15 & 16 Equipment List
Transcript of 15 & 16 Equipment List
(A): Revision Index (H): Internal Diameter (L*I) in meters (N): Design case for exchangers(B): Item (I): Height between tangent lines in meters S: summer case(C): Designation of the Item (J): Material: CS or LTCS + CA mm (Corrosion Allowance), W: winter case(D): Number of items SS, 316L, 304L, TI (Titanium), AL (Aluminum) PW: winter-packed sealine (E): Total number of equipment (K): Design pressure (Barg) case(F), (G): Main and Second Criteria per piece Suction / Discharge for pumps Power If necessary, value will be given as follow: x*value per piece Shell / Tube for exchangers Pe: estimated absorbed Design Flowrate (m3/h) In / Bottom or Out / Top Rated Installed Power (kw) (L): Design temperature Pi: installed power Exchanger Surface Area (m2) Same as point (k) Duty (kw) (M): Type Volume (m3) H: Horizontal or V: Vertical Bare tube area (m2); only for areorefrigerant Centrifugal Pump Head at rated capacity (m) Centrifugal (C), Dosing (Dos) for dosing pumps Reciprocating / Dosing Pump Differential Pressure (bar) Exchanger Type(TEMA)
Others: trays type (valve, random……)
4) To be finalized during detail engineering. 5) Flow rate to be confirmed based on corrosion inhibitor requirement.
shaft power
NOTES
LEGEND
1) Steam out to be considered:150°C/ATM2) Full Vacuum to be considered at the temperature of 5°C
T: Turbine, M: Motor or D: Diesel, P: Pneumatic
3) By mechanical department
Doc. Number : EL-1516-100-P312-001
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Rev.: 2
Pars Oil and Gas Company
Class: 1
Doc Title : LIST OF EQUIPMENT UNIT-100
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 3 of 6NARGAN
High Pressure Separator100-A-201
100-DH-203 Sump Drum HeaterSteam Condensate Surge DrumSump DrumHigh Pressure Separator
100-D-203100-D-202100-D-201
100-E-201
100-D-204
Gas HeaterGas Heater
Steam Condensate Surge DrumSump Drum Heater
Methanol Storage DrumMethanol Injection Package
Slug Catcher MEG Injection Pumps
Slug Catcher
Methanol Injection PackageMethanol Storage Drum
HP Separator MEG Injection Pumps HP Separator MEG Injection PumpsSlug Catcher MEG Injection Pumps
100-P-205 Methanol Injection Pump
100-X-201
100-D-205100-U-201
Methanol Injection Pump
Sump Pump
Phase 16
High Pressure SeparatorLP Steam Condenser
Slug Catcher
Steam Condensate PumpsSump Pump
100-P-204 A/B/C100-P-203 A/B100-P-202 A/B100-P-201
100-U-101
100-X-101
100-P-105100-D-105
100-P-104 A/B/C
Phase 15
100-P-101100-E-101100-DH-103100-D-104100-D-103100-D-102100-D-101100-A-101
Page 4 of 6
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-100 Pars Oil and Gas Company
Rev.: 2
100-P-103 A/B100-P-102 A/B
Class: 1Doc. Number : EL-1516-100-P312-001
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
ITEM LIST
LP Steam Condenser
Sump DrumHigh Pressure Separator
Steam Condensate Pumps
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm
(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
1 100-A-101 1 2 68.6 m2 Air Cooler
1 100-D-101 1 2 3.2 6.0 V
1 100-D-102 1 2 3.2 6.0 V
1 100-D-103 1 2 2.25 6.3 H
1 100-D-104 1 2 1.4 4.2 H
1 100-D-105 1 2 V
1 100-DH-103 1 2 Electric Heater
1 100-E-101 1 2 201.6 m2 CS + 3
mm SS 304L 8 (2) 82 (2) 270 -46/85 (1) BEM
1 100-P-101 1 2 96 m (3) (3)Centr.
Vertical Submerged
1 100-P-102 A/B 2 4 66.8 m (3) (3) Centri. Hrizontal
1 100-P-103 A/B 2 4 DP=79.9 /107.9bar (3) (3) Reciprocatin
g / Dosing
1 100-P-104 A/B/C 3 6 DP=66.7 /
79.9bar (3) (3) Reciprocating / Dosing
1 100-P-105 1 2 DP=81 bar Reciprocating / Dosing
1 100-X-101 1 2 6×46" Finger
Pe=6.1 kW
85136 Pe: by vendor
Pe=16.4 kW
Design case: PW - W
55
135
T.L. H
(m)
No of ITEM
No of Equi. Total
Main CRITERIA
SecondCRITERIA
Diam. L. x I. (m)
REV. ITEM
19900 kW
Sump Drum Heater
Methanol Storage Drum 5 m³
( C)
2141kW
Gas Heater
High Pressure Separator
7.2 m³ CS+3 mm
65.4 m³
28.2 m³
High Pressure Separator
Sump Drum SS (AISI 304 L)
Included in 100-D-103
85 Included in 100-U-101
(F) (K)
14 (2)
(L)
135 (1)
-46/85 (1)
135 (1)
Material (4)
(J)
Design Temp
Type Remarks
Design case: PW
(N)
CS+3mm on Header 2 (2)
Design Pressure
39.5 m³/h
LTCS + SS clad (TP 321)
LTCS + SS clad (TP 321)
CS+3 mm
2.0 (2)
82 (2) -46/85 (1)
3.5 (2)
-58/55 (1)
11.5
25
Slug Catcher MEG Injection Pumps
Steam Condensate Pumps
Sump Pump
3 m³/h (5)
15 m³/h
Pe: by vendor
Methanol Injection Pump 1.5 m³/h included in 100-U-101
102.3 85HP Separator MEG Injection Pumps 1 m³/h
90 85
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 5 of 6
Slug Catcher -29/852000 m³
Pars Oil and Gas Company
Doc. Number : EL-1516-100-P312-001 Class: 1Rev.: 2
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-100
65.4 m³
Steam Condensate Surge Drum
LP Steam Condenser
DESIGNATION OF ITEM
82 (2)
CS+3 mm 139
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm
(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
1 100-U-101 1 2 -one Methanol Storage Drum (100-D-105)
-one Methanol Injection Pump (100-P-105)
ITEM
Design TempMain
CRITERIA
( C)
DESIGNATION OF ITEM
Each of the two packages consists of:
No of ITEM
Methanol Injection Package
Type
(L) (N)
Remarks
Design PressureMaterial (4)
Doc Title : LIST OF EQUIPMENT UNIT-100
Doc. Number : EL-1516-100-P312-001
Pars Oil and Gas Company
Rev.: 2 Class: 1
(F)
South Pars Gas Field Development Phases 15&16 Onshore Facilities
(J)
T.L. H
(m)
Diam. L. x I. (m)
(K)
SecondCRITERIAREV. No of Equi.
Total
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 6 of 6NARGAN
Common for all six MEG Regeneration Packages102-A-102 LP Steam Condenser
102-U-101 MEG Regeneration Package102-D-105 Rich MEG Flash Drums
102-D-103 Reflux drumGlycol reboilerGlycol flash drumStill column
102-D-101102-C-101102-A-101 External reflux condenser
102-E-101
102-D-102
Rich/lean MEG exchangerLean MEG Booster Pumps
Lean MEG Feed FilterMEG Injection Pumps
Still columnExternal reflux condenserMEG Regeneration Package
Steam Condensate Pumps
Lean MEG Storage Tanks
PH Control Package
Lean MEG Feed Pump Glycol export pumpReflux pump
102-F-202
102-D-202102-D-201
102-D-203102-E-201102-F-201 A/B
102-P-201102-P-207
102-C-201102-A-201102-U-201
Charcoal filter
Glycol reboilerGlycol flash drum
Rich glycol filtersRich/lean MEG exchangerReflux drum
Storage tankInjection pumps
MEG Sump Pump
Injection pumps
Charcoal filterRich glycol filters
102-P-107102-P-101102-F-102102-F-101 A/B
102-T-102 A/B102-T-101 A/B
Rich MEG Storage Tanks
102-P-111 A/B/C/D/E/F
102-P-109 A/B102-T-103102-U-102
102-F-103 A/B102-D-107 102-D-106 A/B
102-P-110
102-P-104 102-P-103 A/B102-P-102 A/B/C102-F-104
Page 4 of 8
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Rich MEG Pumps
102-U-103102-T-104
Corrosion Inhibitor PackageStorage tank
102-U-104
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-102 Pars Oil and Gas Company
Rev.: 0
102-P-106 A/B102-P-105 A/B
Class: 1Doc. Number : EL-1516-102-P312-001
ITEM LIST
MEG Sump Drum
Lean MEG FiltersSteam Condensate Surge Drum
102-T-105102-P-112 A/B/C/D/E/F
Antifoam PackageStorage tankInjection pumps
Reflux pumpGlycol export pump
NARGAN
Rev.: 0
102-P-307102-P-301
Class: 1Doc. Number : EL-1516-102-P312-001
ITEM LIST
External reflux condenser
Glycol reboilerGlycol flash drum
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-102 Pars Oil and Gas Company
102-A-301
Page 5 of 8
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Reflux pump
102-D-303102-D-302102-D-301102-C-301
102-F-302102-F-301 A/B102-E-301
102-C-401102-A-401102-U-401
External reflux condenser
102-E-401102-D-403102-D-402102-D-401
102-P-507102-P-501102-F-502
Still columnExternal reflux condenser
MEG Regeneration Package
Reflux pumpCharcoal filter
Glycol reboilerReflux drum
Charcoal filter
Rich/lean MEG exchanger
102-U-601
102-D-601102-C-601102-A-601
Rich/lean MEG exchangerReflux drumGlycol reboiler
Rich glycol filtersCharcoal filter
Glycol export pumpReflux pump
102-E-601102-D-603102-D-602
102-F-601 A/B102-F-602102-P-601102-P-607
Glycol flash drumStill columnExternal reflux condenser
Glycol export pump
MEG Regeneration Package
Still columnGlycol flash drum
Glycol export pump
102-F-501 A/B
102-D-503
Rich glycol filtersRich glycol filters
Reflux drumRich/lean MEG exchanger
Still column102-A-501
102-E-501 Rich/lean MEG exchangerReflux drumGlycol reboilerGlycol flash drum
102-D-502102-D-501102-C-501
102-F-401 A/B102-F-402102-P-401102-P-407
Rich glycol filtersCharcoal filterReflux pumpGlycol export pump
102-U-301 MEG Regeneration Package 102-U-501 MEG Regeneration Package
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
0 102-A-101 1 6
0 102-A-102 1 1 Air Cooler
0 102-C-101 1 6
0 102-D-101 1 6
0 102-D-102 1 6
0 102-D-103 1 6
0 102-D-105 1 1 2.25 6.3 H
0 102-D-106 A/B 2 2 1.85 4.45 V
0 102-D-107 1 1 2 5.4 H
0 102-E-101 1 6
0 102-F-101 A/B 2 12
0 102-F-102 1 6
0 102-F-103 A/B 2 2 Cartridge
CS + 3 mm
3.5 (2) 155 (1)
85 (1) 3.5 (2)
Included in102-U-101 - 601
Included in102-U-101 - 601
CS + 3 mm
T.L. H
(m)
Material (4)
(J)
Type
MEG Sump Drum 28.1 m³
Reflux drum
No of ITEM
No of Equi. Total
SecondCRITERIA
Diam. L. x I. (m)
Main CRITERIA
Glycol flash drum
REV. ITEM
( C)
LP Steam Condenser
Included in102-U-101 - 601
(L)
Still column
Included in102-U-101 - 601
(N)
135 (1)CS + 3 mm
Included in102-U-101 - 601
Included in102-U-101 - 601
Included in102-U-101 - 601
4090 kW
(K)(F)
CS + Coating + 3 mm
CS + 3 mm
Rich MEG Flash Drums
Rich glycol filters
Rich/lean MEG exchanger
Steam Condensate Surge Drum
13.6 m³
19.1 m³
Pars Oil and Gas Company
6.5 85
2 (2)
Included in102-U-101 - 601
135 (1)
Charcoal filter
Class: 1Rev.: 0
Remarks
Design TempDesign Pressure
Glycol reboiler
External reflux condenser
DESIGNATION OF ITEM
2 (2)
Doc. Number : EL-1516-102-P312-001
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-102
Lean MEG Filters 44 m³/h
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 6 of 8NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
0 102-F-104 1 1 Cartridge
0 102-P-101 1 6
0 102-P-102 A/B/C 3 3 DP= 210.3
bar (3) (3) Reciprocating /Dosing
0 102-P-103 A/B 2 2 41.6 m (3) (3) Centrifugal
0 102-P-104 1 1 54.2 m (3) (3) Centr. Vertical Submerged
0 102-P-105 A/B 2 2 187 m (3) (3) Centrifugal
0 102-P-106 A/B 2 2 48.4 m (3) (3) Centrifugal
0 102-P-107 1 6
0 102-P-109 A/B 2 2
0 102-P-110 1 1 53.6 m (3) (3) Centrifugal
0 102-P-111 A/B/C/D/E/F 6 6
0 102-P-112 A/B/C/D/E/F 6 6
0 102-T-101 A/B 2 2 12 11 Fixed roof
DESIGNATION OF ITEM
Steam Condensate Pumps
85234
6.5 85
24.8
7.93
85
135
Class: 1Rev.: 0
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 7 of 8
Design Pressure
MEG Sump Pump
Lean MEG Feed Filter CS + 3 mm
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-102
22 m³/h
9.2 155
Pars Oil and Gas Company
Doc. Number : EL-1516-102-P312-001
Lean MEG Storage Tanks
working capacity1000 m3
-10 / 170 mbarg +hydrostatic head 85CS + 1.5 mm
Injection pumps
Injection pumps
Injection pumps
Lean MEG Feed Pump 5 m³/h
Included in102-U-104
Included in102-U-103
Pe= 15.5 kW
Included in102-U-101 - 601
(F) (K)
Pe= 3.9 kW
Pe= 257.3 kW
5 m³/h
44 m³/h
3.7 (5) 85
Lean MEG Booster Pumps
Included in102-U-102
85 Pe= 5.9 kW
Pe= 92.4 kW
15 m³/h
Pe= 9.1 kW
70 m³/h
7.7
REV. ITEM
Glycol export pump
Rich MEG Pumps 80 m³/h
( C)
Reflux pump
No of ITEM
MEG Injection Pumps
No of Equi. Total
Main CRITERIA
SecondCRITERIA
T.L. H
(m)
Diam. L. x I. (m)
Material (4)
(J)
Included in102-U-101 - 601
Type Remarks
Design Temp
(N)(L)
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
0 102-T-102 A/B 2 2 12 11 Fixed roof
0 102-T-103 1 1
0 102-T-104 1 1
0 102-T-105 1 1
0 102-U-101 1 6
0 102-U-102 1 1
0 102-U-103 1 1
0 102-U-104 1 1Antifoam Package Total capacity: 60 l/h. (7) This package contains: one storage tank (102-T-105), six identical Injection pumps (102-P-112 A/B/C/D/E/F).
Total capacity: 73047 Kg/h. MEG: 27758 Kg/h, water: 45289 Kg/h. 6 identical MEG regeneration packages are provided: 4x25% packages normally operating and 2 stand-by packages.
Total capacity: 3.0 m3 /h.This package contains: one storage tank (102-T-103), two Injection pumps (102-P-109 A/B).
Total capacity: 6.0 l/h. (6) This package contains: one storage tank (102-T-104), six identical Injection pumps (102-P-111 A/B/C/D/E/F).
No of ITEM
Design Temp
Included in 102-U-102
Type Remarks
(N)
Diam. L. x I. (m)
T.L. H
(m)
Material (4)
Storage tank
MEG Regeneration Package
REV. ITEM
( C)
Included in 102-U-104
(L)
Storage tank
working capacity1000 m3
(J)
CS + 1.5 mm -10 / 170 mbarg +hydrostatic head 85
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-102
Included in 102-U-103
Pars Oil and Gas Company
Doc. Number : EL-1516-102-P312-001 Class: 1Rev.: 0
No of Equi. Total
(K)
Design Pressure
Rich MEG Storage Tanks
DESIGNATION OF ITEM
Main CRITERIA
SecondCRITERIA
Storage tank
(F)
Corrosion Inhibitor Package
PH Control Package
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 8 of 8NARGAN
First Stage Offgas Compressor Aftercooler103-F-101A/B
103-P-104 Sump Drum PumpStabilized Condensate Export PumpsStabilizer Reflux PumpsDesalter Feed Pumps
103-P-102 A/B103-P-101 A/B103-K-101
103-P-105 A/B
103-P-103 A/B
Steam Condensate PumpsFirst Stage Offgas Compressor Suction Drum
Condensate StabiliserPreflash Drum
Corrosion Inhibitor Injection pumpsCorrosion Inhibitor Package
Condensate Degassing Drum
Sump Drum
First Stage Offgas Compressor Discharge Sump Drum Heater
Stabiliser Reflux Drum Demulsifier Injection pumpsDemulsifier Package
103-T-102 Corrosion Inhibitor Storage tank
103-T-101
103-P-107 A/B/C/D/E103-U-102
Condensate Preflash HeatersCondensate Desalter Preheater
Second Stage Offgas Compressor Suction
Stabilizer Reboiler
First Stage & Second Stage Offgas CompressorGlycolated Water Filters
Demulsifier Storage tank
Condensate Recycle Pump
103-P-106 A/B103-U-101
103-P-108
Stabilizer Side Reboiler
103-D-110103-D-109103-D-108
HP Steam Condensate Flash Drum
103-E-103103-E-102103-E-101 A/B103-DH-108
103-E-104
103-D-107
Phase 15
103-D-103 103-D-102 103-D-101103-C-101103-A-104103-A-103103-A-102103-A-101
Page 4 of 8
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-103 Pars Oil and Gas Company
Rev.: 0
103-D-106103-D-105
Class: 1Doc. Number : EL-1516-103-P312-001
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
ITEM LIST
Stabilized Condensate Air Cooler
Stabilizer Reflux CondenserSecond Stage Offgas Compressor Aftercooler
Condensate Desalter
NARGAN
Class: 1Doc. Number : EL-1516-103-P312-001
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
ITEM LIST
Stabilized Condensate Air Cooler
Stabilizer Reflux CondenserSecond Stage Offgas Compressor Aftercooler
Condensate Desalter
Page 5 of 8
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-103 Pars Oil and Gas Company
Rev.: 0
103-D-206103-D-205
103-D-207
Phase 16
103-D-203 103-D-202 103-D-201103-C-201103-A-204103-A-203103-A-202103-A-201
Stabilizer Side Reboiler
103-D-210103-D-209103-D-208
HP Steam Condensate Flash Drum
103-E-203103-E-202103-E-201 A/B103-DH-208
103-E-204
First Stage & Second Stage Offgas CompressorGlycolated Water Filters
Demulsifier Storage tank
Condensate Recycle Pump
103-P-206 A/B103-U-201
103-P-208
Condensate Preflash HeatersCondensate Desalter Preheater
Second Stage Offgas Compressor Suction Drum
Stabilizer Reboiler
103-T-201
103-P-207 A/B/C/D/E103-U-202
Corrosion Inhibitor Storage tank103-T-202Corrosion Inhibitor Injection pumpsCorrosion Inhibitor Package
Condensate Degassing Drum
Sump Drum
First Stage Offgas Compressor Discharge DrumSump Drum Heater
Stabiliser Reflux Drum Demulsifier Injection pumpsDemulsifier Package
103-P-205 A/B
103-P-203 A/B
Steam Condensate PumpsFirst Stage Offgas Compressor Suction Drum
Condensate StabiliserPreflash Drum
First Stage Offgas Compressor Aftercooler103-F-201
103-P-204 Sump Drum PumpStabilized Condensate Export PumpsStabilizer Reflux PumpsDesalter Feed Pumps
103-P-202 A/B103-P-201 A/B103-K-201
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
0 103-A-101 1 2 Air Cooler
0 103-A-102 1 2 Air Cooler
0 103-A-103 1 2 Air Cooler
0 103-A-104 1 2 Air Cooler
0 103-C-101 1 2 2.6 23.7 11.8 (2) 11.5 (2) -29/225 (1) -29/110 (1) Valves tray ( SS 304L)
0 103-D-101 1 2 3.55 11.5 H
0 103-D-102 1 2 1.15 2.65 V
0 103-D-103 1 2 1.6 4.5 V
0 103-D-105 1 2 Electrostatic desalter
0 103-D-106 1 2 3.5 10.5 H
0 103-D-107 1 2 1.3 4.15 V
0 103-D-108 1 2 2.4 7.2 H
0 103-D-109 1 2 1.4 4 V
0 103-D-110 1 2 1.25 4.36 V
0 103-DH-108 1 2 Electric Heater
SS 321
SS 321
Dimensions by desalter MFR
85 (1)11.5 (2)
102 (1)
CS + 3 mm
LTCS + COATING+ 3 mm
Main CRITERIA
CS + 3 mm
133 (1)32 (2)
T.L. H
(m)
Material (4)
(J)
130.4 m³
150 (1)
Type Remarks
Design case: S - PW
Design Temp
(N)
First Stage Offgas Compressor Suction
Drum3.2 m³
Preflash Drum 137.2 m³
No of ITEM
No of Equi. Total
SecondCRITERIA
Diam. L. x I. (m)
(F)
1750 kW
251 kW
5960 kW
REV. ITEM
( C)
First Stage Offgas Compressor Aftercooler
Second Stage Offgas Compressor Aftercooler
Stabilizer Reflux Condenser SS 321 115 (1)11.5 (2)
-46 / +85 (1)
103-A-102 in one common bay
with 103-A-103 sharing fans.
Design case: W
Design case: S - W
CS + 3 mm
CS 12 (2)
(L)
LTCS + 3 mm
CS + 3 mm
(K)
160 (1)
11.5 (2) 105 (1)
CS + 3 mm
85
3.5 (2)
213 T/h 328 m³/h 46.5
Second Stage Offgas Compressor Suction
Drum
112.8m³
Stabiliser Reflux Drum
Condensate Degassing Drum
Condensate Desalter
6.1 m³
11.2 m³
HP Steam Condensate Flash
Drum6.9 m³
3.5 (2) -46 / +205 (1)Sump Drum 36.4 m³
8 (2) 270 (1)
First Stage Offgas Compressor
Discharge Drum133 (1)6.4 m³ SS 321 32 (2)
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-103
1920 kW
Pars Oil and Gas Company
Doc. Number : EL-1516-103-P312-001 Class: 1Rev.: 0
82 (2) 150 (1)SS 321
Design Pressure
Condensate Stabiliser
Stabilized Condensate Air
Cooler
DESIGNATION OF ITEM
32 (2)
32 (2)
SS 321
Included in 103-D-108
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 6 of 8
Sump Drum Heater
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
0 103-E-101 A/B 2 4 CS + 3 mm
LTCS + 3 mm 12 (2) 139 (2) 160 (1) -46 / +85 NEN
0 103-E-102 1 2 CS + 3 mm CS + 3 mm 12 (2) 46.5 (2) 210 (1) 95 (1) AES
0 103-E-103 1 2 CS + 3 mm CS + 3 mm 12 (2) 55 (2) 225 (1) 330 (1) BKU
0 103-E-104 1 2 CS + 3 mm CS + 3 mm 11.8 (2) 12 (2) 175 (1) 225 (1) BXU
0 103-F-101A/B 2 4 Cartidge orBasket
0 103-K-101 1 2 DP = 19.1 bar (3) (3) 11.5 32.0 105 132 Reciprocating
DP = 43.9 bar (3) (3) 32.0 82.0 132 150 Reciprocating
0 103-P-101 A/B 2 4 146 m (3) (3) Centrifugal
0 103-P-102 A/B 2 4 72 m (3) (3) Centrifugal
0 103-P-103 A/B 2 4 151 m (3) (3) Centrifugal
0 103-P-104 1 2 79.1 m (3) (3) Centr. VerticalSubmerged
0 103-P-105 A/B 2 4 150.45 m (3) (3) Centrifugal
0 103-P-106 A/B 2 4
0 103-P-107 A/B/C/D/E 5 10
0 103-P-108 1 2 626.4 m (3) (3) Centrifugal
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 7 of 8
Design Pressure
Glycolated Water Filters
Condensate Preflash Heaters
DESIGNATION OF ITEM
And Second Stage Offgas Compressor
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-103
12030 kW
33 (2) -46/85 (1)
Pars Oil and Gas Company
Doc. Number : EL-1516-103-P312-001 Class: 1Rev.: 0
Condensate Recycle Pump 102 Pe = 304 KW160 m³/h 48.5
Corrosion Inhibitor Injection pumps Included In 103-U-102
Demulsifier Injection pumps Includeed In 103-U-101
Stabilizer Reflux Pumps
15 m³/h
Steam Condensate Pumps
Sump Drum Pump
Stabilized Condensate Export
Pumps
Pe = 25.1 KW
Pe = 9.5 KW
29.5 m³/h
102
13.5
290 m³/h 18.4
27025.4
-46 / 175
44.1
Design Temp
(N)(L)
Pe = 1883 KW
(F) (K)
Design Case: S-PW
11020 kW
3260 kW
6710 kW
Stabilizer Reboiler
Stabilizer Side Reboiler
Pe = 4.9 KW
85 Pe = 153 KW
Pe = 920 KW
51 m³/h LTCS + 3 mm
Design Case: S-PW
37245.9 Nm³/h
Diam. L. x I. (m)
REV. ITEM
2.5 m³/h
Desalter Feed Pumps 344.2 m³/h
First Stage Offgas Compressor
14460.1 Nm³/h
( C)
Condensate Desalter Preheater
No of ITEM
No of Equi. Total
Main CRITERIA
SecondCRITERIA
Pe = 139.4 KW
T.L. H
(m)
Material (4)
(J)
Design Case PW-W
Type Remarks
Design Case: PW
17.3 85
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm
(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
0 103-T-101 1 2
0 103-T-102 1 2
0 103-U-101 1 2
0 103-U-102 1 2Corrosion Inhibitor
PackageEach of the two packages contains:- one Storage Tank (103-T-102);- five Injection Pumps (103-P-107 A/B/C/D/E);-spare pumps in warehouse.
Diam. L. x I. (m)
T.L. H
(m)
Material (4)
(J)
Design Temp
Included In 103-U-102
Type Remarks
Included In 103-U-101
(N)
REV. ITEM
( C)
No of ITEM
Demulsifier Package
(F) (K) (L)
Corrosion Inhibitor Storage tank
Each of the two packages contains:- one Storage Tank (103-T-101);- two Injection Pumps (103-P-106 A/B), one inservice and one in stand-by.
Doc Title : LIST OF EQUIPMENT UNIT-103 Pars Oil and Gas Company
Doc. Number : EL-1516-103-P312-001 Class: 1Rev.: 0
No of Equi. Total
Main CRITERIA
SecondCRITERIA
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 8 of 8
Design Pressure
Demulsifier Storage tank
DESIGNATION OF ITEM
South Pars Gas Field Development Phases 15&16 Onshore Facilities
NARGAN
109-P-101 A/B/C/D
109-P-109
First Steam Condensate Surge Drum
109-E-102 Second Sour Water Stripper Reboiler109-F-101 A/B First Sour Water Filters109-F-102 A/B Second Sour Water Filters
Sour Water Sump Drum Heater
109-P-108 A/B
Sour Water Stripper Feed Pumps
First Sour Water Stripper Bottom PumpsFirst Sour Water Stripper Reflux PumpsSecond Sour Water Stripper Bottom PumpsSecond Sour Water Stripper Reflux PumpsFirst Steam Condensate PumpsSecond Steam Condensate PumpsSour Water Sump Pump
First Sour Water Stripper Reboiler
Second Sour Water Stripper Reflux Drum
First Sour Water Stripper Bottom CoolerFirst Sour Water Stripper CondenserSecond Sour Water Stripper Bottom CoolerSecond Sour Water Stripper Condenser
Second Sour Water StripperFirst Sour Water Stripper Feed DrumSecond Sour Water Stripper Feed DrumFirst Sour Water Stripper Reflux Drum
Class: 1Doc. Number : EL-1516-109-P312-001
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
ITEM LIST
Page 4 of 7
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-109 Pars Oil and Gas Company
Rev.: 1
109-D-102109-D-101
109-D-103
Common to phases 15 & 16
109-C-102109-C-101109-A-106109-A-105109-A-104109-A-103109-A-102109-A-101
109-D-106109-D-105109-D-104
109-E-101
109-D-107109-DH-101
Slop Oil Pumps
109-P-106 A/B
109-P-102 A/B109-P-103 A/B109-P-104 A/B
Sour Water Sump DrumSecond Steam Condensate Surge Drum
First Steam Condensate Surge Drum CondenserSecond Steam Condensate Surge Drum CondenserFirst Sour Water Stripper 109-P-107 A/B
109-P-105 A/B
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
1 109-A-101 1 1 176.3 m2 Air cooler
1 109-A-102 1 1 116.3 m2 Air cooler
1 109-A-103 1 1 176.3 m2 Air cooler
1 109-A-104 1 1 116.3 m2 Air cooler
1 109-A-105 1 1 14.3 m2 Air cooler
1 109-A-106 1 1 14.3 m2 Air cooler
1 109-C-101 1 1 1.35 20.7 3.8 (2) 3.5 (2) Packing
1 109-C-102 1 1 1.35 20.7 3.8 (2) 3.5 (2) Packing
1 109-D-101 1 1 2.4 9.12 H
1 109-D-102 1 1 2.4 9.12 H
1 109-D-103 1 1 1.1 2.39 H
1 109-D-104 1 1 1.1 2.39 H
190 (1)
190 (1)
DESIGNATION OF ITEM
3.5 (2) 148 (1)2.4 m3
135
( C)
SS 316L
Bottom up to 12.5m: CSTop: CS (SS316L clad)
3.5 (2)
3.5 (2)
2 (2)
148 (1)
SS 304L
SS 321
CS+3mm
CS+3mm
Class: 1Rev.: 1
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-109
29.6 m3
2nd SOUR WATER STRIPPER FEED
DRUM
1st SOUR WATER STRIPPER BOTTOM
COOLER
Pars Oil and Gas Company
Doc. Number : EL-1516-109-P312-001
13 (2)
(L)
Pi=2x55 kW common for 109-A-101 and 109-A-103
Design Temp
(N)
Remarks
3320x1.1 Kw
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 5 of 7
2.4 m3 SS 316L 3.5 (2) 148 (1)
135
SS 304L 13 (2)
Type
(J)
150 (1)
(K)
148 (1)
150 (1)
SS 321
131 (1)
1st SOUR WATER STRIPPER
44.9 m3 CS (SS321 cladding)
29.6 m3
44.9 m3
2nd SOUR WATER STRIPPER
CS (SS321 cladding)
REV. ITEM
1st SOUR WATER STRIPPER
CONDENSER
(F)
No of ITEM
No of Equi. Total
131 (1)
3.5 (2)
Bottom up to 12.5m: CSTop: CS (SS316L clad)
3.5 (2)
Main CRITERIA
SecondCRITERIA
Pi=2x45 kW common for 109-A-102/104/105/106406x1.1 Kw
406x1.1 Kw
T.L. H
(m)
Diam. L. x I.
(m)
Design PressureMaterial (4)
2 (2)
Pi=2x45 kW common for 109-A-102/104/105/106
Pi=2x55 kW common for 109-A-101 and 109-A-103
Pi=2x45 kW common for 109-A-102/104/105/106
Pi=2x45 kW common for 109-A-102/104/105/106
3970 Kw
3320x1.1 Kw
3970 Kw
2nd SOUR WATER STRIPPER REFLUX
DRUM
2nd SOUR WATER STRIPPER
CONDENSER
1st STEAM COND. SURGE DRUM CONDENSER
2nd STEAM COND. SURGE DRUM CONDENSER
1st SOUR WATER STRIPPER REFLUX
DRUM
2nd SOUR WATER STRIPPER BOTTOM
COOLER
1st SOUR WATER STRIPPER FEED
DRUM
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
1 109-D-105 1 1 1.1 2.2 H
1 109-D-106 1 1 1.1 2.2 H
1 109-D-107 1 1 2.2 5.1 H
1 109-DH-101 1 1 Electric Heater
1 109-E-101 1 1 309.3 m2 CS+ 3mm SS 304L 5.4 (2) 8 (2) 162 270 BKU
1 109-E-102 1 1 309.3 m3 CS+ 3mm SS 304L 5.4 (2) 8 (2) 162 270 BKU
1 109-F-101 1 2 Cartridge or basket
1 109-F-102 1 2 Cartridge or basket
1 109-P-101 A/B/C/D 2 4 63.2 m (3) (3) Centrifugal
1 109-P-102 A/B 2 2 25.2 m (3) (3) Centrifugal
1 109-P-103 A/B 1 2 26.1 m (3) (3) Centrifugal Pe=5.2 Kw7.5 150
13111.3SOUR WATER
STRIPPER FEED PUMPS
1st SOUR WATER STRIPPER BTTOM
PUMPS42.5 m3/h
SLOP OIL PUMPS
SecondCRITERIA
No of ITEM
No of Equi. Total
Main CRITERIA
(F)
2.4 m3
2.4 m3
4.7x103kW
( C)
1st STEAM CONDENSATE SURGE DRUM
2nd STEAM CONDENSATE SURGE DRUM
REV. ITEMT.L.
H(m)
Diam. L. x I.
(m)
Design PressureMaterial (4)
135 (1)
135 (1)
CS + 3mm
CS + 3mm
2 (2)
Type
2 (2)
(K)(J)
Remarks
Design Temp
(N)(L)
SUMP DRUM HEATER
SOUR WATER SUMP DRUM
Included in 109-D-107
148 (1)CS+coating+3mm22.2 m3
2nd SOUR WATER STRIPPER REBOILER
1st SOUR WATER STRIPPER REBOILER
4.7x103kW
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 6 of 7
1st SOUR WATER FILTERS 62 m3/h
2nd SOUR WATER FILTERS 62 m3/h
CS+3mm
Pars Oil and Gas Company
Doc. Number : EL-1516-109-P312-001 Class: 1Rev.:1
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-109
DESIGNATION OF ITEM
3.5(2)
11.4 (2)
11.4 (2)
Pe=0.8 kW
131 (1)
131 (1)
131
Pe=13.3 kW
5 m3/h 6.1
CS+3mm
31 m3/h
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm
(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
1 109-P-104 A/B 1 2 46.9 m (3) (3) Centrifugal
1 109-P-105 A/B 1 2 26.1 m (3) (3) Centrifugal
1 109-P-106 A/B 1 2 46.9 m (3) (3) Centrifugal
1 109-P-107 A/B 1 2 105.2 m (3) (3) Centrifugal
1 109-P-108 A/B 1 2 105.2 m (3) (3) Centrifugal
1 109-P-109 1 1 55.8 m (3) (3)Centr. Vertical Submerged
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 7 of 7
SOUR WATER SUMP PUMP
Pe=8.4 kW
Pe=3.4 kW
8.4 m3/h
148
135
15 m3/h 10.3
(F)
South Pars Gas Field Development Phases 15&16 Onshore Facilities
(J)
T.L. H
(m)
Diam. L. x I.
(m)
(K)
Design Pressure
(N)
Type
1st STEAM CONDENSATE
PUMPS
Pe=3.5 kW6.4 m3/h1st SOUR WATER
STRIPPER REFLUX PUMPS
42.5 m3/h
9.3
7.5
14.4 135 Pe=8.4 kW
Doc Title : LIST OF EQUIPMENT UNIT-109
Doc. Number : EL-1516-109-P312-001
Pars Oil and Gas Company
Rev.:1 Class: 1
SecondCRITERIA Remarks
Material (4)
(L)
Design Temp
14.42nd STEAM
CONDENSATE PUMPS
No of ITEM
Main CRITERIA
( C)
DESIGNATION OF ITEM
8.4 m3/h
148
ITEMREV. No of Equi. Total
Pe=5.2 kW
2nd SOUR WATER STRIPPER REFLUX
PUMPS6.4 m3/h 9.3 148 Pe=3.5 kW
2nd SOUR WATER STRIPPER BTTOM
PUMPS150
NARGAN
110-DH-105 Sump Drum Heater
Condensate Second Heater
Sump Drum
Condensate Preflash Heater
Stabilized Condensate PumpSteam Condensate Pump
110-P-103
Page 4 of 5
Sump Drum Pump
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-110 Pars Oil and Gas Company
Class: 1Doc. Number : EL-1516-110-P312-001
110-P-101110-F-101 A/B
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
ITEM LIST
Preflash Drum
Degassing Drum
Glycolated Water Filter
110-P-102
110-D-103
110-E-103110-E-102
HP Steam Condensate Flash Drum
Rev.: 1
110-E-101 A/B
110-D-105110-D-104
Condensate Final Heater
110-D-102110-D-101
Flash Drum
Phase 15 &16
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
1 110-D-101 1 1 3.6 11.5 H
1 110-D-102 1 1 3.1 10 H
1 110-D-103 1 1 3.2 9 H
1 110-D-104 1 1 1.4 5.4 V
1 110-D-105 1 1 2.25 6.75 H
1 110-DH-105 1 4
1 110-E-101A/B 1 2 CS+3mm (3)
LTCS+3mm (3) 5 (2) 139 (2) 165 (1) -46/85 (1) NEN
1 110-E-102 1 1 CS+3mm (3)
CS+3mm (3) 5 (2) 18 (2) 205 (1) 105 (1) AES
1 110-E-103 1 1 CS+3mm (3)
CS+3mm (3) 18 (2) 55 (2) 205 (1) 330 BEU
1 110-F-101 A/B 1 2 Cartridge or basket
1 110-P-101 1 1 90.5 m CS+ 3mm (3) (3) Centrifugal
1 110-P-102 1 1 117.3 m CS+ 3mm (3) (3) Centrifugal
1 110-P-103 1 1 158.7 m (3) (3) Centr. VerticalSubmerged
CONDENSATE SECOND HEATER Design case: S
SUMP DRUM HEATER 45 kW (3)
Design case: WDCONDENSATE PREFLASH HEATER 11021x1.1 kW
REV. ITEMT.L. H
(m)
No of ITEM
No of Equi. Total
Main CRITERIA
(3)
SecondCRITERIA
DESIGNATION OF ITEM
STEAM CONDENSATE
PUMP
Diam. L. x I. (m)
( C)
DEGASSING DRUM 81.0 m3
9.0 m3
SUMP DRUM 29.8 m3
STEAM CONDENSATE FLASH DRUM
18 (2)
17.6
204m3/h 12.5
21.5
50.6 m3/h
17344x1.1 kW
12.9 m3/h
4301x1.1 kW
LTCS+3mm (3)
270 Pe= 20.9 kW
Design case: WD
Pe= 7.2 kW
129.3 m3LTCS+3mm (3)
SS (TP321) (3) (*) 17 (2)
(F) (K)
SUMP DRUM PUMP
STABILISED CONDENSATE
PUMP
GLYCOLED WATER FILTERS -46/85 (1)
135
205
Pe= 55.5 kW
35.7 m3/h
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 5 of 5
(*) Internals
3.5 (2)
CS+3mm (3) 8 (2)
205 (1) (*) Internals
135 (1)
5 (2)
270 (1)
Design Temp
(N)
Design Pressure
(L)
-46/85 (1)
CS+3mm (3) SS (TP321) (3) (*)
CS+3mm (3)
Pars Oil and Gas Company
Doc. Number : EL-1516-110-P312-001
Material (3)
(J)
Type Remarks
Class: 1Rev.: 1
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-110
CONDENSATE FINAL HEATER
FLASH DRUM 83.3 m3
PREFLASH DRUM
Included in 110-D-105
LTCS+coating+3mm (3)SS (3) (*)
3.5 (2) -46/205 (1) (*) Internals
NARGAN
110-DH-105 Sump Drum Heater
Condensate Second Heater
Sump Drum
Condensate Preflash Heater
Stabilized Condensate PumpSteam Condensate Pump
110-P-103
Page 4 of 5
Sump Drum Pump
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-110 Pars Oil and Gas Company
Class: 1Doc. Number : EL-1516-110-P312-001
110-P-101110-F-101 A/B
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
ITEM LIST
Preflash Drum
Degassing Drum
Glycolated Water Filter
110-P-102
110-D-103
110-E-103110-E-102
HP Steam Condensate Flash Drum
Rev.: 2
110-E-101 A/B
110-D-105110-D-104
Condensate Final Heater
110-D-102110-D-101
Flash Drum
Phase 15 &16
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
2 110-D-101 1 1 3.6 11.5 H
2 110-D-102 1 1 3.1 10 H
3 110-D-103 1 1 3.2 9 H
2 110-D-104 1 1 1.4 5.4 V
3 110-D-105 1 1 2.25 6.75 H
1 110-DH-105 1 1
3 110-E-101A/B 1 2 CS+3mm (3)
LTCS+3mm (3) 5 (2) 139 (2) 165 (1) -46/85 (1) NEN
3 110-E-102 1 1 CS+3mm (3)
CS+3mm (3) 5 (2) 18 (2) 205 (1) 105 (1) AES
2 110-E-103 1 1 CS+3mm (3)
CS+3mm (3) 18 (2) 55 (2) 205 (1) 330 BEU
2 110-F-101 A/B 1 2 Cartridge or basket
1 110-P-101 1 1 90.5 m CS+ 3mm (3) (3) Centrifugal
1 110-P-102 1 1 117.3 m CS+ 3mm (3) (3) Centrifugal
1 110-P-103 1 1 158.7 m (3) (3) Centr. VerticalSubmerged
CONDENSATE SECOND HEATER Design case: S
SUMP DRUM HEATER 45 kW (3)
Design case: WDCONDENSATE PREFLASH HEATER 11021x1.1 kW
REV. ITEMT.L. H
(m)
No of ITEM
No of Equi. Total
Main CRITERIA
(3)
SecondCRITERIA
DESIGNATION OF ITEM
STEAM CONDENSATE
PUMP
Diam. L. x I. (m)
( C)
DEGASSING DRUM 81.0 m3
9.0 m3
SUMP DRUM 29.8 m3
STEAM CONDENSATE FLASH DRUM
18 (2)
17.6
204m3/h 12.5
21.5
50.6 m3/h
17344x1.1 kW
12.9 m3/h
4301x1.1 kW
LTCS+3mm (3)
270 Pe= 20.9 kW
Design case: WD
Pe= 7.2 kW
129.3 m3LTCS+3mm (3)
SS (TP321) (3) (*) 17 (2)
(F) (K)
SUMP DRUM PUMP
STABILISED CONDENSATE
PUMP
GLYCOLED WATER FILTERS -46/85 (1)
135
205
Pe= 55.5 kW
35.7 m3/h
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 5 of 5
(*) Internals
3.5 (2)
CS+3mm (3) 8 (2)
205 (1) (*) Internals
135 (1)
5 (2)
270 (1)
Design Temp
(N)
Design Pressure
(L)
-46/85 (1)
CS+3mm (3) SS (TP321) (3) (*)
CS+3mm (3)
Pars Oil and Gas Company
Doc. Number : EL-1516-110-P312-001
Material (3)
(J)
Type Remarks
Class: 1Rev.: 2
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-110
CONDENSATE FINAL HEATER
FLASH DRUM 83.3 m3
PREFLASH DRUM
Included in 110-D-105
LTCS+coating+3mm (3)SS (3) (*)
3.5 (2) -46/205 (1) (*) Internals
NARGAN
Class: 1Doc. Number : EL-1516-122-P312-001
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
ITEM LIST
HP Fuel Gas Drum
Page 4 of 5
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-122 Pars Oil and Gas Company
Rev.: 0
Phases 15&16 -Train 1
122-D-102 A122-D-101 A
Phases 15&16 -Train 2
LP Fuel Gas DrumHP Fuel Gas Drum
LP Fuel Gas Drum122-D-101 B122-D-102 B
NARGAN
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top
(°C)
(A) (B) (D) (E) ( G) (H) (I) (M)
0 122-D-101 A/B 2 2 1.5 3 V
0 122-D-101 A/B 2 2 1.2 2.9 V
HP Fuel Gas Drums
DESIGNATION OF ITEM
Class: 1Rev.: 0
(N)
7.1 m3 CS+3 mmCA (1)
(F)
REV.
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc Title : LIST OF EQUIPMENT UNIT-122 Pars Oil and Gas Company
(L)
85
Doc. Number : EL-1516-122-P312-001
Design PressureMaterial (2)
(J)
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Page 5 of 5
Type Remarks
Internals: S.S
Design Temp
31
(K)
ITEM
HP Fuel Gas Drums
( C)
T.L. H
(m)
No of ITEM
No of Equi. Total
Main CRITERIA
SecondCRITERIA
Diam. L. x I. (m)
CS+3 mmCA (1) 85 Internals: S.S3.7 m3 8.5
NARGAN
147-A-101 147-T-101147-D-101 A/B 147-T-102147-D-102 A/B 147-X-101147-D-103 A/B
147-P-109
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Pars Oil and Gas Company
Doc. Number : EL-1516-147-P312-001Rev. No.: 0
Class: 3
Doc Title : EQUIPMENT LIST FOR PROPANE STORAGE AND EXPORT( UNIT 147 )
ITEM LIST
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.Page 4 of 6
Common to Phasees 15 &16
Refrigerant CondenserLow Pressure Suction DrumsMedium Pressure Suction DrumsHigh Pressure Suction Drums
Propane Storage TankPropane Storage Tank
Refrigerant Surge DrumPropane BOG Compressor Suction DrumRecovered Propane DrumLPG Flare KO DrumRefrigeration Area Drain DrumTank Area Drain DrumLow Pressure Propane ChillerMedium Pressure Propane ChillerHigh Pressure Propane ChillerPropane Boil Off Gas CondenserRefrigerant CompressorPropane Boil Off Gas CompressorPropane Loading PumpsPropane Circulation PumpPropane Loading PumpsPropane Circulating PumpPropane Recovery PumpRefrigeration Area Drain Drum PumpTank Area Drain Drum Pump
147-D-104147-D-105147-D-106147-D-107147-D-108147-D-109147-E-101147-E-102147-E-103147-E-104147-K-101 A/B
LPG Tank Flare Package
Recovered Propane Transfer Pump
147-P-104147-P-106147-P-107147-P-108
147-K-102 A/B147-P-101 A/B147-P-102147-P-103 A/B/C
NARGAN
Class: 3 Page 5 of 5
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top (°C)
(A) (B) (D) (E) ( G) (H) (I) (J) (4) (K) (L) (M)
0 147-A-101 1 1 HOLD m2 Air cooler
0 147-D-101 A/B 2 2 2.1 3.6 V
0 147-D-102 A/B 2 2 1.5 3.2 V
0 147-D-103 A/B 2 2 1.6 3.2 V
0 147-D-104 1 1 2.9 11.3 H
0 147-D-105 1 1 2 3.55 V
0 147-D-106 1 1 1.5 5 H
0 147-D-107 1 1 HOLD HOLD H
0 147-D-108 1 1 3 10 H
0 147-D-109 1 1 3 7 H
0 147-E-101 1 1 (3) LTCS + 3mm LTCS + 3mm 18 45.4 -46 / 55 -46 / 55 HOLD
0 147-E-102 1 1 (3) LTCS + 3mm LTCS + 3mm 18 45.4 -46 / 55 -46 / 55 HOLD
0 147-E-103 1 1 (3) LTCS + 3mm LTCS + 3mm 18 45.4 -46 / 55 -46 / 55 HOLD
0 147-E-104 1 1 (3) LTCS + 3mm LTCS + 3mm 18 18 -46 / 55 -46 / 55 HOLD
0 147-K-101 A/B 2 2 DP=1.9 bar (3) (3) 18 28 -46 / 85 -46 / 115 Centrifugal
DP=5.2 bar (3) (3) 18 28 -46 / 85 -46 / 115 Centrifugal
DP=14 bar (3) (3) 18 28 -46 / 85 -46 / 115 Centrifugal
0 147-K-102 A/B 2 2 DP=2.2 bar (3) (3) 3.5 3.5 -46 / 85 -46 / 85 Centrifugal
REFRIGERANT AREA DRAIN DRUM 77.7 m3 LTCS + 3mm
REFRIGERANT COMPRESSOR 69486 kg/hr
TANK AREA DRAIN DRUM LTCS + 3mm57 m3
Pe=9117 KW
HIGH PRESSURE PROPANE CHILLER 1.12 MW Design case : Holding
Design case : HoldingLOW PRESSURE PROPANE CHILLER 1.30 MW
Design case : Holding
3.48 MW
28965 kg/hr
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc. Number : EL-1516-147-P312-001
Doc Title : EQUIPMENT LIST FOR PROPANE STORAGE AND EXPORT ( UNIT 147 )
-46 / 85
52489 kg/hr
LOW PRESSURE SUCTION DRUMS
PROPANE BOIL OFF GAS COMPRESSOR
Design case : Holding
MEDUIM PRESSURE PROPANE CHILLER 1.93 MW
PROPANE BOIL OFF GAS CONDENSER
91153 kg/hr
LPG FLARE K.O. DRUM HOLD LTCS + 3mm
LTCS + 3mm
HIGH PRESSURE SUCTION DRUMS 8.6 m3 LTCS + 3mm
MEDIUM PRESSURE SUCTION DRUMS 18
LTCS + 3mm
18 -46 / 85
-46 / 85
-46 / 85
HOLD
-46 / 85
3.5 (2)15.3 m3
-46 / 85
-46 / 85
LTCS + 3mm
Pi=19276.6 KWREFRIGERANT CONDENSER LTCS + 3mm 2819.3 MW
Pars Oil and Gas Company
Desing Temp
Remarks
Rev. No.: 0
LTCS + 3mm
Page 5 of 6
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Internals: SS (4)
Main CRITERIAREV.
Internals: SS (4)-46 / 85
ITEM Type
-46/115
DESIGNATION OF ITEM
(N)
Material
87.4 m3
Design PressureNo of Equi.
Total
(F)( C)
No of ITEM
SecondCRITERIA
Diam. L.x.I. (m)
T.L. H(m)
REFRIGERANT SURGE DRUM
18
PROPANE BOG COMPRESSOR SUCTION DRUM
RECOVERED PROPANE DRUM 9.7 m3 LTCS + 3mm 18
17.3 m3
28
7.4 m3
3.5
3.5
Pe=608 KW
3.5
NARGAN
Class: 3 Page 5 of 5
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top (°C)
(A) (B) (D) (E) ( G) (H) (I) (J) (4) (K) (L) (M)
0 147-P-101 A/B/C 3 3 19.74 bar (3) (3) Cent. Vertical Submerged
0 147-P-102 1 1 21.3 bar (3) (3) Cent. Vertical Submerged
0 147-P-103 A/B/C 3 3 19.74 bar (3) (3) Cent. Vertical Submerged
0 147-P-104 1 1 21.3 bar (3) (3) Cent. Vertical Submerged
0 147-P-106 1 1 21.6 bar (3) (3) Reciprocating
0 147-P-107 1 1 9.24 bar (3) (3) Cent. Vertical Submerged
0 147-P-108 1 1 7.6 bar (3) (3) Cent. Vertical Submerged
0 147-P-109 A/B 2 2 4.2 bar (3) (3) Centrifugal
0 147-T-101 1 1 by vendor by vendor Double wall
0 147-T-102 1 1 by vendor by vendor Double wall
0 147-X-101 1 1
-50 / 56
Refrrigerated, full containment, reinforced concrete external wall
-2/+130 mbarg+ full of water
No of Equi. Total
(F)
Pe=812 KW
by vendor
Pe=4.1 KW
-50 / 55 Pe=287 KW
No of ITEM
-2/+130 mbarg+ full of water
TANK AREA DRAIN DRUM PUMP
21 m3/hr
PROPANE CIRCULATION PUMP
PROPANE RECOVERY PUMP 2 m3/hr
PROPANE LOADING PUMPS 1250 m3/hr 25
REV. ITEM Type
-50 / 55
DESIGNATION OF ITEM
(N)( C)
Material
Page 6 of 6
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Main CRITERIA
15 m3/hr 12.1
23.5
25
28.2339 m3/hr
Pars Oil and Gas Company
Desing TempSecond
CRITERIADiam. L.x.I.
(m)T.L. H
(m) Remarks
Rev. No.: 0
Design Pressure
HOLD
Pe=13.5 KW14.8 -46 / 85
Pe=9 KW
Pe=15.8 KW
-50 / 55
-46 / 85
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc. Number : EL-1516-147-P312-001
Doc Title : EQUIPMENT LIST FOR PROPANE STORAGE AND EXPORT ( UNIT 147 )
Pe=812 KW-50 / 55
Pe=287 KW-50 / 55
RECOVERED PROPANE TRANSFER PUMP 52.2 m3/hr
PROPANE STORAGE TANKSworking capacity
45000m4 by vendor
LPG TANK FLARE PACKAGE
PROPANE STORAGE TANKSworking capacity
45000m3
PROPANE CIRCULATION PUMP 339 m3/hr 28.2
22.7
-46 / 85
-46 / 85
1250 m3/hrPROPANE LOADING PUMPS
REFRIGERATION AREA DRAIN DRUM PUMP
NARGAN
148-P-101 A/B/C148-P-102148-P-103 A/B/C148-P-104148-T-101148-T-102
Butane Storage TankButane Storage Tank
Butane Loading PumpsButane Circulating PumpButane Loading PumpsButane Circulating Pump
ITEM LIST
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.Page 4 of 5
Common to Phasees 15 &16
High Pressure Butane ChillerMedium Pressure Butane ChillerButane Circulation Subcooler
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Pars Oil and Gas Company
Doc. Number : EL-1516-148-P312-001Rev. No.: 0
Class: 3
Doc Title : EQUIPMENT LIST FOR BUTANE STORAGE AND EXPORT( UNIT 148 )
148-E-101148-E-102148-E-103
NARGAN
Class: 3 Page 5 of 5
ShellCasing
TubeImpeller
ShellIn/Btm(bar g)
TubeOut/Top (bar g)
ShellIn/Btm(°C)
TubeOut/Top (°C)
(A) (B) (D) (E) ( G) (H) (I) (J) (4) (K) (L) (M)
0 148-E101 1 1 HOLD LTCS+3mm LTCS+3mm 18 24 -46 / 55 -15 / 55 HOLD
0 148-E102 1 1 HOLD LTCS+3mm LTCS+3mm 18 24 -46 / 55 -15 / 55 HOLD
0 148-E103 1 1 HOLD LTCS+3mm LTCS+3mm 18 24 -46 / 55 -29 / 55 HOLD
0 148-P-101 A/B/C 3 3 18.94 bar (3) (3)Centr, Vertical
Submerged
0 148-P-102 1 1 19.2 bar (3) (3)Centr, Vertical
Submerged
0 148-P-103 A/B/C 3 3 18.94 bar (3) (3)Centr, Vertical
Submerged
0 148-P-104 1 1 19.2 bar (3) (3)Centr, Vertical
Submerged
0 148-T-101 1 1 by vendor by vendor Double wall
0 148-T-102 1 1 by vendor by vendor Double wall
-2/+130 mbarg+ full of water
Butane Loading Pumps
Butane Circulating Pump 718 m3/hr 25.6
( C)
No of ITEM
2227 KW
25.6718 m3/hr
SecondCRITERIA
Diam. L.x.I. (m)
T.L. H(m)
Main CRITERIAREV.
-15 / 55
ITEM DESIGNATION OF ITEM
Design PressureNo of Equi.
Total
(F)
Material
-2/+130 mbarg+ full of water
(N)
Page 5 of 5
This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.
Pars Oil and Gas Company
Desing Temp
Remarks
Rev. No.: 0
Type
Design case : HOLDINGHigh Pressure Butane Chiller 634 KW
Pe=822 KW25.31250 m3/hr
Design case : HOLDINGButane Circulation Subcooler
-46 / 55Butane Circulating Pump
Pe=548 KW
-46 / 55 Pe=822 KW
-46 / 55
-46 / 55
Butane Loading Pumps 1250 m3/hr 25.3
Pe=548 KW
Butane Storage Tank by vendor
Butane Storage Tank by vendor
South Pars Gas Field Development Phases 15&16 Onshore Facilities
Doc. Number : EL-1516-148-P312-001
Doc Title : EQUIPMENT LIST FOR BUTANE STORAGE AND EXPORT ( UNIT 148 )
Design case : HOLDING
working capacity
35000 m3
Refrigerated, full containment, reinforced concrete external
wall
-15 / 55
Medium Pressure Butane Chiller 995 KW
NARGAN