Index
Item Description
AA) Instalation Service of Substation
AA1)
AA2)
Sub Total (AA1 & AA2)
BB) 220 ! D"#T$A%SISSI'% I%
i)
##)
i)
Total (AA * BB & ##)
Sc+edule %o,- . Installation and 't+er Servicesof
1) 220"20 ! Substation2) 220! D"# Trans
(Substation)* Af
Installation of 220/20 KV Substation at Shindan(Annx 1)
Installation of 220/20 KV Substation at Adraskan (Annx 2)
Installation of 220 KV D/C Transmission Line ShindanSubstation)!Ardskan!"erat Substation)# Af$hanistan Line Len$th%A&&' 120 Kms (Annx 4)
T$AI%I%5 ' '6$7S 8$S'%% A%D '& '
T$A%SISSI'% I% A%D S9BSTATI'%Trainin$ of (m&loer*s +ersonnel for o&eration and ,aintenan-e ofboth Substations and Transmission line as laid do.n intheS&e-ifi-ations(Annx 4)
-
8/10/2019 18.06.2014 latest
2/140
Total 8rice Taxes and Duties
(9SD) (9SD) (9SD)
2121
200:-;:2;=0:
ac+ at S+indan and Adras/an* Af+anistan* andmission ine rom S+indan (SubStation) to 3eart
anistan,
9nit $ates(abul Team)
-
8/10/2019 18.06.2014 latest
3/140
Sc+edule %o,- . Installation Services & 't+er Services
3ote%
Item Description (for eac+ Substation) 9nit
AA) S9BSTATI'%S.AA1) Installation of 220"20 ! Substation at S+indan.
A) ain of oundation Bloc/s(As per tec+nical specifications)
a)
1,0 8'$ T$A%S'$$S
i) 3os'
2,0 T Transformer
i) 3os'
S9BT'TA (a. '9%DATI'% B'#S '$ T$A%S'$$S)
b)
1,0
i) 6eeder 7as 3os'
ii) Transformer 7as 3os'
iii) 7us Cou&ler 7a 3o'
2,0 2-< /! -00 A #Ts"%#Ts complete Cit+ Terminal #onnectors"#lamps etc,a) 2-< /! -00 A #Ts(1 8+,) Cit+ 120 extended current for.
i) 6eeder 7as !Core) 3os'
ii) Transformer 7as !Core) 3os'
iii) 7us Cou&ler 7a 2 Core) 3os'
b)
i) +o.er Transformer 7as 3os'
4,0 2-< /! !Ts"#!Ts complete Cit+ Terminal #onnectors"#lamps etc, .
a) 2-< /! !Ts (1 8+ase* !T $atio110 !"E4"110 !"E4"110 !) for .
i) 6eeder 7as 3os'
ii) 7us Cou&ler 7a 3os'
b) 2-< /! #!Ts (1 8+ase* !T $atio110""4"0,110""4) for .
i) 6eeder 7a "eart 9 other Line 7a) 3os'
AA1) Suppl and Installation of 220"20 ! Substation at S+indanCit+ Scope of Cor/s as under.
?nit/>>Total +ri-es shall be
-
8/10/2019 18.06.2014 latest
4/140
iii) Tee ff Cable Tren-h alon$.ithbra-kets 9 Co@ers as abo@e/as &er s&e-ifi-ations ,ete
b) #able Trenc+es for lain 8oCer #ables as under.
i)
,ete
c)
i)
,ete
ii),ete
d) 7uried Cable Tren-hes as abo@e/as &er s&e-ifi-ationsas underi)
,ete
ii),ete
iii)
,ete
) #onstruction of encin *Boundar all and $oads.
i)
,ete
ii)
,ete
iii)
,ete
iv)
,ete
v)
,ete
20kV 1C;0 mmH Al Conndu-tor FL+( -able for lain$ -ontrol -ables for 20 KV CTs u&to20 KV Cont' m' for 2;1/20 ,VA 220/20KV +o.er Transformers from 20 KV CTs'installedon 20 KV side of Trans' to 20 KV Control oom in its Cable Tren-h fi;in$ &ro&erl# dul
labeled for identifi-ation et-'in-ludin$ entr to Control oom# &ro&erl desi$ned/installed or-onstru-ted to &re@ent in!flo. of ain .aters in side -ontrol oom in-ludin$ fi;in$ of Cable7ra-kets##Cable Tras 9 fi;in$ of Cable Du-t Co@ers as abo@e/as &er s&e-ifi-ations
Lain$ of Cable Du-t in 220 KV Control 9 20 K@ Control oom in-ludin$ fi;in$ of Cable7ra-kets##Cable Tras 9 fi;in$ of Cable Du-t Co@ers in-ludin$ entr to Control oom 9 allt&es of -rossin$s and sum& &it#Bal@anied mild steel for bra-kets# Tras 9 Co@ers -o@eredin S-hedule 1) In-ludin$ fabri-ation of 7ra-kets/Tras/Co@ers# in-ludin$ .eldin$ .orks 9materials reuired for .eldin$# in-ludin$ Con-rete and reinfor-ement steel et--om&lete =obas &er s&e-ifi-ations as under%
?nder Du T&e C9 &anels?nder ela &anels installed on front 9 Control &anelinstalled in the rear side .ith inter -onne-tin$ &assa$e to Control 9 ela +anel)#fi;in$50;50;5 mm $al@anied an$le bra-kets# fi;in$ Cable Du-t Co@ers fabri-ated from mm &late 9 10; mm flat frame/# for batterChar$ers/ACD7 9 DCD7 et-'as &ers&e-ifi-ations
In 20 KV Control oom as &er s&e-ifi-ations to a--ommodate all the &o.er Cables 9 &ro&erentr to Contro&l oom as &er s&e-ifi-ations
7uried Cable Tren-h for lain$ 20 KV '5;15 mmH +o.er Cable from 20 KV Control oomto 12nos' Terminal Stru-tures outside 20 KV Cm'for 20 KV 6eeders in-ludin$ entr toControl oom# &ro&erl desi$ned/installed or -onstru-ted to &re@ent in!flo. of ain .aters inside -ontrol oom as abo@e/as &er s&e-ifi-ations
7uried Cable Tren-h for lain$ 20 KV '5;15 mmH +o.er Cable from Terminal Stru-turenear 20 KV Control oom to 2 nos' 20/0' KV 250 KVA Station Au; Transformers S/Stn'Tobe installed near 220 KV -ontrol room)
7uried Cable Tren-h for lain$ 2 3os LT '5C;0 mmH +o.er Cables from ACD7ne.Contro m') to Stn' Au;' +o.er Transformer S/Stn' .ith entr to 220 KV Control oom as&er s&e-ifi-ations#
S9BT'TA (D. A6I%5 ' #AB T$%#3S I% 220 /! SIT#3 6A$D & %T$6 T'#'%T$' $'')
Installation of 6en-in$ of 220KV S.it-hard in-ludin$ Su&&l f Chain Link ,esh 6en-eCL,6)# -onstru-tion of -on-rete &ara&et for ere-tion of CL,6# Bates et- as &er laoutdra.in$ In-ludin$ Con-rete# and reinfor-ement steel# other reuired materials et-' for-om&lee =ob'
Installation of 6en-in$ of 2 3os' Au; Transformer Substation in-ludin$ Su&&l f Chain Link,esh 6en-e CL,6)# -onstru-tion of -on-rete &ara&et for ere-tion of CL,6# Bates et- as &erlaout dra.in$ In-ludin$ Con-rete# and reinfor-ement steel# other reuired materials et-' for-om&lee =ob'
7oundar Eall Stone 9 7ri-k ,asonar!Stone ,asonar 0'5 ,eter belo. (arth Surfa-e0'85 ,eter .ide on 0'2 ,eter thi-k 1%% -on-rete laer# Stone ,asonar 0'5 ,eter .ideu&to 0'5 ,eter hei$ht abo@e (arth Surfa-e# 7ri-k ,asonar 0'5 ,eter .ide u&to 2'5 ,eterhei$ht!total hei$ht abo@e (arth Surfa-e '0 ,eter) for se-urit of the Station alon$.ith$atesBates as &er S&e-ifi-ation) et-' as &er laout dra.in$'
'0 meter .ide road outside Chain Link ,esh 6en-e but inside 7oundar Eall of S/Sno-on-rete) alon$ the 7oundar e;-e&t on len$th fa-in$ Control oom -um ffi-e 7lo-k /20 KVControl oom 7uildin$ in the station .ith a &assa$e to -ontrol room*s landin$# 9 -onne-tion.ith the a&&roa-h road -onne-tin$ main oad nearbif reuired the .idth of the oad -anbe @aried to suit the reuirement after a&&ro@al of the o.ner)
8'5 meter .ide road outside Chain Link ,esh 6en-e but inside 7oundar Eall of S/Sno-on-rete) alon$ the 7oundar as &er s&e-ifi-ations)*len$th fa-in$ Control oom -um ffi-e7lo-k /20 KV Control oom 7uildin$ in the station .ith a &assa$e to -ontrol room*s landin$# 9-onne-tion .ith the a&&roa-h road -onne-tin$ main oad nearbif reuired the .idth of the
oad -an be @aried to suit the reuirement after a&&ro@al of the o.ner)
D l t f B L ith B d 20 i f t 920 2 b th
-
8/10/2019 18.06.2014 latest
5/140
c)
3os
) km
i) Station S+ieldin of ard
ii)
S9BT'TA(. 8$'!IDI%5 STATI'% S3IDI%5)
%)1,1 T$A%S'$$S
a)
3os
b) 3os
S9BT'TA (81,1. T$A%S'$$S )
1,2
1,0
i) 6eeder 7as 3os
ii) Transformer 7as 3os
iii) 7us Cou&ler 7a 3o
2,0 2-< /! -00 A #Ts"%#Ts complete Cit+ Terminal #onnectors"#lamps etc,
a) 2-< /! -00 A #Ts(1 8+,) Cit+ 120 extended current for.
i) 6eeder 7as !Core) 3os
ii) Transformer 7as !Core) 3os
iii) 7us Cou&ler 7a 2 Core) 3os
b)
i) +o.er Transformer 7as 3os
4,0 2-< /! !Ts"#!Ts complete Cit+ Terminal #onnectors"#lamps etc, .
a) 2-< /! !Ts (1 8+ase* !T $atio110 !"E4"110 !"E4"110 !) for .
i) eeder Bas 3os
ii) Bus #oupler Ba 3os
b) 2-< /! #!Ts (1 8+ase* !T $atio110""4"0,110""4) for .
i) 6eeder 7a "eart 9 other Line 7a) 3os
'0
a) Isolator Cit+ B (ine art+in Blade) for eeder Bas 3o
b) Isolator Cit+out B for.
i) 6eeder 7as 3o
ii) +o.er Trans' 7as
iii) 7us Cou&ler 7a
(arthin$ (le-trodes of 0 mm dia ,S ound for Sur$e Arrestors'for 220 KV +o.erTransformer# 2 3os' Stn' Au; Transformers# 220 K@ 9 20 KV SasJ 9 in 220 KV ard forim&ro@ement of (arth esisiti@it et-' in-ludin$ -onne-tion .ith ,ain (, in-ludin$ .eldin$et-'9 ,aterials su-h as Eeldin$ ods9 other sundr mat'reuired'3ote%The no of (arthin$ (le-trodes in the ard shall be as man as reuired forim&ro@ement of (arth esisiti@it)
S9BT'TA(. 8$'!IDI%5 A$T3I%5 ' #'9%S"@9I8%T '9%TI%5ST$9#T9$S"T$A%S'$$S)
8rovidin Station S+ieldin Cit+ Cit+ +ardCare fittins"clamps (as per DraCin)*artin of t+e same Cit+ t+imblin"boltin etc,includin Sundr aterials suc+ asT+imbles of various but adeGuate capacities* fittins"clamps* Solder Soft* 5alvanied%&Bs etc, complete Job as per folloCin items i) to ii).
(arthin$ of Station Shieldin$ .ith (arth Eire at 2 3os'e;treme Cols' 9 at other a&&ro&riatelo-ations at 2 o&&' Columns%
I%STAATI'%"$#TI'% ' T$A%S'$$S* @9I8%TS I%#9DI%5 8##
@98* Bs etc, as under.
220/20 KV 1/20 ,VA 3A3/3A6 T&e -oolin$ !&hase Transformer Ve-tor Brou& :3onoCom&lete .ith 6irst fill of Transformer oil .ith radiators/-onser@ator 9 a--essories in &la-eas &er S&e-ifi-ations!+l refer Clause of Se-tion !Transformer 9 other rele@ant -lauses) #in-ludin$ set of -lam&s/-onne-tors suitable for ACS Condu-tor Code G(7A# Coolin$6ans # LTC in!built) #TCC et-' a--ordin$ to the I(C standard'
250 KVA 20/0'KV Station Au;illar Transformer .ith off!load ta&!-han$er and -om&lete .ith,V and LV a--essories'
220 /! eGuipment. Installation of t+e folloCin Guipmen alon Cit+ complete set ofclamps"connectors suitable for A#S$ #onductor #ode HB$A.
2-< /!* >00 Amps S; #ircuit Brea/er (4 8+,) complete Cit+ Terminal#onnectors"#lamps etc,
2-< /! -00 A %#Ts (1 8+,) Cit+ 120 extended current for $ 8rotection ofTransformers for.
2-
-
8/10/2019 18.06.2014 latest
6/140
-
8/10/2019 18.06.2014 latest
7/140
ii) 3os
iii) 3o
b) 20 ! SCitc+earpoCer 8anel Set for 220"20 ! 8oCer Transformer2
i) 3o
ii) 3os
c) 3o
d) 20 ! Guipment on 20 ! side of 220"20 ! 1;"20 !A Transformers.
i' 3os
ii' 3os
S9BT'TA (S. I%STAATI'% ' 220 ! #&$ 8A%S* & 20 ! SIT#35A$)
T) I3 L
1,0
a) 8rovidin art+in
i) (earthin$ of ,ain (ui&'in the :ards# 20 K@ CTs 9 SAs# +o.er/Au;'Tranformers et-' 3os
ii)3os
iii) (arthin$ of +LCC +anels/(ui&ment et-'-om&lete in +LCC oomJ Set
iv) (arthin$ of +o.er/Au;' Tranformers in-ludin$ 7ushin$s 3os
v) (arthin$ of 20 KV S.it-h$ear Control +o.er +anel) in 20 KV Contro oom 3os
vi) ,arshallin$ 7o;es in the ard 3os
5 3os' ut$oin$ 6eeder -ir-uits .ith Co&&er 7us!7ars#ne-essar Control 9 +rote-tionS-heme!/C and (/6# Transformer 6un-tions Tri Tri& elas# 3e-essar indi-ationlam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$ital Volt/Am&'/,E/,E"/+6 ,eters#CTsere-ted inside &anel)# ki t &ro@ision for termination of '5!Core 15 Suare mm 20 KV AlCondu-tor FL+( Cable# Tri& elas# 3e-essar indi-ation lam&s#7reaker .ith ,otorisedS&rin$ -har$ed ,e-h# Di$ital Volt/Am&'/,E/,E" ,eters et-'
1 3o'Transformer Cir-uit for 20 KV side of 2 3os'20/0' KV 250 KVA Stationau;'Transformerso&eratin$ in &arallel) .ith Co&&er 7us!7ars#ne-essar# Control 9+rote-tion S-heme!/C and (/6# Transformer 6un-tions Tri Tri& elas# 3e-essarindi-ation lam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$italVolt/Am&'/,E/,E"/+6 ,eters# CTsere-ted inside &anel)# kit &ro@ision for termination of'5!Core 15 Suare mm 20 KV Al Condu-tor FL+( Cable# Transformer 6un-tions Tri Tri&elas# 3e-essar indi-ation lam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h# Di$italVolt/Am&'/,E/,E" ,eters et-'
ne In-omer .ith Co&&er 7us!7ars#ne-essar Control 9 +rote-tion S-heme!/C and (/6#Transformer 6un-tions Tri Tri& elas# 3e-essar indi-ation lam&s#7reaker .ith ,otorisedS&rin$ -har$ed ,e-h'Di$ital Volt/Am&'/,E/,E"/+6 ,eters# Set of VTs# CTsere-ted
outdoorin the 110 KV Trans'S.it-h :ard)# kit &ro@ision for termination of 3os'1!-ore 00Suare mm 20 KV Al Condu-tor FL+( Cable# Transformer 6un-tions Tri Tri& elas#7ell/"ooter# 3e-essar indi-ation lam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$italVolt/Am&'/,E/,E"/+6 ,eters et-'
3os' ut$oin$ 6eeder -ir-uits .ith Co&&er 7us!7ars#ne-essar Control 9 +rote-tionS-heme!/C and (/6# Transformer 6un-tions Tri Tri& elas# 3e-essar indi-ationlam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$ital Volt/Am&'/,E/,E"/+6 ,eters#CTsere-ted inside &anel)# ki t &ro@ision for termination of '5!Core 15 Suare mm 20 KV AlCondu-tor FL+( Cable# Tri& elas# 3e-essar indi-ation lam&s#7reaker .ith ,otorisedS&rin$ -har$ed ,e-h# Di$ital Volt/Am&'/,E/,E" ,eters et-'
7us Cou&ler .ith Co&&er 7us!7ars#ne-essar Control 9 +rote-tion S-heme!/C and (/6#Transformer 6un-tions Tri Tri& elas# 3e-essar indi-ation lam&s#7reaker .ith ,otorised
S&rin$ -har$ed ,e-h'Di$ital Volt/Am&'/,E/,E"/+6 ,eters# CTsere-ted inside &anel)# kit&ro@ision for termination of '5!Core 15 Suare mm 20 KV Al Condu-tor FL+( Cable# Tri&elas# 3e-essar indi-ation lam&s et-' for -ou&lin$ of t.o In- 19 In- 2
20 kV Sur$e Arrestors station t&e 10KA dis-har$e -urrent 1 +h) outdoor t&e for 23os'220/20 KV +o.er Transformers'
20 kV .ith 120 e;tended -urrent CTs 1 +h') utdoor T&e for 20 KV Side of 220/20 KV+o.er Transformers To be ere-ted in utdoor :ard) for 7a-k ?& +rote-tion'
eart+in of ain Guip in t+e 6ard "Aux eGuipment & #, $ panels in t+e #,$m,"Transfomers"%eutrals"%#T etc, Cit+ #opper Strip"#onductor & lexible #opper
Bonds at tCo opposite points & fillin of t+imbles (Cit+ Solder Soft) of adeGuatecapacities* fixin Cit+ bolts at appropriate points etc, includin Sundr aterialssuc+ as T+imbles of various but adeGuate capacities, Solder Soft* 5alvanied %&Bs*8aint of reGusite s+ade etc,complete Job as under.
eart+in of ain Guip in t+e 6ard "Aux eGuipment & #, $ panels in t+e #,$m,"Transfomers
(arthin$ of 220KV Du T&e C9 +anels both Control +anel 9 ela +ane)/TCCs inControl oomJ LT S.it-h$earACD7#DCD7 +anel/7oard# 7atter Char$ers et-') in ControloomJ
-
8/10/2019 18.06.2014 latest
8/140
b) 20 KV Control oom 7uildin$ Indoor in-ludin$ 6a-ade Illumination' Set
c) Store buildin$ Indoor Illumination' Set
d) Set
e) Set
S9BT'TA (L. I9I%ATI'% S6ST)
6)Lum& Su
T'TA (AA1 S9BSTATI'% AT S3I%DA%)
S.it-hard Li$htin$ in-ludin$ lain$ of Cables of suffi-ient -a&a-it in reuisite -abletren-hes# dul labeled for identifi-ation# &ro@idin$ 9 ere-tion of Li$ht ,asks Bantr To.er notto be used to install Illumination fi;tures) .ith due foundation# in-ludin$ un-tion 7o;es#
Clam&s/397s# &ro@idin$ 9 strin$in$ of -ond' of suffi-ient -a&'in-ludin$ utdoor Distribution7oards# "ard.are# Insulators# Bu.ires# -ross!arms et-' -om&lete su&&l 9 Installation'
Street Li$htin$ on &eri&heral road 9 inside &eri&her of S.it-hard 9 other &la-es.here e@erreuired) in-ludin$ lain$ of Cables of suffi-ient -a&a-it in reuisite -able tren-hes# dullabeled for identifi-ation# &ro@idin$ 9 ere-tion of reuisite su&&orts .ith due bottomin$#&ro@idin$ 9 strin$in$ of -ond' of suffi-ient -a&'in-ludin$ utdoor Distribution 7oards#"ard.are# Insulators# Bu.ires# -ross!arms et-' -om&lete su&&l 9 Installation'
#'%D9#TI'% ' 8$ #'ISSI'%I%5 TSTS '% A#3 & !$6@9I8%TS"A#IITIS T#,& #'ISSI'%I%5 ' @9I8%TS"A A#IITIST#,* #'8T STATI'% #'8T K'B
S9B T'TA(6. 8$ #'ISSI'%I%5 TSTS & #'ISSI'%I%5 '
STATI'%)
-
8/10/2019 18.06.2014 latest
9/140
emarks
-
8/10/2019 18.06.2014 latest
10/140
Ci@il &art
-i@il &art
-
8/10/2019 18.06.2014 latest
11/140
to be de-ide
-
8/10/2019 18.06.2014 latest
12/140
to be de-ide
to be de-ide
-
8/10/2019 18.06.2014 latest
13/140
In Lot to be -onsider
-
8/10/2019 18.06.2014 latest
14/140
-
8/10/2019 18.06.2014 latest
15/140
Sc+edule %o,- . Installation Services & 't+er Se
3ote%
Item Description (for eac+ Substation) 9nit
AA) S9BSTATI'%S.
AA2) Installation of 220"20 ! Substation at Adras/an.
A) ain of oundation Bloc/s(As per tec+nical specifications)
a)
1,0 8'$ T$A%S'$$S
i) 3os'
2,0 T Transformer
i) 3o'
S9BT'TA (a. '9%DATI'% B'#S '$ T$A%S'$$S)
b)
1) 220"20 ! Substation eac+ at and Adras/an*
Af+anistan
?nit/>>Total +ri-es shall be
-
8/10/2019 18.06.2014 latest
16/140
1,0
i)6eeder 7as
3os'
ii)Transformer 7as
3os'
iii)7us Cou&ler 7a
3o'
2,0 2-< /! -00 A #Ts"%#Ts complete Cit+ Terminal #onnectors"#lamps etc,
a) 2-< /! -00 A #Ts(1 8+,) Cit+ 120 extended current for.
i) 6eeder 7as !Core) 3os'
ii) Transformer 7as !Core) 3os'
iii) 7us Cou&ler 7a 2 Core) 3os'
b)
i) +o.er Transformer 7as 3os'
4,0 2-< /! !Ts"#!Ts complete Cit+ Terminal #onnectors"#lamps etc, .
a) 2-< /! !Ts (1 8+ase* !T $atio110 !"E4"110 !"E4"110 !) for .
i) eeder Bas 3os'
ii) Bus #oupler Ba 3os'
b) 2-< /! #!Ts (1 8+ase* !T $atio110""4"0,110""4) for .
i) 6eeder 7a "eart 9 other Line 7a) 3os'
'0
a) Isolator Cit+ B (ine art+in Blade) for eeder Bas 3os'
b) Isolator Cit+out B for.
i) 6eeder 7as 3os'
ii) +o.er Trans' 7as 3os'
iii) 7us Cou&ler 7a 3os'
5'0 21; /! Sure Arrestors Station Tpe 10A disc+are current for (1 8+)
i) 6eeder 7as 3os'
2-< /!* >00 Amps S; #ircuit Brea/er (4 8+,) complete Cit+ Terminal#onnectors"#lamps etc,
2-< /! -00 A %#Ts (1 8+,) Cit+ 120 extended current for $ 8rotection ofTransformers for.
2-
-
8/10/2019 18.06.2014 latest
17/140
ii) +o.erTransformers 7as 3os'
;,0 3os'
=,0 3os'
S9BT'TA (b. '9%DATI'% B'#S '$ 110 /! @9I8%T)
c) A6I%5 ' 20 /! @9I8%T '9%DATI'% B'#S
i) #Ts, 3os'
ii) Sure Arrestors 3os'
S9BT'TA (c. '9%DATI'% B'#S '$ 20 /! @9I8%T)
B)
a) 220 KV :ard -om&lete in-ludin$ for 2 3os' +o.er Transformers' ,Ts'
b) ,Ts'
S9BT'TA (B. A6I%5 ' AI% A$T3 AT)
#)
i) 3os'
S9BT'TA (#. A6I%5 ' 220 /! 5A%T$6"B '9%DATI'%S)
D) Trenc+es for #ontrol #ables
a)
i) ,eters
ii) ,eters
iii)Tee ff Cable Tren-h alon$.ithbra-kets 9 Co@ers as abo@e/as &er s&e-ifi-ations
,eters
b) #able Trenc+es for lain 8oCer #ables as under.
2-< ! 8ost Insulators(1 8+) for eeder"Transformer"Bus #oupler Bascomplete Cit+ Terminal #onnectors"#lamps etc,
ars+ellin Boxes Cit+ adeGuate no of Terminals & #apacit for Cirin fromoutdoor eGuipment"#&$ panels etc, for 110 ! ard,
T'TA ' S9BT'TAS $' a) T' c) (A. A6I%5 ' '9%DATI'% B'#S)
ain ofain art+ at,Cit+ =
-
8/10/2019 18.06.2014 latest
18/140
i) ,eters
c)
i)
,eters
ii) ,eters
d) 7uried Cable Tren-hes as abo@e/as &er s&e-ifi-ationsas under
i)
,eters
ii)
,eters
iii),eters
) #onstruction of encin *Boundar all and $oads.
i)
,eters
ii)
,eters
iii)
,eters
20kV 1C;0 mmH Al Conndu-tor FL+( -able for lain$ -ontrol -ables for 20 KVCTs u&to 20 KV Cont' m' for 2;8'5/10 ,VA 220/20KV +o.er Transformers from20 KV CTs'installed on 20 KV side of Trans' to 20 KV Control oom in its CableTren-h fi;in$ &ro&erl# dul labeled for identifi-ation et-'in-ludin$ entr to Controloom# &ro&erl desi$ned/installed or -onstru-ted to &re@ent in!flo. of ain .aters inside -ontrol oom in-ludin$ fi;in$ of Cable 7ra-kets##Cable Tras 9 fi;in$ ofCable Du-t Co@ers as abo@e/as &er s&e-ifi-ations
Lain$ of Cable Du-t in 220 KV Control 9 20 K@ Control oom in-ludin$ fi;in$ ofCable 7ra-kets##Cable Tras 9 fi;in$ of Cable Du-t Co@ers in-ludin$ entr toControl oom 9 all t&es of -rossin$s and sum& &it#Bal@anied mild steel forbra-kets# Tras 9 Co@ers -o@ered in S-hedule 1) In-ludin$ fabri-ation of7ra-kets/Tras/Co@ers# in-ludin$ .eldin$ .orks 9 materials reuired for .eldin$#in-ludin$ Con-rete and reinfor-ement steel et--om&lete =ob as &er s&e-ifi-ations asunder%
?nder Du T&e C9 &anels?nder ela &anels installed on front 9 Control&anel installed in the rear side .ith inter -onne-tin$ &assa$e to Control 9 ela+anel)# fi;in$50;50;5 mm $al@anied an$le bra-kets# fi;in$ Cble Du-t Co@ersfabri-ated from mm &late 9 10; mm flat frame/# for batterChar$ers/ACD7 9DCD7 et-'as &er s&e-ifi-ations
In 20 KV Control oom as &er s&e-ifi-ations to a--ommodate all the &o.er Cables9 &ro&er entr to Contro&l oom as &er s&e-ifi-ations
7uried Cable Tren-h for lain$ 20 KV '5;15 mmH +o.er Cable from 20 KVControl oom to nos' Terminal Stru-tures outside 20 KV Cm'for 20 KV 6eedersin-ludin$ entr to Control oom# &ro&erl desi$ned/installed or -onstru-ted to&re@ent in!flo. of ain .aters in side -ontrol oom as abo@e/as &er s&e-ifi-ations
7uried Cable Tren-h for lain$ 20 KV '5;15 mmH +o.er Cable from TerminalStru-ture near 20 KV Control oom to 1 no' 20/0' KV 250 KVA Station Au;Transformers S/Stn'To be installed near 110 KV -ontrol room)
7uried Cable Tren-h for lain$ 1 3o' LT '5C;0 mmH +o.er Cables fromACD7ne. Contro m') to Stn' Au;' +o.er Transformer S/Stn' .ith entr to 220 KVControl oom as &er s&e-ifi-ations#
S9BT'TA (D. A6I%5 ' #AB T$%#3S I% 220 /! SIT#3 6A$D &%T$6 T' #'%T$' $'')
Su&&l of Chain Link ,esh 6en-e 9 6en-in$ of 220KV S.it-hard in-ludin$-onstru-tion of -on-rete &ara& for ere-tion of CL,6# in-ludin$ Bates et- as &erlaout dra.in$ In-ludin$ Con-rete# and reinfor-ement steel# other reuiredmaterials et-' for -om&lee =ob
Su&&l of Chain Link ,esh 6en-e 9 6en-in$ for 220KV S.it-hard in-ludin$-onstru-tion of -on-rete &ara& for ere-tion of CL,6# Bates et- as &er laout dra.in$In-ludin$ Con-rete# and reinfor-ement steel# other reuired materials et-' for-om&lee =ob
7oundar Eall Stone 9 7ri-k ,asonar!Stone ,asonar 0'5 ,eter belo. (arthSurfa-e 0'85 ,eter .ide on 0'2 ,eter thi-k 1%% -on-rete laer# Stone ,asonar0'5 ,eter .ide u&to 0'5 ,eter hei$ht abo@e (arth Surfa-e# 7ri-k ,asonar 0'5,eter .ide u&to 2'5 ,eter hei$ht!total hei$ht abo@e (arth Surfa-e '0 ,eter) forse-urit of the Station alon$.ith $atesBates as &er S&e-ifi-ation) et-' as &er laoutdra.in$'
-
8/10/2019 18.06.2014 latest
19/140
iv)
,eters
v)
,eters
vi) S' ,eters
S9BT'TA(. #onstruction of encin *Boundar all and $oads)
)
i) S' ,eters
ii) S' ,eters
iii) Store 7uildin$ A&&ro;' Car&et area 100 S' m) S' ,eters
5) Set
S9BT'TA(5. D$AI%A5 S6ST ' STATI'%)
3) Station"SCitc+ards evellin"Development of and
i S' ,eters
ii
iii
S9BT'TA(3.STATI'% !I%5"D!'8%T ' A%D))
I)ain of ater suppl Sstem includin boreCells as per specifications, Set
S9BT'TA(I.AT$ S9886)
'0 meter .ide road outside Chain Link ,esh 6en-e but inside 7oundar Eall ofS/Sno -on-rete) alon$ the 7oundar e;-e&t on len$th fa-in$ Control oom -umffi-e 7lo-k /20 KV Control oom 7uildin$ in the station .ith a &assa$e to -ontrolroom*s landin$# 9 -onne-tion .ith the a&&roa-h road -onne-tin$ main oadnearbif reuired the .idth of the oad -an be @aried to suit the reuirement aftera&&ro@al of the o.ner)
8'5 meter .ide road outside Chain Link ,esh 6en-e but inside 7oundar Eall ofS/Sno -on-rete) alon$ the 7oundar as &er s&e-ifi-ations) * len$th fa-in$ Controloom -um ffi-e 7lo-k /20 KV Control oom 7uildin$ in the station .ith a &assa$eto -ontrol room*s landin$# 9 -onne-tion .ith the a&&roa-h road -onne-tin$ mainoad nearbif reuired the .idth of the oad -an be @aried to suit the reuirementafter a&&ro@al of the o.ner)
De@elo&ment of a Brass La.n .ith ose Barden 20m;m in front 920m;2m onboth sides of -ontrol room'
#onstruction of #ontrol $oom cum Administrative Bloc/ Buildins (Includin#oncrete and reinforcement steel)
220 KV Control oom -um Administrati@e 7lo-k 7uildin$ -onsistin$ of sin$le storeha@in$ a&&ro;' -ar&et area a&&'50 S',eter
20 KV Control oom 7uildin$ -onsistin$ of sin$le store ha@in$ a&&ro;' -ar&etarea 200 S' m
S9BT'TA(.#onstruction of #ontrol $oom cum Administrative Bloc/Buildins)
$ain Cater drainae Sstem aout complete for drainin out rain Caters*includin culverts* for C+ole station (Includin #oncrete & $einformentsteeli )
le@ellin$ of land for de@elo&ment of a &ie-e of land measurin$ a&&ro; 140m;15m#.ith same le@el # in-ludin$ e;-a@ation -ut 9 fill eual)# rollin$#.aterin$ 9-onsolidation to reuired s&e-ifi-ations et-' after due (n$ineerin$ 9 a&&ro@al of
6or e;-a@ation and fillin$ from .ithin the substation in-ludin$ dis&osal ofunser@i-eble material beond 0 of around onl @olume of e;-a@ation is to bemeasured)'
,eterCube
6or borro.ed earth from out side the substation onl @olume of fillin$ .ithin thesubstation is to be measured)
,eterCube
-
8/10/2019 18.06.2014 latest
20/140
K)
Soil Investiation as per specifications, Set
S9BT'TA(K.S'I I%!STI5ATI'%)
)
i) ,Ts
ii) ,Ts
)
a)
i) 3os'
ii) 3os'
b) 3os'
c)3os'
)km
i)
Station S+ieldin of ard
ii)
S9BT'TA(. 8$'!IDI%5 STATI'% S3IDI%5)
%)
rection of 5alvanised ild Steel Structural aterial for atticed Tpe 5antrStructures Cit+ fabricated alvanised Stubs(#olumns & Beams "Guipmentountin Structures* for -Isolator ain & Transfer Bus Sc+em
220 KV S.it-h :ard % 1 3os' Cols'C1#1 3os'Cols'C2# 3os' Col C2 for +o.erTrans' and 3os' 7eams for Bantr Stru-ture in-ludin$ stubs for Columns
(ui&ment ,ounti$ Stru-tures for 110KV (ui&ments as mentioned in Items abo@e9 20 KV SAs' 9 CTs
S9BT'TA(.$#TI'% ' 5A%T$6"@9I8%T '9%TI%5ST$9#T9$S)
8rovidin art+in of #olumns"Guipment mountin Structures"8oCer & Stn,Aux,Transformers ,
(arthin$ of Cols'9 (ui&ment ,ountin$ Stru-tures in 220 KV :ard b &ro@idin$risers at t.o o&&osite &oints .ith ,S 6lat 85mm;10 mm 9 -onne-tin$ it ,ain (,in-ludin$ .eldin$ et-'9 ,aterials su-h as Eeldin$ ods9 other sundr mat'reuired
(arthin$ of Cols'in 220 KV :ard 9 Transformer :ard b &ro@idin$ risers at t.oo&&osite &oints in-ludin$ .eldin$'
(arthin$ of (ui&ment ,ountin$ Stru-tures for 220 K@ 9 20 K@ (ui&ments in:ards b &ro@idin$ risers at t.o o&&osite &oints in-ludin$ .eldin$'
(arthin$ of +o.er/Stn Au;' Transformers b &ro@idin$ risers at t.o o&&osite &ointsin-ludin$ .eldin$'
(arthin$ (le-trodes of 0 mm dia ,S ound for Sur$e Arrestors'for 220 KV +o.erTransformer# 1 3os' Stn' Au; Transformers# 220 K@ 9 20 KV SAsJ 9 in 220 KV ardfor im&ro@ement of (arth esisiti@it et-' in-ludin$ -onne-tion .ith ,ain (,
S9BT'TA(. 8$'!IDI%5 A$T3I%5 ' #'9%S"@9I8%T '9%TI%5ST$9#T9$S"T$A%S'$$S)
8rovidin Station S+ieldin Cit+ Cit+ +ardCare fittins"clamps (as perDraCin)* artin of t+e same Cit+ t+imblin"boltin etc,includin Sundraterials suc+ as T+imbles of various but adeGuate capacities*
(arthin$ of Station Shieldin$ .ith (arth Eire at 2 3os'e;treme Cols' 9 at othera&&ro&riate lo-ations at 2 o&&' Columns%
I%STAATI'%"$#TI'% ' T$A%S'$$S* @9I8%TS I%#9DI%58## @98* Bs etc, as under.
-
8/10/2019 18.06.2014 latest
21/140
1,1
T$A%S'$$S
a)3os'
b)
3o'
S9BT'TA (81,1. T$A%S'$$S )
1,2
1,0
i)6eeder 7as
3os'
ii)Transformer 7as
3os'
iii)7us Cou&ler 7a
3o'
2,02-< /! -00 A #Ts"%#Ts complete Cit+ Terminal #onnectors"#lamps etc,
a)2-< /! -00 A #Ts(1 8+,) Cit+ 120 extended current for.
i)
6eeder 7as !Core) 3os'
ii)Transformer 7as !Core) 3os'
iii)7us Cou&ler 7a 2 Core) 3os'
b)
i)+o.er Transformer 7as 3os'
4,02-< /! !Ts"#!Ts complete Cit+ Terminal #onnectors"#lamps etc, .
a)2-< /! !Ts (1 8+ase* !T $atio110 !"E4"110 !"E4"110 !) for .
i)eeder Bas 3os'
220/20 KV 8'5/10 ,VA 3A3/3A6 T&e -oolin$ !&hase Transformer Ve-torBrou& :3ono Com&lete .ith 6irst fill of Transformer oil .ith radiators/-onser@ator9 a--essories in &la-e as &er S&e-ifi-ations!+l refer Clause of Se-tion !
250 KVA 20/0'KV Station Au;illar Transformer .ith off!load ta&!-han$er and-om&lete .ith ,V and LV a--essories'
220 /! eGuipment. Installation of t+e folloCin Guipmen alon Cit+ completeset of clamps"connectors suitable for A#S$ #onductor #ode HB$A.
2-< /!* >00 Amps S; #ircuit Brea/er (4 8+,) complete Cit+ Terminal#onnectors"#lamps etc,
2-< /! -00 A %#Ts (1 8+,) Cit+ 120 extended current for $ 8rotection ofTransformers for.
-
8/10/2019 18.06.2014 latest
22/140
ii)Bus #oupler Ba 3os'
b)2-< /! #!Ts (1 8+ase* !T $atio110""4"0,110""4) for .
i)6eeder 7a "eart 9 other Line 7a) 3os'
'0
a)Isolator Cit+ B (ine art+in Blade) for eeder Bas 3o'
b)Isolator Cit+out B for.
i)6eeder 7as 3o'
ii)+o.er Trans' 7as
iii)7us Cou&ler 7a
5'021; /! Sure Arrestors Station Tpe 10A disc+are current for (1 8+)
i)6eeder 7as 3os'
ii)
+o.erTransformers 7as 3os'
;,03os'
=,03os'
>,03os'
1,4
i) >00 A #Ts, 3os'
ii) Sure Arrestors 3os'
2-
-
8/10/2019 18.06.2014 latest
23/140
')
i)
Strin$in$ of (ui&ment in 220 KV :ard as &er s-heme as &er s-heme'
3os'
ii)
Strin$in$ of 220/20 KV +o.er Transformer
3os'
iii)
Strin$in$ of Station Au; Transformer Transformer
3o'
iv)
Strin$in$ of 20 KV CTs 9 SAs
3os'
S9BT'TA('. ST$I%5I%5 ' @9I8%T"T$A%S'$$S)
8)
1,1 Lain$ of "T Cables
a)Km'
b)Sets
c)Kms'
d)
Sets
e),eters
f)Set
1,2 Lain$ of LT +o.er Cables in Cable Tren-hes as under%
a)meters
b)Set
c)
i) '5C;10 mmH Kms'
ii) 2C;10 mmH Kms'
Strinin"Kumperin of Guipment"- units of Auto Trasformers"8oCer Trans,ST$I%5I%5"K98$I%5 ' B9S BA$S"@9I8%TS I%
6A$D"T$A%S'$$S T#, IT3 TA$A%T'A #'%D9#T'$ includin
ain of #ables in t+e reGuisite #able Trenc+es on t+e #able Tras"$ac/sorderl* %umberin"abelin for identifiation* bindin Cit+ clamps of nonmanetic material etc,
Lain$ of 20kV 1C0 mmH Al Conndu-tor FL+( -able for 220/20KV +o.erTransformer from 20 KV CTs'installed in 22 KV :ard on 20 KV side of Trans' to 20KV Control oom in its Cable Tren-h fi;in$ &ro&erl# dul labeled for identifi-ation
(re-tin$ Cable Termination kits 9 asso-iated stru-tures .ith 6oundation andBroutin$ 9 Clam&in$ arran$ements As &er Te-hni-al S&e-ifi-ation) at bothendsCTs' n one end 9 20 KV In-omer &anel on other end) for item a) abo@e'
Lain$ of '5 C;15 mmH 20kV Al Conndu-tor FL+( -able for 11 3os out$oin$6eeders from res&e-ti@e 20 KV s.it-h$ear +anels installed in 20 KV Control oomu& to res&e-ti@e Termination Stru-ture of feeder in its Cable Tren-h fi;in$ &ro&erl#
+ro@idin$ Cable Termination kits 9 asso-iated Terminal Stru-tures .ith 6oundationand Broutin$ 9 Clam&in$ arran$ements# and ne-essar materials su-h as 20 KV
Insulators# Dis-onn-tors# LAs'et-' for asso-iated stru-tures .ith 6oundation and
Lain$ of 20kV '5C;15 mmH Al Conndu-tor FL+( -able for 1 no' 20/0' KV 250KVA Station Au; TransformersTo be installed near -ontrol room) from 20 KVControl oom to Au; Trans' in its Cable Tren-h fi;in$ &ro&erl# dul labeled for
+ro@idin$ Cable Termination kits 9 asso-iated Terminal Stru-tures .ith 6oundationor Broutin$ 9 Clam&in$ arran$ements# and ne-essar materials su-h as 20 KVInsulators# Dis-onn-tors# LAs'et-' for asso-iated stru-tures .ith 6oundation and
Lain$ 2 3os''5C;0 mmH FL+( Al Condu-tor LT +o.er Cables for 9 fromStn'AuF'Transformers u&to ACD7 in ne. Cont'mJ in Cable tren-h# fi;in$ &ro&erl#dul labeled for identifi-ation et-'
+ro@idin$ Cable Termination kits 9 asso-iated stru-tures .ith 6oundation and
Broutin$ 9 Clam&in$ arran$ements As &er Te-hni-al S&e-ifi-ation) at both endsfor item a) abo@e'
Lain$ of +VC Al Condu-tor LT +o.er Cables alon$.ith asso-iated stru-tures .ith6oundation and Broutin$ 9 Clam&in$ arran$ements!if needed an.here) for /AC&o.er su&&l to 220 KV (ui&s'/AutoTr'LTC Bear 7o;es/C9 +anels or
-
8/10/2019 18.06.2014 latest
24/140
iii) 2C; mmH Kms'
2C; mmH Kms'
1,4
i) 5C;2'5 s'mm Kms'
ii) 8C;2'5 s'mm Kms'
iii) 10C;2'5 s'mm Kms'
iv) 12C;2'5 s'mm Kms'
v) 1C;2'5 s'mm Kms'
vi) 14C;2'5 s'mm Kms'
1,- ,eters
S9BT'TA (8. I%STAATI'% ' #ABI%5)
@)
1,1
a)220 V 00 A" Ca&a-it for 220 KV Le@el
3o'
b) V 100 A" DC 7atter sstem for +LCC Communi-ation Sstem
3o'
1,2
a) 220V#0A/40A for 220 KV/110 KV 7atter 7ank 3o'
b) V 7atter 7ank for +LCC Communi-ation Sstem ' 3o'
1,4
Lain$ of Control Cables +VC) for -ablin$ of (ui&ment!,7!C9 +anels in 220KV S.it-h :ard in ,ain/Sub ,ain/Tee ff Cable Du-t s 9 in Cable Du-t in 220 KV
C'm#C9 &anel/TCC/ACD7/DCD7 et-) 2 3os'' +o.er transformer s Cooler7o;es/LTC Bear 7o;)# 20 KV CTs to 20 KV +o.er &anels in 20 KV C'm#in-ludin$ identifi-ation 9 ferrulin$ of -ores#-onne-tions at both ends C9 +anel#,7 9 (ui&ments) in &ro&er manner# numberin$ of -ables at 10 meters len$th foridentifi-ation et-'-om&lete =ob'
Lain$/Installation of V"6Cable in ,ain Cabla Du-t 9 then in Submain Cable Du-t#Cable Du-t from ,ain Cable Du-t (ntr to Cont m to +LCC oom .ith entr to+LCC oom# fi;in$ &ro&erl# Conne-tions .ith +LCC ,odules# CVT CC) et--om&lete =ob
I%STAATI'% ' D# BATT$IS* BATT$6 #3A$5$S* D# Distribution8anel & A# Distribution 8anel as under.
D'C' 7atteries Lead A-id T&e -om&lete .ith f illin$ of (le-trolte# &ro@idin$ 9lain$/-onne-tin$ of -abledul labeled for identifi-ation) .ith res&e-ti@e-har$er/DCD7#&ro&erl -har$ed et-' for%
7atter Char$er Sstem -om&lete .ith &ro@idin$ 9 lain$/-onne-tin$ of -abledullabeled for identifi-ation) .ith res&e-ti@e DC 7atter 7ank et-'for%
DC Distribution +anel -om&lete .ith &ro@idin$ 9 lain$/-onne-tin$ of res&e-ti@e DC7atter 7ankdul labeled for identifi-ation)#out$oin$ -ir-uits dul -onne-ted .ithreuisite loads throu$h &ro&er -ablesdul labeled for identifi-ation) et-'as under%
-
8/10/2019 18.06.2014 latest
25/140
a) 220V#0A/40A for 220 KV 7atter 7ank 3o'
b) DC Distribution 7oard V 7atter 7ank 3o'
1,- AC Distribution +anel/7oard
a) 3o'
b) 3o'
c) 3o'
$) 3o'
S9B T'TA($. I%STAATI'% ' D5 ST)
S)
1,1
a) 3os'
b) 3os'
3o'
c) 3o'
d) Set
1,2 Set
1,4 ,arshellin$ 7o;es in 220 KV :ard 3os'
AC Distribution +anel -om&lete .ith 2 3os'In-omers .ith AC7s of adeuateCa&'ha@in$ (le-tri-al Interlo-k to S.it-h on one In-omer at a time J &rot-tionsstem/C 9 (/6)# Di$ital Volt/Am&/,E/(ner$ ,eters# Indi-ation Lam&s#
AC Distribution 7oard -om&lete .ith &rote-tion sstem/C 9 (/6)# Di$italVolt/Am&/,E/(ner$ ,eters# Indi-ation Lam&s# 7ell/"ooter#adeuate 3os' of-ir-uits et-' for emer$en- Illummination DB set) et-'
AC Distribution 7oard -om&lete .ith &rot-tion sstem/C 9 (/6)# Di$italVolt/Am&/,E/(ner$ ,eters# Indi-ation Lam&s# 7ell/"ooter#adeuate 3os' of-ir-uits for Illummination et-'
S9B T'TA(@. I%STAATI'% ' D# BATT$IS"BATT$6#3A$5$S"D#DB"A#DB)
I%STAATI'% & #'ISSI'%I%5 ' 100 !A D5 ST I%#9DI%5'9%DATI'%"8A%""#ABI%5"3'9SI%5 $'' IT3 #'8TA##SS'$IS T#, AS 8$ S8#II#ATI'%S,
I%STAATI'% ' 220 ! #&$ 8A%S 8## 8anels & 20 ! SCitc+earalonCit+ irin"Installation of respective ars+ellin Boxes installedoutdoor in t+e ard.
Duplex Tpe Cit+ #orridor #ontrol and $ela 8anel set for 220 ! evelcomprisin of folloCin 220 ! circuits as under.
220 KV 6eeder Cir-uit eui&&ed .ith ,imi- Dia$ram# Auto e!-lose ela#7/7+rote-tion elas#,ain +rote-tion S-heme# 7a-k!u& +rote-tion S-heme# tri&&in$relas# ne-essar -ontrol and ela s.it-hesin-ludin$ &rote-tion transferred on 7C&anel)# De@i-es # Di$ital ,eters et-'
220 Transformer Cir-uit for 220 KV side of 220/20 KV +o.er transformer eui&&ed.ith ,imi- Dia$ram# Differential/(6 elas# 7/7 +rote-tion elas# 7a-k!u&+rote-tion S-heme# tri&&in$ relas# ne-essar -ontrol 6or 7reaker#Isolators) andela s.it-hesin-ludin$ &rote-tion transferred on 7C &anel)# De@i-es# Di$ital,eters et-'
220 KV 7us Cou&ler Cir-uit eui&&ed .ith ,imi- Dia$ram# Auto e!-lose ela#7/7+rote-tion elas# 7a-k!u& +rote-tion S-heme# tri&&in$ relas# ne-essar Controland ela S.it-hes# De@i-es # Di$ital ,eters et-'
Annun-iation +anel (ui&&ed .ith ne-essar S.it-hes/Annun-iatiionelas#"ooter/7ell et- adeuate to -ater to annun-iation fa-ias for -om&lete set of&anel board -om&risin$ of C9 +anels for 5 3os feeder# 23os TransformersIn-omers) and one 3o'7us -ou&ler
ther/Common eui&ments &ertainin$ to C9 sstem abo@e mentioned C9+anels from serial (i to @ ) su-h as (@ent lo$$er# (ner$ ,eters .ith &ulsed out&utto Data +ro-essor# Data +ro-essor for -onsolidation of meter &ulses##Volta$e/6reuen- e-order et-
+LCC +anel/A--essories/Instruments/T9+ et-' -om&lete set for +LCC-ommuni-ation 7et.een Shindan Substation and "erat Substation on one -ir-uit of220 KV D/C Transmission Line for +LCC -ommuni-ation
-
8/10/2019 18.06.2014 latest
26/140
1,- 20 ! SCitc+ear as under.
a) 20 ! SCitc+earpoCer 8anel Set for 220"20 ! 8oCer Transformer1
i) 3o'
ii) 3os'
iii) 3o'
T)
1,0
a) 8rovidin art+in
i)(earthin$ of ,ain (ui&'in the :ards# 20 K@ CTs 9 SAs# +o.er/Au;'Tranformers et-'
3os'
ii) 3os'
iii)(arthin$ of +LCC +anels/(ui&ment et-'-om&lete in +LCC oomJ
Set
iv)(arthin$ of +o.er/Au;' Tranformers in-ludin$ 7ushin$s
3os'
v)(arthin$ of 20 KV S.it-h$ear Control +o.er +anel) in 20 KV Contro oom
3os'
ne In-omer .ith Co&&er 7us!7ars#ne-essar Control 9 +rote-tion S-heme!/Cand (/6# Transformer 6un-tions Tri Tri& elas# 3e-essar indi-ationlam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$ital Volt/Am&'/,E/,E"/+6,eters# Set of VTs# CTsere-ted outdoorin the 110 KV Trans'S.it-h :ard)# kit
&ro@ision for termination of 3os'1!-ore 00 Suare mm 20 KV Al Condu-tor FL+(Cable# Transformer 6un-tions Tri Tri& elas# 7ell/"ooter# 3e-essar indi-ationlam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$ital Volt/Am&'/,E/,E"/+6,eters et-'
5 3os' ut$oin$ 6eeder -ir-uits .ith Co&&er 7us!7ars#ne-essar Control 9+rote-tion S-heme!/C and (/6# Transformer 6un-tions Tri Tri& elas#3e-essar indi-ation lam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$italVolt/Am&'/,E/,E"/+6 ,eters# CTsere-ted inside &anel)# kit &ro@ision fortermination of '5!Core 15 Suare mm 20 KV Al Condu-tor FL+( Cable# Tri&elas# 3e-essar indi-ation lam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h#Di$ital Volt/Am&'/,E/,E" ,eters et-'
1 3o'Transformer Cir-uit for 20 KV side of 2 3os'20/0' KV 250 KVA Station
au;'Transformerso&eratin$ in &arallel) .ith Co&&er 7us!7ars#ne-essar# Control 9+rote-tion S-heme!/C and (/6# Transformer 6un-tions Tri Tri& elas#3e-essar indi-ation lam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$italVolt/Am&'/,E/,E"/+6 ,eters# CTsere-ted inside &anel)# kit &ro@ision fortermination of '5!Core 15 Suare mm 20 KV Al Condu-tor FL+( Cable#Transformer 6un-tions Tri Tri& elas# 3e-essar indi-ation lam&s#7reaker .ith,otorised S&rin$ -har$ed ,e-h# Di$ital Volt/Am&'/,E/,E" ,eters et-'
S9BT'TA (S. I%STAATI'% ' 220 ! * 110 ! #&$ 8A%S* & 20 !SIT#35A$)
eart+in of ain Guip in t+e 6ard "Aux eGuipment & #, $ panels in t+e #,$m,"Transfomers"%eutrals"%#T etc, Cit+ #opper Strip"#onductor & lexible
#opper Bonds at tCo opposite points & fillin of t+imbles (Cit+ Solder Soft)eart+in of ain Guip in t+e 6ard "Aux eGuipment & #, $ panels in t+e #,$m,"Transfomers
(arthin$ of 220KV Du T&e C9 +anels both Control +anel 9 ela+ane)/TCCs in Control oomJ LT S.it-h$earACD7#DCD7 +anel/7oard# 7atterChar$ers et-') in Control oomJ
-
8/10/2019 18.06.2014 latest
27/140
vi),arshallin$ 7o;es in the ard
3os'
1,1
a) 8rovidin %eutral art+in
i) (arthin$ of 3eutrals of +o.er Transformers 3os'
ii) (arthin$ of 3eutral CT for +o.er Transformer for (6 +rot' 3os'
iii) (arthin$ of 3eutrals of 'Stn'Au;'Transformers 3o'
iv) (arthin$ of CVTs in-ludin$ CCs)/+Ts in 6eeder/7'C bas 3os'
1,2 8rovidin art+in 8its
a)
i) (arth ,at of 220 KV :ard 3os'
ii) (arth ,at of 220 KV Control oom for earthin$ of C9 +anels ' 3os'
iii) (arth ,at of 20 KV Control oom for earthin$ of +o.er +anels ' 3os'
iv) Im&ro@ement of (arth esisti@it if reuired 9 if it is found that (arthin$ ,at 3os'
9) Installation of 8## in/ on .
a) Set
S9B T'TA(9. I%STAATI'% ' 8## #'9%I#ATI'% S6ST)
!)
1,1 Air #onditionin of. Set
a) 'ffice of t+e Station Inc+are & S+ift Inc+are $ooms Set
b) 8## $oom Set
20 ! ain #ontrol $oom 3all & S+ift Inc+are $oom
1,2 !entillation & 3eatin Sstem or #ontrol $oom cum office bloc/ buildin,
(arthin$ of 3eutrals of Transformers/3CTs .ith Co&&er Stri&/Condu-tor b &ro@idin$(arthin$ +its In-ludin$ ,aterials su-h as Bal@',S +i&e/+late/Eire# Con-rete# other-on@entional mats' (t-'! the s&e-ifi-ations of (arthin$ +it as &er rele@ant I(C) forthe follo.in$%
8rovidin art+in 8its( Includin aterials suc+ as 5alv,S 8ipe"8late"ire*#oncrete* ot+er conventional mats, etc,( t+e specifications of art+in 8it asper relevant I#) includin Celdin etc,& aterials suc+ as eldin $ods&
S9B T'TA(T. 8$'!IDI%5 ' A$T3I%5 ' AI% @9I8%T"#&$8A%S"T$A%S,%9T$AS"%#TS & A$T3I%5 8ITS)
220 KV Substation at Shindan end on one -ir-uit onl for ea-h of the t.o nos' D/Cfeeders) -om&lete(ui&ment# Cables# +anels in-ludin$ -onne-ted .orks et-') .ithSubstation at other (nd'
Installation of A#"!entillation & 3eatin Sstem* includin complete suppl ofall necessar aterials* 8lants* ans* A# 8lant* 5as 3eaters etc,& Installation*complete as per Specifications includin folloCin .
-
8/10/2019 18.06.2014 latest
28/140
a) #ontrol $oom except 1,1 a) & b) above Set
b) 20 v #ontrol $oom except 1,1 b) above Set
c) 'ffice bloc/ except 1,1 a) & b) above Set
S9B T'TA(!. !entillation & 3eatin sstem)
)
1,1Set
1,2 +ortable 6ire (;tin$uishersSet
1,4 Smoke Dete-tion Sstem Set
S9BT'TA (. I$ 8$'T#TI'% S6ST)
L)
a)220 KV Control oom 7uildin$ Indoor in-ludin$ 6a-ade Illumination'
Set
b)20 KV Control oom 7uildin$ Indoor in-ludin$ 6a-ade Illumination'
Set
c)Store buildin$ Indoor Illumination'
Set
d) Set
e) Set
S9BT'TA (L. I9I%ATI'% S6ST)
6)Lum& Sum
Installation of ire 8rotection Sstem* includin complete suppl of allnecessar aterials* Trolle "+eel mounted"8ortable fire extinuis+ers*Smo/e detection sstem etc, & Installation* complete Sc+eme as perSpecifications includin folloCin but be not limited to t+e folloCin .
Trolle /Eheel mounted fire e;tin$uishers one set -onsistin$ of 22'5 k$ -a&a-it dr-hemi-al &o.der t&e and 22'5k$ -a&a-it of Co2 t&e)
Installation of Illumination Sstem* includin complete suppl ofIllummination Transformer*complete suppl of all necessaraterials"Boards"#ables"8oles & asts"$eceptacles"uminaires & fixtures etc,
S.it-hard Li$htin$ in-ludin$ lain$ of Cables of suffi-ient -a&a-it in reuisite -abletren-hes# dul labeled for identifi-ation# &ro@idin$ 9 ere-tion of Li$ht ,asks BantrTo.er not to be used to install Illumination fi;tures) .ith due foundation# in-ludin$un-tion 7o;es# Clam&s/397s# &ro@idin$ 9 strin$in$ of -ond' of suffi-ient-a&'in-ludin$ utdoor Distribution 7oards# "ard.are# Insulators# Bu.ires# -ross!arms et-' -om&lete su&&l 9 Installation'
Street Li$htin$ on &eri&heral road 9 inside &eri&her of S.it-hard 9 other
&la-es.here e@er reuired) in-ludin$ lain$ of Cables of suffi-ient -a&a-it inreuisite -able tren-hes# dul labeled for identifi-ation# &ro@idin$ 9 ere-tion ofreuisite su&&orts .ith due bottomin$# &ro@idin$ 9 strin$in$ of -ond' of suffi-ient-a&'in-ludin$ utdoor Distribution 7oards# "ard.are# Insulators# Bu.ires# -ross!arms et-' -om&lete su&&l 9 Installation'
#'%D9#TI'% ' 8$ #'ISSI'%I%5 TSTS '% A#3 & !$6@9I8%TS"A#IITIS T#,& #'ISSI'%I%5 ' @9I8%TS"AA#IITIS T#,* #'8T STATI'% #'8T K'B
-
8/10/2019 18.06.2014 latest
29/140
S9B T'TA(6. 8$ #'ISSI'%I%5 TSTS & #'ISSI'%I%5 'STATI'%)
T'TA (AA1S9BSTATI'% AT AD$ASA%) (to Sc+edule
%o,
-
8/10/2019 18.06.2014 latest
30/140
vices
1 9SD ? ;0 I%$
@t,
9nit 8rice Total 8rice
emarks
(1)
(2) (4) (1) x (4) (1) x (2)
2
1
ocal#urrenc
8ortion(I%$)
orein#urrenc
8ortion(9SD)
orein(F) (9SD)
ocal(F) (inacs)
-
8/10/2019 18.06.2014 latest
31/140
2 100 20 0 0'28
2 100 20 0 0'28
1 100 20 20 0'1
100 20 10 0'2
100 20 10 0'2
100 20 10 0'2
2 100 20 0 0'28
100 20 10 0'2
100 20 10 0'2
100 20 10 0'2
2 100 20 0 0'28
100 20 10 0'2
100 20 10 1'10
2 100 20 0 0'28
12 100 20 280 1'5
-
8/10/2019 18.06.2014 latest
32/140
100 20 10 0'2
0 8200 120 00 2'1
5 8200 120 00 0'
-i@il &art
4'5 100 15 52'5 '20
reuired to be de-ide2'0 100 15 280 0'1
2 0 -i@il &art
100 8200 120 12000 8'20
4 8200 120 5410 5'50
50 8200 120 8200 0'2
-
8/10/2019 18.06.2014 latest
33/140
0 11520 142 150 4'22
50 11520 142 400 5'8
0 8200 120 00 2'
250 8200 120 0000 1'00
50 8200 120 000 '0
0 8200 120 00 2'1
5
0
850
reuired to be re@ie. as &er india &er kilometerbasis -onsidered or lot
-
8/10/2019 18.06.2014 latest
34/140
500
-i@il &art
15
1200
50
-i@il &art200
100
1
-i@il &art
25#50
-i@il &art500
500
1 as &er site to be de-ide
-
8/10/2019 18.06.2014 latest
35/140
1
1'0
50'0
2
10
1
as &er site to be de-ide in india &erlo-ationM145 ?SD Soil ma be 3ormal
lo-ations# s&e-ial lo-ation 9 soil sam&lin$ fortest et- )
-
8/10/2019 18.06.2014 latest
36/140
2
1
2
2
1
2
-
8/10/2019 18.06.2014 latest
37/140
2
2
0
2
5
-
8/10/2019 18.06.2014 latest
38/140
10
2
1
12
0'5 4000 50 25 0'20
reuire to be re@ie.
2
1' 4000 50 410 0'55
5
100
1
0
1
25200 20 120 0'85
2'5 25200 20 1050 0'
-
8/10/2019 18.06.2014 latest
39/140
2'5 25200 20 1050 0'
' 25200 20 25 1'81
5'85 25200 20 215 1'4
2'85 25200 20 1155 0'4
' 25200 20 185 1'081
1'1 25200 20 2 0'2882
1' 000 510 41 0'550
0'5 4000 50 25 0'145
120
1 2000 00 00 0'2
reuire to be re@ie.
1 2000 00 00 0'2
1 2000 00 00 0'2
1 2000 00 00 0'2
-
8/10/2019 18.06.2014 latest
40/140
1 2000 00 00 0'2
1 2000 00 00 0'2
1 2000 00 00 0'2
1 2000 00 00 0'2
1 2000 00 00 0'2
1 40000 1500 1500 0'4
2 4000 150 00 0'1
reuire to be re@ie.
2 4000 150 00 0'1
1 4000 150 150 0'04
1 4000 150 150 0'04
1 4000 150 150 0'04
1 4000 150 150 0'04
5 4000 150 850 0'5
-
8/10/2019 18.06.2014 latest
41/140
1 21000 50 50 0'21
reuire to be [email protected] 21000 50 1850 1'05
1 21000 50 50 0'21
115 4000 150 18250 10'5
reuire to be re@ie.
15 4000 150 2250 1'5
1 4000 150 150 0'04
15000 250 850 0'5
8 15000 250 1850 1'05
-
8/10/2019 18.06.2014 latest
42/140
5 15000 250 1250 0'85
2 15000 250 500 0'
reuire to be re@ie.
2 15000 250 500 0'
1 21000 50 50 0'21
12 21000 50 200 2'52
5 000 510 2550 1'5
reuire to be re@ie.
000 510 150 0'41
21000 50 1050 0'
5 000 510 2550 1'5
1 000 510 510 0'0
1 4000 50 50 0'4
reuire to be [email protected] 4000 50 50 0'4
1 4000 50 50 0'4
-
8/10/2019 18.06.2014 latest
43/140
1 4000 50 50 0'4
reuire to be [email protected] 000 510 510 0'0
1 4000 50 50 0'4
1 4000 50 50 0'4
reuire to be [email protected] 4000 50 50 0'4
1 4000 50 50 0'4
1 4000 50 50 0'4
reuire to be re@ie.
1 4000 50 50 0'4
1 4000 50 50 0'4
1 4000 50 50 0'4
1 4000 50 50 0'4
15000 4
-
8/10/2019 18.06.2014 latest
44/140
420>04,< 1:2,->21
-
8/10/2019 18.06.2014 latest
45/140
Buildins
3ote%
Item
BB)
8## in/BetCeen
>?nit/>>To
aterial#ode
-
8/10/2019 18.06.2014 latest
46/140
1,0
1,1
1,1,1
A)
a)b)i)ii)
iii)iv)
1,1,2
1,2
a)
i)
ii)
1,4
a)
i)ii)
1,-
1,-,1
a)i)ii)
-
8/10/2019 18.06.2014 latest
47/140
b)
i)
1,
1,:
i)
1,10
a)
1,11a)
i)
-
8/10/2019 18.06.2014 latest
48/140
b)i)ii)
iii)
iv)
v)vi)
1,12
a)
i)
ii)
iii)iv)
1,14a)
1,1-
1,1?nit/>>To
aterial#ode
-
8/10/2019 18.06.2014 latest
62/140
AA)AA1)
A)
a)
1,0
i)
2,0
i)
b)
1,0
i)
ii)
iii)
2,0
a)
i)
ii)
iii)
b)
i)
4,0
a)
i)
ii)
b)
i)
'0
a)
b)
i)
ii)
iii)
-
8/10/2019 18.06.2014 latest
63/140
5'0
i)
ii)
;,0
=,0
c)
i)
ii)
B)
a)
b)
#)
i)
ii)
D)
a)
i)
ii)
iii)
b)
-
8/10/2019 18.06.2014 latest
64/140
i)
c)
i)
ii)
d)i)
ii)
iii)
)
i)
ii)
iii)
iv)
-
8/10/2019 18.06.2014 latest
65/140
v)
vi)
)
i)
ii)
iii)
5)
3)
i
ii
iii
I)
K)
)
i)
ii)
)
a)
i)
-
8/10/2019 18.06.2014 latest
66/140
ii)
b)
c)
)
i)
ii)
%)1,1
a)
b)
1,2
1,0
i)
ii)
iii)
2,0
a)
i)
ii)
iii)
b)
i)
4,0
a)
i)
ii)
b)
-
8/10/2019 18.06.2014 latest
67/140
i)
'0
a)
b)
i)
ii)iii)
5'0
i)
ii)
;,0
=,0
>,0
1,4
i)
ii)
')
i)ii)
iii)
iv)
8)
1,1
a)
b)
c)
-
8/10/2019 18.06.2014 latest
68/140
-
8/10/2019 18.06.2014 latest
69/140
1,1
a)
b)
1,2
a)b)
1,4
a)
b)
1,-
a)
b)
c)
$)
S)
1,1
a)
b)
c)
-
8/10/2019 18.06.2014 latest
70/140
d)
1,2
1,41,-
a)
i)
ii)
iii)
b)
i)
ii)
c)
-
8/10/2019 18.06.2014 latest
71/140
d)
i'
ii'
T)
1,0
a)
i)
ii)
iii)
iv)
v)
vi)
1,1
a)
i)ii)
iii)
iv)
1,2
a)
i)
ii)
iii)
iv)
9)
a)
-
8/10/2019 18.06.2014 latest
72/140
!)
1,1
a)
b)
1,2
a)
b)
c)
)
1,1
1,2
1,4
L)
a)
b)
c)
d)
e)
6)
-
8/10/2019 18.06.2014 latest
73/140
AA2)
A)
a)
1,0
i)
2,0
i)
b)
1,0
i)
ii)
iii)
2,0
a)
i)
ii)
iii)
b)i)
4,0
a)
i)
ii)b)
i)
'0
a)
b)
i)ii)
iii)
5'0
i)
ii)
;,0
=,0
-
8/10/2019 18.06.2014 latest
74/140
c)i)
ii)
B)a)
b)
#)
i)
D)
a)
i)
ii)iii)
b)
i)
c)
i)
ii)
d)
-
8/10/2019 18.06.2014 latest
75/140
i)
ii)
iii)
)
i)
ii)
iii)
iv)
v)
vi)
)
i)
ii)iii)
5)
3)
-
8/10/2019 18.06.2014 latest
76/140
i
ii
iii
I)
K)
)
i)
ii)
)
a)
i)
ii)
b)
c)
)i)
ii)
%)1,1
-
8/10/2019 18.06.2014 latest
77/140
a)
b)
1,2
1,0
i)
ii)
iii)
2,0
a)
i)
ii)
iii)
b)
i)
4,0
a)
i)
ii)
b)i)
'0
a)b)
i)
ii)
iii)
5'0
i)
ii)
;,0
=,0
>,0
1,4
i)
ii)
-
8/10/2019 18.06.2014 latest
78/140
')i)ii)
iii)iv)
8)1,1
a)
b)
c)
d)
e)
f)1,2
a)
b)
c)i)ii)iii)
-
8/10/2019 18.06.2014 latest
79/140
1,4
i)
ii)iii)iv)v)vi)
1,-
@)
1,1
a)b)
1,2
a)b)
1,4
a)
b)1,-
a)
b)
c)
$)
S)
1,1
-
8/10/2019 18.06.2014 latest
80/140
a)
b)
c)
d)
1,2
1,41,-a)
i)
ii)
iii)
-
8/10/2019 18.06.2014 latest
81/140
T)
1,0
a)i)
ii)
iii)iv)v)vi)
1,1
a)i)ii)iii)iv)1,2
a)
i)
ii)iii)
iv)
9)
a)
!)
1,1a)b)
1,2a)b)c)
-
8/10/2019 18.06.2014 latest
82/140
)
1,1
1,2
1,4
L)
a)b)c)
d)
e)
6)
BB)
1,0
1,1
1,1,1
-
8/10/2019 18.06.2014 latest
83/140
A)
a)b)i)ii)iii)iv)
1,1,2
1,2
a)
i)ii)
1,4
a)
i)ii)
1,-
1,-,1
a)i)ii)b)
i)
1,
-
8/10/2019 18.06.2014 latest
84/140
a)
b)
1,;
a)
i)ii)
1,=
1,>
1,:
i)
1,10
a)
1,11a)i)b)i)ii)iii)iv)v)vi)
-
8/10/2019 18.06.2014 latest
85/140
-
8/10/2019 18.06.2014 latest
86/140
-
8/10/2019 18.06.2014 latest
87/140
Sc+edule %o,- . Installation Services
As per aout DraCin enclosed
2 %os,2
-
8/10/2019 18.06.2014 latest
88/140
As per aout DraCin enclosed
2 %os,2
-
8/10/2019 18.06.2014 latest
89/140
S9BSTATI'%S. (1)Installation of 220"20 ! Substation at S+indan.ain of oundation Bloc/s(As per tec+nical specifications)
8'$ T$A%S'$$S
3os' 2
T Transformer
3os' 2
S9BT'TA (a. '9%DATI'% B'#S '$ T$A%S'$$S)
6eeder 7as 3os'
Transformer 7as 3os' 2
7us Cou&ler 7a 3o' 1
2-< /! -00 A #Ts"%#Ts complete Cit+ Terminal #onnectors"#lamps etc,
2-< /! -00 A #Ts(1 8+,) Cit+ 120 extended current for.
6eeder 7as !Core) 3os' 12
Transformer 7as !Core) 3os'
7us Cou&ler 7a 2 Core) 3os'
+o.er Transformer 7as 3os' 2
2-< /! !Ts"#!Ts complete Cit+ Terminal #onnectors"#lamps etc, .
2-< /! !Ts (1 8+ase* !T $atio110 !"E4"110 !"E4"110 !) for .
6eeder 7as 3os'
7us Cou&ler 7a 3os'
2-< /! #!Ts (1 8+ase* !T $atio110""4"0,110""4) for .
6eeder 7a "eart 9 other Line 7a) 3os'
Isolator Cit+ B (ine art+in Blade) for eeder Bas 3os'
Isolator Cit+out B for.
6eeder 7as3os' 12
+o.er Trans' 7as3os'
7us Cou&ler 7a3os' 2
ain of oundation Bloc/s for folloCin in Transformer ards and ire 8rotection
alls (Includin #oncrete and reinforcement steel) in Transformer 6ard.
220/20 KV1/20,VA 3A3/3A6 T&e -oolin$ !&hase +o.er Transformer Ve-tor Brou&:3ono Com&lete .ith 6irst fill of Transformer oil .ith radiators/-onser@ator 9 a--essories in
250 KVA 20/0'KV Station Au;illar Transformer to be o&erated in &arallel) Com&lete .ith6irst fill of Transformer oil .ith radiators/-onser@ator 9 a--essories in &la-e# in-ludin$ set of-lam&s/-onne-tors# off!load ta&!-han$er and -om&lete .ith all the reuireda--essories
220 /! eGuipment. folloCin Guipmen alon Cit+ complete set of clamps"connectors
suitable for A#S$ #onductor #ode HB$A.2-< /!* >00 Amps S; #ircuit Brea/er (4 8+,) complete Cit+ Terminal#onnectors"#lamps etc,
2-< /! -00 A %#Ts (1 8+,) Cit+ 120 extended current for $ 8rotection ofTransformers for.
2-
-
8/10/2019 18.06.2014 latest
90/140
21; /! Sure Arrestors Station Tpe 10A disc+are current for (1 8+)
6eeder 7as 3os' 12
+o.erTransformers 7as 3os'
3os' 2
3os' 8
S9BT'TA (b. '9%DATI'% B'#S '$ 110 /! @9I8%T)
A6I%5 ' 20 /! @9I8%T '9%DATI'% B'#S
#Ts, 3os'
Sure Arrestors 3os'
S9BT'TA (c. '9%DATI'% B'#S '$ 20 /! @9I8%T)
T'TA ' S9BT'TAS $' a) T' c) (A. A6I%5 ' '9%DATI'% B'#S )
220 kV :ard -om&lete in-ludin$ for 2 3os' +o.er Transformers' ,Ts' 4'5
,Ts' 2'0
S9BT'TA (B. A6I%5 ' AI% A$T3 AT)
3os'
,arshellin$ 7o;es 3os' 8
S9BT'TA (#. A6I%5 ' 110 /! 5A%T$6"B '9%DATI'%S)
Trenc+es for #ontrol #ables
,eters 15
,eters 00
Tee ff Cable Tren-h alon$.ithbra-kets 9 Co@ers as abo@e/as &er s&e-ifi-ations ,eters 880
#able Trenc+es for lain 8oCer #ables as under.
2-< ! 8ost Insulators(1 8+) for eeder"Transformer"Bus #oupler Bas complete Cit+Terminal #onnectors"#lamps etc,
ars+ellin Boxes Cit+ adeGuate no of Terminals & #apacit for Cirin from outdoor
eGuipment"#&$ panels etc, for 110 ! ard,
ain ofain art+ at,Cit+ =
-
8/10/2019 18.06.2014 latest
91/140
,eters 0
,eters 50
,eters 0
7uried Cable Tren-hes as abo@e/as &er s&e-ifi-ationsas under
,eters 500
,eters 0
,eters 50
#onstruction of encin *Boundar all and $oads.
,eters 5
,eters 0
,eters 850
,eters 500
20kV 1C;0 mmH Al Conndu-tor FL+( -able for lain$ -ontrol -ables for 20 KV CTs u&to20 KV Cont' m' for 2;1/20 ,VA 220/20KV +o.er Transformers from 20 KV CTs'installedon 20 KV side of Trans' to 20 KV Control oom in its Cable Tren-h fi;in$ &ro&erl# dullabeled for identifi-ation et-'in-ludin$ entr to Control oom# &ro&erl desi$ned/installed or-onstru-ted to &re@ent in!flo. of ain .aters in side -ontrol oom in-ludin$ fi;in$ of Cable7ra-kets##Cable Tras 9 fi;in$ of Cable Du-t Co@ers as abo@e/as &er s&e-ifi-ations
Lain$ of Cable Du-t in 220 KV Control 9 20 K@ Control oom in-ludin$ fi;in$ of Cable7ra-kets##Cable Tras 9 fi;in$ of Cable Du-t Co@ers in-ludin$ entr to Control oom 9 allt&es of -rossin$s and sum& &it#Bal@anied mild steel for bra-kets# Tras 9 Co@ers -o@eredin S-hedule 1) In-ludin$ fabri-ation of 7ra-kets/Tras/Co@ers# in-ludin$ .eldin$ .orks 9materials reuired for .eldin$# in-ludin$ Con-rete and reinfor-ement steel et--om&lete =obas &er s&e-ifi-ations as under%
?nder Du T&e C9 &anels?nder ela &anels installed on front 9 Control &anelinstalled in the rear side .ith inter -onne-tin$ &assa$e to Control 9 ela +anel)#fi;in$50;50;5 mm $al@anied an$le bra-kets# fi;in$ Cable Du-t Co@ers fabri-ated from mm &late 9 10; mm flat frame/# for batterChar$ers/ACD7 9 DCD7 et-'as &ers&e-ifi-ations
In 20 KV Control oom as &er s&e-ifi-ations to a--ommodate all the &o.er Cables 9 &ro&erentr to Contro&l oom as &er s&e-ifi-ations
7uried Cable Tren-h for lain$ 20 KV '5;15 mmH +o.er Cable from 20 KV Control oomto 12nos' Terminal Stru-tures outside 20 KV Cm'for 20 KV 6eeders in-ludin$ entr toControl oom# &ro&erl desi$ned/installed or -onstru-ted to &re@ent in!flo. of ain .aters inside -ontrol oom as abo@e/as &er s&e-ifi-ations
7uried Cable Tren-h for lain$ 20 KV '5;15 mmH +o.er Cable from Terminal Stru-turenear 20 KV Control oom to 2 nos' 20/0' KV 250 KVA Station Au; Transformers S/Stn'Tobe installed near 220 KV -ontrol room)
7uried Cable Tren-h for lain$ 2 3os LT '5C;0 mmH +o.er Cables from ACD7ne.Contro m') to Stn' Au;' +o.er Transformer S/Stn' .ith entr to 220 KV Control oom as&er s&e-ifi-ations#
S9BT'TA (D. A6I%5 ' #AB T$%#3S I% 220 /! SIT#3 6A$D & %T$6 T'
#'%T$' $'')
Installation of 6en-in$ of 220KV S.it-hard in-ludin$ Su&&l f Chain Link ,esh 6en-eCL,6)# -onstru-tion of -on-rete &ara&et for ere-tion of CL,6# Bates et- as &er laoutdra.in$ In-ludin$ Con-rete# and reinfor-ement steel# other reuired materials et-' for-om&lee =ob'
Installation of 6en-in$ of 2 3os' Au; Transformer Substation in-ludin$ Su&&l f Chain Link,esh 6en-e CL,6)# -onstru-tion of -on-rete &ara&et for ere-tion of CL,6# Bates et- as &erlaout dra.in$ In-ludin$ Con-rete# and reinfor-ement steel# other reuired materials et-' for-om&lee =ob'
7oundar Eall Stone 9 7ri-k ,asonar!Stone ,asonar 0'5 ,eter belo. (arth Surfa-e0'85 ,eter .ide on 0'2 ,eter thi-k 1%% -on-rete laer# Stone ,asonar 0'5 ,eter .ideu&to 0'5 ,eter hei$ht abo@e (arth Surfa-e# 7ri-k ,asonar 0'5 ,eter .ide u&to 2'5 ,eterhei$ht!total hei$ht abo@e (arth Surfa-e '0 ,eter) for se-urit of the Station alon$.ith$atesBates as &er S&e-ifi-ation) et-' as &er laout dra.in$'
'0 meter .ide road outside Chain Link ,esh 6en-e but inside 7oundar Eall of S/Sno-on-rete) alon$ the 7oundar e;-e&t on len$th fa-in$ Control oom -um ffi-e 7lo-k /20 KVControl oom 7uildin$ in the station .ith a &assa$e to -ontrol room*s landin$# 9 -onne-tion.ith the a&&roa-h road -onne-tin$ main oad nearbif reuired the .idth of the oad -anbe @aried to suit the reuirement after a&&ro@al of the o.ner)
-
8/10/2019 18.06.2014 latest
92/140
,eters 15
S' ,eters 1200
S9BT'TA(. #onstruction of encin *Boundar all and $oads)
S' ,eters 50
S' ,eters 200
Store 7uildin$ A&&ro;' Car&et area 100 S' m) S' ,eters 100
S9BT'TA(.#onstruction of #ontrol $oom cum Administrative Bloc/ Buildins)
Set 1
S9BT'TA(5. D$AI%A5 S6ST ' STATI'%)
Station"SCitc+ards evellin"Development of and
S' ,eters 25#50
500
500
S9BT'TA(3.STATI'% !I%5"D!'8%T ' A%D))ain of ater suppl Sstem includin boreCells as per specifications, Set 1
S9BT'TA(I.AT$ S9886)
Soil Investiation as per specifications, Set 1
S9BT'TA(K.S'I I%!STI5ATI'%)
,Ts 18
,Ts
3os'
8'5 meter .ide road outside Chain Link ,esh 6en-e but inside 7oundar Eall of S/Sno-on-rete) alon$ the 7oundar as &er s&e-ifi-ations)*len$th fa-in$ Control oom -um ffi-e7lo-k /20 KV Control oom 7uildin$ in the station .ith a &assa$e to -ontrol room*s landin$# 9-onne-tion .ith the a&&roa-h road -onne-tin$ main oad nearbif reuired the .idth of theoad -an be @aried to suit the reuirement after a&&ro@al of the o.ner)
De@elo&ment of a Brass La.n .ith ose Barden 20m;m in front 920m;2m on bothsides of -ontrol room'
#onstruction of #ontrol $oom cum Administrative Bloc/ Buildins (Includin#oncrete and reinforcement steel)
220 KV Control oom -um Administrati@e 7lo-k 7uildin$ -onsistin$ of sin$le store ha@in$a&&ro;' -ar&et area a&&'50 S',eter
20 KV Control oom 7uildin$ -onsistin$ of sin$le store ha@in$ a&&ro;' -ar&et area 200 S'm
$ain Cater drainae Sstem aout complete for drainin out rain Caters* includin
culverts* for C+ole station (Includin #oncrete & $einforment steeli )
le@ellin$ of land for de@elo&ment of a &ie-e of land measurin$ a&&ro; 140m;15m# .ithsame le@el # in-ludin$ e;-a@ation -ut 9 fill eual)# rollin$#.aterin$ 9 -onsolidation to reuireds&e-ifi-ations et-' after due (n$ineerin$ 9 a&&ro@al of ,(E'
6or e;-a@ation and fillin$ from .ithin the substation in-ludin$ dis&osal of unser@i-eblematerial beond 0 m of Substation onl @olume of e;-a@ation is to be measured)'
,eterCube
6or borro.ed earth from out side the substation onl @olume of fillin$ .ithin the substation isto be measured)
,eterCube
rection of 5alvanised ild Steel Structural aterial for atticed Tpe 5antrStructures Cit+ fabricated alvanised Stubs(#olumns & Beams "Guipment ountinStructures* for -Isolator ain & Transfer Bus Sc+em
220 KV S.it-h :ard % 1 3os' Cols'C1#1 3os'Cols'C2# 3os' Col C2 for +o.er Trans' and 3os' 7eams for Bantr Stru-ture in-ludin$ stubs for Columns
(ui&ment ,ounti$ Stru-tures for 220KV (ui&ments as mentioned in Item A abo@e 9 20KV SAs' 9 CTs
S9BT'TA(.$#TI'% ' 5A%T$6"@9I8%T '9%TI%5ST$9#T9$S)
8rovidin art+in of #olumns"Guipment mountin Structures"8oCer & Stn,Aux,Transformers ,
(arthin$ of Cols'9 (ui&ment ,ountin$ Stru-tures in 220 KV :ard b &ro@idin$ risers at t.oo&&osite &oints .ith ,S 6lat 85mm;10 mm 9 -onne-tin$ it ,ain (, in-ludin$ .eldin$ et-'9,aterials su-h as Eeldin$ ods9 other sundr mat'reuired for abo@e Allied (arthin$ '
(arthin$ of Cols'in 220 KV :ard 9 Transformer :ard b &ro@idin$ risers at t.o o&&osite&oints in-ludin$ .eldin$'
-
8/10/2019 18.06.2014 latest
93/140
3os' 18
3os'
3os' 2
km 1'2
Station S+ieldin of ard
S9BT'TA(. 8$'!IDI%5 STATI'% S3IDI%5)
T$A%S'$$S
3os' 2
3os' 2
S9BT'TA (81,1. T$A%S'$$S )
6eeder 7as 3os'
Transformer 7as 3os' 2
7us Cou&ler 7a 3o' 1
2-< /! -00 A #Ts"%#Ts complete Cit+ Terminal #onnectors"#lamps etc,
2-< /! -00 A #Ts(1 8+,) Cit+ 120 extended current for.
6eeder 7as !Core) 3os' 12
Transformer 7as !Core) 3os'
7us Cou&ler 7a 2 Core) 3os'
+o.er Transformer 7as 3os' 2
2-< /! !Ts"#!Ts complete Cit+ Terminal #onnectors"#lamps etc, .
2-< /! !Ts (1 8+ase* !T $atio110 !"E4"110 !"E4"110 !) for .
eeder Bas 3os'
Bus #oupler Ba 3os'
2-< /! #!Ts (1 8+ase* !T $atio110""4"0,110""4) for .
(arthin$ of (ui&ment ,ountin$ Stru-tures for 220 K@ 9 20 K@ (ui&ments in :ards b&ro@idin$ risers at t.o o&&osite &oints in-ludin$ .eldin$'
(arthin$ of +o.er/Stn Au;' Transformers b &ro@idin$ risers at t.o o&&osite &oints in-ludin$.eldin$'
(arthin$ (le-trodes of 0 mm dia ,S ound for Sur$e Arrestors'for 220 KV +o.erTransformer# 2 3os' Stn' Au; Transformers# 220 K@ 9 20 KV SasJ 9 in 220 KV ard forim&ro@ement of (arth esisiti@it et-' in-ludin$ -onne-tion .ith ,ain (, in-ludin$ .eldin$et-'9 ,aterials su-h as Eeldin$ ods9 other sundr mat'reuired'
3ote%The no of (arthin$ (le-trodes in the ard shall be as man as reuired forim ro@ement of (arth esisiti@itS9BT'TA(. 8$'!IDI%5 A$T3I%5 ' #'9%S"@9I8%T '9%TI%5ST$9#T9$S"T$A%S'$$S)
8rovidin Station S+ieldin Cit+ Cit+ +ardCare fittins"clamps (as per DraCin)*artin of t+e same Cit+ t+imblin"boltin etc,includin Sundr aterials suc+ asT+imbles of various but adeGuate capacities* fittins"clamps* Solder Soft* 5alvanied%&Bs etc, complete Job as per folloCin items i) to ii).
(arthin$ of Station Shieldin$ .ith (arth Eire at 2 3os'e;treme Cols' 9 at other a&&ro&riatelo-ations at 2 o&&' Columns%
I%STAATI'%"$#TI'% ' T$A%S'$$S* @9I8%TS I%#9DI%5 8##
@98* Bs etc, as under.
220/20 KV 1/20 ,VA 3A3/3A6 T&e -oolin$ !&hase Transformer Ve-tor Brou& :3onoCom&lete .ith 6irst fill of Transformer oil .ith radiators/-onser@ator 9 a--essories in &la-eas &er S&e-ifi-ations!+l refer Clause of Se-tion !Transformer 9 other rele@ant -lauses) #in-ludin$ set of -lam&s/-onne-tors suitable for ACS Condu-tor Code G(7A# Coolin$6ans # LTC in!built) #TCC et-' a--ordin$ to the I(C standard'
250 KVA 20/0'KV Station Au;illar Transformer .ith off!load ta&!-han$er and -om&lete .ith,V and LV a--essories'
220 /! eGuipment. Installation of t+e folloCin Guipmen alon Cit+ complete set ofclamps"connectors suitable for A#S$ #onductor #ode HB$A.
2-< /!* >00 Amps S; #ircuit Brea/er (4 8+,) complete Cit+ Terminal#onnectors"#lamps etc,
2-< /! -00 A %#Ts (1 8+,) Cit+ 120 extended current for $ 8rotection ofTransformers for.
-
8/10/2019 18.06.2014 latest
94/140
6eeder 7a "eart 9 other Line 7a) 3os'
Isolator Cit+ B (ine art+in Blade) for eeder Bas 3o'
Isolator Cit+out B for.
6eeder 7as 3o' 12
+o.er Trans' 7as 7us Cou&ler 7a 2
21; /! Sure Arrestors Station Tpe 10A disc+are current for (1 8+)
6eeder 7as 3os' 12
+o.erTransformers 7as 3os'
3os' 2
3os'
3os' 8
#Ts, 3os'
Sure Arrestors 3os'
Strin$in$ of (ui&ment in 220 KV :ard as &er s-heme as &er s-heme' 3os' 14Strin$in$ of 220/20 KV +o.er Transformer 3os' 2
Strin$in$ of Station Au; Transformer Transformer 3os' 2
Strin$in$ of 20 KV CTs 9 SAs 3os' 12
S9BT'TA('. ST$I%5I%5 ' @9I8%T"T$A%S'$$S)
Lain$ of "T Cables
Km' 1'0
Sets 2
Kms' 1'
2-
-
8/10/2019 18.06.2014 latest
95/140
Sets 1
,eters 100
Sets 2
Lain$ of LT +o.er Cables in Cable Tren-hes as under%
meters 100
Sets 2
'5C;10 mmH Kms' '5
2C;10 mmH Kms' '0
2C; mmH Kms' '0
2C; mmH Kms' 8'
5C;2'5 s'mm Kms' 4'0
8C;2'5 s'mm Kms' 5'0
10C;2'5 s'mm Kms' 8'0
12C;2'5 s'mm Kms' 1'5
1C;2'5 s'mm Kms' '
14C;2'5 s'mm Kms' 0'5
,eters 25
S9BT'TA (8. I%STAATI'% ' #ABI%5)
+ro@idin$ Cable Termination kits 9 asso-iated Terminal Stru-tures .ith 6oundation andBroutin$ 9 Clam&in$ arran$ements# and ne-essar materials su-h as 20 KV Insulators#Dis-onn-tors# LAs'et-' for asso-iated stru-tures .ith 6oundation and Broutin$ 9 Clam&in$arran$ements 6eeders As &er Te-hni-al S&e-ifi-ation) at both endsin s.it-h$ear .ithoutterminal stru-ture 9 other end terminal stru-ture lo-ated outside 20 KV Control oom) foritem e) abo@e'
Lain$ of 20kV '5C;15 mmH Al Conndu-tor FL+( -able for 2 nos' 20/0' KV 250 KVAStation Au; TransformersTo be installed near -ontrol room) from 20 KV Control oom to
Au; Trans' in its Cable Tren-h fi;in$ &ro&erl# dul labeled for identifi-ation et-
+ro@idin$ Cable Termination kits 9 asso-iated Terminal Stru-tures .ith 6oundation orBroutin$ 9 Clam&in$ arran$ements# and ne-essar materials su-h as 20 KV Insulators#Dis-onn-tors# LAs'et-' for asso-iated stru-tures .ith 6oundation and Broutin$ 9 Clam&in$arran$ements 6eeders As &er Te-hni-al S&e-ifi-ation) at both endsin s.it-h$ear .ithoutterminal stru-ture 9 other end terminal stru-ture lo-ated outside 20 KV Control oom) foritem $) abo@e'
Lain$ 2 3os''5C;0 mmH FL+( Al Condu-tor LT +o.er Cables for 9 fromStn'AuF'Transformers u&to ACD7 in ne. Cont'mJ in Cable tren-h# fi;in$ &ro&erl# dullabeled for identifi-ation et-'
+ro@idin$ Cable Termination kits 9 asso-iated stru-tures .ith 6oundation and Broutin$ 9Clam&in$ arran$ements As &er Te-hni-al S&e-ifi-ation) at both ends for item a) abo@e'
Lain$ of +VC Al Condu-tor LT +o.er Cables alon$.ith asso-iated stru-tures .ith6oundation and Broutin$ 9 Clam&in$ arran$ements!if needed an.here) for /AC &o.ersu&&l to 220 KV (ui&s'/AutoTr'LTC Bear 7o;es/C9 +anels or ACD7/DCD7 et-'e;-ludin$ Illumination)%
Lain$ of Control Cables +VC) for -ablin$ of (ui&ment!,7!C9 +anels in 220 KV S.it-h
:ard in ,ain/Sub ,ain/Tee ff Cable Du-t s 9 in Cable Du-t in 220 KV C'm#C9&anel/TCC/ACD7/DCD7 et-) 2 3os'' +o.er transformer s Cooler 7o;es/LTC Bear 7o;)#20 KV CTs to 20 KV +o.er &anels in 20 KV C'm# in-ludin$ identifi-ation 9 ferrulin$ of-ores#-onne-tions at both ends C9 +anel# ,7 9 (ui&ments) in &ro&er manner#numberin$ of -ables at 10 meters len$th for identifi-ation et-'-om&lete =ob'
Lain$/Installation of V"6Cable in ,ain Cabla Du-t 9 then in Submain Cable Du-t in-ludin$buried Cable Du-t from ,ain Cable Du-t (ntr to Cont m to +LCC oom .ith entr to+LCC oom# fi;in$ &ro&erl# Conne-tions .ith +LCC ,odules# CVT CC) et- -om&lete =ob
I%STAATI'% ' D# BATT$IS* BATT$6 #3A$5$S* D# Distribution 8anel & A#Distribution 8anel as under.
-
8/10/2019 18.06.2014 latest
96/140
220 V 00 A" Ca&a-it for 220 KV Le@el 3o' 1
V 100 A" DC 7atter sstem for +LCC Communi-ation Sstem 3o' 1
220V#0A/40A for 220 KV/110 KV 7atter 7ank 3o' 1 V 7atter 7ank for +LCC Communi-ation Sstem ' 3o' 1
220V#0A/40A for 220 KV 7atter 7ank 3o' 1
DC Distribution 7oard V 7atter 7ank 3o' 1
AC Distribution +anel/7oard
3o' 1
3o' 1
3o' 1
S9B T'TA(@. I%STAATI'% ' D# BATT$IS"BATT$6 #3A$5$S"D#DB"A#DB)
3o' 1
S9B T'TA($. I%STAATI'% ' D5 ST)
3os'
3os' 2
3o' 1
3o' 1
D'C' 7atteries Lead A-id T&e -om&lete .ith fillin$ of (le-trolte# &ro@idin$ 9lain$/-onne-tin$ of -abledul labeled for identifi-ation) .ith res&e-ti@e -har$er/DCD7#&ro&erl -har$ed et-' for%
7atter Char$er Sstem -om&lete .ith &ro@idin$ 9 lain$/-onne-tin$ of -abledul labeled foridentifi-ation) .ith res&e-ti@e DC 7atter 7ank et-'for%
DC Distribution +anel -om&lete .ith &ro@idin$ 9 lain$/-onne-tin$ of res&e-ti@e DC 7atter7ankdul labeled for identifi-ation)#out$oin$ -ir-uits dul -onne-ted .ith reuisite loadsthrou$h &ro&er -ablesdul labeled for identifi-ation) et-'as under%
AC Distribution +anel -om&lete .ith 2 3os'In-omers .ith AC7s of adeuate Ca&'ha@in$(le-tri-al Interlo-k to S.it-h on one In-omer at a time J &rot-tion sstem/C 9 (/6)# Di$italVolt/Am&/,E/(ner$ ,eters# Indi-ation Lam&s# 7ell/"ooter#adeuate 3os' LT -ables from
Au; Transformers -onne-ted et-'
AC Distribution 7oard -om&lete .ith &rote-tion sstem/C 9 (/6)# Di$italVolt/Am&/,E/(ner$ ,eters# Indi-ation Lam&s# 7ell/"ooter#adeuate 3os' of -ir-uits et-' foremer$en- Illummination DB set) et-'
AC Distribution 7oard -om&lete .ith &rot-tion sstem/C 9 (/6)# Di$italVolt/Am&/,E/(ner$ ,eters# Indi-ation Lam&s# 7ell/"ooter#adeuate 3os' of -ir-uits forIllummination et-'
I%STAATI'% & #'ISSI'%I%5 ' 100 !A D5 ST I%#9DI%5'9%DATI'%"8A%""#ABI%5"3'9SI%5 $'' IT3 #'8T A##SS'$IST#, AS 8$ S8#II#ATI'%S,
I%STAATI'% ' 220 ! #&$ 8A%S 8## 8anels & 20 ! SCitc+ear alonCit+irin"Installation of respective ars+ellin Boxes installed outdoor in t+e ard.
Duplex Tpe Cit+ #orridor #ontrol and $ela 8anel set for 220 ! evel comprisin offolloCin 220 ! circuits as under.
220 KV 6eeder Cir-uit eui&&ed .ith ,imi- Dia$ram# Auto e!-lose ela#7/7 +rote-tionelas#,ain +rote-tion S-heme# 7a-k!u& +rote-tion S-heme# tri&&in$ relas# ne-essar-ontrol and ela s.it-hesin-ludin$ &rote-tion transferred on 7C &anel)# De@i-es # Di$ital,eters et-'
220 Transformer Cir-uit for 220 KV side of 220/20 KV +o.er transformer eui&&ed .ith,imi- Dia$ram# Differential/(6 elas# 7/7 +rote-tion elas# 7a-k!u& +rote-tion S-heme#tri&&in$ relas# ne-essar -ontrol 6or 7reaker#Isolators) and ela s.it-hesin-ludin$&rote-tion transferred on 7C &anel)# De@i-es# Di$ital ,eters et-'
220 KV 7us Cou&ler Cir-uit eui&&ed .ith ,imi- Dia$ram# Auto e!-lose ela#7/7+rote-tion elas# 7a-k!u& +rote-tion S-heme# tri&&in$ relas# ne-essar Control and elaS.it-hes# De@i-es # Di$ital ,eters et-'
Annun-iation +anel (ui&&ed .ith ne-essar S.it-hes/Annun-iatiion elas#"ooter/7ell et-adeuate to -ater to annun-iation fa-ias for -om&lete set of &anel board -om&risin$ of C9+anels for 5 3os feeder# 23os Transformers In-omers) and one 3o'7us -ou&ler
-
8/10/2019 18.06.2014 latest
97/140
Set 1
Sets 2
3os' 8
20 ! SCitc+ear as under.
20 ! SCitc+earpoCer 8anel Set for 220"20 ! 8oCer Transformer1
3o' 1
3os' 5
3o' 1
20 ! SCitc+earpoCer 8anel Set for 220"20 ! 8oCer Transformer2
3o' 1
3os'
3o' 1
ther/Common eui&ments &ertainin$ to C9 sstem abo@e mentioned C9 +anels fromserial (i to @ ) su-h as (@ent lo$$er# (ner$ ,eters .ith &ulsed out&ut to Data +ro-essor#Data +ro-essor for -onsolidation of meter &ulses## Volta$e/6reuen- e-order et-
+LCC +anel/A--essories/Instruments/T9+ et-' -om&lete set for +LCC -ommuni-ation7et.een Shindan Substation and "erat Substation on one -ir-uit of 220 KV D/CTransmission Line ther for +LCC -ommuni-ation
,arshellin$ 7o;es in 220 KV :ard -om&lete .ith .irin$ of Control Cables/AC 9 D- Cables
et-' for ea-h 220 KV 7a
ne In-omer .ith Co&&er 7us!7ars#ne-essar Control 9 +rote-tion S-heme!/C and (/6#Transformer 6un-tions Tri Tri& elas# 3e-essar indi-ation lam&s#7reaker .ith ,otorisedS&rin$ -har$ed ,e-h'Di$ital Volt/Am&'/,E/,E"/+6 ,eters# Set of VTs# CTsere-tedoutdoorin the 110 KV Trans'S.it-h :ard)# kit &ro@ision for termination of 3os'1!-ore 00Suare mm 20 KV Al Condu-tor FL+( Cable# Transformer 6un-tions Tri Tri& elas#7ell/"ooter# 3e-essar indi-ation lam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$italVolt/Am&'/,E/,E"/+6 ,eters et-'
5 3os' ut$oin$ 6eeder -ir-uits .ith Co&&er 7us!7ars#ne-essar Control 9 +rote-tionS-heme!/C and (/6# Transformer 6un-tions Tri Tri& elas# 3e-essar indi-ationlam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$ital Volt/Am&'/,E/,E"/+6 ,eters#CTsere-ted inside &anel)# kit &ro@ision for termination of '5!Core 15 Suare mm 20 KV AlCondu-tor FL+( Cable# Tri& elas# 3e-essar indi-ation lam&s#7reaker .ith ,otorisedS&rin$ -har$ed ,e-h# Di$ital Volt/Am&'/,E/,E" ,eters et-'
1 3o'Transformer Cir-uit for 20 KV side of 2 3os'20/0' KV 250 KVA Stationau;'Transformerso&eratin$ in &arallel) .ith Co&&er 7us!7ars#ne-essar# Control 9+rote-tion S-heme!/C and (/6# Transformer 6un-tions Tri Tri& elas# 3e-essarindi-ation lam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$italVolt/Am&'/,E/,E"/+6 ,eters# CTsere-ted inside &anel)# kit &ro@ision for termination of'5!Core 15 Suare mm 20 KV Al Condu-tor FL+( Cable# Transformer 6un-tions Tri Tri&elas# 3e-essar indi-ation lam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h# Di$italVolt/Am&'/,E/,E" ,eters et-'
ne In-omer .ith Co&&er 7us!7ars#ne-essar Control 9 +rote-tion S-heme!/C and (/6#Transformer 6un-tions Tri Tri& elas# 3e-essar indi-ation lam&s#7reaker .ith ,otorisedS&rin$ -har$ed ,e-h'Di$ital Volt/Am&'/,E/,E"/+6 ,eters# Set of VTs# CTsere-tedoutdoorin the 110 KV Trans'S.it-h :ard)# kit &ro@ision for termination of 3os'1!-ore 00Suare mm 20 KV Al Condu-tor FL+( Cable# Transformer 6un-tions Tri Tri& elas#7ell/"ooter# 3e-essar indi-ation lam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$italVolt/Am&'/,E/,E"/+6 ,eters et-'
3os' ut$oin$ 6eeder -ir-uits .ith Co&&er 7us!7ars#ne-essar Control 9 +rote-tionS-heme!/C and (/6# Transformer 6un-tions Tri Tri& elas# 3e-essar indi-ationlam&s#7reaker .ith ,otorised S&rin$ -har$ed ,e-h'Di$ital Volt/Am&'/,E/,E"/+6 ,eters#
CTsere-ted inside &anel)# kit &ro@ision for termination of '5!Core 15 Suare mm 20 KV AlCondu-tor FL+( Cable# Tri& elas# 3e-essar indi-ation lam&s#7reaker .ith ,otorisedS&rin$ -har$ed ,e-h# Di$ital Volt/Am&'/,E/,E" ,eters et-'
7us Cou&ler .ith Co&&er 7us!7ars#ne-essar Control 9 +rote-tion S-heme!/C and (/6#Transformer 6un-tions Tri Tri& elas# 3e-essar indi-ation lam&s#7reaker .ith ,otorisedS&rin$ -har$ed ,e-h'Di$ital Volt/Am&'/,E/,E"/+6 ,eters# CTsere-ted inside &anel)# kit&ro@ision for termination of '5!Core 15 Suare mm 20 KV Al Condu-tor FL+( Cable# Tri&elas# 3e-essar indi-ation lam&s et-' for -ou&lin$ of t.o In- 19 In- 2
-
8/10/2019 18.06.2014 latest
98/140
20 ! Guipment on 20 ! side of 220"20 ! 1;"20 !A Transformers.
3os'
3os'
S9BT'TA (S. I%STAATI'% ' 220 ! #&$ 8A%S* & 20 ! SIT#35A$)
I3 LT 1
8rovidin art+in
(earthin$ of ,ain (ui&'in the :ards# 20 K@ CTs 9 SAs# +o.er/Au;'Tranformers et-' 3os' 10
3os' 1
(arthin$ of +LCC +anels/(ui&ment et-'-om&lete in +LCC oomJ Sets 2
(arthin$ of +o.er/Au;' Tranformers in-ludin$ 7ushin$s 3os'
(arthin$ of 20 KV S.it-h$ear Control +o.er +anel) in 20 KV Contro oom 3os' 1
,arshallin$ 7o;es in the ard 3os' 8
8rovidin %eutral art+in
(arthin$ of 3eutrals of +o.er Transformers 3os' 2(arthin$ of 3eutral CT for +o.er Transformer for (6 +rot' 3os' 2
(arthin$ of 3eutrals of 'Stn'Au;'Transformers 3os' 2
(arthin$ of CVTs in-ludin$ CCs)/+Ts in 6eeder/7'C bas 3os' 1
8rovidin art+in 8its
(arth ,at of 220 KV :ard 3os' 8
(arth ,at of 220 KV Control oom for earthin$ of C9 +anels ' 3os'
(arth ,at of 20 KV Control oom for earthin$ of +o.er +anels ' 3os'
3os' 8
Installation of 8## in/ on .
Sets 2
20 kV Sur$e Arrestors station t&e 10KA dis-har$e -urrent 1 +h) outdoor t&e for 23os'220/20 KV +o.er Transformers'
20 kV .ith 120 e;tended -urrent CTs 1 +h') utdoor T&e for 20 KV Side of 220/20 KV+o.er Transformers To be ere-ted in utdoor :ard) for 7a-k ?& +rote-tion'
eart+in of ain Guip in t+e 6ard "Aux eGuipment & #, $ panels in t+e #,$m,"Transfomers"%eutrals"%#T etc, Cit+ #opper Strip"#onductor & lexible #opperBonds at tCo opposite points & fillin of t+imbles (Cit+ Solder Soft) of adeGuatecapacities* fixin Cit+ bolts at appropriate points etc, includin Sundr aterialssuc+ as T+imbles of various but adeGuate capacities, Solder Soft* 5alvanied %&Bs*8aint of reGusite s+ade etc,complete Job as under.
eart+in of ain Guip in t+e 6ard "Aux eGuipment & #, $ panels in t+e #,$m,"Transfomers
(arthin$ of 220KV Du T&e C9 +anels both Control +anel 9 ela +ane)/TCCs in
Control oomJ LT S.it-h$earACD7#DCD7 +anel/7oard# 7atter Char$ers et-') in ControloomJ
(arthin$ of 3eutrals of Transformers/3CTs .ith Co&&er Stri&/Condu-tor b &ro@idin$(arthin$ +its In-ludin$ ,aterials su-h as Bal@',S +i&e/+late/Eire# Con-rete# other-on@entional mats' (t-'! the s&e-ifi-ations of (arthin$ +it as &er rele@ant I(C) for thefollo.in$%
8rovidin art+in 8its( Includin aterials suc+ as 5alv,S 8ipe"8late"ire*#oncrete* ot+er conventional mats, etc,( t+e specifications of art+in 8it as perrelevant I#) includin Celdin etc,& aterials suc+ as eldin $ods& ot+er sundr
Im&ro@ement of (arth esisti@it if reuired 9 if it is found that (arthin$ ,atdesi$n/lain$ is &ro&er )
S9B T'TA(T. 8$'!IDI%5 ' A$T3I%5 ' AI% @9I8%T"#&$8A%S"T$A%S,%9T$AS"%#TS & A$T3I%5 8ITS)
220 KV Substation at Shindan end on one -ir-uit onl for ea-h of the t.o nos' D/C 220 KVTr' Lines) -om&lete(ui&ment# Cables# +anels in-ludin$ -onne-ted .orks et-') .ithSubstation at other (nd'
-
8/10/2019 18.06.2014 latest
99/140
S9B T'TA(9. I%STAATI'% ' 8## #'9%I#ATI'% S6ST)
Air #onditionin of. Set 1
'ffice of t+e Station Inc+are & S+ift Inc+are $ooms Set 1
8## $oom Set 1
20 ! ain #ontrol $oom 3all & S+ift Inc+are $oom
!entillation & 3eatin Sstem or #ontrol $oom cum office bloc/ buildin,
#ontrol $oom except 1,1 a) & b) above Set 1
20 v #ontrol $oom Set 1
'ffice bloc/ except 1,1 a) & b) above Set 1
S9B T'TA(!. !entillation & 3eatin sstem)
Set 1
+ortable 6ire (;tin$uishers Set 1
Smoke Dete-tion Sstem Set 1
S9BT'TA (. I$ 8$'T#TI'% S6ST)
220 KV Control oom 7uildin$ Indoor in-ludin$ 6a-ade Illumination' Set 1
20 KV Control oom 7uildin$ Indoor in-ludin$ 6a-ade Illumination' Set 1
Store buildin$ Indoor Illumination' Set 1
Set 1
Set 1
S9BT'TA (L. I9I%ATI'% S6ST)
Lum& Sum
Installation of A#"!entillation & 3eatin Sstem* includin complete suppl of allnecessar aterials* 8lants* ans* A# 8lant* 5as 3eaters etc,& Installation* completeas per Specifications includin folloCin .
Installation of ire 8rotection Sstem* includin complete suppl of all necessaraterials* Trolle "+eel mounted"8ortable fire extinuis+ers* Smo/e detectionsstem etc, & Installation* complete Sc+eme as per Specifications includin folloCinbut be not limited to t+e folloCin .
Trolle /Eheel mounted fire e;tin$uishers one set -onsistin$ of 22'5 k$ -a&a-it dr-hemi-al &o.der t&e and 22'5k$ -a&a-it of Co2 t&e)
Installation of Illumination Sstem* includin complete suppl of IllumminationTransformer*complete suppl of all necessar aterials"Boards"#ables"8oles &asts"$eceptacles"uminaires & fixtures etc, & Installation* complete Sc+eme as perSpecifications includin folloCin but be not limited to t+e folloCin .
S.it-hard Li$htin$ in-ludin$ lain$ of Cables of suffi-ient -a&a-it in reuisite -abletren-hes# dul labeled for identifi-ation# &ro@idin$ 9 ere-tion of Li$ht ,asks Bantr To.er notto be used to install Illumination f