19 th National Award for Excellence in Energy Management ICICI Bank, Chandivli Tower, Mumbai August 29 & 30, 2018 Presenters Atul Parkar Energy Manager Deepak Tyagi Tower Manager

Transcript of 19 National Award for Excellence in Energy Management ... · Sr. No. Description Lac kWh Savings...

19th National Award

for Excellence in Energy

Management

ICICI Bank, Chandivli Tower, Mumbai

August 29 & 30, 2018

Presenters –

Atul Parkar – Energy Manager

Deepak Tyagi – Tower Manager

ICICI Bank is India’s largest private sector Bank by consolidated

assets. We pride ourselves in continuing to support India’s growth

story with our extensive distribution network, diversified portfolio and

leadership in technology.

` 11242.81 Billion

Total consolidated Assets

21%

Year-on-Year growth in retail loans

>100

Large offices

14,367

ATMs

4867

Branches

ICICI Bank, Chandivli Tower, Mumbai

ICICI Bank

Brief Introduction of Chandivli Tower

Operational in 2006

Total Area – 23296 Sq. Mtr.

Wings - 3

Total occupancy – 2800

High density Tower

Back office operations

Training facility

Rooftop Solar 67 kWp

Solar PPA 1.5 MWp

N

Load Distribution of the Building

56%

HVAC

• 3 x 250 TR

• Air cooled VSD

• MCX coils

• 1.08 iKW/TR

18%

IT

• 350 kVA UPS

• TFT Desktops

• MFM printers

• Hub rooms

16%

Other

• Canteen

• Elevators

• Pumping

• Stand alone AC

10%

Lighting

• LED

• 0.6 W / Sq.ft

• Pull cords

Annual Energy consumption

25.41%

savings

in last 3

years

9.40

Lac

kWh

Savings770 Tons of CO2

emissions avoided

37.00

32.78

28.5627.60

20.00

25.00

30.00

35.00

40.00

FY 2015 FY 2016 FY 2017 FY 2018

Annual Energy Consumption Lac kWh

Specific Energy Consumption

130

115

100 97

81

FY 2015 FY 2016 FY 2017 FY 2018 TCS Kochi

EPI normalized for 11 hrs National

Benchmark

25.41% reduction

in SEC

5 STAR

Warm &

Humid zone

Internal benchmarking EPI as on Mar-

2018

80 83

9297 97 100

103109 110

114117

121125

148 148 151

EnCon projects implemented in FY

2016

Equipment based

monitoring & control

• Trimming of AHU & chiller plant operation timings by 30 mins.

• Set point increased to 10 Deg C

• VFD on secondary pumps made operational

• Choking of condenser coils identified

• Savings – 2.30 Lac kWh

UPS optimisation

• Before - 760 kVA

• After – 350 kVA

• Savings – 0.78 Lac kWh

Investment –

Rs. 50 Lacs

Savings –3.08 Lac

kWh

EPI reduced from 130 to

115

EnCon projects implemented in FY

2017

* Individual lighting control

* Savings of 0.28 lac kWh p.a.

* Investment –Rs. 14 Lacs

* Payback – 50 months

* 50% reduced motor capacity

* Savings of 0.42 lac kWh p.a.

* Investment –Rs. 8.00 Lacs

* Payback – 23 months

* 60% reduced motor capacity

* Savings of 0.03 lac kWh p.a.

* Investment –Rs. 0.60 Lacs

* Payback – 19 months

* Dynamic balancing – right flow at all times

* Savings of 0.03 lac kWh p.a.

* Investment –Rs. 0.60 Lacs

* Payback – 19 months

Pull Cords EC Motor DC FansEnergy Valve on

AHU

EnCon projects implemented in FY 2017

BMS Intervention

* Auto operation of plant

* Dynamic set point enabled

* Optimised control & efficiency

* Savings of 2.80 Lac kWh p.a.

Wastage elimination

* No Traffic during Night.

* Operating Temp range of Switches is up to 42oC

* Maintaining Temp. of 28oC in Hub Rooms

* Savings of 0.64 Lac kWh p.a.

No Investment

Total Savings

4.20 lac kWh

Total

Investment

Rs. 23.20 Lac

EPI reduced from

115 to 100

Planned EnCon projects in FY 2018

Sr. Description Remarks Status

1

Separate Standalone AC

system for 24 x 7

Working Areas

Less Chiller

efficiency on

very low

Loads.

Completed

2 HVLS Fans For AtriumEvaluated

& dropped

3VAV & VFD for All Ceiling

Suspended AHU’s

Simultaneous

Control of

Chilled water &

Air

Evaluated

& dropped

Innovative Project implemented in

FY18

Day time

iKw/TR

0.97

Night time iKW/TR

1.37

Night 42% higher iKW/TR

350 kWh

Action taken & savings

23 TR load during night time & full day on holidays. Poor efficacy of chillers on low load

Unitary system provided ( Split AC ) & fans

Investment – Rs. 9.71 Lacs

Total Annual Savings – 60,000 kWh & Rs. 7.20 Lacs

Simple Payback – 16 months

Innovative Project implemented in

FY18Background –

• Training facility on 2nd floor

• Peak Occupancy – 200

• Requests for lowering the temp. set points

• Although AHU set point lowered, cooling was not

achieved hence Chiller outlet set point was reduced

by 1 to1.5 Deg C

• Other floor occupants experiencing chillness

• In case of less occupancy, cooling was wasted

Occupant dis-comfort

& Energy wastage

Innovative solution deployed

• VFD acts as DDC panel with all intelligence stand-alone

• User can set temperature & VAV will modulate

• As VAV operates, AHU speed is controlled by VFD

• VFD also controls Chilled Water valve to control flow

• 90% control on Air & 10% control on chilled water

6% savings achieved

0.10 Lac kWh

Collaboration

with OEM

Projects evaluated in 2018 & dropped

HVLS fan

- Payback was 5.5 years

- Aesthetics

- Safety

- CAPEX & OPEX both were high

VAV & VFD for all AHU

- Duct layout demanded more than 1 VAV

- Variation in speed of Fan was low

- Payback was 5 years

Summary of EnCon projects

Sr.

No.Description

Lac kWh

Savings

Investment

Lac Rs.

Year of

action

1 Equipment based monitoring & control 2.30 Nil FY 2016

2 UPS optimisation 0.78 Nil FY 2016

3 EC Blower for AHU – 8 nos. 0.42 8.00 FY 2017

4 Pull chords for lighting control 0.28 14.00 FY 2017

5 DC fans in Canteen 0.03 0.60 FY 2017

7 Energy valve for AHU 0.03 0.60 FY 2017

8 Chiller sequencing 2.80 Nil FY 2017

9 Hub room AC switched OFF 0.64 Nil FY 2017

10 Stand-alone AC for night operations 0.60 9.73 FY 2018

11 VAV/VFD for Training rooms 0.10 2.25 FY 2018

Grand Total 7.98 34.58

EPI reduced from 130 to 97

Plans for reduction in SEC i.e.EPI

Sr. No. Activity

1 UPS replacement

2 Hot desk concept for extended & holiday working hrs

3 Replacement of AHU blowers with PM motors in AHU

Target to achieve savings of 1.25 Lac kWh & reduction

in EPI by 5 points

Utilisation of renewable energy

sources

• Open Access

PPA

• 1.5MWp Solar

power contract

• 16.44 Lac kWh

in FY 2018

• 67 kWp Roof

top Solar

• OPEX based

• 0.81 Lac kWh in

FY 2018

• Solar water

heating 750

LPD capacity

• Utensil washing

• 0.05 Lac kWh

Total

17.3 Lac kWh

63% energy from Solar

1418 Tons CO2 saved

GHG emission quantification &

certification

As a responsible

Corporate, we have

quantified, verified &

certified the GHG

emissions due to

Chandivli operations.

These emissions were

reported in public portal.

Financial Year CO2 emission (Tons)

FY 2015 3034

FY 2016 2666

FY 2017 2285

FY 2018 2206

Monitoring, control & resources

Equipment based monitoring & control – Chiller plant, AHU, UPS, DG, 125 Energy meters

Daily consumption & efficiency reporting

Monthly Energy review – Chaired by Group Head

EnCon Budget – Rs. 50 Mn p.a. ( Central )

Training & certification of Tower Manager for IGBC AP, representation in Awards like CII, NECA & MEDA

KAIZEN projects by team

• Symphony air cooler for fresh air system

• Thermostat Setting of Kitchen Equipment

• Segregation of Workstations

• Electrical Room Free Cooling

• Return Air Sensor Relocation for AHUs

Initiative in Green Supply Chain

5000

Branches

& offices

5 Critical

Elements

DG, UPS,

AC,

Stabiliser,

CCTV

CAMC

Min. 4

services

yearly

>1 Lac

service

reports

500 Kg

of Paper

Non -productive

Payment TAT

45 days

Both parties i.e. ICICI Bank &

Service partner were suffering

Electronic Field Service Report

Digital Push

• Smart Tablet or phone

• User friendly front end

• Real time data

Improved productivity

• Convenience of handling large data

• Elimination of re-work

• Transparency

Cost Savings

• Savings in Paper

• Savings in courier charges

• Payment TAT @ 10 days

• Storage space

Thanks to ICICI

Because of ICICI we could bring in eFSR & could

achieve

• Integrated eFSR system with Pulse (KOEL CRM)

• eFSR Go Live for 7.5 Lakhs KOEL Assets – Covering

all customers

• 3.5 Lakhs Service Requests closure through eFSR

since Nov 2017

• Saving of 180 trees since Nov 2017

• Improvement in Service Quality, Visibility and

Productivity of Service Engineers

Awards won by Chandivli Tower

CII Energy Management & Excellence Awards

- Excellent Energy Efficient Unit 2015

- Energy Efficient Unit 2016

- Excellent Energy Efficient Unit 2017

- Most Useful Presentation 2017

CII Western Region EHS Excellence Awards

- 3rd Rank 2017

National Energy Conservation Awards ( NECA )

- First Rank ( Building Sector ) 2015

- Certificate of Merit 2017

Maharashtra Energy Development Agency ( MEDA )

- 2nd Rank 2016

Other Initiatives & certifications

Rain Water Harvesting

Recharge pits

Paperless

zone

Green Cover

IGBC AP certification

OHSAS 18001-2007

BEE STAR Rating for Building

Thank You