14.1.1
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15
1 Dallirajahara-Jagdalpur (235 km) Cap. 5,00
EBR 20,00,00
2 Wadsa-Gadchiroli (49.5 km) Cap. 4,00,00
EBR 10,00,00
3 Raigarh (Mand Colliery) - Bhupdeopur (63 km) EBR 1,00
4 Gevra Road - Pendra Road (121.70 km) EBR 1,00
5 Barwadih - Chirmiri (182 km) Cap. ..
6 Raipur - Jharsuguda (310 km) Cap. ..
TOTAL-WORKS IN PROGRESS Cap. 4,05,00
EBR 30,02,00
TOTAL-New Lines (Construction) Cap. 4,05,00
EBR 30,02,00
7 Jabalpur-Gondia incl. Balaghat-Katangi (285 km) Cap. 100,10,00
C.Fund ..
8 Chhindwara-Nagpur (149.522 km) Cap. 124,38,37
9 Chhindwara-Mandla Fort (182.25 km) Cap. 31,99,62
10 Nagbhir - Nagpur (106 km) Cap. 1
TOTAL-WORKS IN PROGRESS Cap. 256,48,00
TOTAL-Gauge Conversion Cap. 256,48,00
11 Bilaspur-Urkura (110 km) Cap. ..
C.Fund ..
Dep(RVN) 8,95,00
12 Bilaspur-Salka Road - Patch doubling (39.4 km) Cap. 2,46,47
EBR ..
13 Salka Road-Khongsara - Patch doubling (26 km) Dep(RVN) 10,89,00
14 Khodri-Anuppur, with flyover at Bilaspur (61.6 km) C.Fund ..
Dep(RVN) 10,00,00
15 Champa - Bypass line Cap. 2,29,24
16 Kalumna-Nagpur Cap. 3,31,29
17 Champa-Jharsuguda - 3rd line (165 km) Cap. 149,00,00
EBR ..
18 Durg-Rajnandgaon - 3rd line Cap. 20,00,00
TOTAL-WORKS IN PROGRESS Cap. 177,07,00
Dep(RVN) 29,84,00
TOTAL-Doubling Cap. 177,07,00
Dep(RVN) 29,84,00
AllocationParticulars
NEW LINES (CONSTRUCTION)
A - Works in Progress
GAUGE CONVERSION
A - Works in Progress
DOUBLING
A - Works in Progress
![Page 2: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/2.jpg)
14.1.2
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
19 Itwari - Addl loop lines (2 Nos) Cap. 35,40
20 Badhwabara - Conversion of stabling line into running line Cap. ..
21 Bakal - Conversion of C-class station into B-class with 4 lines Cap. 1,32,64
22 Gondia Yard - Crossover at Nagpur end to connect Chanda Fort grid DF(3) 1,49,35
23 Ib - Fly-over Cap. 42,00
24 Baraduar - Long loop line DF(3) 20,00
25 Brajrajnagar & Belpahar - Connectivity with Belpahar Open Coal Mines group
sidings
Cap. 20,00
26 Raygad - Extension of shunting neck DF(3) 1,36,50
27 Kothari Road - Long loop line DF(3) ..
28 Dumrikhurd-Ramtek - Extension of overhead equipment DF(3) 1,08,55
29 Kalumna - Goods shed line DF(3) 2,70,97
30 Shahdol - Long loop line DF(3) ..
31 Silyari - Long loop line DF(3) ..
32 Hathbandh - Long loop line DF(3) 2,73,25
33 Salwa - Long loop line DF(3) ..
34 Koka - Long loop line DF(3) ..
35 Jharridih - Addl loop line DF(3) ..
36 Parmalkasa - Conversion of C-class station to B-class DF(3) ..
37 Uslapur - Development as model goods shed DF(3) 43
38 Salwa - Conversion of C-class station into B-class with 4 lines Cap. ..
39 Bhilai - Electrification of Jamul Cement Works siding incl. yard DF(3) ..
40 Gondia-Nagpur - Automatic signalling Cap. 14,50,00
EBR ..
41 Anuppur-Katni - Intermediate block section Cap. 1,20,00
42 Mandir Hassaud - Electrification incl. yard Cap. ..
C.Fund ..
43 Kharsia - Conversion of stabling line into down loop DF(3) 35
44 Rupaund - Addl common loop to serve new goods shed Cap. 48,21
45 Mandhar - New goods terminal Cap. 88,39
46 Silyari - Addl loop DF(3) ..
47 Mudaria - Addl loop Cap. 22,80
48 Kirodimalnagar - Remodeling for dealing with addl traffic of Jindal Steel Plant Ltd
siding
Cap. 1,09
49 Bhupdeopur - Remodelling for dealing with new private sidings Cap. 2,11
EBR ..
50 Bilaspur Division - Intermediate block signalling (8 locations) DF(3) ..
51 Durg - Development of goods shed by common loop (line No 10) and better
unloading facilities
Cap. 27,98
TRAFFIC FACILITIES-YARD REMODELLING & OTHERS
A - Works in Progress
![Page 3: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/3.jpg)
14.1.3
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
52 Bhilai - Addl. freight maintenance depot at coal empty yard with three examination
lines and one shunting neck of full length
Cap. 4,00,09
EBR ..
53 Rasamara - Down loop Cap. 22,59
54 Bhilai (Exchange Yard) - Remodelling with two addl lines by extension of dead
end
Cap. 1,57,06
55 Himgir - Addl down loop Cap. 1,07,67
56 Jamga - Yard remodelling Cap. 3,83,77
57 Ib - Addl up loop Cap. 79,20
58 Saragbundia - Conversion of goods shed siding into up loop cum down reception
line
Cap. 68,03
59 Tilda - Augmentation / improvement / addition of goods shed Cap. 69,20
60 Mudaria - Addl down loop Cap. ..
61 Bilaspur Division - Siding for stabling track machines (9 stations) DF(3) 57,00
62 Nagpur Division - Siding for track machines (6 stations) DF(3) 29,00
63 Kamptee - Addl up loop Cap. 2,10,26
64 Baradaur - Addl up loop Cap. 2,91,74
65 Maroda - New exchange yard for addl traffic of Bhilai Steel Plant Cap. 3,26,62
66 Kotarlia - Conversion of up loop into common loop Cap. 55,95
67 Works costing below Rs.2.5 crore each Cap. 59,20
DRF 18,25
DF(1) 11,17
DF(3) 10,27,42
TOTAL-WORKS IN PROGRESS Cap. 42,22,00
DRF 18,25
DF(1) 11,17
DF(3) 20,72,82
68 Works costing below Rs.2.5 crore each Cap. ..
DRF ..
DF(1) ..
DF(3) ..
TOTAL-NEW WORKS Cap. ..
DRF ..
DF(1) ..
DF(3) ..
TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 42,22,00
DRF 18,25
DF(1) 11,17
DF(3) 20,72,82
TRAFFIC FACILITIES-YARD REMODELLING & OTHERS
B - New Works
![Page 4: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/4.jpg)
14.1.4
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
69 South East Central Railway - Extension of unreserved ticketing system to E-
category stations
DF(1) 1,00
70 South East Central Railway - Extension of automatic ticket vending machines Cap. 50,00
71 Bilaspur - Upgradation of infrastructure of zonal information technology centre DF(3) 13,09
72 Works costing below Rs.2.5 crore each DRF 3,17,00
DF(1) 41,17
DF(3) ..
TOTAL-WORKS IN PROGRESS Cap. 50,00
DRF 3,17,00
DF(1) 42,17
DF(3) 13,09
73 Works costing below Rs.2.5 crore each DRF ..
DF(1) ..
DF(3) ..
TOTAL-NEW WORKS DRF ..
DF(1) ..
DF(3) ..
TOTAL-Computerisation Cap. 50,00
DRF 3,17,00
DF(1) 42,17
DF(3) 13,09
74 Leased Assets - Payment of Capital component of lease charges to Indian
Railway Finance Corporation
C.Fund 252,89,00
TOTAL-WORKS IN PROGRESS C.Fund 252,89,00
TOTAL-Leased Assets - Payment of Capital Component C.Fund 252,89,00
75 Bilaspur, Nagpur & Raipur - Interlocking of level crossing gates (9, 7 & 4 Nos
respectively)
S.Fund 1,42,00
76 Champa-Korba - Elimination of all level crossing gates by grade separators S.Fund ..
77 Bilaspur Division - Manning of level crossings (15 Nos) S.Fund 10
78 South East Central Railway - Manning of unmanned level crossings (140 Nos) S.Fund 26,62
79 Works costing below Rs.2.5 crore each S.Fund 18,31,21
TOTAL-WORKS IN PROGRESS S.Fund 19,99,93
80 Works costing below Rs.2.5 crore each S.Fund ..
TOTAL-NEW WORKS S.Fund ..
TOTAL-Road Safety Works-Level Crossings. S.Fund 19,99,93
COMPUTERISATION
A - Works in Progress
B - New Works
LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT
A - Works in Progress
ROAD SAFETY WORKS-LEVEL CROSSINGS.
A - Works in Progress
B - New Works
![Page 5: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/5.jpg)
14.1.5
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
81 Saraswati Nagar-Sarona - Limited height subway at level crossing No.420 S.Fund 1,11
82 Durg-Dallirajhara - Road over & under bridge at level crossing No.DD-10 S.Fund ..
EBR ..
83 Bilaspur-Katni - Road over & under bridge / limited height subway in lieu of level
crossing No.BK-66
S.Fund 10,00
EBR ..
84 Bilaspur Yard - Limited height subway on multi line section in lieu of
Chuchiyapara level crossing gate No.365
S.Fund 4,70
EBR ..
85 Bilaspur Yard - Road over bridge in lieu of level crossing No.366 at Tarbahar
Naka
S.Fund ..
EBR ..
86 Bhilai-Durg - Limited height subway near level crossing No.443 (Nehru Nagar
Gate)
S.Fund 1,21
87 Raipur Naka - Limited height subway in lieu of level crossing No.444 S.Fund ..
88 Kanhan-Ramtek & Tumsar road-Tirodi - Limited height subways in lieu of level
crossings (6 Nos)
S.Fund 10
89 Nainpur-Chhindwara - Limited height subways by open cut method at unmanned
level crossings (20 Nos)
S.Fund 75
90 Bhilai - Full height subway in lieu of level crosing No.439 (Sirsa Gate) S.Fund ..
EBR ..
91 Chhindwara-Nagpur - Limited height subways by open cut method at unmanned
level crossings (40 Nos)
S.Fund 10,09,67
92 Naila-Champa - Road under bridge in lieu of level crossing No.339 & 340 S.Fund 15,00
93 Amlai-Burhar - Repl of road over bridge No.BK-103/up & down S.Fund 5
94 Balaghat-Nainpur - Limited height subways by open cut method at unmanned
level crossings (27 Nos)
S.Fund ..
95 Gondia-Nagbhir - Limited height subway in lieu of level crosings (9 Nos) S.Fund 10
96 Nainpur-Jabalpur - Limited height subways by open cut method at unmanned
level crossings (13 Nos)
S.Fund 43,53
97 Mandhar-Urkura - Limited height subway in lieu of level crosing No.413 S.Fund ..
EBR ..
98 Nainpur-Mandla Fort - Limited height subways by open cut method at unmanned
level crossings (15 Nos)
S.Fund 30,00
99 Tenganmada-Khongsara - Limited height subway in lieu of level crosing No.BK-30 S.Fund 40,00
100 Gondia-Balaghat - Limited height subways by open cut method at unmanned level
crossings (24 Nos)
S.Fund ..
101 Sarona-Kumhari - Full height subway in lieu of level crosing No.429 S.Fund ..
EBR ..
102 Bramapuri-Chanda Fort - Limited height subways by open cut method at
unmanned level crossings (25 Nos)
S.Fund 8,00,00
103 Durg Yard - Full height subway in lieu of level crosing No.445 S.Fund ..
EBR ..
ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
A - Works in Progress
![Page 6: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/6.jpg)
14.1.6
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
104 Kanhan-Koradih - Limited height subways by open cut method at unmanned level
crossings (5 Nos)
S.Fund ..
105 Bhilai Nagar-Durg Link Block - Road over bridge in lieu of level crossing No.443
(Nehru Nagar)
S.Fund ..
EBR ..
106 Bilaspur-Katni - Road over & under bridge in lieu of level crossing No.BK-37 near
Gourela
S.Fund ..
EBR ..
107 Marauda-Risama - Road under bridge in lieu of level crossing No.DD-12 S.Fund 3,24
108 Gunderdehi-Latabor - Road under bridge in lieu of level crossing No.DD-36 S.Fund 3,24
109 Gunderdehi-Latabor - Road under bridge in lieu of level crossing No.DD-44 S.Fund 3,24
110 Balod-Kusumkasa - Road under bridge in lieu of level crossing No.DD-54 S.Fund 3,24
111 Kusumkasa-Dallirajhara - Road under bridge in lieu of level crossing No.DD-59 S.Fund 3,24
112 Kusumkasa-Dallirajhara - Road under bridge in lieu of level crossing No.DD-60 S.Fund 3,24
113 Kotma Yard - Road under bridge in lieu of level crossing No.AB-10 (Traffic) S.Fund 96,05
114 Parmalkasa-Rajnandgaon - Road under bridge in lieu of level crossing No.458 S.Fund ..
EBR ..
115 Saraswatinagar-Sarona - Full height subway in lieu of level crossing No.421
(Dumartalab Gate)
S.Fund ..
EBR ..
116 Dadhapara-Belha - Limited height subway in lieu of level crossing No.372 S.Fund 50,00
EBR ..
117 Bilaspur-Durg - Limited height subway in lieu of level crossing near G-cabin S.Fund 42
118 Bhilai Power House-Bhilainagar - Road over & under bridge in lieu of manned
level crossing No.442 (Supela Gate)
S.Fund ..
EBR ..
119 Champa-Korba - Elemination of all level crossings by grade seperators S.Fund ..
120 Bijuri Yard - Road over bridge in lieu of level crossing No.AB-18 S.Fund 21
121 Kotma-Bhaiatola - Road over bridge for closure of level crossing No.AB-11
(Traffic)
S.Fund 75,00
122 Akaltara - Road over bridge in lieu of level crossing No.353 S.Fund 2,60,69
EBR ..
123 Uslapur - Road over bridge in lieu of level crossing No BK-4 S.Fund ..
EBR ..
124 Raigarh-Kotarlia - Road over bridge at level crossing No.288 S.Fund ..
EBR ..
125 Tumsar - Road over bridge in lieu of level crossing No 532 S.Fund ..
EBR ..
ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
![Page 7: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/7.jpg)
14.1.7
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
126 Champa-Naila - Road over bridge in lieu of level crossing No 342 (Khoksa level
crossing)
S.Fund 4,51
EBR ..
127 Champa Yard - Road over & under bridge in lieu of level crossing No 337 S.Fund ..
EBR ..
128 Raipur-Baloda Bazar Road - Road over bridge at level crossing No.RV-5 S.Fund ..
EBR ..
129 Raigarh - Road over bridge in lieu of level crossing at km 588/13-15 S.Fund ..
EBR ..
130 Bilaspur-Gatora - Road over bridge in lieu of level crossing No.364 S.Fund 2,44,32
EBR ..
131 Ranisagar Railway - Road over bridge at level crossing at km 615/11-13 S.Fund ..
EBR ..
132 Tilda-Simga - Road under & over bridge at level crossing No.397 near Tilda
crossing (national highway No.37)
S.Fund 75,05
EBR ..
133 Bilaspur Yard Tarbahar - Normal height subway on multi line section level
crossing
S.Fund 7,08,95
134 Dadhapara-Belha - Road over & under bridge at level crossing No.370 S.Fund 9,44
EBR 3,30,00
135 Raipur Division - Road under bridge near H-cabin in lieu of level crossing No.433
& 434
S.Fund 42
136 Raipur-Titlagarh - Limited height subways in lieu of level crossing Nos.RV-4, RV-
15 & RV-19
S.Fund 42
137 Works costing below Rs.2.5 crore each S.Fund 52,36,78
TOTAL-WORKS IN PROGRESS S.Fund 87,37,92
EBR 3,30,00
138 Unchibit - Road over bridge in lieu of level crossing No.293 S.Fund ..
EBR ..
139 Works costing below Rs.2.5 crore each S.Fund ..
TOTAL-NEW WORKS S.Fund ..
TOTAL-Road Safety Works-Road Over/Under Bridges. S.Fund 87,37,92
EBR 3,30,00
140 Durg-Nagpur - TRR(P) - 71.94 km DRF 6,95,93
141 Durg-Nagpur - TRR(P) - 4.91 km DRF 64,16
142 Durg-Nagpur - SEJs (73 sets) DRF 79,04
143 Durg-Nagpur - TWR - 41.10 km DRF 35,74
144 Durg - Kachewani - TFR - 55 km DRF 50,00
145 Anuppur-Katni - TWR - 44.56 km DRF 60,00
ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.
B - New Works
TRACK RENEWALS
A - Works in Progress
![Page 8: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/8.jpg)
14.1.8
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
146 Jharsuguda-Nagpur - Complete renewal of switches & crossings with thick web
switches & weldable CMS crossings on PSC layouts (200 sets)
DRF 9,62,21
147 Jharsuguda - Ib - Through Rail Renewal (Primary) - 7.02 km DRF 4,50,50
Complete Track Renewal
148 Jharsuguda - Bilaspur - CTR(P) - 4.58 km DRF 50,00
149 Anuppur - Boridand - TRR(S) & TSR(P) - 3.65 km each DRF 50,00
150 Motibagh Yard - TRR(S) & TSR(P) - 2.75 km each DRF 63,30
151 Raipur Store Depot - TRR(S) & TSR(P) - 14.98 km each DRF 1,57,68
152 Kotma & Govinda Sidings - CTR(S) - 3.50 km DRF 10,00
153 Bhilai Marshalling Yard - CTR(S) - 19.50 km DRF 4,03,55
154 Nowrozabad & Burhar (Assisted Sidings) - CTR(S) - 6.66 km DRF 50,00
155 Raipur Stores Depot Yard - CTR(S) - 11.73 km DRF 1,00,50
R.
156 Bilapsur - Durg - CTR - 8.15 km (P) DRF 47,33
157 Bhilai Marshalling Yard - CTR - 15 km (S) DRF 13,27
158 Bilaspur Yard Bypass Line - CTR - 2.7 km & TSR - 1.6 km (P) DRF 90,00
R.
159 Bilaspur Yard - CTR - 5 km (S) DRF 1,22,00
160 Nagpur - Durg - CTR - 2.5 km (P) DRF 12,95
161 Durg - Nagpur - CTR - 8.95 km (S) DRF 3,95,56
162 Bhilai Marshalling Yard - CTR - 20 km (S) DRF 8,42
Through Rail Renewal
163 Annupur - Katni - TRR(P) - 16.48 km DRF 3,00,00
164 Durg - Nagpur - TRR(P) - 26.92 km DRF 1,27,50
165 Champa-Gevra Road - TRR(P) - 8.6 km DRF 3,15,00
166 Jharsuguda - Bilaspur - TRR(P) - 21 km DRF 4,72,00
167 Champa - Bilaspur - TRR(P) - 33.43 km DRF 3,00,00
168 Durg - Nagpur - TRR(P) - 35 km (Up) DRF 30,00,00
169 Durg - Nagpur - TRR(P) - 4.59 km DRF 56,57
170 Bilaspur - Champa - TRR(P) - 4 km DRF 80,00
171 Jharsuguda-Champa - TRR(P) - 7 km DRF 5,95,00
172 Champa - Gevra Road - TRR(P) - 6.95 km DRF 4,92,00
173 Bilaspur - Anuppur - TRR(P) - 4.4 km DRF 1,50,00
174 Anuppur - Katni - TRR(P) - 6.16 km DRF 90,00
175 Darekasa-Salekasa - TRR(P) - 3.04 km DRF 2,50,00
176 Mandhar-Murhipur - TRR(P) - 24.977 km DRF 11,44,14
177 Bhilai Marshaling Yard -TRR(S) -10.25 km DRF 1,86,55
178 Bilaspur Yards - TRR(S) - 7 km DRF 1,00,00
TRACK RENEWALS
![Page 9: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/9.jpg)
14.1.9
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
179 Bhilai Marshallaing Yard - TRR(S) - 13.657 km DRF 1,00
180 South East Central Railway - TRR - 10 km (P) (important & major bridges &
approaches)
DRF 2,15,00
181 Jaithari - Anuppur - TRR - 11 km (P) DRF 5,00
182 South East Central Railway - TRR on bridges & bridge approaches - 12.04 km (P) DRF 10,00
183 Jharsuguda - Raigarh - TRR - 3.19 km (P) DRF 60,00
184 Jharsuguda - Raigarh - TRR - 3.38 km (P) DRF 96,60
185 Khodri - Khongsara - Renewal of wheel burnt rail - 7 km DRF 1,20,00
186 Durg - Nagpur - TRR - 15.44 km (P) DRF 1,05,64
Through Sleeper Renewal
187 Jharsuguda - Champa - TSR (P) - 15.85 km DRF 2,42,00
188 Anuppur-Ambikapur - TSR(P) - 8 km DRF 50,00
R.
189 Champa-Gevra Road - TSR(P) - 8.5 km DRF 4,80,00
R.
190 Bilaspur-Baraduar & Khodri-Bhanwar Tonk - TSR(P) - 21.95 km DRF 1,00,00
R.
191 Boridand - Bisrampur - TSR(P) - 6 km DRF 91,00
192 Annupur - Boridand - TSR(P) - 6 km DRF 64,00
193 Darekasa-Salekasa & Paniajob-Bortalao - TSR - 9 km (P) DRF 2,05,06
R.
Ballast
194 Bilaspur - Durg - TBR - 37.97 km DRF 3,82,11
195 Champa - Korba - TBR - 36 km DRF 1,14,00
196 Gondia - Chanda Fort - TBR - 50 km DRF 1,80,72
197 Gondia-Chandafort -TBR - 34.80 km DRF 54,15
198 Champa-Gevra Road - TBR - 26 km DRF 1,00
199 Jharsuguda-Champa - TBR - 14 km (patches) DRF 40,00
R.
200 Bilaspur-Anuppur- Katni - TBR - 49.25 km DRF 2,14,00
201 Durg-Dallirajhara - TBR - 38.8 km DRF 61,07
R.
202 Bilaspur-Durg - TBR - 62.11 km DRF 5,29,79
R.
203 Gondia-Chanda Fort - TBR - 70.875 km DRF 23
R.
204 Bilaspur-Pendra Road TBR 35 km DRF 3,46
R.
205 Gevra Road-Champa - TBR - 30.68 km DRF 1,50,00
R.
TRACK RENEWALS
![Page 10: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/10.jpg)
14.1.10
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
206 Kachewani-Durg - TBR 25.35 km DRF 40,05
R.
207 Gondia-Chanda Fort - TBR - 35 km DRF 1,23,12
R.
208 Bilaspur - Champa - TBR - 35 km DRF 2,34,00
209 Champa - Jharsuguda - TBR - 56.02 km DRF 1,50,00
210 Kachewani - Durg - TBR - 49.06 km DRF 23,42
211 Nagpur - Kachewani - TBR - 70.8 km DRF 35,84
212 Kanhan - Ramtek - TBR - 24.2 km DRF 13,81
Points & Crossings
213 Anuppur - Jhalwara - TTR - 37 sets DRF 50,00
214 Champa-Gevera Road - TTR- 62 sets DRF 50,00
215 Bilaspur Yards - TTR - 38 sets DRF 4,45,00
216 Raipur Stores Depot Yard - TTR- 40 sets DRF 77,68
217 Itwari & Gondiya Yards - TTR - 50 sets DRF 2,13,34
218 Bilaspur- Durg - TTR - 100 sets DRF 4,08,81
219 Bhilai Marshalling Yard - TTR - 46 sets DRF 42,18
220 Goberwahi & Tirodi Yards - TTR - 13 sets DRF 1,01,11
221 Jharsuguda - Bilaspur - TTR - 81 sets DRF 3,73,00
222 Bhilai Marshaling Yard & Raipur Store Depot Yard - TTR - 17 sets & derailing
switches - 3 sets
DRF 41
223 Chhindwara Yard - TTR (12 sets) DRF 1,00
R.
224 Bilaspur-Jharsuguda - TTR (107 sets) DRF 50,00
225 Bilaspur-Katni & Anuppur-Ambikapur - TTR (90 sets) DRF 50,00
226 Bilaspur Division - TTR (77 sets) DRF 50,00
R.
227 Durg-Nagpur - TTR (78 sets) DRF 5,47,51
228 Bilaspur-Durg - TTR (40 sets) DRF 1,22,55
R.
229 Bilaspur-Durg - TTR (46 sets) DRF 2,15,11
230 Durg -Nagpur -TTR - 100 sets DRF 4,26,13
231 Raipur Store Depot Yard - TTR (42 Nos) DRF 21,16
R.
232 Durg-Dallirajhara - TTR (15 sets) DRF 20,51
233 Durg-Dallirajhara - TTR (72 Nos) (Changed to Bhilai marshaling yard) DRF 1,08,89
R.
234 Nagpur - Durg - Thick web switches (30 sets) DRF 1,56,69
235 Bilaspur - Durg (Loop / Yard Lines) - TTR (68 sets) DRF 44,21
TRACK RENEWALS
![Page 11: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/11.jpg)
14.1.11
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
236 Durg - Dallirajhara - TTR (60 sets) DRF ..
237 Durg - Nagpur - TTR (207 sets) DRF 1,59,66
238 Jharsuguda-Champa - Thick web switches & weldable CMS crossings (39 sets) DRF 80,00
R.
239 Bilaspur-Jharsuguda Thick web switches & weldable CMS crossings (87 sets) DRF 4,08,00
240 Jharsuguda - Champa - Thick web switches (47 sets) DRF 2,00,00
241 Champa - Gevra Road - TTR (43 sets) DRF 2,00,00
242 Champa - Korba - TTR (48 sets) DRF 1,00,00
243 Bilaspur Division - TTR (40 sets) DRF 2,83,00
244 Anuppur - Katni - TTR (38 sets) DRF 1,28,00
245 Nagpur Division - TTR (72 sets) DRF 27,70
246 Bhilai Marshalling Yard - TTR (50 sets) DRF 90,21
Others
247 Jharsuguda-Bilaspur - SEJ - 100 Ssets. (60 kg. 85 sets. & 52 kg. 15 sets.) DRF 50,00
248 Durg - Nagpur - Through renewal of guled joints - 500 sets DRF 4,46,67
249 Bilaspur-Durg - Glued joint - 400 sets DRF 3,46,75
250 Bilaspur-Durg - TWR - 73 km DRF 1,66,42
251 Jharsuguda - Bilaspur - Glued joints - 285 sets DRF 5,00
252 Bilaspur - Durg - TWR - 33.95 km DRF 72,55
253 Jharsuguda - Bilaspur - TFR - 110 km DRF 50,00
254 Gondia - Nagbhir - TFR - 60 km DRF ..
255 Bilaspur-Durg - Glued joints (2400 sets) DRF 46,50
256 Bilaspur - Durg - TFR - 80.81 km DRF 4,41,06
257 Bilaspur Division - SEJs (200 Nos) DRF 50,00
258 Bilaspur-Durg - SEJs (100 sets) DRF 49,44
259 Tumsar-Tirodi (Branch Line) - TFR - 46.60 km DRF 1,52,56
260 Champa - Gevra Road - TWR - 23.08 km DRF 50,00
261 Gondia - Chanda Fort - TFR - 45 km DRF 80,00
262 Durg - Nagpur - TWR - 64.93 km DRF 1,48,60
263 Anuppur-Katni - TFR - 113.4 km DRF 20,00
264 Durg-Nagpur - SEJ - 150 sets DRF 20,78
265 Boridand - Bisrampur - TFR - 40 km DRF 1,50,00
266 Bilaspur-Champa - TWR - 18 km DRF 50,00
267 Bilaspur-Anuppur - TWR - 22 km DRF 80,00
268 Bilaspur-Durg - TWR - 34 km DRF 22,55
269 Bilaspur-Champa - TFR - 50 km DRF 50,00
TRACK RENEWALS
![Page 12: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/12.jpg)
14.1.12
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
270 Champa-Gevra Road - TFR - 38.2 km DRF 75,00
271 Jharsuguda-Champa - TFR - 55 km DRF 50,00
272 Durg-Nagpur - TFR - 92 km Up DRF 32,84
273 Bilaspur-Durg - TFR - 130.005 km DRF 1,31,10
274 Gondia-Chanda Fort - TFR - 93.4 km DRF 10
275 Durg - Nagpur - TFR - 188 km DRF 15,00
276 Bilaspur Division - TFR - 118 km DRF 45,00
277 Bilaspur - Durg - TFR - 71 km DRF 86,94
278 Durg - Nagpur - TFR - 47.53 km DRF 1,26,69
279 Bilaspur - Durg - TWR - 42.38 km DRF 2,08
280 Jharsuguda - Bilaspur - TWR - 53 km DRF 15,00
281 Anuppur - Katni - TWR - 38.4 km DRF 55,93
282 Jharsuguda - Champa - TFR - 52.939 km DRF 75,00
283 Champa - Bilaspur - TFR - 51 km DRF 70,00
284 Champa - Bilaspur - TWR - 65 km DRF 2,35,00
285 Durg - Nagpur - TFR - 79.25 km DRF 1,33,25
286 Bilaspur - Durg - TFR - 66.102 km DRF 1,21,58
287 Bilaspur - Durg - TWR - 32.535 km DRF 63,54
288 Works costing below Rs.2.5 crore each DRF 68,64,14
TOTAL-WORKS IN PROGRESS DRF 318,25,90
Complete Track Renewal
289 Raigarh - Champa - CTR (P) - 4.88 km DRF 50,00
R.
Through Rail Renewal
290 Durg -Nagpur (up) - TRR(P) -28.259 km DRF 3,10,88
291 Jharsuguda - Champa - TRR(P) - 11.312 km DRF 75,00
292 Urkura -Sorana - TRR(P) - 7.836 km DRF 2,63,22
293 Bilaspur - Anuppur - TRR(P) - 21 km DRF 75,00
294 Works costing below Rs.2.5 crore each DRF ..
TOTAL-NEW WORKS DRF 7,74,10
TOTAL-Track Renewals DRF 326,00,00
295 South East Central Railway - Repl. of steel girders with pre-stressed concrete
slabs (22 bridges)
DRF 50,00
296 Balaghat-Katangi - Protection work of bank & abutments (bridge No.66) and
leaning abutment (bridge No.12)
DF(4) 5,00
297 Chirimiri Yard - Conversion of skew girders to multiple box (bridge No.171) (6
lines)
DF(4) 32,23
TRACK RENEWALS
B - New Works
BRIDGE WORKS
A - Works in Progress
![Page 13: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/13.jpg)
14.1.13
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
298 Bilaspur Division - Toe walls in approaches of major bridges (16 Nos) DRF 50,21
299 Dagori-Nipania - Regirdering of one girder & rectification of camber (bridge
No.462-up)
DRF ..
300 Mahendragarh-Paradol - Rebuilding (bridge No.99) DRF 44,97
301 Durg-Dallirajhara - Strengthening of bridges for 25 ton axle load DRF ..
302 Jharsuguda-Bilaspur - Jacketing of piers, abutments, foundation, repl. of bearings
for 25 ton axle load & repl.of girders (6 & 2 bridges respectively)
DRF ..
303 Bilaspur-Durg - Strengthening of bridges for 25 ton axle load DRF 40,00
304 Nagpur-Durg - Jacketing & recapping of piers & abutments (bridge No 184-up &
348)
DRF ..
305 Bilaspur Division - Jacketing & widening of abutments and piers in bridges (60
spans)
DRF 86,93
306 Bilaspur Division - Repl of girders with pre-stressed / reinforced concrete cement
slabs (97 Nos) (68 bridges)
DRF 1,20,00
307 Bilaspur - Repl of flat bearing with centralised bearing (32 bridges) DRF 1,03,00
308 Works costing below Rs.2.5 crore each Cap. ..
DRF 5,04,89
DF(2) ..
DF(4) 1,66,70
TOTAL-WORKS IN PROGRESS Cap. ..
DRF 10,00,00
DF(2) ..
DF(4) 2,03,93
309 Works costing below Rs.2.5 crore each DRF ..
TOTAL-NEW WORKS DRF ..
TOTAL-Bridge Works Cap. ..
DRF 10,00,00
DF(2) ..
DF(4) 2,03,93
310 Anuppur-Katni - Second distant signal DF(3) 2,45,00
311 Bilaspur-Anuppur & Champa-Gevra Road - 2nd distant signals DF(3) 2,50
312 Raipur Division - Dual track detection system for improving availability of block
proving by axle counters
DF(3) 73,03
313 South East Central Railway - Data loggers (A-route) DF(3) 60,00
314 Ramtek, Gobarwahi, Dongri Buzurg & Tirodi - Repl of signalling & ground gears DRF 2,25,00
315 Latia - Repl of signalling & ground gears DRF 2,50,00
316 South East Central Railway - Track circuiting fouling mark to fouling mark (17
stations) (E-route)
DF(4) 1,00
BRIDGE WORKS
B - New Works
SIGNALLING AND TELECOMMUNICATION
A - Works in Progress
![Page 14: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/14.jpg)
14.1.14
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
317 Anuppur-Katni - Optic fibre cable link of STM-I with 6-quad underground cable
(160 km)
DRF 5,00
318 Raipur (Store Depot Yard) - Repl. of lever frames & ground gears by centralised
electrical operation of points & signals (end panel)
DRF 50,00
319 South East Central Railway - Permanent way material for completion of signalling
& telecommunication work
DF(4) 1
SRSF ..
320 Anuppur-Bishrampur - Optic fibre cable with 6-quad underground cable etc. (196
rkm)
DRF 1,00,00
321 Durg-Gondia - Automatic signalling Cap. ..
322 Bilaspur Division - Repl. of lever frames & signalling gears by central panel
interlocking over single line territory (10 stations) (E-Spl route)
DRF 2,00,00
323 Harrad, Kotma, Bijuri & Boridand - Repl. of lever frames and signalling gears by
central panel interlocking (E-Spl route)
DRF 1,50,00
324 Bilaspur Division - Home to fouling mark, fouling mark to block section limit and
loop line track circuiting (15 stations)
DF(4) 60,00
325 Bhilai (Peripheral Yard) - Repl.of lever frames & ground gears by centralized
electrical operation of points & signals at ore yard
DRF 20,00
326 Bhilai Marshalling Yard - Repl. of signalling & ground gears by route relay
interlocking (K & M cabins)
DRF 2,25,00
327 South East Central Railway - Fouling mark to home & fouling mark to block
section limit track circuiting (24 stations) (E-route)
DF(4) 1,70,00
328 South East Central Railway - Isolation and alteration of signalling (7 stations) DF(4) 2,25,00
329 Works costing below Rs.2.5 crore each DRF 5,95,00
DF(1) 2,15,57
DF(3) 7,99,71
DF(4) 1,31,48
TOTAL-WORKS IN PROGRESS Cap. ..
DRF 18,20,00
DF(1) 2,15,57
DF(3) 11,80,24
DF(4) 5,87,49
329a Kanhan-Ramtek - Optic fibre cable link (23 km) and Tumsar Road-Tirodi (47 km) DF(3) 1
330 Works costing below Rs.2.5 crore each DRF ..
DF(4) ..
TOTAL-NEW WORKS DRF ..
DF(3) 1
DF(4) ..
TOTAL-Signalling and Telecommunication Cap. ..
DRF 18,20,00
DF(1) 2,15,57
DF(3) 11,80,25
DF(4) 5,87,49
SIGNALLING AND TELECOMMUNICATION
B - New Works
![Page 15: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/15.jpg)
14.1.15
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
331 South East Central Railway - Direct power supply from central generating
agencies
Cap. 5,62,85
332 Works costing below Rs.2.5 crore each DRF 1,15,00
DF(1) 8,36
DF(2) 7,96
DF(3) 65,68
TOTAL-WORKS IN PROGRESS Cap. 5,62,85
DRF 1,15,00
DF(1) 8,36
DF(2) 7,96
DF(3) 65,68
333 Works costing below Rs.2.5 crore each DRF ..
DF(1) ..
DF(2) ..
DF(3) ..
TOTAL-NEW WORKS DRF ..
DF(1) ..
DF(2) ..
DF(3) ..
TOTAL-Other Electrical Works excl TRD Cap. 5,62,85
DRF 1,15,00
DF(1) 8,36
DF(2) 7,96
DF(3) 65,68
334 Bilaspur Division - Modification of overhead equipment over main line DF(3) 1
335 Durg-Nagpur - Reliability improvement work of overhead equipment DRF 1,62,27
336 Bilaspur Division - Repl. of electrical equipment & modification of overhead
equipment
DRF 96,23
337 Himgir - New traction substation & associated 132 kv transmission line from
Orissa State Electricity Board (30 km)
DF(3) 6,69,77
338 Bilaspur Division - Repl of Scada system with updated system DRF 2,00
339 Works costing below Rs.2.5 crore each DRF 1,95,50
DF(3) 10,56
TOTAL-WORKS IN PROGRESS DRF 4,56,00
DF(3) 6,80,34
340 Bilaspur Division - Interrupters for sidings DF(3) 1
341 Works costing below Rs.2.5 crore each DRF ..
DF(3) ..
TOTAL-NEW WORKS DRF ..
DF(3) 1
TOTAL-Traction Distribution Works DRF 4,56,00
DF(3) 6,80,35
OTHER ELECTRICAL WORKS EXCL TRD
A - Works in Progress
B - New Works
TRACTION DISTRIBUTION WORKS
A - Works in Progress
B - New Works
![Page 16: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/16.jpg)
14.1.16
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
342 Nagpur Workshop - Setting up of broad gauge coach periodical overhauling shed
for 27 non airconditioned coaches
Cap. ..
343 Raipur Workshop - Extension of body repair shed towards stripping section (60
m)
DF(3) 70,57
344 Bhilai Marshalling Yard - Extention of covered shed DF(3) ..
345 Bhilai - Augmentation of facilities in main line electrical multiple shed (Phase-III) DF(3) ..
346 Motibagh Workshop - Broad gauge loco shed for maintenance of 15 locos DF(3) 69,00
347 Gondia - Maintenance facilities for diesel electrical multiple unit rakes & broad
gauge diesel locos (Phase-II)
DF(3) 1,13,84
348 Bhilai - Expansion of main line electrical multiple unit shed with necessary
facilities (Phase-II)
Cap. 1,64,42
349 Bhilai (Electric Loco Shed) - Augmentation of homing capacity from 150 to 175
alongwith 3-phase facilities
Cap. 44,56
350 Raigarh - New electric loco shed with holding capacity of 100 locos Cap. 6,19,42
351 Durg - Upgradation of coaching depot (Phase-III), extension of washing & pit lines
to accommodate 26 coaches
DF(3) 5,47
352 Gondia - Development of facilities for premium examination line & maintenance
sick line of freight stock
DF(3) ..
353 Gondia - Development of facilities for maintenance of coaching stock and
creation of covered shed
DF(3) 1,27,00
354 Korba - Upgradation of freight maintenance facilities DF(3) ..
355 Bilaspur - Extension of intermediate overhauling shed at coaching depot DF(3) 2,35,07
356 Raipur (Diesel Shed) - Expansion of capacity to home WDG4 locos Cap. 11,97,81
357 Motibagh Workshop - Setting up of a unit for environment friendly coach toilets DF(3) 9,44,40
358 Works costing below Rs.2.5 crore each DRF 70,77
DF(2) ..
DF(3) 4,67,76
DF(4) 24,08
TOTAL-WORKS IN PROGRESS Cap. 20,26,21
DRF 70,77
DF(2) ..
DF(3) 20,33,11
DF(4) 24,08
359 Works costing below Rs.2.5 crore each Cap. ..
DRF ..
DF(3) ..
TOTAL-NEW WORKS Cap. ..
DRF ..
DF(3) ..
WORKSHOPS INCLUDING PRODUCTION UNITS
A - Works in Progress
B - New Works
![Page 17: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/17.jpg)
14.1.17
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
TOTAL-Workshops including Production Units Cap. 20,26,21
DRF 70,77
DF(2) ..
DF(3) 20,33,11
DF(4) 24,08
360 Brajrajnagar - Type-II - 70, type-III - 10 & typeIV - 4 units Cap. 22,00
361 Brajrajnagar - Type-II & III - 15 units each & type-IV - 1 unit Cap. ..
362 Korba - Type-II - 30, type-III - 10 & type-IV - 5 units Cap. 1,53,37
363 Raipur - Type-II - 20, type-III - 30 & type-IV - 6 units Cap. 3,09,54
364 Bilaspur - Repl. of out-houses, type-I - 50 units DRF ..
365 Bilaspur - Repl.of quarters, type-II - 142 units DRF ..
366 Bilaspur - Repl.of quarters, type-IV - 61 units DRF 53,50
367 Bilaspur - Repl.of quarters, type-I - 401 units DRF 2,18,42
368 Raipur - Repl. of quarters, type-I - 96 units with type-II Cap. ..
369 Raipur - Repl of quarters, type-I - 64 units with type-II - 64 & type-IV - 1 unit at
Durg colony
DRF 1,05,65
370 Raipur - Type-V - 11 & type-IV - 20 units at Settlement Cap. 20,00
371 Raigarh - Repl of quarters, type-II - 46 & type-III - 1 unit DRF 1,70,00
372 Bilaspur Division - Repl. of quarters, type-III - 50 units DRF 1,50,00
373 Bilaspur - Repl of quarters, type-V - 24 units DRF 22,33
374 Works costing below Rs.2.5 crore each Cap. 4,13,25
DRF 1,12,10
TOTAL-WORKS IN PROGRESS Cap. 9,18,16
DRF 8,32,00
375 Works costing below Rs.2.5 crore each Cap. ..
DRF ..
TOTAL-NEW WORKS Cap. ..
DRF ..
TOTAL-Staff Quarters Cap. 9,18,16
DRF 8,32,00
376 Bilaspur (Central Hospital) - Repl/renovation of wards, labour room, out patients'
department, radiology & physiotherapy units and miscellaneous works
DRF 1,60,18
377 Bhilai Marshaling Yard - Repl of pipeline (18 inch dia) and pump DRF 1,20,12
378 Bilaspur - Expansion of divisional railway hospital DF(2) 24,85
379 Bhilai Marshaling Yard & Bhilai - Improvement of staff quarters & colonies (Phase-
I)
DF(2) 66,17
380 Nagpur - Repl of doors, windows & jafferies in quarters and improvement to
colony roads
DRF 20,00
381 Bilaspur Division - Rewiring of staff quarters (2435 Nos) and repl of lights & fans
with energy efficient lights & fans
DRF 40,00
382 Raipur - 12 dia cast iron pipeline parallel to 14 dia pipeline and repl of pumps DF(2) 74,03
STAFF QUARTERS
A - Works in Progress
B - New Works
AMENITIES FOR STAFF
A - Works in Progress
![Page 18: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/18.jpg)
14.1.18
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
383 Bilaspur Division - Improvement of staff quarters (Phase-III) DRF 1,00,00
384 Nagpur Division - Rewiring of quarters (2233 Nos) DRF 45,20
385 Works costing below Rs.2.5 crore each Cap. 5,50
DRF 1,63,50
DF(1) 11,68
DF(2) 5,38,27
DF(3) 83,10
TOTAL-WORKS IN PROGRESS Cap. 5,50
DRF 6,49,00
DF(1) 11,68
DF(2) 7,03,32
DF(3) 83,10
386 Works costing below Rs.2.5 crore each Cap. ..
DRF ..
DF(2) ..
TOTAL-NEW WORKS Cap. ..
DRF ..
DF(2) ..
TOTAL-Amenities for Staff Cap. 5,50
DRF 6,49,00
DF(1) 11,68
DF(2) 7,03,32
DF(3) 83,10
387 Bhatapara, Tilda, Raipur & Bhilai Power House - Extension of platform for 24
coach trains
DF(1) ..
388 Bhilai (G & H Cabin), Bhilai Nagar, Belha & Hathband - Extention & raising of
platforms
DF(1) ..
389 Bilaspur-Durg - Raising of platforms (9 stations) (A-route) DF(1) 25,98
390 Raipur - Development of circulating area at Gudiyari side DF(1) 6,44
391 Itwari - Development of circulating area with booking office & entrance; extension
of foot over bridge and provision of catering stall & parking stand
DF(1) 60,00
392 South East Central Railway - Escalators at various stations (4 Nos) (2 stations) DF(1) 75,00
393 Works costing below Rs.2.5 crore each DRF 7,10,77
DF(1) 28,62,75
DF(2) 25,62
DF(3) 1,90,17
TOTAL-WORKS IN PROGRESS DRF 7,10,77
DF(1) 30,30,17
DF(2) 25,62
DF(3) 1,90,17
AMENITIES FOR STAFF
B - New Works
PASSENGER AMENITIES
A - Works in Progress
![Page 19: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/19.jpg)
14.1.19
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
394 Works costing below Rs.2.5 crore each DRF ..
DF(1) ..
TOTAL-NEW WORKS DRF ..
DF(1) ..
TOTAL-Passenger Amenities DRF 7,10,77
DF(1) 30,30,17
DF(2) 25,62
DF(3) 1,90,17
395 Raipur - New division Cap. ..
DF(3) ..
396 Bilaspur - Creation of new railway zone Cap. ..
DF(3) 4,85
397 Raipur - 50-bedded divisional hospital DF(2) ..
398 South East Central Railway - Integrated security system (3 stations) Cap. 5,00,00
399 Raipur (General Stores Depot) - Extension of godown DF(3) 92,45
400 Raipur - Construction of officers' rest house Cap. 52,57
401 Works costing below Rs.2.5 crore each Cap. 42,90
DRF 50,00
DF(1) 4,08
DF(2) 3,38,43
DF(3) 2,55,96
DF(4) 6,27
TOTAL-WORKS IN PROGRESS Cap. 5,95,47
DRF 50,00
DF(1) 4,08
DF(2) 3,38,43
DF(3) 3,53,26
DF(4) 6,27
402 Works costing below Rs.2.5 crore each Cap. ..
DRF ..
DF(3) ..
TOTAL-NEW WORKS Cap. ..
DRF ..
DF(3) ..
TOTAL-Other Specified Works Cap. 5,95,47
DRF 50,00
DF(1) 4,08
DF(2) 3,38,43
DF(3) 3,53,26
DF(4) 6,27
PASSENGER AMENITIES
B - New Works
OTHER SPECIFIED WORKS
A - Works in Progress
B - New Works
![Page 20: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/20.jpg)
14.1.20
SOUTH EAST CENTRAL RAILWAY
ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15AllocationParticulars
TOTAL-WORKS IN PROGRESS Cap. 521,40,19
C.Fund 252,89,00
DRF 378,64,69
DF(1) 33,23,20
DF(2) 10,75,33
DF(3) 66,71,81
DF(4) 8,21,77
S.Fund 107,37,85
Dep(RVN) 29,84,00
EBR 33,32,00
TOTAL - NEW WORKS Cap. ..
DRF 7,74,10
DF(1) ..
DF(2) ..
DF(3) 2
DF(4) ..
S.Fund ..
GRAND TOTAL Cap. 521,40,19
C.Fund 252,89,00
DRF 386,38,79
DF(1) 33,23,20
DF(2) 10,75,33
DF(3) 66,71,83
DF(4) 8,21,77
S.Fund 107,37,85
Dep(RVN) 29,84,00
EBR 33,32,00
![Page 21: 14.1.1 SOUTH EAST CENTRAL RAILWAY ASSETS …indianrailways.gov.in/railwayboard/uploads/directorate/finance...assets-acquisition, construction and replacement for 2014-15 ... patch](https://reader034.fdocuments.us/reader034/viewer/2022042515/5aaa8c067f8b9a9a188e5c3b/html5/thumbnails/21.jpg)
14.2.1
SOUTH EAST CENTRAL RAILWAY
MACHINERY AND PLANT PROGRAM FOR 2014-15
(Figures in thousand of Rupees)
Item
No.
RE 2014-15
403 System of online monitoring of rolling stock (OMRS) (6 Nos) DF(3) 1
404 Raipur - Hydraulic wheel press (500 ton) DRF 13,23
405 Raipur - Underfloor wheel lathe DRF 2,93,70
406 Raipur - CNC surface wheel lathe DRF 4,85,41
407 Bhilai - CNC surface wheel lathe Cap. 3,69,65
408 Nagpur - Simulator in motion type Cap. 1
409 Raipur - Simulator in Motion Type DF(3) 1
410 Raipur workshop - AJTB Lathe (BG) Cap. 42,15
411 Works costing below Rs.2.5 crore each Cap. 1,01,87
DRF 3,13,47
DF(2) ..
DF(3) 2,34,52
TOTAL-PROGRAMMED DELIVERIES Cap. 5,13,68
DRF 11,05,81
DF(2) ..
DF(3) 2,34,54
412 Works costing below Rs.2.5 crore each Cap. ..
DRF ..
DF(2) ..
DF(3) ..
TOTAL-NEW ACQUISITION Cap. ..
DRF ..
DF(2) ..
DF(3) ..
TOTAL-Machinery & Plant Cap. 5,13,68
DRF 11,05,81
DF(2) ..
DF(3) 2,34,54
B - NEW ACQUISITION
AllocationParticulars
A - PROGRAMMED DELIVERIES