14 October 2004 Kroll/Bedeschi B Meeting 1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi ( Mixing Analysis Coordinators B Meeting 14 October 2004 Outline: 1.Reminder of Ingredients 2.Summary of Progress 3.Schedule of Tasks , Whidbey Island, WA, in the Puget Sound 90 miles from the Pacific

description

14 October 2004Kroll/Bedeschi B Meeting3 Highest Priority Items 1.Unbinned likelihood fit for  m d exploiting fully power of flavor tags, event by event  t, S/B in different modes, etc. 2. Resolve lifetime problem in semileptonic modes (l D s ) 3. Measure lifetime in SVT-biased hadronic modes (D s , etc.) to accomplish 1. we must in parallel with 1, 2, 3 4. Study SSKT – determine defensible D from data and MC From B Meeting 9/16/04 14 Oct 2004 Our Priorities remain the same 1 st Street Ocean City, NJ, Feb

Transcript of 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) &...

Page 1: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 1

Summary of 3rd CDF B Mixing Workshop

Joseph Kroll (Penn) & Franco Bedeschi (Pisa)Mixing Analysis Coordinators

B Meeting14 October 2004

Outline:1. Reminder of Ingredients2. Summary of Progress3. Schedule of Tasks

Fort Ebey, Whidbey Island, WA, in the Puget Sound 90 miles from the Pacific

Page 2: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 2

• Reconstruct Bs signal with adequate signal to noise– semileptonic: lepton + Ds

– hadronic: Ds, Ds

• Measure Bs Lifetime– resolve lifetime problem in semileptonics– demonstrate lifetime measurement in SVT-biased hadronics

• Identify Bs Flavor at production (flavor tagging)– challenge: estimating D for SST in Bs (for limit)

• Demonstrate technique with B0 mixing (md)– use this step to calibrate opposite side flavor tags for Bs

– require unbinned likelihood fit now

• Measure (place limit on) ms

Bs Mixing Ingredients

also have the equivalent B0 & B+ signals

calibration/check is B0 & B+ lifetimes

From B Meeting 9/16/04

Page 3: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 3

Highest Priority Items

1. Unbinned likelihood fit for md exploiting fully power of flavor tags, event by event t, S/B in different modes, etc.

2. Resolve lifetime problem in semileptonic modes (l Ds)

3. Measure lifetime in SVT-biased hadronic modes (Ds, etc.)

to accomplish 1. we must

in parallel with 1, 2, 3

4. Study SSKT – determine defensible D from data and MC

From B Meeting 9/16/0414 Oct 2004Our Prioritiesremain the same

1st Street Ocean City, NJ, Feb. 7 2004

Page 4: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 4

Summary of Progress: Signals & Data Sets

• Signals – source of concern– modest progress (Bs! Ds, Ds! & B! D)– power of tracking in 5.3.1 has not been fully exploited

• e.g., 23D, event by event PV, L00

• see M.D. Shapiro @ BPAK on 8 Oct 2004– still only data up to 13 Feb 2004 – no post COT recovery data

• Data Sets – source of significant concern– B hadronic skim

• only 70% complete up to 13 Feb 2004• no post COT recovery data available

– B Sntuples• need to be remade with new OSTs and other improvements (e.g., PID)• future improvements cannot be exploited – must remake

– Many other private data sets and ntuples

Page 5: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 5

Summary of Progress: Lifetimes (1)

• Semileptonic Lifetimes– dedicated core of people: Clark, Farrington, Tanaka, Ukegawa,

Uozumi– set up list of tasks on 8 September 2004– already covered significant fraction of those tasks – continued steady

progress since the workshop– still have not found the problem – direct charm background appears

to have been eliminated as a candidate– SVT efficiency bias? Background model? Combination of two?

Page 6: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 6

Summary of Progress: Lifetimes (2)

• Hadronic Lifetimes – “Monte Carlo free” approach– have overcome many technical obstacles to produce viable method– limited progress, however, since last presentation in July 2004– Dedicated group of people now back in action: Azfar, Boudreau,

Huffman, Rademacher, Rahaman– clearly defined tasks within this group – schedule defined– Do we get the right answer? Is this approach viable for mixing?

• Hadronic Lifetimes – SVT efficiency approach– limited progress since last presentation in July 2004– Dedicated group of people being assembled at FNAL to attack:

DaRonco, Donega, Giagu, Giolo (Lucchesi @ Padova)– need to define a more detailed list of tasks and schedule– Same burning issue: do we get the right answer in B+, B0?

Page 7: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 7

Summary of Progress: Flavor Tagging

• OSTs– OSTs defined (SLT(e), SLT(), JQT) – in repository– next step clear: define combined OST & measure D2 in data– no further development expected for Winter 2005

• SS(K)T– ambitious plan outlined to estimating D from combo. of data & MC– dedicated group: see list in later slides under “schedule.”– progress on several fronts & short term goals defined:

• particle id around B mesons measured in data• comparison: fragmentation particles around B’s in data vs. MC• establish B** signal – at least at PR level

– Particle id crucial – TOF calibration a concern, dE/dx in good shape

Page 8: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 8

Summary of Progress: Likelihood Fits

• Two groups working independently– MIT/Cantabria/Karlsruhe

• presented likelihood fit with SST on J/ K*0 data• ambitious program to extend to l + D and B! D, D• next step: add OSTs and measure combined D2 (with D bins)• lifetime is necessary intermediate step

– ANL/CMU• full likelihood fit exists for \Delta m_s (see CDFNOTE 7170)• extending to md on l + D (sample composition, implement OSTs)• Basic functionality of fit demonstrated with toy MC• next steps: signal optimization, add OSTs, evt-by-evt vtx, L00• lifetime is necessary intermediate step

Page 9: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 9

Summary of Progress: ms

• One presentation specific to ms: proposal for blinding – preferred option: randomize Bs flavor at decay with (-1)event no.

– need to follow up with written proposal that is approved at B meeting

• Discussion of need for common input file for various fitters– need to follow up with written proposal that is approved at B meeting– seems trivial, but will serve as a method of making sure we are

speaking a common language

Page 10: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 10

Schedule

• We have put together a list of tasks• Each task has

– list of people doing the work • these people are considered “responsible” for delivering

– the venue where they report the results of their work• specify the subgroup or B group

– the various near term tasks including time estimates– long term tasks have more vague time estimates

• Weekly status reports– we want status reports at subgroups on key tasks every week– does not have to be full presentation, can be one slide on previous

week’s activities

Page 11: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 11

Data Sets

• Data set definition– 5.3.X– all data up to August 2004 shutdown

except COT compromised• Good run list

– Furic & Nahn– reports at BPAK– by 4 November 2004

• Skim of SVT two track data set– Belforte, Casarsa, Delli, Fella,

Lucchesi– reports at BPAK– 2 sections of the data

• up to 13 February 2004• after COT recovery

• Skim (continued)– Status of data up to 13 Feb 2004

• Bs! Ds, Ds! K*K or KSK complete• finish other 7 modes by 4 Nov 2004• B-! D0-, D0! K+-, K+-+-, K+K-,

+-

• B0! D-+, D-! K-++

• B0s! Ds

-+, Ds! ,

– post COT recovery data• processing in parallel with above• complete by end of November 2004

– Some modes not included• e.g., B! D* & D• can be added – no time estimate

Page 12: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 12

Data Sets (continued)

• B Sntuple– Paus– reports at BPAK– based on 5.3.1– includes all modes– will include all data to Aug 2004– J/ K by 18 Oct 2004– lepton + D by 26 Oct 2004– B hadronic by 8 Nov 2004

• Direct access to data (datlists)– Furic & Paus– reports at BPAK– available 1 Dec 2004

• Comments– must do better for Summer 05 &

beyond• need to start organizing this now• volunteer (BPAK) needed

– for Winter 2004 success of datlists is critical

– B sntuple• no update of TOF possible• event by event PV, L00 not

included in present production– 1 Oct 2004: Ch. Paus reports 30

pb-1 data bad due to CMX – use anyway?

Page 13: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 13

Signal Optimization

• Hadronic modes– Casarsa, Lucchesi, Squillacioti, Shapiro– reports at B Hadronic– complete by 4 Nov 2004

• Semileptonic modes– Gibson– reports at Semileptonics– update on 26 Oct 2004– schedule for finalizing not established

Concern: inadequate personnel and coming too late

Page 14: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 14

Lifetimes

• Semileptonic– Clark, Farrington, Tanaka,

Ukegawa, Uozumi– reports at Semileptonics– near term (by 4 Nov 2004)

• Tanaka x-check of l + D+

• d0 cut on D* (D+, D0 too?)• generate more c-cbar MC• result in 8 GeV (no SVT)

– long term (no estimate)• have to see results of near term

to decide how to proceed

• Hadronic• “MC free” approach

– Azfar, Boudreau, Huffman, Rademacher, Rahaman

– reports at B hadronic– fitting test and refinement

• Azfar, Rademacher• B+! D0+ in progress

– stripping & ntuple production (data & MC)

• Azfar, Rahaman• B+! D0+ done• B0, Bs, &b modes in progress• complete by 4 Nov 2004

Page 15: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 15

Lifetimes (continued)

• Hadronic “MC free” continued– Systematics

• alignment (Boudreau, Rahaman)• SVT eff. (Azfar, Rademacher)• background parameterization

(Huffman, Rademacher)• all in progress already for B+

mode – done by 4 Nov 2004• others follow later

• Hadronic – SVT eff. method– Da Ronco, Donega, Giagu,

Giolo, Lucchesi– update SVT curves by 4 Nov 2004– preliminary result (lifetime okay

or not okay) by 22 Nov 2004

Page 16: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 16

Opposite Side Flavor Tags

• Validation of blessed Summer 2004 SLT(), SLT(e), JQT– Kravchenko– reports at Semileptonics– means putting taggers in repository & verifying we get the same results– complete by 19 Oct 2004

• Creation of simple combination of above tags– Kravchenko– reports at Semileptonics– determine tag overlaps and combined D2 (including binning) on J/K

• report on 19 Oct 2004– evaluation of more sophisticated combinations (max D, diff. classes)

• time scale not established

Page 17: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 17

Same Side (Kaon) Tag

• Further development of SS(K)T– Bedeschi, Catastini, Punzi, Scuri, Squillacioti– reports to Semileptonics– compare SS(K)T algorithms in data & MC using J/ K samples

• use combined dE/dx & TOF particle ID• report by 4 Nov 2004

• Study particle species produced around B+, B0, B0s

– Heijboer, Jones, Kroll, Usynin– reports to Semileptonics– Measure particle species in data

• initial report using private TOF calibration in July 2004• further progress requires updated TOF calibration and B Sntuples

– MC production in parallel – estimate Dec 2004

Page 18: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 18

Same Side Kaon Tag (continued)

• Comparison MC & data, tuning fragmentation– Ben-Haim, Maksimovic, Pursley– reports to Monte Carlo & Semileptonics– update on 4 Nov 2004

• B** – Ben-Haim, Maksimovic, Pursley– reports to J/ & B hadronics– signal in B+! J/ K+ (update 4 Nov 2004)– signal in SVT hadronic samples (December?)

Page 19: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 19

Likelihood Fitting for md

• MIT/Cantabria/Karlsruhe– Belloni, Gomez-Ceballos,

Kravchenko, Leonardo, Paus, Piedra

– reports to Semileptonics– likelihood fit B!J/ K with SST

exists – see last workshop– need to add OSTs– developing fits for l + D & D, D3– Fully tested with preliminary

result on md by 1 Dec 2004

• Argonne/CMU– Giurgiu, Paulini, Tanaka– reports to Semileptonics– full likelihood for ms exists;

used for ICHEP 04 projections– developing for md w l + D

incorporating blessed OSTs• 1st version fit working and tested

on toy MC – see last workshop• working on including tagging &

vertexing in data ntuple – report at 4 Nov 2004

• run on MC to determine add. K factors: 30 Nov 2004

• 1st result on md by 7 Dec 2004

Page 20: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 20

Result on ms

• Difficult to work this far ahead – we can work backwards from La Thuile & draw some conclusions:– 24 Feb 2005 last day to bless results for La Thuile– 17 Feb 2005 unblind results on ms

– 03 Feb 2005 prebless results on ms

– 20 Jan 2005 bless results on md for ms (Collaboration mtg.)

– 06 Jan 2005 prebless results on md for ms

• Better have full likelihood machinery for md determination using hadronic and semileptonic samples and OSTs before the Winter holiday – this includes a substantial amount of documentation prepared.

Page 21: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 21

In Preparation for ms

• Decision on blinding procedure– Punzi– reports to B meeting– written proposal submitted to B group before 4 Nov 2004– present at workshop on 4 Nov 2004, sign off at following B meeting

• Quantities for input to likelihood fit (flat file content)– Kravchenko & Tanaka– reports to semileptonics– written proposal submitted to B group before 4 Nov 2004– present at workshop on 4 Nov 2004

Page 22: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 22

Common Tools

• dE/dx in COT– COT dE/dx group (Giagu)– reports to BPAK group– validation of entire data set up to Aug 2004 shutdown in progress– ready for 5.3.4 release on 29 Oct 2004

• TOF– TOF group (Snider)– reports to BPAK group– in process of revising/validating calibration schemes– hope to be ready for 5.3.4 release on 29 Oct 2004

Page 23: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 23

Common Tools (continued)

• Combined dE/dx & TOF PID– Ciocci, Morello, Punzi, Squillacioti,

Tonelli– reports to BPAK– available now in private version:

resolution functions for each particle type separately for dE/dx & TOF

– include in public code infrastructure by 18 Oct 2004 – validate

– include in 5.3.4 release on 29 Oct 2004

– include combination of TOF and dE/dx for 29 Oct 2004 release

– demonstrate utility with examples by 4 Nov 2004

• Event by Event Vertexing incl. L00– Cerri, Lucchesi, Shapiro– reports to BPAK– code available & will be in 5.3.4 rel.– documentation by 4 Nov 2004

Page 24: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 24

Monte Carlo Production

• Oversight of Monte Carlo Generation/Production– D’Auria– reports to Monte Carlo– outstanding issues

• existing MC samples produced by various groups privately not registered• only aware of one collaborative effort to generate MC for semileptonics

– see talk by Usynin at semileptonics subgroup on 28 Sep 2004

Page 25: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 25

Some Concluding Remarks

• We have made progress assigning tasks and making a schedule

• The schedule needs to be studied further to see if we are on target to have a result for Winter 2005

• Particular concern is Dec 2004 – how do we go from 1st results on md to documented blessed results by early Jan 2005?

• Two more workshops planned in 2004– November 3 & 4

• off week – we thought it would help to spread the pain over 2 days– December 16

Page 26: 14 October 2004Kroll/Bedeschi B Meeting1 Summary of 3 rd CDF B Mixing Workshop Joseph Kroll (Penn) & Franco Bedeschi (Pisa) Mixing Analysis Coordinators.

14 October 2004 Kroll/Bedeschi B Meeting 26

Calendar

on week

proposedB mixingworkshop

Collaborationmeeting

last Thursdaymeeting

Gasp! now we are here!

La Thuile begins here