Memorandum
To: John Stapleton (PIVOT)
From: Evan Garich, Kyle Romney
Date: April 21, 2016
Subject: Geotechnical Investigation for the LTD Glenwood Facility Bus Lot Expansion & Facilities Management Crew Space, Glenwood, Oregon
This memorandum describes the geotechnical investigation, infiltration and laboratory test results, and final design recommendations pertaining to the Lane Transit District (LTD) Glenwood Facility Bus Lot
project site, located at 3500 East 17th Avenue, Eugene, OR, and is intended to be used to supplement previous geotechnical investigations (Attachment E):
“Foundation Investigation Proposed Bus Maintenance and Operations Facility Lane Transit
District Eugene, Oregon” dated March 6, 1987; performed by L.R. Squire Associates “Geotechnical Evaluation Update LTD Fleet Building Remodel-Expansion Eugene, Oregon” dated
April 1, 2009; performed by Professional Service Industries (PSI)
PROJECT INFORMATION
On Friday, February 12, 2016, a geotechnical site investigation was conducted in the proposed facilities
expansion area (unpaved) on the east side of the LTD Glenwood Facility. Dan J Fischer Excavating was the on-site contractor who performed the test pit excavations. Test pits were advanced with a rubber tracked Hitachi EX30 mini excavator. Kyle Romney was the on-site representative for WSP | Parsons
Brinckerhoff (PB) logging soil stratigraphy, soil samples, and performing infiltration tests. A total of four (4) test pits and four (4) infiltration tests were performed. Carlson Testing was used to perform laboratory tests on soil samples (Attachment C).
TEST PITS
Test pit locations are shown in Attachment A. Test pits generally had a similar soil stratigraphy consisting of the following layers (from top to bottom):
a) Topsoil (1” thick)
b) Clayey gravel fill (1 to 1.5 feet thick) c) Soft to stiff, gray, clayey silt to silty clay (0.5 feet thick) d) Stiff, brown, silt (1 to 2 feet thick)
e) Gravel (>3 feet thick)
Test pits were excavated to approximate depths of 7 feet at TP-1 and TP-3 and 2.5 feet at TP-2 and TP-4; all terminating at or within the gravel layer with the exception of TP-2 which terminated in the silt layer.
Ground water was encountered at a depth of 7 feet at TP-1 and TP-3, at which point excavation stopped
2
because the sides of the gravel layer were caving at a rate faster than the material could be removed.
Test pit logs are provided in Attachment B.
INFILTRATION
Infiltration tests were performed at each of the test pit locations at a depth of 2.5 feet with the exception of
TP-3 being performed at 3.5 feet. Tests were performed in the gravel layer at TP-1 and TP-4 and the silt
layer at TP-2 and TP-3. The EPA falling head percolation test procedure (EPA, 1980) methodology was
followed for each infiltration test, per Surface Infiltration Facility Requirements from the City of Springfield
Storm Water Design Standards. Infiltration tests in the gravel layer had a measured average infiltration
rate of 148 inches per hour. Infiltration tests in the stiff, silt layer had a measured average infiltration rate
of 6.5 inches per hour. The Surface Infiltration Facility Requirements from the City of Springfield Storm
Water Design Standards specify a minimum factor of safety of two and limit the design infiltration rate to
10 inches per hour. The recommended design infiltration rate is 10 inches per hour for the gravel layer
and 3.25 inches per hour for the silt layer. Infiltration test logs are provided in Attachment B. It should be
noted that ponding on the ground surface was prevalent across the site due to recent storm events.
CONCLUSIONS AND RECOMMENDATIONS
After reviewing the previous geotechnical investigation reports by L.R. Squire Assoc. and PSI, it is our
opinion that the previous conclusions and recommendations are applicable, excluding seismic design
factors (provided below), to the proposed Bus Lot Expansion and construction of the Facilities
Management Crew Space assuming the site plan and design loads do not change significantly from the
current design. Additionally, we recommend that all foundation excavations be monitored and examined
by a qualified geotechnical engineer to document competent foundation soil material is indeed present.
Seismic Design Recommendations
The USGS seismic design maps tool was employed, using ASCE 7-10 (with 2013 errata), and the below
seismic design parameters are recommended for building design at the LTD Glenwood Facility. Site
Class D – “Stiff Soil” was selected based on the available information provided in the geotechnical
investigations. These parameters incorporate the potential known sources that could induce ground
shaking at the project site. The report created from the USGS seismic design maps tool is provided in
Attachment D.
Ss = 0.751 g
S1 = 0.395 g
PGA = 0.361 g
Seismic Design Category = D
3
ATTACHMENTS
Attachment A – Site Layout Plan View
Attachment B – Test Pit Logs and Infiltration Test Field Measurements and Calculations
Attachment C – Soil Sample Laboratory Test Report
Attachment D – USGS Seismic Design Map Report
Attachment E – Previous Geotechnical Investigation Reports
REFERRENCES
Design Manual – Onsite Wastewater Treatment and Disposal Systems, EPA, 1980
City of Springfield Storm Water Design Standards, 2012
4
ATTACHMENT A – SITE LAYOUT PLAN VIEW
C3
K:\8
049
2 LT
D F
M C
RE
W S
PA
CE
\CA
DD
\DR
AW
ING
-SE
T\S
ITE
-PLA
N.D
WG
2/2
9/2
016
5:0
3 P
MS
CA
LE O
F 1
1X
17
SH
EE
TS
IS
HA
LF O
F S
CA
LE IN
DIC
AT
ED
PR
OJE
CT
NO
:
DA
TE
:
DR
AW
N:
CH
EC
KE
D:
RE
VIS
ION
S:
11
22
LA
NE
TR
AN
SIT
DIS
TR
ICT
PR
ELI
MIN
AR
Y P
LAN
SE
T
FM
CR
EW
SP
AC
E
PRELIMINARYNOT FOR
CONSTRUCTION
6.2
6.2
015
SIT
E P
LAN
AR
O
BC2
AC2
5
ATTACHMENT B – TEST PIT LOGS AND INFILTRATION TEST FIELD MEASUREMENTS AND CALCULATIONS
PROJECT:
0.0 TOPSOILCLAYEY GRAVEL with COBBLES (GC) brown, moist, fine to coarse gravel, up to 6" cobbles, clasts are subrounded to rounded, iron oxide staining (fill)
0.5
1.0
SILTY GRAVEL with SAND (GM) gray, moist, loose, some sand, 3/4" gravel clasts, trace claySILTY CLAY to CLAYEY SILT (ML-CL)
1.5 gray, moist, soft to stiffSILT (ML) brown, moist, stiff, some fine sand
2.0
2.5POORLY GRADED GRAVEL with SAND (GP) Infiltration Test performed @ 2.5 feet brown, moist, med dense, fine to coarse gravel, up to 6" cobbles, clasts are subrounded to rounded
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0 Bottom of excavation @ 7 feet. GWT encountered @ 7 feet
LTD FMCS LOCATION: Eugene, OR
CONTRACTOR:
WATER LEVELS: 2/12/2016 09:00START:
EQUIPMENT: Hitachi EX30 mini excavator
7 feet
TEST PIT LOG
TP-1 BORING NUMBER: PROJECT NUMBER:
OF180492B 1SHEET
REMARKS
2/12/2016 10:11END: K. RomneyLOGGER:
Dan J. Fischer Excavating, Inc., Banks, ORELEVATION: n/a
3
Gra
b
2
Gra
b
1
Gra
b
DE
PT
H B
EL
OW
S
UR
FA
CE
(ft)
DESCRIPTION
LO
CA
TIO
N
NU
MB
ER
TY
PE
SAMPLE
PROJECT:
0.0 TOPSOILCLAYEY GRAVEL with COBBLES (GC) brown, moist, fine to coarse gravel, up to 6" cobbles, clasts are subrounded to rounded, iron oxide staining (fill)
0.5
1.0SILTY GRAVEL with SAND (GM) gray, moist, loose, some sand, 3/4" gravel clasts, trace claySILTY CLAY to CLAYEY SILT (ML-CL) gray, moist, soft to stiff
1.5 SILT (ML) brown, moist, stiff, some fine sand
2.0
2.5Infiltration Test performed @ 2.5 feetBottom of excavation @ 2.5 feet
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
Eugene, OR
CONTRACTOR: Dan J. Fischer Excavating, Inc., Banks, OR
PROJECT NUMBER: BORING NUMBER: SHEET
80492B TP-2 1 OF 1
TEST PIT LOG
3
Gra
b
2/12/2016 10:20 END: 2/12/2016 12:15
DESCRIPTION
SAMPLE
REMARKS
LO
CA
TIO
N
WATER LEVELS: START:
2
Gra
b
ELEVATION: n/a
LTD FMCS
EQUIPMENT: Hitachi EX30 mini excavator
Not encountered
LOCATION:
1
Gra
b
NU
MB
ER
TY
PE
LOGGER: K. Romney
DE
PT
H B
EL
OW
S
UR
FA
CE
(ft)
PROJECT:
0.0 TOPSOILCLAYEY GRAVEL with COBBLES (GC) brown, moist, fine to coarse gravel, up to 6" cobbles, clasts are subrounded to rounded, iron oxide staining (fill)
0.5
1.0
1.5
2.0SILTY GRAVEL with SAND (GM) gray, moist, loose, some sand, 3/4" gravel clasts, trace claySILTY CLAY to CLAYEY SILT (ML-CL) gray, moist, soft to stiff
2.5 SILT (ML) brown, moist, stiff, some fine sand Infiltration Test performed @ 2.5 feet
3.0
3.5
4.0
4.5POORLY GRADED GRAVEL with SAND (GP) brown, moist, med dense, fine to coarse gravel, up to 6" cobbles, clasts are subrounded to rounded
5.0
5.5
6.0
6.5
7.0 Bottom of excavation @ 7 feet. GWT encountered @ 7 feet
PROJECT NUMBER: BORING NUMBER: SHEET
80492B TP-3 1 OF 1
TEST PIT LOG
REMARKS
LO
CA
TIO
N
WATER LEVELS: START:
LTD FMCS
EQUIPMENT: Hitachi EX30 mini excavator
ELEVATION: n/a
4
Gra
b
3
Gra
b2
Gra
b
1
Gra
b
NU
MB
ER
TY
PE
2/12/2016 10:54
DE
PT
H B
EL
OW
S
UR
FA
CE
(ft)
DESCRIPTION
SAMPLE
7 feet
LOCATION: Eugene, OR
CONTRACTOR: Dan J. Fischer Excavating, Inc., Banks, OR
END: 2/12/2016 12:43 LOGGER: K. Romney
PROJECT:
0.0 TOPSOILCLAYEY GRAVEL with COBBLES (GC) brown, moist, fine to coarse gravel, up to 6" cobbles, clasts are subrounded to rounded, iron oxide staining (fill)
0.5
1.0
SILTY GRAVEL with SAND (GM) gray, moist, loose, some sand, 3/4" gravel clasts, trace claySILTY CLAY to CLAYEY SILT (ML-CL)
1.5 gray, moist, soft to stiffSILT (ML) brown, moist, stiff, some fine sand
2.0
2.5POORLY GRADED GRAVEL with SAND (GP) Infiltration Test performed @ 2.5 feet brown, moist, med dense, fine to coarse gravel, up to 6" cobbles, clasts are subrounded to rounded Bottom of excavation @ 2.7 feet
3.0
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
PROJECT NUMBER: BORING NUMBER: SHEET
80492B TP-4 1 OF 1
TEST PIT LOG
REMARKS
LO
CA
TIO
N
WATER LEVELS: START:
LTD FMCS
EQUIPMENT:
ELEVATION: n/a
Gra
b
4
2
Gra
b
3
Gra
b
NU
MB
ER
TY
PE
1
Gra
b
2/12/2016 12:17
DE
PT
H B
EL
OW
S
UR
FA
CE
(ft)
DESCRIPTION
SAMPLE
Not encountered
LOCATION: Eugene, OR
CONTRACTOR: Dan J. Fischer Excavating, Inc., Banks, OR
END: 2/12/2016 12:31 LOGGER: K. Romney
Infiltration Test Field Measurments and Calculations 1 of 1
Location Test # Time
Time
interval
(min)
Measurement
(feet)
Drop in
Water
Level (ft)
Infiltration
Rate (in/hr)
Average
Infiltration
Rate (in/hr)
TP‐1 1 9:37 AM 3.10
9:38 AM 0:01 3.70 0.60 432.0
9:39 AM 0:01 3.87 0.17 122.4
2 9:41 AM 3.35
9:42 AM 0:01 3.70 0.35 252.0
9:43 AM 0:01 3.87 0.17 122.4
3 9:46 AM 3.05
9:47 AM 0:01 3.55 0.50 360.0
9:48 AM 0:01 3.75 0.20 144.0
4 9:51 AM 3.15
9:52 AM 0:01 3.51 0.36 259.2
9:53 AM 0:01 3.70 0.19 136.8
9:54 AM 0:01 3.87 0.17 122.4 127.8
TP‐2 1 11:03 AM 2.58
11:13 AM 0:10 2.83 0.25 18.0
11:23 AM 0:10 2.98 0.15 10.8
11:36 AM 0:13 3.17 0.19 10.5
11:46 AM 0:10 3.29 0.12 8.6
11:55 AM 0:09 3.39 0.10 8.0
12:05 PM 0:10 3.48 0.09 6.5 6.5
TP‐3 1 11:05 AM 4.98
11:15 AM 0:10 5.13 0.15 10.8
11:25 AM 0:10 5.15 0.02 1.4
11:36 AM 0:11 5.20 0.05 3.3
11:47 AM 0:11 5.23 0.10 6.5
11:57 AM 0:10 5.26 0.11 7.9
12:07 PM 0:10 5.29 0.09 6.5 6.5
TP‐4 1 12:20 PM 3.30
12:21 PM 0:01 3.70 0.40 288.0
12:21 PM 0:00 3.80 0.10 144.0
2 12:22 PM 3.25
12:23 PM 0:01 3.60 0.35 252.0
12:24 PM 0:01 3.90 0.30 216.0
3 12:25 PM 2.80
12:26 PM 0:01 3.45 0.65 468.0
12:27 PM 0:01 3.65 0.20 144.0 168.0
6
ATTACHMENT C – SOIL SAMPLE LABORATORY TEST REPORT
7
ATTACHMENT D – USGS SEISMIC DESIGN MAP REPORT
8
ATTACHMENT E – PREVIOUS GEOTECHNICAL INVESTIGATION REPORTS