1XFOHDU 6,* (YHQW 1RYHPEHU - Cambridge · PDF fileAdopted complete AVEVA Plant suite in 2003...

6
1 Darren Duddy Global Business Development - Nuclear AVEVA The first 45 years 1976 Launched PDMS 1967 CADCentre established from Cambridge University 1979 Launched Intelligent P&ID 1999 Launched world’s 1 st Engineering Information Management Solution 2002 Launch AVEVA NET 2011 Acquired LFM Software 1988 Launched AVEVA Review 2001 Launched AVEVA Global 2004 Acquired Tribon 2006 AVEVA Laser model Interface launched 2010 Acquired Logimatic MARS & ADB Systemer 2012 Acquired bocad A History of Innovation Nuclear SIG Event 12 November 2012 www.cambridgecleantech.org.uk 1

Transcript of 1XFOHDU 6,* (YHQW 1RYHPEHU - Cambridge · PDF fileAdopted complete AVEVA Plant suite in 2003...

1

Darren Duddy

Global Business Development - Nuclear

AVEVA – The first 45 years

1976

Launched PDMS

1967

CADCentre established from Cambridge University

1979

Launched Intelligent P&ID

1999

Launched world’s 1st Engineering Information Management Solution

2002

Launch AVEVA NET

2011

Acquired LFM Software

1988

Launched AVEVA Review

2001

Launched AVEVA Global

2004

Acquired Tribon

2006

AVEVA Laser model Interface launched

2010

Acquired Logimatic MARS & ADB Systemer

2012

Acquired bocad A History of Innovation

Nuclear SIG Event 12 November 2012

www.cambridgecleantech.org.uk 1

2

Existing Nuclear Position

Copyright 2011 AVEVA Solutions Limited. All rights reserved.

Slide 8

Major AVEVA Customers in the Nuclear

Industry - EDF Group (Electricité de France)

The largest operator of nuclear plant in the world

63 GW Nuclear capacity in France – 57 units 9 GW Nuclear capacity in UK – 15 units at 8 sites

AVEVA PDMS customer since 1981

Designed entire series of N4 1450MW reactors using PDMS

Most recent reactors commissioned in France (2000) PDMS used for Thermal plants too

eg Phu My 2-2 715MW Combined Cycle - Viet Nam 2008

Using AVEVA PDMS for maintenance, modification & decommissioning on existing fleet

Designing France’s first 3rd generation reactor using PDMS Flamanville 3 construction site opened Jul 2006

2012

Hinkely Point C Planned NNB – AVEVA Tools Selected

Nuclear SIG Event 12 November 2012

www.cambridgecleantech.org.uk 2

3

Copyright 2011 AVEVA Solutions Limited. All rights reserved.

Slide 9

Current AVEVA Plant Projects :

China: Taishan

- Design & Construction of 2*1600MW EPRs Finland : Olkiluoto 3

– Design & Construction of the world’s first Gen 3+ nuclear plant (1600MW EPR with TVO) – 200+ engineers using AVEVA software across 4 locations

France: Flamanville 3 – First 3rd generation nuclear plant in France (1600 MW EPR with EDF) – Design of the new ATMEA 1 reactor in a JV with MHI in Japan

UK: Hinkley Point C

– First 3rd generation nuclear plant in UK for 25 years (2 x 1600 MW EPR with EDF NNB Genco) – Engineering tools selection and site works started

USA: – Design Certification & COL projects across multiple offices in North America

Major AVEVA Customers in the Nuclear

Industry - AREVA NP

“World’s leading designer and builder of nuclear power plants”

Adopted complete AVEVA Plant suite in 2003 Major development partner of AVEVA

Copyright 2011 AVEVA Solutions Limited. All rights reserved.

Slide 10

AVEVA Nuclear Strategy –

The Challenge

New Nuclear Build

(NNB)

Early adoption of Planning and Licencing requirements

Design for Construction, Operations and Maintenance

Design Standardisation and Reuse (Series/Fleet/Modular

Construction etc),

Construction Planning/Materials Management

Operational

Excellence

(OPEX)

Project Collaboration in commissioning and handover

Validation of Planned Construction Processes, Outages and

maintenance activities

Quality Assurance of information integrity (complete, correct and

reliable from Global Suppliers to Constructors to Operators)

Plant Life Extension

(PLEX)

Accurate Project Execution and Compliance

Project Cost and Schedule Optimisation and validation

Integration of new and legacy technologies

Decommissioning

(DECOM)

Knowledge capture and reuse for future project execution

Increase efficiency without compromise to safety and security

Validate complex decommissioning procedures prior to project

execution

Nuclear SIG Event 12 November 2012

www.cambridgecleantech.org.uk 3

4

Copyright 2011 AVEVA Solutions Limited. All rights reserved.

Slide 12

Asset Information Lifecycle

Management

Asset Data Asset Data

Process Design knowledge base

Organization learning and knowledge sharing

Supplier management

Asset portfolio management

Owner/ Owner/ Operator Operator

Reusable design components

Strategic Sourcing

Project Management

Supplier collaboration

Document control

Engineering Engineering & &

Construction Construction Operation optimization

Equipment reliability

Maintenance management

Abandonment planning

Asset Asset Operations & Operations & Maintenance Maintenance

Equipment maintenance history

Problem analysis

Parts inventory management

Service Service Providers Providers

Design parameters

Performance analytics

As-built documentation

After-market support

Equipment Equipment Supplier Supplier

Construction Planning

Copyright 2011 AVEVA Solutions Limited. All rights reserved.

Slide 13

Managing the Complexity

Start of construction before design completion

Insufficient incorporation of regulatory requirements into design

Insufficient schedule integration and communication

Poor interface definition and management

Nuclear SIG Event 12 November 2012

www.cambridgecleantech.org.uk 4

5

Copyright 2011 AVEVA Solutions Limited. All rights reserved.

Slide 14

iALM «industrial Asset Lifecycle

Management»

“Back Office

Functionalities”

“Engineering

Functionalities”

Product Data Management

Operation Maintenance

Product Life Cycle

Management PLM

1980

1990

2000

2010

“Life Cycle Management

Functions”

“Operation &

Maintenance Functions”

ALM

PPM

PDM

CAD

EDM

ECM

PLM

EAM

iALM Best In Class

CMMS

HR Finance

Engineering Software Trends: “Life Cycle Management functions associated to Operation & Maintenance

functions”

Copyright 2011 AVEVA Solutions Limited. All rights reserved.

Slide 15 Business led, IT enabled Partnership Project

The iALM platform Key business

challenges

Issue NO SINGLE SOURCE OF TRUTH

FOR ENGINEERING INFORMATION (EI) ACROSS THE PLANT LIFECYCLE

INCONSISTENT AND DIFFERING APPROACHES TO STANDARDS, PROCESSES AND SYSTEMS IMPLEMENTATION AFFECTING EI ACROSS NPP FLEET

LATE ADOPTION OF ENGINEERING CHANGES THROUGH INEFFICIENT HANDOVER PRACTICES

PROCESSES OF LOCATING, COLLECTING, VALIDATING AND ACCESSING EI ARE RENDERED INEFFICIENT.

PROCESS OF PROVIDING ACCURATE PROJECT EXECUTION PLANNING ACTIVITIES AND REPORTING DOCUMENTATION

NON-COMPLIANCES WITH REGULATORY AUTHORITIES FOR ASSET INFORMATION INTEGRITY

PROJECT DELAYS AND PROGRAM RISKS

SUPPLIER AND CONTRACTOR PENALTIES

RISK IS NOT ADEQUATELY MANAGED – REACTIVE

INEFFECTIVE COLLABORATIVE DECISION MAKING

GLOBAL ENTERPRISE INFORMATION HUB (EIH)

SCALABLE AND ROBUST SOLUTION FOR :

SINGLE EI ACCESS COMMON, STANDARDS,

PROCESSES, PROCEDURES DATA QUALITY AND

VALIDATION

COMBINES AND REVIEW ALL SOURCES OF INFORMATION CLASSES, OBJECTS AND RELATIONSHIPS

PROVIDING A SYNCHRONOUS SOURCE OF TRUSTED AND RELIABLE ENTERPRISE ASSET INFORMATIONS

2D

3D

Docs

Multiple Formats

Multiple Participants

Part. A

Part. B

Part.…

Part. n

Electric

Mech.

Water

Cooling

Multiple Disciplines

Plant Design

Impact Solution

Nuclear SIG Event 12 November 2012

www.cambridgecleantech.org.uk 5

6

Copyright 2011 AVEVA Solutions Limited. All rights reserved.

Slide 16

iALM Overview

Issues

Solution Structure

Solution Vision

Benefits

“a single logical instance of data gathering and connecting

plant information throughout its life cycle”

Inefficient management of

Engineering Information

contributing to:

o Project Delays

o Non-Compliances

o Increased Risk

o Ineffective Decisions

o Increased Costs

“an innovative,

integrated and effective

solution for the

management of Assets

through their life cycle

… connecting people,

processes and systems

through information”

Thank you.

Nuclear SIG Event 12 November 2012

www.cambridgecleantech.org.uk 6