SFO Interim Boarding Area BCivic Design Review
June 15, 2015
5
4
3
2
1
5. T1 North & BAC8/2022 – 8/2024
4. T1 South & T1/ITB Connector9/2019 – 9/2022
3. T1 Center &BAB (19 Gates)
6/2016 – 9/2019BAB (24 Gates)
6/2016-9/2020
2. T1 Enabling Projects 4/2015 – 6/2017
ERF 3 Complete 11/2016
1. T1 Interim Facilities 4/2015 – 4/2016
TERMINAL 1 PROJECTS
Design Narrative
San Francisco International Airport is creating a ‘temporary’ facility that provides 9 gates and boaring areas for passengers while adjacent construction of a seperate perminant terminal building is completed. The interim facilities are being designed for an an-ticipated three year occupancy and combine new airside exterior construction as well as re-use of portions of the existing building envelope (including associated interior modifi cations).
Exterior Character
The material pallet for new construction consists of formed metal panel cladding (painted fi nish on galvalume), with exposed fas-teners. Two profi le sections will be used with profi les running vertically. All trim and fl ashing will be of similar fi nish as adjacent panels. New fi xed jet bridges to have standard profi le metal cladding with color coordinated with new construction. New windows are to be fi xed aluminum storefront system with black anodized fi nish (with clear glazing with exterior frit complying with SF anti bird strike ord.). Existing window assemblies to remain, with exception of removing existing interior fi lm and replacing with com-plying anti bird strike frit (with similar energy insulating properties).
DESIGN ADJACENCIES
ADJACENT WORK ZONE (SCOPE NOT INCLUDED)
EXTENT OF NEW CONSTRUCTION
SITE MODEL SITE MODEL
EXISTING BUILDING ENVELOPE TO REMAIN (INTERIOR REFINISHING ONLY)
VIEW FROM INTERIM FACILITY
SITE PLAN
CURBSIDE PERSPECTIVE (DAY)
INTERIOR ART LOCATION NEW COLORFUL ENTRY ELEMENT (FORMED METAL PANEL AND PAINT)
EXISTING BUILDING ENVELOPE TO REMAIN
AIRSIDE ELEVATION
ENLARGED AIRSIDE ELEVATIONS
N.T.S.
N.T.S.
PAINTED FORMED METAL PANEL CLADDING WITH EXPOSED FASTENERS
ALUMINUM STOREFRONT SYSTEM WITH BLACK ANOD-IZED FINISH
CLEAR INSULATED GLAZING (COMPLYING WITH SF ANTI BIRD STRIKE ORDINANCE) ADJACENT NEW PREFAB
FIXED JET BRIDGE - FINISH COORDINATED WITH NEW CONSTRUCTION
ENLARGED AIRSIDE ELEVATIONSN.T.S.
N.T.S.
EXISTING BUILDING ENVELOPE TO REMAIN
PAINTED FORMED METAL PANEL CLADDING WITH EXPOSED FASTENERS
ALUMINUM STOREFRONT SYSTEM WITH BLACK ANOD-IZED FINISH
CLEAR INSULATED GLAZING (COMPLYING WITH SF ANTI BIRD STRIKE ORDINANCE)
ENLARGED AIRSIDE ELEVATIONS
N.T.S. N.T.S. N.T.S.
PAINTED FORMED METAL PANEL CLADDING WITH EXPOSED FASTENERS
ALUMINUM STOREFRONT SYSTEM WITH BLACK ANODIZED FINISH
CLEAR INSULATED GLAZING (COMPLYING WITH SF ANTI BIRD STRIKE ORDINANCE)
PARAPET FLASHING PAINTED TO MATCH ADJACENT METAL PANELS
METAL HEAD, JAMB, AND SILL FLSHING TO MATCH ADJACENT METAL PANELS
ADJACENT NEW PREFAB FIXED JET BRIDGE - FINISH COORDINATED WITH NEW CONSTRUCTION
ENLARGED WALL SECTION AND ELEVATION
PAINTED FORMED METAL PANEL CLADDING WITH EXPOSED FASTENERS
ALUMINUM STOREFRONT SYSTEM WITH BLACK ANOD-IZED FINISH
CLEAR INSULATED GLAZING (COMPLYING WITH SF ANTI BIRD STRIKE ORDINANCE)
PARAPET FLASHING PAINTED TO MATCH ADJACENT METAL PANELS
METAL HEAD, JAMB, AND SILL FLSHING TO MATCH ADJACENT METAL PANELS
MATERIAL SAMPLE BOARD
PAINTED FORMED METAL PANEL CLADDING WITH EXPOSED FASTENERS (PATTERN A)
ALUMINUM STOREFRONT SYSTEM WITH BLACK ANODIZED FINISH
CLEAR INSULATED GLAZING (COMPLYING WITH SF ANTI BIRD STRIKE ORDINANCE)
METAL HEAD, JAMB, AND SILL FLSHING TO MATCH ADJACENT METAL PANELS
EXISTING BUILDING ENVELOPE TO REMAIN
EXISTING CURBSIDE MULLIONS TO REMAIN
PAINTED FORMED METAL PANEL CLADDING WITH EXPOSED FASTENERS (PATTERN B)
PATTERN A PATTERN B
3/27/2015 BASIS OF DESIGN
7/13/2015 CONSTRUCTION DOCUMENTS (SHELL)
8/14/2015 CONSTRUCTION DOCUMENTS (FINISH-OUT/INTERIORS)
4/17/2015 ADVANCED PROCUREMENT
PROCUREMENT PRIORITY 3
PROCUREMENT PRIORITY 1
SCHEMATIC DESIGN
DESIGN DEVELOPMENT
PROCUREMENT PRIORITY 2
5/7/2015
5/27/2015
6/12/2015
PROJECT SCHEDULE