Page 1: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

1414thth European Synchrotron Light Source European Synchrotron Light SourceRadio-Frequency Meeting Radio-Frequency Meeting

September 29-30 September 29-30 Trieste – Italy.Trieste – Italy.

STATUS STATUS OF THEOF THE SOLEIL RF SOLEIL RF SYSTEMSYSTEM

M.ELAJJOURI

Page 2: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

• SOLEIL Operation September 2009-September 2010SOLEIL Operation September 2009-September 2010• Booster RF operationBooster RF operation• Storage ring RF operationStorage ring RF operation• New frequency TunerNew frequency Tuner• RF AMPLIFIER operation and R & DRF AMPLIFIER operation and R & D• Summary and conclusionSummary and conclusion

STATUS STATUS OF THEOF THE SOLEIL RF SOLEIL RF SYSTEMSYSTEM

Page 3: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

SOLEIL Operation Sept.2009/ Sept.2010SOLEIL Operation Sept.2009/ Sept.2010

300 mA Top-up until November 2009400 mA Top up standard operation for users since November 2009Other available users modes :

400 mA Hybrid Top-Up 80 mA 8 Bunches Top-Up10 mA Single Bunch Top-Up

500 mA Top-Up validated beginning of 2010, used for machine R&D and Radioprotection test (for users beginning of 2011)

Page 4: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

From Sept. 09 until Sept. 2010 ~ 5000 running hours From Sept. 09 until Sept. 2010 ~ 5000 running hours

•Short Top-up interruption but no beam loss Short Top-up interruption but no beam loss

caused by RF booster interlock card fault caused by RF booster interlock card fault

•Amplifier : no failure at all Amplifier : no failure at all

> 20000 hours operation over 5 years, no real problem > 20000 hours operation over 5 years, no real problem

Booster RF Booster RF

35 kW solid state amplifier & LLRF35 kW solid state amplifier & LLRF 5-cell LEP type cavity5-cell LEP type cavity

Page 5: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

580 kW (500 mA) & 4 MV @ 352 MHz

2 cryomodules, each containing a pair of single-cell s.c. cavities

Each cavity powered by a 180 kW solid state amplifier

Both CM supplied with LHe (4.5 K) from a single cryo-plant

Storage ring Storage ring RFRF

Page 6: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

Beam availability during the users and RP sessions

Storage ring operationStorage ring operation

BBeam time availabilityeam time availability of of ~ 96% , 98% before may 2010~ 96% , 98% before may 2010

Two main RF cryogenic failures impacted beam in 2010 Two main RF cryogenic failures impacted beam in 2010

• Breakdown of compressor PLC CPU board ~Breakdown of compressor PLC CPU board ~60 hours of beam downtime 60 hours of beam downtime failure during week end + day off,failure during week end + day off, spare board not compatible and spare spare board not compatible and spare station under installation.station under installation.

•Electrical power interruption during the spare compressor test (lost Electrical power interruption during the spare compressor test (lost helium ) ~ helium ) ~ 6 hours of beam downtime6 hours of beam downtime

98.20%

1.80%

97.50%

2.50%

99%

1.00%

98.30%

1.70%

97.90%

2.10%

90.30%

9.70%

94.90%

5.10%

96.59%

3.41%

90.00%

91.00%

92.00%

93.00%

94.00%

95.00%

96.00%

97.00%

98.00%

99.00%

100.00%

29/08/09to

29/09/09

09/10/09to

09/11/09

20/11/09to

23/12/09

22/01/10to

01/03/10

12/03/10to

12/04/10

30/04/10to

14/06/10

25/06/10to

30/07/10

Average

failures with impact onbeambeams available

Page 7: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

Install of spare compressor station with separate utilities.Install of spare compressor station with separate utilities.

• Redundancy in operation (losses of utilities (electric, water) Redundancy in operation (losses of utilities (electric, water) few hours restart) few hours restart)

• Maintenance transparencyMaintenance transparency

Operational since June 2010Operational since June 2010

RF Cryogenic System

Page 8: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

1) 1) Standard screw-nut assembly replaced by Standard screw-nut assembly replaced by planetary roller screwplanetary roller screw

22) Stepper motor +) Stepper motor +harmonic drive gear boxharmonic drive gear box

Stepper motor with Stepper motor with planetary gear boxplanetary gear box

Less friction Less friction

More robustMore robust Longer lifetimeLonger lifetime

Prototype was successfully tested on a test Prototype was successfully tested on a test

bench @ cold in CryHolab at CEAbench @ cold in CryHolab at CEA

20 years of SOLEIL operation20 years of SOLEIL operation

Motor-gearboxMotor-gearboxScrewScrew

New Tuner VersionNew Tuner Version

Page 9: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

Installation of the new cold tuning system for cavity 3&4 during summer Installation of the new cold tuning system for cavity 3&4 during summer shut down (August 2009)shut down (August 2009)Installation of the new cold tuning system for cavity 1&2 during winter Installation of the new cold tuning system for cavity 1&2 during winter shut down (January 2010)shut down (January 2010)

Installation of New TunerInstallation of New Tuner

Page 10: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

Broken nutBroken nut

The friction between the nut and satellites screw caused the blocking The friction between the nut and satellites screw caused the blocking of the system of the system

presence of metal presence of metal

chipschips

Tuner Screw DamagesTuner Screw Damages

In may 2010, the tuner of cavity 4 showed signs of malfunctioning In may 2010, the tuner of cavity 4 showed signs of malfunctioning

Before full sticking, use of the backup mode at fixed tuning and variable Before full sticking, use of the backup mode at fixed tuning and variable voltage until next shut down voltage until next shut down

Open Cryomodule 2 and investigation during the summer shut down 2010Open Cryomodule 2 and investigation during the summer shut down 2010

Page 11: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

Double mistake Double mistake • During the preliminary test at warm, without operational soft interlock system, During the preliminary test at warm, without operational soft interlock system, we probably hit the mechanical stop.we probably hit the mechanical stop.• Mechanical stop not correctly settled Mechanical stop not correctly settled abnormal stress abnormal stress

The inspection of the cav 3 system didn’t The inspection of the cav 3 system didn’t show any sign of problem and the other show any sign of problem and the other tuners on CM1 are still working welltuners on CM1 are still working well

Tuner Screw DamagesTuner Screw Damages

Mechanical stop which Mechanical stop which prevents the cavity from prevents the cavity from plastic deformation plastic deformation Visible impactVisible impact

Page 12: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

Thermal Fatigue Failure After working for 20000 hrs

Amplifier Amplifier PerformancePerformance

About 80% of them can be repaired ( preventive repair maintenance on T2 and T3 About 80% of them can be repaired ( preventive repair maintenance on T2 and T3 during the shut down of the last summer) during the shut down of the last summer)

None of these failures has impacted the operation ( modularity & redundancy).None of these failures has impacted the operation ( modularity & redundancy).

≈ ≈ 20000 hours running, and 20000 hours running, and ≈ 100% operational availability ≈ 100% operational availability Modules failure rate ~ 3,5% per year ( AMP 2,3,4~ 2% and AMP1 : 6%)Modules failure rate ~ 3,5% per year ( AMP 2,3,4~ 2% and AMP1 : 6%)

Transistor failure Transistor failure 2 failures types :2 failures types : Soldering thermal fatigueSoldering thermal fatigue

Page 13: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

RF AMPLIFIER UPGRADE RF AMPLIFIER UPGRADE

• Development a new module with 6Development a new module with 6th th generation LDMOS (50V), much generation LDMOS (50V), much more robust + thermal stress strongly reduced more robust + thermal stress strongly reduced longer MTBF. longer MTBF.

• Working point has been optimised for 46V @ 330W (G=21, Working point has been optimised for 46V @ 330W (G=21, =72%) =72%)

P (W) Gain (dB) Idc1 (A) Idc2 (A) Idc (A) Phase (°) S11 (dB) Po (W) E (%)

330 20,82 4,8 5,10 9,92 -127,0 -50,0 456,3 72,3

315 21,20 4,70 4,90 9,60 -126,7 -51,0 441,6 71,3

300 21,48 4,58 4,72 9,30 -126,3 -51,7 427,8 70,1

250 21,95 4,18 4,21 8,39 -126,0 -43,7 385,9 64,8

200 22,10 3,75 3,74 7,49 -126,7 -39,0 344,5 58,0

150 22,14 3,25 3,2 6,47 -128,0 -36,0 297,6 50,4

• Replace progressively the actual modules with LR301 by new ones Replace progressively the actual modules with LR301 by new ones with BLF574 transistor ( typically 1 tower/year) with BLF574 transistor ( typically 1 tower/year)

• The choice of this solution will minimize the modifications The choice of this solution will minimize the modifications

• Option for higher power (380W) @ 50V Option for higher power (380W) @ 50V

Page 14: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

Possibility of designing modules of intermediate frequency such 100 MHz (Astrid) 200 MHz (CERN) and up to L band (1.3-1.5 GHz)

Frequency Output Power

Gain (1 dB) Efficiency projects

MHz W dB %

476 400 20 69 LNLS

352 700 20.5 73 ESRF

500 700 18 67 SESAME

88 1000 26 87

RF AMPLIFIER R & DRF AMPLIFIER R & D

New generation modules developed at SOLEIL for different projects and collaborations.

Page 15: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

Transfer of technology agreement concluded with ELTA-AREVATransfer of technology agreement concluded with ELTA-AREVA ESRF contract for 7 amplifiers of 150 kW (14 towers of 75 kW) ESRF contract for 7 amplifiers of 150 kW (14 towers of 75 kW)

- Module validated P = 700 W, G > 20 dB, > 70% @ 350 MHz- Integration test and validation for one unity of 10kW combination of 16 modules”- 75 kW tower next year

ESRF Project ESRF Project

700 W module 700 W module

DC/DC 50V/1200WDC/DC 50V/1200W

Page 16: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

AVRIL 2010 , “SOLEIL – LNLS team in Campinas BRAZIL”

LNLS CollaborationLNLS Collaboration

2 amplifiers of 50 kW with RF modules of 400 W @ 476MHz 2 amplifiers of 50 kW with RF modules of 400 W @ 476MHz were successfully tested.were successfully tested.

Page 17: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

New digital LLRF BOOSTER New digital LLRF BOOSTER (R. Sreedharan presentation)(R. Sreedharan presentation)

Area test with high power voltage, water and spare BOOSTER Cavity LLRF and amplifier test Conditioning the spare BOOSTER cavity (ready to be installed, if necessary)

Other R & DOther R & D

Page 18: 14 th European Synchrotron Light Source Radio-Frequency Meeting September 29-30 Trieste – Italy. Trieste – Italy. STATUS OF THE SOLEIL RF SYSTEM M.ELAJJOURI.

For the BO RF, no operation problem at allFor the BO RF, no operation problem at all For SR RF , after 4 years of running, the operational experience proved to be fully For SR RF , after 4 years of running, the operational experience proved to be fully satisfactory, but in 2010 significant downtime due to 2 long cryogenics failuressatisfactory, but in 2010 significant downtime due to 2 long cryogenics failuresInstallation of a spare He compressor stationInstallation of a spare He compressor stationConfirm the good reliability of the new CM frequency tuners Confirm the good reliability of the new CM frequency tuners Upgrade of the power couplers (collab. with CERN & ESRF), able to store Upgrade of the power couplers (collab. with CERN & ESRF), able to store 500mA with one Cryomodule (500mA with one Cryomodule ( redundancy) redundancy)Progressive replace of the actual modules by the new generation (1 tour/year)Progressive replace of the actual modules by the new generation (1 tour/year)

increase MTBFincrease MTBFContinue the development of LLRF for Booster and Storage ring and others Continue the development of LLRF for Booster and Storage ring and others projects.projects.

Summary & conclusionsSummary & conclusions