Sub : 36 UTPL Land Problem in the region from Uran to Nagaon

CONSORTIUM OF SREE & MEIL

HYDERABADFAX MESSAGE

Fax040 - 44336789

PROJECT:Desalter Nawagam

PAGEPage 1 of 1

Consortium of Sai Rama Engineering

Enterprises and Megha Engineering &

Infrastructures Ltd., Hyderabad.

Tele No.

040 44609100 Email:[email protected]

From: Ch.NehruFile Ref.:

SREE/MEIL/NWGM/1296Date :

03.05.2012To:

Office of the GGM- Head Works,

Onshore Engineering Services

8 th floor, Scope Minar, Laxmi Nagar

Delhi 110 092 Attn: Mr. Amlan chakroborthy CE (Mech) PC UDP.Fax no:

Tele No.

011 2240 6690011 - 2240 6724 Project: UP GRADATION OF FACILITIES AT DESALTER, NAWAGAM. Ref no: DLH/OESG/DP/CSM/450/2007-08 dated 30-4-12Dear Sir,

Kindly refer the response to the letters received from ONGC dated on 20.04.2012 and 21.03.2012 (Ref. No. DLH/OESG/DP/CSM/449/2007-08).

To meet the output parameters of the installed De-Salter Vessels ( as per Contract )as per the Vendor recommendations the works are in progress, Vendor concerns are being discussed for making the necessary punctures (on Vessel )for the transformer to grid connections. The 3 No. of 150KVA transformers have already arrived on site and the consortium is in process to take all necessary actions to meet the schedule. However we have submitted for proposal of constructing tanks for settling of crude oil and achieving output parameters for your kind review. Rim Seal fire protection system is fully functional, a vendor level meet was organized on first week on Oct 2011 and all the third party communication i.e. DCS (Honeywell) to PLC (Allen-Bradley) was achieved (witness by ONGC engineers), but the necessary graphics updates were not completed. The necessary issues have been communicated to Honeywell concern and the necessary actions would be planned and performed soon. DCS System was commissioned and total failure of the system is rare event as taken care in the basic design so day-to day problems are majorly maintenance issues, still the necessary concerns of the Desalter team (if any) would be addressed soon after consulting with vendorHowever we are planning in the coming weeks to depute with our team along with

M/s Honeywell for closing all the related to DCS system. We request you during the period kindly inform to concerned persons of desalter team to attend the same and sign off the MOM.Enclosed are the attachments for your ready reference.

1. DCS-ESD system commissioning reports.

2. MOM between vendors for third party communication establishment.Thanking you assuring our best attention and services at all times.Yours Very Truly,

For Consortium Of SREE-MEIL.