COMPANY PROFILE
v.2019-10-04/DS
FRI-EL GROUP HISTORIC HIGHLIGHTS
1994 FRI-EL GROUP founded by Thomas, Josef and Ernst
Gostner, operates in the production and sale of electricityfrom renewable sources. First acquisitions of hydro electric plants.
2001 The Group established an important partnership with EDF Energies Nouvelles, building and operating in a 50/50 partner-ship 13 wind farms with a total installed capacity of 274 MW.
2002 The first wind farm was built in Gorgoglione with a total installed capacity of 3.3 MW using 5 Vestas V47 turbines.
2007 Ready to undertake new challenges, FRI-EL GROUP
established FRI-EL Biogas Holding, for the development, construction and operation of power plants fuelled withagricultural products.
2008 FRI-EL GROUP entered into a strategic partnership withInnogy Italia (formally RWE Innogy Italia) for the development and operation of wind farms and biomass plants.
2009 The 74.8 MW thermoelectric power plant in Acerra (Naples), fuelledby vegetable oil, entered in full production. The first biogas power plant located in Codroipo is fully up and running.
2010 Two wind farms with an installed capacity of 50.7 MW have been completed with the JV Partner RWE Innogy Italia and further nine biogas plants enter in full production.
2011 One new wind farm (16 MW in JV with RWE Innogy Italia) and two biogas facilities start operation.
2012 With the commissioning of a wind farm and nine biogasfacilities, FRI-EL GROUP confirms its leadership position in themarket.
2013 FRI-EL GROUP extended its partnership with GAR; two wind farmswith a total capacity of ca.100 MW were installed.
2014 Through the purchase of RWE Innogy’s 80% stakes,
FRI-EL acquires full ownership of SPER S.p.A. and ist solid biomasspower plant of 18.7 MW in Dittaino.
2016 FRI-EL GROUP has been awarded with the subsidized tariff for a
period of 20 years for 4 wind energy projects with an installed capacity of approximately 130 MW.
2017 Due to a public tender offer, FRI-EL owns today 86% of the shares of Alerion Clean Power S.p.A, which is listed on the Milan Stock Exchange. With a total installed wind capacity of 901 MW, the Group is now the second largest wind power producing company in Italy (todays total Group gross capacity of 1,023 MW).
2018 FRI-EL acquires two new biogas plants. One of the two is
the first plant fuelled with organic waste run by the company. FRI-EL GROUP also connected the Medio Campidano wind farm with a total gross installed capacity of 30.8 MW
HISTORY
1
FRI-EL GROUP HISTORIC HIGHLIGHTS
2019 The windfarms of Morcone-Pontelandolfo, Albareto and Colle
Sannita with a total gross installed capacity of 100.1 MW have beenconnected to the national grid and entered into operation.
2019 Alerion Clean Power, now part of the FRI-EL Group acquired the first, already running, wind farm in Spain with a total gross installedcapacity of 36 MW.
2019 FGP Group executed an asset swap with EDF EN Italia S.p.A., resultingin the consolidation of FRI-EL Ichnusa and it‘s subsidiary FRI-EL Campidano (which runs a windfarm of 70 MW).
HISTORY
2
PLANNING TODAY TO LIVE WELL TOMORROW
OUR MISSION
3
Further consolidate our leading position as producer of green energy in the business units Wind, Biomass, Hydro and Biogas and strengthen our activities in energy farming
Focus on sustainable, eco-friendly development andlong-term investments
Create value for our partners and stakeholders throughsustainable investments, consistent risk management andinnovative thinking
A DIVERSIFIED BUSINESS PORTFOLIO
BUSINESS UNITS OVERVIEW
4
34 operating wind farms – 901 MW gross capacity (1 in Bulgaria and 1 in Spain)Annual Energy Gross Production of 1,500 GWhConsolidated experience of more than 20 years in the wind energy business, from research, development, construction, O&M, production and sale of electricity
FRI-ELWIND25 operating biogas plants of 1 MW capacity (2 out Fri-El Green Power perimeter). 23 plants are fuelled by agriculturalproducts and 2 by organic wasteParticipation and integration links with farmersShort supply chainAnnual Energy Gross Production of 180 GWh
FRI-ELBIOGAS1 operating crude palm oil – fuelled power plant of 74.8 MW Annual Energy Gross Production: approx. 600 GWh
FRI-ELLIQUID BIOMASS
1 operating eucalyptus wood-powered plant of 18.7 MWAnnual Energy Gross Production: approx. 126 GWhSecured supply chain
FRI-ELSOLID BIOMASS15 operating hydroelectric power plants (12 out of Fri-El Green Power perimeter) - installed capacity 24 MWLocated in 7 regions of Central and Northern Italy
FRI-ELHYDRORomania: 13,200 ha in operationLogistics and irrigation advantages thanks toDanube deltaCultivation of maize, wheat, barley, sunflower, rape and soya
FRI-ELAGRICULTURE
PIETRO MAURIELLOWIND DEVEL.& HEAD of
BIOMASS DIVISION
ENRICO SIMONETTOBIOGAS DIVISION
LUIGI SPAGNABIOGAS & WASTE to
ENERGY DIVISION
DAVIDE IMAZIOWIND DIVISION
JOSEF GOSTNERCEO (VICE-CHAIRMAN)
THOMAS GOSTNERCHAIRMAN
HAND IN HAND TOWARDS SUCCESS
THE MANAGEMENT TEAM
5
EXPERTISE AND YOUNG TALENTS
ERNST GOSTNERCOO
GEORG VAJACFO
MAURIZIO DE BIASIO&M DIVISION
PATRICK PIRCHERHEAD OF FINANCE
ADMINISTRATIONGROUP STRUCTURE
6
ENSURE FUTURE GROWTH
STRATEGIC PARTNERSHIPS
7
STRONG PARTNERS
Innogy Italia has been partner ofchoice of FRI-EL GREEN POWER
since 2008 for the operation ofthree wind farms in Italy, with a total gross installed capacity of 67 MW.
The strategic partnership with GAR was established in 2010. The jointventure in the liquid biomassdivision assures an optimal supplychain. In 2012 the partnership was extended into the wind sector, withan actual total gross installedcapacity of 125 MW.
GAR (Golden Agri Resources) is oneof the leading palm oil producers in the world.
BANKING RELATIONSHIPS
BANKING
8
HIGH PROFILE
LEASING
FRI-EL GROUP has enteredinto high profile bankingrelationships.
Between 2002-2019 FRI-EL GROUP has raisedca. EUR 1.0 bn of financingfacilities.
The bulk of the financings(ca. 80 %) are structured aslimited recourse/non recourse project financings.
It is FRI-EL‘s aim to createand maintain long termbanking relationships.
FRI-EL COVERS THE WHOLE VALUE CHAIN
BUSINESS STRENGTHS
9
FRI-EL GREEN POWERGROUP STRUCTURE
10
LOCATIONS
11
OPERATIONALPLANTS ANDOFFICES
WIND DIVISION
NULVI-TERGU
MORCONE
SAN BASILIO
CAMPIDANO
URURI
ALBARETO
GRAVINA DI PUGLIA
SANT’AGATA
GORGOGLIONE
ANZI
GROTTOLE
RICIGLIANO
GORGOGLIONE
CIORLANO
S. MARTINO IN P.
S. MARCO IN L.
ORDONA
LACEDONIA
ALBANELLA
CASTEL DI L.
AGRIGENTO
LICODIA
VIZZINI
VILLACIDRO
COMIOLICA
KRUPEN
COLLE SANNITA
HYDRO POWER
LASINO
BELLANO
TORRE
PONTEVICO
VITORCHIANO
MEDUNA
NONCELLO
LIGONCHIO
BURRIDA
LONGONE
TREIA
PONTE S. GIOVANNI
SCOPOLI
CARAMANICO
SERRAVALLE
BIOGAS DIVISION
VIGEVANO
MOMO
MORTARA
BRIONA
PIOVERA
ALESSANDRIA
GROPELLO C.
DAIRAGO
SERMIDE
VILLACIDRO
CODROIPO (Pan)
CODROIPO (Qua)
FLAIBANO
MEDEA
TORVISCOSA
ROVIGO
GARDILLIANA
OSTELLATO (Eu)
OSTELLATO (Bu)
CREVALCORE
MANDURIA
S.NICOLÓ D´ARC.
S. BENEDETTO PO
OSTIGLIA
OFFICES
BOLZANO
PADOVA
ROME
ACERRA
CAGLIARI
POTENZA
ENNA
MILAN
LIQUID BIOMASS
ACERRA
SOLID BIOMASS
ENNA
BULGARIA
SPAIN
WIND
LOCATIONS SPC OWNERSHIP GROSS CAPACITY (MW)
START ofOPERATIONS
FIT / CV(years)
GORGOGLIONE FRI-EL Gorgoglione S.r.l. 100 % 3.30 Feb. 2002 20
MORCONE Eolica PM S.r.l. 85.5 % 51.75 Jun. 2019 20
SANT‘AGATA FRI-EL S. Agata S.r.l. 100 % 72.00 Nov. 2006 12
RICIGLIANO FRI-EL Ricigliano S.r.l. 50 % 36.00 Jun. 2007 12
NULVI-TERGU FRI-EL Anglona S.r.l. 60 % 29.75 Jan. 2008 15
CAMPIDANO FRI-EL Campidano S.r.l. 100 % 70.00 Sep. 2008 15
ALBARETO FRI-EL Albareto S.r.l. 85.50% 19.80 May 2019 20
GROTTOLE FRI-EL Grottole S.r.l. 50 % 54.00 Dec. 2008 15
SAN BASILIO FRI-EL Guardionara S.r.l. 49 % with 24.65 Jun. 2010 15
URURI Andromeda Wind S.r.l. 49 % with 26.00 Oct. 2010 15
ANZI FRI-EL Anzi S.r.l. 49 % with 16.00 Jun. 2011 15
GUARDIA P. GORGOGLIONE FRI-EL San Canio S.r.l. 50 % with 24.00 Mar. 2013 15
GRAVINA DI PUGLIA Nuova Energia S.r.l. 50 % with 72.00 Nov. 2013 20
VIZZINI Callari S.r.l. 85.50% 36.00 Gen. 2009 15
CASTEL DI LUCIO Minerva S.r.l. 85.50% 23.00 Apr. 2010 15
ORDONA Ordona Energia S.r.l. 85.50% 34.00 Mar. 2009 15
SAN MARCO IN LAMIS Renergy San Marco S.r.l. 85.50% 44.20 Dic. 2011 15
ALBANELLA Eolo S.r.l. 85.50% 8.50 Feb. 2004 12
CIORLANO Dotto S.r.l. 85.50% 20.00 Mar. 2008 15
AGRIGENTO Wind Power Sud S.r.l. 85.50% 33.15 Jan. 2007 12
LICODIA Parco Eolico Licodia Eubea S.r.l. 67.19% 22.10 Sep. 2010 15
LACEDONIA Ecoenergia Campania S.r.l. 42.00% 15.00 Sep. 2008 15
SAN MARTINO IN PENSILIS New Green Molise S.r.l. 42.00% 58.00 Oct. 2010 15
WIND PORTFOLIO
OPERATING WINDFARMS
13
LOCATIONS SPC OWNERSHIP GROSS CAPACITY (MW)
START of OPERATIONS FIT / CV(years)
VILLACIDRO Green Energy Sardegna S.r.l. 85.50% 30.80 Dec. 2018 20
KRUPEN Krupen Wind S.r.l. 42.83% 12.00 Oct. 2010 15
COMIOLICA Comiolica SL 85.50% 36.00 Dec. 2012 n.a.
COLLE SANNITA Golden FRI-EL Colle Sannita S.r.l. 50 % with 28.00 Jun. 2019 20
TOTAL 27 SPC‘s - 34 WINDFARMS 900.60
WIND PORTFOLIO
OPERATING WINDFARMS
14
LIQUID BIOMASS
LIQUID BIOMASS
PLANT IN OPERATION
16
LOCATION Acerra (Naples)
OWNERSHIP 50% FRI-EL Green Power with 50%
CAPACITY 74.8 MW (C1: 68.3 MW – C2: 6.5 MW)
ENERGY OUTPUT Approx. 600,000 MWh per year
FEEDSTOCK Crude Palm Oil (approx. 125,000 t/y)
START OF OPERATION December 2008
FRI-EL ACERRA KEY PLANT FEATURES
SOLID BIOMASS
SOLID BIOMASS
PLANT IN OPERATION
18
LOCATION Enna (Sicily)
OWNERSHIP 100% FRI-EL Green Power S.p.A.
CAPACITY 18.7 MW
ENERGY OUTPUT Approx. 128,000 MWh per year
FEEDSTOCK 6,000 ha local eucalyptus plant
START OF OPERATION December 2012
ENNA KEY PLANT FEATURES
BIOGAS
20
BIOGAS PORTFOLIO
PLANTS IN OPERATIONLOCATION SPC OWNERSHIP GROSS CAPACITY
(MW)START OF
OPERATIONSTARIFF (YEARS)
CODROIPO FRI-EL Quadruvium soc. agr. S.r.l. 73 % 0.999 Apr-2009 15
ROVIGO FRI-EL Rhodigium soc. agr. S.r.l. 96 % 0.999 Apr-2010 15
MANDURIA FRI-EL Jonica S.r.l. 100 % 0.999 May-2010 15
MOMO FRI-EL Momo soc. agr. S.r.l. 95 % 0.999 Apr-2010 15
MORTARA FRI-EL Mortara soc. agr. S.r.l. 95 % 0.999 Oct-2010 15
CODROIPO Pannellia Biogas soc. agr. S.r.l. 73 % 0.999 Dec-2010 15
PIOVERA FRI-EL Plovera soc. agr. S.r.l. 98 % 0.999 Dec-2010 15
OSTELLATO Società agricola Il Bue S.r.l. 100 % 0.999 Dec-2010 15
GUARDA VENETA FRI-EL Gardilliana soc. agr. S.r.l. 96 % 0.999 Dec-2010 15
GROPELLO CAIROLI FRI-EL Grupellum soc. agr. S.r.l. 98 % 0.999 Dec-2010 15
TORVISCOSA FRI-EL Annia soc. agr. S.r.l. 80 % 0.999 Jul-2011 15
DAIRAGO FRI-EL Maddalena soc. agr. S.r.l. 100 % 0.999 Sept-2011 15
SERMIDE FRI-EL Sermide soc. agr. S.r.l. 100 % 0.999 Nov-2011 15
ALESSANDRIA FRI-EL Alexandria soc. agr. S.r.l. 70 % 0.999 Feb-2012 15
BRIONA FRI-EL Briona soc. agr. S.r.l. 100 % 0.999 Mar-2012 15
MEDEA FRI-EL Medea soc. agr. S.r.l. 80 % 0.999 Oct-2012 15
VILLACIDRO Villacidro soc. agr. S.r.l. 100 % 0.999 Dec-2012 15
OSTELLATO FRI-EL Euganea soc. agr. S.r.l. 100 % 0.999 Dec-2012 15
FLAIBANO FRI-EL Flaibano soc. agr. S.r.l. * 100 % 0.999 Dec-2012 15
VIGEVANO FRI-EL Vigevano soc. agr. S.r.l. 100 % 0.999 Dec-2012 15
CREVALCORE FRI-EL Crevalcore soc. agr. S.r.l.* 100 % 0.999 Dec-2012 15
S.NICOLÒ D’ARCIDANO FRI-EL S.Benedetto Po soc. agr. S.r.l. 100 % 0.999 Dec-2012 15
SAN BENEDETTO PO Po Energia soc. agr. S.r.l. 100 % 0,999 Jan 2014 15
OSTIGLIA Calandre Energia soc. agr. S.r.l. 100 % 0,526 Jan 2014 15
TOTAL 24 SPC‘s 23.50
* out of perimeter FGP
HYDRO
HYDRO PORTFOLIO
PLANTS IN OPERATION
LOCATION SPC OWNERSHIP GROSS CAPACITY(MW)
START OF OPERATIONS
FIT / CV(YEARS)
CARAMANICO S.I.A. S.r.l.** 50 % 4.50 1994 NO
PONTE S. GIOVANNI Nodessi S.r.l.** 50 % 2.00 2006 12
VITORCHIANO Idroelettrica Umbra S.r.l. 100 % 0.36 1997 – 2017* 20
MEDUNA FRI-EL Hydro S.p.A.** 100 % 0.78 1908 - 2012* 15
NONCELLO FRI-EL Hydro S.p.A.** 100 % 0.58 1908 - 2012* 15
TORRE FRI-EL Hydro S.p.A.** 100 % 0.52 1960 - 2011* 15
BURIDA FRI-EL Hydro S.p.A.** 100 % 0.37 1953 - 2012* 15
LONGONE FRI-EL Hydro S.p.A.** 100 % 0.77 1990 - 2011* 15
PONTEVICO Ener.Fin S.r.l.** 100 % 0.59 1999 – 2017* 20
TREIA Z.E.T. S.n.c.** 100 % 1.24 1997 – 2018* 20
LIGONCHIO P.E.I. S.r.l.** 100 % 3.35 1992 - 2012* 15
BELLANO Hydro Energy Power S.r.l. 100 % 4.50 1947 - 2011* 15
CEPPO MORELLI Hydro Energy Power S.r.l. 100 % 2.49 1992 - 2013* 15
SCOPOLI P.E.I. S.r.l.** 100 % 0.60 2010 NO
SERRAVALLE ENERGAL Snc** 100 % 1.40 2013 15
TOTAL 9 SPC‘s - 15 plants 24.05
22
* After revamping** out of FGP perimeter
AGRICULTURE
AGRIBUSINESS
ROMANIA: OPERATING PLANTATION (13,200 HA)
24
Delta – Rom Agriculture S.r.l. was incorporated in 1997. Ownership: FRI-EL International Holding (33.3% Ener.Fin S.r.l. – 33.3% FRI-EL Energy Investments S.r.l. – 33.3% FRI-EL Capital S.r.l.)
The company owns a land lease for 10,000 ha of very fertile soils and is therefore oneof the largest farms in Romania
The neighboring farm Anglo – Rom Agriculture S.r.l. was purchased in 2009, alongwith its 3,200 ha of fertile farmland
Both farms benefits from logistics and irrigation advantages due to their location on an island on the Danube delta
The farm includes: land, the residential buildings (100 m distance from the river), thepier and the barn
Delta- and Anglo – Rom employs 125 permanent workers
The land is currently being cultivated with maize, wheat, barley, sunflower, rape and soya
FRI-EL GROUP aims to become the leading agriculture company in Romania
Thank You.