19-II.9 Clearing of Right of Way

download 19-II.9 Clearing of Right of Way

of 2

Transcript of 19-II.9 Clearing of Right of Way

  • 8/9/2019 19-II.9 Clearing of Right of Way

    1/2

    CHAPTER 9

    CLEARING OF RIGHT OF WAY

    1.0 GENERAL:

    1.1 It is advisable to carry out the work of clearing the right of way as early as possible during

    the construction of the line.

    1.2 The work of clearing of right of way should preferably be carried out in the seasons when

    there are no standing crops in the agriculture fields. This has two advantages. Firstly, there

    is least resistance from the farmers. Secondly, there is no need to pay any cost towards

    compensation for damage to crops.

    1.3 However, tree cutting necessary for paying out and sagging of conductor may be got done

    during the stringing operation.

    2.0 CLEARANCE OF RIGHT OF WAY:

    2.1 The width of right of way for the various line voltages is repeated below.

    Line Voltage Width of Right of Way

    132 kV 27 metres

    220 kV 35 metres

    400 kV 52 metres

    2.2 A drawing showing the requirements of line clearance within the right of way is given at

    Appendix A.

    2.3 Cutting of trees, shrubs, bushes, etc. in the right of way is to be got done as shown in the

    drawing above. All trees, shrubs, bushes, etc. which infringe on the clearances are to be

    cut.

    2.4 Small bush growth, shrubs and trees whose height is not expected to rise beyond 3 meters

    may be allowed to remain.

    2.5 Grass growth on the boundary walls (Dola) of agriculture fields which can grow to a height

    such as to infringe on the clearance are to be cut.

    2.6 Trees outside right of way but of such height as may infringe on line clearance are to be

    trimmed accordingly.

    2.7 Trees or bushes growing inside or very close to the legs of towers shall be cut / removed.

  • 8/9/2019 19-II.9 Clearing of Right of Way

    2/2

    134 Construction Manual for Transmission Lines

    APPENDIX A