Transcript of 125th HSJV Weekly Meeting
-
7/29/2019 125th HSJV Weekly Meeting
1/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT
P ease Turn o your
mobile! Or Switch to
vibration mode!
BARAKAH NUCLEAR POWER PLANT PROJECT
Check! Right Now!
-
7/29/2019 125th HSJV Weekly Meeting
2/26
7/1/20
SCREEN
Dont Panic11
Switch Off All Electrical Equipment22
BARAKAH NUCLEAR POWER PLANT PROJECT
Dont Run, Walk Fast!33
Go to the Assembly Point44
Wait for the Final Instruction55
1. Safety Moment
2. Previous Meeting
1. Safety Moment
2. Previous Meeting
7. Weekly Inspection
Committee Inspection
Weekly Inspection
7. Weekly Inspection
Committee Inspection
Weekly Inspection
. rograms
4. HSE Statistics
Performance per Area and Total
5. HSE Findings Summary
HSE Findings by Company
. rograms
4. HSE Statistics
Performance per Area and Total
5. HSE Findings Summary
HSE Findings by Company
8. Incident Reports
9. Medical Cases
10.Environmental Issues
11.Action Plans
Gusan
8. Incident Reports
9. Medical Cases
10.Environmental Issues
11.Action Plans
Gusan
BARAKAH NUCLEAR POWER PLANT PROJECT
va ua on y n ngs core6. Findings Analysis per Discipline
va ua on y n ngs core6. Findings Analysis per Discipline
-
7/29/2019 125th HSJV Weekly Meeting
3/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 125th HSJV Weekly Meeting
4/26
7/1/20
NO.NO. ITEMSITEMS ACTIONACTION PLANSPLANS ACTION BYACTION BYDUEDUE
DATEDATESTATUSSTATUS
High HSEGusan Contractor from HSJ V acquired high number ofHSE findings with score of 4.0. This rating is based on
Next
proportional to the severity of given risk. Gusan willpresent on next meeting their corrective actions.
Meeting
2 EAD Visit
ENEC representative reiterated the upcoming visit ofEnvironmental Agency Abu Dhabi (EAD) on 26th J une2013. Subcontractors must initiate intensivehousekeeping at site as part of the preparation.
HSJ V J une 2013
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 125th HSJV Weekly Meeting
5/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT
1.1. Tas kTas k Fo rc eFo r ce TeamTeam w asw as fo rmedf or med c o mp o sedc om po sed o f of HeadHead Of fi ceOf fi ce HSEHSE TeamTeam
headedh ead ed b yb y Sen io r Sen io r Vi c eVi ce Pres iden tPr es i den t t ot o ver if yv er if y HSEHSE i ss u esi ss u es r ai s edr ai s ed d ur in gdur ing
CEOsCEOs (ENEC/HSJV)(ENEC/HSJV) meetingmeeting..
2. Top Management Off sit e HSE Work sho p2. Top Management Off sit e HSE Work sho p -- 2 J ul y2 July -- 04 July 201304 July 2013
At ten ding Or gan izat ion : ENEC, KEPCO, HSJV @At ten ding Or gan izat ion : ENEC, KEPCO, HSJV @ YasYas IslandIsland
Date FindingsIssued
TotalKEPCO HSJV Subcon
1) CAR status before & after gates changed- Camera is more strictly not allowed on site after gates were changed.
15.June to21.June
(Beforegatechanged)CAR
13 32 177 222
22.Juneto28.June
(Aftergatechanged)5 13 145 158
2) Camera permissions official requests to KEPCO Admin and HSSE Team- Official memo was issued on 19th.Feb.2013 and 26th.May.2013.
BARAKAH NUCLEAR POWER PLANT PROJECT
13 46 477 536
-
7/29/2019 125th HSJV Weekly Meeting
6/26
7/1/20
EAD Key Check Points
1) Chemical Storage Management 2) NOC(No Objection Certificate) Attachment
BARAKAH NUCLEAR POWER PLANT PROJECT
1.1 . A l l r el ev an t i te ms ar e p l ac ed i nAl l rel ev an t i tem s ar e p lac ed inchemical storage.chemical storage.
2.2 . D if f er en t t yp es o f c he mi c al s s h ou l d beDi f ferent types of chemicals should beseperatedseperated wi th concrete bunds or t r ipwi th concrete bunds or t r iptray.tray.
1.1 . NOC should be a tt ached on t heNOC shoul d be attached on thenot ice boards.not ice boards.
EAD Key Check Points
3) Waste Management 4) Housekeeping
12
3 45
6
7
BARAKAH NUCLEAR POWER PLANT PROJECT
1.1 . The highes t s t andard housekeepingThe highest s tandard hou sekeepingneeded.needed.
.. en ca on s gnageen ca on s gnage2.2. Per s on i n c har g e s i gn ag ePerson in charge s ignage3.3. Sp i l l k i tSpi l l k i t4.4. Fi re Ex ti ng ui sh er Fire Extinguisher5.5 . B ar r i ca de (b o t h s i d es an d re ar Barr icade(both sides and rear
d i rect ion)d i rect ion)6.6. AssignedAs signed --trained personnelt ra ined personnel7.7. Si m pl i ci ty s h el t er o r s h ad e fo r Simpl ic i ty shel ter or shade for
ass igned personnelass igned personnel Through segregation needed.Through segregation needed.
-
7/29/2019 125th HSJV Weekly Meeting
7/26
7/1/20
CICPA Card
and
CICPA
CardRFIDCard
or
and
RFIDCard
BARAKAH NUCLEAR POWER PLANT PROJECT
CICPA Card
Descript ionDescript ionThe new gates were opened with project site divided into zones (red, yellow, &The new gates were opened with project site divided into zones (red, yellow, &
green). The CICPA fully in co ntrol in Gates 3 and B, other gates have sing le passgreen). The CICPA fully in co ntrol in Gates 3 and B, other gates have sing le pass
requirement .requirement .
Visitor
cardor or
CICPA
Card RFIDCard
Visitor
Card
RFID
Card
Hand & Finger Injury Training RecordDATE MONTH INSTRUCTOR COURSES COMPANY ATTENDEE TRAINING
23-Jun-13 Jun Suhail/Heo/Bakul Hands and Powertools Seoyong 208 Spot
23-Jun-13 Jun Bakul/Chart Hands and Powertools Seoyong 116 Spot
24-Jun-13 Jun Bakul Hand and Power tools Jonghap,U-Jin 8 Special
24-Jun-13 Jun Bakul/Chart Hand and Power tools Gusan 228 Spot
25-Jun-13 Jun Choi Hand and PowertoolsJonghap,Sungchang, Gusan ,Hwachon
plant20 Special
25-Jun-13 Jun Bakul Hand and Powertools Advan 427 Spot
26-Jun-13 Jun Bakul/Chart Hand and Powertools D&I 175 Spot
26-Jun-13 Jun Bakul Hand and Powertools Gusan 5 Special
27-Jun-13 Jun Bakul/Suhail Hand and Powertools Hilalco 178 Special
27-Jun-13 Jun Chakandee Hand and Powertools Gusan 9 Special
29-Jun-13 Jun Choi Hands and Powertools Advan,Gusan , Sungchang 36 SpecialSpecialTrainingSpotTraining
BARAKAH NUCLEAR POWER PLANT PROJECT
29-Jun-13 Jun Bakul/Chart Hands and Powertools Samjin 127 Special
Total 1537
Descript ionDescript ion
The cont inuat ion of hand & f inger spot t ra in ings conducted at theThe cont inuat ion of hand & f inger spot t ra in ings conducted at the
work place as part of project s promotio n to decrease number of injuries.work place as part of project s promotio n to decrease number of injuries.
-
7/29/2019 125th HSJV Weekly Meeting
8/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT
ItemAncil lary Ar ea Camp Area Offic e Area Power Bloc k Village 1 Village 2 HSJV Total
For theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
Cum
Near Misses 0 0 0 0 0 2 0 18 0 0 0 0 0 20
Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1
(This Week From June 22 28, 2013)
First Aid Cases (FA) 0 4 0 0 0 6 1 43 0 7 0 3 1 63
Medical TreatmentCases (MTC) 0 2 0 1 0 5 0 12 0 0 0 1 0 21
Restricted WorkCases (RWC) 0 2 0 1 0 0 0 5 0 0 0 0 0 8
LTIs 0 0 0 0 0 0 0 3 0 0 0 0 0 3
Property/Vehicle
Accid ents 0 3 0 1 0 4 0 7 0 2 0 1 0 18
Environmental
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend : Ancill ary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop
Power Block Cut Off Wall, Wharf Area, Concrete Block Area
* : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 24 (2013)
Release
Forthisweek CumulativeOneStrike Policy 1 130*
-
7/29/2019 125th HSJV Weekly Meeting
9/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT
(This Week From June 22 June 28, 2013)
Issued
NearMissNearMissCARCAR
0 0 0 0
3 13 145 161
Findings TotalKE
P
C
O
H
S
J
V
S
U
B
C
O
N
Open Closed
KEPCO HSJV Subcon KEPCO SubconHSJV
0 0 0 0 0 0
3 7 0 0 6 145
BARAKAH NUCLEAR POWER PLANT PROJECT
TOTALTOTAL
OC&WFOC&WF 0 29 298 3273 42 443 488
0 0 0 0 29 298
3 7 0 0 35 443
-
7/29/2019 125th HSJV Weekly Meeting
10/26
7/1/20
2929
3032
39
Access&Egress
PPE
Plant&Equipment
Signs,Barriers&barricades
FirePrevention
(This Week From June 22 June 28, 2013)
811
1315
1718
192020
2124
2525
27
ColorCoding
Documents
PTW
Lifting
Scaffolding
FallProtection
ElectricalSafety
HotWorks
WorkingatHeight
WasteManagement
Environmental
MaterialManagement
Hand&PowerTools
Health&Welfare
BARAKAH NUCLEAR POWER PLANT PROJECT
1111
35
66
0 5 10 15 20 25 30 35 40 45
ManualHandling
ConfinedSpace
Excavation
LOTO
Emergency&Evacuation
Training
PoorIllumination
Supervision
Source: CAR, Near Miss, Walkthrough and Observation Card
Forklift operator and banks
man must have propercoordination
(Workshop, D&I)(Workshop, D&I)
Clearing path towards fir e
fighting equipment (Ancillary(Ancillary
AreaArea SeilSeil
Conduit pipe threading-
bending machine must be
provided with barrier and
1 32
Air com pressor mus t begrounded and resting on spill
containment tray when in
operation (Power(Power
Block,Block, SeobonSeobon))
MEWP outriggers must be in
contact on ground when
extended and used.
STC HanlimSTC Hanlim
,,
Provide sufficient number of
fire extinguisher to diesel
tanker(Intake Basin, Al(Intake Basin, Al RaeelRaeel))
Fire hydrant point must be
free of any obstruction
(Fabrication(FabricationShop,Shop, YounchangYounchang PB)PB)
signage
(Village 1, Hyundai C&I)(Village 1, Hyundai C&I)
Install barricade for main
electrical panel cabinet
(CWIS,(CWIS, Seoyon gSeoyong PB)PB)
Proper stacking of
material, barricaded, will be
followed by the team. (Village(Village
1 H undai C&I1 H undai C&I
BARAKAH NUCLEAR POWER PLANT PROJECT
,,
BanksmanBanksman should be in fullshould be in full
control when managingcontrol when managing
forkliftforklift (Ancillary(Ancillary
Area,Area, Younc hangYounchang PB)PB)
Oxygen cylinder must befitted with protective cap
when not in use (Village(Village
1, Hanlim)1, Hanlim)
Set barricade during
dismantling of scaffold.
(ADB,(ADB, SeobonSeobon))
Fire Prevention Plant and EquipmentSigns, Barriers, & Barric ades
-
7/29/2019 125th HSJV Weekly Meeting
11/26
7/1/20
BARAKAHNUCLEARPOWERPLANTPROJECT
AncillaryArea46
Village23
FindingsperArea(This Week From June 22 June 28, 2013)
Arch(I)Mech41
Piping
9
2%
FindingsperDiscipline9%
OfficeArea60
12%
V llage157
12%
19%
Civil
84
Elec
56
12%
9%
BARAKAH NUCLEAR POWER PLANT PROJECT
PowerBlock319
66%
Arch(PB)201
41%
17%
-
7/29/2019 125th HSJV Weekly Meeting
12/26
7/1/20
(This Week From June 22 June 28, 2013)
115
100
150
FindingsperCompany(ArchPB)
21
149
Si ns Barriers& Barricades
Supervision
Training
WasteManagementWorkingatHeightFindingsperCause(ArchPB)
2711 6 3
0
50
Advan D&I DOW Samjin Seobon Seoyong(PB)
1 28 8 4 7
66
3 411 8
46
2 1 5
19
3 3
010203040506070
FindingsperArea(ArchPB)
66
17
577
138
1711
148
214
27
Documents
ElectricalSafetyEmergency&EvacuationEnvironmental
FallProtectionFirePreventionHand&PowerToolsHealth&Welfare
HotWorksHousekeepingLifting
MaterialManagementPlant&EquipmentPoorIlluminationPPE
PTW
Scaffolding
,
BARAKAH NUCLEAR POWER PLANT PROJECT
183
0 5 10 15 20
Access&EgressColorCoding
Corrective Action
Replacement of damaged signage, setting signage at workplace.
Maintenance of cleanliness at smoking shelter.
Installation of fi rm and safe ladders.
(This Week From June 22 June 28, 2013)
31
1
29
17
1
14
110
20
30
40
FindingsperCompany(ArchInfra)
4
3
1
3
l
Signs,Barriers&Barricades
Training
WasteManagement
WorkingatHeight
FindingsperCause(ArchInfra)
14
31
3 4 2
40
10
20
30
40
50
FindingsperArea(ArchInfra)
4
4
2
6
5
11
5
3
4
6
1
5
7
9
6
Documents
ElectricalSafety
Emergency&Evacuation
Environmental
FallProtection
FirePrevention
Hand&PowerTools
Health&Welfare
HotWorks
Housekeeping
Lifting
MaterialManagement
Plant&Equipment
PPE
PTW
l
BARAKAH NUCLEAR POWER PLANT PROJECT
0Ancillary
Area
OfficeA re a P BCPI2 PBLa ydown PBO &M V il la ge1 31
0 2 4 6 8 10 12
Access&EgressColor
Coding
Corrective Action
Containers or closed room free of flammable substances. Use of suitable footwear during concrete finishing works. Ensure equipment free of any oil leaks.
Stationary air compressor supported with drip tray.
-
7/29/2019 125th HSJV Weekly Meeting
13/26
7/1/20
(This Week From June 22 June 28, 2013)
65
40
60
80
FindingsperCompany(Civil)1
5
2
Su ervision
Training
WasteManagement
WorkingatHeight
FindingsperCause(Civil)
3 3
18
2 112
0
20
AlR aee l E uge ne Gu san Hi lal co HSJ V S eo yo ng(PB)
WBG
62 3
36
4
19
3 18
2
05
10152025303540
FindingsperArea(Civil)
1
2
8
3
10
1
7
4
2
1
2
11
5
3
6
Documents
ElectricalSafety
Environmental
FallProtection
FirePrevention
Hand&PowerTools
Health&Welfare
Housekeeping
Lifting
Manual Handling
MaterialManagement
Plant&Equipment
PPE
PTW
Signs,Barriers&Barricades
BARAKAH NUCLEAR POWER PLANT PROJECT
6
1
1
0 2 4 6 8 10 12
Access&Egress
ColorCoding
ConfinedSpace
Corrective Action
Repair of heavy equipment operators cabin air conditioning system. Diesel tanker to have sufficient number of fire extinguishers. Paints and other chemicals moved to designated place with reference MSDS posted.
(This Week From June 22 June 28, 2013)
2
11
23
42
11
6
2468
1012
FindingsperCompany(Mech)1
1
3
l
Supervision
WasteManagement
WorkingatHeight
FindingsperCause(Mech)
18
13 2 1 2 2 1 2
8
1
0
5
10
15
20
FindingsperArea(Mech)
2
3
11
2
1
2
1
1
2
2
2
Electrical Safety
Environmental
FirePrevention
Hand&PowerTools
HotWorks
Housekeeping
Lifting
LOTO
Plant&Equipment
PPE
PTW
ca old ng
BARAKAH NUCLEAR POWER PLANT PROJECT
2
0 2 4 6 8 10 12
ColorCoding
l l
Corrective Action
Access to fire fighting equipment is free of any blockage or obstruction.
Completion of scaffolding parts and tagging prior put into use.
-
7/29/2019 125th HSJV Weekly Meeting
14/26
7/1/20
(This Week From June 22 June 28, 2013)
3
6
4
6
8
FindingsperCompany(Piping)1
l
Signs,Barriers&Barricades
FindingsperCause(Piping)
0
2
SungChang YounChang(PB)
4
2 22
3
4
5
FindingsperArea(Piping)
1
2
2
1
1
1
ElectricalSafety
FirePrevention
HotWorks
Housekeeping
Plant&Equipment
Scaffolding
BARAKAH NUCLEAR POWER PLANT PROJECT
0
1
AncillaryArea PBABUnit1 PBLaydown PBRCB1
0 0.5 1 1.5 2 2.5
Corrective Action
Provision of screen to contain radiation, and displaced metal slugs from gas cutting works.
Proper management of empty cylinders its storage and handling followed by working crews.
(This Week From June 22 June 28, 2013)
12
32
20
30
40
FindingsperCompany(Elec)
2
1
2
Signs,Barriers&Barricades
Supervision
WorkingatHeight
FindingsperCause(Elec)
2
0
Daemyung HyundaiC&I Jonghap Jonghap(PB) Y ounChang(PB)
26
14
10
15
20
25
30
FindingsperArea(Elec)
1
5
10
4
3
5
4
1
4
5
2
Excavation
FallProtection
Hand&PowerTools
Health&Welfare
HotWorks
Housekeeping
MaterialManagement
Plant&Equipment
PoorIllumination
PPE
Scaffolding
BARAKAH NUCLEAR POWER PLANT PROJECT
4 3 1 1 1
0
5
Ancillary
Area
Office
Area
PBAB
Unit1
PBAB
Unit2
PBO&M PBTGB1 Village1 Village22
14
0 2 4 6 8 10 12
Access&Egress
ColorCodingElectrical
Safety
Corrective Action
Workers were trained on right positioning when working with hand and power tools. Periodic trainingas part continuous education program is planned by HSJ V HSE Team.
-
7/29/2019 125th HSJV Weekly Meeting
15/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT
77
70
80
13
41
2015
21
11
20
48
1920
30
40
50
BARAKAH NUCLEAR POWER PLANT PROJECT
4 3 3 3 2 4
0
-
7/29/2019 125th HSJV Weekly Meeting
16/26
7/1/20
70
80
90 ConfinedSpaceEmergency&Evacuation
Training
PoorIllumination
Supervision
ColorCoding
10,Signs,Barriers,&Barricades
20
30
40
50
60PTW
Documents
FallProtection
Scaffolding
HotWorks
Lifting
Environmental
ElectricalSafety
Hand&PowerTools
WorkingatHeight
MaterialManagement
7,Signs,Barriers,&Barricades
7 Environmental
4,Health&Welfare4,FirePrevention
4,PlantandEquipment
6,Housekeeping
5,AccessandEgress
5,Housekeeping
BARAKAH NUCLEAR POWER PLANT PROJECT
0
10WasteManagement
Plant&Equipment
FirePrevention
Health&
Welfare
PPE
Access&Egress
Signs,Barriers&Barricades
Housekeeping
,
700
80090
100KEPCO/HSJV
SUBCON
(This Week From June 22 28, 2013)
100
200
300
400
500
600
203040506070 Manpower
BARAKAH NUCLEAR POWER PLANT PROJECT
00
Seoyong
Seoyong(PB)
TowersTech
Gusan
Jonghap
Jonghap(PB)
YounChang
YounChang(PB)
Hwachon
WBG
Hilalco
Advan
Hanlim
Uwell
YooA
HyundaiC&I
Samjin
Eugene
Daemyung
SeobonD&I
AlRaeel
DOW
Samho
IsamKabbani
Geumhwa
SungchangSeil
-
7/29/2019 125th HSJV Weekly Meeting
17/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT
4.0
FindingsScore=NumberofCausalxRisk(FactorScore)FindingsScore=NumberofCausalxRisk(FactorScore)Source: CAR, Near Miss, Walkthrough and
Observation Card reported by KEPCO & HSJV
0.0
1.0
2.0
3.0
1.4
0.60.2
0.0
1.9
1.21.0
0.20.4
1.7
0.70.4
1.0
BARAKAH NUCLEAR POWER PLANT PROJECT
ActionPlanActionPlan forCompanyrequiringassistanceandsupportfromthesystemforCompanyrequiringassistanceandsupportfromthesystem1.JointInspection willbecarriedoutbyAreaManagementTeam.
2.SpotTrainingwillbegiven toworkersaboutmajorfindings
3.Actionplanwillbe submittedtoHSJVHSETeamdevelopby YounChang(Infra)
Legend : (I) Infra, (PB) Power Block
-
7/29/2019 125th HSJV Weekly Meeting
18/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Top Hazards
Cause Nos
Scaffolding 3
Total No. of Findings : 12Scaffolding,3
ColorCodin 1
FirePrevention,1
Housekeeping 2
Control Measure Due Date
Restrict workersfromusingincompletescaffoldandensurethattagsareprovided.
Done
ElectricalSafety,1
,
BARAKAH NUCLEAR POWER PLANT PROJECT
Providecable
hangers
for
propercablemanagement. DoneHousekeeping,2
Plant&Equipment,1
WorkingatHeight,1Environmental,1
HotWorks,1
Source: CAR, Near Miss, Walkthrough and Observation Card
-
7/29/2019 125th HSJV Weekly Meeting
19/26
7/1/20
Top Hazards
Total No. of Findings: 10
ElectricalSafety,2
ColorCoding,1
ElectricalSafety 2FirePrevention 2
Control Measure Due Date
Ensurethatcontrolpanelsareproperlyinspectedandsecurelyinstalled. Sone
re revent on,2
Workingat
Health&Welfare,1
BARAKAH NUCLEAR POWER PLANT PROJECT
Propersegregationandstorageofcombustiblematerials shouldbepracticed.
Done
Housekeeping,1PPE,1
Scaffolding,1
,
Source: CAR, Near Miss, Walkthrough and Observation Card
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 125th HSJV Weekly Meeting
20/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT
InspectionInspection DateDate AttendeesAtt endees RemarkRemark
Commi tt ee Ins pect ion 2013-06-25 HSJV, KEPCO, HSE Manag ement Team Fi ndi ngs
Weekly Inspection 2013-06-26 HSJV HSE Team 4 Findings
2
3
FindingsperCompany
2NoSegregation
FindingsperCausal
2 2
0
1
Hanlim Seobon
BARAKAH NUCLEAR POWER PLANT PROJECT
1
1
0 0.5 1 1.5 2 2.5
NoSpillKit
NoDripTray
Key item : Chemical Storage
-
7/29/2019 125th HSJV Weekly Meeting
21/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT
No.Source of
InjuryArea Descr iption
Immediate
Act ion
Planned
Supervisor
Preventive
Act ion
1Injury;left
4thFinger
ADVAN
Danilo Dizon
Carpenter
PowerBlock
TheIPwithhisSupervisor
triedtoadjusttheconnector
ofanadjustableAtype
laddertotransferittothe
workingarea.Notawareofhis
Supervisorssuddenreleaseof
theladder,theconnectorsnip
Assessedby
Dr.Kim.
Wound
cleansingand
compressive
dressingdone.
BARAKAH NUCLEAR POWER PLANT PROJECT
28062013
07:00
inbetween
the
sharp
edges
of
thesnippingconnector.
Subsequently,theIPsustained
cutwounds.
medicines
given.
-
7/29/2019 125th HSJV Weekly Meeting
22/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT
AFTERBEFORE
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Power Block Laydown Yard
Description Obseved chemical storages without drip tray .
Act ion taken Bunded wall already enclosed to contain hazmats in case of spillage.
Status CLOSED
-
7/29/2019 125th HSJV Weekly Meeting
23/26
7/1/20
AFTERBEFORE
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Power Block Laydown Yard
Description Poor hazmats segregation insi de storage, neglected diesel drums were outside chemical storage.
Act ion taken Segregation of hazmat already done, provided new fuel storage for diesel drums.
Status CLOSED
AFTER
BEFORE
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Power Block Laydown Yard
Description Deteriorated old No Objection Certificate on not ice board and improper management of gascylinders.
Act ion taken New NOC immediately provided and gas cylinders stored properly in st orage.
Status CLOSED
-
7/29/2019 125th HSJV Weekly Meeting
24/26
7/1/20
No.0 DateActio n by
CompanyDescription Status Closing Date
Expiration
Date
Ref. No.
CARM ai n Area Sub -A re a Issu ed By
Issuer
Company
123 June
2013Seoyong
Two (2) units of unbundedor no drip
tray chemical storage observed .CLOSED
29 June
2013
29 June
20131594
Power
Block
Laydown
Yard
Renato
PonceHSJV
223 June
2013D & I
Poor hazmat segregation inside
storage, no padlock and substandard
fuel storage
CLOSED29 June
2013
29 June
20131599
Power
Block
Laydown
Yard
Renato
PonceHSJV
3
23 June
2013 SamjinDeteriorated No Objection Certificate
on notice board and improper
stacking of gas cylinders.
CLOSED29 June
2013
29 June
20131600
Power
Block
Laydown
Yard
Renato
PonceHSJV
BARAKAH NUCLEAR POWER PLANT PROJECT
WASTEMANAGEMENTUPDATEWeek=20/06/2013 26/06/2013
Thisweek LastweekCollected(m3) Disposal(m3) Recycled(m3) Recycle(%) Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)
Paper 64 0 0 80 0 0
Metal 64 0 45 64 0 90
Construction 152 855 135 136 1350 0
Concrete 0 0 45 0 0 0
Wood(Good) 0 0 0 0 0 0
Wood(Bad) 226 225 0 216 135 0
Plastic 200 0 0 128 0 0
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend:Collected WastefromSitetoTemporaryStorageAreaDisposal WastefromTemporaryStorageAreatoLandfillArea
Recycle Treatedwaste(GMET)toRecyclingPlants
Municipal 0 328 0 0 280 0Hazardous 0 0 0 8 8 0
TotalSolidWaste 706 1408 225 31.87% 632 1773 90 14.24%
-
7/29/2019 125th HSJV Weekly Meeting
25/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
-
7/29/2019 125th HSJV Weekly Meeting
26/26
7/1/20
BARAKAH NUCLEAR POWER PLANT PROJECT