Telecom Project Management
Naokhaiz Afaqui
-
8/7/2019 188 Telecom PM
2/31
www.zumbeel.netwww.zumbeel.net Naokhaiz Afaqui
-
8/7/2019 188 Telecom PM
3/31
www.zumbeel.netwww.zumbeel.net Naokhaiz Afaqui
Why is Project Management
important? When things are going well, something will go
wrong. When things just cant get worse, they
will. When things appear to be going better, you
have overlooked something.
Project Management ensures that potential risksand contingency plans are in place to achieve
the desired objectives
-
8/7/2019 188 Telecom PM
4/31
www.zumbeel.netwww.zumbeel.net Naokhaiz Afaqui
What Is a Project?
A project is a temporary endeavor undertaken toaccomplish a unique purpose
Success of a project is (typically) measured by
three dimensions
quality/performance (meeting specifications)
timeliness ( Speed)
within Cost budget
-
8/7/2019 188 Telecom PM
5/31
www.zumbeel.netwww.zumbeel.net Naokhaiz Afaqui
What is project management?
The application of knowledge, skills, tools,
and techniques to project activities in order
to meet or exceed stakeholder needs andexpectations from a project. [PMI, Project
Management Body of Knowledge (PMBOK Guide), 2000]
-
8/7/2019 188 Telecom PM
6/31
www.zumbeel.netwww.zumbeel.net Naokhaiz Afaqui
PM schools of thoughts
IFIs Models
PMBOK 3rd Edition (PMP)
Prince2 Maturity Model (P2MM)
Project Management Maturity Model (PMMM)
Portfolio, Programme and Project Management
Maturity Model (P3M3)
Organizational Project Management MaturityModel (OPM3)
Capability Maturity Model (CMM)
-
8/7/2019 188 Telecom PM
7/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
PM Processes
-
8/7/2019 188 Telecom PM
8/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
Overlap of Process Groups in a
Phase*
*A Guide to the Project Management Body of Knowledge (PMBOK
Guide) 2000 Edition
-
8/7/2019 188 Telecom PM
9/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
Project was identified like this
-
8/7/2019 188 Telecom PM
10/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
After plan it looked like this
-
8/7/2019 188 Telecom PM
11/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
As designed by the designers
-
8/7/2019 188 Telecom PM
12/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
What was actually approved?
-
8/7/2019 188 Telecom PM
13/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
What was constructed?
-
8/7/2019 188 Telecom PM
14/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
What the users actually wanted?
-
8/7/2019 188 Telecom PM
15/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
Project Management Package
T
T
-
8/7/2019 188 Telecom PM
16/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
Work Breakdown Structure: an analytical tool
for dealing with project components in an
orderly way.Gantt Chart: a schedule presented in bar
chart
Milestone Chart: Summary of major critical
activities required for completing the project
PM Tools
-
8/7/2019 188 Telecom PM
17/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
Critical Path Networking: system for
calculating critical activities and for
providing graphic output needed to
schedule and control the project
PM Tools
-
8/7/2019 188 Telecom PM
18/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
Sample WBS for Intranet
Project in Chart Form
Concept
Desi nUser Interf ce
Desi n er er et p
Develop erver
pport Infr str ct re
eb ite
Desi n
Develop es
and Links
Develop
Functionalit
Content
Mi ration/Integration
Testing
eb ite
Development
Roll Out upport
Intranet roject
-
8/7/2019 188 Telecom PM
19/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
20 4 106 8Month
Activity
Design house and
obtain financing
Lay foundation
Order and receive
materials
Build house
Select paint
Select carpet
Finish work
A Gantt Chart
-
8/7/2019 188 Telecom PM
20/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
Milestones
5/13 5/20 5/27 6/3 6/10 6/17 6/24 7/1 7/8 7/15 7/22 7/296/5 2/8
5/6/2002
Project
Start
5/24/2002
Interim esign
eview
6/25/2002
Final esign
eview
6/18/2002OperatorManual
eview
7/2/2002OperatorManual
Approval
7/18/2002
Test ediness
eview
8/2/2002
Project
Completion
-
8/7/2019 188 Telecom PM
21/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
Critical Path Method
(CPM)
Design
Build
Mechanical
Components
Build
Electronics
Write
Operator
Manual
IntegrateComponents
Validate
Operator
Manual
Test
System
Critical Path
-
8/7/2019 188 Telecom PM
22/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
Top 10 PM Software Products
Name of Product Produced by: %use Microsoft Project Microsoft Corp. 48.4%
Primavera Project Planner Primavera Systems 13.8
Microsoft Excel Microsoft Corp. 8.5
Project Workbench Applied Business Tech. 8.1
Time Line Time Line Solutions 6.1
Sure Trak Primavera Systems 5.3
CA-SuperProject Computer Associates, Intl. 2.8
Project Scheduler Scitor 2.8
Artemis Prestige Lucas Management Systems 2.0
FasTracs Applied Microsystems 2.0
Fox, T.L. & Spence, J.W. 1998. Tools of the trade: A survey of project
management tools. Project Management Journal.
-
8/7/2019 188 Telecom PM
23/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
The Project Management Career A 1996 Fortune article called project management the number
one career choice
#1 position that IT managers say they will need for contract help
Average salary for project managers is atleast 1.5 times more as
compared to an equally experienced professional.
End
ser
Project
Staff Executive
Mgt
PM
-
8/7/2019 188 Telecom PM
24/31
www.zumbeel.netwww.zumbeel.netNaokhaiz Afaqui
The end user can be a residential consumer or it can be a huge multinational business using voice, data,
video and multimedia services in a business environment
Telecom Service provider industry includes the traditional telecommunications, which has typically been voice
service, with the addition many years ago of data service as well
Some vendors sell products in a single area while many sell products in multiple areas of telecom, maybe
having business lines with wireless, broadband and optical products. Some vendors are local or regional,while many offer products nationally or internationally
At component manufacturer level, there will be a variety of projects specifically related to the development and
manufacturing processes
Telecom Value Chain
-
8/7/2019 188 Telecom PM
25/31
www.zumbeel.netwww.zumbeel.net Naokhaiz Afaqui
A career in telecom today demands high level of project management skills.
In short, there is a need for Project Management Professionals at entry & managerial
levels who can handle end-to-end infrastructure in the following domains:
Telecom Jargons
-
8/7/2019 188 Telecom PM
26/31
www.zumbeel.netwww.zumbeel.net Naokhaiz Afaqui
Conclusion
Project Management is a discipline that broadens horizon andbuilds competence in multiple knowledge areas
Project Management equips with wonderful tools to enhance
productivity and management skills
There is a great demand of good Project Managers in Telecom
industry
Good Project managers can work on any technology orindustry
-
8/7/2019 188 Telecom PM
27/31
www.zumbeel.netwww.zumbeel.net Naokhaiz Afaqui
Thank You
-
8/7/2019 188 Telecom PM
28/31
www.zumbeel.netwww.zumbeel.net Naokhaiz Afaqui
Project Managers are a fortunate lot, for, as everyone knows, a project manager
has nothing to do; that is, except...
To decide what is to be done;to tell somebody to do it;
to listen to reasons why it should not be done,
why it should be done by somebody else,
or why it should be done in a different way;
What does a Project Manager O?
-
8/7/2019 188 Telecom PM
29/31
www.zumbeel.netwww.zumbeel.net Naokhaiz Afaqui
And then:
To follow up to see if the thing has been done;
to discover that it has not been done;to enquire why it has not been done;
to listen to excuses from the person who did not do it;
and to think up arguments to overcome the excuses .
What does a Project Manager O?
-
8/7/2019 188 Telecom PM
30/31
www.zumbeel.netwww.zumbeel.net Naokhaiz Afaqui
And then:
To follow up a second time to see if the thing has been done;
to discover that it has been done incorrectly;to point out how it shall be done;
to conclude that as long as it has been done it might as well be left as it is;
to wonder if it is not time to get rid of the person who cannot do a thing correctly;
to reflect that in all probability any successor would be just as bad, or worse.
What does a Project Manager O?
-
8/7/2019 188 Telecom PM
31/31
www.zumbeel.netwww.zumbeel.net Naokhaiz Afaqui
And finally:
To consider how much more simply and better the thing would have been done
had he done it himself in the first place;
to reflect satisfactorily that if he had done it himself he would have been able todo it right in 20 minutes
and that as things turned out, he himself spent two days trying to find out why it is
that it has taken somebody else three weeks to do it wrong.
To realise that such an idea would have a very demoralising effect on the project
team, because it would strike at the very foundation of the belief of all employees
that a project manager has nothing to do.
What does a Project Manager O?