19/09/2007 Belfast, AIAA Conference
SWIM-SUIT SWIM-SUIT
Giuliano d’AuriaSELEX Sistemi Integrati
19/09/2007 Belfast, AIAA Conference
Setting the SceneSetting the Scene
•Single European Sky foresees implementation of a European ATM Network
•System Wide Information Management (SWIM) represents main technical enabler
•Many initiatives have already focused on the operational aspects of an ATM Network offering timely information, distributed when and where needed
•C-ATM, OATA PROJECT, EUROCAE Working Groups 59, 61 and 69
ATM Network
Tec
hn
ical
En
able
r
Tec
hn
ical
En
able
r
SW
IM
Tec
hn
ical
En
able
r
Tec
hn
ical
En
able
r
19/09/2007 Belfast, AIAA Conference
Is it Feasible?Is it Feasible?
•How strong are the foundations?
•Still no clear indication on how to implement SWIM
•Investigate the feasibility of an initial System Wide Information Management infrastructure for the European Air Transport System.
ATM Network
Technical Enabler Technical Enabler
Technical Enabler
Technical Enabler
SW
IM
SW
IM-S
UIT
Ove
rall
Ob
ject
ive
19/09/2007 Belfast, AIAA Conference
SWIM-SUIT ObjectivesSWIM-SUIT Objectives
SWIM Prototype
Information management processes
Quality of Service
Safety and security aspects
Data Property
Information Models
Information access and security mechanisms
Cost Benefit
Specification of the requirements for the SWIM implementation
Validation of the technologies identified as enablers of the SWIM concept
Assessment of the Organisational, Legal and Financial Implications
SW
IM F
EA
SIB
ILIT
Y
19/09/2007 Belfast, AIAA Conference
SWIM-SUIT PrototypeSWIM-SUIT Prototype
AOCAOC
Flight Simulator
MXP AIRPORT
Lisbon AIRPORT
ISPOC Prototype
ATFCM
(CFMU)
ACC/APP
ACC
ACC/APP
19/09/2007 Belfast, AIAA Conference
SWIM-SUIT PrototypeSWIM-SUIT Prototype
ManageContent Check
Store
Acquire Data
AOCAOC
Flight Simulator
MXP AIRPORT
Lisbon AIRPORT
ISPOC Prototype
ATFCM
(CFMU)
ACC/APP
ACC
ACC/APP
19/09/2007 Belfast, AIAA Conference
SWIM-SUIT PrototypeSWIM-SUIT Prototype
AOCAOC
Flight Simulator
MXP AIRPORT
Lisbon AIRPORT
ISPOC Prototype
ATFCM
(CFMU)
ACC/APP
ACC
ACC/APP
Disseminate Data
ManageAccess Security
LicensingPricing
19/09/2007 Belfast, AIAA Conference
SWIM-SUIT PrototypeSWIM-SUIT Prototype
ATM Virtual Information Pool
AVI POOL
AOCAOC
Flight Simulator
MXP AIRPORT
Lisbon AIRPORT
ISPOC Prototype
ATFCM
(CFMU)
ACC/APP
ACC
ACC/APP
19/09/2007 Belfast, AIAA Conference
SWIM-SUIT PrototypeSWIM-SUIT Prototype
CENTRAL FLOW MANAGEMENT
AIRCRAFT OPERATOR
AIR TRAFFIC CONTROL ACC
AIR TRAFFIC CONTROL APP
AIRPORT OPERATOR
AIRCRAFT
•Partner Legacy Applications
•SWIM Prototype Network ( WAN connecting all the sites)
•Wrappers connecting legacy applications to Prototype Network
•One or more technologies will be identified and Tested
19/09/2007 Belfast, AIAA Conference
SWIM-SUIT FocusSWIM-SUIT Focus
Network InfrastructureNetwork Infrastructure
MiddlewareMiddleware
ATC ApplicationsATC Applications AirborneAirborne ApplicationsApplications
OTHEROTHER ApplicationsApplications
• The Demonstrator will consider Middleware and Communication Architectural Layers
• SWIM-SUIT will not focus on:– Air/Ground Datalink issues– Operational Requirement Definition Activities
19/09/2007 Belfast, AIAA Conference
SESAR & 6FP: SESAR & 6FP: RELATIONSHIPS RELATIONSHIPS
SESAR Definition phase
2006 2007 2008 2009
OTHERPROJECTS:e.g. C-ATM,
NORDICSWIM,ETC
SESAR Implementation phase
SESAR
SWIM SUIT
EPISODE 3
19/09/2007 Belfast, AIAA Conference
Project DetailsProject Details
•RTD project (STREP)
•Call 4b of the 6FP
•Budget:•11,8 M€•6,3 M€ funded by EC
19/09/2007 Belfast, AIAA Conference
Consortium at a GlanceConsortium at a Glance
• 10 Countries• 20 Partners• 6 Industries• 1 Airport Managing
Company• 2 Airlines• 4 ANSPs• 4 SMEs• 2 Research Centres• 1 University
•External support from:
•User Group
19/09/2007 Belfast, AIAA Conference
The Road to SWIM-SUIT: User The Road to SWIM-SUIT: User GroupGroup
Requirements Design Integration Validation Financial
WP0
WP1
Information Management Users
Requirements
WP2
SWIM Design, Development and
Testing
WP3
Test Bed Integration and Testing
WP4
Validation
WP5
Financialand
Institutional
ECEuropean
Commission
19/09/2007 Belfast, AIAA Conference
The Road to SWIM-SUIT: User The Road to SWIM-SUIT: User GroupGroup
Requirements Design Integration Validation Financial
WP0
WP1
Information Management Users
Requirements
WP2
SWIM Design, Development and
Testing
WP3
Test Bed Integration and Testing
WP4
Validation
WP5
Financialand
Institutional
ECEuropean
Commission
User Group
19/09/2007 Belfast, AIAA Conference
SWIM-SUITSWIM-SUIT
Thank You!Thank You!
19/09/2007 Belfast, AIAA Conference
SWIM SUIT: Reserve SWIM SUIT: Reserve Slides Slides
19/09/2007 Belfast, AIAA Conference
Consortium CompositionConsortium Composition
19/09/2007 Belfast, AIAA Conference
SWIM SUIT: PLANNING SWIM SUIT: PLANNING
Requirements Design Integration Validation Financial
19/09/2007 Belfast, AIAA Conference
SWIM SUIT: PLANNING SWIM SUIT: PLANNING
Requirements Design Integration Validation Financial
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 42007 2008 2009 2010
WP1
WP2
WP3
WP4
WP5 1st Cycle 2nd Cycle