16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ......

15
STANDARDIZATION OF BRIDGE DESIGNS RC DECK GIRDER BRIDGE : ZORIG-DPM JV. CONSULTANT : APRIL, 2011 DATE : 14 SHEETS NOS. OF SHEET SPAN CARRIAGEWAY 16 m 7.00 m

Transcript of 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ......

Page 1: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

STA

ND

AR

DIZA

TION

OF BR

IDG

E DESIG

NS

RC

DEC

K G

IRD

ER B

RID

GE

: ZOR

IG-D

PM JV.

CO

NS

ULTAN

T

: AP

RIL, 2011

DATE

: 14 SH

EETSN

OS

. OF SH

EETS

PAN

CA

RR

IAG

EWAY

16m

7.00m

Page 2: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

REB

AR C

OD

ES &

SH

APE

DETAILS

STD

-02

STD

-07

STD

-06

STD

-05

STD

-04

7 6 5 4 3

S16-C

7-01D

RA

WIN

G LIST

2

CO

VER

PAG

E1

DR

AW

ING

NU

MB

ER

DE

SC

RIP

TION

SL

GE

NE

RA

L NO

TES

FOR

RC

C C

ON

STRU

CTIO

N

DETAILS

OF BR

IDG

E B

EAR

ING

RAILIN

G D

ETAILS

BR

IDG

E DE

CK

EN

D JO

INTS

DR

AW

ING

LIST

SH

EET C

ON

TEN

TS :R

EV

ISION

DATE

DR

AW

ING

NO

.

SC

ALE:

FIR

ST

ISSUE

NA

ME

& S

IGN

ATUR

E

DR

AW

N:

DE

SIGN

:

APPR

OV

ED

BY

:

(as Sheet A3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZA

TION

OF

BR

IDG

E D

ES

IGN

SD

RA

WIN

G LIS

TS

16-C7-01

NTS

S. H

OS

SAINS

. SID

DIQ

UE

16m S

PA

N R

CC

GIR

DE

R(7.00m

CA

RR

IAG

EW

AY

)

APR

IL, 2011

8

STD

-03D

ECK D

RAIN

AG

E D

ETAIL

S16-C

7-08

S16-C

7-12

S16-C

7-11

S16-C

7-10

PLA

N, S

ECTIO

N A

ND

ELE

VATIO

N O

F DEC

K

REIN

FOR

CE

ME

NT D

ETAILS O

F CR

OS

S GIR

DER

AN

D K

ERB BEAM

RE

INFO

RC

EM

EN

T DE

TAILS O

F MAIN

GIR

DER

MIS

CE

LLANEO

US

DETAILS

S16-C

7-09R

EIN

FOR

CE

ME

NT D

ETAILS O

F DEC

K SLAB

S16-C

7-13R

EB

AR

SC

HED

ULE

14 13 12 11 10 9

S16-C

7-14R

EB

AR

SC

HED

ULE

15

Page 3: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

SH

EET C

ON

TEN

TS :R

EV

ISION

DATE

DR

AW

ING

NO

.

SC

ALE:

FIR

ST

ISSUE

NA

ME

& S

IGN

ATUR

E

DR

AW

N:

DE

SIGN

:

APPR

OV

ED

BY

:

(as Sheet A3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZA

TION

OF

BR

IDG

E D

ES

IGN

SG

EN

ER

AL N

OTE

S FO

RR

CC

CO

NS

TRU

CTIO

NS

TD-02

NTS

S. H

OS

SAINS

. SID

DIQ

UE

16m S

PA

N R

CC

GIR

DE

R(7.00m

CA

RR

IAG

EW

AY

)

APR

IL, 2011

C.R

EINFO

RC

EMEN

T1.

ALL R

EIN

FOR

CIN

G S

TEE

L SH

ALL B

E OF H

IGH

YIELD STR

ENG

THD

EFO

RM

ED

BA

RS

(MIN

fy = 500 MPa) C

ON

FOR

MIN

G TO

IS 17862.

BE

ND

ING

OF R

EIN

FOR

CE

ME

NT B

AR

S S

HA

LL BE AS PER AR

TICLE 5.10.2

OF A

AS

HTO

/ 2007.3.

LAP

S IN

RE

INFO

RC

EM

EN

T BA

RS

IN TE

NS

ION

ZON

E SHALL BE AVO

IDED

ASFA

R A

S P

OS

SIB

LE. LA

PS

MA

Y B

E P

RO

VID

ED

, IF UN

AVOID

ABLE. HO

WEVER

,IN

SU

CH

CASES:

(A)

NO

T MO

RE

THA

N 50 %

OF R

EIN

FOR

CEM

ENT BAR

S SHALL BE

LAP

PE

D A

T AN

Y O

NE SEC

TION

.

(B)

FOR

CLO

SE

LY S

PA

CE

D B

AR

S LA

PP

ING

MAY BE AVO

IDED

BYP

RO

VID

ING

SU

ITAB

LE TY

PE

OF M

ECH

ANIC

AL ANC

HO

RAG

E(W

ITH P

RIO

R APPR

OVAL).

(C)

SP

LICE

S S

HA

LL BE

STA

GG

ER

ED

AT LEAST 600 mm

.

(D)

ALL S

PLIC

ES

SH

ALL B

E C

LASS B SPLICES.

(E)

MIN

IMU

M LAP

LENG

TH O

F REIN

FOR

CE

ME

NT S

HA

LLC

ON

FOR

M TO

AR

TICLE

5.11.2 AN

D 5.11.5 O

F AASHTO

/ 2007S

PE

CIFIE

D LE

NG

TH O

F THE

LAP SPLICE SH

ALL BE

4.C

LEA

R C

ON

CR

ETE

CO

VE

R TO

RE

INFO

RC

ING

STEEL SHALL BE

MA

INTA

INE

D A

S FO

LLOW

S U

NLE

SS

OTH

ERW

ISE SHO

WN

IN TH

ED

RA

WIN

GS

OR

DIR

EC

TED

BY THE EN

GIN

EER.

A.

REIN

FOR

CE

D C

ON

CR

ETE

STR

UC

TUR

ES(A

RTIC

LE 5.12.3-1 O

F AASHTO

LRFD

/ 2007)

●C

ON

CR

ETE

DEC

K SLAB-TO

P RE

INFO

RC

EMEN

T- 50 m

m-BO

TTOM

REIN

FOR

CE

MEN

T- 25 m

m●

BE

AM

, ALL FAC

ES- 40 m

m

5.S

PE

CIA

LLY M

AD

E C

OV

ER

BLO

CK

S O

F SAME STR

ENG

TH AS

THAT

OF C

ON

CR

ETE

SH

ALL O

NLY BE U

SED.

6.W

ELD

ING

OF R

EIN

FOR

CE

ME

NT B

AR

S SHALL N

OT BE PER

MITTED

,U

NLE

SS

AP

PR

OV

ED

BY

THE EN

GIN

EER.

7.S

UP

PO

RTIN

G C

HA

IRS

OF R

EQ

UIR

ED D

IAMETER

FOR

MAIN

RE

INFO

RC

EM

EN

T SH

ALL B

E P

RO

VID

ED AT SU

ITABLE INTER

VALSA

S P

ER

DIR

EC

TION

OF TH

E ENG

INEER

.

8.FU

LL CO

VE

R S

HA

LL BE

MA

INTAIN

ED AT G

RO

OVES AN

DO

THER

WISE

ARC

HITEC

TUR

AL FIN

ISHES

TO TH

E CO

NC

RE

TES

UR

FAC

ES.

D. W

ATER

WA

TER

TO B

E U

SE

D IN

CO

NC

RE

TING

AND

CU

RIN

G SH

ALL BE POTABLE

WA

TER

TO B

E TE

STE

D A

S PER

AASHTO

T26-79.

E. MA

TERIA

L SPECIFIC

ATIO

NM

ATE

RIA

L SP

EC

IFICA

TION

S A

ND

WO

RK

MAN

SHIP SH

ALL BE IN AC

CO

RD

ANC

EW

ITH TH

E TEC

HN

ICA

L SPEC

IFICATIO

N AS

SPE

LT OU

T IN TH

E CO

NTR

ACT

DO

CU

MEN

T.

F. WO

RK

MA

NSH

IP / DETA

ILING

1.A

LL SH

AR

P E

DG

ES

OF C

ON

CR

ETE SHALL BE C

HAM

FERED

(10mm

x 10mm

). OR

AS

PE

R D

IREC

TED BY TH

E ENG

INEER

2.FO

RM

WO

RK

DE

TAILS

SH

ALL B

E S

UBM

ITTED BY TH

E CO

NTR

ACTO

RFO

R TH

E A

PP

RO

VA

L AN

D S

HA

LL BE

TESTED IN

ACC

OR

DAN

CE W

ITHTH

E S

PE

CIFIC

ATION

.

3.C

ON

STR

UC

TION

JOIN

T : THE

LOC

ATION

S AND

PRO

VISION

OF

CO

NS

TRU

CTIO

N JO

INTS

SH

ALL BE APPRO

VED BY TH

EE

NG

INE

ER

-IN-C

HA

RG

E. TH

E C

ON

CR

ETING

OPER

ATION

SHALL

BE C

AR

RIE

D C

ON

TINU

OU

SLY

UP TO

THE

CO

NSTR

UC

TION

JOIN

T.

B. C

ON

CR

ETE;

UN

LES

S O

THE

RW

ISE

SP

EC

IFICA

LLY M

EN

TION

ED IN

THE D

RAW

ING

OR

DIR

ECTED

BY

THE

EN

GIN

EE

R, C

ON

CR

ETE

GR

AD

E S

HA

LL BE AS PER R

ELATED SEC

TION

OF

CO

NTR

ACT D

OC

UM

EN

T PAR

TLY RE

PRO

DU

CED

BELO

W:

AP

PLIC

ATIO

N LO

CATIO

N S

PE

CIFIE

D C

OM

PR

ES

SIVE STR

ENG

TH IN

CU

BE (28 D

AYS) IN M

PaR

EINFO

RC

ED

CO

NC

RE

TE (R

CC

)G

IRD

ER

, CR

OS

S G

IRD

ER, R

AILING

,K

ER

B, D

EC

K S

LAB

, etc.M

30

ALL O

THE

R R

CC

WO

RKS

M25

PC

C FO

R LE

VE

LING

/BLIND

ING

CO

NC

RETE

AN

D C

ON

CR

ETE BLO

CKS

M10

***U

NLE

SS

OTH

ER

WIS

E M

EN

TION

ED

IN TH

E SPECIFIC

ATION

, THE TR

IALM

IX D

ES

IGN

STR

EN

GTH

SH

ALL BE 33.0 MPa.

A.G

ENER

AL

1.TH

E N

OTE

S IN

THIS

DR

AW

ING

SH

ALL B

E READ

IN C

ON

JUN

CTIO

N W

ITH ALL

RE

LEV

AN

T DR

AW

ING

S P

ER

TAININ

G TO

THE BR

IDG

E.

2.U

NLE

SS

OTH

ER

WIS

E S

PE

CIFIE

D, A

LL DIM

EN

SION

S ARE IN

MILLIM

ETER (m

m)

AN

D A

LL LEV

ELS

AR

E IN

m. D

IME

NS

ION

S A

RE

NO

T TO BE SC

ALED AN

D O

NLY

WR

ITTEN

DIM

EN

SIO

NS

AR

E TO BE FO

LLOW

ED.

3.TH

E C

ON

TRA

CTO

R S

HA

LL VE

RIFY

ALL C

HAIN

AGES, R

EDU

CED

LEVELS,C

OO

RD

INA

TES

AN

D D

IME

NS

ION

S B

EFO

RE STAR

T OF TH

E WO

RK. IN

CASE

OF A

NY

DIS

CR

EP

AN

CY

, THE

MA

TTER

SH

ALL BE BRO

UG

HT TO

THE N

OTIC

EO

F THE

EN

GIN

EER.

4.B

RID

GE

S/C

ULV

ER

TS A

RE

DE

SIG

NE

D A

S P

ER

AASHTO

LRFD

BRID

GE D

ESIGN

SP

EC

IFICA

TION

2007

●V

EH

ICU

LAR

LIVE

LOA

D : IR

C 6 : 2000 STAN

DAR

D LO

AD

G. SU

PERVISIO

N1.

THE

CO

NS

TRU

CTIO

N W

OR

K M

UST BE SU

PERVISED

BY AC

OM

PE

TEN

T SU

PE

RV

ISION

ENG

INEER

.

GEN

ERA

L NO

TES FOR

RC

C C

ON

STRU

CTIO

N

123

7.00

5.503.50

SNC

AR

RIA

GE

WID

TH (m

)LO

AD

CA

PAC

ITY

SIN

GLE

LAN

E C

LAS

S 70 R

(WH

EELED) O

R D

OU

BLELA

NE

CLA

SS

A W

HIC

HE

VER IS C

RITIC

AL.

DO

UB

LE LA

NE

CLASS A

SIN

GLE

LAN

E C

LASS A

NO

. OF

LAN

E

221

●S

UP

ER

STR

UC

TUR

E - S

ING

LE S

PA

N SIM

PLE SUPPO

RTED

RC

C G

IRD

ER

10300

12412

16732

201144

221384

251787

282241

18926

322927

BA

R D

IA,m

mLA

P SPLICE,m

m

H. A

BB

REVIA

TION

S

B-B

OTTO

MB

F-B

OTH

FAC

ES

BP

-BE

AR

ING

PA

D

CL /℄

-CE

NTE

R LIN

EC

H-C

HA

INA

GE

EF

-EA

CH

FAC

E / E

AR

TH FA

CE

EG

L-E

XIS

TING

GR

OU

ND

LEV

EL

EQ

-EQ

UA

L

FDN

-FOU

ND

ATIO

NFR

L-FIN

ISH

ED

RO

AD

LEV

EL

HFL

-HIG

H FLO

OD

LEV

EL

H / h

-HE

IGH

T

KB

-KE

RB

BE

AM

/ ED

GE

BE

AM

KP

A-K

ILO P

AS

CA

L

L /L-LE

NG

THLB

L-LO

WE

ST B

ED

LEV

EL

LV-LE

NG

TH V

AR

IES

M-M

ETER

MM

-MILLIM

ETERM

PA

/ MPA

-ME

GA

PASC

AL

NF

-NE

AR FAC

E

PC

C-PLAIN

CE

ME

NT C

ON

CR

ETE

RC

C-R

EIN

FOR

CED

CEM

ENT C

ON

CR

ETER

INF

-RE

INFO

RC

EMEN

TR

L-R

ED

UC

ED

LEVEL

SF-S

UP

ER

ELEVATIO

N

T-TO

PTH

K / TH

-THIC

K

V-V

AR

IES

/ VAR

IABLE

W-W

IDTH

X-C

RO

SSX

G-C

RO

SS G

IRD

ER

Page 4: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

1

GIR

DE

R

1.5 % X

-SLO

PE

DR

AIN

SP

OU

T

RA

ILING

CR

OS

SG

IRD

ER

DETA

IL 1S

CA

LE 1 : 40

SE

E D

ETA

IL B

11

DETA

IL 'A'

SC

ALE

1:5

KE

RB

BE

AM

8-8mm

ØB

OLTS

3 NO

S. M

.S. FLA

T BA

R(5X

25) IN E

QU

AL S

PA

CE

RA

IL PO

ST

SLOPE

SLO

PE

SLO

PE

SLO

PE

SLOPESLOPE

SLOPESLOPESLOPE

RA

ILING

20X20X

6 MS

AN

GLE

FRA

ME

SLOPESLOPESLOPESLOPE

100mm

Ø S

TEE

L PIP

E

5X25 FLA

T BA

RW

ELD

ED

WITH

MS

AN

GLE

20X25X

6M

S A

NG

LE

8mm

ØG

I BO

LT

130X130X

6M

S P

LATE

WE

LDE

DW

ITH P

IPE

DETA

IL 'C'

WE

LD TY

PE

KER

B BEAM

3-5X25 M

S FLAT BAR

IN EQ

UA

L SPACE

100mm

Ø PV

C B

END

100mm

Ø PVC

DR

AIN

PIPE

SO

FFIT OF D

ECK

DETA

IL 'B'

SC

ALE

1:10

SEE DETA

IL 'C'

1.5 % CROSS SLOPE

℄ O

F BR

IDG

E

DR

AIN

SP

OU

TK

ER

B B

EA

MR

AILIN

G

SEE DETA

IL 'A'

DEC

K PLA

N(S

HO

WIN

G D

EC

K D

RA

INAG

E AND

RAILIN

G)

SC

ALE

1 : 100

1.5 % CROSS SLOPE

NO

TES

A. G

ENER

AL

1.A

LL DIM

EN

SIO

NS

AR

E IN

MILLIM

ETE

R U

NLE

SS

OTH

ER

WIS

E M

EN

TION

ED

2.D

O N

OT S

CA

LE TH

IS D

RA

WIN

G. U

SE

GIV

EN

DIM

EN

SIO

NS

ON

LY D

UR

ING

CO

NS

TRU

CTIO

NO

F THE

WO

RK

, THE

CO

NTR

AC

TOR

MU

ST

CH

EC

K TH

ED

IME

NS

ION

S, LE

VE

LSA

ND

ME

AS

UR

EM

EN

T. DIS

CR

EP

AN

CIE

S IF A

NY

TOB

E R

EP

OR

TED

TO TH

E E

NG

INE

ER

BE

FOR

EE

XE

CU

TION

2.D

RA

INA

GE

AS

SE

MB

LE M

AY

BE

MM

AN

UFA

CTU

RE

DA

T SITE

OR

PU

RC

HA

SE

D FR

OM

AP

PR

OV

ED

MA

NU

FAC

TUR

ER

AS

PE

R D

IRE

CTIO

N O

FE

NG

INE

ER

.

B. M

ATER

IAL

1.STE

EL

:IS

226 / IS 808

GR

AD

E500

SH

EE

T CO

NTEN

TS :R

EVIS

ION

DA

TED

RA

WIN

G N

O.

SC

ALE:

FIR

ST ISSU

E

NAM

E & SIGN

ATUR

E

DR

AW

N:

DE

SIG

N:

APP

RO

VE

D B

Y :

(as Sheet A

3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM

JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZATIO

N O

FB

RID

GE D

ESIG

NS

DEC

K DR

AINA

GE

DE

TAILS

TD-03

AS SH

OW

N

S. H

OSS

AINS

. SIDD

IQU

E

16m S

PA

N R

CC

GIR

DER

(7.00m C

AR

RIAG

EWAY)

APR

IL, 2011

Page 5: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

RAIL (GI PIPE)

RAIL POST

2.5 % CROSS SLOPESPOUTDRAIN

DECKSECTION 1-1SCALE 1:25

RAILING(75 Ï GI PIPE)

RAIL POST(150 X 150)

F

F

ELEVATION OF RAILINGSCALE 1:25

BHUTANESE ARCHITECTURE(RAIL POST HEAD)

F

F F

F

1

1

120

120

2

2

REINFORCEMENT DETAIL OF RAILINGSCALE 1:25

01

03

04

02

2525

25

25

2525

25

01

03

04

02

01

03

04

02 33

2.5 % CROSS SLOPESPOUTDRAIN

DECK

2X2=4-01-T16

7-02-T10-150-STIRRUP

2X2=4-03-T122-04-T10

SECTION 2-2SCALE 1:25

150x150RCC POST

RAILING(75 Ï GI PIPE)

15 CHAMFERPLAN OF RAILINGSCALE 1:25

SHEET CONTENTS : REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME & SIGNATURE

DRAWN: DESIGN:

APPROVED BY :

(as Sheet A3 size)

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

ZORIG-DPM JV.P.O. Box No. 797

Room No. 09Thimphu Central Building.

Thimphu, Bhutan

STANDARDIZATION OFBRIDGE DESIGNS

RAILING DETAILS STD-04AS SHOWN

S. HOSSAIN S. SIDDIQUE

16m SPAN RCC GIRDER(7.00m CARRIAGEWAY)

APRIL, 2011

NOTES

A. GENERAL

B. MATERIAL

C. COVERING

TYPE OF REBAR DIA OF REBAR

SPACINGBAR MARK

BAR MARK

20 - 05 - T 20 - 150 - EF

LOCATION /REMARKS

NOS.OF BAR

ǒ SEE TABLE 2 IN DWG. NO. - 12 FOR RAILING CONCRETE SCHEDULE

Page 6: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

L

W

h

TRA

NS

VE

RSE AXIS

OF B

RID

GE

LON

G A

XIS O

FB

RID

GE

ELASTO

MER

IC B

EAR

ING

SE

E D

ETAIL 'A'

STE

EL PLATE

ELA

STOM

ER

DETA

IL 'A'

(TYP

ICA

L)

BE

AR

ING

AS PER GRADE

BA

CK

WALL

OF B

EAR

ING

CL

DEC

K END

JOIN

T

GIR

DER

DE

CK

TOP

XX

TRA

FFICD

IRE

CTIO

N

PLAN

OF B

EAR

ING

(PLA

N O

VE

R ABU

TMEN

T)

BE

AR

ING

SE

AT

BE

AR

ING

PAD

GIR

DER

OU

T LINE

SECTIO

N X-X

PLA

CE

ME

NT O

F BEAR

ING

ABU

TMEN

T WA

LLB

AC

K W

ALL

DR

AIN

BEA

RIN

G C

ON

CR

ETE SEAT

(HO

RIZO

NTAL TO

P)

AD

DITIO

NA

L CO

NC

RETE

TO M

AK

E G

IRD

ERB

OTTO

M H

OR

IZON

TAL

DR

AIN

CR

OS

S G

IRD

ER

OF BEARINGCL

1:10

ABU

TMEN

T WA

LL

ELASTO

MER

IC B

EAR

ING

UN

LES

S O

THE

RW

ISE

ME

NTIO

NE

D IN

THE

TEC

HN

ICA

L SP

EC

IFICA

TION

, THE

PR

OP

ER

TIES

AN

D TE

ST R

EQ

UIR

EM

EN

TS O

F THE

ELA

STO

ME

RIC

BE

AR

ING

SH

ALL B

E A

S FO

LLOW

S :

MA

TERIA

L PRO

PERTIES

:a.

Shear m

odulus of ELA

STO

ME

R shall be in the

range of 0.9~1.0 mP

ab.

Min. yield strength of reinforcing steel shall be,

fy = 240 mP

a.

TESTS ON

ELASTO

MER

IC B

EAR

ING

S

A. Test of Elastom

er

A.1. P

hysical properties

a. Hardness test- A

STM

D 2240

b. Tensile strength test-AS

TM D

412c. U

ltimate E

longation Tes - AS

TM D

412.

A.2. H

eat Resistance :

a. Change in D

urometer hardness

b. Change in tensile strength

c. Change in ultim

ate elongation

A.3. C

ompression S

et :22 hours @

212°F Maxim

um %

- AS

TMD

395 Method B

a.4.S

hear Modulus Test on M

aterials fromB

earing - AS

TM D

4014

B. Test on Lam

inate/Elastomer C

ombination

Vulcanized B

ond Test - AS

TM D

429 Method B

C. G

eometric D

imensions

a.O

verall heightb.

Overall horizontal dim

ensionsc.

Thickness of individual layers of elastomer

d.P

arallelism w

ith opposite facee.

Edge cover of em

bedded laminates,

thickness of top and bottom cover.

D. Short D

uration Com

pression Test Design

Maxim

im Load per B

earing :

[ SE

E D

RA

WIN

G 'M

ISC

ELLA

NE

OU

S D

ETA

ILS' - 12 ]

NO

TES

A. G

ENER

AL

1.A

LLD

IME

NSIO

NS

AR

EIN

MILLIM

ETERU

NLESS

OTH

ER

WIS

E M

ENTIO

NED

.2. D

O N

OT S

CA

LE TH

IS D

RAW

ING

. USE G

IVEND

IME

NS

ION

S ON

LY.3.

DU

RIN

GC

ON

STRU

CTIO

NO

FTH

EW

OR

K,TH

EC

ON

TRAC

TOR

MU

STC

HE

CK

THE

DIM

EN

SIO

NS,

LEV

ELSA

ND

MEA

SUR

EM

EN

T.D

ISC

REP

ANC

IESIF

AN

YTO

BE

REP

OR

TEDTO

THE

EN

GIN

EERB

EFO

RE

EX

ECU

TION

.

ASTM

D573

(70 hours at 212° F)

SH

EET C

ON

TEN

TS :R

EV

ISION

DATE

DR

AW

ING

NO

.

SC

ALE:

FIR

ST

ISSUE

NA

ME

& S

IGN

ATUR

E

DR

AW

N:

DE

SIGN

:

APPR

OV

ED

BY

:

(as Sheet A3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZA

TION

OF

BR

IDG

E D

ES

IGN

SD

ETA

ILS O

FB

RID

GE

BE

AR

ING

STD

-05N

TS

S. H

OS

SAINS

. SID

DIQ

UE

16m S

PA

N R

CC

GIR

DE

R(7.00m

CA

RR

IAG

EW

AY

)

APR

IL, 2011

Page 7: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

100X100X10

AN

GLE 4

PLAN

OF M

S AN

GLE

SC

ALE

1:10

T16 @ 300m

m C

/C.

WE

LDE

D TO

ANG

LE

12mm

Ø PIN

@ 300m

m C

/C.

WELD

ED

TOA

NG

LE

22

4

1

WIN

G W

ALL

WIN

G W

ALL

RU

BB

ER

SEAL

GIR

DER

GIR

DER

KE

RB

BEAM

KE

RB

BEAM

GR

ID

GR

ID1

PLAN

OF D

ECK

END

JOIN

TO

VER A

BU

TMEN

TS

CA

LE=1:40

BA

CK

WALL

CR

OS

S G

IRD

ER

12mm

Ø P

IN W

ELDED

WITH

MS

ANG

LE

MS

AN

GLE

100X100X10

CL O

F BR

IDG

E BEARIN

G

T16 @ 300m

m C

/C.

50mm

WC

OVER

RU

BB

ER

SEAL100X

100X10 M

S ANG

LE

BA

CK

WALL

OF AB

UTM

ENT

DE

CK

SLAB

SECTIO

N 1-1

(DE

CK

EN

D JO

INT O

VER

ABU

TMEN

T)

AP

PR

OA

CH

SLAB

CR

OS

S G

IRD

ER

GIR

DER

DEC

K

DO

WE

L BARC

ON

NE

CTED

ATTH

ES

E PO

INTS

@ 300m

m C

/C.

12mm

Ø PIN

(PLA

CE

D W

ITH EPO

XYB

ON

DIN

G M

ATERIA

L)

SECTIO

N 2-2

T16 @ 300m

m C

/C.

WE

LDE

D TO

ANG

LE

(100X100X10)

MS

AN

GLE

(100X100X10)

MS

AN

GLE

55

30X30m

mH

OLE

33

RU

BBER

30X30m

m H

OLE

SECTIO

N 3-3

SC

ALE

1:5PLA

N O

F RU

BB

ERS

CA

LE 1:5

SECTIO

N4-4

SC

ALE

1:2

5MS

AN

GLE

STE

EL PLATE

30X4 m

m W

ELDED

TO A

NG

LE.

12mm

Ø PIN

WELD

ED

TOA

NG

LE @300m

m C

/C5

SH

EET C

ON

TEN

TS :R

EV

ISION

DATE

DR

AW

ING

NO

.

SC

ALE:

FIR

ST

ISSUE

NA

ME

& S

IGN

ATUR

E

DR

AW

N:

DE

SIGN

:

APPR

OV

ED

BY

:

(as Sheet A3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZA

TION

OF

BR

IDG

E D

ES

IGN

SB

RID

GE

DE

CK

EN

D JO

INTS

STD

-06A

S S

HO

WN

S. H

OS

SAINS

. SID

DIQ

UE

16m S

PA

N R

CC

GIR

DE

R(7.00m

CA

RR

IAG

EW

AY

)

APR

IL, 2011

NO

TES

A. G

ENER

AL

1.A

LL DIM

EN

SIO

NS

AR

E IN

MILLIM

ETERU

NLE

SS

OTH

ER

WISE M

ENTIO

NED

.

2.D

O N

OT S

CA

LE TH

IS DR

AWIN

G. U

SEG

IVE

N D

IME

NS

ION

S ON

LY.

3.D

UR

ING

CO

NS

TRU

CTIO

N O

F THE W

OR

K,TH

E C

ON

TRAC

TOR

MU

ST CH

EC

K THE

DIM

EN

SIO

NS

, LEV

ELS

AND

MEASU

REM

ENT.

DIS

CR

EP

AN

CIE

S IF A

NY TO

BE REPO

RTED

TO TH

E E

NG

INE

ER

BEFO

RE EXEC

UTIO

N.

B. SU

GG

ESTED IN

STALLA

TION

PRO

CED

UR

E

1.W

ELD TH

E CO

NN

ECTO

R BA

R AN

D TH

E PINS

WITH

THE

AN

GLE

. THE

ASSEMBLY M

AY BEM

AD

E 1200m

m P

IEC

E O

R AS AG

REED

BY THE

EN

GIN

EER.

2.P

LAC

E TH

E A

SS

EM

BLY

IN TH

E GIR

DER

/ DEC

KA

ND

FIX IN

POSITIO

N.

3.C

AST TH

E GIR

DER

AN

D D

ECK.

4.G

EO

ME

TRY

OF TH

E A

BUTM

ENT AS G

IVENIS

TEN

TATIVE.

5.TH

E A

SS

EM

BLY

OF TH

E DEC

K END

JOIN

TM

AY

BE

MA

DE

AT SITE.

Page 8: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

SH

APE

CO

DE

SH

PAE

00

a

11

b

Total Length :a

a

Total Length :

r

a

bd

c51

Total Length :2(a+b)+16d

21b

ac

Total Length :a+b+c-r-2d

SHA

PE CO

DE A

S PER ISO

4066 : 2000

LEGEN

D :

r= B

EN

DIN

G R

AD

IUS

AS PER TABLE 4

d= D

IAM

ETE

R O

F BARa/b/c/d = AS SH

OW

N

a+b -½r-d

DE

TAILE

D LE

NG

THH

OO

K LE

NG

THU

NB

EN

D H

OO

K LE

NG

TH

OFFS

ET LE

NG

TH

HOOK EXTENSION

BEND DIAMETER

DE

TAILE

D LE

NG

THU

NB

EN

D H

OO

K LE

NG

TH

BEND DIAMETER

HOOK LENGTH

HOOK EXTEN. 12 BN

ED

Φ + B

AR

Φ

DE

TAILE

D LE

NG

THU

NB

EN

D H

OO

K LE

NG

TH

BEND DIAMETER

12 BE

ND

Φ + B

AR

Φ

OFFS

ET LE

NG

TH

HOOK EXTN.

HO

OK

LEN

GTH

DE

TAILE

D LE

NG

THU

NB

EN

D H

OO

K LE

NG

TH

BE

ND

DIA

ME

TER

12 BE

ND

Φ + B

AR

Φ

HO

OK

EX

TEN

SIO

N

HO

OK

LEN

GTH

OFFSET LENGTH BAR DIA

BAR DIABAR DIA

BAR DIA45° H

OO

K

90° HO

OK

135° HO

OK

180° HO

OK

RE

BA

R H

OO

K S

PE

CIFIC

ATIO

NR

EB

ARD

ESIG

NA

TION

DIA

, mm

AR

EA,

mm

2U

NIT W

T.,kg/m

RE

BA

R TYPE

T1010

790.617

IS : 1786 G

RA

DE Fe 500

T1212

1130.888

T1616

2011.578

T2020

3142.466

T2525

4913.853

T2828

6164.834

T3232

8046.313

IS : 1786 G

RA

DE Fe 500

IS : 1786 G

RA

DE Fe 500

IS : 1786 G

RA

DE Fe 500

IS : 1786 G

RA

DE Fe 500

IS : 1786 G

RA

DE Fe 500

TAB

LE 3 : STAN

DA

RD

RE-B

AR

PRO

PERTIES

(UN

IT WT. 0.00785 kg / m

m² /m

)

IS : 1786 G

RA

DE Fe 500

1(A

RT. 5.10 A

AS

HTO

LRFD

2007)

TIE/S

TIRR

UPS

OTH

ER90

0135

090

0180

0

T1040

6060

75120

65T12

4872

7275

14465

T1664

9696

96192

65T20

-120

240120

24080

T25 -

150300

150300

100T28

-168

168336

112T32

-256

192384

1281 A

LL RE

INFO

RC

EM

EN

T SHALL BE C

OLD

BEND

RE

BAR

DES

IGN

ATIO

N

BE

ND

ING

DIAM

ETER

TIE/S

TIRR

UPS

STA

ND

AR

D H

OO

K EXTEN

SION

, mm

OTH

ER

TAB

LE 4 : STAN

DA

RD

HO

OK

AN

D B

END

REQ

UIR

EMEN

T

NO

TES:

A. G

EN

ER

AL

ALL D

IME

NS

ION

S A

RE

IN M

ILLIMETER

UN

LESSO

THER

WISE

MEN

TION

ED

B. S

HA

PE

CO

DE

& B

AR

SH

AP

ETH

E S

TAN

DAR

D SH

APE C

OD

ES AN

D ITS M

ETH

OD

OF M

EA

SU

RE

ME

NT H

AV

E BEEN

PREPAR

ED AS

PE

R E

UR

OP

EA

N S

TAN

DA

RD

BS

EN ISO

4006 : 2000.

SH

EET C

ON

TEN

TS :R

EV

ISION

DATE

DR

AW

ING

NO

.

SC

ALE:

FIR

ST

ISSUE

NA

ME

& S

IGN

ATUR

E

DR

AW

N:

DE

SIGN

:

APPR

OV

ED

BY

:

(as Sheet A3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZA

TION

OF

BR

IDG

E D

ES

IGN

SR

EB

AR

CO

DE

S&

SH

AP

E D

ETA

ILS

STD

-07A

S S

HO

WN

S. H

OS

SAINS

. SID

DIQ

UE

16m S

PA

N R

CC

GIR

DE

R(7.00m

CA

RR

IAG

EW

AY

)

APR

IL, 2011

TYP

E O

F REBAR

DIA

OF R

EBAR

SP

AC

ING

LOC

ATIO

N/R

EMAR

KS

BA

R M

ARK

NO

S. O

F BAR

BA

R M

AR

K

20 - 05 - T 20 - 150 - EF

T - HIG

H Y

IELD

DEFO

RM

ED BAR

Y - D

EFOR

ME

D M

S B

ARR

- RO

UN

D M

S BAR

Page 9: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

1

GIR

DER

1.5 % X

-SLOPE

50 WE

ARIN

G

200 DE

CK SLAB

CO

UR

SE

DR

AIN

SPO

UT

RA

ILING

CR

OSS

GIR

DER

DETA

IL 1S

CA

LE 1 : 40

DE

TAIL2

DE

TAIL1

7000C

AR

RIA

GE W

AY

7700TO

TAL BR

IDG

E WID

TH

12

43

GIR

DER

CR

OS

S G

IRD

ER

DR

AIN

PIPE

1.5 % X

-SLOPE

℄O

F BR

IDG

E1.5 % X

-SLOPE

SECTIO

N 2-2

SC

ALE

1 : 70

BO

TTOM

LEV

EL IS

NO

T TO BE SLO

PED

CROSS GIRDER (300X1100)

AB

C

1234

AB

C

GIR

DER

CR

OS

S G

IRD

ERC

RO

SS

GIR

DER

(XG)

CR

OS

S G

IRD

ER

DE

CK

SLAB

KE

RB

BE

AM

(KB)50m

m W

EAR

ING

CO

UR

SER

AILIN

G

2

11

RA

ILLING

2

1.5 % X-SLOPE1.5 % X-SLOPE

GIR

DE

R (400X1300)

KE

RB

BE

AM

(350X350)

KE

RB

BE

AM

(350X350)

RA

ILLING

GIR

DE

R (400X1300)

GIR

DE

R (400X1300)

GIR

DE

R (400X1300)

CROSS GIRDER (300X1100)

CROSS GIRDER (300X1100)

DEC

K OU

T LINE

℄ O

F BR

IDG

E DR

AIN

SPO

UT

DEC

K PLA

NS

CA

LE 1 : 100

SECTIO

N 1-1

SC

ALE

1 : 100

DR

AIN

SPO

UT

BR

IDG

E DE

CK

EN

D JO

INT

(SEE STD

-06)

DETA

IL '2'N

TS

SO

FFITO

F DE

CK

SH

EET C

ON

TEN

TS :R

EV

ISION

DATE

DR

AW

ING

NO

.

SC

ALE:

FIR

ST

ISSUE

NA

ME

& S

IGN

ATUR

E

DR

AW

N:

DE

SIGN

:

APPR

OV

ED

BY

:

(as Sheet A3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZA

TION

OF

BR

IDG

E D

ES

IGN

SP

LAN

, SE

CTIO

N A

ND

ELE

VA

TION

OF D

EC

KS

16-C7-08

AS

SH

OW

N

S. H

OS

SAINS

. SID

DIQ

UE

16m S

PA

N R

CC

GIR

DE

R(7.00m

CA

RR

IAG

EW

AY

)

00 JAN

, 2011

NO

TES :

A. G

ENER

AL

1.A

LL DIM

EN

SIO

NS

AR

E IN

MILLIM

ETE

R U

NLE

SS

OTH

ER

WIS

EM

EN

TION

ED

.2.

DO

NO

T SC

ALE

THIS

DR

AW

ING

. US

E G

IVE

N D

IME

NS

ION

S O

NLY

.3.

DU

RIN

G C

ON

STR

UC

TION

OF TH

E W

OR

K, TH

E C

ON

TRA

CTO

RM

US

TC

HE

CK

THE

DIM

EN

SIO

NS

, LEV

ELS

AN

D M

EA

SU

RE

ME

NT.

DIS

CR

EP

AN

CIE

S IF A

NY

TO B

E R

EP

OR

TED

TO TH

E E

NG

INE

ER

BE

FOR

E E

XE

CU

TION

B. M

ATER

IAL

4.C

ON

CR

ETE

28 DA

YS

STR

EN

GTH

IN C

UB

E,f'c = 30m

Pa. U

NLE

SS

OTH

ER

WIS

E M

EN

TION

ED

IN TH

E S

PE

CIFIC

ATIO

N, TH

E TR

IAL M

IXD

ES

IGN

STR

EN

GTH

SH

ALL B

E 33.0 M

Pa

5.Y

IELD

STR

EN

GTH

OF S

TEE

L, fy = 500 MP

a (GR

AD

E Fe500, IS

1786)

REFER

ENC

E DR

AW

ING

S1. G

EN

ER

AL N

OTE

S FOR

RC

C C

ON

STR

UC

TION

STD

-022. D

EC

K D

RA

INAG

E DETAIL

STD

-03

Page 10: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

AB

1234

1

C

1

67-01-T12-250-BO

TT.66-1a-T12-250-B

OTT.

67-03-T12-250-TOP

66-3b-T16-250- EXT.TOP

66-3b-T16-250- EXT.TOP

66-3a-T12-250- EXT.TOP

REIN

FOR

CEM

ENT PLA

N O

F DEC

K SLA

BS

CA

LE 1:75

LAP

IN A

LTER

NA

TE P

OS

ITION

FOR

NEXT BAR

33-02-T12-200-BO

TT.33-04-T12-200-TO

P

12

43

03+3b04

01+1a02

LAP

IN A

LTER

NA

TE POSITIO

N

GIR

DER

0304

LAP

IN A

LTER

NA

TE POSITIO

N

REIN

F. DE

TAILS O

F THE

DEC

K SEC

TION

SC

ALE

1 : 40

SECTIO

N 1-1

0101

0303+3a

03+3a03+3b

03

SE

E D

ETAIL 'A'

MA

IN G

IRD

ER R

EINF.

(SE

E, S

16-C7-10)

1a1a

1

GIR

DER

1aG

IRD

ER

RE

INF.

DE

CK

TOP

033b

04

01

DETA

IL 'A'

SC

ALE

1:20

SEC

TION

RO

UG

HED

FOR

KER

B CO

NS

TRU

CTIO

N

KE

RB

BE

AM

REIN

F.(S

EE

, S16-C

7-11)

NO

TES

A. G

ENER

AL

1. ALL D

IME

NS

ION

S A

RE

IN M

ILLIME

TER

UN

LES

S O

THE

RW

ISE

ME

NTIO

NE

D.

2.DO

NO

T SC

ALE

THIS

DR

AW

ING

. US

EG

IVE

N D

IME

NS

ION

S O

NLY

.

3.DU

RIN

G C

ON

STR

UC

TION

OF TH

E W

OR

K,

THE

CO

NTR

AC

TOR

MU

ST C

HE

CK

THE

DIM

EN

SIO

NS

, LEV

ELS

AN

D M

EA

SU

RE

ME

NT.

DIS

CR

EP

AN

CIE

S IF A

NY

TO B

E R

EP

OR

TED

TO TH

E E

NG

INE

ER

BE

FOR

E E

XE

CU

TION

.

B. M

ATER

IAL

1. CO

NC

RE

TE 28 D

AY

S S

TRE

NG

TH IN

CU

BE

,f'c = 30.0 M

Pa. [U

NLE

SS

OTH

ER

WIS

EM

EN

TION

ED

IN TH

E S

PE

CIFIC

ATIO

N,TH

ETR

IAL M

IX D

ES

IGN

STR

EN

GTH

SH

ALL B

E33.0 M

Pa]

2. YIE

LD S

TRE

NG

TH O

F STE

EL, fy = 500 M

Pa

(GR

AD

E Fe 500, IS

1786)

C. C

OVER

ING

a.TO

P O

F DE

CK

=50m

mb.

BO

TTOM

OF D

EC

K=

25mm

c.S

IDE

OF D

EC

K=

40mm

TYP

E O

F REBAR

DIA

OF R

EBAR

SP

AC

ING

BA

R M

ARK

BA

R M

AR

K

20 - 05 - T 20 - 150 - EF

T - HIG

H Y

IELD

DEFO

RM

ED BAR

Y - D

EFOR

ME

D M

S B

ARR

- RO

UN

D M

S BAR

IND

ICATES

BAR

CU

T PO

INT LO

CA

TION

/R

EMAR

KSN

OS.

OF BAR

SH

EET C

ON

TEN

TS :R

EV

ISION

DATE

DR

AW

ING

NO

.

SC

ALE:

FIR

ST

ISSUE

NA

ME

& S

IGN

ATUR

E

DR

AW

N:

DE

SIGN

:

APPR

OV

ED

BY

:

(as Sheet A3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZA

TION

OF

BR

IDG

E D

ES

IGN

SD

:\DH

16D

ata\BH

UT

AN

\1_Zoeig-D

PM

JV\B

hutan_1.JP

G

RE

INFO

RC

EM

EN

TD

ETA

ILS O

F DE

CK

SLA

BS

16-C7-09

AS

SH

OW

N

S. H

OS

SAINS

. SID

DIQ

UE

16m S

PA

N R

CC

GIR

DE

R(7.00m

CA

RR

IAG

EW

AY

)

APR

IL, 2011

REFER

ENC

E DR

AW

ING

S1. G

EN

ER

AL N

OTE

S FOR

RC

C C

ON

STR

UC

TION

STD

-022. R

EB

AR

CO

DE

S &

SHAPE D

ETAILSS

TD-07

3. PLA

N, S

EC

TION

ELEVATIO

N O

F DEC

KS

16-C7-08

4. RE

BAR

SCH

ED

ULE

S16-C

7-135. M

ISC

ELLA

NE

OU

S DETAILS

S16-C

7-12

Page 11: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

10

SECTIO

N 1-1

SC

ALE

1:30

10

4-15-T32-EQ-B

OTT.

2-12-T20-EQ-TO

P12

SECTIO

N 2-2

SC

ALE

1:30

SECTIO

N 3-3

SC

ALE

1:30

**S

EP

ER

ATO

R B

ETW

EE

N TH

E LA

YE

RS

Ø 25 @

1000 C/C

. ALO

NG

THE

LEN

GTH

4-16-T32-EQ-B

OTT.

16

1115

1216 2X3-13-T12-200- FAC

E BAR

2-14-T25-EQ-B

OTT.

1313

SE

E S

16-C7-09 FO

RD

EC

K S

LAB R

EINF.

DE

TAIL

CA

B

12

LON

G SEC

TION

OF TH

E GIR

DER

SC

ALE

1:50 1 1

2 210

1513

LAP IN

ALTER

NATE PO

SITION

1011

3 3

LAP IN

ALTER

NATE PO

SITION

LAP

IN A

LTER

NA

TE POSITIO

N

1416

16

TYPICA

L PLAN

OF A

LAP

TYP

E O

F REBAR

DIA

OF R

EBAR

SP

AC

ING

BA

R M

ARK

BA

R M

AR

K

20 - 05 - T 20 - 150 - EF

T - HIG

H Y

IELD

DEFO

RM

ED BAR

Y - D

EFOR

ME

D M

S B

ARR

- RO

UN

D M

S BAR

IND

ICATES

BAR

CU

T PO

INT LO

CA

TION

/R

EMAR

KSN

OS.

OF BAR

SH

EET C

ON

TEN

TS :R

EV

ISION

DATE

DR

AW

ING

NO

.

SC

ALE:

FIR

ST

ISSUE

NA

ME

& S

IGN

ATUR

E

DR

AW

N:

DE

SIGN

:

APPR

OV

ED

BY

:

(as Sheet A3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZA

TION

OF

BR

IDG

E D

ES

IGN

SR

EIN

FOR

CE

ME

NT

DE

TAILS

OF

MA

IN G

IRD

ER

AS

SH

OW

N

S. H

OS

SAINS

. SID

DIQ

UE

16m S

PA

N R

CC

GIR

DE

R(7.00m

CA

RR

IAG

EW

AY

)

APR

IL, 2011

NO

TES

A. G

ENER

AL

1.A

LL DIM

EN

SIO

NS

AR

E IN

MILLIM

ETE

RU

NLE

SS

OTH

ER

WIS

E M

EN

TION

ED

.

2.D

O N

OT S

CA

LE TH

IS D

RA

WIN

G. U

SE

GIV

EN

DIM

EN

SIO

NS

ON

LY.

3.D

UR

ING

CO

NS

TRU

CTIO

N O

F THE

WO

RK

,TH

E C

ON

TRA

CTO

R M

US

T CH

EC

K TH

ED

IME

NS

ION

S, LE

VE

LS A

ND

ME

AS

UR

EM

EN

T.D

ISC

RE

PA

NC

IES

IF AN

YTO

BE

RE

PO

RTE

D TO

THE

EN

GIN

EE

RB

EFO

RE

EX

EC

UTIO

N.

B. M

ATER

IAL

1.C

ON

CR

ETE

28 DA

YS

STR

EN

GTH

IN C

UB

E,

f'c = 30.0 MP

a. [UN

LES

S O

THE

RW

ISE

ME

NTIO

NE

D IN

THE

SP

EC

IFICA

TION

,THE

TRIA

L MIX

DE

SIG

NS

TRE

NG

TH S

HA

LL BE

33.0 mP

a]

2.Y

IELD

STR

EN

GTH

OF S

TEE

L,fy = 500 M

Pa (G

RA

DE

Fe500, IS 1786)

C. C

OVER

ING

a.M

AIN

GIR

DE

R A

LL SID

E= 40m

m

REFER

ENC

E DR

AW

ING

S1. G

EN

ER

AL N

OTE

S FOR

RC

C C

ON

STR

UC

TION

STD

-022. R

EB

AR

CO

DE

S &

SHAPE D

ETAILSS

TD-07

3. PLA

N, S

EC

TION

ELEVATIO

N O

F DEC

KS

16-C7-08

4. RE

BAR

SCH

ED

ULE

S16-C

7-14

Page 12: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

1D

ETAIL

12

34

SE

E, S

16-C7-09

SLA

B R

EINF.

KE

RB

BE

AM

REIN

F.

MA

IN G

IRD

ER R

EINF.

3 -05 -T20-EQ-TO

P

4-06 -T16-EQ-BO

TT.9-04-T10-190-STR

04

2X2=4-07-T12-EQ-EF

SE

E, S

16-C7-10

KE

RB

BE

AM

REIN

F.

CR

OSS G

IRD

ER R

EINF. D

ETAILS

SC

ALE

1: 30

RA

ILING

04

RA

ILING

FOR

RA

ILING

REIN

F.(SE

E STD-04)

110-01-T12-150-STR.

3-02-T16-EQ-TO

P

3 -03 -T16-EQ-B

OTT.

04 07

06

DETA

IL 1S

CA

LE 1: 20

1

;NO

TES

A. G

ENER

AL

1.A

LL DIM

EN

SIO

NS

AR

E IN

MILLIM

ETE

R U

NLE

SS

OTH

ER

WIS

E M

EN

TION

ED

.

2.D

O N

OT S

CA

LE TH

IS D

RA

WIN

G. U

SE

GIV

EN

DIM

EN

SIO

NS

ON

LY.

3.D

UR

ING

CO

NS

TRU

CTIO

N O

F THE

WO

RK

, THE

CO

NTR

AC

TOR

MU

ST C

HE

CK

THE

DIM

EN

SIO

NS

,LE

VE

LS A

ND

ME

AS

UR

EM

EN

T. DIS

CR

EP

AN

CIE

SIF A

NY

TO B

E R

EP

OR

TED

TO TH

E E

NG

INE

ER

BE

FOR

E E

XE

CU

TION

.

B. M

ATER

IAL

1.C

ON

CR

ETE

28 DA

YS

STR

EN

GTH

IN C

UB

E,

f'c = 30.0 MP

a. [UN

LES

S O

THE

RW

ISE

ME

NTIO

NE

DIN

THE

SP

EC

IFICA

TION

,THE

TRIA

L MIX

DE

SIG

NS

TRE

NG

TH S

HA

LL BE

33.0 mP

a]

2.Y

IELD

STR

EN

GTH

OF S

TEE

L, fy = 500 MP

a(G

RA

DE

Fe500, IS 1786)

C. C

OVER

ING

a.A

LL SID

E= 40m

m

D. C

ON

STRU

CTIO

N1.

KE

EP

CR

OS

S G

IRD

ER

BA

R FO

LDE

D IN

SID

ES

HU

TTER

ING

DU

RIN

G C

ON

STR

UC

TION

OF

MA

IN G

IED

ER

SH

EET C

ON

TEN

TS :R

EV

ISION

DATE

DR

AW

ING

NO

.

SC

ALE:

FIR

ST

ISSUE

NA

ME

& S

IGN

ATUR

E

DR

AW

N:

DE

SIGN

:

APPR

OV

ED

BY

:

(as Sheet A3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZA

TION

OF

BR

IDG

E D

ES

IGN

SR

EIN

FOR

CEM

ENT

DE

TAILS

OF C

RO

SSG

IRD

ER

AN

D KER

B BEAM

S16-C

7-11A

S S

HO

WN

S. H

OS

SAINS

. SID

DIQ

UE

16m S

PA

N R

CC

GIR

DE

R(7.00m

CA

RR

IAG

EW

AY

)

APR

IL, 2011

TYP

E O

F REBAR

DIA

OF R

EBAR

SP

AC

ING

BA

R M

ARK

BA

R M

AR

K

20 - 05 - T 20 - 150 - EF

T - HIG

H Y

IELD

DEFO

RM

ED BAR

Y - D

EFOR

ME

D M

S B

ARR

- RO

UN

D M

S BAR

IND

ICATES

BAR

CU

T PO

INT LO

CA

TION

/R

EMAR

KSN

OS.

OF BAR

;REFER

ENC

E DR

AW

ING

S1. G

EN

ER

AL N

OTE

S FOR

RC

C C

ON

STR

UC

TION

STD

-022. R

EB

AR

CO

DE

S &

SHAPE D

ETAILSS

TD-07

3. PLA

N, S

EC

TION

ELEVATIO

N O

F DEC

KS

16-C7-08

4. RE

BAR

SCH

ED

ULE

S16-C

7-13

Page 13: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

HIG

H P

OIN

T OF C

AMBER

℄S

EE

DE

TAIL 'A'

CO

NSTR

UC

TION

JOIN

TW

ITH S

HEAR

KEY

TYPICA

L CO

NSTR

UC

TION

JOIN

T IN D

ECK

[LOC

ATIO

N O

F CO

NS

TRU

CTIO

N JO

INT SH

ALL BE DEC

IDED

ASP

ER

EN

GIN

EE

R'S D

ECISIO

N]

DE

CK

TOP

℄D

EC

K TO

P

25X30 D

EEP C

OLD

AP

PLIE

D P

OLYSU

LPHATE

JOIN

T SEALER

DETA

IL 'A'

12

43

12

43

SC

AFFO

LDIN

GG

IRD

ER

SE

Q : 1

GIR

DER

CA

STING

CO

NSTR

UC

TION

SEQU

AN

CE

:

SC

AFFO

LDIN

G

SE

Q : 2

CR

OSS G

IRD

ER &

DEC

K C

ASTIN

G

12

43

SE

Q : 3

KER

B B

EAM

& R

AILIN

G C

ASTIN

G

ABU

TMEN

T●

SC

AFFO

LDIN

G R

EMO

VED

●B

RID

GE

SU

PP

OR

TED O

NA

BUTM

ENT

12

43

SE

Q : 4

WEA

RIN

G C

OU

RSE C

ASTIN

GR

EA

DY

FOR

TRA

FFIC

SH

UTTER

AR

RAN

GE

MEN

T4

32

1

Y

XZ

SH

EET C

ON

TEN

TS :R

EV

ISION

DATE

DR

AW

ING

NO

.

SC

ALE:

FIR

ST

ISSUE

NA

ME

& S

IGN

ATUR

E

DR

AW

N:

DE

SIGN

:

APPR

OV

ED

BY

:

(as Sheet A3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZA

TION

OF

BR

IDG

E D

ES

IGN

SM

ISC

ELLA

NE

OU

SD

ETA

ILSS

16-C7-12

AS

SH

OW

N

S. H

OS

SAINS

. SID

DIQ

UE

16m S

PA

N R

CC

GIR

DE

R(7.00m

CA

RR

IAG

EW

AY

)

APR

IL, 2011

TAB

LE 3 :¹

12 Upw

ard camber in m

illimeter

UPW

AR

D C

AM

BER

TO B

EPR

OVID

ED IN

THE G

IRD

ERD

UR

ING

CO

NSTR

UC

TION

Cam

ber Provided Considering

● G

irder Self W

eight.●

Deck W

eight

LENG

THIN

mC

AMBE

R2

IN m

m0

01

32

53

64

85

96

107

118

119

1110

1011

912

813

614

515

316

0

Page 14: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

SH

EE

T CO

NTEN

TS :R

EVIS

ION

DA

TED

RA

WIN

G N

O.

SC

ALE:

FIR

ST ISSU

E

NAM

E & SIGN

ATUR

E

DR

AW

N:

DE

SIG

N:

APP

RO

VE

D B

Y :

(as Sheet A

3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM

JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZATIO

N O

FB

RID

GE D

ESIG

NS

RE

BA

R S

CH

EDU

LES

16-C7-13

NTS

S. H

OSS

AINS

. SIDD

IQU

E

16m S

PA

N R

CC

GIR

DER

(7.00m C

AR

RIAG

EWAY)

AP

RIL

, 2011

TYPE O

F REB

ARD

IA O

F RE

BAR

SPA

CIN

GB

AR M

ARK

BA

R M

AR

K

20 - 05 - T 20 - 150 - EF

T - HIG

H YIELD

DE

FOR

MED

BARY

- DEFO

RM

ED

MS

BARR

- RO

UN

D M

S BAR

IND

ICATES

BAR

CU

T PO

INT LO

CATIO

N /

REM

ARKS

NO

S.O

F BAR

NO

TES

A. G

ENER

AL

1. ALL D

IME

NS

ION

S A

RE IN

MILLIM

ETERU

NLE

SS

OTH

ER

WISE M

ENTIO

NED

.

2.DO

NO

T SC

ALE

THIS D

RAW

ING

. USE

GIV

EN

DIM

EN

SIO

NS O

NLY.

3.DU

RIN

G C

ON

STR

UC

TION

OF TH

E WO

RK,

THE

CO

NTR

ACTO

R M

UST C

HE

CK TH

ED

IME

NS

ION

S, LE

VE

LS AN

D M

EASUR

EMEN

T.D

ISC

RE

PA

NC

IES

IF AN

Y TO BE R

EPOR

TEDTO

THE

EN

GIN

EE

R B

EFOR

E EXECU

TION

.

B. M

ATER

IAL

1. CO

NC

RE

TE 28 D

AY

S STR

ENG

TH IN

CU

BE,f'c = 30.0 M

Pa. [U

NLESS O

THER

WISE

MEN

TION

ED IN

THE SP

ECIFIC

ATION

,THE

TRIA

L MIX

DE

SIG

N S

TREN

GTH

SHALL BE

33.0 MPa]

2. YIE

LD S

TRE

NG

TH O

F STEEL, fy = 500 M

Pa(G

RA

DE

Fe 500, IS 1786)

C. C

OVER

ING

DEC

K:

a.TO

P O

F DE

CK

=50m

m b.

BO

TTOM

OF D

ECK

=25m

m c.

SID

E O

F DEC

K=

40mm

KER

B B

EAM

:a.

ALL S

IDE

=40m

m

CR

OSS G

IRD

ER:

a.A

LL SID

E=

40mm

MA

IN G

IRD

ER:

a.A

LL SID

E=

40mm

RA

ILING

:a.

RA

ILING

PO

ST ALL SID

E=

40mm

b.R

AIL A

LL SIDE

=25m

m

;REFER

ENC

E DR

AW

ING

S1. G

EN

ER

AL N

OTE

S FO

R R

CC

CO

NS

TRU

CTIO

NS

TD-02

2. RE

BA

R C

OD

ES

& S

HA

PE

DE

TAILS

STD

-073. R

EIN

F. DE

TAILS

OF D

EC

K S

LAB

S16-C

7-094. R

EIN

F. DE

TAILS

OF C

RO

SS

GIR

DE

R A

ND

KE

RB

BE

AM

S16-C

7-11

Page 15: 16 · PDF fileall reinforcing steel shall be of ... for closely spaced bars lapping may be ... specified length of the lap splice shall be 4. clear concrete cover to

SH

EET C

ON

TEN

TS :R

EV

ISION

DATE

DR

AW

ING

NO

.

SC

ALE:

FIR

ST

ISSUE

NA

ME

& S

IGN

ATUR

E

DR

AW

N:

DE

SIGN

:

APPR

OV

ED

BY

:

(as Sheet A3 size)

RO

YAL G

OVE

RN

ME

NT O

F BH

UTA

NM

inistry of Works &

Hum

an settlement

Departm

ent of Roads, B

ridge Division

Thimphu, B

hutan

ZOR

IG-D

PM JV.

P.O

. Box N

o. 797R

oom N

o. 09Thim

phu Central B

uilding.Thim

phu, Bhutan

STA

ND

AR

DIZA

TION

OF

BR

IDG

E D

ES

IGN

SR

EB

AR

SC

HE

DU

LES

16-C7-14

NTS

S. H

OS

SAINS

. SID

DIQ

UE

16m S

PA

N R

CC

GIR

DE

R(7.00m

CA

RR

IAG

EW

AY

)

APR

IL, 2011

TYP

E O

F REBAR

DIA

OF R

EBAR

SP

AC

ING

BA

R M

ARK

BA

R M

AR

K

20 - 05 - T 20 - 150 - EF

T - HIG

H Y

IELD

DEFO

RM

ED BAR

Y - D

EFOR

ME

D M

S B

ARR

- RO

UN

D M

S BAR

IND

ICATES

BAR

CU

T PO

INT LO

CA

TION

/R

EMAR

KSN

OS.

OF BAR

NO

TES

A. G

ENER

AL

1. ALL D

IME

NS

ION

S A

RE

IN M

ILLIME

TER

UN

LES

S O

THE

RW

ISE

ME

NTIO

NE

D.

2.DO

NO

T SC

ALE

THIS

DR

AW

ING

. US

EG

IVE

N D

IME

NS

ION

S O

NLY

.

3.DU

RIN

G C

ON

STR

UC

TION

OF TH

E W

OR

K,

THE

CO

NTR

AC

TOR

MU

ST C

HE

CK

THE

DIM

EN

SIO

NS

, LEV

ELS

AN

D M

EA

SU

RE

ME

NT.

DIS

CR

EP

AN

CIE

S IF A

NY

TO B

E R

EP

OR

TED

TO TH

E E

NG

INE

ER

BE

FOR

E E

XE

CU

TION

.

B. M

ATER

IAL

1. CO

NC

RE

TE 28 D

AY

S S

TRE

NG

TH IN

CU

BE

,f'c = 30.0 M

Pa. [U

NLE

SS

OTH

ER

WIS

EM

EN

TION

ED

IN TH

E S

PE

CIFIC

ATIO

N,TH

ETR

IAL M

IX D

ES

IGN

STR

EN

GTH

SH

ALL B

E33.0 M

Pa]

2. YIE

LD S

TRE

NG

TH O

F STE

EL, fy = 500 M

Pa

(GR

AD

E Fe 500, IS

1786)

C. C

OVER

ING

DEC

K:

a.TO

P O

F DE

CK

=50m

m b.

BO

TTOM

OF D

EC

K=

25mm

c.S

IDE

OF D

EC

K=

40mm

KER

B B

EAM

:a.

ALL S

IDE

=40m

m

CR

OSS G

IRD

ER:

a.A

LL SID

E=

40mm

MA

IN G

IRD

ER:

a.A

LL SID

E=

40mm

RA

ILING

:a.

RA

ILING

PO

ST A

LL SID

E=

40mm

b.R

AIL A

LL SID

E=

25mm

REFER

ENC

E DR

AW

ING

S1. G

EN

ER

AL N

OTE

S FOR

RC

C C

ON

STR

UC

TION

STD

-022. R

AILIN

G D

ETAILSS

TD-04

3. RE

BA

R C

OD

ES

& SH

APE DETAILS

STD

-074. R

EIN

F. DE

TAILS

OF M

AIN G

IRD

ERS

16-C7-10