Jordan GreenPortfolio
Salisbury Figure Ground Plan with Green Areas
Traditional practice in western medicine has focused on
curing disease and sickness, providing for those already sick.
However in recent years an interest into more natural forms
of medicine has reawakened an approach that appreciates
genuine health and that cultivates physical and mental well being.
The project is set in Salisbury, a city which is characterised by
its natural environment and particularly the watermeadows,
which historically supported a web of local industry of sheep,
wool and barley.
As well as celebrating the history and agricultural heritage
of the site and the city, the scheme aims to restore the true
character to portions of the Churchfields site.
The scheme proposes an apothecary and physic garden designed
around two gardens. The building forms an enclosure and, in
adapting the typologies of the walled garden and the Benedictine
monastic cloister, adopts their metaphors of seclusion, place of
peace and sanctuary.
At one level the physic garden is enclosed by a cloister which
houses process areas for washing, drying and preparing the
medicines; while above this the main spaces of the apothecary
and tea room provide public amenities linked to a semi-enclosed
teaching garden.
- Hortulus -Part I Final Year Project
Salisbury Cathedral
Harnham Watermeadows
Apothecary and Physic Garden
Churchfields Site and View across Watermeadows
View on Approach
The scheme is located in South-East corner of
the Churchfields site, at the confluence of the river,
Nadder island and the existing water-meadows.
The proposed building and supporting green
space and adjoining allotments replace an
industrial building and will be the root of the future
re-greening of the site.
The orientation of the building allows the sun to
penetrate all areas of the lower cloister growing
area, whilst also creating a notional axis and views
across the watermeadows to Salisbury Cathedral.
Site Analysis
Site Plan Site Axonometric
14
15
16
17
1819
2021
22
23
24
25
26
Ground Floor 01. pergola
02. refectory
03. kitchen
04. reception
05. classrooms
06. tea room
07. loggia
08. garden terrace
09. apothecary
10. treatment rooms
11. store
12. drying tower
13. public garden
Lower Ground 14. lavatorium
15. the glasshouse
16. workshops/classrooms
17. florilegium studio
18. cultivation collection
19. screening and sorting
20. washing and cleaning
21. oven drying
22. natural hang drying
23. processing
24. dark store
25. apothecary lab
26. herb garden
01
02
03
0405
05
06
07
09
10
12
13
08
11
Ground Floor Plan
Cross Section
Lower Ground Floor Plan
Building New CloisterAdditionAccessCloister
The building adapts the typology of the walled garden and
cloister to create an enclosed garden and growing space bounded
by a peripheral zone for the preparation and processing of the herbs.
The form of the building itself facilitates the self-contained
organisation and ritual-like process of the growing, screening,
cleaning, sorting and drying. The herbs are then used to create
natural medicines in the lab below the apothecary.
The physical enclosure provided by the architecture helps create
a feeling of intimacy and protection whereby the garden assumes
an atmosphere of sacredness and worship. Here nature, horticulture
and the ritual of growing and process contribute to the healing and
health benefits.
Garden
Growing
Collection
Screening
Cleaning
Sorting
Drying
Process
Apothecary
01 10
11
1216
15
13
05
06
03
04
07
14
17
0809
01. Cedar cladding on 50mm vertical battens
02. Triple glazed fixed window
03. Copper standing seam cladding to parapet
04. Timber frame wall with 150mm insulation
05. Structural timber joists
06. Structural timber Column
07. Warm roof construction with 175mm insulation
08. Copper standing seam flat roof at 2% fall
09. Recessed gutter system in copper flat roof
10. Timber cladding to internal walls
11. Timber flooring on joists and 150mm insulation
12. Concrete kerb stone
13. 100mm thick polished screed
14. 200mm Insulation
15. Natural stone paving on sand bedding
16. Concrete planter for thermal mass
17. Soil for planting with geotextile mat
The design of the building is such the apothecary and
processing lab, which are central to the plan, mediate
between the two levels of garden. The lower, more formal,
garden, where the herbs are grown and cultivated for
medicinal use is linked to the processing areas and the lab,
where the herbs and natural medicines are ultimately
prepared for sale and treatment in the apothecary above.
The garden at the higher level linked to the apothecary,
workshops and cafe is used as a public space and teaching
garden. The smells and colours of the herbs and flowers in
this garden also provide an experiential threshold for those
visiting the apothecary.
The timber is used throughout the scheme both structurally and as
a cladding material. The structural timber framing uses steel angle
connections at the joints to create the folded roof line while the vertical
elements delineate the cloister, creating the threshold between the garden
and internal herb processing areas. As well as being external, the timber
cladding is also used internally in certain areas for its visual and tactile
qualities.
In the lower cloister the exposed concrete floor is left unpolished with areas
of timber-formed concrete walls. This is also for aesthetic and tactility.
Materiality and Tactility
At an urban scale, the tower serves as a beacon and
point of reference, much like Salisbury Cathedral spire
which can be seen from various locations within and
around the city.
At the building scale the tower serves for the drying of
herbs. The fully openable louvres in the facade facilitate
this process, drawing fresh air through the tower.
Herb Drying tower
- Paul Davis + partners -Part I Architectural Assistant
Project: Chelsea Barracks Phase II
Work: High-end residential. New build.
Experience: Stages C-F
Dates: Jan 2014 - March 2015
Role and Tasks: Assisting Project Architect in
leading coordination and resolution of main
facade packages including windows, doors and
stonework, design and technical development,
preparation of planning reports including planning
documentation, general design team coordination.
DN
DN
P2H
P2F
P2D
P2C
P2B
P2A
P2G
P2E
8000 2000 8671 8279 107 1943 6443
1
PDP_B5.5_S_AA_G200_001
N
178 ebury street london SW1W 8UP t +44(0)20 7730 1178 f +44(0)845 280 5071 [email protected]
GENERAL NOTES:
All dimensions to be checked on site prior to commencement of any works, and/or preparationof any shop drawings. Sizes of and dimensions to any structural elements are indicative only.See structural engineers drawings for actual sizes / dimensions. Sizes of and dimensions ofany service elements are indicative only. See service engineers drawings for actual sizes anddimensions. This drawing to be read in conjunction with all relevant Architects drawings,specifications and other Consultants' information.
DO NOT SCALE FROM THIS DRAWING
Client
Project
Drawing title
drawn
date
Project No. Drawing No. Revision
chkd
scale
Drawing Status
Revision Description Date Initials
Origin Locator Sub-Loc. Uniclass Series Sheet No.
variessee drawing
Tasleem (UK) Ltd
F1As indicated @
A1Proposed GA
Chelsea BarracksPhase 2
01/13/15
EL
1697 PDP_B5.5_S_AA_G200_001
MB
STAGE F
1:100 @ A3Townhouse 5.5
Section AA
M 0150N
KEY FOR ROOM NAMES NOTES
L DO NOT SCALE FROM THIS DRAWING.ALL DIMENSIONS TO BE CHECKED ON SITE.ALL OMISSIONS AND DISCREPANCIES TO BEREPORTED TO THE ARCHITECT IMMEDIATELY.
ALL RIGHTS RESERVED. THIS IS COPYRIGHTAND CANNOT BE REPRODUCED OR COPIEDOR MODIFIED IN ANY FORM BY ANY MEANS,GRAPHIC ELECTRONIC OR MECHANICAL.INCLUDING PHOTOCOPYING WITHOUT THEWRITTEN PERMISSION OF PAUL DAVIS +PARTNERS
LivingR ReceptionB BedroomBA BathroomD DiningK KitchenDR DressingU UtilityS StoreT TreatmentSa SaunaSt SteamSe Servery
Scale 1 : 100 @ A11
Townhouse 5.5 Section AA
Scale 1 : 200 @ A12
Townhouse 5.5 Keyplan
F1 Issued for Stage F External / Shell & Core 27.02.15 GP
DN
DN
P2H
P2F
P2D
P2C
P2B
P2A
P2G
P2E
8000 2000 8671 8279 107 1943 6443
1
PDP_B5.5_S_AA_G200_001
N
178 ebury street london SW1W 8UP t +44(0)20 7730 1178 f +44(0)845 280 5071 [email protected]
GENERAL NOTES:
All dimensions to be checked on site prior to commencement of any works, and/or preparationof any shop drawings. Sizes of and dimensions to any structural elements are indicative only.See structural engineers drawings for actual sizes / dimensions. Sizes of and dimensions ofany service elements are indicative only. See service engineers drawings for actual sizes anddimensions. This drawing to be read in conjunction with all relevant Architects drawings,specifications and other Consultants' information.
DO NOT SCALE FROM THIS DRAWING
Client
Project
Drawing title
drawn
date
Project No. Drawing No. Revision
chkd
scale
Drawing Status
Revision Description Date Initials
Origin Locator Sub-Loc. Uniclass Series Sheet No.
variessee drawing
Tasleem (UK) Ltd
F1As indicated @
A1Proposed GA
Chelsea BarracksPhase 2
01/13/15
EL
1697 PDP_B5.5_S_AA_G200_001
MB
STAGE F
1:100 @ A3Townhouse 5.5
Section AA
M 0150N
KEY FOR ROOM NAMES NOTES
L DO NOT SCALE FROM THIS DRAWING.ALL DIMENSIONS TO BE CHECKED ON SITE.ALL OMISSIONS AND DISCREPANCIES TO BEREPORTED TO THE ARCHITECT IMMEDIATELY.
ALL RIGHTS RESERVED. THIS IS COPYRIGHTAND CANNOT BE REPRODUCED OR COPIEDOR MODIFIED IN ANY FORM BY ANY MEANS,GRAPHIC ELECTRONIC OR MECHANICAL.INCLUDING PHOTOCOPYING WITHOUT THEWRITTEN PERMISSION OF PAUL DAVIS +PARTNERS
LivingR ReceptionB BedroomBA BathroomD DiningK KitchenDR DressingU UtilityS StoreT TreatmentSa SaunaSt SteamSe Servery
Scale 1 : 100 @ A11
Townhouse 5.5 Section AA
Scale 1 : 200 @ A12
Townhouse 5.5 Keyplan
F1 Issued for Stage F External / Shell & Core 27.02.15 GP
CGI showing the Townhouse Rear Facades (collaborative wok) View of Townhouses from Productive Garden (collaborative work)
Typical Townhouse Section
Facade Strip Sections
Construction Package References:
GENERAL NOTES:
All dimensions to be checked on site prior to commencement of any works, and/or preparation of any shop drawings. Sizes of and dimensions to any structural elements are indicative only. See structural engineers drawings for actual sizes / dimensions. Sizes of and dimensions ofany service elements are indicative only. See service engineers drawings for actual sizes anddimensions. This drawing to be read in conjunction with all relevant Architect's drawings,specifications and other Consultants' information.
DO NOT SCALE FROM THIS DRAWING.
1:5
@ A
11:
10 @
A3
A10
00P
DP
_P2
_D
_02_
G25
1_11
016
97F1
Revision Description Date
178 ebury street london SW1W 8UP t +44(0)20 7730 1178 f +44(0)845 280 5071 [email protected]
Drawing Title
Client
Project
Initials
RevisionProject No. Drawing No.
PDP_P2 _D_02_G251_1101697 F1
drawn
date
Scale
chkd
1:5 @ A11:10 @ A3
JG
Chelsea BarracksPhase 2
Tasleem (UK) Ltd.
Drawing Status
Proposed DetailsPhase 2Blocks 4 & 5Second Floor Window Head and SillTypical Detail
STAGE F
MW
Origin
Feb-2015
Uniclass SeriesLocator Type Sub-Loc Sheet No.
E1 Issued for Stage E External /Shell & Core
12.12.14 JG
F30/155A - Insulation
H51/110B - Natural limestonewith fossilisation
L10/652 (Type L2.1) Recessed grille andinsect screen to service engineer's
information. Connection detail to bedeveloped by contractor. Refer to louvre
schdule by PD+P
P10/307 - VCL / Airtightness membrane taped and sealed to MVHR duct and window frame
Insitu concrete slab to structural engineer's information
P10/321A Continuous breather membranesealed and taped
P10/307 - VCL / Airtightness membrane taped and sealed to MVHR duct and insitu concrete
INTERNALTOWNHOUSE
EXTERNAL
F30/171A - MVHR termination piece
Sheet applied waterproofing layer.Refer to facade engineer's information.
L10/331 - Inward opening timber window with external aluminium cladding bronze colour finish. Refer to facade engineer's drawings. Schedule by PD+P
Cavity tray to facade engineer'sspecification
170 80
30
320
280
F30/171A - Metal duct for MVHR primary ducts to services engineer's specification
Window lateral restraint. Refer to facade engineer's information
Curtain rail detail. Refer to drawing PDP_P2_D_TY_G332_003
Ductwork contractor and main contractor interface
Lightweight wall system to support window head, MVHR duct/plenum and membrane. Refer to facade engineer's information
Facade restraint system for stackedstone. Refer to facade engineer's
information
100
150
60
25
F30/155A - Insulation
11
1550
50
50
12
520
800
50
30
Window lateral restraint. Refer to facade engineer's information
Drylining. Refer to PDP_P2_D_TY_G252 series
F30/155A - Insulation
F30/721 - Natural limestone cill. Referto facade engineer's details
H51/111A - Natural limestone
Cavity minimum 50mm. Refer to facadeengineer's information
P10/321A - Continuous breather membranesealed and taped
Sheet applied waterproofing layer.Refer to facade engineer's information.
Insitu concrete upstand and slab tostructural engineers' details
Internal floor finishes. Refer to PDP_P2_D_TY_G331 series
Window architraves and linings. Refer to PDP_P2_D_TY_G333_002
Insitu concrete slab to structural engineers' details
L30/595 - Circular bronze finished metalguardrail fixed to stone at jamb. 50mm
diameter at 800mm from FFL. Refer to facadeengineer's report for specification and fixing
details
L30/595 - Circular bronze finished metalguardrail fixed to stone at jamb. 30mm
diameter at 800mm from FFL. Refer to facadeengineer's information
P10/304 - VCL / Airtightness membrane taped and sealed continuously to window frame and lapped 200mm with insitu concrete
Facade support brackets for naturalstone sill. Refer to facade engineer's
information
F30/155A - Insulation
5mm stone joint. Refer to facadeengineers information
P10/304 - VCL / Airtightness membrane taped and sealed at insitu concrete joints
25
+12.950 Second Floor FFL
+12.815 Seond Floor SSL
Rear Elevation Second Floor Head Detail with MVHR1:5 @ A11:10 @ A3
A1
P10/300L Services penetration Type 11
F1 Issued for Stage F External /Shell & Core
27.02.15 JG
Drawing Key:
Indicates waterproofing line as specified by the 'Lower Ground Floors Element Architect' (LGFEA)
Indicates Air Tightness Line
Breather Membrane
Vapour Control Layer
Parameter Line
Typical Window Jamb Plan DetailTypical Window Head and Sill Section Details
Construction Package References:
GENERAL NOTES:
All dimensions to be checked on site prior to commencement of any works, and/or preparation of any shop drawings. Sizes of and dimensions to any structural elements are indicative only. See structural engineers drawings for actual sizes / dimensions. Sizes of and dimensions ofany service elements are indicative only. See service engineers drawings for actual sizes anddimensions. This drawing to be read in conjunction with all relevant Architect's drawings,specifications and other Consultants' information.
DO NOT SCALE FROM THIS DRAWING.
1:5
@ A
11:
10 @
A3
A10
00P
DP
_P2
_D
_02_
G25
1_10
216
97F1
Revision Description Date
178 ebury street london SW1W 8UP t +44(0)20 7730 1178 f +44(0)845 280 5071 [email protected]
Drawing Title
Client
Project
Initials
RevisionProject No. Drawing No.
PDP_P2 _D_02_G251_1021697 F1
drawn
date
Scale
chkd
1:5 @ A11:10 @ A3
JG
Chelsea BarracksPhase 2
Tasleem (UK) Ltd.
Drawing Status
Proposed DetailsPhase 2Blocks 4 & 5Second Floor Window JambTypical Detail
STAGE F
MW
Origin
Feb-2015
Uniclass SeriesLocator Type Sub-Loc Sheet No.
E1 Issued for Stage E External /Shell & Core
12.12.14 JG
Second Floor Elevation1:25 @ A11:50 @ A3
-0 1.0 1.5 M
2
3
5
8
4.1
C C
Internal drylining. Refer to PDP_P2_D_TY_G252 series
Concrete wall to structural engineer's information
F30/155A - Insulation board to window reveals to mitigate cold bridges
P10/304 - VCL/AT membrane taped and sealed continuously to window wall and party wall
F30/721 - Natural limestone cill. Refer to facade engineer's information
H51/111D - Natural limestone with fossilisation to window reveal recessed from facade by 30mm
F30/155A - Insulation
P10/321A - Continuous breather membrane sealed and taped
H51/111A - Natural limestone
L30/595 - Circular bronze finished metal guardrail. Refer to facade engineer's details
Sheet applied waterproofing layer. Refer to facade engineer's information.
Facade restraint system for stacked stone. Refer to facade engineer's information
INTERNALTOWNHOUSE
EXTERNAL
L10/331 - Inward window. Schedule by PD+P
Window lateral restraint
Second Floor Jamb Detail1:5 @ A11:10 @ A3
C
75
110
150
150
5575
280
30
Varies - Refer to Elevation Setting Out
25
80
10
175
Where relevant to front facadesBlock 4 Gridline 13Block 5 Gridline C
Where relevant to rear facadesBlock 4 Gridline 11Block 5 Gridline E
F1 Issued for Stage F External /Shell & Core
27.02.15 JG
Drawing Key:
Indicates waterproofing line as specified by the 'Lower Ground Floors Element Architect' (LGFEA)
Indicates Air Tightness Line
Breather Membrane
Vapour Control Layer
Parameter Line
Construction Package References:
GENERAL NOTES:
All dimensions to be checked on site prior to commencement of any works, and/or preparation of any shop drawings. Sizes of and dimensions to any structural elements are indicative only. See structural engineers drawings for actual sizes / dimensions. Sizes of and dimensions ofany service elements are indicative only. See service engineers drawings for actual sizes anddimensions. This drawing to be read in conjunction with all relevant Architect's drawings,specifications and other Consultants' information.
DO NOT SCALE FROM THIS DRAWING.
1:10
@ A
11:
20 @
A3
A10
00P
DP
_B5
_D
_TY
_G25
1_00
116
97F1
Revision Description Date
178 ebury street london SW1W 8UP t +44(0)20 7730 1178 f +44(0)845 280 5071 [email protected]
Drawing Title
Client
Project
Initials
RevisionProject No. Drawing No.
PDP_B5 _D_TY_G251_0011697 F1
drawn
date
Scale
chkd
1:10 @ A11:20 @ A3
JG
Chelsea BarracksPhase 2
Tasleem (UK) Ltd.
Drawing Status
Proposed DetailPhase 2Block 5Portico Section Details
STAGE F
MW
Origin
Feb-2015
Uniclass SeriesLocator Type Sub-Loc Sheet No.
Entrance/communication panel to AV/ITspecification on leading edge of door
Natural stone clad planter to match pavementstone
L30/550C Black painted metal entrance railings1600mm high. To match Phase 1 architect's design
Flame white granite to Phase 1 elementsarchitect's specification
Q25/110A - Ramp rising 40mm natural stone floorfinish. Refer to FMDC for stone specification
F21/110A - Flamed white granite coping stone tomatch Phase 1 elements architect's specification
150
15
50
75
Slot drain flush with ground floor entrance FFL
900
300
300
1000
1600
Phase 1 architect's scope
eq eq
1000
+4.905 Ground SSL
+5.040 Ground FFL
+4.200 Podium Block 5 Entrance SSL
+5.000 Podium Block 5 Entrance FFL
Note:For all stone specification refer to FMDC report. For all brackets/stone support, DPC details and window specifications refer to facade engineer's report. For all facade performance requirements and stone cladding profiles refer to facade engineer's report. For all structural information refer to structural engineer's report.For all structural support please refer to structural engineer's report.
Metal cladding1
2
3
4.1
5
6
Natural limestone
Timber windows alu-clad
Limestone with medium fossilisation
Cast iron rainwater pipe bronze painted
Insulation PIR/PUR foiled back
8
Key of materials:
7 Structural insulation
External metal guardrail 30mm 800mm from FFL
9 Metal balustrade bronze finish 15mm bars. Details tbc by S+P
10Metal balustrade bronze finish to metal work specialists specification. TBC once appointed post Stage E.
11 Flamed white granite plinth stone
12Timber entrance door to security and facade engineer's information
13 External planter
14 Black painted metal railings to metal specialists specification with feature light
4.2 Limestone with high fossilisation
Housetype 5.5 Portico and Planter ElevationScale 1:50 @A1 1:100 @A3
-
2
4.21
5
1
3
1
1
4.1
4.2
4.1
4.2
4.2
10
1014
2
E1 Issued for Stage E Externals / Shell & Core
12.12.14 JG
F1 Issued for Stage F Externals / Shell & Core
27.02.15 JG
Drawing Key:
Indicates waterproofing line as specified by the 'Lower Ground Floors Element Architect' (LGFEA)
Indicates Air Tightness Line
Breather Membrane
Vapour Control Layer
Parameter Line
H31/104 Anodised aluminium cladding toportico entrance. Refer to facade engineer's
information. Fixings by sub-contractor
H51/114 - Solid stacked natural limestone withfossilisation to facade engineers' details
H31/104 Anodised aluminium cladding toportico entrance. Refer to facade engineer's
information. Fixings by sub-contractor
P20/150A - Bronze decorative inlay
Structure to structural engineers' details
L30/553 - Balcony balustrade to metal workspecialist's specification. All fixings to facade
engineer's information
Q25/110A - Natural stone floor finish
Recess to house lightfitting tolighting designers' details
0 1.0 2.0 M
75
50
1100
400
125
275
EQ
440
160 20
280
J31/130A - Liquid applied waterproofing
R10/365A - Rainwater outlet
C
P20/150A - Bronze decorative inlay
H51/110B - Solid stacked natural limestone withfossilisation to facade engineers' details
H51/114 - Natural limestone with fossilisation.Refer to facade engineer's details
Drain cut in stone to facade engineer's details
H51/111A Natural limestone
Steel structure to structural engineers' details
250
750F30/155A - Insulation
280
Construction Package References:
GENERAL NOTES:
All dimensions to be checked on site prior to commencement of any works, and/or preparation of any shop drawings. Sizes of and dimensions to any structural elements are indicative only. See structural engineers drawings for actual sizes / dimensions. Sizes of and dimensions ofany service elements are indicative only. See service engineers drawings for actual sizes anddimensions. This drawing to be read in conjunction with all relevant Architect's drawings,specifications and other Consultants' information.
DO NOT SCALE FROM THIS DRAWING.
1:10
@ A
11:
20 @
A3
A10
00P
DP
_B5
_D
_TY
_G25
1_00
116
97F1
Revision Description Date
178 ebury street london SW1W 8UP t +44(0)20 7730 1178 f +44(0)845 280 5071 [email protected]
Drawing Title
Client
Project
Initials
RevisionProject No. Drawing No.
PDP_B5 _D_TY_G251_0011697 F1
drawn
date
Scale
chkd
1:10 @ A11:20 @ A3
JG
Chelsea BarracksPhase 2
Tasleem (UK) Ltd.
Drawing Status
Proposed DetailPhase 2Block 5Portico Section Details
STAGE F
MW
Origin
Feb-2015
Uniclass SeriesLocator Type Sub-Loc Sheet No.
Entrance/communication panel to AV/ITspecification on leading edge of door
Natural stone clad planter to match pavementstone
L30/550C Black painted metal entrance railings1600mm high. To match Phase 1 architect's design
Flame white granite to Phase 1 elementsarchitect's specification
Q25/110A - Ramp rising 40mm natural stone floorfinish. Refer to FMDC for stone specification
F21/110A - Flamed white granite coping stone tomatch Phase 1 elements architect's specification
150
15
50
75
Slot drain flush with ground floor entrance FFL
900
300
300
1000
1600
Phase 1 architect's scope
eq eq
1000
+4.905 Ground SSL
+5.040 Ground FFL
+4.200 Podium Block 5 Entrance SSL
+5.000 Podium Block 5 Entrance FFL
Note:For all stone specification refer to FMDC report. For all brackets/stone support, DPC details and window specifications refer to facade engineer's report. For all facade performance requirements and stone cladding profiles refer to facade engineer's report. For all structural information refer to structural engineer's report.For all structural support please refer to structural engineer's report.
Metal cladding1
2
3
4.1
5
6
Natural limestone
Timber windows alu-clad
Limestone with medium fossilisation
Cast iron rainwater pipe bronze painted
Insulation PIR/PUR foiled back
8
Key of materials:
7 Structural insulation
External metal guardrail 30mm 800mm from FFL
9 Metal balustrade bronze finish 15mm bars. Details tbc by S+P
10Metal balustrade bronze finish to metal work specialists specification. TBC once appointed post Stage E.
11 Flamed white granite plinth stone
12Timber entrance door to security and facade engineer's information
13 External planter
14 Black painted metal railings to metal specialists specification with feature light
4.2 Limestone with high fossilisation
Housetype 5.5 Portico and Planter ElevationScale 1:50 @A1 1:100 @A3
-
2
4.21
5
1
3
1
1
4.1
4.2
4.1
4.2
4.2
10
1014
2
E1 Issued for Stage E Externals / Shell & Core
12.12.14 JG
F1 Issued for Stage F Externals / Shell & Core
27.02.15 JG
Drawing Key:
Indicates waterproofing line as specified by the 'Lower Ground Floors Element Architect' (LGFEA)
Indicates Air Tightness Line
Breather Membrane
Vapour Control Layer
Parameter Line
H31/104 Anodised aluminium cladding toportico entrance. Refer to facade engineer's
information. Fixings by sub-contractor
H51/114 - Solid stacked natural limestone withfossilisation to facade engineers' details
H31/104 Anodised aluminium cladding toportico entrance. Refer to facade engineer's
information. Fixings by sub-contractor
P20/150A - Bronze decorative inlay
Structure to structural engineers' details
L30/553 - Balcony balustrade to metal workspecialist's specification. All fixings to facade
engineer's information
Q25/110A - Natural stone floor finish
Recess to house lightfitting tolighting designers' details
0 1.0 2.0 M
75
50
1100
400
125
275
EQ
440
160 20
280
J31/130A - Liquid applied waterproofing
R10/365A - Rainwater outlet
C
P20/150A - Bronze decorative inlay
H51/110B - Solid stacked natural limestone withfossilisation to facade engineers' details
H51/114 - Natural limestone with fossilisation.Refer to facade engineer's details
Drain cut in stone to facade engineer's details
H51/111A Natural limestone
Steel structure to structural engineers' details
250
750F30/155A - Insulation
280
View of Townhouse Entrance Portico (collaborative work)Townhouse Entrance Portico Section Detail
- Banes planning department -Part I Work experience
The work is the result of two consecutive summer placements in
the urban design and planning department of Bath and North East
Somerset Council.
As a project assistant I assisted in the research which culminated
in a new Supplementary Planning Document on Sustainable
Construction and Retrofitting. I was able to assist with the design
and running of a stakeholder workshop, conducted research and
produced a range of hand-drawn images of various building
typologies and retrofitting interventions.
Project: Sustainable Construction & Retrofitting Supplementary Planning Document Work: Pubic Sector Planning Policy Experience: Planning Policy
Dates: August 2011 & 2012
Role and Tasks: Hand Pencil drawings, Surveys, Construction and Retrofit Research, Assisting with consultation event.
Early Modern House ConstructionInternal Insulation Retrofit to Solid Wall Construction
18th C Georgian Townhouse Construction Section