18 September, Thursday Presented by : Laurie B. Navarro President, AED-P
-
Upload
reuben-simmons -
Category
Documents
-
view
18 -
download
0
description
Transcript of 18 September, Thursday Presented by : Laurie B. Navarro President, AED-P
BARRIERS TO CDM FINANCINGBARRIERS TO CDM FINANCING Climate Change Information Center
Manila Observatory Ateneo de Manila Campus
Loyola Heights, Quezon City
18 September, Thursday
Presented by: Laurie B. Navarro
President, AED-P
RE Technology Development Process
Pre-Feasibility
Study
DetailedFeasibility
Study
DetailedEngineering
Design
Construction/Installation
Commissioning& Operation
CDMProcess
Phase I. Barriers to Bringing Projects to Actual Implementation (Construction, Commissioning
and Operation) Ready for CDM
1. Lack of processed site-specific resource and market data as basis for private sector interest
Pre-Feasibility
Study
DetailedFeasibility
Study
DetailedEngineering
Design
Construction/Installation
Commissioning& Operation
CDMProcess
1 1
Phase I. Barriers to Bringing Projects to Actual Implementation (Construction, Commissioning
and Operation) Ready for CDM
2. Lack of packaged pre-feasibility study as basis for private sector interest to pursue detailed FS
Pre-Feasibility
Study
DetailedFeasibility
Study
DetailedEngineering
Design
Construction/Installation
Commissioning& Operation
CDMProcess
1 1, 2
Phase I. Barriers to Bringing Projects to Actual Implementation (Construction, Commissioning
and Operation) Ready for CDM
3. Lack of packaged feasibility study as basis for private sector interest to pursue actual project
Pre-Feasibility
Study
DetailedFeasibility
Study
DetailedEngineering
Design
Construction/Installation
Commissioning& Operation
CDMProcess
1 1, 2 3
Phase I. Barriers to Bringing Projects to Actual Implementation (Construction, Commissioning
and Operation) Ready for CDM
4. Lack of local financing facilities for FS and actual project implementation with ‘appropriate terms and conditions’
Pre-Feasibility
Study
DetailedFeasibility
Study
DetailedEngineering
Design
Construction/Installation
Commissioning& Operation
CDMProcess
1 1, 2, 4 3, 4
Phase I. Barriers to Bringing Projects to Actual Implementation (Construction, Commissioning
and Operation) Ready for CDM
5. Absence of institutionalized support for access to low-cost foreign financing for main project implementation
Pre-Feasibility
Study
DetailedFeasibility
Study
DetailedEngineering
Design
Construction/Installation
Commissioning& Operation
CDMProcess
1 1, 2, 4 3, 4, 5
Phase I. Barriers to Bringing Projects to Actual Implementation (Construction, Commissioning
and Operation) Ready for CDM
6. Facility for accessing government subsidy for RE systems intended for missionary areas not yet operational
Pre-Feasibility
Study
DetailedFeasibility
Study
DetailedEngineering
Design
Construction/Installation
Commissioning& Operation
CDMProcess
1 1, 2, 4 3, 4, 5, 6
Phase II. Barriers to Bringing Projects to the CDM Market
Kyoto Protocol not yet ratified
CDM National Authority not yet in place (although there are existing mechanisms to access CDM market)
Lack/Absence of local financing/financing scheme for doing PDD
Difficult access to baseline data needed for doing PDD
Phase II. Barriers to Bringing Projects to the CDM Market
High transaction cost of validation/registration till verification of CDMable projects and lack of access to potential funding mechanisms to cover such costs particularly if incurred before project generates sufficient income
Absence of institutionalized support for linking CDMable projects to potential sources of funding of transaction costs and buyers of CERs
Thank you.Laurie B. NavarroPresident, AED-P
Alternative Energy Development-PhilippinesTel- 9103008;6385529
Fax:6373003Visit us at http://www.aed-p.com.ph