Interior Fit Outs & Turn Key Solutions
AIRPORTS OFFICES HOMES HOTELS RESORTS CLUBS RESTAURANTS HOSPITALS MALLS SHOWROOMS BOUTIQUES SCHOOLS
Gurgaon - Delhi / NCR – Jaipur – Ahmedabad – Hyderabad – Vizag – Bengaluru – Chennai – Coimbatore - Trivandrum.
About Us.
Our Founder
Started in year 1992 by our Founder Shri. Padam Kularia, who believed that each project is as unique as each client. Interior decoration, design
and its implementation along with architecture is a collaborative process. He transformed virtual execution / designs into concrete spaces and
dreams into reality. He is a story of struggle, anxiety, adventure and achievement. He provided his sons the ethics, moral values, hands-on-
training and guidance in this field. He had a vision for the future and his vision now lives in the form of his sons, the present promoters of the
company and its guiding force.
Promoters
Kanaram Kularia, Shankar Kularia and Dharam Kularia. The current promoters have not only consolidated the business but have also
propelled it into the big league. The company has now become a major player in the field of interior construction. An elite clientele base, a
turnover in hundreds of crores, major fit out and turnkey projects spread all over India with future plans to expand internationally.
Our Mission
Our mission is to fulfil each client’s requirements on every project and to ensure their complete satisfaction by going that extra mile using our
superior craftsmanship. We strive to provide comprehensive and personalised interior fit-out solutions—enhancing both ambiance and quality
whilst minimizing cost and maintenance. To deliver high quality, designs and commercially viable schemes that exceed our client expectations.
We are committed to creating buildings interiors that enhance local environments by being truly sustainable and commercially successful.
Core Business Strengths:
One of the largest leading Turnkey Interior Fit-out companies in India.
Vast experience of more than 23 years in this field.
Extensive experience in successfully executing Corporate Interior fit-outs, base build fit-outs
Based in Mumbai, with branches and operations spread out in Pune, Gurgaon, Delhi / NCR, Jaipur,
Ahmedabad, Hyderabad, Vizag, Bangalore, Chennai, Coimbatore and Trivandrum.
A strong dedicated team & skilled work force to execute single project of more than I Million Sq. foot.
in a single phase.
Executed over 50 projects of over 2,00,000 square foot in the past 5 years.
Currently have over 2.50 million square feet of civil and interior fit-outs in progress pan-India.
Large state of art infrastructure - in house manufacturing facility of 1.27 lakh square feet.
An ISO 9001-2008 certified company.
A large full time salaried work force of 2100 workers.
On Time deliveries, Competitive Pricing & Value Engineering to help client in meeting budgetary
targets.
Financially sound to undertake and execute large scale projects.
Financial Solvency certified by our bankers for Rs. 150 Crores.
STRONG INFRASTRUCTURE
In house manufacturing facility is located at TTC Industrial Area, Turbhe, Navi Mumbai.
State of art infrastructure.
Area of more than 1.27 lakh sq. ft.
Equipped with latest CNC technology with fully and semi automatic machines to manufacture huge volumes of modular and solid woodfurniture of any kind.
The CNC machinery installed at our plant is from Europe, this helps us to maintain the highest quality standards at consistent level for eachbatch and huge volumes production.
The plant is also facilitated with paint booths to finish the furniture in different wood finishes as per the client requirement.
Professionally managed material procurement, HR, production planning and
control, machining, assembly, quality control, finishing, packaging and
logistics.
A highly skilled workforce of more than 200 carpenters are managed,
fulltime by one of the promoters Mr. Kanaram Kularia. He is assisted
by an experienced and able production team at every stage of production.
Products that are manufactured at our plant:
Demountable partitions in modular form in different finishes
Demountable built in joinery paneling in various finishes
Flush Doors and Door Frames
Conference Room, Meeting Room Tables, Reception
Tables and other desks.
All kind of modular storages, cabinets
Laser Cut Panels, Divider Screen, Ceiling Panels
Veneer, Laminate and solid wood ceilings
Wooden Flooring
All Kind of pantry and kitchen, wash room counters
Seating Chairs and Sofas
List of machinery CNC Router
Beam Saw
Edge Binders
Wide Belt Sanders
Panel Saws
Hot & Cold Press
Post Forming
Spindle Moulder
Multi Boring
Air Compressors
Dust Collector
Spray Guns
CNC Router from HomagLaser Cut Paneling Production on CNC Router
Beam Saw from Homag (Compatible with Cad drawings) for accuracy and faster production
A journey of 23 years have us at a well expe
undertake the large volume projects. T
Interiors is recognized as a quality brand
market to deliver the projects with the highest
the quality that a client expects in a fit out p
our market segment covers the major corpor
IT Parks, airports, hospitals and luxury hotels.
rtise level to
oday Padam
in domestic
standards of
roject. Today
ates, MNC’s,
Financial Soundness
• Financially sound as per the past and
current rating given by our banker.
• Solvency Certified by banker for Rs 150 Cr.
• Annual Turn Over:
FY 2015 – 2016: Rs 236 Cr.
FY 2014 – 2015: Rs 224 Cr.
FY 2013 – 2014: Rs 180 Cr.
FY 2012 – 2013: Rs 160 Cr.
Quality Policy
As a ISO certified organization we follow a strict quality control on our projects to deliver the highest standards of the quality project to our clients as per the expectations.
The Quality Assurance process starts from the initial stage of selection of material up to the final finishing and handing over of the project.
Our performance can be recognized from the repeat orders from the clients giving them a confidence to deliver our potential by best performance as per the requirements in terms of
time lines and quality work.
Implementation of best practices and work methods helps us to perform and deliver the superior quality of works.
The Padam Group is committed to consistently meeting customer’s expectations in service, delivery and product satisfaction. Padam promotes continuous improvement of customer’s
satisfaction by maintaining and continually reviewing a compliant Quality Management System.
To this end, each and every Project is required to:
Maintain staff whom are able to interpret, clarify and conform to the clients requirements.
Ensure, by proper selection and examination that goods supplied and/or incorporated are suitable, fit for purpose and safe.
Ensure that goods and systems are installed in a satisfactory manner.
Ensure completed installations are properly operational and maintenance free wherever possible.
To observe the company Quality Assurance Manual and Procedures (and/or any and all project specific Quality Plans)
Properly plan, control and document, in a systematic manner, those procedures necessary to provide the specified level of Quality Assurance.
Maintain such records as will substantiate the Quality Assurance applied throughout each project undertaken.
Provide evidence of quality by demonstration where required.
Determine and define the design intent and performance standard.
Convey appropriate design parameters to those responsible for purchasing, installing, erecting or maintaining the product.
In endorsement of the above, the Quality Assurance Manager has been given the authority to promote and support the QA function at all levels within the organization.
Accreditations: ISO Certification 9001:2008
Quality Management Systems
Compliances
COMPLY WITH APPLICABLE ENVIRONMENTAL, HEALTH AND
SAFETY (EHS) LEGISLATION AND STATUTORY, REGULATORY
AND OTHER REQUIREMENTS.
OUR COMMITMENT TO HEALTH & SAFETY IS NOT JUSTAWRITTEN POLICY, IT IS INGRAINED IN OUR CORE BELIEFS
GREEN BUILDING & LEED COMPLIANCE
Some Current Projects on Hand.
Siemens@ Panchsil Business Park, PuneTotal Area: Approx 1,72,000 Sq. FtCompletion: July 2016Scope: GC- Interior Turnkey Fit Out
Arcesium Phase -2 12th & Terrace floor.@ Mindspace, HyderabadTotal Area: Approx 60,000 Sq. FtCompletion: July 2016Scope: Interior Fit Out Works
Four Seasons Hotel - Embassy One @Bellary Road, BangaloreTotal Area: Approx 3,75,000 Sq. FtCompletion: March 2017Scope: Civil & Interior Fit Out Works
Citicorp Services India Ltd@ Ramanujan IT City, ChennaiTotal Area: Approx 90,000 Sq. FtCompletion: August 2016Scope: Interior Fit Out Works
HCL Technologies Ltd@ Sector 126, Noida.Total Area: Approx 1,50,000 Sq. FtCompletion: June 2016Scope: Interior Fit Out Works
HCL State Street Services@ Tidel Park, CoimbatoreTotal Area: Approx 27,000 Sq. FtCompletion: June 2016Scope: GC- Interior Turnkey Fit Out
HCL Technologies LtdCorp. Floor & Café Ph 3 @ Sec-125, Noida.Total Area: Approx 2,27,000 Sq. FtCompletion : July 2016Scope: Interior Fit Out Works
Wave rock Phase-2.2 & 2.3@ Financial District, HyderabadTotal Area: Approx 2,25,000 Sq. FtCompletion: September 2016Scope: Common Area Finishes
Abbott India @ Godrej BKC, MumbaiTotal Area: Approx 4,80,000 Sq. FtCompletion Time March 2017Scope: Civil Interior & MEP Works
Amdocs@ Magarpatta SEZ, PuneTotal Area: Approx 1,00,000 Sq. FtCompletion: August 2016Scope: Interior Fit Out Works
Some Current Projects on Hand.
Bitwise Terra Tower @ Baner, PuneTotal Area: Approx 1,80,000 Sq. FtCompletion Time Sep 2016Scope: Civil and Interior Works
Wipro Digipod@ Electronics City, BangaloreTotal Area: Approx 18,000 Sq. FtCompletion Time June 2016Scope: Civil Interior & MEP Works
XilinxDivyasree NSL, Orion, HyderabadTotal Area: Approx 50,000 Sq. FtCompletion: Sept. 2016Scope: Interior Fit Out Works
Kalyani DevelopersCorporate Office - BangaloreTotal Area: Approx 35,000 Sq. FtCompletion: Sept 2016Scope: Interior Fit Out Works
Some Recent Major Projects
Reliance InfrastructureGlobal Head Quarters @
Santacruz –Mumbai
Total Area: 2,60,000 Sq. Ft.Completion: 2016Duration: 6 MonthsScope: Interior Fit Out Works
Four Seasons Hotel –Embassy One@ Bellary Road, BangaloreTotal Area: 3,75,000 Sq. Ft Completion – June 2016Duration: 8 MonthsScope: Interior Fit Out Works
Citi Corp@ Ramanujan IT City – Chennai Total Area: 1,30,000 Sq. Ft Completion Year: 2015Duration: 8 MonthsScope: Interior Fit Out Works
Arcesium – Phase 1 @ Mindspace, HyderabadTotal Area: Approx 60,000 Sq.FtCompletion: March 2016
Scope: Interior Fit Out Works
Some Recent Major Projects
Barclays Technology Centre@ EON IT Park, Kharadi –
Pune (SEZ) – Ph1 – Ph3Total Area: 3,75,000 Sq. FtCompletion Year: 2015Duration: 8 MonthsScope: Interior Fit Out Works
HCL Technologies Ltd@ Elcot SEZ – ChennaiTotal Area: 8,75,000 Sq. FtCompletion Year: 2015Duration: 18 MonthsScope: Interior Fit Out Works
HCL Technologies Ltd@ Jigani Industrial Area,Bangalore - SDB2 & SDB4 TowerTotal Area: Approx 14,10,000 Sq Ft.Completion Year: 2015Duration: 18 MonthsScope: Interior Fit Out Works
Citi Corp@ Nirlon Knowledge Park - Mumbai Total Area: 1,52,000 Sq. Ft Completion Year: 2014Duration: 4 MonthsScope: Interior Fit Out Works
Some Recent Major Projects
Schlumberger@ Commerzone, Kharadi – Pune Total Area: 89,000 Sq. Ft Completion Year: 2015Duration: 03 MonthsScope: Interior Fit Out Works
MasterCard@ Business Bay Park – Pune Total Area: 48,000 Sq. Ft Completion Year: 2015Duration: 3 MonthsScope: Interior Fit Out Works
De Shaw Software India @ Jubilee Hills – Hyderabad
Total Area: 1,80,000 Sq. Ft
Completion Year: 2015
Duration: 08 MonthsScope: Interior Fit Out Works
VMware Software India@ Kalyani Vista – Bangalore
Total Area: 2,50,000 Sq. FtCompletion Year: 2015Duration: 15 MonthsScope: Interior Fit Out Works
Some Recent Major Projects
Altisource Business Solutions@ Priteck Park – Bangalore Total Area: 2,11,000 Sq. Ft Completion Year: 2015Duration: 15 MonthsScope: Interior Fit Out Works
Cisco Systems India Pvt Ltd@ Bld 18 Cessna Business Park – BangaloreTotal Area: 2,64,000 Sq. FtCompletion Year: 2015Duration: 15 MonthsScope: Interior Fit Out Works
HCL State Street Services@ Tidel Park – CoimbatoreTotal Area: 1,73,000 Sq. FtCompletion Year: 2015
Duration: 5 MonthsScope: GC-Interior Turnkey Fit Out
Embassy Tech ZoneFood Court - PuneTotal Area: 2,10,000 Sq. FtCompletion Year: 2010Duration: 5 MonthsScope: Interior Fit Out Works
Some Recent Major Projects
Kohinoor HospitalMumbaiTotal Area: 2,00,000 Sq. Ft
Completion Year: 2010Duration:
Scope: Civil and Interior Fit Out
Robert Bosch Engineering@ CHIL – CoimbatoreTotal Area: 2,80,000 Sq. FtCompletion Year: 2015Duration: 4 MonthsScope: Interior Fit Out Works
JSWKalina, MumbaiTotal Area: Sq. Ft Completion Year: 2015Duration: MonthsScope: Interior Turnkey Fit Out
Hilton Residency@ Embassy Golf Link Park – Bangalore Total Area: 3,15,000 Sq. Ft Completion Year: 2014Duration: 8 MonthsScope: Interior Fit Out Works including 120 rooms
Some Recent Major Projects
Ruby Hall Clinic@ Wanworie – PuneTotal Area: 2,10,000 Sq. FtCompletion Year: 2014Duration: 15 MonthsScope: Interior Fit Out Works
Symantec Software India Pvt. Ltd@ EON IT Park, Kharadi – Pune (SEZ) (Ph1-Ph6)Total Area: 6,48,000 Sq. FtCompletion Year: 2014Duration: 15 MonthsScope: Interior Fit Out Works
Divyasree NSL – Orion B6 & B7Raidurgam , HyderabadTotal Area: 5,50,000 Sq. FtCompletion Year: 2014Duration: 18 MonthsScope: Common Area Finishes
Wave rock Phase-2.1Tishman Speyer Business Parks Financial District , Hyderabad Total Area: 3,50,000 Sq. FtCompletion Year: 2014Duration: 8 MonthsScope: Common Area Finishes
Some Recent Major Projects
Ascend International SchoolBKC, MumbaiTotal Area: 1,60,000 Sq. Ft.Completion Year: 2012
Duration: 7 MonthsScope: Interior Fit Out Works
Kohinoor CityAndheri, MumbaiTotal Area: 4,00,000 Sq. FtCompletion Year: 2013Duration: 7 MonthsScope: Interior Fit Out Works
Volkswagen India Pvt LtdSilver Utopia Park Kalina, MumbaiTotal Area: 1,30,000 Sq. Ft.Completion Year: 2013
Duration: 11 MonthsScope: Interior Fit Out Works
Symantec Software India Pvt. Ltdat DLF IT Park , Chennai Total Area: 1,00,000 Sq. Ft Completion Year: 2012Duration: 3 MonthsScope: Interior Fit Out Works
Some Recent Major Projects
IBMManyata Embassy Business ParkEmbassy Golf Link Business Park Bangalore.Total Area: 38,08,000 Sq.Completion Year: 2012
Duration: 39 MonthsScope: Interior Fit Out Works
IBMEmbassy Tech Park, Pune Total Area: 8,82,000 Sq. Ft Completion Year: 2011Duration: 8 MonthsScope: Interior Fit Out Works
IBM
DLF - Chennai
Total Area: 2,24,000 Sq. Ft
Completion Year: 2011
Duration: 4 Months
Scope: Interior Fit Out Works
IBM
Bannergatta Road , Bangalore
Total Area: 2,15,000 Sq. Ft
Completion Year: 2011
Duration: 4 Months
Scope: Interior Fit Out Works
Some Recent Major Projects
Citicorp Services India Ltd@ Ramanujan IT City, Chennai
Total Area: Approx 1,30,000 Sq. FtCompletion Year: 2011Duration: 8 monthsScope: Interior Fit Out Works
Lonza Knowledge CenterTurkapalli , HyderabadTotal Area: 1,00,000 Sq. FtCompletion Year: 2012Duration: 4 MonthsScope: Civil & Interior Fit Out Works
DSMMindspace , Hyderabad Total Area: 30,000 Sq. Ft Completion Year: 2012Duration: 3 MonthsScope: Civil & Interior Fit Out Works
Mysore Malls and Hotels.MysoreTotal Area: 5,00,000 Sq. Ft
Completion Year: 2011Duration: 8 Months
Scope: Civil and Interior Fit Out
Some Recent Major Projects
AtosEmbassy Tech Park, Pune Total Area: 5,50,000 Sq. Ft Completion Year: 2011Duration: 9 MonthsScope: Interior Fit Out Works
Sun TV Corporate Office@ MRC Nagar – Chennai Total Area: 3,50,000 Sq. Ft Completion Year: 2011Duration: 5 MonthsScope: Interior Fit Out Works
Dr. Reddy’sCorporate Office@ Banjara Hills, Hyderabad
Total Area:1,92,000 Sq. Ft
Completion Year: 2011Duration: 4 Months
Scope: Interior Fit Out Works
LeMéridien-Gurgaon,(HOTEL PULLMAN)Total Area: 75,000 Sq. FtCompletion Year: 2011
Duration: 4 Months Scope: Interior Fit Out-Main Lobbies , Business Centre, banquets
Some Recent Major Projects
Sayaji HotelPune
Total Area: 3,00,000 Sq. Ft.Completion Year: 2010Duration: 11 MonthsScope: Interior Fit Out Works
Barbeque Nation Pan IndiaTotal Area: 20 restaurants Completion Year: 2015Duration: 24 MonthsScope: Interior Fit Out Works
Taj Mahal Palace Hotel -MumbaiTotal Area: 2,10,000 Sq. Ft
Completion Year: 2002 and 2010Scope: Executed the Old Taj fit-out & Post Attack repair. Main Lobbies, Wasabi, Golden Dragon, Masala Kraft, Japanese restaurant. All Rooms and Corridors in Ground, 1st,2nd,3rd and 4th floors.
TAJ PRESIDENTMumbaiTotal Area: 2,00,000 Sq. FtCompletion Year: 2010
Duration: 6 MonthsScope: Interior Fit-Out –Rooms, Restaurants and Main Lobby
Some Recent Major Projects
GRAND HYATTMumbaiTotal Area: 2,00,000 Sq. FtCompletion Year: 2010
Duration: 6 Months Scope:Interior Fit Out- Presidential Suites and Main Lobbies, main corridors, banquets
TAJ ResidencyBangaloreTotal Area: Over 1,00,000 Sq. FtCompletion Year: 2010
Duration: MonthsScope: Main Lobbies, 3 floors rooms , bar and banquets
Taj CoromandelChennai.Total Area: Over 1,00,000 Sq. FtCompletion Year: 2011
Duration: Months
Scope: Civil and Interior Fit Out –
Main Lobbies, main corridors,
restaurants
Taj ConnemaraChennai.Total Area: Over 50,000 Sq. FtCompletion Year: 2004
Duration: Months
Scope: Civil and Interior Fit Out –
Main Lobbies, main corridors,
restaurants
Some Recent Major Projects
Kohinoor Elite HotelsMumbaiTotal Area: 1,50,000 Sq. Ft. Completion Year: 2011Duration: 5 MonthsScope: Complete Interior Fit Out including 125 Rooms
Columbia Asia HospitalBangaloreTotal Area: 1,50,000 Sq. Ft
Completion Year: 2008Duration:
Scope: Civil and Interior Fit Out
Kokilaben Dhirubhai Ambani Hospital@ MumbaiTotal Area:15 SuitesCompletion: March 2016Scope: Interior Fit Out Works
Linkedin@ Global Tech Park, BangaloreTotal Area: Approx 2,30,000 Sq. FtCompletion: May 2016Scope: Interior Fit Out Works
Some Recent Major Projects
Maruti Suzuki Flashback Showroom @Jaipur Completion: Jan 2016Total Area: Approx 40,000 Sq. Ft Scope: GC- Interior Fit Out & MEP Works
Vodafone@ PuneTotal Area: Approx 45,000 Sq. FtCompletion: May 2016Scope: Interior Fit Out Works
T2 International Airport @ MumbaiScope of Works: Public Areas & Toilet PackageTotal Area: Approx 6,50,000 Sq. Ft Completion Year: 2014Duration: 30 MonthsScope: Interior Fit Out Works
Terminal 1A Domestic Airport @ MumbaiScope of Works: Public Areas & Toilet PackageTotal Area: Approx 1,75,000 Sq. Ft Completion Year: 2008Duration: 08 MonthsScope: Interior Fit Out Works
Some Recent Major Projects
Reliance Petroleum Head Quarters @ Navi MumbaiScope of Works: Approx 1.5 Lakh Sq. FtCompletion Year: 2002-2003Duration: 07 MonthsScope: Interior Fit Out Works
Cisco Systems India Pvt Ltd@ One Bkc, MumbaiTotal Area: Approx 42,000 Sq. FtCompletion : Mar 2016Scope: Interior Fit Out Works
Bloomberg LP @ One India Bulls, Lower Parel - Mumbai Total Area: Approx 11,000 Sq. Ft Completion: Mar 2016Scope: GC-Interior Turnkey Fit Out
Redhat@ Magarpatta City, PuneTotal Area: Approx 28,000 Sq. FtCompletion: Feb 2016Scope: Interior Fit Out & MEP Works
Some Recent Major Projects
Manyata Promoters@ Manyata Campus- BangaloreTotal Area: Approx 22,000 Sq. FtCompletion: June 2016Scope- Lobby finishes
Embassy Properties @Pebble Beach - EGL – BangaloreTotal Area: Approx 24,000 Sq. FtCompletion: June 2016Scope- Lobby finishes
Cisco Video Technologies@ Pritech Park, BangaloreTotal Area: Approx 21,000 Sq. FtCompletion: April 2016Scope: Interior Fit Out Works
Dimension Data@ One BKC, MumbaiTotal Area: Approx 27,000 Sq. FtCompletion: March 2016Scope: Interior Fit Out Works
Some Recent Major Projects
Philips India Ltd@ Boomerang, MumbaiTotal Area: Approx 19,000 Sq. FtCompletion: June 2016Scope: Interior Fit Out Works
Philips India Ltd@ Embassy Manyata Tec Park, BangaloreTotal Area: Approx 98,000 Sq. FtCompletion: Mar 2012Scope: GC- Interior Fit Out & MEP Works
Qubix Food Court -Blackstone@ Hinjewadi, PuneTotal Area: Approx 40,000 Sq. FtCompletion: April 2016Scope: Interior Fit Out Works
PADAM GROUP MAJOR FITOUT PROJECT LIST
Name of Project Location Scope of WorkArea in
Square Feet.Status Completion year
Major Projects on Hand
1 Abbott India Godrej BKC, Mumbai Civil & Interior Fit Out and MEP Works 4,80,000 In Progress Mar-17
2 Four Seasons Hotel - Embassy One Bellary Road, Bangalore Civil & Interior Fit Out Works 3,75,000 In Progress Mar-17
3 HCL Technologies Ltd Corp floor & Café Ph 3 @ Sec-125, Noida. Civil & Interior Fit Out Works 2,27,000 In Progress Jul-16
4 Embassy Lake Terrace Bangalore Civil & Interior Fit Out Works 2,50,000 In Progress Dec-16
5 Bitwise Terra Tower @ Baner, Pune Civil & Interior Fit Out Works 1,80,000 In Progress Sep-16
6 Siemens Panchsil Business Park, Pune GC-Interior Turnkey Fit Out 1,72,000 In Progress Jul-16
7 HCL Technologies Ltd Sector 126, Noida Civil & Interior Fit Out Works 1,50,000 In Progress Jun-16
8 Arcesium Mindspace, Hyderabad Interior Fit Out Works 1,20,000 In Progress Jul-16
9 Amdocs Magarpatta City, Pune Civil and Interior Works 1,00,000 In Progress Aug-16
10 Citicorp Services India Ltd Ramanujan IT City, Chennai Interior Fit Out Works 90,000 In Progress Aug-16
11 Wave rock Phase-2.2 & 2.3 Financial District , Hyderabad Common Area Finishes 2,25,000 In Progress Sep-16
12 Xilinx Divyasree NSL - Orion - Hyderabad Interior Fit Out Works 50,000 In Progress Sep-16
13 HCL State Street Services Tidel Park, Coimbatore GC-Interior Turnkey Fit Out 27,000 In Progress Jul-16
14 Kalyani Developers Bangalore Interior Fit Out Works 35,000 In Progress Oct-16
15 Wipro Digipod Electronics City, Bangalore GC-Civil Interior & MEP Works 18,000 In Progress Jun-16
Major Recent Projects
1 IBM Manyata & Golf Link Embassy Business Parks Civil & Interior Fit Out Works 38,08,000 39 2009-12
2 HCL Technologies Ltd Jigani Industrial Area, Bangalore (SEZ) Interior Fit Out Works 14,10,000 18 2015
3 HCL Technologies Ltd Elcot SEZ – Chennai Interior Fit Out Works 8,75,000 15 2015
4 IBM Embassy Tech Park, Pune Civil & Interior Fit Out Works 8,82,000 8 2011
5 T2 International Airport Mumbai Public Area and toilet Finishes 6,50,000 2014
6 Symantec Software India Pvt. Ltd EON IT Park, Kharadi – Pune (SEZ) Interior Fit Out Works 6,48,000 15 2014
7 Atos Embassy Tech Park, Pune Interior Fit Out Works 5,50,000 9 2011
8 Divyasree NSL – Orion B6 & B7 Raidurgam , Hyderabad Common Area Finishes 5,50,000 18 2014
9 Mysore Malls and Hotels. Mysore Civil and Interior Fit Out 5,00,000 8 2011
10 Kohinoor City Andheri, Mumbai Civil and Interior Works 4,00,000 7 2013
11 Barclays Technology Center India EON IT Park, Kharadi – Pune (SEZ) Interior Fit Out Works 3,75,000 8 2015
12 Wave rock Phase-2.1 Financial District , Hyderabad Common Area Finishes 3,50,000 8 2014
13 Sun TV Corporate Office MRC Nagar – Chennai Civil and Interior Works 3,50,000 8 2011
14 Hilton Residency Embassy Golf Link Park – Bangalore Interior Fit Out Works 3,15,000 8 2014
15 Sayaji Hotels Ltd Pune Civil and Interior Works 3,00,000 11 2010
16 Robert Bosch Engineering CHIL – Coimbatore Civil and Interior Works 2,80,000 8 2015
17 VMware Software India Pvt Ltd Kalyani Vista – Bangalore Interior Fit Out Works 2,64,000 15 2015
18 Reliance Infrastructure Global Head Quarters, Santacruz, Mumbai Civil and Interior Works 2,60,000 15 2016
19 Cisco Systems India Pvt Ltd Bld 18 Cessna Business Park – Bangalore Interior Fit Out Works 2,64,000 15 2015
20 Linkedin Global Tech Park, Bangalore Interior Fit Out Works 2,30,000 May-16
21 IBM DLF Campus - Chennai Interior Fit Out Works 2,24,000 4 2011
22 IBM Bannergatta Road, Bangalore Interior Fit Out Works 2,15,000 3 2011
23 Altisource Business Solutions Priteck Park – Bangalore Interior Fit Out Works 2,11,000 15 2015
24 Ruby Hall Clinic Wanworie – Pune Civil and Interior Works 2,10,000 15 2014
25 Kohinoor Hospital Mumbai Civil and Interior Works 2,00,000 2010
26 Embassy Tech Zone – Food Court Pune Civil and Interior Works 2,10,000 5 2010
27 Taj Mahal Palace Hotel Mumbai Civil and Interior Works 2,10,000 6 2010
28 Taj President Mumbai Civil and Interior Works 2,00,000 6 2010
29 Grand Hyatt Mumbai Civil and Interior Works 2,00,000 6 2010
30 Dr. Reddy’s Corporate Office Banjara Hills, Hyderabad Interior Fit Out Works 1,92,000 4 2011
31 De Shaw Software India Pvt Ltd Jubilee Hills – Hyderabad Interior Fit Out Works 1,80,000 15 2015
32 Terminal 1A Domestic Airport Mumbai Public Area and toilet Finishes 1,75,000 2008
33 HCL State Street Services Tidel Park – Coimbatore Interior Turnkey Fit Out 1,73,000 5 2015
34 Ascend International School BKC, Mumbai Interior Fit Out Works 1,60,000 7 2012
35 Columbia Asia Hospital Bangalore Civil and Interior Works 1,50,000 2008
36 Citicorp Services India Ltd Nirlon Knowledge Park - Mumbai Interior Fit Out Works 1,52,000 15 2014
37 Reliance Petroleum Head Quarters Navi Mumbai Interior Fit Out Works 1,50,000 2003
38 Citicorp Services India Ltd Ramanujan IT City – Chennai Interior Fit Out Works 1,30,000 8 2015
39 Volkswagen India Pvt Ltd Silver Utopia Park Kalina, Mumbai Interior Fit Out Works 1,30,000 11 2013
40 Symantec Software India Pvt. Ltd DLF IT Park , Chennai Interior Fit Out Works 1,00,000 3 2012
41 Lonza Knowledge Center Turkapalli , Hyderabad Civil and Interior Works 1,00,000 4 2012
42 Kohinoor Elite Hotels Mumbai Interior Fit Out Works 1,00,000 5 2011
43 Philips India Ltd Embassy Manyata Tec Park, Bangalore GC- Turn Key interiors - MEP 98,000 2012
44 Schlumberger Commerzone, Kharadi – Pune Interior Fit Out Works 89,000 15 2015
45 LeMéridien-Gurgaon Gurgaon HOTEL PULLMAN Civil and Interior Works 75,000 4 2011
46 IBM DAKSH Gurgaon Interior Fit Out Works 66,000 2012
47 MasterCard Business Bay Park – Pune Interior Fit Out Works 48,000 15 2015
48 Cisco Systems India Pvt Ltd One Bkc, Mumbai Interior Fit Out Works 42,000 Mar-16
49 Vodafone Pune Interior Fit Out Works 45,000 May-16
50 Maruti Suzuki Flashback Showroom Jaipur GC-Interior Fit Out & MEP Works 40,000 Jan-16
51 Qubix Food Court -Blackstone Hinjewadi, Pune Civil & Interior Fit Out Works 40,000 Jul-16
52 DSM Mindspace , Hyderabad Interior Fit Out Works 30,000 3 2012
53 Redhat Magarpatta City, Pune Interior Fit Out & MEP Works 28,000 Feb-16
54 Dimensions Data One BKC, Mumbai Interior Fit Out Works 27,000 Jun-16
55 Embassy Properties Pebble Beach - EGL - Bangalore Lobby finishes 24,000 Jun-16
56 Manyata Promoters Manyata Campus- Bangalore Lobby finishes 22,000 Jun-16
57 Cisco Video Technologies Pritech Park, Bangalore Interior Fit Out Works 21,000 Jun-16
58 Philips India Ltd Boomerang, Mumbai Interior Fit Out Works 19,000 Apr-16
59 JSW Kalina, Mumbai Interior Turnkey Fit Out 2015
60 Bloomberg LP One India Bulls, Lower Parel, Mumbai GC-Interior Turnkey Fit Out 11,000 Mar-16
61 Kokilaben Dhirubhai Ambani Hospital Mumbai 15 Suites 10,000 Apr-16
62 Barbique Nation restaurants Pan India Interior Turnkey Fit Out 20 restaurants 2013-14
Project Operations Team Structure:In House Work Force 2000 Approx
Project Managers & Engineers 26
Project Co-ordinators 8
Asst . Project Manager & Supervisors 68
MEP Engineers 5
Designers 6
Draftsman - Auto-Cad operators 7
HSE Officers 13
HSE Supervisor 22
Quality Officers 9
Admin & Logistics 21
Billing Engineers 10
Quantity Surveyors 23
2218
Environment, Health & Safety Policy
Responsibility to our environment and our Community occupies an important role in the corporate thinking of the Padam Group. We have, thus, identified,
Environment, Health, and Safety as one of the priority areas for achieving this responsibility.
As a responsible turnkey interior construction company, we are committed to take adequate precautions related to Health, Safety and Environment invarious stages such as conceptualization, planning, execution, storage, handling and other similar related activities.
It is our endeavor to organize an environment which is very conducive and is free from hazardous chemicals, accidents and injuries and which conservesnatural resources and off course, prevents further pollution to protect our environment.
In our relentless pursuit of the above, we are committed to:
Communicate EHS guidelines and systems to all our vendors and people related to. Promote and impart these factors to our employees, staff, as well as all related and concerned.
Integrate EHS considerations into the business planning, execution and services.
Address all EHS concerns and considerations proactively in our operations
Compliance with all Health, Environmental and Safety legislations, regulations and requirements.
Adherence to management techniques like frequent audits and analysis and studies in all facets of our operations.
Being prepared and equipped to handle emergency EHS situations.
Periodic reviews of our responsibilities for better results and performance and providing the organizations support in order to achieve these
responsibilities.
Corporate Office
1101 Lotus Trade Center, Near DN Nagar Metro Station, New Link Road, Andheri West, Mumbai-58Mobile: +91.9821168074 (Shankar Kularia) +91.9821224312 (Dharam Kularia)
Ph # 91-22-26731301,302,303. Fax# 91-22-26731304.Email- [email protected], [email protected]
South Zone- +91-9160075550 (Sumeet Gunti) - Email – [email protected]
www.padams.in I https://in.pinterest.com/PadamInteriors I https://www.facebook.com/padaminteriors I https://twitter.com/PadamInteriors I https://www.linkedin.com/in/padam-interiors-050384122
Interior Fit Outs & Turn Key Solutions
Gurgaon - Delhi / NCR – Jaipur – Ahmedabad – Hyderabad – Vizag – Bengaluru – Chennai – Coimbatore - Trivandrum.