1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee...

27
Rev 091123 S_EN MANUAL TOWER Marin 2 x 5 Litre Your retail dealer

Transcript of 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee...

Page 1: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

Rev 091123S_EN

MANUAL

TOWER Marin2 x 5 Litre

Your retail dealer

Page 2: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

2.

1. Table of contents page 2

2. General Tower 3

3. Function description, general 3

4. Start up, general 3

5. Overview of components 4

5. Overview operation buttons 5

6. Indications brewing 5

7. Installation and start 6

8. Operation instructions, brewing 7- 10

9. Maintenance and cleaning 11- 12

10. Important! 12

11. Mounting machine on a work bench 13 -14

12. Programming 15 - 17

13. Error message 18

14. Contemplated use and warnings 19

15. Spare parts list 20 - 21

16. Exploded View (serving station) 22 - 23

17. Electrical diagram 24

18. Dimension sketch Tower station 25

19. Dimension sketch serving station 5L 26

1. Table of contents Tower marin

EN

Page 3: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

3.

2. General TOWER marin

TOWER 2x5-Litre

We congratulate to your choice of Towercoffee machine.The brewer is equiped with full and half brewfunction.and a separate outlet for hot water.Tower is delivered with a brew unit, 2 servingstations and filter holder.

Crem International AB is certifiedISO 9001 and 14001 and thereforea minimal stress of the enviroment.

3. Function description - General

TOWER bulk brewerCoffee brewer with automatic water supply.It is also equipped with a separate outlet for hot water.Brewing takes place in removable serving stations.Brewing is carried out in paper filters. (filter 523).

Brew time for 5 ltrs. approx. 7min.

4. Start up - General

Turn on the main switch, push on/off.The machine is now filling and will start heating water.

Machine is ready for brewing when ”Display” lights upand the correct temperature has been reached. (A)(approx 17 minutes).

Page 4: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

5. Overview of components. TOWER marin

Warning!

The machine must be connected correctly for your safety.Read the manual before using the machine.

Adjustable feet Tap for Hot water

Drip trayDrip tray insert

Display

Lock filterholder

4.

Filter holder

Upper lid

Level tube

Serving station

Tap forcoffee

Upper lid

Handle

Level tube

Tap forcoffee

ON / OFF-switch

Function buttons

Slide Slide locklock

Page 5: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

5. Overview operating buttons. TOWER marin

1/1 BrewingFull brew 5,0 litre

1/2 BrewingHalf brew 2,5 litre

PAUSE / STOP

1/1 BrewingFull brew 5,0 litre

1/2 BrewingHalf brew 2,5 litre

PAUSE / STOP

When machine is in useand filling water.

Display shows:

When machine is filling up andheating water. Display is blinking.

When water has reach righttemperature.Display will light up

5.

6. Indications, Brewing. TOWER marin

When machine isbrewing Full brewDisplay shows: see A

When machine isbrewing Half brewDisplay shows: see B

A

B

Page 6: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

6.

7. Installation and start - Service TOWER marin

7.1. Place the brewer unit on a flat, level and waterproof surface.

7.3. Connect the brewer unit to a coldwater feed -1/2"R with connection tube supplied.

NOTE! The new hose set supplied with the appliance shall be used and that old hosesets shall not be reused. Connection to a closable valve is recommended.Min. water pressure; 2bar (200kPa). Max. water pressure; 8bar (800kPa).Water supply to the machine is the customer ’s responsibility according toinstruction and advice from the supplier.

In areas with high level lime problem, a descaling filter should be mounted.

7.4. Electrical connection;The brewer is not reconnectable and may only be installed to the electric supply networkwith a voltage that is stated on the brewer and shall be carried out by an AuthorizedElectrician.Recommended: Install a line circuit breaker and a earth fault breaker to the machine.CAUTION! Connection to a separate 3 phase only

- Brewer should be connected to 380 V with Zero and ground.- Use 16 Amp fuses.

IMPORTANT! Electrical installations must be done of an certificated electrician.440 V 3 - phase + ground 9000W

Observe!See page 13-14, Mounting machine -Service. And how to assemble themachine.

7.2. Install and lock machine. See fig, A. Adjust feets to stabilize machine.

Fig. A

Page 7: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

8. Operating instructions. (Brewing with coffee) TOWER marin

8.1. Startting up machine.

Turn on the switch A.The machine will now starts filling water .

A

Display shows:

Place a filter in the filter holder.

Filter type 523 for 5Litre.

8.3. Place a filter in the filter holder.

Use Crem International´s recommended coffee filter

Filter type 523 for 5Litre. Article no. 110102 - 02

8.2. Machine starts heating water.While machine is heating the water, displayis blinking.

When water has reached the right temperature.

Display will light up.

Machine is now ready to brew.

7.

Page 8: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

8. Operating instructions. (Brewing with coffee) TOWER marin

8.4. Add coffee.

Add coffee; Use coffee dedicated for bulk brewerapprox. 250 grams for 5 litres of water.

Shake the filterholder easy and make sure that thecoffee is evenly spreaded.

8.5. Place filter holder.

Place the filter holder and lock it with filter lock (A). A

A AA

8.6. Place the serving station.Make sure that the serving station is centeredwith the rotation plate (B).

B

8.

Page 9: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

8. Operating instructions. (Brewing with coffee) TOWER marin

8.7. Start brewing .

1. Push button 1/1 for 5 litre.

Display shows:

When ”Brewing” is ready.The ”Brewing” indicatorlamp will lit.

2. STOP / PAUSE button

- Press button once for stand by.- Press button twice to stop brewing.

To complete brewing press ½ alt. 1/1.

TAPING HOT WATER It is possible to takehot water while brewing coffee.

NOTE!On the brewer unit, a water tap is placed forserving hot water.

You can as a maximum taping 2 pitchers (1.8litre)of hot water, while brewing coffee on 1 serving station .

9.

Page 10: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

8.8. To keep temperature and aroma.Put the lid (A) back on the serving stationimmediately after the brewing.

(A)

Tips!

Preheating of serving stations.Fill the serving station with hot tap water one hour before brewing.Pour out water and do a brewing.

8.9. Empty the filter holder from filter and coffee groundsand clean the filter holder.

Machine is now ready for the next brew.

Some tips for best coffee quality

1. Do not change the recommendedportion of coffee.

2. Do not mix freshly brewed coffeewith old coffee.

3. Always rinse the serving station beforenext brew.

8. Operating instructions. (Brewing with coffee) TOWER marin

10.

Page 11: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

9. Maintenance and Cleaning TOWER marin

Weekly Cleaning

Cleaning

- To keep the serving stations clean. It is effective to start a half brew with water only.- This will disolve the coffee remains.- Empty the serving station by opening the tap and this will also be cleaned.- Repeat this every day.- Dismount the level tube and clean it every week with the enclosed brush.

Cleaning with cleaning powder Article no. 1104162

CLEANING OF SERVING STATION 5 LITRE.Fill the serving station. ( Full brewing without coffee and filter ).Put 2 tablespoons with cleaning powder in the serving stationand wait at least 15 minutes.Tap off 2/3 of the cleaning solution.Clean the serving station with the following cleaning brush.IMPORTANT! Rinse the serving station on the inside severaltimes with fresh tap water.

Observe!The filter holder and serving station should be cleaned every day.Rinse the serving station before each new brewing.

Do not use strong liquid solution when cleaning the brewer unit and serving station.

11.

Page 12: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

9. Maintenance and Cleaning TOWER marin

Outwardly Cleaning of machineUse a soft rag and liquid cleaning agent to prevent scratches.

10. Important! TOWER marin

Important.

Do not make any alterations to the machine. Such measures may cause personal injury andthe machine to fail.The machine should stand on a flat surface so that it will function properly.The machine should be placed on a water-proof surface so that any leakage is easily noticeable.Make sure there is no bendage on the connection tube when machine is pushed into its place.The tube connections should be regularly checked. Make sure that no leakage has occurred inconnection with installation.Do not leave the machine unattended while using.Close water connection when not using machine.The machine must be disconnected from electrical supply beforeany maintenance.

All maintenance and installations must be done byauthorized personel.

12.

Page 13: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

13.

11. Mounting machine on workbench - SER VICE T OWER marin

Mounting the lock pin. see Fig. 2. Fig. 2.

Mounting machine on a work top.

645

58,5

2

87

Fig.1. Bore holes for lock pin.

Ø 3mm. hole 4 pcs

Page 14: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

14.

11. Mounting machine on workbench - SER VICE T OWER marin

Fig. 4.

Mounting machine on a work top.

Fig. 3.

Page 15: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

15.

12. Programming. Adjustings. - SERVICE TOWER marin

ADJUSTING OF TEMPERATURE.

1. Push buttons 1, 2, at the same time for 5 secondsuntil you hear 1 beep .Left side.

Display shows: present setting.

Adjust with the buttons 1 and 2.

Confirm the new settingsby pushing button 3 once.

96°C = max. temperature.70°C = min. temperature.

ADJUSTING AMOUNT OF WATER. Adjust Signal

Off 6

-25% -5

-20% -4

-15% -3

-10% - 2

-5% -1

0% 0

5% 1

10% 2

15% 3

20% 4

25% 5

1. Push buttons 1, 3 at the same time for 5 seconds until you hear 3 beeps .Left side. Display shows: present setting. Adjust with the buttons 1 and 2.Confirm the new settings by pushing button 3 once.

Push buttons 4, 6 at the same time for 5 seconds until you hear 3 beeps.Right side. Display shows: present setting. Adjust with the buttons 4 and 5.

Confirm the new settings by pushing button 6 once.

ON

ON

1 4

2 5

3 6

96

1 4

2 5

3 6

0

Page 16: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

16.

12. Programming. Adjustings. - SERVICE TOWER marin

ADJUST BREWING TIME. (Coffee Ready).Adjust Signal

Off 6

-25% -5

-20% -4

-15% -3

-10% -2

-5% -1

0% 0

5% 1

10% 2

15% 3

20% 4

25% 5

1. Push buttons 2, 3 at the same time for 5 seconds until you hear 5 beeps .Left side. Display shows: present setting. Adjust with the buttons 1 and 2.Confirm the new settings by pushing button 3 once.

Push buttons 5, 6 at the same time for 5 seconds until you hear 5 beeps.Right side. Display shows: present setting. Adjust with the buttons 4 and 5.

Confirm the new settings by pushing button 6 once.

CALIBRATE TEMPERATURE SENSOR.

1. Push buttons 1, 2, 3 at the same time for 5 seconds until you hear a beep twice.Left side. Display shows: present setting. Adjust with the buttons 1 and 2.Confirm the new settings by pushing button 3 once.

NOTE! When calibrating the temperature sensor, you must check the presenttemperature in water tank.

Adjust Signal

98° 2

97° 1

96° 0

95° 1

94° 2

93° 3

92° 4

91° 5

Off 6

1 4

2 5

3 6

0ON

1 4

2 5

3 6

-1

ON

Page 17: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

17.

12. Programming. Hardware test - SERVICE TOWER marin

Hardware test:

Controll of hardware.

1. Checking all electrical outlets: (No outgoing

voltage from the electronic-card in 3 seconds).

2. Control of water, in 3 seconds.

3. Control left outlet valve, in 3 seconds.

4. Control right outlet valve, in 3 seconds.

5. Control heating element, in 3 seconds.

6. Testing buzzer, in 3 seconds.

7. Testing temperature in tank, in 3 seconds.

8. Control of membrane switch by pushing the

buttons 1, 2, 3, 4, 5, 6.

See fig.

9. Display shows:

Function of temp. sensor. = L1/L2.

10. To leave programming: Restart machine.

1. To do a hardware test, rest art machine.Machine must be in position OFF.

Push buttons 1, 3 left side at the same timeand start machine, position ON.ON/OFF

ON

1 4

2 5

3 6

1 4

2 5

3 6

Page 18: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

18.

13. Error message - SERVICE TOWER marin

Error message: Display shows: E1, E2, E3, E4.

LEVEL CONTROL

TEMPERATURE CONTROL

Display shows: E1 = Level sensors short electrod is Clean level sensor.earthed, (GND) Change level sensor.but not level sensors long electrod. Cables wrongly coupled.

Display shows: E4 = Filling time too long. Restart machine.Low pressure on water.Water tap not open.

Display shows: E2 = Temp. sensor out of range 5°C - 105°C.Temp. sensor failure. Change temp. sensor.Cable is loose. Connect cable.

Display shows: E3 = Heating time too long. Restart machine.

Solid state defect. Change solid state.Element defect. Change heating element.

High limit control defect.

IMPORTANT! All maintenance and installations must be done of anauthorized technician.

Page 19: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

19.

14. Contemplated use and warnings. TOWER marin

Contemplated use and warnings

Tower is an appliance for delivering hot water and preparation of coffee.Its long lasting, non-toxic components are easily accessible for proper cleaning and maintenance.The user must be an adult.The appliance must not be used by children or unsuitable people.The user must comply with the safety regulations in force in the country of installation, aswell as with the rules dictated by common sense, and ensure that routine maintenance is carriedout regularly and correctly. The installer, the user and the maintenance technician must inform themanufacturer of possible faults or wear which could af fect the system´s original safety.The installer must check that the environmental conditions are suitable, so as to guarantee safetyand hygiene for the operators and users. The various manufacturers are responsible for thecommercial components fitted to the applince; the customer is responsible for the peopleauthorized to use the machine. (Do not expose the machine to the weather (sun, rain, etc. ).Long appliance stoppages at temperatures as below 0ºC (zero degrees celsius) can causedamage or breakage to the water tank ; thus total emptying is recommended.

”If the Power cord is damaged , it must be replaced by the manufacturer , its service agent orsimilarly qualified persons in order to avoid a hazard” (see servicemanual.)

All electrical installations must be done by a qualified electrician and within safety regulations thatapplies for each country where the appliance are installed.

The manual is dedicated the user and/or an authorized personel. It will give you information how touse the appliance in a correctly way, desirable maintenance and a good safety and security for theuser. The manufacturer is not responsible for personnel damage or environment damage, causedby the appliance, if it has been used in a way, which is different from what prescribes in theseinstructions.This manual must always be available to the user and/or maintenance technician, who mustbe informed of the correct use of the appliance and of possible hidden risks. It must be kept ina dry, clean place.The information given in this manual does not replace the safety instructions and technicaldata for installation and operating directly affixed to the machine and packaging.This manual is to be considered as part of the appliance and must be kept for future reference untilsame is dismantled.

Should you lose it or require further information , contact your area agent or the manufacturer .This manual reflects the state of the art at the current time and cannot be considered inadequatemerely because it is updated later on the basis of new developments.The manufacturer also reserves the right to modify the manual without the duty of updating earlierissues, except in exceptional basis of new developments.

If the appliance is used incorrectly or in ways, other than described in this manual,it will render any guarantee or manufacturer´s responsibility condition null and void; it shouldonly be used by a responsible adult.

Page 20: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

1 15. Spare part list. TOWER marin

20.

Pos. Article number Description Quantity / unit

1 220220 High limit switch 12 1205302 Sensor pin short 13 1605362 Double seal level sensor 14 1205301 Sensor pin long 15 160536 Rubber 16 1206586 Gasket, tank 17 160537-03 Seal for outlet valve 18 1102122 End cover 19 160230-05 Solenoid valve 230V 110 160538-03 Plug for water outlet 111 1031642 PCB 112 1102131 Brew basket 113 1608017 Rocker switch (espresso) 114 1603856 Membrane switch 115 1505022 Silicon hose 116 1403400 Outlet plug 117 1104330 Rotation guide 118 120200-02 Faucet metal 119 1802120 Connection faucet, (short) 120 120634 Single valve 5L/min. 121 1203162 Foot, adjustable 122 160564 Nut PG 13,5 123 1505022 Silicon hose 124 160549 Connector FV/122/B 125 160351 Connector + sidewall 125 160352 Sidewall 126 160429-02 Fuse automatic 127 1602231 Contactor 128 160563 Restrainer PG 13,5 129 1604203 Solid state 130 1604133 NTC thermistor 131 1505076 Plastic plug 132 1031801 Spray nozzle, Tower 133 1505041 Silicon hose, hot water 134 1204016 Spray nozzle 135 1605361 Seal for NTC 136 1031502 Owerflow protection tube 137 1601312 Element 3000W 230V 138 1305011 Binding clip for sensor 139 1604393 Cable 5x 2,5 mm with EMI filtre 140 1203526 Water tank complete 141 1505042 Inlet hose 1

Page 21: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

1 15. Spare part list. TOWER marin

21.

Pos. Artikelnummer Benämning Antal/enhet

50 1103351 Lid Cover with Tie51 1103352 Brew-Thru Lid with SS Tube52 1103353 Main Housing with

Upper Housing & Handle53 1103354 SS Vacuum Bottle, Silicone Gasket54 1103355 Lower Housing55 1103356 Outlet Tube Jacket56 1103357 Stand57 1103358 Drip Tray58 1103359 Glass Tube59 1103360 Brush60 1103361 Water Indicator Lens61 1103362 Outlet Tube62 1103363 Faucet63 1103302 Serving station complete64 1103370 Decor lid, 5 litre65 500316 Transformer- 1202492 KIT Slide lock

Page 22: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

16. Exploded V iew. TOWER marin

22.

15

16

17

18

14

21

10

3

6

9

4

7

30

11

22

20

21

25

27

26

24

28

32

35

31

33

36

37 5

13

8

12

29

23

34

19

38

39

40

41

65

Page 23: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

16. Exploded V iew. Serving Station TOWER

23.

40

41

4250

49

48

43

44

45

46

47

51

52

53

54

Page 24: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

24.

17. Electrical diagram. 3 x 440VAC + ground T ower marin

Page 25: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

25.

18. Dimension sketch. TOWER marin

Page 26: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

26.

19. Dimension sketch. Serving Station TOWER

Page 27: 1740054 tower marin s en 091123 - Crem Internationaldownload2.creminternational.com/Coffee Queen/01_Filterbrew/Towe… · Brewing takes place in removable serving stations. Brewing

Tower marin

Din återförsäljare

FÖR SERVICEVänligen kontakta din återförsäljare

Art.nr. 1740054

CREM International ABBox 10, Viksgränd 2, 670 40 Åmotfors,

Sweden Tel: +46 (0)570-477 00, Fax: +46 (0)570-47719

E-mail: [email protected] www.creminternational.com