1E. TsitronePWI TF meeting 13-15/11/2006 Euratom ITER divertor status Annual ITER divertor meeting...
-
Upload
jacob-morris -
Category
Documents
-
view
214 -
download
2
Transcript of 1E. TsitronePWI TF meeting 13-15/11/2006 Euratom ITER divertor status Annual ITER divertor meeting...
1E. Tsitrone PWI TF meeting 13-15/11/2006
EuratomITER divertor statusAnnual ITER divertor meeting (4-6 october 2006, St Petersbourg)
• Memorandum of undestanding on the procurement of ITER divertor : agreed by parties july 2006« Divertor procurement plan » : final issue end of november 2006, binding for ITER and parties
• Divertor : 54 cassettes (32 « standard »)
• Procurement sharing :EU : cassette body + integration
inner divertorJA : outer divertor RU : dome
high heat fluxes+ full scale prototypes
• Prequalification :Each party : 2 QPs at least (more if they wish)At least 2 QPs acceptance criteria, at least 1 HHF testing
Delegations : ITER IT : 10 EU : 19 RU : 21 (3/4 Efremov) JA : 1
Slides available upon request : Contact M. Merola
2E. Tsitrone PWI TF meeting 13-15/11/2006
Euratom
•Signature of the Task Agreement for the prequalification: December 2006
•Set-up of Working Groups for Procurement Specifications: November 2007
•Deadline for delivery of all the QPs: July-2008
•Deadline for completion of HHF testing: December-2008
•Signature of Procurement Arrangements: February-2009
•Call for Tender for the ITER divertor PFCs: early-2009
•Start of procurement contract for PFCs: mid-2009
+ Delivery on site – assembly (PFCs + diags) - tests : 2013-2016
Schedule until start of procurement (M. Merola)
3E. Tsitrone PWI TF meeting 13-15/11/2006
EuratomExecutive summary (extracts)
H phase (2 years) : very marginal for H mode (70 MW installed)• Plasma formation, X point control• Radiative plasma scenario (up to 15 MW/m2 on divertor otherwise)• Divertor protection systems, disruptions (enough for melting ?)• Material strategy : if retention too high full W divertor : alternative set of PFCs ? Corresponding diagnostics necessary !
Diagnostics• Still at very early conceptual phase• Intense effort required by IO + PTs (finalize design mid 2008 for call for tender 2009)• Critical path : priority
CFC • EU reference NB31 not available anymore• 7 alternative grades (NB41 from SNECMA, Dunlop)• Plansee : test all materials, Ansaldo : test 4 materials
My (very personnal) comments :• Planning « optimistic » (diags, tests with new CFC, a-CH filter, design review …)• Coordination with first wall (diags) ? • More interaction needed with tokamak people (building / running experience)• Meeting PWI TF with Holtkamp planned early december
4E. Tsitrone PWI TF meeting 13-15/11/2006
EuratomITER divertor status
5E. Tsitrone PWI TF meeting 13-15/11/2006
EuratomQualification Prototypes (QPs)
VT Full-monoblock option
VT CFC-monoblock, W flat tile option
Dome
6E. Tsitrone PWI TF meeting 13-15/11/2006
EuratomProposed materials (in no particular order)
SNECMA
NB31 CVD/Pitch impreg. 3D/u Needled Tonnes
N31 CVD 3D/u Needled 100 kgs
N11 CVD 3D Needled 100 kgs
NB41 CVD/Pitch impreg 3D/u Needled 10 kgs
Dunlop
DMS780 CVD 2D Tonnes
NEW CVD 3D/u Needled 10 kgs
CLC
A412F CVD 3D Needled 100 kgs
SGL
NEW CVD 3D Woven 10 kgs