13601_term paper[1]
-
Upload
kripa-dudu -
Category
Documents
-
view
221 -
download
0
Transcript of 13601_term paper[1]
-
8/8/2019 13601_term paper[1]
1/4
LOVELY PROFRSSIONAL UNIVERSITY From/LPUO/AP-3
(The format to be used for Planning the academic activities other than Lectures/
Tutorial/Practical like Assignments, Case study , Presentation, Quiz, Projects, class tests ,
industrial visits, teaching practice, court visits etc. to be undertaken as a part of the continuousassessment for the Course)
TERM PAPER
School of: Management Department ofManagement
Name of the faculty Member: Puneet Bawa Course No :MGT 301CourseTitle: Fundamentals of project managementClass-BBA Section - s1806
Max. Marks 25 Date of Allotment : Date of Submission
Important: To be read before filling up the Plan format.
1. Planning for academic activities other than Lectures/ Tutorial/Practical like Assignments, Case
study , Presentation, Quiz, Projects, class tests , industrial visits, teaching practice, court visits etc.
to be undertaken as a part of the continuous assessment for the Course should be preparedseparately as per the format at the start of session.
2. Industry oriented assignments should be encouraged. If the academic activities are organization
based, please specify the organization with respect to the assignment. Absolute theoretical
academic assignments, which involve only copying from the books, should be discouraged. Model
*(Method/Pedagogy) used in allotment and evaluation of the assignments should be specified in the
assignment plans itself.
3. All the students should be given a different topic of assignment, in all cases either the topic of
assignment should be different or the organization on which the assignment is based should be
different.
S.No Roll
No./team
Topic Model
1 RS1806
A01
Study of Six laning of NH-1(Jalandhar to
Ludhiana). For basic details refer to
www.nhai.org/
Break up of marks.
Report 10 marks, analysis and study d
e on project- 10 marks, current scenario
projects- 5 marks.
The credentials that will be taken i
consideration for evaluation are as follow
clarity of ideas
comprehensives
reasoning
references
Academic
Integrity:
Students found to have copied both, t
one who copied and from whom copi
will be awarded ZERO marks.
2 RS1806 left Do
-
8/8/2019 13601_term paper[1]
2/4
A07
3 RS1806
A08
Study and analyze the TATA nano project,
concept generation to implementation and
various pros and cons of related to shifting of
project from west Bengal to Gujarat.
Do
4 RS1806A09
Student have to make a report on making ofIPL team considering various
analysis( technical, marketing, financial,
demand etc) and make a report on various
requirements to start such project and also
on performance evaluation.
Do
5 RS1806
A13
Student have to make a report and detail
analysis on nuclear power project in India
and their importance and threats to society,
government permission and policy for such
projects.
Do
6 RS1806A15
Student have to study the mid day mealstarted by government, cost involved,
purpose, effect, area covered, target,
implementation and channel through which
it is conducted.
Do
7 RS1806
A16
Study of Wind Energy Farm project in
India.
Do
8 RS1806
A17
Study of construction of building in LPU Do
9 RS1806
A18
Study the construction of konkan railways
and role of Mr. Elattuvalapil Sreedharan in
that project completion on time.
Do
10 RS1806
A19
Study the projects of construction and
maintainance monumenta nad buildings
under The Archaeological Survey of India
(ASI).
Do
11 RS1806
A20
Study of setting up centralised Air
Conditioning unit in LPU
Do
12 RS1806
A22
Small Hydro electric project of 1 megawatt
capacity on canals in punjab (example
SIDHWAN Canal power project in
Ludhiana)
Do
13 RS1806A23
Three Gorges dam Project in China.Forbasic info refer to
http://www.chinapage.com/3gorge/3gorge.ht
ml
Do
14 RS1806
A25
Study of Setting up of a pharma company in
bhadi himachal Pradesh, pros and cons of
such project.
Do
15 RS1806 Study the project on space tourism. Do
-
8/8/2019 13601_term paper[1]
3/4
B27
16 RS1806
B29
Study the project on health tourism. Do
17 RS1806
B30
Pradhan Mantri Gram Sadak Yojna . Status
of Progress and Implementation. Student can
take the state of his choice . ForBasic Info and Leads refer to
http://pmgsy.nic.in/
Do
18 RS1806
B31
Power Cogneration Projects in Punjab.
Study of any one projects set up in various
industries across Punjab. Complete list
of all such Projects can be had from PEDA
website
Do
19 RS1806
B32
Study of construction of medical college in
jalandhar.
Do
20 RS1806
B33
Rajiv Gandhi(Bandra- Worli) Sea Link
Project.For basic info refer tohttp://www.bandraworlisealink.com/index.ht
ml
Do
21 RS1806
B37
Solar Renewable Energy Project. For basic
info refer
http://www.juliantrubin.com/solarprojects.ht
ml
Do
22 RS1806
B38
Study the project on body building of buses
and trucks.
Do
23 RS1806
B39
Study the Rohtang Tunnel Project. Do
24 RS1806B40
Study the polio drops project in India. Do
25 RS1806
B41
Study of construction of railways overbridge
in india
Do
26 RS1806
B42
Study of Solar Power Plant at Bhagat Singh
village on phagwara chandigarh highway
near Banga.
Do
27 RS1806
B43
Study of the Newly built Indira Gandhi
International Airport at new Delhi
Do
28 RS1806
B45
Elementary Education Project (Sarva
Shiksha Abhiyan). For basic info refer to
http://ssa.ap.nic.in/
Do
29 RS1806
B46
Study of ISRO chandrayan project in India. Do
30 RS1806
B47
BMC Flyover project In Jalandhar City .
Refer to the Municipal Corporation for
Information . Use RTI act to get
information Desired . Evaluate the
controversies in print Media about its faulty
Do
-
8/8/2019 13601_term paper[1]
4/4
design
31 RS1806
B48
Study of internationalization of Bangalore
airport.
Do
32 RS1806
B54
Study of Delhi Metro Project. For basic info
refer to
http://www.delhimetrorail.com/index.htm
Do
Date: Sig. of Faculty Member