17: Review
-
Upload
tu-delft-opencourseware -
Category
Technology
-
view
431 -
download
2
description
Transcript of 17: Review
April 10, 2023
Vermelding onderdeel organisatie
1
Chapter 17: Review
ct5308 Breakwaters and Closure Dams
H.J. Verhagen
Faculty of Civil Engineering and GeosciencesSection Hydraulic Engineering
Emergency closure at Westkapelle1944 (photo: National Geographic
April 10, 2023 2
advantages and disadvantagesrubble mound monolithic • simple construction
• withstand unequal settlement• large ratio between initial
damage and collapse• many guidelines available• dependence on the availability
of adequate quarry• large quantity of material
required in deep water• large space required• difficult to use as quay wall
• short construction time on location
• can function as quay wall• economical use of material in
deeper water• sensitivity to poor foundation
conditions• uncertainty about wave loads in
breaking waves• complete and sudden failure
when overloaded• reflection against vertical wall• limited support for the designer
from guidelines and literature
April 10, 2023 3
Quarry stone or concrete ??
April 10, 2023 4
which design formula ???
3
33 cos sinrN gH
W
3
3 cotr
D
g HW
K
0.2
0.18 0.5
50
0.2
0.13
50
6.2 (plunging breakers)
1.0 cot (surging breakers)
sc
n
Psc
n
H SP
d N
H SP
d N
April 10, 2023 5
SLS and ULS
April 10, 2023 6
Closure dams: special conditions
• subdivision of the basin in order to reduce storage area
• subdivision because of two entrances• a closure with two or more entrances
April 10, 2023 7
two ways to reduce the area of a basin
April 10, 2023 8
a basin with two entrances
April 10, 2023 9
an estuary with two channels
April 10, 2023 10
The gap is not (yet) in equilibrium• stabilise the bottom of
the gap as soon as possible
• avoid erosion of gullies in the storage area
April 10, 2023 11
closure dike breach Ouderkerk aan den IJssel (1953)
April 10, 2023 12
closure alignments