Transcript of 17 New Slide to Translate VN - JGC Comm Training
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
1/21
LOCK OUT & TAGOUT
MANAGING PRE-
COMM/COMMISSIONING SAFETY
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
2/21
OBJECTIVES FOR THIS TRAINING
By End of this training you will understanding:
Pre-Comm/Commissioning Area Access requirement.
To Indentify otential ha!ards and ris"s.
#ecurity / Access control.
Commissioning #ignage$s / Tag.
%nderstand the emergency and e&acuation rocedures
'ote: 'o wor"ers are allowed to wor" on any
re-comm or commissioning acti&ities without
comleting this training.
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
3/21
Why this !"-#$%%/#$%%issi$&i&' t!(i&i&')
It is ( N"* (&+ P$t"&ti(, h((!+$.s h(s" $ th" !$0"#t1
N"* #$&t!$,s i&t!$+.#"+ t$ %(&('" th" h((!+s1
T$ (#hi"2" GOAL 3ERO t(!'"t1
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
4/21
( Wh(t is C$%%issi$&i&')
( CONSTRUCTION
( P!"- C$%%issi$&i&'
( C$%%issi$&i&'
( St(!t - U
( N$!%(, O"!(ti$&s
)echanical Comletion
#*% + *eady for
#ulher,
*eady for ando&er
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
5/21
Pre-Comm/Commissioning Processfow
Site HSEM to review (Sample)
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
6/21
( Wh(t is C$%%issi$&i&')
P!$0"#t C$%%issi$&i&' is #h"#4i&' (&+ t"sti&'1
T$ +$ this syst"% *i,, 5" LIVE1
LIVE syst"% (!" h((!+$.s (&+ &""+ #(!"., %(&('"%"&t1
A++iti$&(, #$&t!$, (!" &""+1
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
7/21
Sources o Energy
Te o!"ective o te #$T$ proce%ure is te control oa&ar%ous energy sources' Te proce%ure is use% or all typeso a&ar%ous energy sources'
All these are
energy sourceElectrical
Mecanical
Hy%raulic
Pneumatic
Cemical
Termal
lui% / as
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
8/21
*at is te a&ar%ousenergy+
Electricityenerated electrical ower/static
or electrical storage de&ices
Mechanical
0inetic energy reresented 1y
mo&ing arts of mechanical
systems.
Pressure
Potential energy in ressure
&essels2 gas tan"s2 hydraulic or
neumanatic system
Thermal
Thermal energy+igh or 3ow
temerature,result from
mechanical wor" 2 chemical
reaction 2 electrical resistances
and radiation.
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
9/21
Causes o a&ar%ous energyacci%ents
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
10/21
,solation can !e acieve% using various meto%san% means inclu%ing
Close valves Bleed pressure Deconnect
circuits
Installation of curtains/blinds PancakesBlock and purge
H$*E.E0 ,solation ,S 1$T C$MP#ETE until te energy source isloc2e% out an% mar2e%' Materials for preventing the use of theequipment and hence isolation of equipment/personnel from thehazardous energy source include (but are not limited to). :
Padlocks ChainsTags/Labels
3 $ 1 $ T $ P E / 4 T E
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
11/21
What is Lock out / Tag out?What is Lock out / Tag out?
Co&ers the ser&icing and maintenance of Co&ers the ser&icing and maintenance of
machines and equiment in which themachines and equiment in which the
une4ected start-u or the release of storedune4ected start-u or the release of stored energy could cause in5ury to emloyeesenergy could cause in5ury to emloyees.
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
12/21
What is Lock out / Tag out?What is Lock out / Tag out?
Lock
To 3oc" something signifies lacing a adloc" on
the equiment in such a manner that it can6t 1e
energi!ed. This is the 1est tye of loc".
TA#
TA# are secially designed tic"ets attached to the switch2
&al&e etc. that warn the user not to energi!e the system. The
tag must 1e tied securely and 1e a1le to withstand weather
conditions such as rain or wind. It must 1e signed 1y the
authori!ed emloyee.
'E7E* I'8*E A 98 '8T 8PE*ATE TA
3$ 1$T
$PE4TE
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
13/21
““Lock-out”Lock-out” means de-energi!ing and utting ameans de-energi!ing and utting ahysical loc" with a adloc" on the energyhysical loc" with a adloc" on the energy
isolating de&ice; of a iece of equiment to re&entisolating de&ice; of a iece of equiment to re&ent
someone from re-energi!ing the equiment andsomeone from re-energi!ing the equiment and
otentially causing the erson ser&icing theotentially causing the erson ser&icing the
equiment to 1e in5ured.equiment to 1e in5ured.
Tag-outTag-out; means de-energi!ing and utting; means de-energi!ing and uttinga warning tag on the energy isolatinga warning tag on the energy isolating
de&ice; of a iece of equiment to re&entde&ice; of a iece of equiment to re&entsomeone from re-energi!ing the equimentsomeone from re-energi!ing the equiment
and otentially causing in5ury to the ersonand otentially causing in5ury to the erson
ser&icing the equiment.ser&icing the equiment.
What is Lock out / Tag out?What is Lock out / Tag out?
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
14/21
What is Lock out / Tag out?What is Lock out / Tag out?
Tag outTag out
TagsTags will notwill not be used alone without locks andbe used alone without locks and
will clearly indicate the ollowing!will clearly indicate the ollowing!
"ame o the #uthori$ed Person working on the e%ui&ment or"ame o the #uthori$ed Person working on the e%ui&ment or&rocess&rocess
'ate the lock and tag was installed'ate the lock and tag was installed
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
15/21
*y we use #$T$*y we use #$T$
(Protect Peole2 Equiment and the En&ironment.Protect Peole2 Equiment and the En&ironment.
( Positi&e isolation of ha!ardous energy sourcesPositi&e isolation of ha!ardous energy sources
( 9efines resonsi1ilities2 tas" and wor" location.9efines resonsi1ilities2 tas" and wor" location.
( Communication2 documentation and trac"ing.Communication2 documentation and trac"ing.
( %nder multi-disciline control2 8erations2 )echanical%nder multi-disciline control2 8erations2 )echanical
( Consistency in alicationConsistency in alication
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
16/21
TE4M *$5
( 4voi% any actions tatmigt reactivatee6uipment
( 3o not mistreat loc2s ortags'
( 3on7t touc anytingunless you ave inorme%your team mem!ers an%
your supervisor'
( 1ever ignore/remove tagsigne% !y oters
3$ 1$T
$PE4TE
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
17/21
When using T#()*T &lease remember!
( Tags are only warning de&icesTags are only warning de&ices
( Tags must 1e securely attachedTags must 1e securely attached
( )ay e&o"e false sense of security)ay e&o"e false sense of security
( Tags do not ro&ide hysical restraintTags do not ro&ide hysical restraint
( Tags must ne&er 1e ignoredTags must ne&er 1e ignored
( )ust withstand en&ironmental conditions)ust withstand en&ironmental conditions
( )ust 1e legi1le and understanda1le)ust 1e legi1le and understanda1le
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
18/21
PTW 'uring +ommissioning
Permit for Construction and commissioning acti&ities area different.
Both PT< are under the =7C Control. Authori!e PT< issuer for commissioning 1ase on disciline required.
PT< during Commissioning > Issuing
=7C Commissioning team.
+Pictures,
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
19/21
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
20/21
,ummary
All arties understood of the safety requirement and resonsi1ilities to meet theo&erall commissioning goal of the ro5ect.
%nderstood the tye of ha!ards.( Electrical( Pressure
( Chemical(Thermal on hot surface( Confined #ace( *otating equiment
%nderstood the emergency e&acuation rocedures.
'o Permit no wor"
Comleted commissioning training.
-
8/9/2019 17 New Slide to Translate VN - JGC Comm Training
21/21
Than" you for your attention
If you have any question donot hesitate to ask any !"
#$% personnel.%ven on the &eld' never
hesitate to solicitation us if
you have a doubt.a&e a safe good wor" a&e a safe good wor"