1Page
TÜV SÜD AG
ARIPPA Technical Symposium
Block Grid Nozzle ModificationBy
TÜV SÜD Industry Service, Inc.August 2009
TÜV SÜD Industry Service, Inc.
ARIPPA Technical SymposiumAugust, 2009
2Page
TÜV SÜD AG
• TÜV SÜD Industry Service, Inc. is a subsidiary of TÜV SÜD America, Inc.
Parent Company Background
• TÜV SÜD America, Inc. is a subsidiary of TÜV SÜD AG.
• TÜV SÜD was established over 140 years ago as a steam boiler inspection association in Germany.
• Worldwide business approximately $1.4 Billion with over 10,000 employees.
• Operating in more than 30 countries worldwide
• TÜV participates in the Steam Boiler, Health Service, Medical, Automotive, Electromechanical, and Product Certification markets.
3Page
TÜV SÜD AG
Translation of TÜV SÜD
TÜV (Technischer Überwachungsverein)
English translation: Technical Inspection Association
SÜD
English translation: South
4Page
TÜV SÜD AG
• Established July 7, 2005 as wholly owned subsidiary of TÜV SÜD America Inc.
• Established as the steam generation equipment engineering and service subsidiary.
• Holders of ASME “S”, “U” ,“PP” and National Board “R” stamps.
• Key Management and Operation personnel with extensive service and management experience with all major Boiler OEM’s.
TÜV SÜD Industry Service, Inc. Background
5Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc. Contact Information
Operations OfficeTÜV SÜD Industry Service, Inc.5910 Pacific Center Blvd., Suite 310San Diego, CA 92121(858) 550-4780 Fax (858) 638-723624 Hr. Emergency Service 1-800-873-9725www.tuvindustryservice.com
Corporate OfficeTÜV SÜD America, Inc.10 Centennial Drive Peabody, MA 01960 (978) 573-2500 Fax: (978) 762-7637
Regional Service Center - JesupTÜV SÜD Industry Service, Inc.810 E. Pine St.Jesup, GA 31546(912) 530-7195 Fax (912) 530-7133
Regional Service Center - FresnoTÜV SÜD Industry Service, Inc.3065 N. Sunnyside, Suite 101Fresno, CA 93727(559) 348-1500Fax (559) 348-1525
Regional Service Center - RidgecrestTÜV SÜD Industry Service, Inc.1126 B West Ward Ave.Ridgecrest, CA 93555(760) 446-7930 Fax (760) 446-7960
6Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc.
Arrowhead Nozzles
7Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc.
Bubble Cap Nozzles
8Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc. Pigtail Nozzles
9Page
TÜV SÜD AG
Block Nozzles
TÜV SÜD Industry Service, Inc.
10Page
TÜV SÜD AG
Block Grid Nozzles
• Design Advantages Include:
•Minimal Backsifting
•Pluggage Resistant
•Fuel Flexibility
•Eliminates the Riser Pipe
•Increased Wear Resistance
• Longer Life
• Alloy Selection for Problematic Fuels
• Ease of Replacement
• Improved Spacing on Grid for Maintenance
and Access
11Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc.
Benefits of Block Nozzles
Over Pigtail Over Bubble Cap Over Arrowhead Nozzles Nozzles Nozzles
Reduced Backsifting X
Reduced Plugging X XIncreased Wear Resistance of Nozzles
X X X
Fuel Flexibility X
Eliminates Riser Pipe X X XAlloy Selection for Problematic Fuels
X X
Ease of Replacement/Reduced Repair Duration
X X X
Improved Spacing on Grid for Maintenance and Access
X X
Reduction in Erosion of Refractory X
12Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc.
Dominion Energy North Branch
• Block Nozzle Conversion made in Fall, 2008
• Conversion of Pigtail Nozzles to Block nozzles
• Performance Significantly Improved
13Page
TÜV SÜD AG
TÜVTÜV SÜD Industry Service, Inc.
Air Flow Reduced to 230,000 lb/hr (at 400° ̊F) 280,000 + lbs/hr (at 400° F)
Grid delta P 35" H20 @ 230,000 lb/hr 18" H20 @ 280,000 lb/hr
Steam Flow 350,000 lbs/hr 395,000 lbs/hr (*Increase of 10%)
Average Bed Temperature >1770° F 1680° F
Limestone Consumption
_ * Reduced by ~10% (no accurate measurement)
Before Conversion After Conversion
* Pre conversion load limited by NOx and High Bed Temperature.
Other: Greater flexibility to balance air distribution in the combustor due to increased grid air flow & reduced secondary air needs.
Dominion North BranchBefore / After Performance
14Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc.
Block Nozzle Details
15Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc.
Block Nozzle Arrangement
16Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc.
Block Nozzle Installation
17Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc.
Installation Tasks• Remove all existing grid refractory
• Remove membrane between the grid tubes where the block nozzles will be located.
• Remove or cut off remaining nozzle stubs. The cut off point for the stubs will be well below the surface of the replacement refractory.
• Plug tubes of cut off nozzle stubs, by installing plugs or bolts in tubes and welding, alternatively a plate can be welded to the cut nozzles.
• Apply sealing refractory to the base of the block nozzle. Note groves on the block for this.
• Set block nozzle in position on tray plenum, inserting the fixing rod down through the hole in tray plenum base. A locating bar is positioned on the tray as an assembly guide. Set the nozzle against the bar, and install the fixing washer against the spacer tube. Tack weld is required on the fixing washer to rod.
• Trays and nozzles can be assembled outside of the unit, in parallel with the removal of the existing refractory, thus reducing the installation schedule.
• Weld new tray/nozzle assemblies to the crown of the grid tubes with a full seal weld.
• Apply ceramic fiber paper or grease around the sides of the nozzle that are in contact with the replacement refractory to facilitate easy removal at a later date, if required.
• Pour refractory to the height indicated by the specific design drawings.
18Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc. Installation Process
19Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc. Installation Process
20Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc. Installation Process
21Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc. Installation Process
22Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc. Installation Process
23Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc. Installation Process
24Page
TÜV SÜD AG
Installation Process
TÜV SÜD Industry Service, Inc.
25Page
TÜV SÜD AG
Installation Process
TÜV SÜD Industry Service, Inc.
26Page
TÜV SÜD AG
Installation Process
TÜV SÜD Industry Service, Inc.
27Page
TÜV SÜD AG
TÜV SÜD Industry Service, Inc.
Installation Complete