PLANNING AND PLANNING AND PROGRAMMINGPROGRAMMING
[email protected]://www.construction-productivity.co.ukhtt://www.construction-productivity.co.uk
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMINGProject planning, programming & Project planning, programming &
scheduling is about estimating and scheduling is about estimating and managing the cost, time, quality, safety, managing the cost, time, quality, safety, etc.etc.
Management of a construction firm Management of a construction firm determine exactly how long each aspect of determine exactly how long each aspect of a project should take to complete.a project should take to complete.
A realistic time estimate ‘programme’ for A realistic time estimate ‘programme’ for the entire development process is a key the entire development process is a key factor for project duration time. factor for project duration time.
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING As the project progress management team As the project progress management team
constantly monitor progress against the constantly monitor progress against the original time plan;original time plan;
Planning and programming is about Planning and programming is about recovery of lost time;recovery of lost time;
Recommending management action in Recommending management action in order to maintain programme (time, cost, order to maintain programme (time, cost, quality, safety, etc).quality, safety, etc).
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMINGTender Planning Tender Planning Tender planning is the first phase of any project.Tender planning is the first phase of any project.It is important to generate a plan covering items such as:It is important to generate a plan covering items such as: clear project directionclear project direction budget and schedule before proceeding to avoid making budget and schedule before proceeding to avoid making
costly mistakes and causing delays costly mistakes and causing delays Tender programmes Tender programmes Feasibility Studies Feasibility Studies Budget Generation Budget Generation Design ManagementDesign Management Value Engineering Value Engineering
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
On the other hand programming is about:On the other hand programming is about: Construction programmes for all site Construction programmes for all site
activities activities Package and Procurement programmes Package and Procurement programmes
for each element of works for each element of works Overall design and Procurement Overall design and Procurement
programmes programmes As built programmes As built programmes Critical path analysis Critical path analysis
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
So far: Once the basic planning and preparation of the
master plan are complete, management should work on:
plans, specifications and cost estimates tender documents selection of contractor and award of work construction activities project management and control handing over for commissioning
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMINGAppropriate construction technology The choice of building materials has an effect
both on cost and length of construction. Locally available materials Traditional building techniques should be given
priority. They are usually cheaper and more accessible. Selection of materials and future maintenance
must be considered during design stages.
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
Building materials should be:economicaldurableeasy to cleanand to maintain or replace.They should also be easy to handle on the
site and to replace in case of breakage or damage.
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
The designer must choose:(1) the type of construction of the project: indigenous technology on-site methods prefabricated modules and components
assembled on site Or a combination of prefabricated components
and on-site construction.(2) the level of technology: low, medium or high.
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMINGConstruction technology should take in toconsideration factors such as: conditions of site time constraints availability of labour and raw materials construction equipment and any other related
factors.Whenever possible: Methods adopted should be within the capability
of local manpower and resources.
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
Consideration of innovative methods when possible
Issue of sustainability If design professionals are brought in, they
should work in association with: local architectsengineers so that there is a transfer of
knowledge in the area.
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
Tenderinggeneral conditions of contract technical specifications tender drawingsbill of quantities.
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
General conditions of contract This should consist of: cover or title sheet index instructions to bidders bidding form form of agreement performance bond and bidding bond forms description of the site Client CDM Cost matrix.
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
2) Technical specificationsThese should supplement the drawings to
provide a full description on:capacities workmanship finishes and other characteristics of all
materials and equipmentcodes of practices and standards
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
Also:Tender drawingsBill of quantitiesProject management
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
The basic Management Principles described byThe basic Management Principles described byHenri Fayol are:Henri Fayol are: To planTo plan To organiseTo organise To co-ordinateTo co-ordinate To controlTo control To leadTo leadThe function of Project Management in moreThe function of Project Management in moredetail; are:detail; are:
brief formulationbrief formulation
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
client organisationclient organisationapproval powersapproval powers
Design Project Organisation such as:Design Project Organisation such as:organisation chartorganisation chartdecision pointdecision point relationshipsrelationships feed backfeed back
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMINGIntegrate Client into the projectIntegrate Client into the project Client organisation integrated into project Client organisation integrated into project
organisationorganisation People responsibilitiesPeople responsibilities Decision processesDecision processesSelection and appointment of contributorsSelection and appointment of contributors Identify contributorsIdentify contributors Identify input requiredIdentify input required Identify when input required and durationIdentify when input required and duration Record types of appointmentRecord types of appointment
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMINGFull brief formulation processFull brief formulation process Establish need, budget, cost plan, cost limit, Establish need, budget, cost plan, cost limit,
procurement route, start value engineeringprocurement route, start value engineeringProgramme formulationProgramme formulation The overall project programmeThe overall project programme The phase or stage programmeThe phase or stage programme The design programmeThe design programme The procurement programme The procurement programme The construction programmeThe construction programme The commissioning programmeThe commissioning programme
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
Activation of the relationships betweenActivation of the relationships betweencontributorscontributors Ensure contributors are brought in, and Ensure contributors are brought in, and
integrated into the project organisationintegrated into the project organisation Ensure contributors can perform as Ensure contributors can perform as
requiredrequiredEstablish appropriate information andEstablish appropriate information andcommunication structure by establishing acommunication structure by establishing afull project procedures manual containing;full project procedures manual containing;
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMINGDescription of formal communication Description of formal communication
cannelcannelChange requests and instructionsChange requests and instructionsDrawings frameworkDrawings frameworkCo-ordination project information systemCo-ordination project information systemAddress index of all contributorsAddress index of all contributorsConvening and chairing meetings of Convening and chairing meetings of
contributors at all stagescontributors at all stagesJudging the need and frequencyJudging the need and frequency
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
Monitoring and controllingMonitoring and controllingPro-active rolePro-active roleObtaining feedback and under taking Obtaining feedback and under taking
analysisanalysisTesting outcomes to objectives and taking Testing outcomes to objectives and taking
corrective actioncorrective actionForecastingForecasting Integrating and controlling contributorsIntegrating and controlling contributors
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMINGContribution to primary and key decisionsContribution to primary and key decisions Information/advice/reports/recommendationInformation/advice/reports/recommendationTo assist clients in decision makingTo assist clients in decision makingManaging completionManaging completionCommissioning programmeCommissioning programmeTraining of userTraining of userAs built drawings-user maintenance As built drawings-user maintenance
manualsmanualsStrategy for occupation or disposalStrategy for occupation or disposal
PLANNING AND PROGRAMMINGPLANNING AND PROGRAMMING
Evaluation of outcomesEvaluation of outcomesSuccess in achieving objectivesSuccess in achieving objectivesThe final feedback loopThe final feedback loop
THE DESIGN OF MANAGEMENT STRUCTURE
GENERALMANAGER
SUPERVISORYEXECUTIVE
PERSONNELPURCHASING
MAINTENANCEOFFICE
DEVELOPMENT
FINANCEDESIGN
PRODUCTIONMARKETING
OPERATIVES
THE DESIGN OF MANAGEMENT STRUCTURE
CONTRACTMANAGER
MARKETINGPRODUCTIONDESIGNFINANCE
DEVELOPMENTOFFICE PURCHASINGPERSONNEL MAINTENANCE
OPERATIVES
GROUP STRUCTUREGROUP STRUCTURE
GENERALMANAGER
OPERATIONSDEPARTMENT
ADMIN-DEPARTMENT
ENGINEERINGDEPARTMENT
MATRIX MANAGERGROUP A
ENGINEERINGDEPARTMENT
CONSTRUCTIONGROUP
DESIGNGROUP
FINANCEGROUP
PURCHASINGGROUP
B CA B CA
B CA B CA
B CA
MATRIX ORGANIZATION-IDENTICAL TO F.L HARRISON
GROUP STRUCTUREGROUP STRUCTURE
GENERALMANAGER
OPERATIONSDEPARTMENT
ADMIN-DEPARTMENT
ENGINEERINGDEPARTMENT
MATRIX MANAGERGROUP A
ENGINEERINGDEPARTMENT
CONSTRUCTIONGROUP
DESIGNGROUP
FINANCEGROUP
PURCHASINGGROUP
B CA B CA
B CA B CA
B CA
MATRIX ORGANIZATION-IDENTICAL TO F.L HARRISON