1800 Park Avenue Transit Easement CertificationJun 10, 2020 · Existing Deciduous Tree Storm Sewer...
Transcript of 1800 Park Avenue Transit Easement CertificationJun 10, 2020 · Existing Deciduous Tree Storm Sewer...
1800 Park Avenue Transit Easement Certification
Manhattan Community Board 11
June 10, 2020
Zoning Lot
SCALE
NEW YORK, NY 10036
T +1 212 257 6600
ONE BRYANT PARK
CLIENT
MANHATTAN174933
BOROUGH:BLOCK:LOT:
THE DURST ORGANIZATION
NEW YORK, NY 11201
45 MAIN STREET, SUITE 900
PROJECT NO16525
BAR SCALE
SEAL
PROJECT BY OTHERS.
ADDITIONS TO THIS PROJECT OR COMPLETION OF THIS
SUCH MAY NOT BE USED FOR OTHER PROJECTS, FOR
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND AS
NOT FOR CONSTRUCTION
SHEET NAME
SHEET NO
DOB NO
DATE
FORMAT
ISSUE
BJARKE INGELS GROUP
T +1 347 549 4141
ARCHITECT
ARCH D
(NTS)
KEY PLAN
DATE
N
1800 PARK AVE1800 PARK AVENEW YORK, NY 10035
DCP FILING SET
DCP FILING SET6/12/2019
5/20/2020
5/20/2020
E. 124TH STREET
E. 125TH STREET
PA
RK
AV
E.
MA
DIS
ON
AV
E.
S
D
D
D
(DR MARTIN LUTHER KING JR BOULEVARD)EAST 125TH STREET (100' WIDE STREET)
PA
RK
AV
EN
UE
(14
0' W
IDE
ST
RE
ET
)
PA
RK
AV
EN
UE
(14
0' W
IDE
ST
RE
ET
)
EAST 124TH STREET (60' NARROW STREET)
HY D
H
Y
D
H
YD
HY D
H
YD V
V
V
V V
V
BUS
C4-4D
Lot 46
19
'-9
"
C6-4
Lot 24
52
'
201
'-1
0"
30
'
Lot 33
C4-7
15
'-3
"
315'
59
'-1
1"
215'
A-210-00
C4-4A
1800 PARK AVENUE
1
C6-4
19'-1"
Lot 49
R7-2
12
'-1
1"
15'-7"
31
'-1
0"
20
'-5
"
105'-3"
C6-4
MTA EASEMENT VOLUME BELOW18' x 30'
F
100'
100
'-1
1"
18'
10
0'-1
1"
A-210-00
2
HARLEM - 125TH STMETRO NORTH
RAILROAD STATION
S
E
D
HY D
V
BUS
F
Hydrant
Catch Basin
Fire Box
Sign
Bus Stop
Vault
Drain
Trestle Column
NOTE:
Information outside of the boundaries of the zoning lot is for illustrative purposes only. The architect bears no responsibility for inexact information on surrounding properties.
Information outside of the boundaries of the MTA Easement Volume is for illustrative purposes only and is subject to change.
Project datum of 0 at grade level based on approximate ACL of +22 NAVD88
LEGEND:
Illustrative Building Line
Existing Building Footprint
Proposed Building Footprint
Road Traffic Direction
Section Cut
C4-7 Zoning District
Zoning Lot Line
Zoning District Line
MTA Easement Volume
MTA Easement Above-grade
Light Pole
Existing Deciduous Tree
Storm Sewer Manhole
Electric Manhole
Sanitary or Combined Sewer ManholeA-100-10
1/32" = 1'-0"1
1/32" = 1' - 0"
SITE PLAN
SITE PLAN
50 2510
SCALE
NEW YORK, NY 10036
T +1 212 257 6600
ONE BRYANT PARK
CLIENT
MANHATTAN174933
THE DURST ORGANIZATION
BOROUGH:BLOCK:LOT:
NEW YORK, NY 11201
45 MAIN STREET, SUITE 900
PROJECT NO16525
BAR SCALE
SEAL
PROJECT BY OTHERS.
ADDITIONS TO THIS PROJECT OR COMPLETION OF THIS
SUCH MAY NOT BE USED FOR OTHER PROJECTS, FOR
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND AS
NOT FOR CONSTRUCTION
SHEET NAME
SHEET NO
DOB NO
DATE
FORMAT
ISSUE
BJARKE INGELS GROUP
T +1 347 549 4141
ARCHITECT
ARCH D
(NTS)
KEY PLAN
DATE
N
1800 PARK AVE1800 PARK AVENEW YORK, NY 10035
DCP FILING SET
8/26/2019
8/26/2019
E. 124TH STREET
E. 125TH STREET
PAR
K AV
E.
MAD
ISO
N A
VE.
S
E
D
HY D
V
F
BUS
Zoning District
Zoning Lot Line
Zoning District Line
MTA Easement Volume
MTA Easement Above-grade
Light Pole
Existing Deciduous Tree
Storm Sewer Manhole
Electric Manhole
Sanitary or Combined Sewer Manhole
LEGEND:
Illustrative Building Line
Existing Building Footprint
Proposed Building Footprint
Road Traffic Direction
Section Cut
Vault
Drain
Trestle Column
NOTE:
Information outside of the boundaries of the zoning lot is for illustrative purposes only. The architect bears no responsibility for inexact information on surrounding properties.
Information outside of the boundaries of the MTA Easement Volume is for illustrative purposes only and is subject to change.
Project datum of 0 at grade level based on approximate ACL of +22 NAVD88
C4-7 Hydrant
Catch Basin
Fire Box
Sign
Bus Stop
S
D
D
D
HYD
HY
D
HYD
HY D
HY D
VVV
V
V V
F
(DR MARTIN LUTHER KING JR BOULEVARD)EAST 125TH STREET (100' WIDE STREET)
EAST 124TH STREET (60' NARROW STREET)
PARK AVEN
UE
(140' WID
E ST REET )
PARK AVE N
UE
(140' WID
E ST REET )
HARLEM - 125TH STMETRO NORTH
RAILROAD STATION
BUS
R7-2 C6-4
C4-7C4-4D
C6-4
C4-4A19
'-9"
12'-1
1"
15'-7" 19'-1"
15'-3
"20
'-5"
1
A-210-00
215'
C6-4
201'
-10"
MTA EASEMENT VOLUME20' x 100'-11"
Lot 33
Lot 24
Lot 46Lot 491800 PARK AVENUE
20'
100'
-11"
100'
-11"
100'
315'
A-210-00
2
31'-1
0"
105'-3"
59'-1
1"
SITE PLAN1
SITE PLAN
1/32" = 1' - 0"
1/32" = 1'-0"
A-100-10
50 2510
SCALE
NEW YORK, NY 10036
T +1 212 257 6600
ONE BRYANT PARK
CLIENT
MANHATTAN174933
BOROUGH:BLOCK:LOT:
THE DURST ORGANIZATION
NEW YORK, NY 11201
45 MAIN STREET, SUITE 900
PROJECT NO16525
BAR SCALE
SEAL
PROJECT BY OTHERS.
ADDITIONS TO THIS PROJECT OR COMPLETION OF THIS
SUCH MAY NOT BE USED FOR OTHER PROJECTS, FOR
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND AS
NOT FOR CONSTRUCTION
SHEET NAME
SHEET NO
DOB NO
DATE
FORMAT
ISSUE
BJARKE INGELS GROUP
T +1 347 549 4141
ARCHITECT
ARCH D
(NTS)
KEY PLAN
DATE
N
1800 PARK AVE1800 PARK AVENEW YORK, NY 10035
DCP FILING SET
DCP FILING SET6/12/2019
5/20/2020
5/20/2020
E. 124TH STREET
E. 125TH STREET
PA
RK
AV
E.
MA
DIS
ON
AV
E.
PARK AVE(140' WIDESTREET)
HARLEM - 125TH STMETRO NORTH
ZONING LOT
29
'
16
4'
ZONING LOT
18'
13
5'
MTA EASEMENT VOLUME
EAST 125TH STREET(100' WIDE STREET)
EAST 124TH STREET(60' NARROW STREET)
ZONING LOT
13
5'
30'
ZONING LOT
MTA EASEMENT VOLUME
29
'
16
4'
LEGEND:
Zoning Lot Line
MTA Easement Volume
MTA Easement Above-grade
MTA Easement Below-grade
NOTE:
Information outside of the boundaries of the zoning lot is for illustrative purposes only. The architect bears no responsibility for inexact information on surrounding properties.
Information outside of the boundaries of the MTA Easement Volume is for illustrative purposes only and is subject to change.
Project datum of 0 at grade level based on approximate ACL of +22 NAVD88
Illustrative Building Line
Existing Building / Structure
Proposed Building (As of Right)
A-210-00
2
1/32" = 1'-0"
1/32" = 1' - 0"
1
1
BUILDING SECTIONS
21/32" = 1'-0"
NORTH-SOUTH SECTIONEAST-WEST SECTION
50 2510
SCALE
NEW YORK, NY 10036
T +1 212 257 6600
ONE BRYANT PARK
CLIENT
MANHATTAN174933
THE DURST ORGANIZATION
BOROUGH:BLOCK:LOT:
NEW YORK, NY 11201
45 MAIN STREET, SUITE 900
PROJECT NO16525
BAR SCALE
SEAL
PROJECT BY OTHERS.
ADDITIONS TO THIS PROJECT OR COMPLETION OF THIS
SUCH MAY NOT BE USED FOR OTHER PROJECTS, FOR
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND AS
NOT FOR CONSTRUCTION
SHEET NAME
SHEET NO
DOB NO
DATE
FORMAT
ISSUE
BJARKE INGELS GROUP
T +1 347 549 4141
ARCHITECT
ARCH D
(NTS)
KEY PLAN
DATE
N
1800 PARK AVE1800 PARK AVENEW YORK, NY 10035
DCP FILING SET
8/26/2019
8/26/2019
E. 124TH STREET
E. 125TH STREET
PAR
K AV
E.
MAD
ISO
N A
VE.
S
E
D
HY D
V
F
BUS
Zoning District
Zoning Lot Line
Zoning District Line
MTA Easement Volume
MTA Easement Above-grade
Light Pole
Existing Deciduous Tree
Storm Sewer Manhole
Electric Manhole
Sanitary or Combined Sewer Manhole
LEGEND:
Illustrative Building Line
Existing Building Footprint
Proposed Building Footprint
Road Traffic Direction
Section Cut
Vault
Drain
Trestle Column
NOTE:
Information outside of the boundaries of the zoning lot is for illustrative purposes only. The architect bears no responsibility for inexact information on surrounding properties.
Information outside of the boundaries of the MTA Easement Volume is for illustrative purposes only and is subject to change.
Project datum of 0 at grade level based on approximate ACL of +22 NAVD88
C4-7 Hydrant
Catch Basin
Fire Box
Sign
Bus Stop
S
D
D
D
HYD
HY
D
HYD
HY D
HY D
VVV
V
V V
F
(DR MARTIN LUTHER KING JR BOULEVARD)EAST 125TH STREET (100' WIDE STREET)
EAST 124TH STREET (60' NARROW STREET)
PARK AVEN
UE
(140' WID
E ST REET )
PARK AVE N
UE
(140' WID
E ST REET )
HARLEM - 125TH STMETRO NORTH
RAILROAD STATION
BUS
R7-2 C6-4
C4-7C4-4D
C6-4
C4-4A
19'-9
"12
'-11"
15'-7" 19'-1"
15'-3
"20
'-5"
1
A-210-00
215'
C6-4
201'
-10"
MTA EASEMENT VOLUME20' x 100'-11"
Lot 33
Lot 24
Lot 46Lot 491800 PARK AVENUE
20'
100'
-11"
100'
-11"
100'
315'
A-210-00
2
31'-1
0"
105'-3"
59'-1
1"SITE PLAN
1
SITE PLAN
1/32" = 1' - 0"
1/32" = 1'-0"
A-100-10
50 2510
SCALE
NEW YORK, NY 10036
T +1 212 257 6600
ONE BRYANT PARK
CLIENT
MANHATTAN174933
BOROUGH:BLOCK:LOT:
THE DURST ORGANIZATION
NEW YORK, NY 11201
45 MAIN STREET, SUITE 900
PROJECT NO16525
BAR SCALE
SEAL
PROJECT BY OTHERS.
ADDITIONS TO THIS PROJECT OR COMPLETION OF THIS
SUCH MAY NOT BE USED FOR OTHER PROJECTS, FOR
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND AS
NOT FOR CONSTRUCTION
SHEET NAME
SHEET NO
DOB NO
DATE
FORMAT
ISSUE
BJARKE INGELS GROUP
T +1 347 549 4141
ARCHITECT
ARCH D
(NTS)
KEY PLAN
DATE
N
1800 PARK AVE1800 PARK AVENEW YORK, NY 10035
DCP FILING SET
DCP FILING SET6/12/2019
5/20/2020
5/20/2020
E. 124TH STREET
E. 125TH STREET
PA
RK
AV
E.
MA
DIS
ON
AV
E.
Illustrative Building Line
Proposed Building (As of Right)
NOTE:
Information outside of the boundaries of the zoning lot is for illustrative purposes only. The architect bears no responsibility for inexact information on surrounding properties.
Information outside of the boundaries of the MTA Easement Volume is for illustrative purposes only and is subject to change.
Project datum of 0 at grade level based on approximate ACL of +22 NAVD88
LEGEND:
Zoning Lot Line
MTA Easement Volume
MTA Easement Above-grade
MTA Easement Below-grade
Lot 22
Lot 49
Lot 23
Lot 24
Lot 48
Lot 46
Lot 123
Lot 21
Lot 50
16
4'
13
5'
18'
30'
29
'
NORTH-WEST AXONOMETRIC VIEW
NTS
A-601-00
1
MTA EASEMENT VOLUMEAXONOMETRIC
SCALE
NEW YORK, NY 10036
T +1 212 257 6600
ONE BRYANT PARK
CLIENT
MANHATTAN174933
THE DURST ORGANIZATION
BOROUGH:BLOCK:LOT:
NEW YORK, NY 11201
45 MAIN STREET, SUITE 900
PROJECT NO16525
BAR SCALE
SEAL
PROJECT BY OTHERS.
ADDITIONS TO THIS PROJECT OR COMPLETION OF THIS
SUCH MAY NOT BE USED FOR OTHER PROJECTS, FOR
THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND AS
NOT FOR CONSTRUCTION
SHEET NAME
SHEET NO
DOB NO
DATE
FORMAT
ISSUE
BJARKE INGELS GROUP
T +1 347 549 4141
ARCHITECT
ARCH D
(NTS)
KEY PLAN
DATE
N
1800 PARK AVE1800 PARK AVENEW YORK, NY 10035
DCP FILING SET
8/26/2019
8/26/2019
E. 124TH STREET
E. 125TH STREET
PAR
K AV
E.
MAD
ISO
N A
VE.
S
E
D
HY D
V
F
BUS
Zoning District
Zoning Lot Line
Zoning District Line
MTA Easement Volume
MTA Easement Above-grade
Light Pole
Existing Deciduous Tree
Storm Sewer Manhole
Electric Manhole
Sanitary or Combined Sewer Manhole
LEGEND:
Illustrative Building Line
Existing Building Footprint
Proposed Building Footprint
Road Traffic Direction
Section Cut
Vault
Drain
Trestle Column
NOTE:
Information outside of the boundaries of the zoning lot is for illustrative purposes only. The architect bears no responsibility for inexact information on surrounding properties.
Information outside of the boundaries of the MTA Easement Volume is for illustrative purposes only and is subject to change.
Project datum of 0 at grade level based on approximate ACL of +22 NAVD88
C4-7 Hydrant
Catch Basin
Fire Box
Sign
Bus Stop
S
D
D
D
HYD
HY
D
HYD
HY D
HY D
VVV
V
V V
F
(DR MARTIN LUTHER KING JR BOULEVARD)EAST 125TH STREET (100' WIDE STREET)
EAST 124TH STREET (60' NARROW STREET)
PARK AVEN
UE
(140' WID
E ST REET )
PARK AVE N
UE
(140' WID
E ST REET )
HARLEM - 125TH STMETRO NORTH
RAILROAD STATION
BUS
R7-2 C6-4
C4-7C4-4D
C6-4
C4-4A
19'-9
"12
'-11"
15'-7" 19'-1"
15'-3
"20
'-5"
1
A-210-00
215'
C6-4
201'
-10"
MTA EASEMENT VOLUME20' x 100'-11"
Lot 33
Lot 24
Lot 46Lot 491800 PARK AVENUE
20'
100'
-11"
100'
-11"
100'
315'
A-210-00
2
31'-1
0"
105'-3"
59'-1
1"
SITE PLAN1
SITE PLAN
1/32" = 1' - 0"
1/32" = 1'-0"
A-100-10
50 2510