BARRIERS TO CDM FINANCING BARRIERS TO CDM FINANCING Climate Change Information Center Manila Observatory Ateneo de Manila Campus Loyola Heights, Quezon City 18 September, Thursday Presented by: Laurie B. Navarro President, AED-P

description

BARRIERS TO CDM FINANCING Climate Change Information Center Manila Observatory Ateneo de Manila Campus Loyola Heights, Quezon City. 18 September, Thursday Presented by : Laurie B. Navarro President, AED-P. RE Technology Development Process. - PowerPoint PPT Presentation

Transcript of 18 September, Thursday Presented by : Laurie B. Navarro President, AED-P

Page 1: 18 September, Thursday  Presented by :  Laurie B. Navarro President, AED-P

BARRIERS TO CDM FINANCINGBARRIERS TO CDM FINANCING Climate Change Information Center

Manila Observatory Ateneo de Manila Campus

Loyola Heights, Quezon City

18 September, Thursday

Presented by: Laurie B. Navarro

President, AED-P

Page 2: 18 September, Thursday  Presented by :  Laurie B. Navarro President, AED-P

RE Technology Development Process

 

Pre-Feasibility

Study

DetailedFeasibility

Study

DetailedEngineering

Design

Construction/Installation

Commissioning& Operation

CDMProcess

Page 3: 18 September, Thursday  Presented by :  Laurie B. Navarro President, AED-P

Phase I. Barriers to Bringing Projects to Actual Implementation (Construction, Commissioning

and Operation) Ready for CDM

1. Lack of processed site-specific resource and market data as basis for private sector interest

 

Pre-Feasibility

Study

DetailedFeasibility

Study

DetailedEngineering

Design

Construction/Installation

Commissioning& Operation

CDMProcess

1 1

Page 4: 18 September, Thursday  Presented by :  Laurie B. Navarro President, AED-P

Phase I. Barriers to Bringing Projects to Actual Implementation (Construction, Commissioning

and Operation) Ready for CDM

2. Lack of packaged pre-feasibility study as basis for private sector interest to pursue detailed FS 

Pre-Feasibility

Study

DetailedFeasibility

Study

DetailedEngineering

Design

Construction/Installation

Commissioning& Operation

CDMProcess

1 1, 2

Page 5: 18 September, Thursday  Presented by :  Laurie B. Navarro President, AED-P

Phase I. Barriers to Bringing Projects to Actual Implementation (Construction, Commissioning

and Operation) Ready for CDM

3. Lack of packaged feasibility study as basis for private sector interest to pursue actual project 

Pre-Feasibility

Study

DetailedFeasibility

Study

DetailedEngineering

Design

Construction/Installation

Commissioning& Operation

CDMProcess

1 1, 2 3

Page 6: 18 September, Thursday  Presented by :  Laurie B. Navarro President, AED-P

Phase I. Barriers to Bringing Projects to Actual Implementation (Construction, Commissioning

and Operation) Ready for CDM

4. Lack of local financing facilities for FS and actual project implementation with ‘appropriate terms and conditions’

 

Pre-Feasibility

Study

DetailedFeasibility

Study

DetailedEngineering

Design

Construction/Installation

Commissioning& Operation

CDMProcess

1 1, 2, 4 3, 4

Page 7: 18 September, Thursday  Presented by :  Laurie B. Navarro President, AED-P

Phase I. Barriers to Bringing Projects to Actual Implementation (Construction, Commissioning

and Operation) Ready for CDM

5. Absence of institutionalized support for access to low-cost foreign financing for main project implementation

 

Pre-Feasibility

Study

DetailedFeasibility

Study

DetailedEngineering

Design

Construction/Installation

Commissioning& Operation

CDMProcess

1 1, 2, 4 3, 4, 5

Page 8: 18 September, Thursday  Presented by :  Laurie B. Navarro President, AED-P

Phase I. Barriers to Bringing Projects to Actual Implementation (Construction, Commissioning

and Operation) Ready for CDM

6. Facility for accessing government subsidy for RE systems intended for missionary areas not yet operational

  Pre-Feasibility

Study

DetailedFeasibility

Study

DetailedEngineering

Design

Construction/Installation

Commissioning& Operation

CDMProcess

1 1, 2, 4 3, 4, 5, 6

Page 9: 18 September, Thursday  Presented by :  Laurie B. Navarro President, AED-P

Phase II. Barriers to Bringing Projects to the CDM Market

Kyoto Protocol not yet ratified

CDM National Authority not yet in place (although there are existing mechanisms to access CDM market)

Lack/Absence of local financing/financing scheme for doing PDD

Difficult access to baseline data needed for doing PDD

Page 10: 18 September, Thursday  Presented by :  Laurie B. Navarro President, AED-P

Phase II. Barriers to Bringing Projects to the CDM Market

High transaction cost of validation/registration till verification of CDMable projects and lack of access to potential funding mechanisms to cover such costs particularly if incurred before project generates sufficient income

Absence of institutionalized support for linking CDMable projects to potential sources of funding of transaction costs and buyers of CERs

Page 11: 18 September, Thursday  Presented by :  Laurie B. Navarro President, AED-P

Thank you.Laurie B. NavarroPresident, AED-P

Alternative Energy Development-PhilippinesTel- 9103008;6385529