THE DILG CAR IN FY 2017: Sustaining a development-oriented local
government through SUCCESS 2017
I. Introduction
To impress the change that the administration promised to the Filipino people, the
DILG CAR recognized the need to usher LGUs to be development oriented. To realize such
task, the DILG CAR devised a guidepost coined SUCESS 2017 or “Stepping-Up to Challenges and Changes thru Excellent and Sustainable Strategies” to make DILG CAR
more effective, relevant and responsive to the needs of the LGUs.
II. Significant Accomplishments
LOCAL GOVERNMENT SECTOR
A. PEACEFUL, ORDERLY AND SAFE LGUs
a. Mamamayang Ayaw Sa Anomalya, Mamamayang Ayaw Sa Ilegal na Droga
(MASA MASID)
1. Community watch and volunteerism through MASA MASID was
observed by the 686 barangays with MASA MASID teams organized throughout this region while 12 municipalities have organized their
Community Rehabilitation Network as of March 31, 2017. For 2nd Qtr, MM
teams were organized in 471 barangays. In total, 1157 barangays have organized MMTs EO 2nd Semester.
2. 21 municipalities have organized CRN for 2nd Qtr. In total, as of EO
2nd semester, there were 33 CRNs organized in this region.
3. As of 2nd Semester, 2383 from the five provinces and 1 HUC of CAR
registered as MM volunteers.
b. Payapa at Masaganang Pamayanan (PAMANA-DILG Fund) Pillar 3
Continuing
1. Two remaining PAMANA 2015 projects were on-going as of 2nd Semester t wit,
Benguet Province; Concreting Of Dangadangan-Copcopit Road
(Bakun)Tinglayan, Kalinga; Concreting Of Bugnay-Butbut Road
3:
2. For PAMANA 2016, there were a total of 24 SPs under. 4 SPs were already
completed on FY 2016. For this year, 20 remaining SPs were monitored as to status as shown in the table below:
Province Municipality PROJECT_TITLE AMOUNT STATUS
ABRA Province CONCRETING AND IMPROVEMENT OF ACCESS ROAD OF BARANGAY DALIMAG CABAYUGAN-OLO TO LAPTING, ILOCOS SUR
P 48,000,000.00 On-going
APAYAO Province CONCRETING AND IMPROVEMENT OF MARAG-CALAYUCAY ROAD
P 20,000,000.00 Completed
APAYAO Province IMPROVEMENT OF GUINAMGAMAN ILI LOCAL ACCESS ROAD
P 20,000,000.00 Completed
BENGUET Province IMPROVEMENT OF TALABING-TINOC (KABAYAN) P 12,000,000.00 On-going
BENGUET Province ROAD OPENING FROM BOKES SADDLE TO LASILAS, TAWANG TOWARDS BADEO (KIBUNGAN)
P 10,000,000.00 On-going
BENGUET Province CONCRETING OF CABITEN-KAMTAKKI ROAD (MANKAYAN)
P 20,000,000.00 On-going
BENGUET Province CONSTRUCTION OF MANPEY-AS CONCRETE CANAL AND FLOOD CONTROL (MANKAYAN)
P 3,000,000.00 Completed
IFUGAO Asipulo OPENING AND IMPROVEMENT OF LIWON AMDUNTONG ASIPULO-INDALMOGAN KIANGAN ACCESS
P 24,000,000.00 Completed
IFUGAO Tinoc IMPROVEMENT OF DANGGO ROAD P 24,000,000.00 On-going
IFUGAO Alfonso Lista IMPROVEMENT OF POTABLE WATER SYSTEM/CONSTRUCTION OF DEEPWELL AND RESERVOIR
P 4,000,000.00 On-going
IFUGAO Alfonso Lista CONCRETING OF JUNCTION TO CARAGASAN ACCESS ROAD
P 20,000,000.00 On-going
KALINGA Province CONCRETING AND IMPROVEMENT OF ALLAGUIA-ASIBANGLAN ROAD (PINUKPUK)
P 32,000,000.00 On-going
KALINGA Province WAREHOUSE AND MULTI-PURPOSE PAVEMENT (GIMMA, TANUDAN)
P 600,000.00 Completed
KALINGA Province WAREHOUSE AND MULTI-PURPOSE PAVEMENT (PORAY, TANUDAN)
P 600,000.00 Completed
KALINGA Province CONSTRUCTION OF 60 LM WAGUD BUAYA BRIDGE (BALBALAN)
P 40,000,000.00 On-going
KALINGA Pasil LANAS CEMENTED PATHWAY P 600,000.00 Completed
KALINGA Pasil LEVEL II WATERWORKS SYSTEM P 1,600,000.00 On-going
MT. PROVINCE
Province IMPROVEMENT OF BETWAGAN ACCESS ROAD P 20,000,000.00 On-going
MT. PROVINCE
Province COMPLETION OF CONSTRUCTION OF EVACUATION CENTER IN BARANGAY AMBAGIW
P 1,500,000.00 Completed
MT. PROVINCE
Tadian IMPROVEMENT OF WATERWORKS IN KAYAN WEST AND LUBON
P 6,000,000.00 On-going
PHOTO DOCUMENTATION of PAMANA 2016 project entitled: Concreting of Junction to
Caragasan Access Road in Alfonso Lista, Ifugao
Start of the Road project Materials used for the construction of slope protection
4:
c. Payapa at Masaganang Pamayanan (PAMANA-DILG Fund) Pillar 1
Continuing
All 15 PAMANA LGUs in this region successfully drafted their POPS plan.
d. Provision of Secretariat Services to the Peace and Order Council
All 65 NON PAMANA LGUs in this region successfully drafted their POPS plan
while Abra municipalities of Bucay and Penarrubia have approved POPs plan. As of 2nd semester, additional 10 LGUs have approved POPs plan. LGUs were
Kalinga Province, Tanudan, Rizal, Balbalan, Tinglayan, Apayao Province,
Calanasan, Pudtol, Conner, and Luna.
e. Comprehensive Local Integration Program (CLIP) – Continuing
For 1st Qtr, 100% or 10 surfacing former rebels from Boliney, Bucay, Lacub, Licuan-Baay, Malibcong and Sallapadan, Abra were provided with financial
assistance. Six FRs surfaced in Abra, Kalinga and Mt. Province for the 2nd Qtr
were provided with financial assistance.
B. SOCIALLY PROTECTIVE LGUs
a. BUB Other Infra FY 2015
One (1) remaining project for this program, which is the Purchase of Rescue Equipment for Baguio City, targeted to be completed for the 4th quarter this
year was successfully completed 1st quarter. 100% of projects for this
program was already complete.
b. BUB Others FY 2016
Construction of slope protection
Remaining concreting works of the road network (materials for slope protection
works are still stockpiled in the area)
End of the Road network
5:
A total of 5 projects were under this program, however one project was
completed in 2016. The status of implementation of the four remaining project this year are as follows:
Province Municipality PROJECT_TITLE AMOUNT STATUS
IFUGAO Hingyon EVACUATION FACILITY (CABABUYAN SOUTH) P 1,500,000.00 On-going
IFUGAO Hingyon EVACUATION FACILITY (NORTH CABABUYAN) P 500,000.00 Procurement
KALINGA Rizal EVACUATION FACILITY P 5,000,000.00 Completed
MT. PROVINCE
Sadanga EVACUATION FACILITY P 5,000,000.00 On-going
c. BUB-Provision of Potable Water Supply (PWS) FY 2014
Out of the total 118 projects under this PWS 2014, only five projects are left for completion this year. Status as of EO 2nd semester are as follows:
Province Municipality PROJECT_TITLE AMOUNT STATUS
ABRA Bangued PROPOSED LEVEL I WATER SYSTEM - BAÑACAO P 1,471,000.00 Completed
ABRA La Paz PROVISION OF WATER SUPPLY P 4,560,000.00 On-going
ABRA Licuan-Baay REHABILITATION OF CAGUYEN WATER SYSTEM P 300,000.00 Completed
ABRA Licuan-Baay REHABILITATION OF BAQUERO WATER SYSTEM P 1,000,000.00 Completed
IFUGAO Aguinaldo PROVISION OF WATER SYSTEM FOR MALELEMPFOB-POBLACION
P 4,000,000.00 On-going
d. BUB-Provision of Potable Water Supply (PWS) FY 2015
Under this program, 91 sub-projects were spread over 38 LGUs. There are
16 remaining project for completion this year while one project was
cancelled. The table below reflects the status of implementation as of
reporting date:
Province Municipality PROJECT_TITLE AMOUNT STATUS
ABRA Danglas SALINTUBIG P 12,500,000.00 On-going (68%)
ABRA Lagayan SALINTUBIG (PHASE I) P 11,000,000.00 On-going (70.11%)
ABRA San Quintin SAGANA AT LIGTAS NA TUBIG SA LAHAT( SALINTUBIG)
P 5,000,000.00 Completed
ABRA Lacub TALIPUGO POTABLE WATER SYSTEM P 1,200,000.00 On-going (30%)
ABRA Malibcong CONSTRUCTION OF BAYABAS LEVEL 1 DOMESTIC WATER SYSTEM
P 1,000,000.00 Completed
ABRA Malibcong IMPROVEMENT OF PACGUED DOMESTIC WATER SYSTEM
P 1,000,000.00 On-going (90%)
ABRA Malibcong CONSTRUCTION OF ADUGAO (UMNAP) DOMESTIC WATER SYSTEM
P 1,000,000.00 Completed
ABRA Tubo CONSTRUCTION OF TABACDA WATER SYSTEM P 1,407,640.60 On-going (75.49%)
APAYAO Sta. Marcela EXPANSION AND UPGRADING OF WATER SYSTEM (LEVEL 2 TO LEVEL 3)
P 4,475,000.00 completed
BENGUET Atok CONSTRUCTION OF POTABLE WATER SUPPLY AT SALIDET-SAYET
P 500,000.00 CANCELLED
BENGUET Atok CONSTRUCTION OF POTABLE WATER SUPPLY AT UPPER AND LOWER ENGLANDAD
P 500,000.00 Completed
IFUGAO Kiangan SALINTUBIG FOR KIANGAN URBAN AREA P 5,000,000.00 Completed
IFUGAO Banaue CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM (5 PROJECTS)
P 3,500,000.00 On-going (70%)
IFUGAO Hungduan DAYANDI-TINANGAAN WS P 500,000.00 Completed
KALINGA Tanudan LAY-ASAN WWS P 3,000,000.00 On-going (80.46%)
KALINGA Balbalan REHAB OF MADALAAG-BOTOD WWS P 600,000.00 On-going (51.54%)
6:
MT. PROVINCE
Sadanga COMPLETION OF DEMANG WATER SYSTEM P 2,000,000.00 On-going (20%)
e. SALINTUBIG FY 2013
A total of eight projects were lined-up for this program. However, the one
remaining project which is the CONSTRUCTION OF PANTIKIAN WATER
SYSTEM in Balbalan, Kalinga amounting to P1,696,000.00 was successfully
completed this quarter. All or 100% of the projects were completed.
f. SALINTUBIG FY 2014
There were three remaining on-going projects last FY 2016 for completion
this year. Out of the three projects, two were already completed while one
is still on-going as of 1st quarter.
Province Municipality PROJECT_TITLE AMOUNT STATUS
ABRA Bangued MACARCARMAY SHALLOW WELL PROJECT (2 WELLS)
P 461,538.46 Completed
ABRA Bangued MALITA SHALLOW WELL PROJECT P 230,769.24 Completed
BENGUET Kibungan REHABILITATION OF WATER SYSTEM DERIVED FROM TOPINAO (SAGPAT)
P 1,000,000.00 On-going (48.83%)
Distribution tank at Upper Englandad, Atok, Benguet
Completed 2015 BUB Potable Water Supply Construction at Upper and Lower Englandad, Atok, Benguet Under CY 2015 BUB-GPP. Photos taken during the final joint inspection of the project on March 7, 2017.
7:
g. SALINTUBIG FY 2015
Status of the remaining 25 subprojects under this program is shown below:
Province Municipality PROJECT_TITLE AMOUNT STATUS
ABRA Bangued CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM AT SAPPAAC, MAOAY, SAO-ATAN, PALAO
P 5,000,000.00 On-going (50%)
ABRA La Paz CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM AT BENBEN
P 3,000,000.00 Procurement
ABRA Pidigan CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM (IMMULI)
P 1,000,000.00 Completed
ABRA Pidigan CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM (ARAB)
P 1,000,000.00 On-going (60%)
ABRA Pidigan CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM (SAN DIEGO)
P 1,000,000.00 Completed
ABRA Villaviciosa CONSTRUCTION OF TAMAC LEVEL II WATER SYSTEM
P 2,000,000.00 On-going (53.23%)
ABRA Bucay CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM AT MADALIPAY/LAYUGAN
P 2,000,000.00 Completed
APAYAO Luna WATER DISTRIBUTION SYSTEM (TUROD) P 2,000,000.00 on-going (10%)
APAYAO Luna SPRING DEVELOPMENT AND WATER DISTRIBUTION (CAGANDUNGAN)
P 2,000,000.00 on-going(16%)
APAYAO Luna SPRING DEVELOPMENT AND WATER DISTRIBTION SYSTEM (CALABIGAN)
P 3,000,000.00 on-going(16%)
APAYAO Luna WATER DISTRIBUTION SYSTEM (LUYON) P 1,000,000.00 on-going (10%)
APAYAO Luna WATER DISTRIBUTION SYSTEM (SAN ISIDRO NORTE)
P 1,000,000.00 on-going (10%)
APAYAO Conner IMPROVEMENT AND EXTENSION OF WATER SYSTEM (GUINAMGAMAN)
P 1,000,000.00 On-going(68.42%)
APAYAO Conner IMPROVEMENT OF WATER SYSTEM (DAGA) P 1,000,000.00 on-going(86.34%)
APAYAO Conner CONSTRUCTION OF WATER SYSTEM PHASE II (ALLANGIGAN)
P 1,000,000.00 on-going(56.90%)
APAYAO Conner CONSTRUCTION OF WATER SYSTEM (RIPANG) P 1,000,000.00 On-going(75.36%)
APAYAO Conner IMPROVEMENT OF WATER SYSTEM (CALAFUG) P 1,000,000.00 on-going(53.07%)
APAYAO Conner CONSTRUCTION OF KARIKITAN WATER SYSTEM P 1,000,000.00 Completed
APAYAO Conner CONSTRUCTION OF CAGLAYAN WATER SYSTEM P 3,000,000.00 on-going(70.29%)
APAYAO Flora CONSTRUCTION OF WATER SUPPLY SYSTEM LEVEL 2 (MALAYUGAN, BALLUYAN)
P 12,000,000.00 On-going (58%)
APAYAO Kabugao REHABILITATION AND UPGRADING OF LEVEL 2 WATER SYSTEM
P 12,000,000.00 On-going(70%)
BENGUET Kibungan REHABILITATION OF NAPSONG WATER SYSTEM (MADAYMEN)
P 1,000,000.00 Completed
IFUGAO Banaue BANAO WATER SYSTEM P 2,000,000.00 On-going (15%)
KALINGA Pinukpuk CONSTRUCTION OF PAKAWIT WATERWORKS SYSTEM
P 2,000,000.00 Procurement
KALINGA Lubuagan CONSTRUCTION OF ANTONIO CANAO WATERWORKS SYSTEM
P 1,000,000.00 Procurement
h. SALINTUBIG FY 2016
Project identification is still on-going under this program.
C. Accountable, Transparent, Participative and Effective Local Governance
a. Transition Towards Federalism
The DILG CAR is constantly pushing our LGU functionaries to be more active
in the drive towards Federalism. The IEC on federalism was a ride-on activity
during the conduct of barangay assemblies of 570 barangays of this region. Also, Federalism which was presented by ARD Jonathan Paul M. Leusen, Jr.,
was also included as one of the topics in the following activities:
i. MASA MASID orientation in the provinces of Abra and Kalinga
8:
ii. Radio guesting in Radyo Natin, Abra
iii. Turn-over of DILG completed projects in Tubo, Abra attended by
five barangay captains and their kagawads.
iv. BUB stakeholders’ forum in Bontoc, Mt. Province and for the
province of Benguet
v. Autonomy and Federalism conducted by NEDA CAR (together with
Atty. Tomas Kiwang, Jr.) in Paracelis, Mt. Province attended by
municipal officials and functionaries, teachers, policemen, barangay
officials and CSOs
b. Full Disclosure Policy
The Full Disclosure Policy (FDP) has been seriously observed by all levels of
local governments in the Cordillera. 74 out of 75 municipalities or 98.67% were
FDP compliant as of 1st quarter while 86.75% of provinces, cities and municipalities
combined are FULLY complying.
c. Performance Challenge Fund
2015 – 4 projects were continuing for this year. Hereunder table depicts
the details:
Province Municipality PROJECT_TITLE AMOUNT STATUS
ABRA San Juan CONSTRUCTION AND REPAIR OF MULTI-PURPOSE AND TOURISM FACILITY
P 3,000,000.00 Completed
APAYAO Calanasan CONSTRUCTION OF YMANDAYA ISNAG VILLAGE REPLICA
P 3,500,000.00 on-going(25.56%)
BENGUET Province IMPROVEMENT ALONG PICO-STOCKFARM PROVINCIAL ROAD
P 7,000,000.00 Completed (Awaiting PCR)
MLGOO Julie Malig discusses Federalism during the Barangay Assembly Day at Bagong, Sablan last March 25, 2017
(From Left to Right)
MLGOO Soledad M. Bersamin, CCAGG Joel
Barbadillo (CSO),
Mayor Meynardo M.
Bautista Jr., Municipal Staff Twinkle Jane
Bueno, FDP Focal
Person JR A. Tenebro
and Municipal Treasurer Marieta
Rivada during the FDP
monitoring at San
Juan, Municipal Hall on February 17, 2017.
9:
BAGUIO CITY
CONSTRUCTION OF TRANSPORT TERMINAL AT CITY CAMP PROPER
P 5,000,000.00 Procurement
2016 – Status of implementation of 22 LGUs provided with PCF 2016 funds were as follows:
Province Municipality PROJECT_TITLE AMOUNT PRESENT
ABRA La Paz Construction of Pasalubong Center at Bulbulala P 3,000,000.00 Document Preparation
ABRA Dolores Construction of Drainage Canals at Poblacion P 3,000,000.00 On-going
ABRA San Juan Construction of Access Road at Baug P 3,000,000.00 On-going (65%)
ABRA Tayum Construction of Stone Masonry at Basbasa P 3,000,000.00 On-going (85%)
ABRA Bucay Construction of Multi-Purpose Hall at South Poblacion
P 3,000,000.00 On-going
ABRA Peñarrubia Construction of Access Roads P 3,000,000.00 On-going (3.32%)
APAYAO Luna IMPROVEMENT OF BUYAGAO ROAD P 3,000,000.00 On-going(20%)
APAYAO Pudtol CONSTRUCTION/REHABILITATION OF DRAINAGE CANAL LINING
P 3,000,000.00 on-going(0%)
APAYAO Sta. Marcela IMPROVEMENT AND CONCRETING OF PUBLIC MARKET PERIMETER
P 3,000,000.00 on-going(86%)
BAGUIO CITY
P 3,400,000.00
Authority of LCE to enter into a MOA is under review by with the SP
BENGUET Province Construction of PDRRM Office P 4,000,000.00 Procurement
BENGUET Itogon Improvement of Antamok-Loacan Brgy. Road P 3,000,000.00 Procurement
BENGUET Kapangan Improvement of Municipal Eco-Tourism Park P 3,000,000.00 Procurement
BENGUET La Trinidad Expansion of Cell 3 Engineered Sanitary Landfill (Phase 2)
P 3,000,000.00 Procurement
BENGUET Tublay Construction of Multipurpose Building at the Municipal Grounds cum Evacuation Center, Caponga
P 3,000,000.00 Procurement
IFUGAO Lamut CONSTRUCTION OF PUBLIC MARKET BUILDING 4 (2nd Floor Vegetable Section)
P 3,000,000.00 Procurement
IFUGAO Banaue CONSTRUCTION OF MULTIPURPOSE PAVEMENT P 3,000,000.00 Procurement
KALINGA Province BULANAO-MARKET PROVINCIAL ROAD P 4,000,000.00 Document Preparation
KALINGA City of Tabuk IMPROVEMENT OF ROAD (AGBANNAWAG AND GOBGOB)
P 3,400,000.00 Document Preparation
KALINGA Balbalan POBLACION WATERWORKS SYSTEM P 3,000,000.00 Document Preparation
MT. PROVINCE
Province SADSADAN-BALICANAO-SALIN ROAD P 4,000,000.00 Procurement
MT. PROVINCE
Paracelis PARACELIS WATER SYSTEM PHASE III P 3,000,000.00 Document Preparation
d. Lupong Tagapamayapa Incentives and Awards (LTIA)
There were a total of nine nominees for all categories assessed on March
23-24, 2017 as follows:
HUC Category – Imelda, Village, Baguio City
CC Category – Dagupan Centro, Tabuk City
1st to 3rd Class Category - Alno, La Trinidad, Benguet
- Poblacion, Bontoc, Mt. Province
- Dagupan, Luna, Apayao
4th to 6th Class Category - Payawan, Lamut, Ifugao
10:
- Poblacion, Sablan, Benguet
- Poblacion, Luba, Abra
- Nueva, Santa Marcela, Apayao
Regional winners and forwarded as regional nominees to the national
awards were:
HUC Category – Imelda, Village, Baguio City
CC Category – Dagupan Centro, Tabuk City
1st to 3rd Class Category - Alno, La Trinidad, Benguet
4th to 6th Class Category - Payawan, Lamut, Ifugao
D. BUSINESS-FRIENDLY AND COMPETITIVE LGUs
a. Regulatory Simplification for Local Governments- ENHANCED BPLS
As of 1st quarter, 88% of CAR LGUs were oriented on JMC- 1-2016 while
29% of LGUs were coached on BPLS standards.
E. Environment-Protective, Climate Change Adaptive and Disaster Resilient LGUs
a. DILG CAR is continuously giving technical assistance and trainings on
mainstreaming CSPP and sectoral concerns in the Comprehensive Development Plan as well as Mainstreaming DRR-CCA in the Local
Development Plan. As of 1st quarter nine municipalities (i.e. Licuan Baay, Abra;
Asipulo, Ifugao; Alfonso Lista, Ifugao; Tinoc, Ifugao; Tanudan and Tinglayan,
Kalinga; Besa, Bontoc and Paracelis, Mt. Province) were provided with TA on CDP formulation.
b. The Regional Planning for Provincial Preparedness Dialogue and Regional
Disaster Preparedness Planning Workshop was conducted last February 1,
2017 at the Nene Pimentel Hall, DILG-CAR, Upper Session Road, Baguio City. All provinces of CAR successfully conducted their Provincial Preparedness &
Listo Partnership Dialogue as well. Schedule of said activity were as follows:
1. Abra February 23, 2017
2. Apayao March 7, 2017
3. Benguet March 9, 2017
4. Ifugao March 7, 2017
5. Kalinga March 14, 2017
6. Mountain Province March 8, 2017
c. The assessment of the nominees for the Gawad Kalasag Award was effectively
conducted on March 2017.
F. Strengthened Internal Organizational Capacity
a.
a. The 1st Regional Management Conference (RMC) was conducted on January
19, 2017. On February 24, a special RMC was conducted as a venue for the
DILG CAR COA Auditors to present their Audit Observation Memo for FY 2016
Participants from DILG Benguet, PRO-Cor, BJMP Benguet, Municipal Mayors and MDRRMOs from 13 municipalities of Benguet and PDRRMO from Benguet Province during the Operation Listo Partnership Dialogue at the Jewel Igorot Building last March 9, 2017.
11:
as well as to update management on the accomplishments of this year’s PPAs.
In addition, the regional management welcomed SILG Ismael Sueno on February 25. The SILG interfacing activity with DILG CAR family and the PRO-
Cor Regional Director was conducted on the same date.
b. The 13 DILG CAR 50th Batch LGOO II trainees presented their outputs during
the Component 2- Phase II- Field Immersion. Trainees also attended the
Component 3- Part I: Paper and Pen Examination and Part 2: Simulated
Exercise and Interview of the said training.
c. The January-February 2017 issue of the Gongs and Drums, which is the official
publication of the DILG CAR, was published as of 1st quarter.
d. To continuously learn and be capacitated employees attended various
technical trainings called for by Central Office bureaus and other agencies as
well as seminar/workshops relating to stress management.
Prepared by:
Fe S. Binay-an
PLO III
Approved by:
Rene V. Valera Daisy A. Payang Shirley Evangeline V. Mon DC, LGCDD DC, LGMED DC, FAD
Noted by:
Jonathan Paul M. Leusen, Jr. Assistant Regional Director
Approved by:
Engr. Marlo L. Iringan
Regional Director
Engr. Marlo L. Iringan
Regional Director