+132.0m2 - 33.7m2+ 98.3m2
EC Operational Spares: Racks + shelves = 3.6m x 2.5mFPS drawings: 6m x 2.5m (move to 865 S-412?)
Additional space attribution in B865 (not yet approved)
FPS Storage
EC software lab
EC software lab
EC Lab. B EC Lab. CEC Lab. AEC Power Lab.
EC Storage
Mechanical workshop
19.85
Conference Room
Printers/ Photocopiers
CAD Ofice
865 1-D
865 2-D
865 2-A
2 2 2 2 2 2 2 1 2 2 2 1 2 1 2 1 2 1 2 1
3 13 23 33 13 13 1
EC Monitoring
Room
SL Secretariat SLGL
2 2 2 1 2 2 2 2 2 1 2 2 2 1 2 2 2 2 2 2
SL
2 1
3 3 3 3 3 2 3 1 3 1 3 2 3 2
2 2 2 1 2 2 2 1 2 2 2 2 2 1 2 2 2 2 2 1
Production Office
3 FSU
SL CAD Office
Present TE-ABT distribution in B865
EC software lab
EC software lab
EC Lab. B EC Lab. CEC Lab. AEC Power Lab.
EC Storage
Mechanical workshop
19.85
Conference Room
Printers/ Photocopiers
865 1-D
865 2-D
865 2-A
2 2 2 2 2 2 2 1 2 2 2 1 2 1 2 1 2 1 2 1
3 13 23 33 13 13 1
EC Monitoring
Room
19.9SL Secretariat SLGL
2 2 2 1 2 2 2 2 2 1 2 2 2 1 2 2 2 2 2 2
SL
2 1
3 3 3 3 3 2 3 1 3 1 3 2 3 2
2 2 2 1 2 2 2 1 2 2 2 1 2 2 2 2 2 1
Production Office
3 FSU
SL CAD Office
Proposed TE-ABT distribution in B865
2 2
Proposed TE-ABT-EC reconfiguration in B865
EC Storage
Mechanical workshop
+componentstorage
2 2 2 1 2 2 2 2 2 1 2 2 2 1 2 2 2 2 2 2
SL
2-D30 2-D26 2-D24 2-D22 2-D18 2-D16 2-D12 2-D10 2-D06 2-D04
2-D17 2-D15 2-D13 2-D05 2-D03 2-D01
41.5 40.7 62.3
14.1 13.7 13.7 13.7 13.7 13.7 13.7 13.7 13.7 13.7 21.0 17.7
30.220.3
2-B01 2-B05
2-B02 2-B06
865 2-D
Returns,Repair and Calibration
HT Cage 1 HT Cage 2 HT Cage 3 HT Cage 4 HT Cage 5
FSU workshop
HT Buffer and stores
HT Lab 1HT Lab 2
System Spares
Electronics lab
bench Racks
She
lves
benchesCAD Office
4 4 CAD Office
2 2
2 1
3 new HT Test Cages with temporary equipment test bench storage
Operational equipment returns, repair and calibration
Operational Spares
CAD Office1 x STAFF(1 x STD)
CAD Office1 x STAFF
CAD Office3 x FSU1 x TTE
CAD Office1 x STAFF1 x STD
17.7 m2 16.9 m2
32 m2
19.2 m2
4 4 2 2
2 1 2 1
Cupboard wall to ceiling(sliding doors)
Preferred Option,7 people in 2-B06 would be very tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)
35.2
CAD Office(Remy)
1 x STAFF(1 x STD)
CAD Office(Wim)
1 x STAFF
CAD Office(Stephane)
(Yves)(Gregory)
(Remi)3 x FSU1 x TTE
CAD Office(Patrick)(Lorena)1 x STAFF1 x STD
17.7 m2 16.9 m2
32 m2
19.2 m2
4 4 2 2
2 1 2 1
Cupboard wall to ceiling(sliding doors)
Preferred Option (with names), 7 people in 2-B06 would be very tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)
CAD Office1 x STAFF
CAD Office3 x FSU1 x TTE1 x STD
CAD Office2 x STAFF
16.9 m2
32 m2
19.2 m2
4 5 2 2
2 1
Cupboard wall to ceiling(sliding doors)
Alternative Option,7 people in 2-B06 would be too tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)
35.2
CAD Office(Wim)
1 x STAFF
CAD Office(Stephane)
(Yves)(Gregory)
(Remi)(Lorena)3 x FSU1 x TTE1 x STD
CAD Office(Patrick)(Remy)
2 x STAFF
16.9 m2
32 m2
19.2 m2
4 5 2 2
2 1
Cupboard wall to ceiling(sliding doors)
Alternative Option (with names),7 people in 2-B06 would be too tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)
6m x 7.5m
B355: LIU-PSB Montage a Blanc