Prepared for: Golden Gate University 536 Mission St San Francisco, CA 94105 Prepared by: 1500 Sansome Street San Francisco, CA 94111 1 7D - 5th Floor West 04/29/14 PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION Phase 7D - 5th Floor West Meeting Three

Transcript of 140429 meeting3

Page 1: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 1

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

Phase 7D - 5th Floor West

Meeting Three

Page 2: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 2

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

MEETING AGENDA

AGENDA:• Review and confirm project scope

• Test Fits

• Space Program

• Digital Signage

- Introduction

- Precedents

- GGU’s vision for digital signage

Page 3: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 3

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

PHASE 7D SCOPE5th floor

5TH FLOOR SCOPE:• Right-size and re-purpose the

classrooms

• Create the new 5th floor auditorium

• Open the hallway at both ends

• Install new HVAC components

• Upgrade the electrical service to meet the technological service demands

• Enhance the information technology infrastructure and classroom technology capabilities

• Improve the acoustics

• Revamp the lighting

• Construct the Lobby-East Wing Hallway Fire Doors

• Install new flooring

• Re-paint and freshen the classrooms, hallways, and common areas

• Comply with any applicable code upgrades as required by the City

BASELINE SCOPE

NEWLY AVAILABLE SPACE

NEW AUDITORIUM

CLASSROOMRIGHT-SIZING

CAPTUREDOUTDOOR SPACE

CAPTUREDOUTDOOR SPACE

ELEVATORLOBBY

536 Mission | 5th Floor

Page 4: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 4

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

PHASE 7D SCOPE2nd floor

2ND FLOOR SCOPE:• Absorb small part of scope from 7C

in order to adhere to new permitting standards

- Enclose outdoor space on north-west end (Jessie side) of the 2nd floor

CAPTUREDOUTDOOR SPACE

536 Mission | 2nd Floor

Page 5: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 5

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

PHASE 7D SCOPE6th floor

6TH FLOOR SCOPE:• Enclose outdoor space on north-west

end (Jessie side) of 6th floor in order to reduce construction costs and increase implementation efficiency

• Consider enclosing outdoor space on south-west end (Mission side) of 6th floor in order to bring entrance to stairwell indoors

• Additional work if needed

CAPTUREDOUTDOOR SPACE

POTENTIAL CAPTUREDOUTDOOR SPACE

536 Mission | 6th Floor

Page 6: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 6

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

PHASE 7D SCOPEcomplete scope

5TH FLOOR SCOPE:• Right-size and renovate the

classrooms (similar to 4th floor renovations)

• General renovations of the entire west wing including the elevator lobby (similar to 4th floor renovations)

• Create the new 5th floor auditorium

• Open the hallway at both ends

• Upgrade HVAC and electrical components

• Improve lighting and acoustics

• Code upgrades as required

2ND FLOOR SCOPE:• Absorb small part of scope

from 7C in order to adhere to new adhere to new permitting standards

- Enclose outdoor space on north-west (Jessie side) end of the 2nd floor

6TH FLOOR SCOPE:• Enclose outdoor space

on north-west end (Jessie side) of 6th floor in order to reduce construction costs and increase implementation efficiency

• Consider enclosing outdoor space on south-west end (Mission side) of 6th floor in order to bring entrance to stairwell indoors

• Additional work if needed

DIGITAL SIGNAGE:• Determine the function,

operational systems, and location of various forms of digital signage throughout the GGU campus

Page 7: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 7

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

CURRENT CLASSROOM INVENTORY

EXISTING

COMBINED ROOMS

OPTIMIZED

XS S M L XL XXL

5

10

15

20

25

30

XSSF

360

750

900

1240

1450

1500+

CAPACITY

12

25

40

60

80

90+

SML

XLXXL

*Two sets of S rooms on the 4th floor (4204 & 4202 and 4222 & 4218) can be combined into two sets of XL rooms.

25

+5

5

1

3 3

8

+5

+2

-1

-2

Page 8: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 8

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

TEST FIToption 1

CLASSROOM INVENTORY:

+4 XS+5 S+4 M

Page 9: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 9

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

TEST FIToption 2: meets optimized classroom inventory

CLASSROOM INVENTORY:

+2 XS+5 S+5 M

Page 10: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 10

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

SPATIAL ORGANIZATION MODELbaseline instructional

STUDY

INTERACTION

STUDY

STO

RA

GE

XS

M S M MSSS

M SXS

XSXS

INTERACTIO

N

INSTRUCTION

INTERACTION

STUDY

EVENT

BREAKOUT

Page 11: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 11

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

SPATIAL ORGANIZATION MODELlarge instructional

STUDY

INTERACTION

STUDY

STO

RA

GE

XS

M S M XLL

M SXS

XSXS

INTERACTIO

N

INSTRUCTION

INTERACTION

STUDY

EVENT

BREAKOUT

Page 12: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 12

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

SPATIAL ORGANIZATION MODELlarge event

EVENT

BREAKOUT

BREAKOUT

BREAKOUT

BREAKOUT CATERING

REGISTRATION/ RECEPTION

FOOD PREP

STORAGE

INSTRUCTION

INTERACTION

STUDY

EVENT

BREAKOUT

Page 13: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 13

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

SPATIAL ORGANIZATION MODELmedium event

EVENT

REECEPTION

REGISTRATIO

N

FOOD PREP

STORAGE

INSTRUCTION

INTERACTION

STUDY

EVENT

BREAKOUT

Page 14: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 14

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

SPATIAL ORGANIZATION MODELbreakout heavy event

EVENT

BREAKOUT

BREAKOUT

BREAKOUT

BREAKOUT

BREAKOUT

RECEPTION

FOOD PREP

STORAGE

REGISTRATIO

N

INSTRUCTION

INTERACTION

STUDY

EVENT

BREAKOUT

Page 15: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 15

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

SPACE PROGRAMexisting and proposed

4/29/14 Content is proprietary and confidential

Golden Gate University Phase 7D

Space Program: Fifth Floor West

INSTRUCTIONAL Primary Use Secondary Use Quantity ASF Primary Use Secondary Use Quantity ASFClassrooms Instruction - 10 8,796 Instruction - 9 5,417Auditorium Classrooms Instruction Auditorium 4 2,733 * Instruction Auditorium 4 2,726

Subtotal 14 11,529 13 8,143

INTERACTION Primary Use Secondary Use Quantity ASF Primary Use Secondary Use Quantity ASFElevator Lobby Lobby Circulation 1 1,247 Lobby Event Reception/Registration 1 1,247Study Space - - - - Study Circulation 2 557Lounge - - - - Lounge Study 1 620

Subtotal 1 1,247 4 2,424

OFFICES Primary Use Secondary Use Quantity ASF Primary Use Secondary Use Quantity ASFELS Offices Office - 4 522 - - - -

Subtotal 4 522 0 0

USER SUPPORT Primary Use Secondary Use Quantity ASF Primary Use Secondary Use Quantity ASFStorage - - - - Storage - 1 109Food Prep - - - - Food Prep - 1 114ELS Support Storage - 3 114 - - - -

Subtotal 3 114 2 223

CIRCULATION Primary Use Secondary Use SF Primary Use Secondary Use SFCorridor Circulation Study Space 1 922 Circulation Break-out Catering and Study 1 922ELS Circulation Circulation - 1 199 - - - -

Subtotal 2 1,121 1 922

OUTDOOR INTERACTION Quantity SF Quantity SFExterior Balcony - - 2 557 - - - -

Subtotal 2 557 0 0

Instructional 14 11,529 * 13 8,143Interaction 1 1,247 4 2,424Offices 4 522 0 0Circulation 3 1,121 2 922User Support 2 114 1 223Outdoor Interaction 2 557 0 0

TOTAL NET SF 15,090 * 11,712NEWLY AVAILABLE ASF…………………………………………………………………………….…………………………………………………………………………….…………………………………………………………………………….…………………………………………………………………………….…………………………………………………………………………….…………………………………………………………………………….…………………………………………………………………………….…………………………………………………………………………….573

*Includes  space  on  5th  Floor  East

Current Building Program Proposed Building Program

Page 16: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 16

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

DIGITAL SIGNAGEinformation design

DIGITAL SIGNAGE....IS PART OF SIGNAGE AND WAYFINDING INCLUDING BOTH THE DESIGN OF CONTENT AND INSTALLATION

EXAMPLES OF DIFFERENT USES:

REAL-TIME INFO: NEWS, WEATHER, TRAFFIC, BUILDING DIRECTORY

INTERNAL INFO: UNIVERSITY MESSAGES, NEWS, EVENTS

ADVERTISING: RELATED TO LOCATION AND AUDIENCE

BRAND DEVELOPMENT: PROMOTE UNIVERSITY AND BUILD IDENTITY

Page 17: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 17

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

DIGITAL SIGNAGEinformation design

SIGNAGE/WAYFINDING

REALTIME INFORMATION INFORMATIONAL

PILLAR

Digital Signage at Matterhorn/SwitzerlandWayfinding system at new city library in Stuttgart Digital Signage at Design Offices

Page 18: 140429 meeting3

Prepared for:Golden Gate University536 Mission StSan Francisco, CA 94105

Prepared by: 1500 Sansome StreetSan Francisco, CA 94111 18

7D - 5th Floor West 04/29/14

PRELIMINARY, CONFIDENTIAL and NOT FOR DISTRIBUTION

DIGITAL SIGNAGEinformation design

UNIVERSITY OF OREGON STANFORD LAW SCHOOL