129th HSJV Weekly Meeting

download 129th HSJV Weekly Meeting

of 29

Transcript of 129th HSJV Weekly Meeting

  • 7/29/2019 129th HSJV Weekly Meeting

    1/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    P ease Turn o your

    mobile! Or Switch to

    vibration mode!

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    Check! Right Now!

  • 7/29/2019 129th HSJV Weekly Meeting

    2/29

    7/28/20

    SCREEN

    Dont Panic11

    Switch Off All Electrical Equipment22

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    Dont Run, Walk Fast!33

    Go to the Assembly Point44

    Wait for the Final Instruction55

    1. Safety Moment

    2. Previous Meeting

    1. Safety Moment

    2. Previous Meeting

    7. Weekly Inspection

    Committee Inspection

    Weekly Inspection

    7. Weekly Inspection

    Committee Inspection

    Weekly Inspection

    . rograms

    4. HSE Statistics

    Performance per Area and Total

    5. HSE Findings Summary

    HSE Findings by Company

    . rograms

    4. HSE Statistics

    Performance per Area and Total

    5. HSE Findings Summary

    HSE Findings by Company

    8. Incident Report- NM

    9. Medical Cases

    10.Environmental Issues

    11. Action Plans

    Hanlim

    8. Incident Report- NM

    9. Medical Cases

    10.Environmental Issues

    11. Action Plans

    Hanlim

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    va ua on y n ngs core6. Findings Analysis per Discipline

    va ua on y n ngs core6. Findings Analysis per Discipline

    Seoyong (Infra)

    Jong Hap (PB)

    Seoyong RWC-CAR Status

    Seoyong (Infra)

    Jong Hap (PB)

    Seoyong RWC-CAR Status

  • 7/29/2019 129th HSJV Weekly Meeting

    3/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 129th HSJV Weekly Meeting

    4/29

    7/28/20

    NO.NO. ITEMSITEMS ACTIONACTION PLANSPLANS ACTION BYACTION BYDUEDUE

    DATEDATESTATUSSTATUS

    1Low HSE

    Both Seoyong(I), J onghap(PB) reported none onHSE nonconformance but HSJ V/KEPCO team Seoyong (I) Next

    DONEn ngs spo e eva ons n e area. o companes o

    present action plans on next meeting.J onghap(PB) ee ng

    2High HSE

    Findings

    Hanlim E&C group acquired high number of HSE

    findings with score of 4.5. This rating is based on

    established scoring by HSE Department that is

    proportional to the severity of given risk. The

    subcontractor will present on next meeting their

    corrective actions.

    Hanlim E&CNext

    MeetingDONE

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    3 Medical Case

    HSE Manager inquired about Seoyongs action on

    last week RWC. Seoyongconfirmed to verify status

    of corrective action.

    SeoyongNext

    MeetingDONE

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 129th HSJV Weekly Meeting

    5/29

    7/28/20

    OtherPTWissues:

    WorkingwithoutapprovedJHA/PTW

    CompetencyofPermitHolders/Supervisor

    Relatedactions:

    Screenin of Permit Holders and Permit

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    Issuers

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 129th HSJV Weekly Meeting

    6/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    Current StatusCurrent Status

    Batches : 2, Attendees : 34Batches : 2, Attendees : 34

  • 7/29/2019 129th HSJV Weekly Meeting

    7/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    ItemAncil lary Ar ea Camp Area Offic e Area Power Bloc k Village 1 Village 2 HSJV Total

    For theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    Cum

    Near Misses 0 0 0 0 0 2 3 22 0 0 0 0 3 24

    Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1

    (This Week From July 20 July 26, 2013)

    First Aid Cases (FA) 0 4 1 4 0 9 3 69 0 7 0 3 4 96

    Medical TreatmentCases (MTC) 0 4 0 3 0 5 0 12 0 0 0 1 0 25

    Restricted WorkCases (RWC) 0 4 0 1 0 0 0 4 0 0 0 0 0 9

    LTIs 0 0 0 0 0 0 0 3 0 0 0 0 0 3

    Property/Vehicle

    Accid ents 0 4 0 1 0 4 0 7 0 2 0 1 0 20

    Environmental

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend : Ancill ary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop

    Power Block Cut Off Wall, Wharf Area, Concrete Block Area

    * : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 31 (2013)

    Release

    Forthisweek Cumulative

    OneStrike Policy 2 136*

  • 7/29/2019 129th HSJV Weekly Meeting

    8/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    (This Week From July 20 July 26, 2013)

    Issued

    NearMissNearMiss

    CARCAR

    0 1 2 3

    1 20 178 199

    Findings TotalKE

    P

    C

    O

    H

    S

    J

    V

    S

    U

    B

    C

    O

    N

    Open Closed

    KEPCO HSJV Subcon KEPCO SubconHSJV

    0 1 0 0 0 2

    1 13 0 0 7 178

    BARAKAH NUCLEAR POWER PLANT PROJECT

    TOTALTOTAL

    OC&

    WFOC

    &

    WF 0 32 289 321

    1 53 469 523

    0 0 0 0 32 289

    1 14 0 0 39 469

  • 7/29/2019 129th HSJV Weekly Meeting

    9/29

    7/28/20

    3334

    3738

    39

    MaterialManagement

    FirePrevention

    Health&Welfare

    Plant&Equipment

    PPE

    (This Week From July 20 July 26, 2013)

    99

    1015

    1920

    222424

    2626

    2931

    Environmental

    HotWorks

    Training

    Lifting

    Hand&PowerTools

    ElectricalSafety

    ColorCoding

    WasteManagement

    Access&Egress

    FallProtection

    WorkingatHeight

    Scaffolding

    Signs,Barriers&barricades

    BARAKAH NUCLEAR POWER PLANT PROJECT

    01

    233

    455

    0 5 10 15 20 25 30 35 40 45

    SteelErection

    LOTO

    ConfinedSpace

    PTWExcavation

    Documents

    PoorIllumination

    RoadSafety

    uperv s on

    Source: CAR, Near Miss, Walkthrough and Observation Card

    Regular suction or disposal

    Replace eye protection with

    blurred vision and scratch

    lens Power Bl ockPower Block AdvanAdvan

    Provide spill containment

    tray for threading machine.

    1 32

    of toilet sewage waste

    (Power Bl ock,(Power Block, AdvanAdvan))

    Provide first aid kit at the

    workshop (Village 1, WBG)(Village 1, WBG)

    Provide rest shelter for

    workers at site (Mixing(Mixing

    Basin, AlBasin, Al RaeelRaeel))

    Inform worker not to use

    ,,

    Proper respirator, hand

    gloves when handling

    Bitumen compounds (Office(Office

    Area,Area, Seob onSeobon))

    Supervisor to use suitable

    eye protection when exposedto laser beams. (Ancillary(Ancillary

    Area,Area, HwacheonHwacheon))

    ,,

    Warn all drivers to fil l in

    equipment checklist prior

    start of work (Batching(Batching

    Plant, Eugene)Plant, Eugene)

    Install anti-whip arrestor for

    concrete pump truck

    discharge pipe line.

    (RCB1,(RCB1, SeoyongSeoyong))

    BARAKAH NUCLEAR POWER PLANT PROJECT

    drinking water for washinghands (Office Area,(Office Area, SeobonSeobon))

    Flagman must us e the

    approved vest color(Power(Power

    Block, WBG)Block, WBG)

    Ensure limit switches for

    MEWP are instal led and

    working .(O&M, Al Inayah)

    PPE Health and WelfarePlant and Equipment

  • 7/29/2019 129th HSJV Weekly Meeting

    10/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    AncillaryAreaVillage1

    42

    FindingsperArea

    (This Week From July 20 July 26, 2013)

    Arch(I)Mech

    Piping

    28

    FindingsperDiscipline

    75

    14%

    CampArea

    6

    1%

    OfficeArea

    81

    16%

    8%19%

    Elec

    67

    13%

    49

    10%

    5%

    BARAKAH NUCLEAR POWER PLANT PROJECT

    PowerBlock

    316

    61%

    Arch(PB)

    189

    36%

    Civil

    87

    17%

  • 7/29/2019 129th HSJV Weekly Meeting

    11/29

    7/28/20

    (This Week From July 20 July 26, 2013)

    3443

    93

    40

    60

    80

    100

    FindingsperCompany(ArchPB)

    33

    710

    Supervision

    Training

    WasteManagement

    WorkingatHeight

    Findingsper

    Cause

    (Arch

    PB)

    154

    0

    20

    Advan D&I DOW Seobon Seoyong(PB)

    38

    2 17 10

    19

    1

    134

    31

    2

    22 26

    1 210

    05

    10152025303540

    FindingsperArea(ArchPB)

    25

    414

    115

    134

    216

    116

    131

    1214

    Documents

    ElectricalSafety

    Environmental

    FallProtection

    FirePrevention

    Hand&PowerTools

    Health&Welfare

    HotWorks

    Housekeeping

    LIfting

    MaterialManagement

    Plant&Equipment

    PPE

    PTW

    Scaffolding

    Signs,Barriers&Barricades

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1311

    0 5 10 15 20 25

    Access&Egress

    ColorCoding

    Corrective Action

    Clearing of rebars, cables, and other materials exposed at ground.

    Provide barricades at crawler crane and laydown area.

    (This Week From July 20 July 26, 2013)

    2428

    16

    22

    15

    20

    25

    30

    FindingsperCompany(ArchInfra)

    94

    62

    Signs,Barriers&Barricades

    Training

    WasteManagement

    WorkingatHeight

    FindingsperCause(ArchInfra)

    3

    0

    5

    10

    Han li m S eo bo n Se oy ong T owe rs tec h Uw el l Yo oA

    23

    6

    45

    26

    20

    30

    40

    50

    FindingsperArea(ArchInfra)

    51

    5777

    102

    110

    112

    51

    ElectricalSafety

    Environmental

    FallProtection

    FirePrevention

    Hand&PowerTools

    Health&Welfare

    Housekeeping

    LIfting

    LOTO

    MaterialManagement

    Plant&Equipment

    PoorIllumination

    PPE

    PTW

    BARAKAH NUCLEAR POWER PLANT PROJECT

    0

    AncillaryArea CampArea OfficeArea Village1

    2 3

    0 2 4 6 8 10 12

    Access&EgressColor

    Coding

    Corrective Action

    Spill containment trays to be provided for crane, and pipe threading machine.

    Arrangement o f scaffolding, wooden materials scat tered on ground.

  • 7/29/2019 129th HSJV Weekly Meeting

    12/29

    7/28/20

    (This Week From July 20 July 26, 2013)

    44

    2330

    40

    50

    Findingsper

    Company

    (Civil)

    13

    53

    Training

    WorkingatHeight

    Findingsper

    Cause

    (Civil)

    5 2 310

    0

    10

    20

    AlRaeel Athena Eugene Gusan Hilalco WBG

    3

    31

    26 4 5

    19

    3 5 5 4

    05

    101520253035

    FindingsperArea(Civil)

    222

    3333

    108

    51

    97

    27

    2

    ElectricalSafety

    Excavation

    FirePrevention

    Health&Welfare

    LIfting

    Plant&Equipment

    RoadSafety

    Signs,Barriers&Barricades

    BARAKAH NUCLEAR POWER PLANT PROJECT

    32

    0 2 4 6 8 10 12

    Access&Egress

    Corrective Action

    Expedite repair of water cooler intended for Hilalcos workers.

    Removal of stagnant water to prevent development of il lness at site.

    Drivers and HSE personnel shall use equipment checklist prior start of w ork.

    (This Week From July 20 July 26, 2013)

    10 11

    4

    16

    410

    15

    20

    FindingsperCompany(Mech)

    1222

    Signs,Barriers&Barricades

    Supervision

    WasteManagement

    WorkingatHeight

    FindingsperCause(Mech)

    0

    G eu mh wa H wa ch on S am ji n S ei l Y ou n

    Chang

    Sam ho AlInayah

    14

    8

    3 2 14 3

    1 2 2 1

    8

    02468

    10121416

    FindingsperArea(Mech)

    111

    522

    1111

    61

    77

    ConfinedSpace

    Environmental

    FallProtection

    FirePrevention

    Hand&PowerTools

    Health&Welfare

    HotWorks

    Housekeeping

    LIfting

    MaterialManagement

    Plant&Equipment

    PoorIllumination

    PPE

    Scaffolding

    BARAKAH NUCLEAR POWER PLANT PROJECT

    2

    0 1 2 3 4 5 6 7 8

    Access&

    Egress

    o or od ng

    Corrective Action

    Complete main parts of scaffolding, scaf tag signed prior use of scaffolding.

    Use of eye protection when exposed to rays from laser machine, and engaged in

    high speed cutting machine for plywood.

  • 7/29/2019 129th HSJV Weekly Meeting

    13/29

    7/28/20

    (This Week From July 20 July 26, 2013)

    9

    19

    10

    15

    20

    FindingsperCompany(Piping)

    111

    l

    Signs,Barriers&Barricades

    WasteManagement

    WorkingatHeight

    Findingsper

    Cause

    (Piping)

    0

    5

    SungChang YounChang(PB)

    20

    510

    15

    20

    25

    FindingsperArea(Piping)

    21

    24

    13

    211

    33

    1

    l

    ElectricalSafety

    Environmental

    FallProtection

    FirePrevention

    Health&Welfare

    HotWorks

    Housekeeping

    MaterialManagement

    Plant&Equipment

    PPE

    RoadSafety

    Scaffolding

    BARAKAH NUCLEAR POWER PLANT PROJECT

    0

    5

    AncillaryArea PBABUnit1 PBTGB1

    0 1 2 3 4 5

    olor od ng

    Corrective Action

    Proper storage of gas cylinder in laydown area protected from exposure to

    sunlight.

    Follow reverse parking of vehicles at fabrication shop.

    (This Week From July 20 July 26, 2013)

    17

    30

    1720

    30

    40

    FindingsperCompany(Elec)

    24

    38

    Scaffolding

    Signs,Barriers&Barricades

    WasteManagement

    WorkingatHeight

    FindingsperCause(Elec)

    3

    0

    10

    D ae my un g H yu nd aiC&I Jonghap JongHap(PB)

    10

    27

    84 2 1 1

    61 1 3 3

    05

    1015202530

    FindingsperArea(Elec)

    61

    42

    31

    61

    85

    24

    1

    ElectricalSafety

    FallProtection

    FirePrevention

    Hand&PowerTools

    Health&Welfare

    HotWorks

    Housekeeping

    LIfting

    MaterialManagement

    Plant&Equipment

    PoorIllumination

    PPE

    PTW

    BARAKAH NUCLEAR POWER PLANT PROJECT

    4

    0 2 4 6 8 10

    Access&

    Egress

    Corrective Action

    Follow safe use of ladder with one worker to assist and hold ladder at the base.

    Provision of safe working platform for working at height jobs.

  • 7/29/2019 129th HSJV Weekly Meeting

    14/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    5150

    60

    3430

    26

    9

    2421

    1714

    16

    10

    20

    30

    40

    BARAKAH NUCLEAR POWER PLANT PROJECT

    4 3 2 3 4 3 2 1 10

  • 7/29/2019 129th HSJV Weekly Meeting

    15/29

    7/28/20

    50

    60 RoadSafetyConfinedSpace

    PTW

    RoadSafety

    Excavation

    Documents

    5 Housekee in

    9,Housekeeping

    20

    30

    40 EnvironmentalTraining

    ElectricalSafety

    HotWorks

    Hand&PowerTools

    LIfting

    ColorCoding

    WasteManagement

    Signs,Barriers&Barricades

    MaterialManagement

    Plant&Equipment

    ,

    4,FallProtection

    4,Access&Egress

    5,Housekeeping

    5,PPE5,Health&

    Welfare

    3,Health&

    Welfare4,Plant&

    Equipment

    4,Health&

    Welfare

    4,Housekeeping

    4,Housekeeping

    BARAKAH NUCLEAR POWER PLANT PROJECT

    0

    10 FirePreventionAccess&Egress

    WorkingatHeight

    Fall

    ProtectionScaffolding

    Health&Welfare

    PPE

    Housekeeping

    700

    80090

    100KEPCO/HSJV

    SUBCON

    (This Week From July 20 July 26, 2013)

    100

    200

    300

    400

    500

    600

    203040506070 Manpower

    BARAKAH NUCLEAR POWER PLANT PROJECT

    00

    Seoyong

    Seoyong(PB)

    TowersTech

    Gusan

    Jonghap

    Jonghap(PB)

    YounChang

    YounChang(PB)

    Hwachon

    WBG

    Hilalco

    Advan

    Hanlim

    YooA

    HyundaiC&I

    Samjin

    Eugene

    Daemyung

    Seobon

    D&I

    AlRaeel

    DOW

    Samho

    Geumhwa

    Sungchang

  • 7/29/2019 129th HSJV Weekly Meeting

    16/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    8.06.3

    FindingsScore=NumberofCausalxRisk(FactorScore)FindingsScore=NumberofCausalxRisk(FactorScore)

    Source: CAR, Near Miss, Walkthrough and

    Observation Card reported by KEPCO & HSJV

    0.0

    2.0

    4.0

    6.0

    2.6 2.52.2

    0.0

    1.2

    3.22.5

    1.5

    2.8

    0.41.0 1.2

    2.0

    0.71.5

    BARAKAH NUCLEAR POWER PLANT PROJECT

    ActionPlanActionPlan forCompanyrequiringassistanceandsupportfromthesystemforCompanyrequiringassistanceandsupportfromthesystem

    1.JointInspection willbecarriedoutbyAreaManagementTeam.

    2.SpotTrainingwillbegiven toworkersaboutmajorfindings

    3.Actionplanwillbe submittedtoHSJVHSETeamdevelopby TOWERSTECH

    Legend : (I) Infra, (PB) Power Block

  • 7/29/2019 129th HSJV Weekly Meeting

    17/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    Top Hazards

    Cause Nos

    Plant&Equipment 5

    Total No. of Findings : 16

    Health&Welfare,1

    Signs,Barriers&Barricades,1

    WasteManagement 4

    Control Measure Due Date

    Ensuretoturnoffswitchof

    equipmentbeforeleaving

    andwhennotinuse.

    Done

    Soilprotectionagainst

    Plant&Equipment,5

    Hand&PowerTools,1

    LIfting,1

    BARAKAH NUCLEAR POWER PLANT PROJECT

    concrete

    waste

    should

    be

    providedduringconcrete

    works.

    Alw ays

    WasteManagement,4

    FallProtection,1Housekeeping,1

    PPE,1

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 129th HSJV Weekly Meeting

    18/29

    7/28/20

    Top Hazards

    Total No. of Findings: 23

    Scaffolding,4

    Plant&Equipment,4

    ConfinedSpace,1

    PoorIllumination,1

    Scaffolding 4

    Plant&Equipment 4

    Control Measure Due Date

    Ensurethatscaffoldingare

    inspectedandprovidedwith

    greentagbeforeuse.

    Done

    ElectricalSafety,1

    WasteManagement,1

    Access&Egress,1

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Equipmentmustbe

    inspectedandcolorcoded

    beforeuse

    on

    site.

    Done

    FirePrevention,3

    Hand&PowerTools,2

    RoadSafety,2Supervision,1

    ColorCoding,1ot or s,1

    Source: CAR, Near Miss, Walkthrough and Observation Card

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 129th HSJV Weekly Meeting

    19/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    InspectionInspection DateDate AttendeesAtt endees RemarkRemark

    Commi tt ee Ins pect ion 2013-07-23 HSJV, KEPCO, HSE Manag ement Team 1 Fi nd ing

    Weekly Inspection 2013-07-24 HSJV HSE Team 6 Findings

    2

    3

    FindingsperCompany

    2PoorMaintenance

    FindingsperCausal

    2

    1

    2

    1

    0

    1

    AlInayah Hanlim Towerstech YounChang

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1

    1

    2

    0 1 2 3

    NoSignages

    NeedsTraining

    NoInspection

    Key item : MEWP

  • 7/29/2019 129th HSJV Weekly Meeting

    20/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    AREAAREA : Power Bl ock ,: Power Block, AdvanAdvan 25 June 201325 June 2013

    CORRECTIVE ACTION:CORRECTIVE ACTION:

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 129th HSJV Weekly Meeting

    21/29

    7/28/20

    AREAAREA : GIB,: GIB, SeoyongSeoyong 25 July 201325 July 2013

    CORRECTIVE ACTION:CORRECTIVE ACTION:

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    AREAAREA :: GIB,GIB, JonghapJonghap 21 July21 July 20132013

    CORRECTIVE ACTION:CORRECTIVE ACTION:

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 129th HSJV Weekly Meeting

    22/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    No.Source of

    InjuryArea Descr iption

    Immediate

    Act ion

    Planned

    Supervisor

    Preventive

    Act ion

    1Injury left

    thumb.

    D&I

    RebarWorker

    PowerBlock

    TGB1

    Whiledoingrebar

    activity,rebar

    suddenlyslippedandIPs

    glovescaughtinbetween

    slingbelt

    AssessedbyDr.Kim

    Woundcleaningwith

    salinedone

    Withdressing

    application

    AnalgesicIMmedicine

    Proper

    coordination

    between

    riggerand

    worker

    Useof

    crowbar to

    BARAKAH NUCLEAR POWER PLANT PROJECT

    21072013

    21:15

    .

    gotinjured. g ven Referredtohospital disengage

    trapped

    rebars

  • 7/29/2019 129th HSJV Weekly Meeting

    23/29

    7/28/20

    No.Source of

    InjuryArea Descr iption

    Immediate

    Act ion

    PlannedSupervisor

    Preventive Acti on

    2Sprainleft

    lateralankle

    JONGHAP

    LaundryBoy

    StaffCamp

    LaundryRoom

    Laundryworkerentered

    theroomandhave

    argumentwithIPwhich

    promptedtheworkerto

    pushIPandloses

    balancewhich

    accidentall fellonthe

    AssessedbyDr.

    Kim

    Referredto

    hospitalforXRay

    Personnelwere

    advisedtoreport

    any

    disagreements.

    Scheduleof

    dryingisset

    BARAKAH NUCLEAR POWER PLANT PROJECT

    21072013

    08:00

    floorandsustainedpain

    onhisleftankle.

    whenACis

    unavailable.

    No.Source of

    InjuryArea Descr iption

    Immediate

    Act ion

    Planned

    Supervisor

    Preventive

    Act ion

    3

    Minormiddle

    finger

    laceration

    ADVAN

    RebarWorker

    PowerBlock

    AB1Unit4

    IPwithhisteam

    performedtherebar

    erectionactivity.

    Reportedly,IPhadhis

    middlefingercaughtin

    betweentherebars

    AssessedbyDr.Kim

    Woundcleaningwith

    salinedone

    Withdressing

    application

    Anal esicIM

    Useof

    appropriate

    handgloves.

    Proper

    coordination

    between

    riggerand

    BARAKAH NUCLEAR POWER PLANT PROJECT

    21072013

    20:45

    causingminor

    laceration

    tothesaidfinger.medicine

    given wor ers. Awarenessof

    workersto

    givenhazards.

  • 7/29/2019 129th HSJV Weekly Meeting

    24/29

    7/28/20

    No.Source of

    InjuryArea Descr iption

    Immediate

    Act ion

    PlannedSupervisor

    Preventive

    Act ion

    4

    Righteyepain

    withforeign

    body

    SHINWOO

    H/EPainter

    PowerBlock

    AB1

    Whiletakingarestin

    frontofventilationfan

    hedidnotnoticethata

    housekeeperissweeping

    thefloorandthe

    accumulatedduskflew

    AssessedbyDr.Kim

    Eyewashingwith

    salinedone

    Eyedropsmedication

    iven

    Settimeto

    performdaily

    cleaningof

    restrooms.

    Provide

    housekeeping

    tools to

    BARAKAH NUCLEAR POWER PLANT PROJECT

    22072013

    10:00

    causedirritationtohis

    eyes.

    collectdirton

    floor dustpan,

    etc.

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 129th HSJV Weekly Meeting

    25/29

    7/28/20

    Opening Meeting NMDC Dredging AreaHeavy Equipment Shop

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Descript ionDescript ion

    CEMP 3CEMP 3rdrd Party Audit Conducted on 24Party Audit Conducted on 24 thth .July.2013.July.2013 1 Moderate f indi ng for NMDC and 2 Minor f indin gs for HSJV1 Moderate f indi ng for NMDC and 2 Minor f indin gs for HSJV The draft audit report w i l l be issued on 3rd.August .2013The draft audit report w i l l be issued on 3rd.August .2013

    Batch PlantAncillaryPower Block

    Issuedon11.July.2013

    Waitin s are artsfromUSA

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Marine Works Wharf Phase 2

    Description Crawler Crane on barge observed disch arging heavy black smoke whil e dredging works.

    Act ion taken Ensure to conduct preventive maintenance according to manufacturers specification

    Status OPEN

  • 7/29/2019 129th HSJV Weekly Meeting

    26/29

    7/28/20

    No.0 DateActio n by

    CompanyS ta tu s C lo s in g D ate

    Expiration

    Date

    Ref. No.

    CARM ai n Area Sub -A re a Issu ed By

    Issuer

    Company

    1

    11 July

    2013 Athena

    Crawler Crane on barge with body

    number LIMA 2400-B observed

    discharging heavy black smoke from

    the exhaust system while dredging

    works in progress which contributes

    to degradation of ambient air quality.

    OPEN

    16 July

    2013

    16 June

    2013 1621 Wharf Phase 2Renato

    PonceHSJV

    BARAKAH NUCLEAR POWER PLANT PROJECT

    WASTEMANAGEMENTUPDATE

    Week=18/07/2013 25/07/2013

    WASTETYPEThisweek Lastweek

    Collected(m3) Disposal(m3) Recycled(m3) Recycle(%) Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)

    Paper 48 0 45 56 0 0

    Metal 32 0 0 24 0 45

    Construction 104 675 0 88 405 0

    Concrete 0 0 0 0 0 0

    Wood(Good) 0 0 0 0 0 0

    Wood(Bad) 176 90 0 104 45 0

    Plastic 96 0 0 72 0 0

    Municipal 0 336 0 0 376 0

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend:Collected WastefromSitetoTemporaryStorageAreaDisposal WastefromTemporaryStorageAreatoLandfillArea

    Recycle Treatedwaste(GMET)toRecyclingPlants

    Hazardous 0 0 0 8 8 0

    TotalSolidWaste 456 1,101 45 9.87% 352 834 45 12.78%

  • 7/29/2019 129th HSJV Weekly Meeting

    27/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 129th HSJV Weekly Meeting

    28/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 129th HSJV Weekly Meeting

    29/29

    7/28/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECTBARAKAH NUCLEAR POWER PLANT PROJECT