    REINFORCEMENT OF Al Leith 33/13.8kV S/S

    110V Battery & Battery charger Sizing Calculations

    JEDDAH SAUDI ARABIA 20641055/00

    0

    REV NO.

    DESIGN CALCULATION

    OF

    110V Battery and Battery Charger Sizing

    Calculations

    DRAWING TITLE SHEET NO.DRAWING NO.

    DWG CONT SHT AG/ALS/G-001

    1 of 13AG/ALS/E-342

    JOB ORDER NO

    CERTIFIED

    DATE:

    THIS DRAWING IS NOT

    TO BE USED FOR

    CONSTRUCTION OR

    FOR ORDERING

    MATERIALS UNTIL

    CERTIFIED AND DATED

    OPRG DEPT

    DATE:

    ENG'G DEPT

    DATE:

    DRAWN

    DATE: 10/08/2008

    DATE: 10/08/2008

    CHECKED

    Shabeer.A

    K. Kandiah

    DE

    SC

    RIP

    TIO

    ND

    AT

    E

    10-A

    ug-0

    8

    BY

    110V

    Battery

    & B

    attery

    charg

    er

    Siz

    ing C

    alc

    ula

    tions S

    ubm

    itte

    d for

    appro

    val

    TH

    IS D

    RA

    WIN

    G A

    ND

    TH

    E I

    NF

    OR

    MA

    TIO

    N C

    ON

    TA

    INE

    D H

    ER

    EIN

    AR

    E T

    HE

    SO

    LE

    PR

    OP

    ER

    TY

    OF

    SA

    UD

    I E

    LE

    CT

    RIC

    ITY

    CO

    . N

    O R

    EP

    RO

    DU

    CT

    ION

    IN

    FU

    LL

    OR

    IN

    PA

    RT

    SH

    AL

    L B

    E O

    BT

    AIN

    ED

    FR

    OM

    TH

    IS D

    OC

    UM

    EN

    T W

    ITH

    OU

    T T

    HE

    WR

    ITT

    EN

    CO

    NS

    EN

    T O

    F I

    TS

    OW

    NE

    R.

    CE

    RT

    'DA

    PP

    VD

    CH

    K'D

  • Page

    1 - 110V Battery Bank Sizing Calculations 3

    2 - 110V Battery Charger Sizing Calculations 10

    NO

    .

    0

    REVISIONS

    BY: Shabeer.A

    BY:

    BY:

    BY:

    BY:

    REINFORCEMENT OF Al Leith 33/13.8kV S/S

    JEDDAH SAUDI ARABIA

    DRAWING NO.

    AG/ALS/E-342

    110V

    Battery

    & B

    attery

    charg

    er

    Siz

    ing C

    alc

    ula

    tions S

    ubm

    itte

    d for

    appro

    val

    AP

    PV

    D

    TH

    IS D

    RA

    WIN

    G A

    ND

    TH

    E I

    NF

    OR

    MA

    TIO

    N C

    ON

    TA

    INE

    D H

    ER

    EIN

    AR

    E T

    HE

    SO

    LE

    PR

    OP

    ER

    TY

    OF

    SA

    UD

    I E

    LE

    CT

    RIC

    ITY

    CO

    . N

    O R

    EP

    RO

    DU

    CT

    ION

    IN

    FU

    LL

    OR

    IN

    PA

    RT

    SH

    AL

    L B

    E O

    BT

    AIN

    ED

    FR

    OM

    TH

    IS D

    OC

    UM

    EN

    T W

    ITH

    OU

    T T

    HE

    WR

    ITT

    EN

    CO

    NS

    EN

    T O

    F I

    TS

    OW

    NE

    R.

    CE

    RT

    'D

    2 of 13

    BY

    CH

    K'D

    DE

    SC

    RIP

    TIO

    N

    DRAWN

    DATE: 10/08/2008

    DATE: 10/08/2008

    CHECKED

    K. Kandiah

    DA

    TE

    10-A

    ug-0

    8

    CERTIFIED

    DATE:

    THIS DRAWING IS NOT

    TO BE USED FOR

    CONSTRUCTION OR

    FOR ORDERING

    MATERIALS UNTIL

    CERTIFIED AND

    DATED

    OPRG DEPT

    DATE:

    ENG'G DEPT

    DATE:

    20641055/00 AG/ALS/G-001

    TABLE OF CONTENTS

    0

    DWG CONT SHT

    REV NO.DRAWING TITLE

    JOB ORDER NO

    110V Battery & Battery charger Sizing Calculations

    SHEET NO.

  • A. 110V BATTERY BANK SIZING CALCULATIONS

    1- SCOPE

    To meet the requirements as per SOW of Al-Leith 33/13.8kV substation, this

    document deals with sizing 110V battery bank to cater for new as well as relocated equipment

    in substation building. 110V DC system shall consist of 1 No. battery bank and charger.

    2 - CALCULATIONS

    The calculations for sizing the battery are based on IEEE-1115

    2-1 CELL SIZING CALCULATIONS :

    The station DC auxillary power supply parameters for DC Control System are as follows.

    Battery Type = Ni-Cad

    Nominal DC system Voltage = V

    Minimum allowable system voltage percentage =

    End cell voltage = V

    Minimum Allowable DC system Voltage = V

    Number of cells Required ( Ncell ) = Minimum Allowable DC system Voltage

    End cell voltage

    ( Ncell ) = 99/1.1

    = Cells

    NO

    .

    0

    REVISIONS

    BY:

    BY:

    BY:

    BY:

    BY:

    REINFORCEMENT OF Al Leith 33/13.8kV S/S

    JEDDAH SAUDI ARABIA

    CERTIFIED

    DATE:

    0.9

    DRAWING TITLE SHEET NO.

    OPRG DEPT

    DATE:

    ENG'G DEPT

    DATE:

    THIS DRAWING IS NOT

    TO BE USED FOR

    CONSTRUCTION OR

    FOR ORDERING

    MATERIALS UNTIL

    CERTIFIED AND

    DATED

    110V Battery & Battery charger Sizing Calculations

    DRAWING NO.

    AG/ALS/E-342

    AG/ALS/G-001

    0

    JOB ORDER NO 20641055/00 DWG CONT SHT

    Shabeer.A

    DRAWN

    DATE: 10/08/2008

    DATE: 10/08/2008

    CHECKED

    K. Kandiah

    BY

    CH

    K'D

    DE

    SC

    RIP

    TIO

    ND

    AT

    E

    10-A

    ug-0

    8110V

    Battery

    & B

    attery

    charg

    er

    Siz

    ing C

    alc

    ula

    tions S

    ubm

    itte

    d for

    appro

    val

    99

    CE

    RT

    'DA

    PP

    VD

    90

    TH

    IS D

    RA

    WIN

    G A

    ND

    TH

    E I

    NF

    OR

    MA

    TIO

    N C

    ON

    TA

    INE

    D H

    ER

    EIN

    AR

    E T

    HE

    SO

    LE

    PR

    OP

    ER

    TY

    OF

    SA

    UD

    I E

    LE

    CT

    RIC

    ITY

    CO

    . N

    O R

    EP

    RO

    DU

    CT

    ION

    IN

    FU

    LL

    OR

    IN

    PA

    RT

    SH

    AL

    L B

    E O

    BT

    AIN

    ED

    FR

    OM

    TH

    IS D

    OC

    UM

    EN

    T W

    ITH

    OU

    T T

    HE

    WR

    ITT

    EN

    CO

    NS

    EN

    T O

    F I

    TS

    OW

    NE

    R.

    REV NO.

    110

    1.1

    3 of 13

  • LOAD CALCULATION :

    Continuous load of 401.2 W ( 3.65A ) for Duration of 8 hours is considered.

    Load details are given in Table - 1

    TABLE-1

    NO

    .

    0

    REVISIONS

    BY:

    BY:

    BY:

    BY:

    BY:

    REINFORCEMENT OF Al Leith 33/13.8kV S/S

    JEDDAH SAUDI ARABIA

    CERTIFIED

    DATE:

    DA

    TE

    10-A

    ug-0

    8

    BY

    5

    AG/ALS/G-001

    Shabeer.A

    K. Kandiah

    110V Battery & Battery charger Sizing Calculations

    SHEET NO.

    4 of 13

    DRAWING NO.

    1

    AG/ALS/E-342

    6

    3 1

    33kV Transformer AVC Panel ( +AVC3)

    1

    61.24

    133.3

    29.8

    61.2

    77.3

    133.3

    29.8

    1

    77.3

    TH

    IS D

    RA

    WIN

    G A

    ND

    TH

    E I

    NF

    OR

    MA

    TIO

    N C

    ON

    TA

    INE

    D H

    ER

    EIN

    AR

    E T

    HE

    SO

    LE

    PR

    OP

    ER

    TY

    OF

    SA

    UD

    I E

    LE

    CT

    RIC

    ITY

    CO

    . N

    O R

    EP

    RO

    DU

    CT

    ION

    IN

    FU

    LL

    OR

    IN

    PA

    RT

    SH

    AL

    L B

    E O

    BT

    AIN

    ED

    FR

    OM

    TH

    IS D

    OC

    UM

    EN

    T W

    ITH

    OU

    T T

    HE

    WR

    ITT

    EN

    CO

    NS

    EN

    T O

    F I

    TS

    OW

    NE

    R.

    CE

    RT

    'DA

    PP

    VD

    2.2

    Sl.No.

    1

    TOTAL CONTINUOUS CURRENT

    33kV Transformer Protection Panel ( +ARH06 )

    DRAWN

    DATE: 10/08/2008

    DATE: 10/08/2008

    CH

    K'D

    DE

    SC

    RIP

    TIO

    N

    110V

    Battery

    & B

    attery

    charg

    er

    Siz

    ing C

    alc

    ula

    tions S

    ubm

    itte

    d for

    appro

    val

    CHECKED

    DWG CONT SHTJOB ORDER NO 20641055/00

    THIS DRAWING IS NOT

    TO BE USED FOR

    CONSTRUCTION OR

    FOR ORDERING

    MATERIALS UNTIL

    CERTIFIED AND

    DATED

    OPRG DEPT

    DATE:

    ENG'G DEPT

    DATE:

    Qty

    24.4

    Unit Load

    (Watt)

    33kV Bus Coupler feeder Panel (+ARH07 )

    33kV Bus bar Protection Panel ( +ARHBB02 )

    33kV Transducer Panel

    33kV feeder Panel (+ARH05 )

    Total Load

    (Watt)

    75.2

    24.4

    75.2

    Continuous Loads

    1

    12

    Description

    0

    REV NO.DRAWING TITLE

    TOTAL 401W

    3.65A401.2/110

  • 2.3 TRIPPING LOADS

    Unit Loads for Trip Coils have been given table-2

    a) Worst Critical case of assessing the momentary Loading :

    i ) Worst Critical case assessing the momentary loading has been assessed which

    involves simultaneous tripping of 5 Nos. of 33kV CBs on 33kV bus fault and

    8 Nos. of 13.8kV CBs on 13.8kV bus fault

    Load of 5 x 2 No. Trip Coils = 5 x 2 x 50 = W

    Load of 8 x 2 No. Trip Coils = 8 x 2 x 50 = W

    Total Trip Coils = W

    Nominal DC system Voltage = V

    Total Tripping Current = A

    2.4 RESTORATION LOADS

    Momentary Loading for restoration is considered as the load for closing 2 no. 33kV CB,

    1 Nos. of 13.8kV CBs, tripping of 1 No. of 13.8kV CB ( if the fault persists ) and 1 No. of

    Spring Charging motor running. Load details are given in table 2

    i) Load of 2 33kV closing CB = 2 x 50 = W

    ii) Load of 1 13.8kV closing CBs = 1 x 50 = W

    iii) Load of 1 13.8kV Tripping CB = 1 x 50 = W

    iv) Load of one operating motor = 1 x 380 = W

    running

    Total = W

    Total Restoration Current = A

    Table - 2

    NO

    .

    0 MOMENTARY LOADS

    REVISIONS

    BY:\

    BY:

    BY:

    BY:

    BY:

    REINFORCEMENT OF Al Leith 33/13.8kV S/S

    JEDDAH SAUDI ARABIA

    50

    1 50 50CHECKED

    1

    1

    Total Load

    (Watt )

    50

    50

    1300

    110

    11.82

    Unit Load

    (Watt )

    50

    500

    800

    110V

    Battery

    & B

    attery

    charg

    er

    Siz

    ing C

    alc

    ula

    tions S

    ubm

    itte

    d for

    appro

    val

    CE

    RT

    'DB

    YC

    HK

    'DD

    ES

    CR

    IPT

    ION

    AP

    PV

    D

    K. Kandiah

    REV NO.

    110V Battery & Battery charger Sizing Calculations

    DRAWN

    DATE: 10/08/2008

    DATE: 10/08/2008

    DA

    TE

    10-A

    ug-0

    8

    Shabeer.A

    OPRG DEPT

    DATE:

    ENG'G DEPT

    DATE:

    AG/ALS/E-342

    AG/ALS/G-001

    CERTIFIED

    DATE:

    THIS DRAWING IS NOT

    TO BE USED FOR

    CONSTRUCTION OR

    FOR ORDERING

    MATERIALS UNTIL

    CERTIFIED AND

    DATED

    0

    DRAWING TITLE

    Drive Mechanism 1

    5050

    5.27

    DWG CONT SHT

    SHEET NO.

    5 of 13

    DRAWING NO.

    1 50 50

    JOB ORDER NO 20641055/00

    100

    50

    50

    380

    580

    380 380

    Sl.No

    a) 33kV Switchgear ( assumed)

    QtyDescription

    TH

    IS D

    RA

    WIN

    G A

    ND

    TH

    E I

    NF

    OR

    MA

    TIO

    N C

    ON

    TA

    INE

    D H

    ER

    EIN

    AR

    E T

    HE

    SO

    LE

    PR

    OP

    ER

    TY

    OF

    SA

    UD

    I E

    LE

    CT

    RIC

    ITY

    CO

    . N

    O R

    EP

    RO

    DU

    CT

    ION

    IN

    FU

    LL

    OR

    IN

    PA

    RT

    SH

    AL

    L B

    E O

    BT

    AIN

    ED

    FR

    OM

    TH

    IS D

    OC

    UM

    EN

    T W

    ITH

    OU

    T T

    HE

    WR

    ITT

    EN

    CO

    NS

    EN

    T O

    F I

    TS

    OW

    NE

    R.

    b) 13.8kV Switchgear

    Circuit Breakers

    Circuit Breakers

    Trip Coil-2

    Closing Coil

    Closing Coil

    Trip Coil-1

    50 50

    Trip Coil-1 1

    Trip Coil-2 1

  • 2.5 EMERGENCY LOAD

    Emergency Lighting load for 1.5 hours is considered as 360W ( 2.88A ) maximum number

    of 9 incandascent lamps of 40W each are switched on at any given time by the maintenance

    personnel who reach the substation within 1.5 hours of power failure

    3 LOAD SUMMARY :

    The respective loads are listed below. Duty cycle is given in Annex-1

    Continuous Load - 8 hours = A

    Momentary Tripping Load - 1 min. = A

    Momentary Restoration Load - 1 min. = A

    Emergency Lighting Load - 1.5 Hours = A

    4 BATTERY SIZING WORKSHEET :

    Given in Annexure II and III.

    5 BATTERY CURVE/ DATA :

    Manufactures Data are given in Annexure IV.

    6 CALCULATION OF REQUUIRED SIZE :

    Maximum uncorrected size = Ah

    Temperature Correction = (Refer IEEE-1106, Table A.1)

    (at minimum Temp = -5C)

    Design Margin =

    Aging Factor =

    NO

    .

    0

    REVISIONS

    Required Capacity = Uncorrected Size x Design Margin x Aging factor

    BY: x Temperature Correction Factor

    BY: Required Capacity = 107.84948 x 1.15 x 1.25 x 1.2

    BY: Required Capacity = Ah

    BY:

    BY:

    REINFORCEMENT OF Al Leith 33/13.8kV S/S

    JEDDAH SAUDI ARABIA

    SHEET NO.

    6 of 13

    DRAWING NO.

    AG/ALS/E-342

    DRAWING TITLE TH

    IS D

    RA

    WIN

    G A

    ND

    TH

    E I

    NF

    OR

    MA

    TIO

    N C

    ON

    TA

    INE

    D H

    ER

    EIN

    AR

    E T

    HE

    SO

    LE

    PR

    OP

    ER

    TY

    OF

    SA

    UD

    I E

    LE

    CT

    RIC

    ITY

    CO

    . N

    O R

    EP

    RO

    DU

    CT

    ION

    IN

    FU

    LL

    OR

    IN

    PA

    RT

    SH

    AL

    L B

    E O

    BT

    AIN

    ED

    FR

    OM

    TH

    IS D

    OC

    UM

    EN

    T W

    ITH

    OU

    T T

    HE

    WR

    ITT

    EN

    CO

    NS

    EN

    T O

    F I

    TS

    OW

    NE

    R.

    CE

    RT

    'DA

    PP

    VD

    BY

    CH

    K'D

    DE

    SC

    RIP

    TIO

    ND

    AT

    E

    10-A

    ug-0

    8110V

    Battery

    & B

    attery

    charg

    er

    Siz

    ing C

    alc

    ula

    tions S

    ubm

    itte

    d for

    appro

    val

    DRAWN

    DATE: 10/08/2008

    DATE: 10/08/2008

    CHECKED

    Shabeer.A

    K. Kandiah

    186.04

    CERTIFIED

    DATE:

    THIS DRAWING IS NOT

    TO BE USED FOR

    CONSTRUCTION OR

    FOR ORDERING

    MATERIALS UNTIL

    CERTIFIED AND

    DATED

    OPRG DEPT

    DATE:

    ENG'G DEPT

    DATE:

    110V Battery & Battery charger Sizing Calculations

    DWG CONT SHT

    REV NO.

    0

    AG/ALS/G-001

    1.20

    107.85

    JOB ORDER NO 20641055/00

    1.15

    1.25

    3.65

    11.8

    5.27

    2.88

  • 7 - CONCLUSION

    Required Battery Ah capacity = Ah

    Nearest available size = Ah

    The Total Ampere - hour capacity may be used to determine the intial cell size,

    the total capacity = 186.0 Ah and the choosen battery is SBM208

    Rated Capcity = 208 Ah

    NO

    .

    0

    REVISIONS

    BY:

    BY:

    BY:

    BY:

    BY:

    REINFORCEMENT OF Al Leith 33/13.8kV S/S

    JEDDAH SAUDI ARABIA

    AG/ALS/E-342

    DRAWING TITLE

    AG/ALS/G-001

    0

    208

    REV NO.

    186.0

    SHEET NO.

    7 of 13

    DRAWING NO.

    K. Kandiah

    OPRG DEPT

    DATE:

    ENG'G DEPT

    20641055/00 DWG CONT SHT

    CERTIFIED

    DATE:

    THIS DRAWING IS NOT

    TO BE USED FOR

    CONSTRUCTION OR

    FOR ORDERING

    MATERIALS UNTIL

    CERTIFIED AND

    DATED

    110V Battery & Battery charger Sizing Calculations

    DATE:

    JOB ORDER NO

    DRAWN

    DATE: 10/08/2008

    DATE: 10/08/2008

    CHECKED

    DA

    TE

    10-A

    ug-0

    8

    Shabeer.A

    110V

    Battery

    & B

    attery

    charg

    er

    Siz

    ing C

    alc

    ula

    tions S

    ubm

    itte

    d for

    appro

    val

    BY

    CH

    K'D

    DE

    SC

    RIP

    TIO

    N

    TH

    IS D

    RA

    WIN

    G A

    ND

    TH

    E I

    NF

    OR

    MA

    TIO

    N C

    ON

    TA

    INE

    D H

    ER

    EIN

    AR

    E T

    HE

    SO

    LE

    PR

    OP

    ER

    TY

    OF

    SA

    UD

    I E

    LE

    CT

    RIC

    ITY

    CO

    . N

    O R

    EP

    RO

    DU

    CT

    ION

    IN

    FU

    LL

    OR

    IN

    PA

    RT

    SH

    AL

    L B

    E O

    BT

    AIN

    ED

    FR

    OM

    TH

    IS D

    OC

    UM

    EN

    T W

    ITH

    OU

    T T

    HE

    WR

    ITT

    EN

    CO

    NS

    EN

    T O

    F I

    TS

    OW

    NE

    R.

    CE

    RT

    'DA

    PP

    VD

  • A1 = Continuous Load + momentary Tripping = A

    A2 = Continuous Load = A

    A3 = Continuous + Emergency = A

    A4 = Continuous = A

    A5 = Continuous + Restoration = A

    NO

    .

    0

    REVISIONS

    BY:

    BY:

    BY:

    BY:

    BY:

    REINFORCEMENT OF Al Leith 33/13.8kV S/S

    JEDDAH SAUDI ARABIA

    8.92

    15.5

    3.65

    6.53

    3.65

    TH

    IS D

    RA

    WIN

    G A

    ND

    TH

    E I

    NF

    OR

    MA

    TIO

    N C

    ON

    TA

    INE

    D H

    ER

    EIN

    AR

    E T

    HE

    SO

    LE

    PR

    OP

    ER

    TY

    OF

    SA

    UD

    I E

    LE

    CT

    RIC

    ITY

    CO

    . N

    O R

    EP

    RO

    DU

    CT

    ION

    IN

    FU

    LL

    OR

    IN

    PA

    RT

    SH

    AL

    L B

    E O

    BT

    AIN

    ED

    FR

    OM

    TH

    IS D

    OC

    UM

    EN

    T W

    ITH

    OU

    T T

    HE

    WR

    ITT

    EN

    CO

    NS

    EN

    T O

    F I

    TS

    OW

    NE

    R.

    CE

    RT

    'DA

    PP

    VD

    BY

    OPRG DEPT

    DATE:

    ENG'G DEPT

    CH

    K'D

    DE

    SC

    RIP

    TIO

    N

    110V

    Battery

    & B

    attery

    charg

    er

    Siz

    ing C

    alc

    ula

    tions S

    ubm

    itte

    d for

    appro

    val

    10-A

    ug-0

    8

    DRAWN

    DATE: 10/08/2008

    DATE: 10/08/2008

    CHECKED

    DA

    TE

    Shabeer.A

    K. Kandiah

    CERTIFIED

    DATE:

    THIS DRAWING IS NOT

    TO BE USED FOR

    CONSTRUCTION OR

    FOR ORDERING

    MATERIALS UNTIL

    CERTIFIED AND

    DATED

    110V Battery & Battery charger Sizing Calculations

    DRAWING TITLE

    DATE:

    DRAWING NO.

    AG/ALS/E-342

    AG/ALS/G-001

    0

    REV NO.SHEET NO.

    8 of 13

    JOB ORDER NO 20641055/00 DWG CONT SHT

  • ANNEXURE - 1

    A1= 15.5A

    A5=8.92A

    A3=6.53A

    A2=A4=3.65A

    NO

    .

    0

    REVISIONS

    BY:

    BY:

    M1 M2 M3 M4 M5

    BY:

    0 1 90 479 MINUTES

    BY:

    Al-Leith 33/13.8kV Substation Load duty cycle profile for

    110V DC Battery Sizing Calculation

    BY:

    REINFORCEMENT OF Al Leith 33/13.8kV S/S

    JEDDAH SAUDI ARABIA

    TH

    IS D

    RA

    WIN

    G A

    ND

    TH

    E I

    NF

    OR

    MA

    TIO

    N C

    ON

    TA

    INE

    D H

    ER

    EIN

    AR

    E T

    HE

    SO

    LE

    PR

    OP

    ER

    TY

    OF

    SA

    UD

    I E

    LE

    CT

    RIC

    ITY

    CO

    . N

    O R

    EP

    RO

    DU

    CT

    ION

    IN

    FU

    LL

    OR

    IN

    PA

    RT

    SH

    AL

    L B

    E O

    BT

    AIN

    ED

    FR

    OM

    TH

    IS D

    OC

    UM

    EN

    T W

    ITH

    OU

    T T

    HE

    WR

    ITT

    EN

    CO

    NS

    EN

    T O

    F I

    TS

    OW

    NE

    R.

    CE

    RT

    'DA

    PP

    VD

    CH

    K'D

    DE

    SC

    RIP

    TIO

    N

    110V

    Battery

    & B

    attery

    charg

    er

    Siz

    ing C

    alc

    ula

    tions S

    ubm

    itte

    d for

    appro

    val

    BY

    OPRG DEPT

    10-A

    ug-0

    8

    Shabeer.A

    K. Kandiah

    DRAWN

    DATE: 10/08/2008

    DATE: 10/08/2008

    CHECKED

    DA

    TE

    DWG CONT SHT

    REV NO.

    AG/ALS/G-001

    SHEET NO.

    DATE:

    ENG'G DEPT

    DATE:

    AG/ALS/E-342

    DRAWING TITLE

    CERTIFIED

    DATE:

    THIS DRAWING IS NOT

    TO BE USED FOR

    CONSTRUCTION OR

    FOR ORDERING

    MATERIALS UNTIL

    CERTIFIED AND

    DATED

    110V Battery & Battery charger Sizing Calculations

    JOB ORDER NO 20641055/00

    0

    5.2

    7 A

    9 of 13

    DRAWING NO.

    2.88A

    180 480

    AM

    PE

    RE

  • B. 110V BATTERY CHARGER SIZING CALCULATIONS

    1 - SCOPE :

    To meet the requirements as per SOW of Al-Leith 33/13.8kV substation, this

    document deals with sizing 110V battery charger to cater for new as well as relocated equipment

    in existing SWGR building. DC system shall have one battery float / boost charger.

    2 - CALCULATIONS :

    The ampere hour rating of a battery charger is determined by equation which is as per

    Technical specification

    A = (1.25 X L)+ (BIF X AHR) ) / 0.83 1

    RT

    Where :

    A = required charger rating in amperes

    L = Maximum Required DC load in amperes =

    ( Continuous load is considered )

    BIF = Battery inefficiency factor =

    AHR = Ampere hour removed during discharge =

    (Maximum discharger is considered)

    RT = Recharge time in hours =

    Subsitituting the above values in Equ - 1

    AR = [ (1.25 x 3.2 ) + (1.1 x 200) ] / 0.83

    NO

    .

    0 16

    REVISIONS

    AR =

    BY:

    Next higher size available = 50A

    BY:

    BY:

    The battery Charger Current Size = 50A

    BY:

    BY:

    REINFORCEMENT OF Al Leith 33/13.8kV S/S

    JEDDAH SAUDI ARABIA AG/ALS/G-001

    Shabeer.A

    K. Kandiah

    3.6

    1.1

    208

    110V Battery & Battery charger Sizing Calculations

    SHEET NO.

    10 of 13

    DRAWING NO.

    TH

    IS D

    RA

    WIN

    G A

    ND

    TH

    E I

    NF

    OR

    MA

    TIO

    N C

    ON

    TA

    INE

    D H

    ER

    EIN

    AR

    E T

    HE

    SO

    LE

    PR

    OP

    ER

    TY

    OF

    SA

    UD

    I E

    LE

    CT

    RIC

    ITY

    CO

    . N

    O R

    EP

    RO

    DU

    CT

    ION

    IN

    FU

    LL O

    R I

    N P

    AR

    T S

    HA

    LL B

    E O

    BT

    AIN

    ED

    FR

    OM

    TH

    IS D

    OC

    UM

    EN

    T W

    ITH

    OU

    T T

    HE

    WR

    ITT

    EN

    CO

    NS

    EN

    T O

    F I

    TS

    OW

    NE

    R.

    CE

    RT

    'DA

    PP

    VD

    AG/ALS/E-342

    BY

    DRAWN

    DATE: 10/08/2008

    DATE: 10/08/2008

    CH

    K'D

    DE

    SC

    RIP

    TIO

    N

    11

    0V

    Ba

    tte

    ry &

    Ba

    tte

    ry c

    ha

    rge

    r S

    izin

    g C

    alc

    ula

    tio

    ns S

    ub

    mitte

    d f

    or

    ap

    pro

    va

    l

    DA

    TE

    10

    -Au

    g-0

    8

    OPRG DEPT

    DATE:

    ENG'G DEPT

    JOB ORDER NO 20641055/00 DWG CONT SHT

    CERTIFIED

    DATE:

    THIS DRAWING IS NOT

    TO BE USED FOR

    CONSTRUCTION OR

    FOR ORDERING

    MATERIALS UNTIL

    CERTIFIED AND DATED

    CHECKED

    DATE:

    DRAWING TITLE

    0

    16

    22.7

    REV NO.

  • ANNEXURE -II

    CALCULATION OF CAPACITY RATING FACTOR.( KT )

    REFERENCE : IEEE Std. 1115-2000

    Minimum Cell Voltage : 1.1 V

    Cell Mfg. : SAFT

    Rated Ampere hour capacity (Ay std. Time Rate at 25 C

    to Std % end of discharge)

    KT = Ampere that will be supplied for T minute at 25 C

    to given end of discharge voltage

    The Kt factor for time t is calculated in the table by interpolation using the formula

    (Kt2 - Kt1) x ( t2 - t )

    Kt = Kt2 - ( t2 - t1 )

    End voltage discharge voltage of cell = V

    Rated Ampere hour capacity = Ah

    Calculation of K T Factor :

    NO

    .

    0

    REVISIONS

    BY:

    BY:

    BY:

    BY:

    BY:

    REINFORCEMENT OF Al Leith 33/13.8kV S/S

    JEDDAH SAUDI ARABIA

    DATE:

    THIS DRAWING IS NOT

    TO BE USED FOR

    CONSTRUCTION OR

    FOR ORDERING

    MATERIALS UNTIL

    CERTIFIED AND

    DATED

    5

    OPRG DEPT

    DATE:

    ENG'G DEPT

    DATE:

    DRAWING TITLE

    480

    3.432

    2 90 93.9 2.215

    25.60 8.125

    4 479 25.65

    1.1

    208

    Sl.No T minute Total Ampere

    TH

    IS D

    RA

    WIN

    G A

    ND

    TH

    E I

    NF

    OR

    MA

    TIO

    N C

    ON

    TA

    INE

    D H

    ER

    EIN

    AR

    E T

    HE

    SO

    LE

    PR

    OP

    ER

    TY

    OF

    SA

    UD

    I E

    LE

    CT

    RIC

    ITY

    CO

    . N

    O R

    EP

    RO

    DU

    CT

    ION

    IN

    FU

    LL

    OR

    IN

    PA

    RT

    SH

    AL

    L B

    E O

    BT

    AIN

    ED

    FR

    OM

    TH

    IS D

    OC

    UM

    EN

    T W

    ITH

    OU

    T T

    HE

    WR

    ITT

    EN

    CO

    NS

    EN

    T O

    F I

    TS

    OW

    NE

    R.

    CE

    RT

    'DA

    PP

    VD

    BY

    CH

    K'D

    DE

    SC

    RIP

    TIO

    ND

    AT

    E

    10-A

    ug-0

    8110V

    Battery

    & B

    attery

    charg

    er

    Siz

    ing C

    alc

    ula

    tions S

    ubm

    itte

    d for

    appro

    val

    JOB ORDER NO 20641055/00

    DRAWN

    DATE: 10/08/2008

    DATE: 10/08/2008

    CHECKED

    Shabeer.A

    K. Kandiah

    8.109

    CERTIFIED

    KT Factor

    REV NO.

    0

    DWG CONT SHT

    SHEET NO.

    11 of 13

    DRAWING NO.

    AG/ALS/E-342

    AG/ALS/G-001

    0.588

    110V Battery & Battery charger Sizing Calculations

    1 1 354

    3 180 60.6

  • ANNEXURE-III

    NO

    .

    0

    REVISIONS

    BY:

    BY:

    BY:

    BY:

    BY:

    REINFORCEMENT OF Al Leith 33/13.8kV S/S

    JEDDAH SAUDI ARABIA

    DRAWING NO.

    Load (A)change in

    load (A)

    Duration of

    operation

    (min)

    REV NO.

    0

    20641055/00 DWG CONT SHT

    SHEET NO.

    12 of 13

    AG/ALS/G-001

    T = M1 = 1.0 0.5880 9.11

    Total

    time to end of

    section (min)

    1A1 =

    15.50A1-0= 15.50 M1 = 1.0

    period

    DATE:

    THIS DRAWING IS NOT

    TO BE USED FOR

    CONSTRUCTION OR

    FOR ORDERING

    MATERIALS UNTIL

    CERTIFIED AND

    DATED

    110V Battery & Battery charger Sizing Calculations

    DRAWING TITLE

    T = M2+M3+M4 =

    478.08.0920 -95.89

    T = M3+M4=

    389.0

    JOB ORDER NO

    AG/ALS/E-342

    K. Kandiah

    OPRG DEPT

    DATE:

    ENG'G DEPT

    DATE:

    CERTIFIED

    DATE: 10/08/2008

    DRAWN

    DATE: 10/08/2008

    110V

    Battery

    & B

    attery

    charg

    er

    Siz

    ing C

    alc

    ula

    tions S

    ubm

    itte

    d for

    appro

    val

    BY

    CH

    K'D

    DE

    SC

    RIP

    TIO

    N

    CHECKED

    DA

    TE

    10-A

    ug-0

    8

    Shabeer.AT

    HIS

    DR

    AW

    ING

    AN

    D T

    HE

    IN

    FO

    RM

    AT

    ION

    CO

    NT

    AIN

    ED

    HE

    RE

    IN A

    RE

    TH

    E S

    OL

    E P

    RO

    PE

    RT

    Y O

    F S

    AU

    DI

    EL

    EC

    TR

    ICIT

    Y C

    O.

    NO

    RE

    PR

    OD

    UC

    TIO

    N I

    N F

    UL

    L O

    R I

    N P

    AR

    T S

    HA

    LL

    BE

    OB

    TA

    INE

    D F

    RO

    M T

    HIS

    DO

    CU

    ME

    NT

    WIT

    HO

    UT

    TH

    E W

    RIT

    TE

    N C

    ON

    SE

    NT

    OF

    IT

    S O

    WN

    ER

    .

    CE

    RT

    'DA

    PP

    VD

    M2 = 89.0

    Require section size

    (Ah)

    +ve value -ve value

    Section - 1 first period only

    KT factor

    M1 = 1.0 T =M1+M2 = 90 2.2150 34.33

    T = M1+M2+M3 =

    180.03.4320

    9.11

    Section - 2 first two periods only

    1A1 =

    15.50A1-0= 15.50

    2A2 =

    3.65

    A2-A1=

    -11.85

    1A1 =

    15.50A1-0= 15.50 M1 = 1.0 53.20

    T = M2 = 89.0 2.1970 -26.03

    SECTION - 1 to 5 (TOTAL) 107.85

    T = M3

    90.02.2150 6.383

    A3 =

    6.53

    A3-A2=

    2.88M3 = 90.0

    Total 37.28

    2A2 =

    3.65

    A2-A1=

    -11.85M2 = 89.0

    T = M2+M3 =

    179.03.4190

    2A2 =

    3.65

    A2-A1=

    -11.85M2 = 89.0

    -40.52

    Total 8.30

    Section - 3 first three periods only

    Total 19.06

    Section - 4 first four periods only

    1A1 =

    15.50A1-0= 15.50 M1= 1.0

    T =

    M1+M2+M3+M4 = 8.1080 125.67

    34.10

    Section - 5 first five periods only

    3A3 =

    6.53

    A3-A2=

    2.88M3 = 90.0

    M4 = 299 T =M3

    299.05.1090

    125.94

    6.6070 19.03

    4A4 =

    3.65

    A4-A3= -

    2.88-14.71

    Total

    1A1 =

    15.50A1-0= 15.50 M1 = 1.0

    T =

    M1+M2+M3+M4 = 8.1250

    19.08

    2A2 =

    3.65

    A2-A1=

    -11.85M2 = 89.0

    T =

    M2+M3+M4+M5 = 8.1080 -96.08

    3A3 =

    6.53

    A3-A2=

    2.88M3 = 90.0

    T = M3+M4+M5=

    3906.6240

    3.10

    4A4 =

    3.65

    A4-A3= -

    2.88M4 = 299

    T = M4+M5

    3005.1230 -14.75

    5A5 =

    8.92

    A5-A4=

    5.27M5 = 1.0

    T = t4

    1.00000.5880

  • 13 of 13