare socio-economic development plans,

follow up socio-economic development plans, and prepare studies, research and statistics.93

To be able to keep track of all the concrete projects in Egypt, the MoP has an extensive

internal document where the approximately 10,000 activities are listed. This document is

referred to as the Technical Plan.

It is the aim of this following part to describe and examine the quality of the socio-

economic development plans presented above and to discuss their viability in the context of

the developmental equation. Note that in the following section plans will refer to the yearly

or five-year socio-economic development plans.

The Process of Making Plans

Official Procedure

The MoP collaborates with many different entities when producing the national development

plan. Firstly, the MoP works closely together with two other national planning institutions to

formulate the strategies and objectives of the developmental plan. One of these entities is the

National Planning Institute (NPI). The NPI’s role is to conduct planning research and studies

related to the national plan and implementation methodology, and apply these principles and

methods to achieve the national targets.94 The second entity closely involved in the process

of making a plan is the Central Agency for Public Mobilization and Statistic (CAPMAS).

CAPMAS’ role is to collect required statistics for the government. In addition to this,

CAPMAS conducts population census and various economic and social statistics for all

93 Ministry of Planning, “Activation of the Planning Process”, A PowerPoint Presentation by Ministry of

Planning, slide 2, 5. 94 Ministry of Planning, “Activation of the Planning Process”, A PowerPoint Presentation by Ministry of

Planning, slide 2.

Page 48: 2 List of Contents and Thesis

41

variables.95 Both institutions are furthermore in charge of training government staff in

national planning skills.

Figure 5 shows a model illustrating the structure of the planning process centered on

the MoP. The MoP has provided the “Planning Institutions Data and Information Flow

Chart.”96

Figure 5: Planning Institutions Data and Information Flow Chart. 97

The process of making a plan begins with the MoP consulting line Ministries

(Executive Bodies) to deliver a so-called ‘wish list’ in October. The wish list contains all

projects and project-proposals that each line Ministry would like to have included in the

95 Ministry of Planning, “Activation of the Planning Process”, A PowerPoint Presentation by Ministry of Planning, slide 2. 96 Ministry of Planning, “Activation of the Planning Process”, A PowerPoint Presentation by Ministry of

Planning, slide 3. 97 Ministry of Planning, “Activation of the Planning Process”, A PowerPoint Presentation by Ministry of Planning, slide 3.

Page 49: 2 List of Contents and Thesis

42

technical plan and receive funding for. Based on this and the response from the MoF

(National Investment Bank (NIB)), the MoP makes a preliminary budget for the coming year

with a list of all the projects it wants to implement. To make the plan, the MoP measures

socio-economic development inputs and outputs depending on the following kind of

indicators: basic indicators necessary to prepare the plan (e.g. saving rate and production

structure), economic efficiency indicators (e.g. evaluation of balance of payments and of self-

sufficiency rate) and human development indicators (e.g. human development index).”98

The MoP, MoF, and the MIC (MOIC) then meet in the “Steering Committee”, in

order to agree upon what projects and programs in the shape of both grants and loans should

be put into action and thus included in the technical plan. According to the MoP, the Steering

Committee consists of Assistants to Ministers and is the core forum where the national

planning (prioritization of projects and programs, goals, strategies) officially takes place.

According to all interviewees in the MoP and the MIC, this committee meets

regularly. However, no single interviewee would/could say how often. In the Steering

Committee, the MoP provides the yearly and five-year socio-economic development plans as

well as the accompanying technical plan that are made in accordance with Vision 2022

(which will be explained below). The MoF decides how many of the projects in the plan it is

able to finance, and the MIC is thereafter supposed to get external donor funding for the last

projects that are agreed upon but which there is not enough national funding for. Normally

the technical plan reaches Parliament in January, and is approved by Parliament in April, in

due time for the new fiscal year which starts in July in Egypt.99

98 Ministry of Planning, “Activation of the Planning Process”, A PowerPoint Presentation by Ministry of

Planning, slide 8. 99 (1.1, 2.2)

Page 50: 2 List of Contents and Thesis

43

Analysis of Ministry of Planning

After providing the structural, institutional and functional account of the national planning in

Egypt it is important to scrutinize how the process of making plans takes place in reality. The

quality and efficiency of the process is worth examining with regard to human and technical

resources as well as the structural setup.

Planning - Aspects of Concern

In the following sections five main aspects of concern are investigated: the quality of data in

the analysis in MoP; national capacity to make plans and program proposals; ownership in

the planning process; the economic issues; and finally the information about and promotion

of the plans.

The quality of data in the analysis in MoP

The MoP depends on a variety of indicators to make the plan.100 However, the interviewee in

MoP said that only approximately 75% of the information provided by the line Ministries is

accurate. Also, the information conveyed by the CAPMAS and the National Planning

Institute is insufficient since the CAPMAS only publishes statistics every 5 years, and as

such there are only random samples available for use as indicators in the planning process in

the interval in between. The source at the MoP also asserted that the statistics are not always

correct (which is common knowledge in academic circles in Cairo). In addition to this, it is

difficult to obtain data from the private sector, which often uses different indicators, making

the need for data correction a complicated task for the MoP. Obviously, the lack of proper

100 (1.1)

Page 51: 2 List of Contents and Thesis

44

and regular statistics, which is the foundation of decision-making, complicates and

deteriorates the planning process.101

National capacity to make plans and program proposals

Despite the issue of quality of data available to the MoP, one could question whether the

needed strategic capacity in the form of knowledge and experience of developmental

strategies is in place. In fact, the interviewees in MoP described the planning process in MoP

as just following the priorities from the individual line Ministries.102 A more profitable

approach to national coordination would be if a core Ministry would consult with all the line

Ministries and identify key challenges, which should then be solved in a holistic manner,

producing synergy between sector activities103. It is worth questioning how much beneficial

planning actually takes place when the MoP develops the socio-economic and technical

plans.

In the technical plan, a number identifies each project. However, a former employee

in the MoP stated, that a project’s title is so loose that it can contain many activities. The

project title and its number can refer to a project’s appraisal, a project document or a kind of

project.104 This means that it is fairly easy for the donors to achieve their respective agendas

by having their proposed aid programs accepted somewhere in the technical plan.

Likewise, critique from a former employee indicated the lack of specific

correspondence between planned projects/programs in the technical plan and the socio-

economic development plans within neither the one, five nor twenty year’s plans.105 There

was also little information provided which could indicate and ensure that the accomplished

101 (1.1) 102 (1.1) 103 (3.12) 104 (2.1, 3.19) 105 (3.9)

Page 52: 2 List of Contents and Thesis

45

activities are in coherence with the plans.106 The source that formerly worked in the MoP did

not expect that any real comparison between intended and accomplished activities at the

program level took place.107

It was very difficult to get any precise information concerning the Steering

Committee and its functions. Outside sources describe the process as ad hoc, to some extent

arbitrary, with no transparency in the decision-making process.108 This manner of national

prioritization is typical for developing countries.109

There is a problem of writing capacity in the line Ministries. The needed capacity to send

proper proposals to the MoP is at times lacking. This means that projects that should have

priority according to the line Ministry’s wishes for that reason will not be included in the

plan by MoP because the concrete project/program is not well-presented. External

interviewees from a line Ministry stressed this issue as one of the key problems in making

bottom-up planning.110 One member of civil society questioned how the MoP should be

capable of making good overall planning and coordination, when other Ministries are not

themselves capable of proper planning.111

Thus lack of planning, strategic and communication capacity on both sectoral and

central governmental levels deteriorate the national coordination of aid activities.

Ownership in the planning process

The question arises whether the Egyptian government has ownership of its aid priorities at

all. The overall frameworks and priorities of the UN represented via the MDGs, in addition

106 (3.9) 107 (3.9) 108 (3.12; 4.1; 5.3) 109 UNDP, 14. 110 (3.1; 3.9) 111 (4.1)

Page 53: 2 List of Contents and Thesis

46

to the strategies of the WB, the IMF and OECD DAC very much influence the national

development agenda in developing countries. In Egypt, the priorities of the ODA are in fact

shaped by such external entities. For example, the Millennium Development Goals Second

Country Report issued by the UN and the MoP illustrates that the international community to

a large extent sets the priorities in Egypt. These priorities are likely to be followed by

national authorities because of their focus by the international donor community. Already,

MIC states in the DCR 2003 that there has been a 35% increase in the total ODA

disbursement to MDGs from 2001 to 2003.

At the same time, according to the MIC, the recent years of donor assistance show

signs of aid disbursement increasingly aligning to local needs and priorities determined by

partner countries. This means that the donors are shifting away from setting policies for

recipient countries, and towards building partnerships with governments, civil society, and

other stakeholders.112 In the MIC’s Development Cooperation Report 2002, the MIC writes:

“For Egypt, development trends are shaped primarily by its national objectives but also

influenced by major donor priorities.”113 The donors’ priorities vary over time according to

political, economic and social concerns at the particular time. However, the era where

individual donors set different priorities for partner governments is likely to have been

substituted by an influential international aid agenda – mostly shaped by donors.

Several positive developments in the case of Egypt are to be emphasized. The report

by the MoP and the WB “Arab Republic of Egypt, A Poverty Reduction Strategy for Egypt”

and the report by The African Development Bank “Arab Republic of Egypt – 2005-2009

Country Strategy Paper” clearly illustrate the tendency of single donors aligning to national

priorities. Both reports intend to support the implementation of GoE’s Vision 2022.

112 Ministry of International Cooperation. “Development Cooperation Report 2002”. 9. 113 Ministry of International Cooperation. “Development Cooperation Report 2002”. 9.

Page 54: 2 List of Contents and Thesis

47

Thus, it appears that while the international donor community has great influence on

Egypt’s aid allocation, there is simultaneously a tendency of donors aligning to national

visions.

Economic Issues

When asked about the biggest problem for the MoP in the planning process, a source in the

MoP stated that the weakest link in the chain of aid prioritizing in Egypt is the lack of

sufficient domestic financial support of foreign projects and programs.114 Often donors

require that the Egyptian state place its own money in an 80% donor funded project to create

local ownership and responsibility for the particular project. However, this condition makes it

hard for the Egyptian state to obtain the most needed projects from donors. The lack of

national resources can easily be envisioned to deteriorate a planning process of aid. A highly

prioritized program may not be implemented because the national part of the funding cannot

be provided.

This conditionality of national funds being allocated to aid programs hereby shows its

infliction on the degree of ownership of national planning.

Information about and Promotion of the Plans

According to interviews of senior staff in MoP, it is clear that the MoP formally is

responsible for preparation and follow-up on a development plan. However, no interviewees

outside MoP and MIC said they could sense that national plans actually existed, and if so that

they were indeed being used. All interviewees from the donor community, the civil society,

and the private sector were entirely unaware of the existence of the annual and five-year

plans. Apparently, the level of knowledge with regards to national coordination is very low,

114 (1.1)

Page 55: 2 List of Contents and Thesis

48

which seems to be an indicator of low coordination and partnership in practice. This is also

an example of the general lack of transparency in the Egyptian political and administrative

system. The procedures within the highest ranks of the public administration are non-

transparent and no one outside these circles seems to be consulted with respect to defining

what the country’s needs are. Accordingly, no one knows what to expect from the

government. It is therefore also more difficult to hold the responsible people accountable.

Many interviewees referred to the political side of the administration as very closed,

consequently making it difficult for anyone to judge whether the allocation of funds is based

on solid reasons.115

On the positive side, it is important to stress that the MoP has indeed produced a

variety of information kits pertaining to its activities, including presentations on the structure

and functions of the MoP. Also, the MIC issued the DCR 2003, which focuses on the

national coordination and harmonization, showing an increased awareness of the importance

of these issues. The future regarding aid coordination by the Egyptian authorities looks

brighter – if the written words mean that more coordinating activities will follow by both

Ministries.116

When the Cabinet receives a plan, and discussions between the MoP and the Cabinet

on the modifications of the plan arise, the stronger Ministries get the most projects included

in the plan according to a senior member of staff in the MIC117. This means that information

about prioritizations and efforts of coordination are not only needed in the general public but

also within the political system so that the priorities of all Ministries are known and all

Ministries back up the final overall priority setting agreed upon.

115 (3.12, 4.1, 4.2, 5.2) 116 Ministry of Planning, “Activation of the Planning Process”, A PowerPoint Presentation by Ministry of

Planning. 117 (2.1)

Page 56: 2 List of Contents and Thesis

49

Follow-up

Follow-up118 is an important aspect of national coordination. In fact, it is as important as the

planning process. Typically, it is impossible to accomplish everything planned. In Egypt, the

MoP is responsible for the financial follow-ups on national plans. Furthermore, the MoP is

responsible for ensuring that the funding from the donors has been provided, such that

governmental money can be channeled as agreed upon.

After a plan has been approved, the MoP is required to follow up on the approved

plan. The MoP needs to follow up on the actions of Ministries and agencies, the Cabinet, and

the Parliament. At the same time, the MoP is expected to present the follow-up to the same

aforementioned entities.119 In the MoP’s Five-Year Plan from 2002, there are 20 pages of

follow-ups on the previous plan. It is, again, outlined in very general terms, mainly focusing

on macro-economic indicators that have changed due to internal and external factors.

Consequently, the follow-up document on the developmental performance during 2002/2003

is difficult to assess. The document could have been much more focused, as the plan was

more elaborate than a 5-year plan. However, the five pages of follow-up is just a brief macro-

economic overview of the past year.

Overall, there are approximately 10.000 projects taking place, which are

commissioned by the Egyptian government (excl. private sector). All projects should be

officially examined/followed-up on quarterly with each follow-up lasting for about a

month.120 Hence according to sources in the MoP, a third of the time allocated to a project is

spent on follow-ups, reviews, and evaluations that the line Ministries consequently send to

118 (The Egyptian authorities use the term follow-up as a broad synonym for the different kinds of assessments of ongoing as well as finished activities. It has been unclear what kind of evaluations, reviews or monitoring activities it refers to) 119 Ministry of Planning, “Activation of the Planning Process”, A PowerPoint Presentation by Ministry of

Planning, slide 6. 120 (1.1)

Page 57: 2 List of Contents and Thesis

50

the MoP.121 These considerable follow-up procedures are more wide-ranging than one would

expect. Perhaps the format of these official follow-up procedures has remained like it is

because the Ministries do not actually implement the follow-ups every time they are asked to.

Participatory Approach

Efficient and proper planning often needs collaboration with the entities that are

knowledgeable of the area of concern, and who often take part in the implementation of the

plan. In the above sections, it was shown how the MoP collaborates with other governmental

bodies. In this section it is examined to which extent the Ministry collaborates with the civil

society and the private sector.

In a presentation that the MoP has made to inform outsiders of the work of the

Ministry, it is stated that “Egypt will combine three types of planning procedures: central

planning (planning by commands and state domination), indicative planning (depends on

achieving the aspired targets by adopting a package of economic indicators) and

partnership122 planning.”123 Moreover, the role of the state is described as “a partner in the

development process jointly with the private sector and NGOs, catalyst for steering,

supervisor, facilitator, pioneer and financier.”124 Also, according to the recent plans it is

formally announced that partnership planning will play an increasingly important role in the

future.125

In the preface of the plan “The Fifth Five-Year Plan for Socio-Economic

Development (2002-2007) & First Year”, it is additionally asserted that partnership planning

121 (1.1) 122 Participation is explained as a process through which stakeholders influence and share control over development initiatives and the decisions and resources which affects them Ministry of Planning, “Activation of

the Planning Process”, A PowerPoint Presentation by Ministry of Planning. 123 Ministry of Planning, “Activation of the Planning Process”, A PowerPoint Presentation by Ministry of

Planning, slide 2. 124 Ministry of Planning, “Activation of the Planning Process”, A PowerPoint Presentation by Ministry of

Planning, slide 12. 125 Ministry of Planning, “Activation of the Planning Process”, A PowerPoint Presentation by Ministry of

Planning, slide 11.

Page 58: 2 List of Contents and Thesis

51

is done in accordance with the participatory planning concept, increasing the role of the

private sector in the making of as well as the execution of the plan. Furthermore, in the

description of the background of the five-year plan 2002-2007, it is being declared “the

private sector has participated – in an institutional way in the preparation of the draft and in

determining its general trends.”126 It is also stated that the five-year plan seeks to “Activate

the role of the private sector and NGOs through participatory planning and securing the

proper investment climate.”127 In fact, the argument for using this participatory approach

stems from the MoP’s recognition of the increasing role played by the private sector that

contributes with 60% of national investments and 70% of GDP.128 Additionally, in the

December 2004 Government Statement to the People’s Assembly, it is listed that one of the

working conditions and principles for the implementation of the ten developmental programs

presented is to support sincere partnership between the government and the private sector.129

Thus, there are surely positive steps towards participation, at least at the official level.

Nevertheless, one more element of the planning process that deviates from the

structural/formal description is the participatory aspect.

According to an interviewee in the MoP, meetings are held with approximately 20

NGOs and representatives from the private sector (Heads of Chambers) every 2-3 months.

The aim of these meetings is to make an effort to incorporate these entities into the planning

process.130 However, partaking in the planning process is not felt among the civil society and

the private sector.131 Also, an interviewee representing the donor community said that

partnership between the GoE and donors is lacking in practice, as communication is

126 Ministry of Planning, 3, 9-14. 127 Ministry of Planning, 39. 128 Ministry of Planning, 35. 129 Ahmed Nazif, Governmental Statement to the People’s Assembly. (Speech by the Prime Minister) (Egypt:

The Cabinet, Information & Decision Support Center (IDSC), 2004, 6. 130 (1.1) 131 (5.3, 4.2)

Page 59: 2 List of Contents and Thesis

52

scarce.132 From what was discussed above, and according to all interviews, it is clear that in

practice the partnership between the GoE and the stakeholders in the development process is

weak133. The centralized political system in Egypt can to a large extent explain the GoE’s

limited use of a participatory approach.

Centralized Government

Limited of use of a participatory approach often goes hand in hand with an overly centralized

government, as the one portrayed by the Egyptian political system. As Saad Eddin Ibrahim

puts it in 2001 “The State (...) has yet to fully emerge from a form of centralized rule, (...) in

which the entire policy revolves around an omnipotent ruler.”134 Kassem, concludes in her

book from 2004:

“The Presidency during Mubarak’s tenure remains the ultimately

source of power and authority, as was the case with his predecessors. Advantageous laws and an extensive patronage system, combined effectively, have not only hindered the balance of power within the formal governmental branches, but also assured the preservation of personal authoritarian rule for Egyptian presidents for over half a century.”

135

This centralized rule, the top-down flow of commands and information as well as the general

lack of delegation of responsibilities might explain the limited use of the participatory

approach. The Egyptian government has confirmed its willingness to open up to greater

citizen participation and to advance the democratic process. At the same time, the emergency

law continues to limit full participation of the general public in the political process.136

132 (2.4, 3.12, 5.3) 133 (5.3, 4.2) 134 Saad Eddin Ibrahim, Egypt, Islam and Democracy – Critical Essays. (Cairo: The American University in Cairo Press, 2003, 267). 135 Kassem, 43. 136 United Nations, and Ministry of Planning. Millennium Development Goals – Second Country Report Egypt 2004. (Egypt: 2005), 5.

Page 60: 2 List of Contents and Thesis

53

Ministry of International Cooperation

This section will examine the role of the MIC in national coordination of aid in Egypt.

Firstly, the MIC is introduced regarding its goals, visions and objectives as well as its

structure and functions. The focus is hereafter on the main responsibilities of the MIC:

execution of the national plans regarding foreign aid and follow-up on the developmental

outcome of the aid programs.

Goals, Vision and Objectives

In July 2004, Egypt established the Ministry of International Cooperation (MIC). The MIC

was created based on Presidential Decree 201 of the same year that a new Cabinet was

appointed. Ever since “international cooperation” was introduced in 1982 as a ministerial

entity, the job and responsibility had fallen under the domain of other Ministries.137 The year

2004 was accordingly the first time it was a separate fully-fledged Ministry with a separate

minister. The MIC has its own “Minister of International Cooperation”; Dr. Fayza Abu El-

Naga.138

Between 1987-1996, the function of international cooperation was managed in a

“Ministry of State for International Cooperation”. This meant that the Prime Minister was

responsible for the Ministry, as he was responsible for all the other “Ministries of State”. As

such, the Minister of Ministry of State for International Cooperation could not make

decisions without consulting the Prime Minister.139

137 (Previously, the tasks of international cooperation had been under the Ministry of Investment Affairs (1982-1983), the Ministry of Planning and International Cooperation (1984-1986), the Ministry of State for International Cooperation (1987-1996), under Ministry of Economy and International Cooperation (1996-1997), under Ministry of Planning and International Cooperation (1997-2000), and the International Cooperation Sector – Ministry of Foreign Affairs (2001-2004). There were many reasons for placing the job under the above-mentioned ministries; the task of international cooperation was placed according to the main goals of foreign aid at the particular point of time Ministry of International Cooperation. Ministry of International Cooperation, A timetable of the International Cooperation domain’s placement within other ministries in Egypt since 1982. (Egypt: Ministry of International Cooperation; 2.1; 3.9). 138 Ministry of International Cooperation, Press Release. (Egypt: Ministry of International Cooperation, 2004). 139 (2.2)

Page 61: 2 List of Contents and Thesis

54

According to Presidential Decree 303 of year 2004, the new MIC is responsible for

“The development and support of economic cooperation relations between the Arab Republic

of Egypt and other states as well as international and regional organizations.”140 The

responsibilities of the Ministry as mandated by Decree 303 include the preparation of

agreements for loans, grants, and financial guarantees, and the allocation of ODA,

guarantees, and facilities.141 These tasks are handled by the MIC in cooperation with

organizations, authorities, and institutions involved in economic co-operation.142 According

to an official press release, the MIC is established “in appreciation of such a Ministry’s

prospective vital role in driving and executing Egypt’s Development Plan for the upcoming

phase.”143 Subsequently, the main functions of the MIC strategy to fulfill its mandate include

acting as the national coordinator between government sectors, Ministries, and foreign

organizations in order to secure foreign resources required by the national technical

development plan.144 Secondly, they are to follow up on the developmental progress of

projects and programs, from inception to impact assessment.145

Structure and Functions

The MIC is divided into regional departments. In addition to this, there is a separate

department only dealing with USAID because USAID is the dominating financial source of

projects/programs. Furthermore, there is also a sole department with the sheer task of dealing

with multilateral agencies. The department for European Assistance therefore administers the

140 Ministry of International Cooperation, “Press Release”. 141 For details see Appendix B 142 Ministry of International Cooperation. “Development Cooperation Report 2002”, 3. 143 Ministry of International Cooperation, “Press Release”. 144 For details see Appendix B 145 Ministry of International Cooperation. “Development Cooperation Report 2002”. 3-4.

Page 62: 2 List of Contents and Thesis

55

Danish aid.146 According to a key employee in the MIC, each department in the Ministry is

supposed to deal with its own projects and programs.147

In the preparation of agreements for loans, grants, and financial guarantees, the MIC

needs to follow certain guidelines. Firstly, all projects and programs that the MIC is trying to

get donor funding for, need to have prior approval by the MoP.148 The MIC then negotiates

funding, and makes mutual agreements with donor countries/agencies. Secondly, presidential

and cabinet approval is needed prior to negotiation for loans. Furthermore, for loans there is a

roof of maximum US$ 1.5 billion per year to ensure ability of the Egyptian state to pay back.

However, the process is different for grants that have no financial implications for the

Egyptian system. During the negotiation period for grants, there is therefore no need for

either presidential or cabinet approval. The negotiations and finalization of the agreements

may thus be completed before approved by the cabinet and the president, and before a final

parliamentary ratification.149 The drafts of the agreements are thereafter sent to the relevant

line Ministry that heads the implementation. The MIC is responsible for contacting line

Ministries and providing information for the respective entities.150

Analysis of Ministry of International Cooperation

Execution of Plans

Official Procedure

There are various procedures in use during the MIC’s execution of the five-year development

plan. According to a senior employee in the MIC, the most often used procedures among four

kinds of coordinating procedures, applies when the MIC contacts donor communities,

proclaiming what projects it wishes to implement. A senior official at MIC stated, that the

146 (2.1) 147 (2.4) 148 (2.1) 149 (2.2) 150 (2.2)

Page 63: 2 List of Contents and Thesis

56

MIC asks donors what needed support they can help providing according to the donors’

expertise, priorities, strategic preferences and respective interests in e.g. supporting their own

companies.151

Second method used by MIC to execute developmental plans is to submit the need for

finance to the Development Association Group (DAG). Subsequently, representatives from

the MIC explained that the Ministry regularly holds meetings with the DAG, where a certain

Minister requests funding from the members.152

A third way of coordinating aid activities occurs when the support initiative comes

from donor agencies themselves.153 The donor’s offer (either a project or program) is then, if

possible, fitted into the national plan. The MIC checks whether there is already funds

transferred to the proposed goal and whether the donor’s idea for funding is a priority of the

GoE.154

In addition, Egypt is also allowed to obtain loans from financial institutions such as

the World Bank or the African Development Bank, according to the status of its membership

and participation within these institutions. This aid is also handled and channeled by the

MIC.

The MIC states in its DCR 2002 that although donors have priorities of their own

with regards to ODA allocation, it is essential for the recipient country to ensure optimum

utilization of foreign assistance.155 In fact, efficient allocation of ODA is attained when

assistance allocations as a whole match the development priorities and needs of the country.

This means that, officially, the MIC is aware that the ODA needs to be coordinated.

However, in the DCR 2002 the Ministry does not describe how ODA was coordinated to

151 (2.1) 152 (2.1) 153 (2.1) 154 (2.1) 155 Ministry of International Cooperation. “Development Cooperation Report 2002”. 26.

Page 64: 2 List of Contents and Thesis

57

match exact development priorities, or what the precise priorities are for Egypt when this is

done.

Practical Implementation

The stipulated role of the MIC in coordinating aid activities is very difficult to implement in

practice. The challenges are immense the three main procedures described above meet many

obstacles when put into practice.

The coordination that should be secured when the MIC contacts a donor does not

seem to be effective under real life conditions. The senior head of a bilateral donor agency in

Cairo showed an example of this process during the interview. The interviewee had, before

the interview took place, received a letter from MIC offering the donor agency to choose

from a number of listed projects that the MIC sought funding for. Each project was described

in a few pages that were enclosed with the letter from the MIC. The head of the agency

explained that the agency had very different competences than the ones needed to fund and

implement the listed projects. Accordingly, he did not appreciate this strictly top-down

approach by the MIC. The letter was therefore put aside. This left the head of this donor

agency uncertain with regard to why he received this letter; why his agency had not first been

asked about its competences, and on what basis the MIC had picked these concrete projects

as the ones to be implemented.156 The interviewed Head of this donor agency was therefore

confused, not enlightened, and no coordination was achieved.

The second approach by the MIC is to contact the DAG that since August 2001 has

functioned as a donor coordination forum under the UN Resident Coordinator. The activities

in DAG are discussed in the last section of this chapter; prerequisites for national aid

coordination.

156 (5.3)

Page 65: 2 List of Contents and Thesis

58

The third method that is followed by the MIC when coordinating ODA is when the

donor approaches the MIC with a funding offer. When such an approach is followed, it

seems as if the only coordination taking place inside the MIC is to ensure that funding is

obtained to implement the technical plan.157 A senior top official in the MIC said (after many

attempts of trying not to answer the question) that there is no independent developmental

planning taking place within the MIC. The interviewee’s justification was that planning was

the responsibility of the MoP and that the MIC’s only role was to get funding for projects

already accepted and included in the technical plan in accordance with the five-year socio-

economic development plan. Logically speaking, it seems rather inefficient when the

executing Ministry does not have the necessary tools to carry out its work. The tools (the

national plans) are so loose that it is difficult for the MIC to accommodate donor priorities

while at the same time ensure that national priorities are met. With the lack of sufficient

knowledge and a proper overview of aid activities in the country, one cannot expect the MIC

to be able to undertake the role of the coordinator properly.

In certain instances the line Ministries bypass the MIC when seeking an external donor to

fund a project. As a result, the MIC is not involved in the initial planning of donor relations

with line Ministries until the final official agreement has to be signed. This furthermore acts

as a potential obstacle for proper aid coordination to take place.

The above findings show, that the degrees of national coordination executed by MIC can be

characterized as consultation with donors. This is the least extensive level of coordination

where information is being shared between parties. Preferably, coordination would take the

shape of a multifaceted process where also cooperation with donors involving discussions

157 A former staff member in the MoP said that there was no doubt that the MIC should have a copy of the MoP’s plans to be able to react properly to other ministries and donors (2.2). However people inside the MIC

said that they contact MoP for a certain project to be accepted in the plan every time a donor offer a certain project (2.1, 2.5).

Page 66: 2 List of Contents and Thesis

59

with donors of policies, priorities and principles are taking place in order to maximize the

outcome of aid programs. Also, coordination in the form of collaboration with donors, that

is, agreeing on procedures and practices in an effort to ensure smooth, shared implementation

of agreed policies would be a central facet of national coordination.158 Consequently, it must

be concluded that the procedures of the MIC are not yet implemented and followed to an

extent that would enable the MIC to fulfill its stipulated goals.

Follow-up

Official Procedure

As stated in the list of MIC responsibilities and functions, MIC is to follow-up on the

progress of projects and programs, from initiation to impact assessment.159 The interviewees

from inside the MIC confirmed, that the employees recognize the responsibility of following-

up on all projects.160 The Centre for Project Evaluation and Macro-economic Analysis

(PEMA) under the MIC is responsible for these tasks. Supposedly, in the future, annual

DCRs shall show the status of a follow up on ODA disbursements on macro-level according

to national priorities.

Practical Implementation

Inside the MIC, the follow-up mechanism is portrayed as weak since there is insufficient

capacity to manage the task of following up on programs’ developmental impact. Most

outsiders described the follow-up as non-existent. An outsider was, after having been in

touch with the MIC, of the impression that the MIC reviews are restricted to procedural

158 Claret de Fleurieu, 18-20. 159 Ministry of International Cooperation. “Development Cooperation Report 2002”. 3-4. 160 (2.2; 2.4)

Page 67: 2 List of Contents and Thesis

60

matters, and do not address substantial issues. It does not focus on coordination between

donors, but on procedural or financial issues.161

The Center for Project Evaluation and Macro-economic Analysis (PEMA) evaluates

projects after they have been completed. This renders this follow-up setup fairly unhelpful

during the implementation of any projects and unable to redirect financial resources to the

most successful parts of the program. The follow-up that takes place in PEMA, however,

serves to pivot capacity building in the unit, as it gains additional experience of how projects

should be designed and implemented to accomplish the intended impact. According to senior

personnel in the PEMA, there is a need for additional capacity to follow-up on projects.

However, according to the person in charge of PEMA there has been a significant progress in

the center for the last 12 months, starting July 2005, such that with time the PEMA – if

granted more resources – could become a useful national follow-up unit.162

There are definitely also institutional weaknesses in the follow-up process, as the

Minister is not demanding technical memorandums on a regular basis. The staff only

produces evaluations on request by the minister.163 Hence, the structures do not encourage

the employees to follow-up continuously.

In the DCR 2002, the MIC describes how the ODA is allocated sectorally and

geographically on the macro-level.164 In the document, it is briefly described how some of

the sectors that receive the most donor funds have either reached more or less ODA than

expected. In the document there is no categorical prioritization of the different sectors. For

example, both the educational and the environmental sectors are given “highest priority”. In

this section, it could have been useful to provide the ODA disbursement according to some

clear national priorities for the ODA. However, the DCR only provides a very general

161 (4.1) 162 (2.4) 163 (2.4) 164 Ministry of International Cooperation. “Development Cooperation Report 2002”. 30.

Page 68: 2 List of Contents and Thesis

61

statement of previous distribution as well as general policy recommendations to GoE, donors

and implementing agencies.165 Hopefully, future DCRs will provide follow-ups on

disbursement according to national priorities and provide an overview of the allocation, as

the donors might very likely want such priorities for the upcoming period.

Nonetheless, one task of the MIC that seems to work fine is when the MIC takes on

the role as problem-solver handling complaints from donors and informing the respective

Ministries, that they cannot obtain funds from donors due to dissatisfaction. If Ministries do

not improve, the MIC informs the Prime Minister. Also, the line Ministry can inform the

Prime Minister that the MIC themselves cannot obtain the funding applied for; usually this

information is channeled smoothly and helps donors implement their aid activities in

Egypt.166

In 2002, the Development Cooperation Data of Egypt (DECODE) unit in the MIC produced

the first report called the “Egypt International Cooperation Report - 2001”. Before this

volume, there was no comprehensive database on aid in the Ministry. The next report for

2002 was produced in April 2005, and the one for the year 2003 was launched in November

2005, while the date for the launch of the newest and updated version for 2004 has not yet

been set. This production of DCRs represents a great progress in the information available

from within the MIC. It also shows that until now, updated information has not been

available in the ranks of the MIC. Accordingly, the Ministry does not have the basis and the

overview to coordinate foreign aid activities properly. The civil servants in the Ministry are,

according to insiders in the MIC, not adequately trained, which means that they lack

knowledge and professionalism.

165 Ministry of International Cooperation. “Development Cooperation Report 2002”. 32. 166 (3.14, 4.1)

Page 69: 2 List of Contents and Thesis

62

It is fairly clear, that the earlier kind of aid scheme, where donors implemented and

evaluated their own projects with their own apparatus, gave the national authorities fewer

incentives to promote the capacity to follow-up. However, since the national structures are

now beginning to play an actual role, they need time to start up and get running. The latest

progresses of DCRs seem to indicate a more constructive future of the MIC regarding

coordination and following-up.

Issues pertaining to Execution and Follow-up

During the research some specific aspects showed to be essential for the coordinating role of

the MIC, these are discussed in the following.

A new Ministry – a new Structure of National Aid Coordination

Indeed, one must allow the MIC some additional years to operate before a fair evaluation can

be executed. It is a new Ministry that needs to build up its competences over the years to

come. At the same time, if the government really wants a strong MIC that follows up on

projects and programs and ensures aid coordination, it should support MIC with more funds,

higher salaries to attract good researchers etc. An uplifting recent development is the newly

published DCR 2003 from November 2005 that has chosen coordination and harmonization

as main topics. In this report, the public is being informed on the initiatives done by GoE,

especially the MIC, in an effort to increase donor coordination. These initiatives – the DAG,

the DCRs etc - are also mentioned in the present report.

In spite of the positive developments, the basic legitimacy of this new Ministry is

worth questioning. An interviewee stated that the creation of the MIC is an example and a

result of the Egyptian system’s way to react when it identifies a problem – they create

Page 70: 2 List of Contents and Thesis

63

something new.167 As a consequence of the lack of coordination, the government created a

new Ministry: the MIC. However, as concluded by an interviewee “The creation of the MIC

does not automatically solve the problem that all the other Ministries do not collaborate.”168

It might have been more effective if the MIC task was taken care of by MoP that is already in

charge of planning and have developed experiences within strategy making.169 Trying to

make double capacity building in the MIC and in the MoP may not be worthwhile and

justified170, one interviewee argued. At the same time, one key senior official in MIC did not

find anything flawed with the overall structure in which MIC finds itself or the way the

functions were implemented by the Ministry171. This was stated in spite of the fact the

interviewee also commented that there were a multitude of issues that needed to be resolved

within the MIC.

The Practical Role of the MIC

When asked the question of whether Egypt executes any aid coordination, a former manager

in a Ministry answered: “There is no (or very little) national aid coordination, there is no (or

very little) local aid coordination and there is no (or very little) sector aid coordination –

because the system is wrong”. He defined the MIC as a “bureaucratic paper-shifting organ”

that is not strong enough to stand alone and which is only capable of taking complaints. He

summarized his assessment of the MIC by stating, “It could not be any worse - there is no

coordination.”172 By and large, outsiders generally viewed the MIC’s role as minimal.

Another person, representing civil society, summarized the situation this way; “My

167 (4.1) 168 (3.2) 169 (4.1) 170 (3.2) 171 (2.1) 172 (4.1)

Page 71: 2 List of Contents and Thesis

64

conviction is that it does not make a difference with the MIC or not.”173 These comments

from line Ministries and civil society must make one wonder how much coordination the

MIC does indeed accomplish.

Centralized Decision-making Process

One of the main causes resulting in the shortcoming of clear-cut sector targets, policies, and

strategies might be the relatively high degree of centralization in Egypt’s decision-making

process, in which decision-making powers are rarely conveyed to lower levels of civil

servants. The implementation and use of the plans in coordination of aid is (to the extent it

takes place) very centralistic and top-down. This may explain the vague answers of some

interviewees in the MoP and the MIC when they were asked specific questions. It became

clear, that they were focused on the planning or formal coordination that takes place on their

level. However, they had often not thought about whether and how their planning could

effect implementation in practice. The MIC would greatly profit from and create more

interest in its operation by improving their communication with the line Ministries, donors

and civil society.

Lack of Information

An interviewee inside the MIC declared “sometimes one finds some similar projects close to

each other that are financed by different donors. The lack of previous coordination is due to

MIC’s need for more information.”174 The staff in the Ministry said they needed full

information to facilitate coordination and take the right decisions.175 When Egyptian

authorities do not know the country’s needs, they cannot say ‘no’ to new donor programs.

This hampers national planning and coordination. Egypt should be able to express which

173 (4.2) 174 (2.2) 175 (2.2, 2.3, 2.4)

Page 72: 2 List of Contents and Thesis

65

programs are needed and not accept other offers. However, this certainly does not yet

happen. A member of the private sector strongly believed that Egypt is not prepared to

manage national coordination, as it is simply neither prepared nor able to tell the donors what

the country’s needs are.

According to a source in the MIC, the Ministry has asked a donor to provide a

Geographical Information System (GIS) in technical assistance so that the MIC can get an

overview of the developmental projects and programs in the country176. Also, the UNDP and

the EU has helped the MIC with tools and capacity to execute its functions. This means that

the MIC is getting help to improve its tasks, which seems to be a very positive trend.

Lack of Competences

The different needed competences with respect to development strategy, writing of program

documents, and methods of evaluation are lacking in the MIC.177 Most of the staff within the

Ministry cannot see the differences between different projects or programs, an outsider

said.178 A senior official in the MIC backs up this point by saying that when it comes to the

evaluation of projects, MIC personnel needs to learn how to distinguish between good and

bad projects. The senior official in the MIC said they were in the process of learning - the

willingness was there - but the knowledge and skills were still missing.179 Indeed, if the

plans were outlined in proper detail and the aid capacity were present inside the MIC, the

Ministry would be able to fulfill its role of “..driving and executing Egypt’s Development

Plan”. However, this goal has not yet been achieved, as there is no capacity to execute the

plan properly in the first place.

176 (2.2) 177 (2.4, 4.1) 178 (4.1) 179 (2.4)

Page 73: 2 List of Contents and Thesis

66

Lack of National Coordination: also the Donors’ Fault

There are many examples of donors not willing to be responsive to the needs formulated by

the country’s own authorities. Also donors are often not interested in joint projects or

programs. In addition to this, unpredictability is a problem for the national coordination

authorities. A senior member of staff in the MIC raised this question in an interview “How

do I know if we get 5 or 50 million LE? And how do we plan and coordinate, if we do not

know?”180 Also, the problem is that donor commitment is established and defined well in

advance of the donor activities actually being initiated.181 Basically very few factors are

predictable. These are some of the external factors challenging national aid coordination in

Egypt. However, the research of this thesis is on how the partner country’s authorities fill out

the necessary prerequisites for managing national coordination.

Prerequisites for National Aid Coordination in Egypt

The previous sections tackled the prerequisites for donor coordination on the partner

country’s side. These prerequisites are formulated by the UNDP:182

1) A clear policy framework at the national level to ensure a long-term development

visions are in focus when national priorities and strategies are decided upon;

2) A system of medium-term rolling development programs is required with budget

estimates tied to sector strategies, programs and projects; and

3) A clear division of responsibility between core and line Ministries.

4) A governmental forum to secure efficient government-donor partnership needs to be

established.

180 (2.1) 181 (4.2) 182 UNDP, vi, 29-30.

Page 74: 2 List of Contents and Thesis

67

The following discussion presents an analysis of the extent to which Egypt fulfills the above-

mentioned prerequisites for national coordination. The Vision 2022 is supposedly

functioning as the ‘policy framework and long-term development visions’ and is referred to

in the five-year and the one-year plans. In practice, the existence of this Vision 2022

document means that there is a policy framework and long-term development visions in

Egypt. However, it has been difficult to document whether this vision functions well as the

policy framework and long-term development vision since it is only being referred to and yet

not made available. At any rate, as judged from the summaries of this vision document, it

appears unlikely that it meets the requirements defined by the UNDP.183 A comprehensive

vision would ensure that national governance could undertake widest possible participation

in decision-making. Furthermore, an ideal vision includes incentives to ensure and qualify to

which extent society moves towards implementing the vision, and means in the form of

regulations and service deliveries to optimize the goals stipulated in the vision document.184

Vision 2022 does not contain such information.

This conclusion is supported by the fact that none of the interviewees mentioned

either the former or the current vision documents. This indicate that only a minority of the

people who would be expected to be responsible for implementing of the Vision document

are aware of its existence. According to officials in the MIC, the MoP keeps the vision

document within its own Ministry, and does not distribute it to line Ministries. The

argumentation for the rational behind this decision is that the line Ministries are solely

supposed to implement and follow-up the five-year plans.185

183 A UNDP definition of a policy framework and long-term development vision includes for example how the population’s future living conditions and opportunities in the country shall be affected by socio-economic and political means; what the political structures of participation are; and the roles that should be instrumented by all the different groups in society in order to achieve this vision. UNDP, 29. 184 UNDP, 29. 185 The MIC has a long technical version of the previously mentioned five-year plan “The Economic and Social

Development Plan for 2002-2007”, which contains all the activities accepted by the MoP on its more than 2050

pages (2.5).

Page 75: 2 List of Contents and Thesis

68

The Five-year plan for socio-economic development fills out the formal and

theoretical role as a medium-term plan. However, just as it was the case with the 20-year

vision document mentioned earlier, it does not fully meet the UNDP standard requirements

for a five-year plan. Such a medium-term plan, according to UNDP, must include budget-

estimates tied to sector strategies, programs, and projects. When such information is lacking,

the experience of UNDP is that the actors outside the implementing institutions cannot define

or find their own roles and contributions. For donors, these concrete programs are necessary

as a starting point to channel any scheme of aid to a country.186

Egypt’s five-year plan is without any budgetary estimates tied to programs and

projects of specific sector strategies. The strategies mentioned in the five-year plan are very

general and are not prioritized. Therefore the donors in Egypt have heavily criticized this

lack of medium-term program planning.187 According to the Development Cooperation

Report 2002, donors have expressed concern that the GoE has not yet formulated clear-cut

sector targets, policies, and strategies – apart from the broad development objectives and

priorities already indicated. If these existed, they could surely guide donors and help pivot

the entire scheme of aid coordination.188 As a matter of fact, in the DCR 2002, which briefly

tackles the coordination of ODA disbursement, it is written that the donors request that the

GoE make more clear-cut sector strategies, policies, and targets to guide the donors’

disbursements. The reply by the MIC in the DCR 2002 on this request was that “The

initiatives taken by the MIC in this regard aims at addressing this issue”. However, the

precise nature of these taken initiatives was not specified anywhere in the response. The

report goes on stressing that better coordination between the MIC and donors is essential to

ensure maximum utilization of funds. While decentralization should reduce administrative

186 UNDP, 30. 187 Ministry of International Cooperation. “Development Cooperation Report 2002”. 188 Ministry of International Cooperation. “Development Cooperation Report 2002”. 4.

Page 76: 2 List of Contents and Thesis

69

and management costs, it is mentioned that this should not undermine the central

coordinating role of the Ministry.189

In conclusion it can be said that it is simply unclear from the MoP’s Vision 2022 and

its five-year socio-economic plan what the main priorities of the GoE are. Consequently, this

means that it is complicated for the MIC to execute the developmental plans, thus fulfilling

its role as aid coordinating body.

The role of the Steering Committee with regard to prioritizing the wish lists of the line

Ministries is not at all transparent. Therefore, the third prerequisite for aid coordination does

not seem to be fulfilled.

According to UNDP, the greatest weakness pertaining to aid coordination today is the

absence of a dialogue between the government and the various donors at the country level.190

Indeed, partnership is a central part of national coordination. In practice the coordination

does not take place if the GoE and the development stakeholders do not have consultations,

cooperation, or collaboration regarding policies, principles and priorities, procedures and

practices.191 Inspired by the Paris Declaration in 2005, which Egypt has signed,192 the senior

staff in the MIC proclaims that the Ministry is trying to fulfill this commitment by

establishing a Committee of MoP, MoF, MIC, line Ministries and donors. These parties have

indeed already met on a few occasions. At these meetings each donor supposedly provides

the others with a proposal and each representative gives his/her opinion in person, concerning

aid disbursement. Obviously, the MIC could have a very important function as coordinating

body of such meetings and thus fulfill their main task.193 However, this series of meetings are

189 Ministry of International Cooperation. “Development Cooperation Report 2002”. 32. 190 UNDP, vi. 191 Claret de Fleurieu, 18-20. 192 (Egypt is additionally a signatory to the Rome Declaration on Aid Harmonization from 2003. Ministry of International Cooperation. “Development Cooperation Report 2003”, 4. 193 (2.2)

Page 77: 2 List of Contents and Thesis

70

not yet fully institutionalized and thus do not yet fulfill the role of a governmental/donor

forum for coordination of aid.

In developing countries, the lack of such an efficient forum reflects a lack of the

necessary capacity. Ministries of finance and planning need to have devised a medium-term

development strategy, and line departments must be capable of conducting the necessary

sector policy dialogues. When these elements are not present, it is difficult if not impossible

for the authorities to establish such an aid coordination forum.194

In Egypt, the UN Resident Coordinator has assessed that these necessary capacities

were not in place and has therefore set up the Donor Association Group (DAG) and provided

a matrix containing the donors’ contribution to all ten development programs/areas as

defined in the previously mentioned speech by the Prime Minister in 2004. The DAG

consists of two groups: the large donor group with a representative from about 50 embassies

or organizations that provide the most aid to Egypt. There are no representatives from civil

society, private sector or NGOs. Moreover, there are 8 DAG subgroups divided into different

fields of development. Most sub-groups have two chairs, often one from a donor agency and

one Egyptian official working in a key position within the respective field. The sub-groups

are supposed to meet every month where they attend a presentation by a government official

or someone from the academia.

The purpose of the DAG meetings are obviously to attempt to compensate for the

MIC not taking on the responsibility of national aid coordination, as well as Egypt not having

a Poverty Reduction Strategy that could potentially guide the donors. In fact, a representative

from the DAG executive Secretariat explained that the GoE is doing its best to coordinate

194 UNDP, vi.

Page 78: 2 List of Contents and Thesis

71

between donors, but is obstructed by not having the needed human resources and funds to

undertake the task properly.195

The coordination operations of the DAG meetings take place at different levels. In the

plenary DAG, where all the Embassies and organizations are present, the coordination effort

can be characterized as being on a consultation level.196 Conversely, in the DAG thematic

sub-groups, the coordination is more aligned to the government and line Ministries and the

kind of coordination taking place could be defined as being on the level of cooperation. The

third and most extensive level of effective coordination collaboration only happens in some

of the most active sub-groups and it is still only on the agenda for others.197

According to a key official at the Royal Danish Embassy in Cairo the best

coordination of aid activities in Egypt happens in the DAG. Unfortunately, Egyptian

authorities do not have the ownership of the coordination that takes place in DAG. The DAG

Secretariat under the UN Resident Coordinator would have liked to see a national ownership

of aid coordination, but this cannot happen as long as the necessary capacity has not been

developed in the MIC.

The lack of national coordination in Egypt is not solely a problem that could be solved by

institutional support and capacity development, despite the fact that it could appear to be the

case at the first glance. In addition, a willingness at the presidential and ministerial level to

allocate the necessary national resources to the MoP and the MIC is absolutely necessary

before these prerequisites can be fulfilled.

195 (5.2) 196 (5.2) 197 (5.2)

Page 79: 2 List of Contents and Thesis

72

Conclusions

Officially, Egypt does have national aid coordination. The MoP is the Egyptian authority

with the responsibility to coordinate foreign aid programs as accomplished by planning and

financial follow-up. The MIC is responsible for executing the plans and developmental

follow-up. Thus it is not the same authority that is responsible for preparing and executing

the plans.

In practice, the MoP produces a long-term vision, medium-term plans and annual

plans: However, the plans are by and large so general that they do not provide the necessary

details for priority setting at the MIC as needed for implementation. Donor strategies indicate

that some donors align their official approaches to the MoP’s national visions and plans. This

means that the MoP does indeed to some extent foster national coordination by producing

national vision and strategies. Furthermore, on the strategic level as well, the MoP actively

collaborates in producing reports on poverty reduction with donors such as the WB and the

UN, thus consulting and cooperating with donors. Unfortunately, the impact of these efforts

is severely reduced by the centralistic nature of the MoP operations. This results in a low

level of participation of non-governmental stakeholders in the planning process.

The MIC, which has the task to mediate contact to donors, uses the five-year plans

when coordinating with donors. However, the coordination is insufficient as it only involves

scarce consultation with donors. As the plans are not very detailed, donor-proposed activities

can easily be fitted into the plan, making the notion of national donor coordination somewhat

useless. The financial follow-up by the MoP seems to be working, whereas the MIC’s

follow-up on impact is very limited.

This research investigation has demonstrated that there is a consistent discrepancy between

the official policies and the practice regarding national aid coordination in Egypt. Sometimes,

Page 80: 2 List of Contents and Thesis

73

as in the case of the Steering Committee, it has not been possible to elucidate what is the

reality of national coordination of aid in Egypt. The prerequisites for national aid

coordination as listed by UNDP are therefore according to this research concluded not to be

fulfilled in Egypt. The long and medium term planning provided by the Egyptian authorities

is simply not adequate to serve as efficient tools for the MIC coordinating foreign aid

activities. Also, clear division of responsibility between core and line Ministries is deficient

due to a lack of transparency with respect to decisions and procedures in the Steering

Committee. There is no national-led forum for coordinating aid in Egypt and the overall

strategies, priorities and programs are not formulated based on a participatory approach with

donors, private sector and civil society entities. It is thus virtually impossible to ensure

smooth and shared implementation of policies agreed upon by the government and donors.

This research investigations shows that Egypt has major difficulties in deciding on foreign

aid priorities and administration and with respect to having the ownership of the aid

activities. In this context it is important to note that agencies like Danida now has decided to

gradually shift parts of its development assistance to partner countries to budget support as a

replacement for program support. It is clear from this research that a country like Egypt

would need many more years of capacity development and institutional strengthening before

it is able to prioritize, plan, coordinate as well as follow up on foreign assistance. At the

moment the planning process at the top of the system is non-transparent. Previously the

national plans, strategies and priorities have been too general, and the donors have not

known, understood or followed a scheme of national coordination. With certainty, Egypt

could benefit a lot from receiving capacity building to the MoP and the MIC before receiving

direct budget support.

Page 81: 2 List of Contents and Thesis

74

It is known that Denmark phases out its aid to Egypt by 2008 so the question of

Danida shifting to budget support in Egypt is not realistic. However, had Denmark not

decided to withdraw its assistance to the country, and Egypt in stead had received more

capacity building in the years to come, the country might had been able to profit from budget

support in the future. Had Danida begun to give budget support to Egypt these years, it must

be envisioned that inefficient use of its resources in Egypt would have become a major issue

in the years to come. The political consequence of this could be that the Danish government

decides to reduce its foreign aid.

Page 82: 2 List of Contents and Thesis

75

CHAPTER 3

Environmental Sector Program - and its Internal National Involvement

The general conviction among the interviewed environmental stakeholders in Egypt was that

foreign aid programs do not have a satisfactory impact on improving the environment. It

must therefore be relevant to investigate whether this is due to a lack of national coordination

between institutions in the field of environmental policy. This research will focus on the

Environmental Sector Program (ESP) in Egypt and investigate whether insufficient national

coordination has limited the intended impact of the program. This chapter investigates the

features of national involvement in the ESP and how it affects the intended outcome of the

program. Firstly, an overview of environmental aid to Egypt is provided, showing the

broader context of the ESP. Secondly, the case study of the Environmental Sector Program

will illustrate how national involvement in the program can affect the outcome of the

program.

Account on Environmental Aid to Egypt

A recent World Bank study on cost assessment of environmental degradation,

estimates the damage cost to be LE 10-19 billion per year (or 3.2-6.4 percent of GDP).198 The

environmental situation is worsened by the rapid population growth, which damages Egypt’s

national resources.199 This estimate additionally stresses the need for efficient environmental

foreign aid and national aid coordination is one of the factors that possibly can increase the

impact of the environmental aid to the country. The latest official data available from the

MIC from 2003 shows that the donors’ total disbursement for targeting MDG 7

198 United Nations, and Ministry of Planning. “Millennium Development Goals – Second Country Report Egypt 2004”, 41. 199 United Nations, and Ministry of Planning. “Millennium Development Goals – Second Country Report Egypt 2004”, 42.

Page 83: 2 List of Contents and Thesis

76

(environmental sustainability) amounted to US$383 million, which is a 7 percent increase

from 2002.200 During the same period, the number of environmental development projects

operating decreased form 233 to 209. In 2003, the main donors contributing to Goal 7 were

the African Development Bank (ADB) with 24 percent, followed by the USAID with 20

percent and the European Investment Bank (EIB) with 15.7 percent. With regard to the

environmental MDG, donors have committed a net budget of US$8.98 billion until the year

2009.201 Concerted or joint initiatives, including “basket funding” have, so far, been rare in

the sector of environment.202

In Figure 6, the chart shows the distribution of ODA disbursements by MDG in US$

million during the period 2001-2003. The donor funds allocated within the environmental

field in Egypt are relatively high compared to the other areas of the MDGs.

Figure 6: Distribution of ODA disbursements by MDG, 2001-2003, US$ million.203

200 Ministry of International Cooperation. “Development Cooperation Report 2003”. 39. 201 Ministry of International Cooperation. “Development Cooperation Report 2003”. 39. 202 “First Joint Annual Sector Review Agreement, 09 April 2003 between The Government of the Arab Republic

of Egypt and the Government of the Kingdom of Denmark for the Environmental Sector Programme (ESP)”.

(2003), 3. 203 Ministry of International Cooperation. “Development Cooperation Report 2003”. 33.

Page 84: 2 List of Contents and Thesis

77

All interviewees from the government’s environmental sector stated that Egypt has received

a considerable amount of funds compared to the improved environmental impact that the

assistance brought about.204 For example, Danida has spent somewhere around 300 million

LE on environment aid to Egypt since year 2000. According to some managers in EEAA,

this high investment did not result in the expected and desired improved environmental

outcome.205 A similar opinion was expressed by a manager at the MIC responsible for

coordinating USAID’s environmental aid to Egypt. This interviewee thought that the

relatively modest accomplishments achieved using USAID support in this area were

disproportionate with the allocated funds.206 One explaining factor of the limited outcome of

the foreign environmental aid programs could be lack of coordination. But it should also be

remembered that environmental issues are typically complex and difficult to resolve.

Figure 7 shows the disbursements of ODA by geographical allocation in 2002-2003

weighed against the regional standards of environment as defined by the percentage of

Egyptian households with access to piped water and sanitation in 2001 in different regions.

The MIC uses access to piped water and sanitation as an indicator of environmental

conditions. However, it can always be debatable whether this measure is adequate and

sufficient. The graph shows some selected governorates, stated to be medium- and low-

ranking governorates that were targeted by ODA. However, the MIC also acknowledges that

the governorates of Menoufia, Assyout, Matrouh and South Sinai (which are not included on

the graph) had the lowest access to piped water and sanitation and yet received the lowest

percentages of ODA disbursements. The MIC recognizes that this knowledge of a

disproportionate distribution of environmental aid should be reflected in future re-allocations

of ODA to increase efficiency of resources.207

204 (3.7) 205 (2.2, 3.10) 206 (2.2) 207 Ministry of International Cooperation. “Development Cooperation Report 2002,” 39.

Page 85: 2 List of Contents and Thesis

78

Figure 7: Disbursements of ODA by Geographical Allocation (2002-2003) versus Households with Access to Piped Water and Sanitation (2001) in Egypt.208

The Environmental Sector Program

During the 1997 annual consultation between the governments of Denmark and Egypt, it was

agreed that future environmental co-operation between the two countries would be structured

as Sector Program Support (SPS).209 Danida first introduced this kind of assistance strategy

in 1994 to ensure that Danish support would be harmonized with the sector policies of the

different partner countries regarding mutual cooperation.210 Before 2001, Danida had been

giving project support to Egypt in the fields of environment, water, and energy, but by

January 2000 the SPS was appraised. January 1st, 2001 was the starting date for the

Environmental Sector Program (ESP), where the Egyptian Environmental Affairs Agency

(EEAA) under the Ministry of State for Environmental Affairs (MSEA) became cooperating

agency in Egypt with Danida. The total budget of the SPS program, including the already

208 Ministry of International Cooperation. “Development Cooperation Report 2003,” 39. 209 “Sector Program Support” replaced the previously used “Project Support” 210 Danish Ministry of Foreign Affairs (DMFA from now on), Final Sector Programme Support Document - Danish Support to the Environment Sector. Egypt. (Denmark: DMFA, 2000), 1.

Page 86: 2 List of Contents and Thesis

79

ongoing projects, was DKK 432.1 million equal to US$58 (DKK 7.44 = US$ 1) spread over

the period 2001 to 2006.211

The developmental objective212 of the ESP is to contribute to the efforts of the Egyptian

government to improve environmental conditions, and furthermore to develop environmental

management capacity of institutions by provision of frameworks of compliance with

environmental regulations.213 This goal is to be achieved through effective implementation of

environmental management and improvement activities at the local level. Also, the ESP aims

at supporting the EEAA’s strategy for rationalization of its services and functions as well as

providing institutional support to two selected governorates, Aswan and Beni Suef.

Furthermore, the ESP aims at assisting Egyptian industry in improving compliance with

environmental regulation through a focus on implementation of cleaner production

systems.214

Structure of the ESP

The ESP consists of several components and support activities, some of which have

changed during the course of the program. In June 2005 the components within the program

were SDEM (EMU, DEM, EMG), ACI, CEM, and EIMP. The Decentralized Environmental

Management (DEM) component is responsible for setting up Regional Branch Offices

(RBOs) that lead to a decentralization of the environmental management in Egypt. The

Environmental Management in the Governorates (EMG) component, however, is expected to

set up Environmental Management Units (EMUs) in the Governorates. Collaboration on

rules and cooperation takes place between RBOs and EMUs. The EMU component is a pilot

project that had the purpose of establishing the EMUs to show that for a fairly small amount

211 DMFA, “Final Sector Programme Support Document - Danish Support to the Environment Sector,” x. 212 For details see Appendix C 213 (DMFA, “Final Sector Programme Support Document - Danish Support to the Environment Sector,” viii. 214 (DMFA, “Final Sector Programme Support Document - Danish Support to the Environment Sector,” viii.

Page 87: 2 List of Contents and Thesis

80

of money the EMUs could be set up, and decentralization achieved.215 The new structure of

the ESP stipulates Support to Decentralized Environmental Management (SDEM).216 This

entity is thus made responsible for the three abovementioned components under a common

planning, budgeting and work-planning framework. This system was introduced to augment

and enhance coordination and effective use of Danida funding within the three

components.217 The Achieving Compliance in Industry (ACI) component’s development

objective is to improve compliance with the environmental legislation through cleaner

production in a number of Egyptian industries.218 The Communication in Environmental

Management (CEM) component provides support in the form of increased communication

and awareness within EEAA, the RBOs and EMUs, which is necessary for the other

components intended activities to take place.219 The Environmental Information and

Monitoring Program (EIMP) component aims at enhancing knowledge and understanding of

environmental quality and pollution sources and their interaction via primarily supporting the

Environmental Quality Department within EEAA.220 The Fertiliser and Ferrosilicon Plant

(KIMA) component that was designed to prevent and control pollution from the KIMA

fertilisers and ferrosilicon plants was removed from the ESP in 2003.221

A senior official at the Royal Danish Embassy in Cairo has the overall responsibility

of the ESP. Inside the program itself, which is implemented in EEAA, the highest level of

responsibility of the ESP is placed in the Program Coordination Committee (PCC) of which

215 (3.12, 3.14, Egyptian Environmental Affairs Agency and Danish Ministry of Foreign Affairs. Adjusted Sector Programme Support Document – Danish Support to the Environmental Sector, (Egypt: 2005), 20. 216 The SDEM now contains the EMU (12 EMUs), DEM (that does the RBOs), and the EMG (EMUs) that all are described in “Draft Final Component Description”. Egyptian Environmental Affairs Agency and Danish

Ministry of Foreign Affairs. Draft Final Component Description - Support to Decentralisation of Environmental Management (SDEM). (Egypt: 2005). 217 Egyptian Environmental Affairs Agency and Danish Ministry of Foreign Affairs. “Adjusted Sector

Programme Support Document – Danish Support to the Environmental Sector”, 25. 218 Egyptian Environmental Affairs Agency and Danish Ministry of Foreign Affairs. “Adjusted Sector

Programme Support Document – Danish Support to the Environmental Sector”, 25-30 219 Egyptian Environmental Affairs Agency and Danish Ministry of Foreign Affairs. “Adjusted Sector

Programme Support Document – Danish Support to the Environmental Sector”, 30. 220 DMFA, “Final Sector Programme Support Document - Danish Support to the Environment Sector,” 79. 221 DMFA, “Final Sector Programme Support Document - Danish Support to the Environment Sector,” 89.

Page 88: 2 List of Contents and Thesis

81

the chair is the Minister of MSEA. This committee meets 2-3 times every year. The Program

Steering Committee consists of the governors of Aswan and Beni Suef, a representative from

the Royal Danish Embassy in Cairo, the Chief Executive Officer (CEO) from EEAA, the

ESP coordinator (Egyptian), Chief Technical Advisor (foreign), a representative from MIC,

and a representative from Department of International Cooperation (DIC) in MSEA.222 Until

2004, the Program Steering Committee (PCC) was under the supervision of the Program

Support Unit (PSU) responsible for all components. However, due to the second review

mission in October 2004, the PSU became a Program Management Unit (PMU) that monitors

SDEM, gives support to EEAA’s strategy, the Environmental Protection Fund (EPF), budget

support to CEM (communication) and EIMP (information).223 The Program Management

Unit (PMU) consists of a (local) Program Coordinator and this person’s counterpart (a

foreign Chief Technical Advisor) and a (local) Technical Coordinator. The PMU is

accountable to Danida for monitoring and follow-up. Also, the PMU is responsible for

helping EEAA on a strategic level, e.g. making the NEAP into an Action Plan, delegating

responsibility to magistrates, and improving communication flow in EEAA.224

In addition, every component has a local manager who has an advisor by his/her side.

Thus the program is designed with two managers in each leading position; an Egyptian and a

foreign advisor. This means that there are two Program Coordinators responsible for the

entire ESP and two managers of each of the components. The advisors are meant to develop

the capacity of the Egyptian counterparts, yet the Egyptians are supposed to be the

responsible part, leading the implementation.

The ESP’s structure as well as its internal flow of information is conducive to

national involvement and coordination. There seems to be a satisfactory flow of information

222 (3.5, 3.12) 223 “Second Joint Sector Review, Environmental Sector Programme Egypt. Review Aide Memoir”, October

2004. 224 (3.12)

Page 89: 2 List of Contents and Thesis

82

from the ground level of the program (the components and the SDEM) to the PMU and the

PCC, as well as structured interaction and internal coordination. The relations between the

mentioned levels of management in the ESP can be found in Appendix D.

Account of the Environmental Sector Program

The first program document and the introduction to EEAA staff of the ESP was donor driven.

This became clear from interviews with experienced Danida employees as well as local

members of staff in EEAA. According to some local staff members, the first time they were

made aware of the program, it was presented as an already made and finalized program.225

Some local managers were indeed consulted about the program. Yet, it was their impression

that Danida made the final decisions without their involvement.226 Also, the first program

document was too difficult to grasp due to the program’s complexity, the numerous sub-

structures and abbreviations used. In addition, the first program document was written using

Danida terminology, and although translated from English into Arabic227 the language made

the local staff members in EEAA alienated and disconnected from the new program.228

According to senior staff in EEAA, most employees were confused in the beginning and the

introductory courses of the ESP were insufficient to make the Egyptians feel ownership of

the program.

On the positive note, this research investigation strongly indicates that the situation

has improved and that there is now generally a great satisfaction with the current proceedings

used by Danida. It appears as if the current officials are able to accommodate the local staff

members and involve them in a constructive way. This is a clear shift in comparison to the

225 (3.8, 3,14) 226 (3.8) 227 (The language policy of Danida has been changed and all documents are now translated into unproblematic Arabic. Danida uses some of the best translators although some in MSEA find them too expensive (3.14) ). 228 (3.8, 3.14)

Page 90: 2 List of Contents and Thesis

83

initial phase where some local staff members in EEAA felt looked down upon, pushed and

given order by the Royal Danish Embassy in Cairo and Danida.

The donor driven characteristics of the initial phase of the ESP have caused a

subsequent delay in the phase of program implementation. The current Danida staff greatly

regrets that the program was rushed through in 2000/2001. However, due to disbursement

pressure there was no other alternative available at the time.229 One member of staff in DIC

said that this is an example of Danida’s focus on results instead of being process-oriented.230

Owing to a greater effort by present Danida staff at the embassy and in the program, the

apathy among the EEAA staff during the first couple of years with a consequent low program

output has now been replaced by progress. In October 2004, the implementation had begun

and the program finances were beginning to be spent. The staff in EEAA now understands

the program, feels a higher degree of ownership, and thereby makes a lot more progress than

previously with regard to the implementation of the program.231

At the High Level Negotiations in 2003, it was decided to phase out the program in

the year 2008. This decision shortened the period available to embed the program into the

relevant national structures, and made the time for the phasing out approach much sooner

than planned. The Danida advisors are now in a difficult situation. They need to push the

program forward at the same time ensuring its self-sustainability by letting local staff take on

increased responsibility. Due to dissatisfaction, the latest Review Mission (2005) resulted in

a memoir being written jointly by local and foreign consultants. The recommendations in this

“Aide Memoir - from a Joint Review of the proposed Reshaped ESP April-May 2005” were

that the ESP document should be modified232 so that the ESP includes elements of strategic

229 (3.14) 230 (3.10) 231 (3.8, 3.12) 232 These changes can be found in the “Adjusted Sector Program Support Document – Danish Support to the Environmental Sector” from 2005, and in the “Draft Final Component Description – Support to Decentralization of Environmental Management (SDEM)”. Egyptian Environmental Affairs Agency, and Danish Ministry of

Page 91: 2 List of Contents and Thesis

84

support to different EEAA departments, support to the Environmental Protection Fund, a

ceasing role of the PMU at the end of the program period, and increased clarity about

division between EEAA, RBOs and EMUs.233 The PCC approved these changes August

22nd 2005. In summer/fall 2005, the PMU started making an exit-strategy, where the

procedure for the EEAA taking over the responsibility of the funding and the implementation

of the ESP is described.234

Analysis

Counterparts

Some interviewees from EEAA pointed out that the set-up of two managers in the same

position in the program as the only right way to implement an aid program. However, others

said that this is an impossible construction creating conflicts and unclear leadership.

The double-staffed positions are meant to foster capacity development of the EEAA

and to demonstrate that the program is nationally owned and driven. However, certain

challenges obstruct the actualization of this scheme. The local private consultancy

EcoConServ’s report Donor Assistance to Egypt in the Field of Environment from June 2005

contains a summary of the findings from a survey on donors and Egyptian counterparts and is

a good account of the lessons learned during the last ten years of cooperation in the field of

environmental aid. One finding is that there is no equal standing between donor and

counterpart in the design phase of aid programs. This has also been seen to be the case with

Foreign Affairs, Adjusted Sector Programme Support Document, Danish Support to the Environment Sector, Egypt. (Egypt: 2005); Egyptian Environmental Affairs Agency and Danish Ministry of Foreign Affairs. “Draft Final Component Description - Support to Decentralisation of Environmental Management (SDEM)”. . 233 Egyptian Environmental Affairs Agency, and Danish Ministry of Foreign Affairs. Adjusted Sector Programme Support Document, Danish Support to the Environment Sector, Egypt. (Egypt: 2005), 1-11. 234 (3.6, 3.12)

Page 92: 2 List of Contents and Thesis

85

the ESP. The Egyptian counterparts state in the survey that this is one of the main difficulties,

concluding that “..Counterparts are viewed as recipients and not real partners”.235

In reality, it depends on the situation whether the Egyptian staff member or the

foreign advisor make a certain decision. Some local staff members mentioned that often

when an Egyptian takes the lead, the foreign advisors are correcting him or her. It is difficult

for the Danida advisors to hand over the full responsibility e.g. when the issue is money

expenditures. Some Danida advisors still request to sign all checks that might as well just be

signed by local staff. Another key element of the ESP that is dominated by the donor

becomes apparent when a program is to be reshaped. Danida staff seems to be more

enthusiastic than the Egyptians. The Egyptians, in many cases, view this process as too time

consuming, too focused on written documents and small details, and with far too many

meetings and workshops involved.236 This means that the resulting overall strategic changes,

as the formation of the SDEM, ends up as a mostly donor driven process.

The management system in Egypt is, as mentioned earlier, very centralized with

orders normally coming form above. This has cultivated an organizational culture where

middle and lower rank staff members are not used to make decisions and to take on

responsibility. Consequently, there is a tendency of local staff members to prefer that the

Danida advisors make the final decisions, so that they do not have the responsibility when

something goes wrong. However, on a positive note, most interviewees in EEAA are of the

impression that the ESP in general is lead, coordinated and influenced by local staff.237

The alternative to the structural set-up with counterparts in the ESP is that the

management becomes purely Egyptian or purely Danish/international. If it were purely

Egyptian, the changes that the ESP seeks to achieve in the EEAA would probably not have

235 EcoConServ, Donor Assistance to Egypt in the Field of Environment – Ten Years of Donors’ Experience in

Environmental Management - The Lessons Learned and the Way Forward. (Egypt: EcoConServ/Egyptian Environmental Affairs Agency, 2005), 10. 236 (3.5, 3.7, 3.8) 237 (3.2, 3.7, 3.10, 3.12)

Page 93: 2 List of Contents and Thesis

86

been initiated due to lack of funds, and technical and human resources. Nonetheless, had it

been purely done by Danish and international development officials – which some local staff

members would have preferred – the activities would not be sustainable when the Danida

support is phased out. It seems as if the current structure is appropriate as well as challenging

and time-consuming. The basic understanding that great patience is necessary to achieve the

build-up of capacity development and institutional development seems to have been a bit

lacking. The ESP would have increased its chances to achieve the intended impact and to

become sustainable, had it been given more time.

Alternatively, had the ESP started off in the design phase with equal input from

Danida staff and local staff, it would have seemed more plausible that the role of Danida

advisors could have been toned down over the years. Conversely, due to the lack of EEAA’s

participation in the initial phases of the program (and the slow start of the program itself) and

due to Danida’s pulling out before time, the program is in a phase where the Danida staff

feels a need to coordinate and push the program, because the time for the exit strategy is

getting close. While conducting the interviews in July/August 2005, the preparations of an

exit strategy were finally on the agenda. It shall be a demanding, however, not impossible

process, to make the ESP sustainable when the Danida funds run out in 2008. The Egyptian

authorities could have demanded that the initial phases of the program had been instrumented

in close coordination with national authorities. Just an upfront decision would have increased

the overall outcome of the ESP.

Capacity Development

The capacity development that takes place as a major element of the ESP is also a factor of

different opinions among the staff in EEAA. Most interviewed employees within and outside

the EEAA said that judged upon the actions of the Ministry it is difficult to argue that the

Page 94: 2 List of Contents and Thesis

87

capacity development is working.238 One local member of staff in EEAA thought that

capacity development was a bigger success for Danida in the past when the agency trained

local lower/middle rank staff, compared to now when Danida attempts to develop the

capacity of managers/leaders.239 Some local and international staff members in EEAA and a

former manager of EEAA said that it is almost naive of Danida to believe it can change the

overall Egyptian management style. It has shown to be very difficult and would require a lot

of concerted initiatives to achieve.

One aspect that certainly complicates the capacity development is the well-known

fact that the two cultures – the Danish/Scandinavian and the Egyptian/Arab lie far apart from

each other on a cultural spectrum.240 Edward Hall’s theory of “Low versus High Context

Cultures” and Melton Bennett’s theory of “Individualistic versus Collectivist Societies”

shows that the Egyptian and Scandinavian culture could be placed towards each end on such

continuums. The Canadian International Development Agency (CIDA) in Cairo has

published two books on these matters. One book explains the Canadian culture to Egyptians,

and the other provides the Canadian aid workers with the values of the Egyptians. CIDA

produced these books after the management realized that lack of cultural understanding

negatively influences the implementation of aid programs. Without going into detail, it is

clear from the two books that each culture has their own working styles, learning styles, way

of communicating at work and preferred relationships with colleagues.241

These cultural differences mean, that what is the appropriate management style in the

view of the local manager might be viewed as the wrong way of doing things by the

international counterpart.242 One divergence is that some Danida staff prefer that the

238 (3.5, 3.10, 4.1, 4.2) 239 (3.5) 240 Sanaa Hafez and Mariam Ahmed, Working with an Egyptian Partner. (Egypt: Canadian International Development Agency), 2005. 241 Sanaa Hafez and Mariam Ahmed, “Working with an Egyptian Partner”, 4-41. 242 (3.5)

Page 95: 2 List of Contents and Thesis

88

Egyptian counterparts talk openly of all kinds of structural, management, and efficiency

problems at meetings, whereas the Egyptian part would rather not be so frank and critical in

forums where superiors are present.243 The foreign advisors would in general - in an attempt

to solve problems – prefer to talk openly about the challenges faced, whereas the Egyptians

generally have a tendency not to expose problems at open meetings. The Egyptians respect

the levels of hierarchy to a much larger extent than persons coming from an anti-authoritarian

Scandinavian culture would generally do. Therefore, it is not comfortable for an Egyptian to

mention ground-level problems in front of a higher ranked manager. The Egyptian staff

members do not always find that superiors accept and understand problems on the ground-

level, and the consequence of this lack of understanding can be that ground-staff gets blamed

and punished for their openness.244 On the other hand, Western workers have a tendency to

worry about whether they meet the expectations of their superiors if actual problems are

being hidden or toned down.

Concerning capacity development, national coordination could also have played a

constructive role; if the MIC or MSEA had focused their negotiations with Danida to achieve

a longer-term assistance from Danida, the gradual results of capacity development would

have had more time to make the intended positive impact.

Findings and Conclusions

The initial phase of the ESP did not encourage national ownership of the program, as it was

donor-driven. However, the program’s placement in EEAA during the phase of

implementation is conducive for national involvement. Also the set-up of the ESP has

continuously been adjusted to enhance internal coordination. The execution of the ESP by a

national authority and national staff facilitates an ongoing alignment of the program to

243 (3.5, 3.12) 244 (3.10, 3.12)

Page 96: 2 List of Contents and Thesis

89

national priorities. The arrangement of counterparts on the managerial positions in the

program supports national involvement in the decision making process. Still the influence of

national authorities and staff on daily operations and on the coordination of the ESP could

have been much stronger, had the capacity and institutional framework been at place in the

MSEA. The set-up with counterparts does foster capacity development. However, the

expected managerial and institutional changes in EEAA will take a long time to achieve. The

intended national ownership of the ESP nevertheless increases the chances of the program

being nationally well coordinated as well as sustainable. There is a need for increased

capacity and organizational restructuring in EEAA before national involvement to the

greatest extent possible helps the ESP reaching its intended outcome.

In the following chapter, it shall be scrutinized whether/how Egyptian authorities have

coordinated the ESP both on a sectoral level (by MSEA) and on a cross-sectoral level (by

MoP and MIC). It shall be evident whether the national sectoral and cross-sectoral aid

coordination has supported or delayed the ESP in reaching its intended outcome.

Page 97: 2 List of Contents and Thesis

90

CHAPTER 4

Environmental Sector Program – and its Sector and Cross-Sector National

Coordination

Does sector and cross-sector national coordination of the ESP have an effect on the program

reaching its intended outcome? This chapter argues that national coordination by the

Ministry of State for of Environmental Affairs, the MoP and the MIC could have played a

much stronger role in coordinating the ESP, had the mentioned institutions been better

equipped for executing their respective responsibilities.

Ministry of State for Environmental Affairs, Egyptian Environmental Affairs Agency

Firstly, the Ministry is introduced and its goals, visions and objectives are presented.

Thereafter, the functions and structure of the Ministry is described and the biggest challenges

for national environmental aid coordination by MSEA are discussed. Hereafter follows

accounts of MSEA’s official as well as practical use of national environmental development

strategies, follow-up procedures, and use of a participatory approach. Lastly it is being

scrutinized whether the MSEA has coordinated the ESP.

The environment came on the national agenda in Egypt in the 1970s/80s because of an

increased international focus on environmental issues and activities and consequently by the

local civil society245. The Minister for Public Sector Industries, that simultaneously was the

Minister of State for Local Development, was also appointed Minister for Environmental

Affairs.246 In the 1980s and onwards there were only laws on environmental issues related to

protected areas as well as irrigation and agriculture. It was not until 1994, when Law 4/1994

245 (3.10, 4.2) 246 (3.10)

Page 98: 2 List of Contents and Thesis

91

for the Protection of the Environment247 was introduced, that the first comprehensive

environmental law was put into action.248 Law 4/1994249 established the Egyptian

Environmental Affairs Agency (EEAA) that initiated its operations in 1995 as affiliated with

the Cabinet of Ministers. In 1997, the Ministry of State for Environmental Affairs was

established and the Egyptian Environmental Affairs Agency (EEAA) became its executive

body. The EEAA is the central government institution for promoting sustainable

development and environment in Egypt.250 In June 1997, Egypt's first full time Minister of

State for Environmental Affairs was assigned as stated in the Presidential Decree no.

275/1997. From thereon, the new Ministry focused, in close collaboration with the national

and international development partners, on defining environmental policies, setting priorities

and implementing initiatives within a context of sustainable development.251

The Ministry of State for Environmental Affairs (MSEA) and more specifically its executing

body, the EEAA, is the entity responsible for the coordination of environmental programs on

a sector level. In the following section, the official objective and strategies of the MSEA and

EEAA is presented. Subsequently, it shall be analysed whether and how the MSEA/EEAA

has played a coordinating role in the case of the ESP.

247 Law 4/1994, has a greater role with respect to all governmental sectors as a whole. The law has been designated as the highest coordinating body in the field of the environment that will formulate the general policy and prepare the necessary plans for the protection and promotion of the environment. It will also, follow-up the implementation of such plans with competent administrative authorities. The law dictates that the EEAA must formulate the national plan and its projects and prepare environmental profiles for new and urban areas, and set the standards to be used in planning for their development (http://www.eeaa.gov.eg). 248 (3.10) 249 (See Genena 2003 for a brief analysis of the law and its implementation) Tarek Genena, “A Consultant

Report on the Country Environmental Analysis (CEA),” (Egypt: 2003). 250 “Agreed Minutes of the Development Cooperation Consultations between The Kingdom of Denmark and The Arab Republic of Egypt, (Egypt: 3-7 May 2003), 2. 251 EEAA’s webpage: http://www.eeaa.gov.eg

Page 99: 2 List of Contents and Thesis

92

Goals, Vision and Objectives

The EEAA has three main objectives; the strategic objective aims at introducing and

integrating environmental dimensions in all national policies, plans, programs relevant to

protection of human health and management of natural resources. The medium-term

objective is to preserve the natural resource base, national heritage and biodiversity within a

context of sustainable development. The short-term objective is to reduce current pollution

levels and thereby to minimize health hazards and to improve quality of life.252

Functions

Official Procedure

The principle functions253 of the EEAA are to formulate environmental policies and prepare

the necessary plans for environmental protection and environmental development projects, as

well as to follow-up on their implementation, and to undertake pilot projects. Furthermore,

the agency is the national authority in charge of promoting environmental relations between

Egypt and other States, as well as regional and international organizations.254

As with every other line Ministry, the MSEA sends its prioritised program proposals to the

MoP every year. Furthermore, regarding foreign aid programs, the EEAA designs programs

in collaboration with donors or send program proposals to the MIC to apply for external

funding. In general, the MSEA communicates through MIC if they need additional funds,

new projects to be financed, extension of projects, and if there are problems of

implementation.255 Moreover, the MSEA collaborates with donors and other line Ministries

when executing the national as well as the donor funded programs.

252 http://www.eeaa.gov.eg 253 For further details on the tasks that the EEAA has to undertake to fulfill the objectives, see Appendix E. 254 http://www.eeaa.gov.eg 255 (2.1, 2.2, 3.1, 3.9)

Page 100: 2 List of Contents and Thesis

93

Practical Implementation

In practice, the formulation of environmental policies and the preparation of the necessary

plans for environmental development projects in EEAA take place in the department of

“Foreign Relation & Technical Cooperation” (from now on called Department of

International Cooperation (DIC)), the “Planning and Follow-up Unit” and the “Financial

Affairs Unit”. Finally, the Chief Executive Officer (CEO) reads all the projects after which

the recommended projects are shown to the Minister.

The CEO is responsible for the environmental coordination. Yet it seems that this is

more a formal procedure that is not sufficiently followed in practice within the MSEA. Few

of the interviewees in EEAA seemed to be concerned with the actual requirements and

managerial procedures. According to five different interviewees in EEAA and a former

EEAA manager, the Planning and Follow-up Department does not have the needed capacity

and management structures in place to prepare the necessary plans.256 As explained by the

interviewees, the Planning and Follow-up Department is one of the weakest in the agency,

and therefore the DIC has become the driving force in environmental coordination.

Structure

Official Procedure

The Minister of State for Environmental Affairs is directly accountable to the Prime Minister.

This is partly due the fact, that the MSEA is not an implementing Ministry but a coordinating

Ministry, whose role is to ensure environmental policies are implemented through other

relevant Ministries.

256 (3.10, 3.12)

Page 101: 2 List of Contents and Thesis

94

Figure 8 below provides an overview of the EEAA organizational structure257. The

chart is eleven years old, from 1994; however, a new organizational chart was announced in

August 2005 but not yet approved by the central authorities. The fundamental structure is not

changed in the new organization but approximately 48 new departments have been added.

Figure 9: Egyptian Environmental Affairs Agency (EEAA) Organization Chart.258

The chart shows that the EEAA contains a Planning and a Follow-up Department, which is

the department responsible for the National Environmental Action Plan (NEAP) and the

planning of future projects in MSEA. Just below this department on the chart, one finds the

Department of International Cooperation entitled “Foreign Relations and Technical

Cooperation”. This department is responsible for obtaining the needed external funding in

MSEA through MIC. The MIC is also the external link to the MoP, responsible for delivering

257 Salwa Sharawi Gomaa, Environmental Policy Making in Egypt (United States: University Press of Florida, 1997), 13. 258 Gomaa, “Environmental Policy Making in Egypt”, 13.

Page 102: 2 List of Contents and Thesis

95

project and program proposals that the MSEA would like to have accepted in the yearly

technical plan, which is the responsibility of the MoP. Furthermore, at the bottom left corner

of the chart one finds a department entitled “Financial Affairs” that manages the internal

financial aspects in the Ministry. According to interviewees, the relevant technical

department for a certain project prepares the project documents or proposals together with

Department of International Cooperation and the Department of Planning and Follow-up

(different views in MSEA exist regarding this procedure).259

Practical Implementation

It was impossible to get clear-cut information about the structural procedures for

communication between the departments in EEAA, which seems to be a symptom of weak

official coordination within the agency. Genena stated in the country environmental analysis

from 2003, that the relationships between the different departments of the EEAA need to be

more formalized.260

From interviews with staff within the MSEA, past employees, and outside stakeholders, it

became apparent that the Ministry is known to be one of the more complicated Ministries to

work within as well as to collaborate with. This reputation is partly derived from previous

chaotic periods with lack of effective management and good organization.261 The structure of

the MSEA is still to this day a mix of the political and executive branches. This has been

criticized by many interviewees as limiting the civil servants’ focus on scientific knowledge

in the executive branch. The executing branch is supposed to function as a non-political,

scientific and technical agency, yet the politicians in MSEA interfere with their work.262 It

seems as if consistency of work progress and the institutional memory in the EEAA suffers

259 (3.6, 3.7, 3.10) 260 Tarek Genena, “A Consultant Report on the Country Environmental Analysis (CEA),” 74. 261 (3.2, 3.3, 3.12, 4.1). 262 (3.12, 4.1)

Page 103: 2 List of Contents and Thesis

96

under the ongoing political changes taking place in the GoE. At the same time, the EEAA is

known as a good agency compared to the agencies of other Ministries, as its employees are

active, responsive and interested in programs.263

The fact that the Planning and Follow-up Department is weak means that the planning

authority inside the MSEA is not capable of fulfilling its function of contacting other line

Ministries to make them fund and/or implement environmental policies. Also when DIC

contacts the MIC to obtain external funding, internal staff members in DIC acknowledge that

the quality of the projects could be made better. This issue will be discussed in the section on

DIC264.

One local senior staff member of EEAA was fascinated by planning and cited

different scientist within the field of sustainable development. This interviewee saw a great

need for improved environmental planning according to a system including: needs, budgets,

the element of sustainability, the roles of NGOs, donors, civil society and the national

budget. He told that recent debate on sustainable development strategies has led to a proposal

for EEAA to be the coordinator of a sustainable development strategy with other Ministries

in Egypt. This proposal is currently awaiting the approval of the Prime Minister. 265

This encouraging initiative to ensure sustainability in Egypt can pave the way for

more staff being trained to meet the technical challenges faced to run the Ministry, as well as

to ensure sufficient funds and implementation of more up-to-date laws.266 According to Law

4, the EEAA is officially already the coordinating body for sustainable development in

Egypt. However, these recent developments involve making the MSEA the leading Ministry

of national sustainable development strategies. If this comes through, this would

simultaneously provide the Ministry with increased authority to ensure implementation of

263 (3.3) 264 (3.1, 3.10) 265 (3.11) 266 (3.11)

Page 104: 2 List of Contents and Thesis

97

environmental policies. At the time of the interview, the CEO had approved an “Institutional

Framework for Sustainable Development”,267 which could open the door for a “National

Strategy for Sustainable Development” (NSSD) that through its national enforcement could

foster coordination in environmental and sustainable developmental matters in Egypt.

However, according to a senior staff member in EEAA, there needs to be an increased

dissemination of environmental knowledge at highest level for any coordination progress to

happen. 268

It is crucial for the overall cross-sectoral national coordination of environmental aid

that the MSEA knows its priorities. As stated by a former EEAA manager: “Outsiders cannot

judge what a country needs, a sectoral Ministry knows best.”269 Consequently, if the MSEA

does not know what it wants or needs, then national environmental aid coordination becomes

very complicated. Some interviewees were therefore of the opinion, that it would be

unreasonable to expect MoP to be able to plan and coordinate environmental aid when the

plans and priorities from the sector Ministry are of such low quality as in the case of the

plans provided by the MSEA.270 The MoP builds its plan upon information from line

Ministries, following (formally at least) the line Ministries’ priorities and plans. This bottom-

up mechanism is indeed essential for good planning. However, the MSEA is one of many

examples of line Ministries that does not have the competences to implement this

communication mechanism.271

267 (3.11) 268 (3.11) 269 (4.1) 270 (3.2, 3.12, 4.1) 271 (3.12, 4.1, 4.2)

Page 105: 2 List of Contents and Thesis

98

Issues pertaining to Coordination of Environmental Aid

Listed below are the different factors, that the author, on the basis of the current

research investigations, have identified as the main challenges for national environmental aid

coordination by MSEA. They are concerned with the national commitment to ensure

environmental sustainability, capacity in the field of environment, management culture and

leadership, parallel structures within the bureaucracy, the relationship between MSEA and

other line Ministries and finally ministerial and bureaucratic structure.

National Commitment to ensure Environmental Sustainability

In Egypt, the MoP and the UN both assessed the possibility of attaining the environmental

MDG target of environmental sustainability as a “potential” probability. Actually the

country’s ‘state of supportive environment’ (that indicates the commitment and the priority

that environment gets in Egypt) was evaluated as “fair”. This assessment was better than the

two worse alternatives “weak but improving” and “weak”. On the other hand, it was not

assessed as “strong”, the highest state of supportive environment.272 Only one other area of

the MDGs (HIV/AIDS) receives a worse assessment of state support, which shows the

somewhat difficult conditions that the MSEA is working under.273

Capacity in the field of Environment

The Millennium Development Goals Second Country Report made by MoP and the UN

assesses the Egyptian capacity in the different fields of the Millennium Development Goals

(MDGs). MDG number 7 is the environmental Millennium Development Goal, which aims

at “Ensuring Environmental Sustainability”. The three targets of the MDG 7 are: 1)

272 United Nations, and Ministry of Planning. “Millennium Development Goals – Second Country Report Egypt 2004”, 8. 273 United Nations, and Ministry of Planning. “Millennium Development Goals – Second Country Report Egypt 2004”, 8.

Page 106: 2 List of Contents and Thesis

99

integrating the principles of sustainable development into country policies and programs, and

reverse the loss of environmental resources; 2) halve, by 2015, the promotion of people

without sustainable access to safe drinking water and basic sanitation; and 3) have achieved,

by 2020, a significant improvement in the lives of at least 100 million slum dwellers.274

The authors of the report have assessed Egypt’s “Monitoring and Evaluation

Capacity” within the field of the environmental MDG as the second weakest area of capacity

out of the 9 areas of MDGs. Only the 9th MDG - developing a global partnership for

development – had slightly less capacity in Egypt than the environmental field.275 The field

of environment was thereby the second weakest field within the 9 MDGs concerning data

gathering capacity, quality of survey information, statistical tracking, statistical information

policy and monitoring and evaluation. This supports the view of the critics cited above.276

The MoP/UN concluded in the report “Millennium Development Goals – Second

Country Report, Egypt 2004” that the major challenge of ensuring environmental

sustainability (the overall goal of the ESP) is “Strengthening environmental institutions and

enforcing a sound environmental behavior.”277

Data on Egypt’s environment exists and is mainly provided by donors as the WB and

the UN.278 However, according to Tarek Genena’s A Consultant Report on the Country

Environmental Analysis (CEA) from 2003, there is a serious deficiency in data and

information regarding health impacts of environmental problems as well as cost benefit

analyses of different environmental challenges and priorities.279 The EEAA is in need of

274 MIC, “Development Cooperation Report 2002”, 92. 275 United Nations, and Ministry of Planning. “Millennium Development Goals – Second Country Report Egypt 2004”, 9. 276 United Nations, and Ministry of Planning. “Millennium Development Goals – Second Country Report Egypt 2004”, 9. 277 United Nations, and Ministry of Planning. “Millennium Development Goals – Second Country Report Egypt 2004”, 44. 278 (5.2, World Bank, Arab Republic of Egypt – Country Environmental Analysis (1992-2002) (World Bank, 2005)) 279 Tarek Genena, “A Consultant Report on the Country Environmental Analysis (CEA),” 54.

Page 107: 2 List of Contents and Thesis

100

regular data and information gathered by the monitoring activities within the agency.280 This

means, that it is actually difficult for the MSEA to devise plans even if the budget and the

people knowledgeable with respect to planning issues were available. The EEAA suffers

from serious shortages of human resources both in quantitative and qualitative terms.281 As a

consequence, the most efficient staff including the Minister is always being overloaded.

There is a strong need for better human resources as well as an organizational structure and

culture that uses the knowledge available in the system.282 There is a high turning over of

staff in EEAA because of political and financial reasons.283 The competent and well-trained

staff members are attractive to the private sector, where they can easily increase their value

on the job market.284 The staff is therefore tempted to move away from the EEAA, which

risks lowering the human capacities inside the agency.

One aspect that the author believes could increase environmental capacity in EEAA

would be if the agency were better at preserving documents and ensuring efficient archives

that would make it easy to retrieve documents internally as well as for external users. This

could increase the institutional memory of important success stories. Some employees within

the DIC uttered that the frequent turnover causes the lack of institutional memory and the

inefficient use of experiences gained during work with former plans. When staff is not used

to using and following a plan, it cannot be a surprise that making a helpful plan becomes

difficult.285 EcoConServ’s research of the donors and Egyptian counterparts’ experiences in

the field of environmental management also leads to the conclusion by the Egyptian

280 Tarek Genena, “A Consultant Report on the Country Environmental Analysis (CEA),” 74. 281 Tarek Genena, “A Consultant Report on the Country Environmental Analysis (CEA),” 73. 282 (3.1, 3.12) 283 (3.10) 284 (3.10) 285 (3.1)

Page 108: 2 List of Contents and Thesis

101

counterparts286 that it is a constraint that there is “no building on previous experiences” in the

project preparations phase.287

Management Culture and Leadership

A strong leader with a controlled organizational apparatus underneath is a suitable and

common characterization of the management and leadership styles in the public sector of

Egypt. Along the same lines – as viewed by staff in MSEA - a superior in EEAA typically

decides and dictates what needs to be done in the departments beneath his own.

Consequently, everyone underneath the superior is waiting for orders and many interviewees

referred to the problem of passiveness and not daring to initiate activities themselves.

Because of this lack of influence in the overall process, some employees in the EEAA

become indifferent to the impact of the aid programs as a whole, resulting in little concern

with work of colleagues in other departments.288

Ideally, coordination comes from discussions, sharing of information and

collaboration between levels and departments as well from a strong feeling of ownership

among the employees. The knowledge flowing upwards in the system is also restricted under

the current management structure. It is customary that a sub-manager does not discuss any

problems directly with managers in other departments. This structure restricts and

complicates the internal flow of knowledge in the EEAA. According to some interviewees,

inside EEAA this results in collaboration most commonly taking place within the

possibilities of the bureaucratic structure, which is not necessarily the most efficient

286 (The Egyptian counterparts that have answered the EcoConServ’s questionnaires include; EEAA, Ministry of

Water Resources and Irrigation, Ministry of Local Development, Governorates, NGOs, private sector and consulting firms) 287 EcoConServ, 10. 288 (3.5, 3.12)

Page 109: 2 List of Contents and Thesis

102

approach. Employees are hesitant to attempt alternative approaches, since their superiors can

interpret this as criticism.289

In this organizational culture, the director can interfere all the way down to the lowest

ranks of employees, making it unclear what are his/her main responsibilities. This leaves the

CEO with an excessive workload. Due to the structure of the EEAA, as seen in Figure 10,

nineteen people are referring to the CEO. This structure means that the politically responsible

– the CEO – would most likely have too little time left to pay attention to long-term planning

and strategies.

Another issue that interviewees found problematic with regard to the current leadership was

the selection of ministers in the field of environment. In an interview, an environmental NGO

representative and a former EEAA manager stated that the problem of environmental aid

coordination factually lies on the ministerial level, through the process of the selection of the

Minister of State for Environmental Affairs him/herself. Indeed, from all the interviews made

it became clear that there has been much dissatisfaction with the Prime Minister’s former

appointments to the position of Ministers of State for Environmental Affairs. The point of the

interviewees were that, as long as an incompetent person can become a Minister and turn

everything upside down, it is hard to reach the Ministry’s goals, visions and objectives.290

Ministers have in general not acknowledged the plans of their previous counterparts and,

instead, they mostly attempted to alter such plans, also before having been properly briefed

by senior staff in MSEA.291 One environmentalist said in frustration of the history of

leadership in EEAA “You can’t blame the Ministers for what they do or don’t do. But the

procedures for the selection of the Minister of State for Environmental Affairs must be done

289 (3.5, 3.12) 290 (4.1, 4.2) 291 (4.1)

Page 110: 2 List of Contents and Thesis

103

with certain relevant criteria.”292 The source stressed the importance of the Prime Minister

selecting the Minister for Environment with criteria such as the person’s experience with

international, national, and local environmental issues. As it is now, most of the ministers are

often one-sided and not well rounded when it comes to environmental awareness,

management skills, and personality.293

Parallel Structures within the Bureaucracy

Military ranks create their own kind of structure that sometimes suspend/contradict with the

bureaucratic structure. An employee that attained a high title in the army as Marshal, Major

General or General can due to his rank in the military take on a more powerful role in a

Ministry than the person would be entitled to based on his relevant skills even without any

protests from colleagues.294

MSEA and other Line Ministries

According to the international agenda, the Rio Summit and Agenda 21, all Ministries need a

strategy for sustainable development – and this strategy will without a doubt impinge on a

multitude of areas. The environmental concerns are thus the responsibility of most Ministries

and not only of the Ministry of environment. The participants on the Summit of Sustainable

Development in Johannesburg in 2002 agreed, that all countries must have a strategy of

sustainable development implemented by 2005. This is also what some senior officials in

MSEA are trying to set up.295

There are different views of whether the MSEA fulfills its mission of environmental

development not being an implementing Ministry with its own funding. Some interviewees

292 (4.2) 293 (4.2) 294 (3,2, 3.12) 295 (3.11)

Page 111: 2 List of Contents and Thesis

104

inside the EEAA said that the MSEA has failed its coordinating role, as it has not managed to

coordinate the other Ministries. It requires a more developed and less hierarchical structure to

have a Ministry of environment that coordinates. Until the communication between the

Ministries is improved, the MSEA is unlikely to achieve an efficient promotion of the

environment. However, other members of staff stated that a Ministry of environment

functions better when it implements through other Ministries, as the environment is a cross-

cutting issue that should be integrated into other relevant Ministries.296

It is difficult for the MSEA to implement and follow-up a certain scope of policies,

when it is relatively weak compared to the other line Ministries that are older, bigger, and

richer and rather more respected and established in the realm of the Egyptian government.297

Also, people in other Ministries need to be more aware of environmental issues if the tasks of

the MSEA are to be implemented. It would be beneficial if the Ministries would look at the

environment as a benefit instead of a cost.298 According to a high official in MSEA, every

line Ministry in Egypt has a department of environment299 that helps the MSEA execute

environmental policies. Conversely, an official from DIC stated that only approximately six

Ministries have established internal departments for environmental concerns.300 These

departments are helpful for line Ministries to understand the needs of the environment and

help the EEAA integrate environmental concerns in the work plan of their respective

Ministries.301

According to Salwa Sharawi Gomaa, the author of the book from 1997

Environmental Policy Making in Egypt, the MSEA has clear policy goals. The problem is

that some of these goals are undermined by conflicting policies in other Ministries and

296 (3.1) 297 (3.2, 3.12) 298 (3.3) 299 (3.6) 300 (3.1) 301 (3.1)

Page 112: 2 List of Contents and Thesis

105

agencies that were supposed to implement the environmental policies.302 The author’s

description of the MSEA in 1997 is generally much more positive than the view of this

research’s interviewees. This difference might be explained by looking at the leadership in

the MSEA at the time Gomaa conducted her research, which was, according to many

interviewees, the best period regarding the leadership of and management in the EEAA.303

Gomaa’s point, nevertheless, stresses the need for a common view among decision makers

on environmental issues.

Therefore, one could argue that, in order for the MSEA’s goals to be achieved, the

Ministry should be allotted much more political power by the state itself. A coordinating

Ministry needs a proper status, sufficient respect, and the ability to exercise law enforcement

mechanisms.304 It would, for example, be useful if more funds were given to the MSEA for it

to distribute to implementing Ministries. Another option is for the other line Ministries to be

able to receive funding earmarked for environmental initiatives.305

Ministerial and Bureaucratic Structure

An important structural obstacle is that a staff member in an Egyptian Ministry need to

obtain a protocol signed by the Minister to be allowed to communicate with a staff member

in another Ministry. This protocol needs to be elaborated upon by the Chief Executive

Officer (CEO) that clarifies what the Ministries can discuss. Every time a new Minister is

appointed, all the protocols written by the former Minister are discarded and new ones needs

to be established and implemented. This consequently results in a very low level of

communication between Ministries as the time-consuming/administrative protocols in effect

function as an incentive not to make a connection to another Ministry. The procedure

302 Gomaa, “Environmental Policy Making in Egypt”, 58. 303 (3.1, 3.10, 3.12, 4.1, 4.2) 304 (3.2, 3.3, 3.12, 4.1) 305 (3.2, 4.1)

Page 113: 2 List of Contents and Thesis

106

hampers and limits the internal collaboration, continuity, coherence and long term planning

and coordination between Ministries that otherwise could foster holistic developmental

planning.306

On top of this, the fact that political and executive branches of Ministries are

sometimes mixed with each other also makes it difficult for the technical experience inside

the Ministries to play its rational and intellectual role. Different interviewees inside EEAA

thought that the Minister’s secretariat would be better placed if situated separately from the

executing branch of the MSEA. When the implementing agency is mixed with political

agendas, this influences the technical assessments.307

National Environmental Development Strategies

The MSEA has currently two plans for coordination of environmental aid programs; a long

term “National Environmental Action Plan 2002-2017” and a five-year plan. There is no one-

year plan for the environmental field in Egypt. There have currently been produced seven

Governmental Environmental Action Plans (GEAPs) in Egypt, and in the future regional

environmental action plans (REAPs) are expected to be produced.308 These action plans are

supposed to guide stakeholders e.g. donors in their formulation of environmental aid

programs.

Gomaa has examined the first NEAP and paid attention to three key elements: its lack

of priorities, the lack of initiative concerning the impact of the growing population on

environmental degradation as well as the relation between poverty and the environment.

Gomaa concludes, “Consequently the NEAP became more like a shopping list of projects to

be presented to donor countries than a National Environmental Plan to solve the country’s

306 (3.12) 307 (3.2, 3.3, 3.12) 308 (3.11)

Page 114: 2 List of Contents and Thesis

107

basic problems.”309 The second NEAP (2002-2017) that appeared after the design of the ESP

in 2000, is also, but to a lesser extent, a donor-led report made by EEAA in collaboration

with UNDP and Capacity 21.310

However, in 1998, the Minister of State for Environmental Affairs issued a seven-point

directives framework “Egyptian Policy Framework for the Environmental Sector” that is

seen in Table 2.

Practical Implementation

The first NEAP provided an agenda for the MSEA and donors. However, it is questionable to

which degree other Ministries viewed the plan as reflecting their priorities.311 When it comes

to coordination with other line Ministries, the updated NEAP has not worked the way it

should either.312 One environmentalist outside MSEA held the view, that line Ministries need

to meet and coordinate before the line Ministries would feel the need to implement

environmental policies.313 The internal authority of the NEAP in MSEA is also relative and

unclear. When a new Minister was appointed after the second NEAP had been launched, he

did not respect the plan and changed the priorities. This is an example of the plan aligning to

the system, instead of the system aligning to the plan.

The donors interviewed did not perceive the NEAP as an ideal plan or strategy. This

reflects a different view of what a plan is supposed to contain and provide. Most donors view

the NEAP as a background document.314 Some of the reasons for this assessment were:

“There is no commitment in this document; it does not have a schedule, national resources,

309

Gomaa, “Environmental Policy Making in Egypt”, 39-41. 310 (3.10) 311 Tarek Genena, “A Consultant Report on the Country Environmental Analysis (CEA),” 69. 312 (3.12, 4.1, 4.2) 313 (4.1) 314 (3.12, 3.14, 4.1, 4.2)

Page 115: 2 List of Contents and Thesis

108

an action plan and priorities.”315 Another environmental stakeholder stated: “It does not have

a plan of relations with donors or a strategy of relations to geographic areas that donors

should help with.”316 One very critical former employee in EEAA said: “It is mostly a

dream” and “In Egypt a plan on paper is never implemented.”317 It was not possible for me to

be ascertained by staff in EEAA, that the plan was not changed when a donor comes with a

certain new idea and funding offer.318

According to local staff, however, the updated NEAP is very useful. A couple of local

staff representatives assigned the plan as their bible. However, the expatriates call it a wish

list of limited use. At any rate, the NEAP has, in general, not had the greatest success with

regards to coordinating environmental aid programs as well as environmental activities in

other Ministries. The report by EcoConServ concludes, based on both donor and Egyptian

perspectives, that there is a need for a vision and a strategy for the environment in Egypt.319

Also, Genena states in the 2003 consultant report, that even after the updated NEAP, there is

a need for a vision and a strategy that prioritize environmental problems, a need to achieve

consensus between key institutional players, and to assign clear roles and responsibilities, to

set quantitative goals and a follow-up mechanism as well as a guide to donor support.320

Capacity development is crucial in relation to the NEAP. Donors could with great

results help to review and update the NEAP without taking ownership. Many interviewees

have mentioned that the NEAP desperately needs to be transformed into a real action plan

that could be used in practice.321 As the agenda and approaches to the environment are

different within and outside Egypt, it would be of great use for donors to participate in a

dialogue with MSEA on environmental strategies. One Egyptian environmentalist was of the

315 (3.12) 316 (4.2) 317 (4.1) 318 (4.1) 319 EcoConServ, 2, 10. 320 Tarek Genena, “A Consultant Report on the Country Environmental Analysis (CEA),” 69. 321 (3.3, 3.12)

Page 116: 2 List of Contents and Thesis

109

opinion, that the environmentalists in the West have new and different concepts and

approaches to the environment than those of Egyptian environmentalists. Therefore, the

donors are in a position where they would be able to share new concepts of environmental

programs and ideas with the Egyptian environmentalists.322

Follow-up

Official Procedure

Officially, it is stated on the EEAA web page that the agency needs to conduct follow-up of

its projects, which is the responsibility of the department “Planning and Follow-up” within

the EEAA. In the MSEA, the CEO of EEAA is in dialogue with all high level managers

about results and future plans at a monthly or every two months basis.323 Every third month,

the CEO meets with a group of managers and collectively evaluates the current projects and

programs. According to top-officials in the EEAA, the Planning and Follow-up Department

supposedly discusses the status of financial disbursement every 6 months, and the Minister

meets with Directors of projects every half a year. Every three months, an impact assessment

is made to managers in EEAA.324

Practical Implementation

The follow-up is a task that needs to be undertaken by the line Ministries. According to staff

in EEAA and sources outside the Ministry, the lack of follow-up is one of the biggest

weaknesses of the MSEA.325 According to a senior staff-member in the ESP, there is no

follow-up in the MSEA, stating that “It is relatively easy to produce something that looks like

a plan. However, follow-up that requires evaluation tools is much more difficult to carry

322 (3.11) 323 (3.6) 324 (3.6) 325 (3.10, 3.12, 4.1, 4.2).

Page 117: 2 List of Contents and Thesis

110

out.”326 In the opinion of a senior local staff member in MSEA, it is relatively new for the

Egyptians to work with planning, which naturally means that follow-up is also a new

concept.327

The follow-up approach in EEAA was described as ad hoc, reactive and unstructured.

Staff members in MSEA were of the opinion, that the reason for the poor follow-up was lack

of capacity. The interviewees were concerned with the absence of the necessary skills

required to evaluate and follow-up on a development program as well as of the lack of

knowledge on how to structure ones time, and lack of knowledge of developmental and

environmental programs.328 Furthermore, in a follow-up an assessment is necessary, which

makes it a much more demanding and subjective task than making plans. This adds to the

difficulties faced by the personnel within the EEAA.

If the EEAA’s follow-up mechanism had worked properly, it would have ensured that

the ESP as a whole (like each of its components) as a part of this exercise would have

acquired a developmental objective that would have made it possible to evaluate the

program. It could have been a useful scheme of national coordination, if the EEAA had set

up certain standards and rules of evaluation and follow-up procedures for donor-funded

programs. This could have helped increasing the impact of the ESP. From the beginning of

the program, there was no log-frame made regarding ESP as a whole, but only of its

subcomponents. No impact-assessment has therefore been conducted on the ESP; only

performance (output/outcome) has been reviewed. However, most recently, strategic

indicators for impact assessment are in the process of being prepared. In 2004, the “Review

and Adjustment of Program Indicators” focused on future indicators used in an impact

assessment of the overall program. All of the components of the ESP do have log-frames,

however, not with developmental objectives and immediate objectives that could be used in

326 (3.12) 327 (3.11) 328 (3.10, 3.12)

Page 118: 2 List of Contents and Thesis

111

the follow-up process. In the summer of 2005, the components were indeed provided with

development objectives. So progress is indeed being made.

Participatory Approach

Official Procedure

The field of environment planning would benefit from participation of the civil society that

knows of local environmental issues and thereby can contribute to the planning process. In

the “Report on the State of the Environment in Egypt” published in 2005, it is stated that the

report is done in consultancy with NGOs. Also, “The National Environmental Action Plan

2002-2017” (NEAP) stresses that it was prepared with a participatory consultative process

favorable to sustainable development. The section of the report on the consultative process,

within which the plan was made, looks impressive. However, interviewees from outside the

MSEA say that there was no real partnership between the MSEA and all the environmental

stakeholders. The Fifth Five-Year Plan on environment does not mention a participatory

approach. Nevertheless, in High Governmental Committees within the governorates, the civil

society is supposed to play a role.

Practical Implementation

The “Report on the State of the Environment in Egypt” published in 2005, states that the

document is written in consultancy with NGOs. However, a representative from one of the

oldest and largest environmental NGOs had not been notified of its commencement before it

was finished. The interviewee proclaimed, that the Ministry uses the phrase ‘participation of

others’ in the report for PR purposes, as recipients accept a report much better if it says it has

been made in collaboration with non-governmental entities. However, according to this

director of an environmental NGO, the reality was that the NGOs had only been informed not

Page 119: 2 List of Contents and Thesis

112

involved. The aforementioned representative cannot feel there is a real scope of partnership

between the EEAA and NGOs. In the mid 1980s and 1990s, there was indeed an actual sense

of partnership between the two entities. However, after the mid 1990s and till 2005, the

partnership was not any longer institutionalized329. Interviewees outside the EEAA believe,

that realistically the staff in MSEA could and should be participatory in their approach330.

The widespread conviction amongst these sources was that EEAA’s hierarchical structure

does not appreciate influence from civil society. Whether inside or outside the Ministry, the

majority of the interviewed sources assured that no one in EEAA would understand why

people from the outside should be asked or involved. This phenomenon makes sense in the

light of the abovementioned top-down and centralistic government of Egypt. The

participatory approach then becomes an alien way of thinking for many civil servants. No

procedures are in operation to specify how information derived from a participatory approach

should be used by or communicated within the organization by the civil servant.

These findings regarding scarce participation by EEAA are supported by

EcoConServ’s report from 2005. Their research among the donor community shows, that the

donors believe that targets groups often are not sufficiently integrated into the design process.

Furthermore, donors evaluated that there is an “initial resistance to participatory planning”

within Egyptian counterparts in the phase of implementation331. The ESP’s EMG and EMU

components are supposed to support decentralization of the EEAA through a participatory

approach. The GEAPs are made in working-groups with a participatory approach. This is, in

effect, an unusual example of a bottom-up approach in the field of environment in Egypt332.

329 (4.2) 330 (4.1, 4.2) 331 EcoConServ, 5. 332 (4.2)

Page 120: 2 List of Contents and Thesis

113

Sector-coordination of the Environmental Sector Program

Official Procedure and Practical Implementation

The ESP has been coordinated after the overall national environmental priorities in the

“Egyptian Policy Framework for the Environmental Sector”, which was launched by the

Minister of State for Environmental Affairs in 1998333. Danida has according to its first

program documents from 2000 until 2005 been looking at the Egyptian Policy Framework

for the Environmental Sector when designing and adjusting the program.334 The alignment of

the ESP’s goals and objectives to the “Egyptian Policy Framework for the Environmental

Sector” can be seen in Table 2.335 When looking at the Table, it becomes clear that the design

of the SDEM and ACI components, helped and facilitated by the support activities (CEM and

PMU), focus on assistance to three specific goals of the Egyptian Policy Framework for the

Environmental Sector. The three goals of the GoE that the ESP supports are;

“Implementation of Law 4/94 for the protection of the environment; Support to institutional

capacity development in the Egyptian Environmental Affairs Agency, its RBOs and EMUs in

26 governorates; and lastly Support to sustainable environmental management systems.”336

Factually, Danida’s alignment to national priorities show that MSEA executed national

coordination on Danida’s initial three phases of formulating program support through the

Egyptian Policy Framework for the Environmental Sector. The MIC and the Danish Ministry

of Foreign Affairs formally agreed upon the ESP in 2001. However, the first program

document was according to all sources interviewed (inside MSEA/EEAA and Danida) a very

donor driven document where only the official objectives of MSEA played a coordinating

role.

333 Tarek Genena, “A Consultant Report on the Country Environmental Analysis (CEA),” 52. 334 DMFA, “Final Sector Programme Support Document - Danish Support to the Environment Sector,” 3 and

EEAA, DMFA, “Adjusted Sector Programme Support Document – Danish Support to the Environmental Sector, Egypt,” 19. 335 EEAA, DMFA, “Adjusted Sector Programme Support Document – Danish Support to the Environmental Sector, Egypt,” 19. 336 DMFA, “Final Sector Programme Support Document - Danish Support to the Environment Sector,” 4.

Page 121: 2 List of Contents and Thesis

114

The alignment of the ESP’s goals and objectives to the “Egyptian Policy Framework

for the Environmental Sector” shows that national environmental coordination has taken

place. However, this is not to say that the Egyptian authorities made this happen, as Danida’s

own policy was to follow priorities of partner countries when designing the ESP. According

to a senior staff member, the EEAA could not really support and modify the ESP in the initial

phase of the program, as the ESP came into being in a stage of awakening in EEAA after a

predominantly donor-driven era.337 However, according to a senior local staff member, the

ESP fits well into the NEAP, and there is coherence between the EEAA’s strategy and the

goal of the ESP.338

The environmental “Fifth 5-Year Plan (2002-2007)” by MSEA/EEAA, which has

come after the construction of the ESP, emphasizes sustainable development. The goals of

the ESP are also coherent with the strategic (and broad) goal of the MSEA listed in this plan.

The ESP’s developmental objective is furthermore in direct support of MDG 7: Ensure

Environmental Sustainability,339 which demonstrates that the MDGs also have guided the

donor when formulating the aid program.

337 (3.10) 338 (3.10) 339 Egyptian Environmental Affairs Agency, and Danish Ministry of Foreign Affairs, “Adjusted Sector

Programme Support Document – Danish Support to the Environmental Sector, Egypt”, 18.

Page 122: 2 List of Contents and Thesis

11

5

Eg

yp

tia

n P

oli

cy F

ram

ew

ork

fo

r th

e E

nvir

on

men

tal

Sec

tor

En

vir

on

men

tal

Sec

tor

Pro

gra

m

Fo

ster

ing p

artn

ersh

ips,

co

ord

inat

ion

an

d c

oll

abo

rati

ve

wo

rk b

etw

een

th

e d

iffe

ren

t se

gm

ents

of

the

soci

ety a

t

the

Nat

ion

al l

evel

.

Fo

ster

ing p

artn

ersh

ips

at t

he

bil

ater

al,

regio

nal

an

d

glo

bal

lev

els.

Imp

lem

enta

tio

n o

f L

aw 4

/94

fo

r th

e p

rote

ctio

n o

f th

e en

vir

on

men

t.

Dev

elo

pm

ent

and

up

gra

din

g o

f n

atu

ral

pro

tect

ora

tes

and

pro

tect

ion

of

bio

div

ersi

ty.

Sup

po

rt t

o s

ust

ain

able

en

vir

on

men

tal

man

agem

ent

syst

ems.

Op

erat

ion

alis

atio

n o

f m

ark

et-b

ased

in

stru

men

ts i

n t

he

fiel

d o

f en

vir

on

men

tal

pro

tect

ion

.

Sup

po

rt t

o D

ecen

tral

ized

Envir

on

men

tal

Man

agem

ent

(SD

EM

)

Ach

ievin

g C

om

pli

ance

in I

nd

ust

ry

(AC

I)

Co

mm

unic

atio

n f

or

Envir

on

men

tal

Man

agem

ent

(CE

M)

Sup

po

rt t

o i

nst

ituti

on

al c

apac

ity d

evel

op

men

t in

th

e E

gypti

an E

nv

iro

nm

enta

l A

ffai

rs A

gen

cy,

its

RB

Os

and

EM

Us

in 2

6 g

ov

ern

ora

tes.

Dev

elo

pm

ent

Ob

ject

ive

To c

ontr

ibute

to

the

effo

rts

of

the

Eg

yp

tian

go

ver

nm

ent

to a

chie

ve

its

envir

on

men

tal

ob

ject

ives

wit

h p

arti

cula

r re

gar

d t

o i

mp

rov

ing

envir

on

men

tal

cond

itio

ns,

dev

elo

pin

g e

nvir

on

men

tal

man

agem

ent

cap

acit

y o

f in

stit

uti

ons,

wh

ich

can

sup

po

rt c

om

mu

nit

ies

in

mai

nta

inin

g a

cle

aner

and

hea

lthie

r en

vir

on

ment

and

by p

rov

idin

g

fram

ewo

rks

for

com

pli

ance

wit

h e

nvir

on

men

tal

reg

ula

tio

ns.

Pro

gra

m M

anag

emen

t U

nit

(PM

U)

Co

mp

on

ents

Su

pp

ort

Act

ivit

ies

Tab

le 2

: E

gyp

tian

Po

licy

Fra

mew

ork

fo

r th

e E

nvir

on

men

tal

Sec

tor

and

the

En

vir

on

men

tal

Sec

tor

Pro

gra

m.

Page 123: 2 List of Contents and Thesis

116

Department of International Cooperation in the Ministry of State for Environmental

Affairs

The Department of International Cooperation inside the MSEA plays the most important role

as coordinator between environmental activities. Therefore it is important to scrutinize

whether this department has had an effect on the ESP.

To promote coordination between donors inside the EEAA, UNDP initially funded a

project where a department denoted the Technical Cooperation Office for Environment

(TCOE) was set-up in the MSEA. This department was in 1998/1999 restructured and

renamed the Department of International Cooperation (DIC). At this occasion the technical

staff from the original department left the DIC for other departments in EEAA, leaving only

planning, negotiating and administrative staff. This restructuring phase greatly reduced the

environmental know-how of the department.

Sector- coordination of the Environmental Sector Program

Official Procedure

The MSEA is according to Law 4/ 1994 responsible for the coordination of environmental

projects in Egypt. It is the role of the DIC to make sure that the environmental programs, like

the ESP, fits into the NEAP ensuring synergy with other programs. The DIC’s main task is

managing the donor proposals in the MSEA that are either produced in collaboration with the

departments in the EEAA or sent from donors through the MIC. According to officials within

the DIC, the department is meant to brief the MIC of what the environmental sector within

the country needs the most.340 This link from the DIC to the MIC is supposed to transfer

ground level-knowledge on the environment upwards in the system. According to top

340 (3.1)

Page 124: 2 List of Contents and Thesis

117

officials in the ESP, the role of the DIC is also to interfere in programs, involve other

departments, and produce environmental strategies.341

Practical Implementation

According to a couple of interviewees, the DIC plays the most crucial role in the

coordination of environmental aid to Egypt, also in the case of the ESP. Compared to the

engagement found in the other departments of the EEAA, single staff members in the DIC

have acquainted themselves very well with all environmental activities implemented by

MSEA. These employees have thereby been able to improve the national coordination of

environmental aid. The key staff in the DIC has been collaborating regarding the reshaping

of the ESP, such that it does not overlap with other environmental projects and programs.342

At the same time there are problems pertaining to the role of the DIC as coordinating

body in the MSEA. Key employees both inside and external to the DIC stated, that the DIC

does not have a strategy for what is needed from donors.343 This makes the coordination

insufficient as donors in contrast often have strong priorities when approaching the MSEA,

and in negotiations with DIC, these are supposed to be modified and fitted into the national

environmental strategy.344

In practice, the DIC seems to prioritize coordination quite highly. However, insiders

in the EEAA, external to the DIC, say that these intentions burst due to the fact that the

meetings of the DIC are often very inefficient. The meetings are often slowed down by

needless attendance of irrelevant staff members resulting in the agenda being slowed down

and important communication being delayed.345 Another factor that often delays the

commencement of meetings is the lack of attendance or late arrival of key participants. As

341 (3.12) 342 (3.12) 343 (3.10, 3.12) 344 (3.10) 345 (3.12)

Page 125: 2 List of Contents and Thesis

118

such, this high degree of participation, which one would assume to be positive, in fact

weakens the national coordination. It is a problem that there are no taskforces where only the

relevant people within a certain issue can meet and discuss and coordinate.346 The reason for

the long lists of participants to each meeting was described as a consequence of the Egyptian

culture, where it is not polite to exclude individuals. The meetings are prolonged further,

because the decision-making process is very slow at these meetings.

Furthermore, when the DIC conducts a coordination meeting and reaches certain

decisions, there is no mechanism that would actually ensure that these decisions are followed

and implemented. If these managerial elements were improved, the Egyptian impact on the

coordination of environmental programs would increase.

The people working in the DIC are mostly educated within administrative fields, and

do not have sufficient technical or environmental knowledge.347 It is therefore, crucial for the

success of the DIC coordination of environmental activities, that DIC receives technical

information from other units in the EEAA. Some interviewees have indicated that more

environmental knowledge in the DIC would enhance the utilization of the department. It

would appear to be both the responsibility of the DIC and the other units in the EEAA, that

the coordinating entity receives the necessary information. If the DIC does not know what

priorities to tell the MIC or the donors, the bottom-up structure of national coordination does

not function properly. In fact, a representative from the DIC said that the department ensures

that it receives information on a yearly basis.348 However, according to EEAA staff, the DIC

is still in need of a better understanding of the environmental priorities in the EEAA to be

able to manage the environmental programs efficiently.349 A very clear strategy would have

346 (3.12) 347 (3.1) 348 (3.10) 349 (3.1)

Page 126: 2 List of Contents and Thesis

119

made the DIC capable of coordinating aid activities with the current capacity. However, as

the NEAP and the five-year plan lack clear priorities, the DIC fails to fulfill its role.

Staff in the DIC furthermore affirms that there is a need for raising the quality of

project proposals from the EEAA departments, so that the donor community more easily

becomes interested in funding them when approached by the MIC.350 Sometimes, the DIC

staff hesitates to involve the MIC, only doing so after the donor has agreed to fund a certain

environmental project in EEAA. The DIC does this, based on the opinion that DIC knows

which donor is most experienced in the particular activity. The fact that DIC directly contacts

donors and thus circumvents the MIC is frustrating for the MIC. MIC would argue that in

these cases they might have been able to attain cheaper funding from another donor351.

However, as long as the MIC does not have any specialists in the field of environmental aid

(as will show later in this chapter), the DIC will often have more technical information

available on appropriate donors as well as the needed environmental activities than is

available within the MIC. This situation clearly would give rise to conflicts, which would

further inhibit collaboration between these entities.

There are different views within the EEAA regarding the kind of coordination that

should be undertaken by the DIC. Some staff members in EEAA external to the DIC would

like to see the DIC’s role strengthened, such that it could receive more funding through the

MIC. However, representatives from the DIC hold the view that the DIC should not be

managing the affairs of the MSEA but rather play a coordinating role352. Moreover, most of

the insiders in the DIC are of the opinion, that time constraints are a main problem in their

department and admit that time is not properly managed, and therefore it seems more logical

that others, for instance ESP managers, to handle the coordination in the MSEA353. It would

350 (3.9) 351 (3.9) 352 (3.12) 353 (3.10)

Page 127: 2 List of Contents and Thesis

120

be a problem though, if international consultants were to coordinate aid activities, since this

would not be national coordination and therefore most likely be less sustainable.

According to the interviews it seems as if the Danida advisors already have spent a lot

of time briefing and coordinating between people. The permanent staff appears to be less

concerned with the overall picture and devote their attention to their own department or main

task in opposition to the program or the Ministry’s function as a whole.354 Thus, Danida

advisors asserted that they have to coordinate despite the fact that their main role is to

implement the program. If they do not ensure that coordination takes place, initiatives to

coordinate are simply not taken at a regular basis and in an efficient manner.355 As previously

stated in this research investigation, the narrow focus of the Egyptians is likely to result from

the organizational culture and public sector characteristics of strong top-down leadership.

This takes away incentives from employees to consider more than their own narrowly

defined interests. ”Who would think of the bigger picture if one’s opinion was never listened

to anyway?” one local staff replied when asked about the causes for this characteristic.356

One staff member of the EEAA would prefer if representatives from DIC (as well as

from the Planning and Follow-up Department) participated in the meetings between ESP

components and the PMU, in order for the staff at the two departments to increase their

understanding of the mechanisms in the ESP. Such joint meetings could provide a good

forum and serve as capacity development in environmental problem solving and follow-

up.357

In Appendix F, details are given of the procedures of coordination between the DIC

and the PMU and between the DIC and the MIC. The former connection could provide the

DIC with ground level knowledge from the implementation of the ESP. The latter link

354 (3.5, 3.12) 355 (3.2, 3.12) 356 (3.5) 357 (3.12)

Page 128: 2 List of Contents and Thesis

121

between the DIC and the MIC could facilitate upward transfer of sectoral knowledge to the

cross-sector coordinating authority. Also, this link is where the cross-sectoral strategies can

trickle down into practice on the field of environment, which is dealt with in the section of

the MIC’s coordination of the ESP.

From this research it seems reasonable to conclude that higher focus on capacity

development of senior civil servants in the DIC should have greater priority in foreign

environmental aid.

Ministry of Planning

Cross-sectoral national coordination of the Environmental Sector Program

Official Procedure and Practical Implementation

A key official at the Royal Danish Embassy in Cairo, EEAA representatives and

environmental stakeholders stated that it was unlikely that the MoP and GoE had followed

the NEAP in its cross-sectoral planning.358 Along the same lines, Genena stated “The extent

to which these policy directives [The Egyptian Policy Framework for the Environmental

Sector by the Minister of State for Environmental Affairs] represent a common and

coordinated GoE approach to environmental management, as opposed to the Minister of

Environment and EEAA’s view, is questionable”.359

The general impression from the present research as well as the literature previously referred

to360 is that environmental policy decisions are not made at the highest levels of government

and therefore they do not have the necessary support to be implemented.

358 (3.12, 3.14, 4.1, 4.2) 359 Tarek Genena, “A Consultant Report on the Country Environmental Analysis (CEA),” 52. 360 Gomaa, “Environmental Policy Making in Egypt”, 69; Tarek Genena, “A Consultant Report on the Country

Environmental Analysis (CEA),” 52-53; United Nations, and Ministry of Planning. “Millennium Development

Goals – Second Country Report Egypt 2004”, 8, 41-44.

Page 129: 2 List of Contents and Thesis

122

With regard to the MoP’s plans and strategies, the environment has been mentioned

in the cross-national plans. Nonetheless, neither the objectives of the “Long Term

Development Vision 2022”, nor the pre-requisites for achieving the objectives mention the

environment.361 However, in the medium term plan “The Fifth Five-Year Plan for Socio-

Economic Development (2002-2007) & First Year”, environment is the last item on a list of

what the plan seeks to achieve when fostering economic development which is to “preserve

and protect the environment from all sources of pollution”.362 It is surely a positive feature

that the environment is mentioned once (although at the bottom of a list). Still, if this is the

only mention of the environment in the plan it is quite vague, and without any prioritization

asserted. Also, if the MoP had incorporated the strategic goal of the MSEA’s Fifth 5-Year

Plan (2002-2007) [for Environment] into “The Fifth Five-Year Plan for Socio-Economic

Development (2002-2007) & First Year”, the latter would have emphasized the

environmental dimensions within the whole plan e.g. with regards to agriculture, health, and

tourism. Yet the socio-economic plan emphasizes economic development and does not make

strong emphasis on sustainable development as the environmental plans do.363 The one-year

plan “The Economic and Social Development Plan for 2003/2004”, produced by the MoP,

has a chapter on Human Development that provides objectives and policies relating to the

environment. The plan says: “Environment has become a vital component in Egypt’s

sustainable development”.364 The main objectives in relation to the environment in “The

Economic and Social Development Plan for 2003/2004” are perfectly in line with the

objectives proclaimed in the Fifth 5-Year Plan (2002-2007) [Environment] the year before.365

361 Ministry of Planning, 4-9. 362 Ministry of Planning, 39) 363 Ministry of State for Environmental Affairs/Egyptian Environmental Affairs Agency, 1. “Fifth 5-Year Plan (2002-2007)”, 1,

and Ministry of State for Environmental Affairs, UNDP and Capacity 21, The National Environmental Action Plan 2002-2017. (Egypt: 2002) 363 (3.12, 4.1, 4.2) 364 Ministry of Planning. “The Economic and Social Development Plan (2003-2004)”, 33. 365 (The main objectives in relation to the environment in “The Economic and Social Development Plan for

2003/2004” can be found in Appendix H).

Page 130: 2 List of Contents and Thesis

123

This is a very positive step towards integrating environmental plans into cross-sector

planning. However, the line Ministries as mentioned in chapter two are only responsible for

implementing the five-year plan. It is therefore detrimental that the environment is not a

recurrent issue in all sectors in this plan.

In practice, the MoP could not find the ESP in the internal technical plan. However,

updated data on actions by Danida between 2002- 2005 existed in the database of financial

follow-ups in the MoP. If the ESP was not actually included in the technical plan of concrete

projects, then it is an apparent error.366

A promising indication of GoE’s stronger commitment to the field of the

environment, materialized in 2002 when President Mubarak called a top level ministerial

meeting to discuss an Environmental Strategy for Egypt.367 Also, the speech to the People’s

Assembly by the Prime Minister Dr. Ahmed Nazif in December 2004 provided an

environmental program named “Protection of Natural Resources” that had the objective to

achieve sustainable development, create environmental balance and efficiently using natural

wealth.368 This speech could indicate that the agenda of sustainable development coming

from the MSEA/EEAA is influencing the national priorities and plans. It shows that there is a

notion of sustainability and holistic thinking when making plans and strategies, at least on the

official level. An optimistic perspective would therefore be that the MoP would position the

environment as a cross-sectoral issue in the upcoming five-year plan for 2008-2013.

366 The MoP demonstrated how they had all environmental programs in Egypt in their big technical plan where environmental projects were divided into projects/programs implemented inside and outside the MSEA. It was not possible during the meeting in the MoP to gain access to the plan with the help of an Arab translator, as it seemed to be an internal governmental document. 367 Tarek Genena, “A Consultant Report on the Country Environmental Analysis (CEA),” 53. 368 Ahmed Nazif, “Governmental Statement to the People’s Assembly,” 30-32.

Page 131: 2 List of Contents and Thesis

124

Ministry of International Cooperation

The MIC is the responsible national authority for aid coordination in Egypt, therefore the

MIC’s role in coordinating the ESP is offered.

Cross-sectoral National Coordination of the Environmental Sector Program

Official Procedure

At the time of the formation of the ESP, the responsibility of international cooperation was

under the Ministry of Planning and International Cooperation (1997-2000). Conversely in

2001, when the ESP was actually started, international cooperation in Egypt was the

responsibility of the International Cooperation Sector in the Ministry of Foreign Affairs

(2001-2004). During the ESP’s current phase of implementation, the MIC is responsible for

its coordination.

Due to the fact that there is no department in the MIC responsible for environmental

aid, as the Ministry is divided into regional areas, the Danish desk within the Department for

European Countries is responsible for the connection between the MIC and the DIC.

Therefore, the MSEA’s DIC collaborates with several different departments in the MIC

where donors support the environment. There is consequently no focal point through which

the DIC staff in the MSEA can channel the environmental priorities. In general, no simple

body is clearly responsible for coordinating environmental aid programs in Egypt.

Paradoxically, the MIC’s responsible person for coordinating all USAID to the environment

does not have access to the NEAP.369 When this person receives the separate proposals from

donors, it is therefore unknown whether/how prioritization takes place. It also appears as if

sectoral strategies are almost unknown and only modestly used in coordination of foreign

environmental aid with other sector strategies, which is due the fact that the MIC is not

369 (2.2, 2.5)

Page 132: 2 List of Contents and Thesis

125

divided into sectors. It therefore seems plausible, that the extent of environmental

coordination that takes place in Egypt is carried out in the DIC within the ranks of the MSAE

and not on the highest national level in the MIC.

It was not possible to arrange an interview with the responsible party for the ESP in

the MIC. Due to this specific interviewee’s insecurity of whether this research investigation

would bring out confidential information, he chose not to take part in an interview on the

MIC’s role in the coordination of the ESP.370

The person responsible for the ESP at the Royal Danish Embassy in Cairo stated that

the national authority of international cooperation had been used as partner when the ESP

was initiated. The MIC had later been used successfully when there were problems of

smaller-scale mis-use of funding in the ESP. The MIC then took contact to the Minister in

MSEA and this always solved the problems371.

Conclusion

National Sector and Cross-sector Coordination in the different Phases of the ESP

The national coordination of the ESP according to official policy and actual implementation

is illustrated in Table 3 below. The table is structured after the policy cycle defined by

Premfors,372 where the policy phases are classified as: problem identification, alternative

solutions, recommendations, decision-making, implementation, and evaluation.373 The author

has added a last phase; “feedback”, which is essential for the acquired knowledge of the

evaluation (in Egyptian terminology follow-up) phase to be utilized.

The ESP has already gone through most of its policy phases, since it is currently in

the phase of implementation. The role played by national coordination in all of these phases

370 However, the role played by the MIC in coordinating and follow-up on the ESP became apparent after interviews with other employees in MIC as well as outsiders dealing with the MIC. 371 (3.14) 372 Rune Premfors, Policyanalys. (Studenterlitteratur: Lund, 1989), 44. 373 Premfors

Page 133: 2 List of Contents and Thesis

126

is summarized on the foundation of the abovementioned descriptions and analysis of the

roles of MSEA, MoP and MIC. National authorities would affect all policy phases if the

national coordination were to work efficiently.

Table 3 shows that in the phases of problem identification, alternative solutions,

recommendations, and decision-making, the ESP has been nationally coordinated after the

“Egyptian Policy Framework for the Environmental Sector”, which was launched by the

Minister of State for Environmental Affairs in 1998.374 The strategic aim of Danida was to

design a program that would on the same time meet the development objectives of Danida

and be fully consistent with the environmental policy, priorities and ongoing initiatives

within Egypt.375 In the same phases, the MoP should have ensured that this sector strategy

created synergy with other sector strategies by making environmental concerns visible within

the strategies of other sectors. However, in practice this overall holistic cross-sectoral

development planning does not seem to take place. The MIC was stipulated to play a

coordinating role in the initial phases of the program to ascertain that the program would fit

into national strategies and other donor activities, but this also did not seem to take place in

practice.

In reality, most employees working on the ESP in EEAA are Egyptian and at this particular

time of the program’s implementation it seems as if most Egyptians feel ownership of the

program. This implies that the Egyptian environmental authorities and staff are able to follow

the program closely and to influence its coordination. National authorities (the EEAA) are

thereby responsible for the implementation of the program, yet Danida still has the final say

in the decision-making.

374 Tarek Genena, “A Consultant Report on the Country Environmental Analysis (CEA),” 52. 375 (DMFA, “Final Sector Programme Support Document - Danish Support to the Environment Sector,” 3, and

as someone currently working in the ESP for Danida confirmed, “Danida would like to fulfill and follow the

needs and wishes of a partner country”, 3.12, 3.14)

Page 134: 2 List of Contents and Thesis

12

7

Off

icia

l N

ati

on

al

Res

pon

sib

ilit

y o

f C

oo

rdin

ati

on

of

the

ES

P

Pro

ble

m i

den

tifi

cati

on

M

SE

A

Mo

P

MIC

Alt

ern

ati

ve

So

luti

on

s M

SE

A

Mo

P

MIC

Rec

om

men

da

tio

n

MS

EA

M

oP

M

IC

Dec

isio

n-m

ak

ing

M

SE

A

Mo

P

MIC

Ev

alu

ati

on

M

SE

A (

env

iro

nm

enta

l)

Mo

P (

finan

cial

ly)

MIC

(d

evel

op

men

tal)

Feed

ba

ck

MS

EA

(en

vir

on

men

tal)

M

oP

(fi

nan

cial

ly)

MIC

(d

evel

op

men

tal)

Imp

lem

enta

tio

n

MS

EA

Pra

ctic

al

Co

ord

ina

tio

n

of

the

ES

P

P

rob

lem

id

enti

fica

tio

n

MS

EA

(E

gyp

tian

Po

licy

Fra

mew

ork

fo

r E

nv

iro

nm

enta

l S

ecto

r)

Dan

ida

Alt

ern

ati

ve

So

luti

on

s D

anid

a

(Eg

yp

tian

Po

licy

Fra

mew

ork

fo

r E

nvir

on

men

tal

Sec

tor)

Rec

om

men

da

tio

n

Dan

ida

(Eg

yp

tian

Po

licy

Fra

mew

ork

fo

r E

nvir

on

men

tal

Sec

tor)

Dec

isio

n-m

ak

ing

D

anid

a

MS

EA

Ev

alu

ati

on

D

anid

a

Mo

P (

finan

cial

ly)

Feed

ba

ck

Dan

ida

Imp

lem

enta

tio

n

Dan

ida

MS

EA

/EE

AA

Tab

le 3

: N

atio

nal

Co

ord

inat

ion i

n t

he

dif

fere

nt

po

licy

phas

es o

f th

e E

SP

Page 135: 2 List of Contents and Thesis

128

Evaluation is officially the responsibility of the MSEA and the donor, whereas the

MoP has an obligation of financial follow-up along with the MIC that is obliged to follow-up

on the developmental impact of the program. The MoP follow-up on Danida’s disbursement

of funds. However, the MIC does not appear to fulfill its role of evaluating the program.

Danida has regularly evaluated on the components, and are currently setting up indicators

such that the whole program can be evaluated according to its intended impact.

In the last phase; feedback, it is ensured that evaluations are used in the particular

program as well as in future programs. This task is the responsibility of the MSEA, MIC, and

the donor. The feedback mechanism works as intended in Danida where Joint Sector

Reviews and Aide Memoirs have resulted in adjustments and restructuring of the program.

Conversely, in the case of the MSEA and the MIC, the feedback mechanism seems

insufficient.

The Influence of National Aid Coordination on the ESP

Some interviewees in the EEAA stated that national coordination in certain phases of

the ESP were more important than in others, for the ESP to reach its intended impact. At the

same time, other senior staff members stated, that national coordination was equally

important on all stages.376

It seems reasonable to say that national coordination was important in the start-up

phases (problem identification, alternative solutions, recommendation, and decision-making)

where the program is shaped. At this initial stage of the program, it is crucial that people

communicate to form the most needed and best fitted program. It is equally important, that

everyone involved feels ownership of the program, are convinced of the basic ideas and the

validity of the program. The Planning and Follow-up Department inside the EEAA is

376 (3.2, 3.3, 3.12, 5.1)

Page 136: 2 List of Contents and Thesis

129

responsible for this part of national coordination. It is clear that in this phase of the ESP the

donor was in control when it came to the degree of the influence that the staff members in

EEAA had on the program design. Barely any more than the goal of the program was made

in coherence with the formal strategy of MSEA, which nevertheless is a formidable example

of national coordination.

In addition, another interviewee was of the opinion that the national coordination in

the exit strategy was of utmost importance. This view was based on the fact that if there were

no national interference and authority over the exit phase of the program, the national

authorities would not feel enough responsibility to carry on without the presence of the donor

agency.377

Many improvements of national coordination could take place within the MSEA. It would be

beneficial if the NEAP were made more operational by the Planning & Follow-up

Department. Also, the Department of Financial and Administrative Affairs could have helped

to the outcome of the program by securing a technical organization that would have been

beneficial to the implementation of the program. The rules and procedures for

communication within the EEAA could have been improved through the CEO office and

Department of Administrative Affairs. The Ministers office could improve the ESP by

providing services to the Minister, assisting him in making balanced decision and

prioritizations378. Additionally, it is also important that the IT department assists the EEAA

in providing informative communication to outsiders about the program. The Planning and

Follow-up Department could play an increased role in following up on the ESP. The DIC

could also play an essential role in coordinating all the environmental programs. If the donors

perform these tasks themselves, the know-how, the experiences, and the overall coordination

377 (3.3) 378 (3.12)

Page 137: 2 List of Contents and Thesis

130

capacity will eventually disappear when they pull out of the program in Egypt. Consequently,

many aspects of national coordination could have increased the ESP’s chances of reaching its

intended impact.

Insufficient National Aid Coordination

Both the bottom-up mechanism of national coordination (from MSEA to the cross-sectoral

level) and the top-down mechanism (from MoP/MIC to the line Ministries) do not work

efficiently when it comes to environmental planning of the ESP. In the case of the ESP, it

was the sectoral priorities that made the donor align the program to national priorities. The

environment-sector national aid coordination in the form of the Egyptian Policy Framework

for the Environmental Sector by MSEA has shaped the ESP, as Danida has aligned to these

national priorities. Nevertheless, no cross-sectoral national activities seem to have helped the

program reach its intended impact.

Skilled and Efficient National Aid Coordination can enhance the Outcome of Aid Programs

in Egypt

The national aid coordination instrumented by MSEA has been beneficial to the outcome

of the environmental aid program, since the Egyptian Policy Framework for the

Environmental Sector harmonizes donor efforts. In addition, the senior DIC staff makes sure

that the environmental programs are well aligned. The DIC plays a central role in

coordinating the ESP in relation to other environmental programs. The DIC seems to have

good relations to MIC. However, it does not appear as if the skills, tools and level of

environmental knowledge regarding national coordination is sufficient in any of the national

entities, least of all in the MIC.

Page 138: 2 List of Contents and Thesis

131

Cross-sector planning or coordination by the Egyptian authorities has not helped the

ESP reaching its outcome as the socio-economic plans in practice have not incorporated or

enforced environmental sustainability as a goal for all sectors. One of the aims of the ESP is

to strengthen the environmental awareness and standards in Egypt. The ESP has attempted to

make the MSEA capable of this mainly through ensuring that environmental policies are

implemented in other line Ministries. The fact that the national socio-economic or technical

plans have not made environment a cross-cutting issue in all sector policies has made this

outcome of the ESP difficult to achieve. Nationally given incentives to incorporate

environmental concerns into the sector policies were almost non-existing in the other

Ministries.

According to interviewees, the national aid coordination was not sufficient on the

governorate or regional level due to the fact that the administration of the country needs to be

decentralized before the local institutions can start coordinating. A few interviewees said that

the aim of decentralization through Danida’s ESP was too ambitious as there is a need for

political decentralization before actual decentralized decisions can be taken.379

Consequently, capacity development in the field of environment as well as in the field

of planning and evaluation, followed by a restructuring of the MIC, could be the most useful

improvements for national coordination of environmental aid in Egypt.

379 (3.2)

Page 139: 2 List of Contents and Thesis

132

CHAPTER 5

Findings and Conclusions

The new agenda in the field of development states that national coordination together with

donor alignment to national priorities are the two key elements to ensure that the Millennium

Development Goals are achievable. Yet, the inherent dilemma of this approach lies in the fact

that the partner country faces great difficulties in carrying out efficient aid coordination.

Nonetheless, it is supposed to be the responsible entity. The donor countries on the other

hand have the necessary resources to carry out efficient aid coordination. However, this

would directly counteract the key purpose of its presence: sustainable development.

This research effort has investigated and analyzed the national coordination of aid in

Egypt through in depth analysis of the performance of the responsible national authorities:

the MSEA, the MoP, and the MIC. The central question that emerged is whether the

necessary prerequisites are in place in the Government of Egypt to administer the task of

national coordination. With the outset in the Environmental Sector Program initiated by

Danida the sectoral and cross-sector coordination in Egypt was found to be deficient, as the

prerequisites for national coordination formulated by the UNDP were not in place.

The main findings of this research investigation are that the kind of national

coordination that is present in Egypt is mostly sporadic, ad hoc, and does not seem to be

taking place in accordance with a particular holistic developmental strategy. Moreover, the

people responsible do not manage it with the required skills.

Lessons learned for the Government of Egypt

Everyone that was asked the question “Is national coordination one of the answers to more

effective aid programs?” has answered positively along the same lines. Here, the rationale is

Page 140: 2 List of Contents and Thesis

133

that the GoE should have a complete overview of where funding is most needed compared to

outside agencies.

The goal of the ESP is to contribute to the efforts of the Egyptian government within

the environmental sector to improve environmental conditions, to develop environmental

management capacity of institutions and to provide frameworks of compliance with

environmental regulations380. If environmental planning by the MSEA were implemented by

the other relevant line Ministries (e.g. industry, agriculture, water) these goals would be more

easily achieved. However, the deficiency of internal coordination between sectors in Egypt

counteracts the environmental efforts.

On a cross-sectoral level, the national coordination of aid apparently does not help the

ESP reaching its outcomes. At this point of time, the individuals most knowledgeable about

the environmental issues in Egypt do not plan and coordinate. Preferably, the MoP, MoF,

MIC, MSEA and the Ministry of Local Development would meet regularly in a focus group

(e.g. a Environmental Executive Board) to enable enforcement of environmental

considerations in all line Ministries in Egypt.381 Increased planning, monitoring, training and

evaluation by the MoP and the MIC would improve the impact of aid. “Institutional

development is key to successful coordination since this establishes national rules of the

game that are managed by national authorities and which all actors must follow.“382

The GoE should deal with the environment as an asset to reach further socio-

economic development and not deal with it as a liability. If long-term strategies were to be

made, then the reduced cost of environmental degradation would show that the environment

could be an asset not a burden.383

380 (DMFA, “Final Sector Programme Support Document - Danish Support to the Environment Sector,” viii. 381 (3.11) 382 Disch, 8. 383 World Bank, “Arab Republic of Egypt – Country Environmental Analysis (1992-2002)”, ix.

Page 141: 2 List of Contents and Thesis

134

A central question that remains is whether there is the necessary motivation in the

very top of the Egyptian government to meet the necessary preconditions for efficient

national planning and coordination.

Lessons learned for Donors

The key effort of the donors should be to improve capacity development in the Ministry of

Planning to strengthen national coordination in Egypt – since the MoP has the responsibility

for the planning. This would build the foundation for the coordination between the relevant

Ministries in the GoE.

Egypt surely needs capacity development while retaining the ownership of the

planning and coordination of aid activities. Therefore, the trend of donors aligning to national

priorities, giving the partner country responsibility for the activities is a constructive

framework for providing assistance. Thus, donors must provide a longer-term commitment

so that national planning and coordination authorities can plan ahead with some sense of

predictability.

Key questions that donors could ask themselves are: what kind of government capacity is

required for effective and accountable aid coordination and management to be sustainable?

How can governments acquire sufficient capacity to coordinate and manage aid, replacing

(although at times insufficient) donor coordination by national ownership? Which

instruments are available for donors to build capacity for aid coordination and management?

What is needed for a partner country to increase its capacity in the area of aid

coordination?384

With the new aid agenda stressing the need of the partner country to take the

dominant role, it is important that the donors do not overlook and ignore the countries with

384 UNDP, 7.

Page 142: 2 List of Contents and Thesis

135

the weakest institutions, just because they cannot as yet be trusted the obligation of planning,

coordination and implementation of aid activities. A consequence of such priorities would be

that the countries, which need aid and development the most, would suffer from decreasing

donor funds.

One of the newest trends and goals on the international aid agenda is that donors

should try to work towards providing aid in the form of budget support to the national

governments in the developing world. However, this research shows that a developing

country like Egypt – albeit a middle-income developing country - needs to improve the

national planning, coordination and follow-up capacity, as well as institutions, before being

able to make efficient use of increased funding through budget support.

This research investigation also shows that further development within the structural

parameters of democracy, good governance, accountability, freedom of speech at work, the

structure and functions of the bureaucracy, and transparency is needed before budget support

would be an efficient way of providing aid. In addition to this, the political climate needs to

be open towards discussing poverty reduction in public, and making a Poverty Reduction

Strategy Paper (PRSP) or a national sustainable development plan.385 Key tools that could be

improved are for instance the availability of accurate national statistically reliable data,

management skills, know-how of making plans, follow-up and evaluation.

It seems to be a step in the right direction to work towards budget support. Yet, this

could take a decade or two of capacity development, institutional strengthening and

democratization before this kind of aid would be successful. Development takes time and the

international community needs to be patient.386 This is exactly the dilemma of national

coordination – donors would like the partner countries to be in charge of national

385 (4.1) 386 Dichter, 292.

Page 143: 2 List of Contents and Thesis

136

coordination, nonetheless the time-consuming process that this will take is not always

welcomed.

The donors need to be able to adjust their way of support according to the political

developments in the partner country. Flexibility by the donor agencies becomes a key issue,

so that the population of a partner country can continue to receive the promised assistance

although there are negative set backs in the country’s governance. If donors decide to give a

fixed amount of assistance in either project, program sector or budget support this would

hinder the right combination of the three kinds of assistance to an individual country.

Shifting some of the development assistance between project, sector program support and

budget support does not necessarily leave out the poor countries that are not yet ready for

receiving a particularly kind of support.

The trend is that improvements in the area of national aid coordination do indeed take

place. The positive findings of this study are not the particular state of national coordination

but rather the fact that national coordination has been placed on the agenda in Egypt. With

time the country will increase its aid coordination capacity if the responsibility and thereby

ownership of the aid activities continue to be national.

Page 144: 2 List of Contents and Thesis

137

BIBLIOGRAPHY

Aid Coordination

Books/Chapters in Books

Arvin, B. Mak (ed.). 2002. “Allocation of Foreign Aid and Economic Development: New

Theoretical and Empirical Perspectives”. Westport, CT, USA: Greenwood Publishing

Group, Incorporated.

Brainard, Lael et al.. 2003. “The Other War – Global Poverty and the Millennium Challenge Account”. Washington D.C.: Brookings Institution Press

Cassen, Robert, and others. 1994. “Does Aid Work?”, Oxford University Press: New York. Cox, Aiden 2000. “European Development Cooperation and the Poor”. New York, NY USA:

Palgrave Publishers. Degnbol-Martinussen, John. 1997. “Society, State and Market: a Guide to Competing

Theories of Development”. London : Zed. Forster, Jacques, and Olav Stokke. 1999. ”Policy Coherence in Development Co-operation”.

Frank Cass.: London

Articles

Marc Claret de Fleurieu. 2003. “Towards more Effective Development Cooperation: the EU’s Coordination and Harmonization Initiative”, The Courier ACP-EU, no. 196, Pp. 18-20.

English, Linda. 1994. ”Financing Aid Education in Africa: Need for Improved Aid

Coordination”. Africa Development – Afrique Et Developpement, Vol. 19, Iss. 4, Pp.97- 111.

Oswald, Stefan, Knut Bäse, and Frerk Meyer. 2004. “Donor Harmonisation to Increase Efficiency” in D+C – Magazine for Development and Cooperation. Edi. 2. Ross, David J.. 1990. “Aid Co-ordination: Summary”. Public Administration & Development

(1986- 1998). Chichester. Vol. 10, Iss. 3; Pp. 331. van de Sand, K.. 1996. “Towards More Donor Coordination? OECD Prepares for 21st Century.” Development and Cooperation, Iss. 5, Pp. 22– 25. Walt, G. and others. 1999. “Health Sector Development: From Aid Coordination to Resource

Management”. Health Policy and Planning. Oxford: Sep 1999. Vol. 14, Iss. 3; Pp. 207- 218. Whittington, D., and C. Calhoun. 1988. “Who Really Wants Donor Co-ordination?”

Development Policy Review Vol. 6. Iss. 3, Pp. 295– 309.

Page 145: 2 List of Contents and Thesis

138

Declarations

World Bank. 2005. “Paris Declaration on Aid Effectiveness – Ownership, Harmonization, Alignment, Results and Mutual Accountability”. Joint Progress Towards Enhanced Aid Effectiveness – Harmonisation, Alignment, Results. Paris High-Level Forum

(February 28 - March 2, 2005). Paris. World Bank. 2003. “Rome Declaration on Harmonization. High-Level Forum on

Harmonization in Rome (February 24 - 25, 2003). Rome.

Reports

Barry, A. J.. 1988. ”Aid Co-ordination and Aid Effectiveness - A Review of Country and Regional Experiences”. OECD Development Centre. Disch, Arne. 1999. ”Aid Coordination and Aid Effectiveness”. Evaluation Report 8,99, Econ

Centre for Economic Analysis UD, Royal Ministry of Foreign Affairs: Norway. UNDP (prepared for UNDP’s Bureau for Policy and Programme Support by Poul Engberg- Pedersen). 1996. ”Aid Coordination and Aid Management by Government: A Role

for UNDP”. OESP Series on Lessons Learned: New York. Overseas Development Institute for DAC Working Party on Aid Effectiveness “Incentives

For Harmonisation in Aid Agencies” OECD. 2005. “Environmental Fiscal Reform for Poverty Reduction”. OECD Publishing. OECD Development Assistance Committee. 2001. “Poverty Reduction”. Organisation for

Economic Co-operation and Development (OECD). OECD. “Harmonising Donor Practices for Effective Aid Delivery” United Nations, General Assembly. 2005. “2005 World Summit Outcome” United Nations General Assembly. United Nations. 2005. “The Millennium Development Goals Report 2005”. United Nations Department of Public Information: New York. World Bank. 1999. ”Review of Aid Coordination and the Role of the World Bank”. World

Bank.

Seminars (attended)

Ulandsfagligt Selskab (in English: Society of Third World Issues). 2005. “Den Nye Bistandsdagorden - Tilpasning og Donorharmonisering” (in English: “The New Aid Agenda – Alignment and Donor Harmonization”). 28.09.2005, Copenhagen.

Speeches

Aileen Carroll. 2005. The Canadian Minister of International Cooperation’s speech at University College, Oxford for a meeting on "Exploring Aid Effective and

Cooperative Aid Partnerships". Global Economic Governance Programme. Canada’s

Aid Program: The Way Forward, March 9, 2005.

Page 146: 2 List of Contents and Thesis

139

Cd Roms

CD-ROM for “Development, Coordination of International Assistance: Proceedings of a

Seminar”. 1993), organized in Paris by the Technical Centre for Agricultural and Rural Cooperation and the United Nation Educational, Scientific and Cultural Organization, 1992. Wageningen, Technical Centre for Agricultural and Rural Cooperation.

Web pages

http://www.nssd.net http://topics.developmentgateway.org http://topics.developmentgateway.org/aideffectiveness/ http://www.aidharmonization.org/ http://www.oecd.org/ http://millenniumindicators.un.org http://www.un.org/millenniumgoals http://www.idsc.gov.eg/English/index.asp

The Role of the Partner Government in Aid Coordination

Books/Chapters in Books

Carew-Reid, Jeremy, Robert Prescott-Allen, Stephen Bass, and Barry Dalal-Clayton. 1995. “Strategies for National Sustainable Development: A Handbook for their Planning

and Implementation”. Cling, Jean-Pierre, Mireille Razafindrakoto, and François Roubaud (ed.). 2003). ”New

International Poverty Reduction Strategies”. Routledge. Stokke, Olav (edi). 1996. “Foreign Aid Towards the Year 2000: Experiences and

Challenges”. EDDI Book Series: London.

Articles

Hafez, Sanaa, and Mariam Ahmed. “Working with an Egyptian Partner”. Canadian International Development Agency: Egypt.

Samoff, Joel. 1999. “Education Sector Analysis in Africa: Limited National Control and even

Less National Ownership”, International Journal of Educational Development, Vol. 19, Iss. 4-5, Pp. 249-27.2.

Reports

African Development Bank. 2004. “Arab Republic of Egypt 2005-2009 Country Strategy Paper”. African Development Bank, Country Operation Department OECD. 2005. “Environmental Fiscal Reform for Poverty Reduction”. DAC Guidelines and

Reference Series, OECD Publishing.

Forums

“Report of the International Forum on National Sustainable Development Strategies”. 2001. International Forum on National Sustainable Development Strategies. Accra, Ghana, 7-9 November 2001.

Page 147: 2 List of Contents and Thesis

140

Workshops

Development Assistance Committee (DAC). 2000. “Informal Workshop on Poverty Reduction Strategies, Comprehensive Development Framework and National Strategies for Sustainable Development: Towards Convergence”, Paris 29-29 November 2000.

Aid Coordination by Egyptian Authorities, Empirical Documents provided by Egyptian

Authorities

Ministry of Planning

Ministry of Planning. 2002.“The Fifth Five-year Plan for Socio-Economic Development

(2002- 2007) and First Year”. Ministry of Planning. “Socio-Economic Development Plan (2005-2006)”. In Arabic Ministry of Planning. 2003.“The Economic and Social Development Plan (2003-2004)”. Ministry of Planning and the World Bank. 2004. “Arab Republic of Egypt – A Poverty

Reduction Strategy for Egypt”, The World Bank. Ministry of Planning. “Activation of the Planning Process”, A PowerPoint Presentation by

Ministry of Planning. Ministry of Planning. 2005. Internal documents about the follow up on the ESP from the

Ministry’s database. Ministry of Planning. 2005. Arabic document about evaluation and follow up 1. Ministry of Planning. 2005. Arabic document about evaluation and follow up 2. United Nations, and Ministry of Planning. 2005. “Millennium Development Goals – Second Country Report Egypt 2004”. Ministry of International Cooperation

Ministry of International Cooperation. Nov. 2005. “Development Cooperation Report 2003”. Ministry of International Cooperation: Egypt.

Ministry of International Cooperation. April 2005. “Development Cooperation Report 2002”.

Ministry of International Cooperation: Egypt. Ministry of International Cooperation (2004). “Press Release”. Provided by Ministry of

International Cooperation.

Ministry of International Cooperation (2004). A timetable of the International Cooperation domain’s placement within other Ministries in Egypt since 1982. Provided by

Ministry of International Cooperation.

Page 148: 2 List of Contents and Thesis

141

Ministry of State for Environmental Affairs (MSEA)/Egyptian Environmental Affairs Agency

(EEAA)

EEAA. 1995. “EEAA Organization and Functional Structure - Part 1 - EEAA Organization

Structure Components and general Functional Roles” “Ministry of State for Environmental Affairs - Egyptian Environmental Affairs Agency –

Fifth 5-Year Plan (2002-2007)”. Ministry of State for Environmental Affairs, UNDP and Capacity 21. 2002. “The National

Environmental Action Plan 2002-2017”. Ministry of State for Environmental Affairs:

Egypt.

Effectiveness and Impact of aid

Books/Chapters in Books

Carlsson, Jerker, and others. 1994. “The Political Economy Evaluation: International Aid Agencies and the Effectiveness of Aid”. International Political Economy Series, St. Martin’s press: New York.

Dichter, Thomas W.. 2003. ”Despite Good Intentions: Why Development Assistance to the

Third World has Failed”. University of Massachusetts Press. Maren, Michael. 1997. “The Road to Hell – The Ravaging Effects of Foreign Aid and International Charity”. The Free Press: New York. Rider, Barry (ed.). “Corruption: The Enemy Within”. Kluwer Law International: The

Netherlands. Roche, Chris. 1999. “Impact Assessment for Development Agencies: Learning to Value Change”. Oxford : Oxfam : NOVIB. Sachs, Jeffrey D.. 2005. “Investing in Development: A Practical Plan to Achieve the

Millennium Development Goals”. Earthscan Publications. Stokke, Olav (edi). 1996. “Foreign Aid Towards the Year 2000: Experiences and

Challenges”. EDDI Book Series: London.

Articles

Collier, Paul, and Dollar, David. 2004. “Development Effectiveness: What have we learnt?”, In The Economic Journal , Vol. 114, Iss. 496, Pp. 244-271.

United Nations; Economic and Social Commission for Asia and the Pacific. 1999.

“Enhancing Effectiveness of Aid”. Least Developed Countries series, No. 2, United Nations Publications: New York.

White, Louise G.. 1986. “An Approach to Evaluating the Impact of Projects”, Series: Aid

Program Design and Evaluation Methodology, No. 5, Pp. vi, 56. US Agency for International Development: Washington, D.C.

Page 149: 2 List of Contents and Thesis

142

World Bank. 1995. “Strengthening the Effectiveness of Aid: Lessons for Donors”, Series:

Development in Practice, World Bank: Washington D. C. World Bank. “Development Aid: Doing More and Doing It Better”, the World Bank’s

Spanish website.

Bureaucracy in Theory, and Bureaucracy and Politics in Egypt

Books/Chapters in Books

Andreski, Stanislav (ed.). 1983. “Max Weber on Capitalism, Bureaucracy and Religion – A Selection of Texts”, George Allen and Unwin: London. Gomaa, Salwa Sharawi. 1997. “Environmental Policy Making in Egypt”. University Press of

Florida: United States Ibrahim, Saad Eddin. 2003 “Egypt, Islam and Democracy – Critical Essays”. The American

University in Cairo Press: Cairo. Kassem, Maye. 2004. “Egyptian Politics: The Dynamics of Authoritarian Rule”. Boulder:

Lynne Rienner Publishers. Mayfield, James B.. 1996. “Local Government in Egypt”. The American University in Cairo Press: Cairo. McDaniel, Thomas Robb. 1992. “Two faces of Bureaucracy: A Study of the Bureaucratic

phenomenon in the thought of Max Weber and Franz Kafka”, University Microfilms

international (UMI): Michigan.

Development and Aid in Egypt

Reports

EcoConServ. 2005. “Donor Assistance to Egypt in the Field of Environment” – Ten Years of Donors’ Experience in Environmental Management - The Lessons Learned and the

Way Forward. EcoConServ/Egyptian Environmental Affairs Agency: Egypt. Genena, Tarek. 2003. “A Consultant Report on the Country Environmental Analysis (CEA)”. Ministry of Foreign Affairs, Danida. 2000. “Evaluation – Danish Development Assistance to

Egypt”. Danida series 1999/7. Ministry of Foreign Affairs: Denmark. UNDP. 2004. “The Egypt Human Development Report 2004”. Commercial Press: Egypt. World Bank. 2005. “Arab Republic of Egypt – Country Environmental Analysis (1992-

2002)”. World Bank’s Water and Environment Department, The Middle East and

North Africa Region. World Bank Staff. 2004. “Global Monitoring Report 2004 : Policies and Actions for

Achieving the Millennium Development Goals and Related Outcomes”. Herndon,

Page 150: 2 List of Contents and Thesis

143

VA, USA: The World Bank. World Bank. 2002. “Arab Republic of Egypt – Cost Assessment of Environmental

Degradation”. World Bank’s Rural Development, Water and Environment Department, Middle East and North Africa Region.

Speeches

Nazif, Ahmed. Dec. 2004. “Governmental Statement to the People’s Assembly”. The Cabinet, Information & Decision Support Center (IDSC).

Environmental Sector Program, Empirical Documents provided by Danida

2004. “Annual Progress Report. Annual Progress and Financial Report – Environmental

Sector Programme ESP. Reporting period: January 2004 to December 2004”. Arab Republic of Egypt, and Danida. May 2005. “Aide Memoir from a Joint Review of the

proposed Reshaped ESP 25th April – 5th May, 2005 - Complementary to the Review Aide Memoire of October 2004”. Egypt. Bayoumi, Gihan, and Anders Bjoernshave. September 2004. “ESP Strategic Management

Plan – Environmental Sector Programme (ESP)” (Draft). Danish Ministry of Foreign Affairs (referred to as DMFA), and Egyptian Environmental

Affairs Agency. January 31th 2005. “Feasibility Note – The PMU / EPF Reshaping. The Environmental Sector Programme”. PEM Consult (Draft).

“Agreed Minutes of the Development Cooperation Consultations between The Kingdom of

Denmark and The Arab Republic of Egypt, 3-7 May 2003”. Danida. 2001. “Environment Sector Programme Support”. Danida: Denmark. Danish Ministry of Foreign Affairs. March 2000. “Final Sector Programme Support

Document - Danish Support to the Environment Sector. Egypt. Egyptian Environmental Affairs Agency, and Danish Ministry of Foreign Affairs. June 2005. “Adjusted Sector Programme Support Document – Danish Support to the Environmental

Sector, Egypt”. Egypt. Egyptian Environmental Affairs Agency, and Danish Ministry of Foreign Affairs. June 2005. “Draft Final Component Description - Support to Decentralisation of Environmental

Management (SDEM). Egypt. Egyptian Environmental Affairs Agency, and Danish Ministry of Foreign Affairs. May 2005.

“Adjusted Sector Programme Support Document, Danish Support to the Environment Sector, Egypt”. Egypt.

Egyptian Environmental Affairs Agency, and Danish Ministry of Foreign Affairs. January

Page 151: 2 List of Contents and Thesis

144

2005. “Feasibility Note – Reshaping Communication in Environmental Management & Environmental Management Decentralisation Components of the Environmental Sector Programme Support” (Draft). Egypt.

Egyptian Environmental Affairs Agency, and Danish Ministry of Foreign Affairs. July 2004.

“Pilot Project of Support to Decentralisation of Environmental Management in Governorates and Environmental Management Units (EMUs)”. Egypt.

Egyptian Environmental Affairs Agency, and Danish Ministry of Foreign Affairs. June 2004.

“Outline Sustainability Review for environmental decentralisation in the

Environmental Sector Programme Support”. (Draft). Egypt. “First Joint Annual Sector Review Agreement, 09 April 2003 between The Government of

the Arab Republic of Egypt and the Government of the Kingdom of Denmark for the Environmental Sector Programme (ESP)”. 2003.

“Second Joint Sector Review, Environmental Sector Programme Egypt.

Review Aide Memoir”, October 2004.

Websites

http://www.eeaa.gov.eg

State Capacity: Institution Building and Capacity Development

Books/Chapters in Books

Cassen, Robert and others. 1994. “Does Aid Work?”, Oxford University Press: New York. Ch. 4, VI: Strengthening recipient capacities

Kayizzi-Mugerwa, Steve (ed.). 2003. “Reforming Africa’s Institutions: Ownership,

Incentives and Capabilities”. United Nations University Press. Stokke, Olav (ed.). 1996. “Foreign Aid Towards the Year 2000: Experiences and Challenges”. EDDI Book Series: London.

Articles

Polidano, Charles. 2000. “Measuring Public Sector Capacity”. World Development, Vol. 28, Iss. 5, Pp 805-822.

Reich, Michael R.. 2002. “Reshaping the State from Above, from Within, from Below:

Implications for Public Health”, Social Science & Medicine, Vol. 54, Iss. 11, Pp. 1669-1675.

Methodology

Books/Chapters in Books

Premfors, Rune. 1989. Policyanalys. Studenterlitteratur: Lund.

Page 152: 2 List of Contents and Thesis

145

APPENDIX

A: Details on Short, Medium and Long Term Planning Documents in Egypt

Development Objectives of “Long Term Development Vision 2022”

(MoP 2002, 4-9).

· Conservation of natural resources and directions of urban growth

Towards desert land

· Steady reduction of current population growth

· Achievement of high and sustainable GDP growth

· Gradual removal of balance of payments deficit

· Alleviation of poverty and attenuation of income disparities

· Development of human capital and attainment of full employment

· Improvement of social services.

Strategic elements of The Fifth Five-Year Plan for Socio-Economic Development

(MoP 2002, 36).

· Embracing an export promotion strategy to reduce balance of

payments and augment job opportunities

· Deepening the industrialization process

· Eliminating unemployment

· Increasing competitiveness of Egyptian firms

· Rationalizing investment incentives to maximize net economic

benefits

Page 153: 2 List of Contents and Thesis

146

· Directing development efforts towards desert land

· Asserting equity considerations and lessening the poverty rate

· Increasing women’s participation in the development process

Focus of “The Economic and Social Development Plan for 2003/2004”

(MoP 2003, 9)

· Restoring the economic growth rate to its level before the negative impacts of

international and regional events on the Egyptian economy

· Concentrating on human resource development as the main driving force for

development

· Continuing the efforts to curtail the problems of population growth and

unemployment

· Spreading the development efforts to cover all geographical areas through the

provision of infrastructure for ill-served areas, especially the South Valley

governorates

· Intensifying efforts aiming at boosting exports by focusing on areas where Egypt

enjoys competing advantage, modernizing domestic industry, and opening new

markets through regional and bilateral agreements

Page 154: 2 List of Contents and Thesis

147

B: Details on Responsibilities and Functions of the Ministry of International

Cooperation

MIC’s responsibilities according to Presidential Decree 303 of year 2004

(MIC April 2005, 3)

· Preparation of draft laws and decrees that support the accomplishment of the

Ministry’s goals and objectives in the field of international cooperation

· Proposal of and formulation of criteria and monitoring guidelines for external

borrowing

· Preparation of bilateral and multilateral agreements in the fields of economic and

technical co-operation, fulfilling ratification procedures, following up on the

implementation of these agreements with concerned governments, international

and regional organizations.

· Preparation of agreements for loans, grants, and financial guarantees, and

assuming responsibility for the allocation of ODA, guarantees, and facilities

· Preparation of agreements on debt rescheduling, debt swaps with foreign

governments and agencies, fulfilling ratification procedures, and following up on

their implementation

· Management of Egypt’s relationship with organizations, authorities, and

institutions involved in economic co-operation and international and regional

finance and investment guarantees, as well as with specialized United Nation

agencies promoting economic cooperation

· Preparation of compensation agreements with foreign governments and

fulfillment of ratification procedures, as well as following up on their

implementation and resolving all problems related to these

Page 155: 2 List of Contents and Thesis

148

· Proposal of the participation of the Arab Republic of Egypt in establishing

common economic co-operation projects with Arab and foreign countries and

other donor parties

· Supervising and monitoring the progress of development projects funded by the

UNDP

The main functions of the MIC strategy to fulfill its mandate

(MIC April 2005, 3-4)

· Act as the national coordinator between government sectors, Ministries, and

foreign organizations in order to secure foreign resources required by the

National Development Plan

· Obtain the most concessionary assistance that does not burden the government’s

budget

· Undertake measures in increase the effectiveness of development co-operation

and maximize the benefits thereof

· Ensure that there is no duplication in the development assistance provided

· Follow up on the progress of projects and programs, from inception to impact

assessment, with particular focus on the impact of development, co-operation on

services provided to Egyptian citizens

· Identify and address problems faced during project implementation

· Ensure that feasibility studies are reliable and effective

· Expand debt swap arrangements aiming at transferring debts into local currency

to be utilized in financing development projects

· Monitor expenditures related to feasibility studies, expatriates, and consultants,

to ensure cost-effectiveness

Page 156: 2 List of Contents and Thesis

149

C: The immediate Objectives of the Components in the Environmental Sector Program

(“Agreed Minutes of the Development Cooperation Consultations between Denmark and

Egypt”, May 2000, ix).

· EEAA capacity for decentralized environmental management strengthened.

· Selected Regional Branches Offices of the EEAA able to fulfill their mandates

according to Law #4/94.

· Dissemination of environmental information to support the priority [of]

environmental strategies of the EEAA, Environmental Management Units of the

Governorates (EMUs) and other partner stakeholders.

· Awareness of environmental issues and capacity of decision-makers,

implementers in the EEAA, governorates, and the industrial sectors enhanced.

· The EMUs in Aswan and Beni Suef enabled to carry out their mandated

environmental management functions.

· Governmental Environmental Action Plan (GEAP) process functioning in Beni

Suef and Aswan that involves people at the community level in identifying and

rectifying local environmental problems through community based and

replicable projects.

· Awareness and usage of cleaner production in at least three sectors of the

Egyptian industry.

· Egyptian technical consultants promote and implement cleaner production in the

industry.

· Environmental Compliance Office at FEI serves as a link between the industry,

the Egyptian technical consultants, EEAA, and financial facilities.

Page 157: 2 List of Contents and Thesis

150

D: Collaboration between Components and Program Management Unit & between

Program Management Unit and Program Coordination Committee

Collaboration between the Components and the PMU

This connection between the components and the PMU is the briefing conjunction, merging

the technical knowledge from the components and the coordination effort in the PMU.

Regular weekly meetings take place between the PMU and the different components of ESP,

and follow-up meetings take place between PMU and the components SDEM and ACI every

month. According to staff, the creation of SDEM enhanced the coordination between the

different components387. Everyday the SDEM - the umbrella of the components EMU, DEM

and EMG - consults the EEAA and the EMUs. Also, every month there is a “Management

Forum Meeting” with all components. The PMU has a standard agenda for these meetings;

however, there are also loose ad hoc meetings. Minutes called “Actions to Do” are made

after these meetings. Permanent staff members in EEAA, regularly contact the responsible at

the Royal Danish Embassy in Cairo, who most EEAA staff members perceive as a helpful

person to go to.

The change from PSU to PMU is a favorable alteration that morphs the PSU from a

reporting body to an implementing entity388. Subsequently, all the components present

quarterly progress reports to PMU. Then the PMU presents progress reports from the

different components to PCC when they meet three times a year. The PCC then takes

decisions on how to move forward. The entirety of the ESP is checked annually by Joint

Sector Reviews. In charge of this, there is a mission/international consultant who conducts

this review together with an Egyptian from DIC, a representative from MIC and a local

387 (3.3) 388 (3.5, 3.12)

Page 158: 2 List of Contents and Thesis

151

consultant in the environmental sector389. This link of internal coordination in the program is

described very positively. It appears as if the PMU’s coordination of the components work

fine.

Collaboration between PMU and PCC

The PCC holds its meetings twice a year390. The PCC is where the overall assessment of the

management of objectives, finance, and audits takes place. The PMU meets with the PCC

three times a year. The PMU’s role is to present the results of monitoring the program. There

is a standard agenda to these meetings regarding the ESP’s progress, budget, last meeting,

arising matters. The PMU then asks the PSS for feedback on what could be done better.

Minutes from these meetings then come out391. The PCC approves the new program

document that describes how the program is changed in coherence with the previous Aide

Memoirs. The responsible person for the ESP at the Royal Danish Embassy in Cairo looks

after whether the Danida responsible for the PMU does the job, whereas the CEO looks after

whether the Egyptian counterpart fulfills the requirements. A member of the PCC asserted

that it would be beneficial if more donors participated in the PCC. Yet other members did not

like the idea of more participants as they find that the forum should be responsible for taking

care of coordination issues inside the ESP, not outside the program392.

389 (3.5, 3.12) 390 (3.7) 391 (3.12) 392 (3.12, 3.14)

Page 159: 2 List of Contents and Thesis

152

E: Tasks that the EEAA has to undertake to reach its objectives

(http://www.eeaa.gov.eg)

· Preparing draft legislation and decrees related to the fulfillment of its objectives

· Preparing state of the environment studies and formulating the national plan for

environmental protection and related projects.

· Setting the standards and conditions to which applicants for construction projects

must adhere before working on the site and throughout operations.

· Periodically collecting national and international data on the actual state of the

environment and recording possible changes.

· Setting the principles and procedures for mandatory Environmental Impact

Assessment (EIA) of projects.

· Monitoring Programs and employing data and information gained thereof.

· Coordinating with other empowered authorities for the control and safe handling

of dangerous substances.

· Listing of national establishments and institutions, as well as experts qualified to

participate in the preparation and implementation of environmental protection

programs, and coordinating measures with the Ministry in charge of

international Cooperation to ensure that projects funded by donor organizations

and states are compatible with environmental safety.

· Preparing an annual report on the state of the environment to be submitted to the

President and the Cabinet of Ministers.

Page 160: 2 List of Contents and Thesis

153

F: Coordination between Department of International Cooperation and the Program

Management Unit

Official Procedure

No official linkage is established between the PMU and the DIC though the two

parties serve as the link between the pt. biggest environmental program in Egypt and the

sector-coordinator of environmental programs. In the Agreed Minutes between Denmark and

Egypt from 2003, PSU’s (later changed to the PMU) role as coordinator of the program

internally within the EEAA, and with other related programs and activities is underlined393.

However, factually speaking, the personnel from the PMU and the DIC only meet randomly

in the corridors and on the staircases a couple of times every week. The coordination between

these links must therefore be described as ad hoc. However, as conveyed by senior officials

in the ESP, the responsible at the Royal Danish Embassy in Cairo would find out if this

connection did not work at all394.

Practical Implementation

Some staff members in the ESP would like the DIC to hold meetings regularly for the

reason that it is important that they know what is going on in the environmental field so that

they can get the right funding and advice donors through MIC to support what is needed. It

would be beneficial if the DIC were playing a stronger strategic and coordinating role, as the

department is the responsible national body for coordination of environmental projects and

programs.

393 (DFM 2003, 8) 394 (3.12)

Page 161: 2 List of Contents and Thesis

154

G: Environmental objectives in “The Economic and Social Development Plan for

2003/2004”

(MoP 2003, 33)

· Improving air quality

· Protection the River Nile from pollution

· Protecting nature and preserving biological diversification

· Expanding green areas and tree plantation

· Increasing public environmental awareness

· The policies in achieving the objectives are based on a pro-active approach,

seeking to prevent pollution and environmental deterioration. The first two

policies mentioned to attain this are: Strengthening the environment

management systems

· Supporting the institutional capabilities of Environmental Affairs Authority and

its regional braches.

Page 162: 2 List of Contents and Thesis

155

H: Interview Guide

Professional and Academic info of the Interviewee

a. Full name:

b. Occupation, previous and current:

c. Responsibility:

d. Similar experience:

e. Donor coordination:

f. Academic standing:

Introduction to Aid and Coordination

Coordination of Aid and Impact of Aid

0. What thoughts do you get in your head if I say the term aid coordination? What does it

mean to you?

- Definition of Aid Coordination: In my research I focus on the recipient’s government’s role

in coordinating aid activities, so when I say aid coordination I mean the coordination taken

on by the government. You can talk about other coordination affords just have in mind what I

am referring to…

National Coordination and Impact of Aid

1. Do you think there is a relationship between that national coordination of Aid and Impact

of Aid?

Projects to Programs

Page 163: 2 List of Contents and Thesis

156

2. Do you think coordination plays a different role in Projects as opposed to Programs?

Coordination versus Competition of Aid

3. Do you think aid programs better reach their goals through competition bw donors/donor

programs than through coordination (the opposite)?

Obstacles that impede Coordination of Aid Programs

4. Have you faced any obstacles that impede coordination of aid programs?

Methods of Coordination of Aid Programs

5. Do you know any methods of National Coordination of Aid Programs – some you like,

some you don’t like?

5A. Do you know of any entity, which is currently trying to coordinate aid in Egypt?

Coordination of Aid in Egypt

Questions to people inside the MIC

Coordination in Egypt before the Ministry of International Cooperation

6. Were aid activities coordinated prior to the establishment of MIC?

- If so, then how?

Page 164: 2 List of Contents and Thesis

157

7. Do you know of any entity, which has been trying to coordinate aid in Egypt, before the

MIC?

- What do you think of these attempts? – Positive/negative comments…

Ministry of International Cooperation (MIC)

Goals, Vision and Objectives

8. What are the MIC’s goals (general), vision (outlook) and objectives (specific)?

Collaboration/coordination with other Ministries in Egypt

9. How does MIC collaborate/coordinate with other Ministries in Egypt?

National Development Strategy

10. Is there a national development plan?

11. Is there a holistic national development strategy?

- Who wrote it? Who initiated it? Who feels an ownership of it? Is it long-term? Is it

sustainable? Is the plan being followed?

- Is it well-acknowledged and known within entities working with development

(governmental/NGO/Foreign bilateral/ IMF WB)? Who is more supportive than the other

within these entities?

12. What are the main problems and obstacles of implementing the coordination?

13. How is the document being used in the planning of aid?

Page 165: 2 List of Contents and Thesis

158

14. What is the difference between the aspired versus the actual role of the MIC?

14A. Is the program coordination on the macro level (national level in Egypt) in the Ministry

of International Cooperation (MIC) beneficial to the output of aid programs?

Yes, how? Examples

No, why not? Examples

15. Does the MIC follow a participatory approach, whether a sectoral or a grassroots one, in

prioritizing aid activities? (Define participatory approach from your viewpoint).

Impact on aid programs

15A Does coordination take place between different sector experts in the forum of MIC to

match foreign aid activities?

- Examples?

Questions to people outside the MIC

17. What do you know about the Ministry of International Cooperation? What’s your

feedback on their work?

18. Do you know whether aid activities were coordinated prior to the establishment of MIC?

- If so, then how?

7A. Do you know of any entity, which has been trying to coordinate aid in Egypt, before the

MIC?

Page 166: 2 List of Contents and Thesis

159

- What do you think of these attempts? – Positive/negative comments…

Overview of Environmental Sector Program (ESP) (within the context of the MSEA)

Ministry of Environmental Affairs

Questions to people inside the MSEA

Role and level:

18. What is the main role of the MSEA regarding ESP?

19. Is the MSEA playing a role in coordinating the ESP in Egypt?

- If yes, how? In what ways – on what levels? – National? Sectoral?

- If no, why not?

19A. Is the afford to coordinate in the MSEA prioritized?

- Examples

19B. Does the employees in the MSEA view/witness that the coordination affords are

detrimental for the outcome of the program?

19 C. Is MSEA monitoring and coordinating environmental initiatives in other Ministries?

(besides Ministry of Local Development (pays for EMUs) and Min. of Industries (ACI))

- If yes, how?

- If no, why not?

Phases:

Page 167: 2 List of Contents and Thesis

160

20. What phases of the program are you more involved in?

21. Does coordination play a more important role in a particular phase more than another?

Why? /Why not?

- Good impact on program?

- Bad impact on program?

Coordination’s impact on aid programs

21B. Is the program coordination on the sectoral/ministerial level in the Ministry of State for

Environmental Affairs (MSEA) beneficial to the output of the aid program?

Yes, how? – Examples

No, why not? - Examples

21B. Does the coordination set-up help or hinder the ESP program in reaching its goals?

Yes, how? – Examples

No, why not? - Examples

21C Is it good for the impact of the Ministry of Environmental Affairs that it doesn’t receive

money directly to implement its programs, and therefore needs to coordinate environmental

initiatives between other Ministries?

Questions to people outside the MSEA

Role and level:

22. Do you think the MSEA plays a role in coordinating the ESP in Egypt?

- If yes, how? In what ways – on what levels? – National? Sectoral?

Page 168: 2 List of Contents and Thesis

161

- If not, why?

23. Would it be beneficial for the impact of aid in Egypt if the MSEA coordinates more?

24. Would it be better if the MSEA weren’t coordinating the ESP on a national or sectoral

level? (Having their own money and spending it themselves)? Why?

Phases:

25. What phases of the program are you more involved in the program?

26. Does coordination play a more important role in a particular phase more than the other?

Why? / Why not?

Egyptian Environmental Affairs Agency (EEAA)

Questions to people inside the EEAA

Role and level:

27. What is the main function of the EEAA regarding ESP?

28. Is the EEAA playing a role in coordinating the ESP in Egypt?

- If yes, how? In what ways – on what levels? – National? Sectoral?

- If no, why not?

28A. Is the afford to coordinate in the EEAA prioritised?

- Examples

Page 169: 2 List of Contents and Thesis

162

28 B. Does the employees in the EEAA view/witness that the coordination affords are

detrimental for the outcome of the program?

28C. How does your function increase the chances of the ESP reaching its intended

outcome?

Phases:

29. What phases of the program are you more involved in the program?

30. Does coordination play a more important role in a particular phase more the other?

Why? / Why not?

Questions to people outside the EEAA

Role and level:

31. Do you think the MSEA plays a role in coordinating the ESP in Egypt?

- If yes, how? In what ways – on what levels? – National? Sectoral?

- If not, why?

32. Would it be beneficial for the impact of aid in Egypt if the MSEA was coordinating

more?

33. Would it be better if the MSEA wasn’t coordinating on a national or sectoral level? (i.e:

Having its own money and spending it themselves)

Phases:

34. What phases of the program are you more involved in the program?

35. Does coordination play a more important role in a particular phase more than the other?

Why? / Why not?

Page 170: 2 List of Contents and Thesis

163

Components of the Environmental Sector Program

Role and level:

36. Are the different components of the Environmental Sector Program coordinated together?

37. What is the structure of this coordination?

38. Does the Structure of the Environmental Sector Program help the coordination?

-Is the structure useful?, If yes, how? / If not, why?

-How often do people meet to coordinate?

39. Who sets the agenda?

-Physical placement of the different people involved in the Environmental Sector Program?

- Promote coordination on national and sectoral level?

Phases:

40. What phases of the program are you more involved in the program?

41. Does coordination play a more important role in any particular phase more than another?

Why? / Why not?

Department of International Cooperation (DIC) in the MSEA

Questions for people inside the DIC

Role and level:

42. How does your function increase the chances of the ESP reaching its intended outcome?

43. What is the main role of the DIC regarding ESP?

44. Is the DIC playing a role in coordinating the ESP in Egypt?

- If yes, how? In what ways – on what levels? – National? Sectoral?

- If no, why not?

Page 171: 2 List of Contents and Thesis

164

Phases:

45. What phases of the program are you more involved in the program?

46. Does coordination play a more important role in any particular phase more than the

other? Why? / Why not?

Questions for people outside the DIC

Role and level:

31. Do you think the DIC plays a role in coordinating the ESP in Egypt?

- If yes, how? In what ways – on what levels? – National? Sectoral?

- If not, why?

32. Would it be beneficial for the impact of aid in Egypt if the DIC was coordinating more?

Other stakeholders in the Environmental Sector Program

47. Does outside stakeholders affect the ESP? In what manner?

Role and level:

48. What is the main role of the stakeholders regarding ESP?

49. How does your function increase the chances that the ESP reaches its intended outcome?

50.What is the main role of your organization regarding ESP?

51.Are stakeholders playing a role in coordinating the ESP in Egypt?

- If yes, how? In what ways – on what levels? – national? Sectoral?

- If not, then why no?

Page 172: 2 List of Contents and Thesis

165

Phases:

52.What phases of the program are you more involved in the program?

53. Does coordination play a more important role in any particular phase more than another?

Why? / Why not?

The coordination’s impact on the outcome of the ESP

Illustrate the coordination all the way down

A- Coordination between MIC & Department of International Cooperation in MSEA

Action:

54. Is there a scheme of coordination that is going on bw MIC and DIC?

- If so, for how long has it been going on?

- How often do the people from MIC and DIC meet?

- Who sets the agenda?, do people prioritise going to these meeting? – Do people read the

memos/documents launched after these coordinating meetings? – Does change happen as a

result of these meetings? (Ask for examples)

- Who monitors this connection and the success of the coordination?

54A. Does the Department of International Cooperation in MSEA have good contacts to MIC

in a way that influences how much money and to what activities donor funds are being used

in the field of Environment?

Page 173: 2 List of Contents and Thesis

166

Yes, examples, procedure?

No, why not/

Structure:

55. How is the structure of the coordination bw MIC and DIC?

- Who is in charge of the Coordination?

55A. Does the way of coordinating the program (between national and local level) have

beneficial elements of the participatory approach?

- Is the structure actually good, but practice or incentives are missing?

- Has the structural and organizational changes of the ESP enhanced the coordination?

B- Coordination between the Department of International Cooperation in MSEA and

Program Support Unit (PSU)/Environmental Sector Program (ESP) Coordinator

Action:

56. Is there a scheme of coordination going on bw DIC and PSU?

- If so, for how long has it been going on?

- No, why not? And is MIC aware?

56A How often do the people from DIC and PSU meet?

- theoretically

- in practice?

56B. Who sets the agenda?

Page 174: 2 List of Contents and Thesis

167

56C. Do people prioritise going to these meeting? - Do people read the memos/documents

launched after these coordinating meetings? – Does change happen as a result of these

meetings? (Ask for examples)

56D. Who monitors this connection and the success of the coordination?

Structure:

57. How is the structure of the coordination bw DIC and PSU?

- Who is in charge of the Coordination?

- Is the structure actually good, but practice or incentives are missing?

- Has the structural and organizational changes of the ESP enhanced the coordination?

C- Coordination between the PSU (ESP Coordinator and Chief Advisor) and the

Program Coordination Committee (PCC)

Action:

58. Is there a coordination going on bw PSU and PCC?

- If so, for how long has it been going on?

- How often do the people from PSU and PCC meet?

- Who sets the agenda? Do people prioritise going to these meeting? – Do people read the

memos/documents launched after these coordinating meetings? – Does change happen as a

result of these meetings? (Ask for examples)

- Who monitors this connection and the success of the coordination?

Structure: How is the structure of the coordination bw PSU and PCC?

59. Who is in charge of the Coordination?

- Is the structure actually good, but practice or incentives are missing?

Page 175: 2 List of Contents and Thesis

168

- Has the structural and organizational changes of the ESP enhanced the coordination?

D- Coordination between the PSU + the Program Coordination Committee (PCC) and

the Components

Action:

60. Is there a coordination going on bw PSU/PCC and Components?

- If so, for how long has it been going on?

- How often do the people from PSU/PCC and Components meet?

- Who sets the agenda? Do people prioritise going to these meeting? – Do people read the

memos/documents launched after these coordinating meetings? – Does change happen as a

result of these meetings? (Ask for examples)

- Who monitors this connection and the success of the coordination?

Structure:

61. How is the structure of the coordination bw PSU/PCC and Components?

- Who is in charge of the Coordination?

- Is the structure actually good, but practice or incentives are missing?

- Has the structural and organizational changes of the ESP enhanced the coordination?

E- Coordination between outside stakeholders e.g. donor agencies and the ESP

Action:

62. Is there coordination going on bw donors and the ESP?

- If so, for how long has it been going on?

- How often do the people from other donor organizations and ESP meet?

Page 176: 2 List of Contents and Thesis

169

- Who sets the agenda? do people prioritise going to these meeting? - Who monitors this

connection and the success of the coordination?

Structure:

63. How is the structure of the coordination bw donors and the ESP?

- Who is in charge of the Coordination?

- Is the structure actually good, but practice or incentives are missing?

Has the structural and organizational changes of the ESP enhanced the coordination?

What are the incentives, norms, work chats, the perspectives on the structure of coordination,

the aim of coordination, rewards for results?

Findings and Conclusions

64. Is National Coordination one of the answers to more effective Aid Programs?

65. Would it be fruitful for the Donors in Egypt to support the MIC to make it capable of

playing a stronger Role in the process of Coordination in Egypt?

66. Would a stronger (planning, monitoring, training, evaluating) MIC be beneficial for the

outcome of Aid?

a. For example, is the MIC aware of the deficiencies in EEAA and, if so, is it capable of

dealing with these deficiencies?

Page 177: 2 List of Contents and Thesis

170

67. Can we induce Lessons about Aid Coordination in Egypt from this Case Study?

68. Where in between the MIC and the Egyptians, do you think the coordination is working

best?

- where is it worse?

WHY???

69. Would the ESP had been managed and coordinated differently if there had been no MIC?

- better or worse for the impact of the program?

What are the biggest obstacles for the program to reach its intended outcome?