Transcript of 122543829-dpwh
-
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
PERSPECTIVE VIEW, TABLE OF CONTENTS9A-1
GROUND, TYP. 2nd & 3rd FLOOR PLAN, FINISHESFRONT, REAR ELEVATIONS
TOILETS, STAIRS & RAMP DETAIL
RIGHT, LEFT ELEV., LONGITUDINAL & CROSS SECTION
TOILET SECTION DETAILS, FACADE PEDIMENTS
PERSPECTIVE VIEW & TABLE OF CONTENTSA-1
A-2
A-3
A-6
A-5
A-4
A-7
S-1
S-2
S-3
S-4PERSPECTIVE VIEW1A-1 SCALE : N T S
P-1
P-2
THIRD FLOOR REFLECTED CEILING & ROOF PLAN
STAIR, HANDRAIL & MISC. DETAILSA-8
E-1 GENERAL NOTES, SINGLE LINE DIAGRAM,LOAD SCHEDULE, LEGEND & RISERDIAGRAM
E-2 GROUND & TYP. 2nd & 3rd FLOOR POWERLAYOUT
E-3 GROUND & TYP. 2nd & 3rd FLOOR LIGHTINGLAYOUT
P-5 SEPTIC TANK, CATCH BASIN & COVERDETAILS, NOTES, LEGEND, DESIGN CRITERIA
FOUNDATION PLAN, DET. OF FOOTING, TIEBEAM, STAIR ON GRADE & RAMP, ELEV. OF
COL. SCH. FOOTING & COLUMN
2nd & 3RD FLOOR FRAMING PLAN, TYP. DET.OF BEAM & SLAB, SCH. OF BEAMS & SLABS
STAIR PLAN & SECTION DETAIL, MISC. DETAILSROOF FRAMING PLAN, TRUSS DIAGRAM DETAILS
OF STEEL CONNECTION
DOOR & WINDOW SCHEDULE, DETAIL OF STEELCASEMENTA-9
DRAINAGE AND SANITARY SYSTEM LAYOUT
DARINAGE AND SANITARY SYSTEMISOMETRIC VIEW
WATER SYSTEM ISOMETRIC DIAGRAM
WATER SYSTEM LAYOUTP-3
P-4
ELECTRICAL
STRUCTURAL
ARCHITECTURAL
ENGINEER/BUILDING OFFICIALOFFICE OF THE CITY/MUNICIPAL
MECHANICAL
ELECTRICAL
SANITARY
STRUCTURAL
ARCHITECTURAL
LAND USE & ZONING
LINE & GRADE
DISTRICT/CITY/MUNICIPALITY
TABLEOFCONTENTS
-
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
GROUND FLOOR PLANSCALE :
1A-2 1 : 100 METERS
9A-2
TYPICAL 2nd & 3rd FLOOR PLAN2A-2 SCALE : 1 : 100 METERS
C O R R I D O R
UP UP
C O R R I D O R
GROUND, 2nd & 3rd TYPICAL FLOOR PLAN, FINISHES
25mmDEP
WF1
25mmDEP
FL1
BLAC
KBO
ARD
BAS
E
WF1
FL1
W1
W1
W2
W2D
1D
1
25mmDEP
WF1
25mmDEP
FL1
BLAC
KBO
ARD
BAS
E
WF1
FL1
W1
W1
W2
W2D
1D
1
25mmDEP
WF1
25mmDEP
FL1
BLAC
KBO
ARD
BAS
E
WF1
FL1
W1
W1
W2
W2D
1D
1
25mmDEP
WF1
25mmDEP
FL1
BLAC
KBO
ARD
BAS
E
WF1
FL1
W1
W1
W2
W2D
1D
1
25mmDEP
WF1
25mmDEP
FL1
BLAC
KBO
ARD
BAS
E
WF1
FL1
W1
W1
W2
W2D
1D
1
4500 4500
CLASSROOM
2 3 4
1
4500 4500
CLASSROOM
5 6
2
4500 4500
CLASSROOM
9 10
4
4500 4500
CLASSROOM
11 12
5
C O R R I D O R
WF2 WF2 WF2
WF2 WF2 WF2
25mmDEP
WF1
25mmDEP
FL1
BLA
CKB
OAR
D B
ASE
WF1
FL1
W1
W1
W2
W2D
1D
1
25mmDEP
WF1
25mmDEP
FL1
BLA
CKB
OAR
D B
ASE
WF1
FL1
W1
W1
W2
W2D
1D
1
25mmDEP
WF1
25mmDEP
FL1
BLA
CKB
OAR
D B
ASE
WF1
FL1
W1
W1
W2
W2D
1D
1
25mmDEP
WF1
25mmDEP
FL1
BLA
CKB
OAR
D B
ASE
WF1
FL1
W1
W1
W2
W2D
1D
1
25mmDEP
WF1
25mmDEP
FL1
BLA
CKB
OAR
D B
ASE
WF1
FL1
W1
W1
W2
W2D
1D
1
CONCRETE SUNBREAKER
LINE OF SUNBREAKER
A-63
LINE OF ROOF FORTHIRD FLOOR
A-62
A-64
A-61
A-71
A-810
9000
LANDING LANDING
LANDINGLANDING
163
STO STO
7000
9500
1500
2500
B
C
DN
1090
140060
0
200x200mmVITRIFIED FLOORTILES (UNGLAZED)
A
4500
960 960 1200
SHE
SINK COUNTER D-2
D-2
D-4
W3
D-4 D-4
STO
W4
1
955
7000
9500
1500DN
2500
4500
1000 10002075
SINK COUNTER
W3
HED-4
D-2
2000
WCURINAL
D-4
600
200x200mmVITRIFIED UNGLAZEDFLOOR TILES
WC
1400
13
7000
3850
RAMP
1200
3600 1700
2500
UP
D-3a
1500 UP
2000
3150
4500
W4
D-3
NCR
W3
HE
SINK COUNTER
D-4
13
URINALLAVWC WC
D-2
W3
SINK COUNTER
1750
1700
SD
1400
200x200mm VITRIFIEDFLOOR TILES
(UNGLAZED)
1
3625
3600
UPRAMP
1200
1500D-3a
UP
850 850
WF3
W4
D-3SHE
D-4 D-4
2000
1200
1525
A-43
A-44
A-43
A-44
650
4500 4500
7
4500
8
1700 850
54000
CLASSROOM3
WITH GROOVES
SCHEDULE OF FINISHES
- PLAIN CEMENT FLOOR FINISH
- PLAIN CEMENT FLOOR ROUGH
( UNGLAZED )- 200X200 VITRIFIED FLR TILES
WF2
WF1
WF3
WALLS :
FL3
FLOORS :
FL1
FL2
- 100 MM THK. CHB W/ PLAIN CEMENT PLASTER FIN (PAINT) 50mm G.I. PIPE FOR HANDRAIL
- 200X200 VITRIFIED WALL TILES (GLAZED)
- 150 MM THK. CHB W/ PLAIN CEMENT PLASTER FIN (PAINT)
FL1
4500 4500
CLASSROOM
2 3
6
WF1FL1
4500 4500
CLASSROOM
4 5
7
WF1FL1
4500 4500
CLASSROOM
6 7
8
WF1FL1
4500 4500
CLASSROOM
8 9
9
WF1FL1
4500 4500
CLASSROOM
10 11 12
10
WF1
54000
1750
SS
HCR
425
425425
PIPE CHASE
PIPE CHASE
PIPE CHASE
PIPE CHASE
425 650 773
A-71
385025
00
C
B
A
3150
9500
-
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
9925
THIRD FLOOR LEVEL
NAT. GRD. LN.GROUND FLOOR LEVEL
320032
532
00
REAR ELEVATION1 : 100 METERS
2A-3 SCALE :
A-39
APEX LINE OF TRUSS
TOP OF ROOF BEAM
2500
1 : 100 METERS
FRONT ELEVATIONSCALE :A-31
D-1W-2D-1
W-2
W-2D-1
W-2D-1
W-2D-1
W-2D-1
GM
A
C A RE
S
W-2D-1
W-2D-1
W-2D-1
W-2D-1
W-2D-1
W-2D-1
W-2D-1W-2D-1
W-2D-1W-2D-1
W-2D-1W-2D-1G
MA
C A RE
S
1
SECOND FLOOR LEVEL
3200
FRONT, REAR ELEVATIONS
13
CONCRETE SUN BREAKER(SEE DETAIL)
PLAIN CEMENT PLASTERPAINT FINISH
GA#26 PL. G.I. GUTTER ON12x300mm FIBER CEMENT
FASCIA BD. (PAINT FINISH)
GA#26 CORR. G.I. ROOFINGSHEET (PAINT FIN.)
13
GA. #26 CORR. G.I.ROOFING SHEET (PAINTFINISH)
GA. #26 PLAIN G.I.GUTTER ON12x300mm FIBER
CEMENT FASCIA BD.(PAINT FINISH)
100 MM THK. CHBRAILING W/50mm
G.I. PIPE RAILING
32mm G.I. PIPEHANDRAIL WITH 32mm
VERT. SUPPORT @ 600mmO.C. (PAINT FINISH)
D-2
D-2
D-2
1
9925
SECOND FLOOR LEVEL
NAT. GRD. LN.GROUND FLOOR LEVEL
320032
532
00
APEX LINE OF TRUSS
TOP OF ROOF BEAM
2500
THIRD FLOOR LEVEL
3200
D-2
D-2
D-2
W3
W3
W4
W4
W3
W4
W3
W4
W3
2985
W3
815
D-3A D-3A
1112
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
W1
W1
W1
W1
W1
W1
910
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
W1
W1
W1
W1
W1
W1
78
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
W1
W1
W1
W1
W1
W1
56
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
W1
W1
W1
W1
W1
W1
34 2
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
FF F F F
W1
W1
W1
W1
W1
W1
2 3 4 5 6 7 8 9 10 11 12
W-2D-1
W-2D-1
W-2D-1
W-2D-1
W-2D-1
W-2D-1
W-2D-1
W-2D-1
W-2D-1
W-2D-1
W-2D-1
W-2D-1
-
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
1242
5
3200
2500
3200
NAT. GRD. LN.GROUND FLOOR LEVEL
325
3200
SECOND FLOOR LEVEL
LONGITUDINAL SECTION4A-4 SCALE : 1 : 100 METERS
THIRD FLOOR LEVEL
NAT. GRD. LN.GROUND FLOOR LEVEL
9925
320032
532
00
CLASSROOM
A-43
1 CORRIDOR
CROSS SECTION1 : 100 METERSSCALE :
CLASSROOM
W-1
W-1
10 CORRIDOR
D-1
9A-4
APEX OF TRUSS
600
THIRD FLOOR LEVEL
TOP OF TRUSS
TOP OF ROOF BEAM
CBA7000
95001000
2500
SEE TRUSS DETAIL
RIGHT SIDE ELEVATION1A-4 SCALE : 1 : 100 METERS
9925
320032
0032
5 NAT. GRD. LN.GROUND FLR. LVL.
SECOND FLR. LVL.
TOP OF ROOF BEAM
APEX LINE OF TRUSS
C B A
1100
1000
LEFT SIDE ELEVATION2A-4 SCALE : 1 : 100 METERS
1000
CBA
1 2
2500
TOP OF ROOF BEAM
CLASSROOM
W-1
6 CORRIDORSECOND FLOOR LEVEL
3200
3200
THIRD FLR. LVL.
RIGHT & LEFT SIDE ELEV., LONGITUDINAL & CROSSSECTION
2 3
THIRD FLOOR LEVEL
NAT. GRD. LN.GROUND FLOOR LEVEL
9925
320032
532
00
TOP OF TRUSS
TOP OF ROOF BEAM
SECOND FLOOR LEVEL
3200
600
12 1311
SEE STRUCTURAL DETAIL
W3
W4
200x200mmVITRIFIED WALLTILES (GLAZED)
CONCRETESUNBREAKER (SEEDETAIL)
32mm GI PIPE HANDRAILw/32mm VERT. SUPPORT@600mm O.C. (PAINT FIN.)
GA#26 CORR. G.I.ROOFING SHEET(PAINT FIN.)
GA#26 PLAIN G.I. GUTTERON 12x300mm FIBERCEMENT FASCIA BOARD(PAINT FIN.)
PLAIN CEMENT PLASTERWALL PAINT FIN.
CONCRETESUNBREAKER (SEE
DETAIL)
GA#26 CORR. G.I.ROOFING SHEET(PAINT FIN.)
GA#26 G.I. GUTTERON 12x300mmFIBER CEMENTFASCIA BOARD(PAINT FIN.)
PLAIN CEMENT PLASTERWALL PAINT FIN.
38mm G.I. PIPEHANDRAIL
w/32mm VERT.SUPPORT @600mmO.C. (PAINT FIN.)
GA#26 CORR. G.I.ROOFING SHEET
(PAINT FIN.)
CONCRETESUNBREAKER(SEE DETAIL)
FEMALETOILET
FEMALETOILET
FEMALETOILET
STORAGE
STORAGE
W3 W4
W3
W4
MALETOILET
MALETOILET
MALETOILET
W4
200x200mmVITRIFIED WALLTILES (GLAZED)
W3
W3
EXPOSED CEILING UNDERSLAB PAINT FIN.
EXPOSED CEILING UNDERSLAB PAINT FIN.
WC WCCSLAV
3mm THK. FASCIALMIRROR ON AL.FRAME
50mm G.I. PIPERAILING PAINT FIN.
1100
D-1
D-1
840
900
200
900
900
W3
6mm THK. MARINE PLYWOODCEILING FOR ALL TOILET ON
50x50mm CEILING JOIST@600mm ON CENTERBOTHWAYS w/10mm BAR
HANGER @1200mm OC.BOTHWAYS EMBEDDED ON
CONC. SLAB
300
3200
3200
3225
TOP OF ROOF BEAM
3rd FLOOR TOILET LEVEL
2nd FLOOR TOILET LEVEL
GROUND FLOOR TOILETLEVEL
1100 200 200
CLASSROOM
CLASSROOM
CLASSROOM
F F F F
F F F F
F F F F
F F F F
F F F F
F F F F
W1
W1
W1W
1
W1
W1 CLASSROOM
CLASSROOM
CLASSROOM
F F F F
F F F F
F F F F
F F F F
F F F F
F F F F
W1
W1
W1W
1
W1
W1 CLASSROOM
CLASSROOM
CLASSROOM
F F F F
F F F F
F F F F
F F F F
F F F F
F F F F
W1
W1
W1W
1
W1
W1 CLASSROOM
CLASSROOM
CLASSROOM
F F F F
F F F F
F F F F
F F F F
F F F F
F F F F
W1
W1
W1W
1
W1
W1 CLASSROOM
CLASSROOM
CLASSROOM
F F F F
F F F F
F F F F
F F F F
F F F F
F F F F
W1
W1
W1W
1
W1
W1
3
11
6
1
5 6
12
7
4 7
13
8
9
14
9
4
8 11 12
15
10
5
10
2500
815
2500
10A-8
-
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
ROOF PLANSCALE :A-52
1 : 100 METERS
THIRD FLOOR REFLECTED CEILING PLAN1A-5 SCALE : 1 : 100 METERS
100010
0025
00
c
b
A
A-8
600
13
600
THIRD REFLECTED CEILING, ROOF PLAN9A-5
9000
4500
700025
00
4500
9000
1 324500
9000
4500
4 54500
6 74500
8 134500600 4500 600
LN. OF STRUCTURE
RD RD
100010
00
B
C
A
1
4500
9000
4500
2 3 4
GA#26 CORR. G.I. SHEETROOFING (PAINT FIN.)
GA#26 PLAIN G.I. RIDGEROLL (PAINT FIN.)
GA#26 PLAIN G.I. FLASHING(PAINT FIN.)
9000
4500
94500
109000
4500
114500
12
SLOPE
SLOPE
SLOPE
SLOPE
CEILING VENTILATION (SEEDETAIL)
GA#26 PLAIN GI GUTTER ON12x300mm FIBER CEMENT FASCIA
BOARD (PAINT FIN.)
6mm THK. ORD. PLYWOOD CEILING ON50x50mm CEILING JOIST @600mm OCBOTH WAYS (PAINT FIN.)
LIGHTING FIXTURES
6mm THK. MARINE PLYWOODCEILING ON 50x50mm CEILING
JOIST @600mm OC BOTH WAYS(PAINT FIN.)
A-77
CONCRETE PARAPET
CONCRETE PARAPETGA#26 G.I. GUTTER ON12x300mm FIBER CEMENT
FASCIA BOARD (PAINT FIN.)
GA#26 G.I. GUTTER ON12x300mm FIBER CEMENT
FASCIA BOARD (PAINT FIN.)
4500 4500
9000
4500
5 6
4500
9000
4500
9 10
4500
9000
4500
11 124500
RD RD RD RD RD RD RD RD RD RD RD
200 RD RD RD RD RD RD RDRD RD RD RD RD
MANHOLE MANHOLE
7000
4500
9000
4500
7 8
-
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
5b DETAIL SECTIONA-6 SCALE 1:10 M
700
900
100
200
SPOT DETAILSCALEA-6 1:5 M
100X100 CONCRETESKIRTING
100
150 1
00
5b1DET. ELEVATION OF RAMPA-6
5SCALE 1:50 M
20070
0900
20070
0 900
1200
300
32mm G.I. PIPE HANDRAILWITH 32mm VERT. SUPPORT @600mm O.C. (PAINT FINISH)
NONSKID PLAIN CEMENT FLOORFINISH W/ GROOVE LINES
GROUND FLOORGROUND FLOOR
TYP. 2nd & 3rd FLOORTYP. 2nd & 3rd FLOOR
TOILETS, STAIR & RAMP PLAN ANDRAMP DETAIL
32 mm G.I PIPEVERTICAL SUPPORT @600mm ON CENTERPROVIDE 12mm STEEL
DOWELS (PAINT FIN.)
32mm G.I. PIPEHANDRAIL WITH 32mm
VERT. SUPPORT @600mmO.C. (PAINT FINISH)
32 mm G.I PIPEVERTICAL SUPPORT@600mm ON CENTERPROVIDE 12mm STEEL
DOWELS (PAINT FIN.)
NONSKID PLAIN CEMENTFLOOR FINISH W/
GROOVE LINES
W3
4500
SINK COUNTER
1750
1700
600
9500
385025
00
C
B
A
SD
3150
1400
200x200mm VITRIFIEDFLOOR TILES
(UNGLAZED)
1
3600
UPRAMP
1200
1500
D-3aUP
WF3
W4
D-3SHE
D-4 D-4
2000
5000
7000
3850
RAMP
1200
3600 1700
2500
UP
D-3a1500 UP
2000
3150
10251700CLEAR
888
4500
W4
D-3
NCR
W3
HE
SINK COUNTER
D-4
13
7000
9500
1500
2500
B
C
DN
1090
140060
0
200x200mmVITRIFIED FLOORTILES (UNGLAZED)
A
4500
960955 960 1200
SHE
SINK COUNTERD-2
D-2
D-4
W3
D-4 D-4
STO
W4
1
7000
9500
1500
DN
2500
4500
1000 13002100
SINK COUNTER
W3
HED-4
D-2
1500
WCURINAL
D-4
600
200x200mmVITRIFIED UNGLAZEDFLOOR TILES
WC
1400
13
1
2
3
4 16
5 15
6 14
7 13
8 12
9 11
10
A-85
A-812
D-2
WC WCWCWC WCLAV
WC
38mm STAINLESSSTEEL GRAB BAR
19
18
17
16
5 15
6 14
7 13
8 12
9 11
10
1
2
3
416
515
614
713
812
911
10
19
18
17
416
515
614
713
812
911
10
WCLAV URINAL WC
38mm STAINLESSSTEEL GRAB BAR
A-89
9-ST
EPS@
300m
m =
270
013
37
1360 1359
8-ST
EPS@
300m
m =
240
013
37
200x200mmVITRIFIED UNGLAZEDFLOOR TILES
STO.
STO.
D-2
2 2
1212
3600 1700
A-65a
SPOT DETAIL5aA-6 SCALE 1:50 M
NON-SKID PLAIN CEMENT FLO
OR CEMEMNT FINISH
100 100
6mm
TYPICAL
6mm 6mm
A-65b
A-65b1
4A-6 SCALE : 1:50
MALE TOILET PLAN DETAILM
3A-6 SCALE : 1:50
MALE TOILET PLAN DETAILM
2A-6 SCALE : 1:50
FEMALE TOILET PLANDETAIL
M
1A-6 SCALE : 1:50
FEMALE TOILET PLANDETAIL
M
9A-6
1075 850 850 1725
2000
3000
1574A-81
A-81
425425
-
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
TOILET SECTION DETAILS9A-7
150
URINAL
300
1625
1525
10032
00
CLASSROOM LVL.TOILET LVL.
2ND FLR. LVL.
50
3200
4500
21
300
1600
1650
3250
CLASSROOM LVL.TOILET LVL.
2ND FLR. LVL.
5026
95
3200
4549
1312
1A-7
DET. SECTION OF FEMALE TOILETSSCALE 1:50 M
6A-7
MOUNTING FIXTURES OF MALE TOILETSCALE 1:50 M
FIN. GRD. LN.TOILET LVL.
FIN. GRADE LN.TOILET LVL.
500500
SD
200
600
3mm THK. FASCIALMIRROR ON AL. FRAMING
200x200mm VITRIFIEDWALL TILES (GLAZED)
CONC. COUNTER
800
600
300
PLAIN CEM. PLASTERPAINT FIN.
PLAIN CEM. PLASTEREDPAINT FIN.
200x200mm GLAZEDWALL TILES
COUNTER SINK DET. PLAN
600
1900
200x200mm VITRIFIEDGLAZED TILES
5A-7
DETAIL SECTIONSCALE 1:20 M
200x200mm VITRIFIEDGLAZED WALL TILES
600
70
100
100
15 25
50 300200
150
URINAL
WC
38 STAINLESS STEELGRAB BAR
300
3RD FLR. LVL.
3200
TOP OF BEAM LVL.
3225
1625
3005
032
00
4500
2 1
900
FIN. GRD. LN.
CORRIDOR LVL.TOILET LVL.
325
3200
320016
0016
00
450450
200200
2A-7
DET. SECTION OF MALE TOILETSSCALE 1:50 M
FEMALETOILET
FEMALETOILET
FEMALETOILET
STORAGE
STORAGE
W3
W4
W3
W4
W3
W4
MALETOILET
MALETOILET
MALETOILET
W3
WC 78
0
3A-7
DETAIL OF COUNTER SINKSCALE 1:20 M
DETAIL SECTIONSCALE 1:20 M
DET. SECTIONSCALE 1:20 M
LAV
WC
W3
W3
WC WC WC
WC WC WC
1600
A-88
1000
1600
1800
100
200 20060
PLAIN CEMENT PLASTERPAINT FINISH
200x200mmVITRIFIED WALLTILES ( GLAZED )
CORRIDOR LVL.
W3
W3
6mm THK. MARINEPLYWOOD CEILING ON
50x50mm CEILING JOIST@600mm OC BW.w/10mm BAR HANGEREMBEDDED ON SLAB
@1200mm OC. BW.
150
TOILET LVL.
TOILET LVL.
GROUND FLOOR
2nd FLOOR
3rd FLOOR
TOP OF ROOF BEAM
1319
5
650
9425
9000
1000
1000
1000
802
654
39214
52
40
1000
1000
1000
1000
1000
1000
650
4175
65080
500
268
654
80
1525
650
150
650
350
150mM THK. CHBPLASTER FIN. w/40mm
GROOVE @1040mm OC &10mm REINF. BAR
@600mm OC. BW.PLASTERED PAINT FIN.
150mm THK. CHBPLASTERED PAINT FIN.
150mm CHB
G
MA
C AR
E
S
CONCRETE COLUMN
3315
100010
0010
0 0
40
1000
1000
100010
0010
0010
00
DET. SECTION
CEM. PLASTERED FIN.6" THK CHB PEDIMENT
1525
A-7 SCALE7a
783
200
1:50 M
TOP OF ROOF BEAM
320032
0032
00
6aA-7
DET. OF FACADE PEDIMENTSCALE 1:50 M
7A-7
3919
DET. SECTIONSCALE 1:20 M
7bA-7
4A-7
7aA-7
7bA-7
6aA-7
(PROVIDE MANHOLE)
1500
FFLFFL
1002
84
800
183
100
1500
650R746
FFL
300
300
PIPE CHASE
PIPE CHASE
PIPE CHASE
-
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
SUN BREAKER DETAILSCALE :
10A-8 1:20 MTYPICAL DETAIL OFBALCONY RAILING
SCALE
9A-8 AS SHOWN
1:50 MSECTION
700
SCALE
C15
0
100mm CHB CONC.
50THIRD FLOOR LEVEL
RAILING W/ PLAIN CEM.PLASTER PAINT FIN.
SCALE 1:20 MSPOT DET.
EVERY 1200mmPAINT FINISH
W/ 25mm SQ. BARSTEEL BRACKET @
SCHED. 40 RAILING 50mm B.I. PIPE
C
200
CEILING VENT DETAILA-8
13SCALE : 1 : 10 M
PLAN
275
275
325 5050
575 575
1150
25x25mm WOOD VENTPROVIDE INSECT SCREEN
DAMP PROOFING DET.NOT
8A-8 SCALETO
GRAVEL BEDDINGDAMP PROOFING
POLYETHYLENE SHEET
CONCRETE SLAB
50
175
SPOT DETAIL1:5 M
4A-8 SCALE
50
9A-8
5A-8
5090
0
900
HANDRAIL DETAIL
1:5 M
HANDRAIL @150mm O.C.WELDED TO G.I. PIPE19mm SQUARE BAR
175
100
7A-8 SCALE
50
SCALE
3A-8 1:5 M
300
2A-8
16816
8
50
1:20 M
DETAIL SECTIONSCALE
LANDING F.F.L.
ANCHORED @ R.C. STAIR
SCHEDULE 4050mm% G.I. PIPE
(PAINT FINISH)
A-83
W A
L L
6A-8CRASH RAILING
SCALE 1:20 M
ANCHORED @ R.C. STAIR150
SPOT DETAIL1:20 MSCALE
200
5050mm G.I. PIPESCHEDULE 40(PAINT FINISH)
19mm SQUARE BARWELDED TO G.I. PIPEHANDRAIL @150mm O.C.
50mm G.I. PIPESCHEDULE 40(PAINT FINISH)
19mm SQUARE BAR@150mm O.C. WELDED
TO G.I. PIPE HANDRAIL(PAINT FIN.)
50mm G.I. PIPESCHEDULE 40(PAINT FINISH)
19mm SQUARE BAR @150mmO.C. WELDED TO G.I. PIPE
HANDRAIL (PAINT FIN.)
50mm G.I. PIPESCHEDULE 40PAINT FINISH
19 mm SQUARE BARANCHORED TO THEWALL (PAINT FIN.)
50mm G.I. PIPESCHEDULE 40(PAINT FINISH)
19 mm SQUARE BARANCHORED TO THEWALL (PAINT FIN.)
38mm STAINLESSSTL. GRAB BAR
7000
200x200mm VITRIFIEDGLAZED WALL TILES
1625
3200
FINISHED GRADE LINE
320032
5
6
STORAGE
3800
SECTION OF STAIR
2000
1A-8 SCALE
FEMALE
1:50 M
32
45
CORRIDOR1
10W-4 1211
1415
13
98
7
CORRIDOR
7000A
2500
B C
50mm % G.I. PIPESCHEDULE 40 PAIN. FIN.
SCHEDULE 40 PAIN. FIN.50mm % G.I. PIPE
320032
00
CORRIDOR
TOP OF ROOF BEAM
STAIR, HANDRAIL & MISC. DETAILS
D3
900
FR. 25x75mmWD.FRAME S4S KD
TANG.
1125
1617
1819
6
32
45
1
10
1211
1415
13
98
7
1617
1819
1200
100
10mm @250mmON CENTER
675
100
12x12mm GROOVE
BEAM REBARS SEESTRUCTURAL DETAIL
25x25 mmWOOD VENTPROVIDE INSECT
SCREEN
D4
W-4
W-4
D4
19mm SQUARE BARRAILING @150mm O.C.
WELDED TO G.I. PIPE
50mm G.G. PIPE SCH.40 (PAINT FIN.)
900
168
50 300
950
A-814
1 : 10 MSCALE :
A-814
A-82
SPOT DETAIL(CRASH RAILING)
SPOT DETAIL(CEILING VENT.)50mm G.I. PIPESCHEDULE 40 PAIN. FIN.
25x25x2mm THK.ANGULAR BARNOSING
6mm THK. MARINE PLYWOODCEILING ON 50x50mm CEILING.
JOISTS @600mm O.C. B/W(PAINT FIN.)
15015
015
0
200x200mm VITRIFIEDGLAZED WALL TILES
200x200mm VITRIFIEDGLAZED WALL TILES
LAV
WCCS
WCCS
WCCS
25x25x2mm THK.ANGULAR BARNOSING
9-RI
SERS
@16
8mm=
1512
mm
10-
RISE
RS@
168m
m=
1680
mm
9-RI
SERS
@16
8mm=
1512
mm
GROUND FLOORTOILET FIN. LINE
SECOND FLOORTOILET FIN. LINE
THIRD FLOORTOILET FIN. LINE
6mm THK. MARINE PLYWOODCEILING ON 50x50mm CEILING
JOIST @600mm 0N CENTERBOTHWAYS W/ 10mm BARHANGER @1200mm OC. BW.
CONC. BEAM
QUARTER ROUNDMOULDING
6mm THK. ORD.PLYWD. CEILING(PAINT) ON 50x50mm
CLG. JST. @600mmOC BW
SEE TRUSS DET.
6mm THK. MARINE PLYWD.CEILING (PAINT) ON 50x50mm
CLG. JST. @600mm OC BW
SPOT DETAILA-8
12SCALE 1 : 10 M
LANDING
LANDING5A-8
EAVES SECTIONA-4
5SCALE 1 : 20 M
38mm TEKSCREWC-PURLIN (SEE STRUC'LDETAIL)
SAG ROD SEESTRUCTURAL DETAIL
GA 26 GI GUTTERPAINT FIN.
GA 26 GI STRAP
BASKET STRAINER
75mm PVCDOWNSPOUT PAINT
FINISH
CEILING VENT (SEEDETAIL)
6mm THK. MARINEPLYWOOD CEILING ON
50x50mm CEILINGJOIST @600mm BW
1000
6mm THK. ORD.PLYWOOD CEILING W/
6mm GROOVE ON50x50mm CEILINGJOIST @600mm BW
(PAINT FIN.)
ROOFBEAM
TOP CHORD SEESTRUCTURAL DETAIL
5AA-4
GA 26 GI GUTTERPAINT FIN.
GA 26 GI STRAP
BASKET STRAINER
75mm PVCDOWNSPOUT PAINT
FINISH
6mm THK. MARINEPLYWOOD CEILING ON
50x50mm CEILINGJOIST @600mm BW
12x300mm FIBER CEMENTFASCIA BOARD FIX W/METAL
SCREW ON STL. FRAME PAINTFINISH
20x20X2mm ANGULARBAR FOR FASCIA BOARD
FRAME COATED WITHPRIMER
GA 26 CORR. G.I.ROOFING SHT. PAINT FIN.
COPPER RIVET
38mm TEKSCREW
-
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
PRC NO. :
PTR NO. :
TIN :
DATE :
CHIEF, ARCHITECTURAL DIVISION
EMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWH
ALBERT Z. DE BELEN
0010990 149 460 161ARCHITECT IV
27 OCT. 2002
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGO
OIC, DIRECTOR III
RAMON C. BACANI
UNDERSECRETARYOIC, DIRECTOR IV
GILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND
ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI
GNEECROF OTINOM&TN
SESEMS
EF
ATS
T
GN
MA
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES
DEPA RTMENT OF ED
UC
A T
I ON
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG,I
Max C
01 03
THREE STOREYFIFTEEN CLASSROOM
SCHOOL BUILDINGA-1
8PERSPECTIVE VIEWTABLE OF CONTENTS
01-002
AZB
SCHEDULE OF DOORS & WINDOWSSCALE :
1A-9
2400
2100
D-1
FFL
CLASSROOM
900
300
1 : 50 METERS
TOILET (CUBICLE)
300
1500 12
002100
2100
D-2 TOILET D-3
300
TOILET (DISABLED)
800
D-4
800 900
600
TANGUILE PANEL DOOR ON 50X150mm YACAL/GUIJO JAMB W/ FIXED
CLEAR GLASS TRANSOM COMPLETEWITH HARDWARE AND ACCESSORIES
HOLLOW CORE FLUSH TYPE SWINGDOOR ON 50x50mm YACAL GUIJO
JAMB W/ MARINE PLYWOOD FACINGINSIDE AND ORDINARY OUTSIDE
COMPLETE W/ HARDWARE ANDACCESSORIES
HOLLOW CORE FLUSH TYPE SWINGDOOR ON 50x150mm GUIJO/YACAL
JAMB w/MARINE PLYWOOD FACINGINSIDE AND ORDINARY OUTSIDE
COMPLETE W/ HARDWARE ANDACCESSORIES PROVIDE KICK PLATE
SWING DOOR ON 50X100YACAL/GUIJO DOOR JAMBCOMPLETE WITH HARDWARE
ACCESSORIES
STAINLESS STL.KICKING PLATE
800
D-3a
LOUVER DOOR ON 50X100YACAL/GUIJO DOOR JAMBCOMPLETE WITH HARDWARE
ACCESSORIES
1 : 20 METERS
202
20
6020
20 2 20
60 20
20 2 20
60 20
7
3
10
GLAZING CLIP
TYP. STEEL CASEMENT TYPE (W-1)2A-9 SCALE :
1 : 10 METERS
HORIZONTAL DETAIL SECTION4A-9 SCALE :
3532
SEALANT
3x35mm Z-BAR
PUTTY
CLEAR GLASS
HINGE
MULLION
SPOT WELDFRAMEMEETING RAIL
25
25
WINDOW JAMB
WINDOW JAMB
FULL WELD
FULL WELD
10mm BAR
PVC PIPE
10mm BAR
PVC PIPE
SEALANTZ-BAR FRAME
CLEAR GLASS
PUTTY
I-BAR MULLION
SPOT WELD
Z-BAR
ANGLE PIN
CHB GROUT
WINDOW JAMB
25
25
25
25
16
1.6
35
ANGLE PIN
1 : 10 METERS
VERTICAL DETAIL SECTION3A-9 SCALE :
10mm BAR
PVC PIPE
SEALANT
SEALANTBEAM
3x25mm Z-BAR
PUTTY
CLEAR GLASS
FRAME
3x25mm Z-BAR
TRANSOMBAR
1.6x35mm CONT.WEATHERING
HINGES
CLEAR GLASS
GLAZING PIN
PUTTY
VENTHINGE
WELD GROUT
WINDOW SILLANGLE PIN
CHB
FRAME
4 5 6
1 2 3
9
8
7
9
8
7456
123
4EQ. PARTS=4000
1200
30015
00
F F F F
2400
1100
3 EQUAL PARTS = 2000
600
900
120024
00
4EQ. PARTS4000
300
40030
0
2400
2400
600
600
9502 EQUAL PARTS =2000
FF F F F
W-1 CLASSROOM
STEEL CASEMENT WINDOW WITH FIX GLASS
W-2 CLASSROOM
JALOUSIE WINDOWS WITH CLEAR GLASSBLADES ON STANDARD ALUMINUM CASING
ON 50X150mm YACAL/GUIJO JAMBCOMPLETE WITH HARDWARE AND
ACCESSORIES & STEEL GRILLS ON 300mmFROM FLOOR FIN.
W-3 TOILET
STEEL AWNING WINDOW
W-4 TOILET
STEEL AWNING WINDOW
9A-9DOOR & WINDOW SCHEDULE, DETAIL
OF STEEL CASEMENT
MANUAL LOCK
2100
2000
1800
RQD: 30 SETSLOC: REAR ELEVATION
1000 1000 1000 1000
1000
-
FIRE ALARM
2-2.0mm TWIN 15MMOC
NOT TO SCALE NOT TO SCALE
150AT, 225AF, 2P, 230V AC
GROUND ROD16mm x 2.40m
COPPERWELD
GROUND TERMINAL
2
OI
SINGLE LINE DIAGRAM
#14mm BARE COPPER WIRE18
00 m
m
METERING CONDUIT
RISER DIAGRAM
ELECTRICALGROUND FLOOR LINE
FIN. GRADE LINE
KWHR METER
1-8.0mm BARE COPPER WIRE
16MMO x 240MM LENGTHGROUNDING ROD COPPERWELD
2
IN 15mmO C
RATING: 20AT, 50AF,
IN 15MMORSC
ENCLOSED ACB
3-3.5mm THW
230V, 2P
1500
mm
2
FA
F
2
IN 40MMORSC2-50mm THW
TO LINE SIDE OF LP
B
GENERAL NOTESSINGLE LINE DIAGRAM
LEGENDLOAD SCHEDULERISER DIAGRAM
E-13
VIBRATING BELL
2-2.0mm TWIN 15MMOC
2
2
TO NEAREST C.O.
B
d. FIRE ALARM STATION OUTLET - 1.50 M. ABOVE FINISH FLOOR
f. FIRE ALARM & VIBRATING BELL - 0.30 M BELOW CEILING LINE
e. PUSH BUTTON OUTLET - 1.20 M ABOVE FINISH FLOOR
c. PANELBOARD - 1.50 M ABOVE FINISH FLOOR b. CONVENIENCE OUTLET - 0.30 M ABOVE FINISH FLOOR.
POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE REQUIREMENT.
a. LIGHT SWITCH - 1.20 M ABOVE FINISH FLOOR
8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS :
7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND
20
20
20
20 20
20
20
20
- SERVICE ENTRANCE
- ENCLOSED AIR CIRCUIT BREAKER- FIRE ALARM CONTROL PANEL
- VIBRATING BELL OUTLET- FIRE ALARM STATION OUTLET
- SERVICE METER
- PUSH BUTTON
- FIRE ALARM BELL
PANEL LP
M
FA
F
BB PROTECTION: 150 AT, 225 AF, 2P, 230 V
FEEDER:
BUILDING WALL
2ND FLOOR LINE
OVERHEAD SERVICE ENTRANCECONNECTED TO 220V AC, 1O,
2 WIRE, 60 Hz FITTED WITH40mm O TYPE "F" CONDULET
2-50mm THW IN 40mm C230 V
2
& THIRD FLOOR @ SECOND FLOOR TO SIMILAR OUTLET
THE ELECTRICAL WORKS SHALL BE DONE UNDER THE IMMEDIATE
THE RULES AND REGULATION OF THE LOCAL ENFORCING AUTHORITYOF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC).
6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED
- POLYVINYL CHLORIDE CONDUIT- INTERMEDIATE METALLIC CONDUIT
SIZE OF WIRE FOR POWER AND LIGHTING CIRCUIT HOMERUN SHALL BE "THW" UNLESS OTHERWISE INDICATED IN THE PLAN. THE MINIMUM 4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE
3.5mm AND INSULATED FOR 600 VOLTS. SMALLEST RACEWAY SHALL BE 15mm TRADE/NOMINAL SIZE.
b. LIGHTING, POWER RECEPTACLE
TYPE WITH FACTORY KNOCKOUTS.
3. WIRING METHOD SHALL BE AS FOLLOWS :
TYPE FOR THE PARTICULAR LOCATION AND PURPOSE OF USAGE.
5. ALL OUTLET BOXES SHALL BE GALVANIZED GAGE NO. 16 DEEP
2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2-WIRE,
AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY.
SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER.
O2
I
BRANCH CKT., & AUXILIARY
a. FEEDERS AND RISERS
230 V AC, 60 Hz.
SCH. 40
GENERAL NOTESTHESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH
CIRCUIT BREAKER
IL @ 80% D.F. = 21940 x 80% x 1.25 = 95.4 A
- EXHAUST FAN OUTLET, SINGLE, GROUNDING TYPE 10 AMPS, 250 VOLT WITH MODERN PLATE COVER
- RACEWAY CONDUIT CONCEALED IN CEILING- RACEWAY CONDUIT CONCEALED UNDER FLOOR
10 AMPS, 250 VOLT WITH MODERN PLATE COVER- DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE
- EXHAUST FAN SWITCH- FAN CONTROL SWITCH
- ONE GANG DEVICE SWITCH- TWO GANG DEVICE SWITCH
- THREE WAY DEVICE SWITCH- THREE GANG DEVICE SWITCH
- CKT. BREAKER, RATING AS INDICATED
- HOMERUN DIRECT TO PANELBOARD
- PANELBOARD
EF
LP
EFSSf
abSS/S
S 3WScde
a
- CEILING LIGHT OUTLET- 2 x 40 WATTS FLUORESCENT LAMP- CEILING FAN OUTLET
SYMBOL
2
DESCRIPTION
LOADNO. DESCRIPTION
LIGHTING OUTLET
LIGHTING OUTLET
LIGHTING OUTLET
CONVENIENCE OUTLET
10
9
11
8
5
4
6
7
2
3
1
1500
1260
17601260
10002
20202230230
202230
230 2 20
10001500
17601260
1860
1260 230230
230230
22
2020
220202
VOLT230230230
POLE222
202020
AT
LOAD SCHEDULE
MOUNTING: FLUSH
CKT. VA WIRE & CONDUIT SIZE
3-3.5mm THW IN 15mm C3-3.5mm THW IN 15mm C
2
5050 2
50
503-3.5mm THW IN 15mm C
3-3.5mm THW IN 15mm C3-3.5mm THW IN 15mm C
3-3.5mm THW IN 15mm C3-3.5mm THW IN 15mm C
3-3.5mm THW IN 15mm C3-3.5mm THW IN 15mm C
2
2
2
2
2
2
2
50505050
AF505050
150AT, 225AF, 2P, 230VMAIN :PANELBOARD: LP
TYPE: BOLT-ON
15
16
14
13
TOTALS P A R E
LIGHTING OUTLET 3-3.5mm THW IN 15mm C3-3.5mm THW IN 15mm C20
2020
20
230230230150021940
12601260
2
22
2301000 2
505050 250 2LIGHTING OUTLET
LIGHTING OUTLET
1500 230 2 20 503-3.5mm THW IN 15mm C3-3.5mm THW IN 15mm C
3-3.5mm THW IN 15mm C
2
2
2
12
3-3.5mm THW IN 15mm C2
LIGHTING OUTLETLIGHTING OUTLET
LIGHTING OUTLET
CONVENIENCE OUTLET
CONVENIENCE OUTLET
CONVENIENCE OUTLET
CONVENIENCE OUTLET
CONVENIENCE OUTLET
F
B
FIRE ALARM
IN 15MMOC4-2.0mm TW
20
20
20
20
20
20
20
20
1
3
5
7
9
11
13
15 16
14
12
10
8
6
4
2
PRC NO. :PTR NO. :
TIN :DATE :
ENGINEER IIIVENERANDO D. SAHAGUN
CHIEF, ELECTRICAL DIVISIONBUREAU OF DESIGN, DPWH
FE M. BARRIENTOS
THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANTFROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILUREOF THE SAME DUE TO FAULTY DESIGN.
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGOOIC, DIRECTOR III
RAMON C. BACANIUNDERSECRETARY OIC, DIRECTOR IVGILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT ANDALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NR
EENI
GNE
EC
ROF O
TIN
OM
&
TNSES
EMS
EF
ATS
T
GN
M
A
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL
IC of
the PHILIPPIN
ES
DE
PARTMENT OF E
DUCA
TIO
N
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG ,I
BNA
01 03
01-002
BNA
-
45009000
4500
45009000
4500
45009000
4500
45009000
4500
450090004500
4500
SCALE : 1 : 100 METERS
UP UP
450090004500
450090004500
450090004500
SCALE : 1 : 100 METERS
CHAL
KBOA
RDCH
ALKB
OARD
450090004500
4500
c a
1
Sabc
i
CLASSROOM
ac
CLASSROOM CLASSROOM CLASSROOM CLASSROOM
CLASSROOM
a
1
CLASSROOM
a
EFSEF
2
d2
i
SdeSfgShi
i2
d2
Sabc
Sab
i Shi Sfg Sde
LIGHTING LAYOUT3E-2
9500
DN
4500
SHESINK COUNTER
STO
DN
4500
HE
RAMPUP
UP
NCRHE
4500
SD
UPRAMP
1500UP
SHE SS
SS SS
SS
EFEFS
S
S
SS
EF EFS
2
S
2
S
S
EFS EF
b
b
c
c
450090004500
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Sabc
Sabc SFSabc
Sabc
abc
c b a
abc
c b a
abc
c b a
abc
c b a
h1 1
gh1 1
fg1 1
ef1 1
de1
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
F
F
b
b
c b
c b
F
Sabc SF F
a
c b
c b
F
Sabc F
a
c b
c b
F
Sabc F
a
c b
c b
F
Sabc F
a
1
h g1
h1
f1g
1
e1
f1
d1
e1
aa a a
3.0000
PRC NO. :PTR NO. :
TIN :DATE :
ENGINEER IIIVENERANDO D. SAHAGUN
CHIEF, ELECTRICAL DIVISIONBUREAU OF DESIGN, DPWH
FE M. BARRIENTOS
THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANTFROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILUREOF THE SAME DUE TO FAULTY DESIGN.
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGOOIC, DIRECTOR III
RAMON C. BACANIUNDERSECRETARY OIC, DIRECTOR IVGILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT ANDALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NR
EENI
GNE
EC
ROF O
TIN
OM
&
TNSES
EMS
EF
ATS
T
GN
M
A
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL
IC of
the PHILIPPIN
ES
DE
PARTMENT OF E
DUCA
TIO
N
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG ,I
BNA
01 03
01-002
BNA
-
SCALE : 1 : 100 METERS
SCALE : 1 : 100 METERS
C O R R I D O R
UP UP
45009000
4500
45009000
4500
450090004500
450090004500
450090004500
C O R R I D O R
4500
45009000
4500
450090004500
450090004500
45004500
90004500
REFER TO RISER DIAGRAMOVERHEAD SERVICE ENTRANCE
TO LINE SIDE OF DPRATING: 220 V, 2P, 20AT, 50AFENCLOSED AIR CIRCUIT BREAKER
DPA
M
FA
45009000
4500
TO C.O.
B
TO FA
E-3POWER LAYOUT
3
4500
SD
UPRAMP
1500UP
SHE
RAMPUP
UP
NCRHE
DN
4500
HE
9500
DN
4500
SHESINK COUNTER
STO
F
F
F
F
F
F
F
F
F
F
M
DPB/DB
CTO
FA
B
Sf Sf Sf Sf Sf
TO FAB
Sf Sf Sf Sf Sf
TO C.O.
B
TO FA
F
F
F
F
F
F
F
F
F
F
TO F
A
B
Sf Sf Sf Sf Sf
TO FAB
Sf Sf Sf Sf Sf
PRC NO. :PTR NO. :
TIN :DATE :
ENGINEER IIIVENERANDO D. SAHAGUN
CHIEF, ELECTRICAL DIVISIONBUREAU OF DESIGN, DPWH
FE M. BARRIENTOS
THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANTFROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILUREOF THE SAME DUE TO FAULTY DESIGN.
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGOOIC, DIRECTOR III
RAMON C. BACANIUNDERSECRETARY OIC, DIRECTOR IVGILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT ANDALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NR
EENI
GNE
EC
ROF O
TIN
OM
&
TNSES
EMS
EF
ATS
T
GN
M
A
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL
IC of
the PHILIPPIN
ES
DE
PARTMENT OF E
DUCA
TIO
N
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG ,I
BNA
01 03
01-002
BNA
-
150 mm CDP sloped @ 2%
SEPTICTANKLINE
150 mm CDP sloped @ 2%
100mm PVCSP
15
0 m
m
CD
P s
loped
@ 2
%
150 mm CDP sloped @ 2%
20
0 m
m
CD
P s
loped
@ 2
%
TO MAIN DRAINSYSTEM
RAMPUP
150 mm CDP sloped @ 2%
15
0 m
m
CD
P s
loped
@ 2
%
FD
CSFCSFCOCO
75mm PVCWPSD
UP
10
0m
m
PVC
WP
CO
FDWC
FDWCSS
100mm PVCSP
LAVWCFD
150 mm CDP sloped @ 2%
P-11
SCALE :
UP
150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%
100mmCO
150 mm CDP sloped @ 2%
C O R R I D O R
UP
1 : 100 METERS
100mmCO
CO
150 mm CDP sloped @ 2%
100mm PVCSP
CO
CO
DN
FDWC WC
75mm PVCWP
100mm PVCSP
75m
m
PVCW
P
75mm PVCWP
CO
CSFCSF
FD
CSFCO
SHE
FDWC FD
100mm PVCSPTO SEWER
100mmCO
2P-1 SCALE : 1 : 100 METERS
15
0 m
m
CD
P s
loped
@ 2
%
150 mm CDP sloped @ 2%
RAMPUP
20
0 m
m
CD
P s
loped
@ 2
%
TO MAIN DRAINSYSTEM
FD
CO
100mm PVCWP
HE
150 mm CDP sloped @ 2%
100mm PVCSP
LAVFDWC
CO
NCR
15
0 m
m
CD
P s
loped
@ 2
%
100m
m
PVCW
P
CB
CSFCSF
CO
UP
UR
WCFD
CO
CO
UR
FD
CSF
CO
CSFCSF
WCWC
DN
CO
CO
75m
m
PVCW
P
100mm PVCSP
75mm PVCWP
CB CB
CB
CB CB CB
CB CB
CB
CB CB
CB CB
CB CB
CB
DRAINAGE AND SANITARY SYSTEM LAYOUT 5P-1
FDFD
CO CO
8850
75mm PVCWP
100mm PVC MAIN SOIL STACK PIPE
75mm PVC MAIN VENT STACK
100mm PVC MAIN WASTE STACKPIPE
75mm PVC MAIN VENT PIPE
100mm PVC MAIN
100mm PVC MAIN
75mm PVC MAIN
SOIL STACK
VENT STACK
WASTE STACK
CO CO
100mm PVCWPCO
PRC NO. :PTR NO. :
TIN :DATE :
CHIEF, ARCHITECTURAL DIVISIONEMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWHSANITARY ENGINEERELIAS MELQUIADES EMEL B. CUBA II
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGOOIC, DIRECTOR III
RAMON C. BACANIUNDERSECRETARY OIC, DIRECTOR IVGILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT ANDALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NR
EENI
GNE
EC
ROF O
TIN
OM
&
TNSES
EMS
EF
ATS
T
GN
M
A
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL
IC of
the PHILIPPIN
ES
DE
PARTMENT OF E
DUCA
TIO
N
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG ,I
Max C
01 03
01-002
mmC
-
100m
m PV
CSP
150 mm CDP sloped @ 2%
FD
CO
CO
75mm
PV
CWP
SD100mm PVCWP
RISER
CO
CO
FDWCFD
WC
SS
CO LAV
WCFD
150 m
m CD
P slop
ed @
2%
50mm
PV
CBV
50mm
PV
CBV
CB
CS
CS
FD COCO
WC
100m
m PV
CSP
SHE
SINK C
OUNTERRIS
ERCO
FD
CO75
mm
PVCW
P
75mm
PV
CHD
75mm
PV
CWP
FD
FD CSCS
CS50mm
PV
CBV
50mm
PV
CBV
DN
FD COCO
WC
WC
100m
m PV
CSP
SHE
SINK C
OUNTERRIS
ERCO
FD
CO75
mm
PVCW
P
75mm
PV
CWP
75mm
PV
CWP
FD
FD CSCS
CS50mm
PV
CBV
50mm
PV
CBV
2ND FLR
3RD FLR
CB
CB
PIPE C
HASE
PIPE C
HASE
CO
FD
CO
100m
m PV
CWP
150 m
m CD
P slop
ed @
2%
100m
m PV
CSP
LAV
FD
WC
CO
NCR
CS COUR
WCFD
CO
RISER
50mm
PV
CBV
50mm PVCBV
CB
CSCS
DN
CO
UR
CO
CO CO75
mm
PVCW
P
100m
m PV
CSP
75mm
PV
CWP
RISER
FD
WC
WC
CSCS
50mm
PV
CBV
50mm PVCBV
50mm
PV
CBV
CO
UR
CO
CO CO75
mm
PVCW
P
100m
m PV
CSP
75mm
PV
CWP
RISER
FD
WC
WC
CS
CS
50mm
PV
CBV
50mm PVCBV
50mm
PV
CBV
CB
PIP[E C
HASE
PIP[E C
HASE
DS
FD
75m
m
PVC
DS
DS
150 m
m CD
P slop
ed @
2%
SEPT
IC
TANK
LINE
150 m
m CD
P slop
ed @
2%
100m
m PV
CSP
150 m
m CD
P slop
ed @
2%
200 mm CDP sloped @ 2%
TO M
AIN D
RAIN
SYST
EM
CB
CB
RAMPUP
150 mm CDP sloped @ 2%
FD
CO
CO
75mm
PV
CWP
SD100mm PVCWP
RISER
CO
CO
FDWCFD
WC
SS
CO LAV
WCFD
150 m
m CD
P slop
ed @
2%
CB
CB
UP150 mm
CDP
sloped
@ 2%
150 m
m CD
P slop
ed @
2%10
0mm
CO
150 m
m CD
P slop
ed @
2%
C O
R
R I
D
O
R
CB
UP
CB
150 m
m CD
P slop
ed @
2%
100m
m
CO
CO
150 m
m CD
P slop
ed @
2%
100m
m PV
CSP
100m
m PV
CSP
TO SE
WER
100m
m
CO
150 mm CDP sloped @ 2%
150 m
m CD
P slop
ed @
2%
RAMPUP
200 mm CDP sloped @ 2%
TO M
AIN D
RAIN
SYST
EM
CB
FD
CO
100m
m PV
CWP
150 m
m CD
P slop
ed @
2%
100m
m PV
CSP
LAV
FD
WC
CO
NCR
CS COUR
WCFD
CO
RISER
50mm
PV
CBV
50mm
PV
CBV
50mm
PV
CBV
50mm PVCBV
CB
CB
CB
CB
CB
CB
CB
CO
FD
FD
DS
CSCS
CS
CS
FD COCO
WC
100m
m PV
CSP
SHE
SINK C
OUNTERRIS
ERCO
FD
CO75
mm
PVCW
P
75mm
PV
CHD
75mm
PV
CWP
FD
FD CSCS
CS50mm
PV
CBV
50mm
PV
CBV
DN
CO
UR
CO
CO CO75
mm
PVCW
P
100m
m PV
CSP
75mm
PV
CWP
RISER
FD
WC
WC
CSCS
50mm
PV
CBV
50mm PVCBV
50mm
PV
CBV
DN
FD COCO
WC
WC
100m
m PV
CSP
SHE
SINK C
OUNTERRIS
ERCO
FD
CO75
mm
PVCW
P
75mm
PV
CWP
75mm
PV
CWP
FD
FD CSCS
CS50mm
PV
CBV
50mm
PV
CBV
CO
UR
CO
CO CO75
mm
PVCW
P
100m
m PV
CSP
75mm
PV
CWP
RISER
FD
WC
WC
CS
CS
50mm
PV
CBV
50mm PVCBV
50mm
PV
CBV
2ND FLR
3RD FLR
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
DRANAIGE & SANITARY SYSTEMISOMETRIC VIEW
P-25
PIPE C
HASE
PIPE C
HASE
PIP[E C
HASE
PIP[E C
HASE
CO
FD
FD
75m
m
PVC
DS
DS
CO
FD
FD
75m
m
PVC
DS
DS
CO
FD
FD
75m
m
PVC
DS
DS
CO
FD
FD
75m
m
PVC
DS
DS
CO
FD
FD
75m
m
PVC
DS
DS
CO
FD
FD
75m
m
PVC
DS
DS
CO
75m
m
PVC
DS
DS
CO
75m
m
PVC
DS
DS
CO
75m
m
PVC
DS
DS
CO
75m
m
PVC
DS
DS
CO
75m
m
PVC
DS
DS
150 mm CDP sloped @ 2%ISOMETRIC PLUMBING LAYOUT
NOT TO SCALE
ISOMETRIC PLUMBING LAYOUT
ISOMETRIC PLUMBING LAYOUT - MALE TOILET
- FEMALE TOILET2P-2
1P-2
3P-2
PRC NO. :PTR NO. :
TIN :DATE :
CHIEF, ARCHITECTURAL DIVISIONEMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWHSANITARY ENGINEERELIAS MELQUIADES EMEL B. CUBA II
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGOOIC, DIRECTOR III
RAMON C. BACANIUNDERSECRETARY OIC, DIRECTOR IVGILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT ANDALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NR
EENI
GNE
EC
ROF O
TIN
OM
&
TNSES
EMS
EF
ATS
T
GN
M
A
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL
IC of
the PHILIPPIN
ES
DE
PARTMENT OF E
DUCA
TIO
N
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG ,I
Max C
01 03
01-002
AZB
-
RAMPUP
UP
WC
F SD
SS
F
GV WC WCLAV
SCALE :
UP
1P-3
C O R R I D O R
1 : 100 METERS
UP
FROM
WAT
ER S
OURC
E
RAMPUP
UP
NCR RISERHE
SINK COUNTER
DN
SHE
FFF SINK COUNTER
STO
SCALE :
2P-3 1 : 100 METERS
DN
RISERRISER
RISER
GVCV
25mm GICWL
25mm
GI
CWL
19mm
GI
CWL
19mm GICWL
25mm GICWL
19mm GICWL
19mm
GI
CWL
25mm
GI
CWL
19mm GICWL
19mm GICWL
19mm GICWL
19mm GICWL
19mm
GI
CWL
19mm GICWL
WCURLAVWC
CSUPCV
GV
UP GV
WATER SYSTEM LAYOUT
6574 3 214321
4
3 2 1
8
31 2
3P-3 SCALE : 1 : 20 METERS
CS
WCWCURWCWCWC
19mm
GI
CWL
WC
F SD
SS
F
GV WC WCLAV
RISER
25mm GICWL
19mm GICWL
19mm
GI
CWL
25mm
GI
CWL
4321
FROM
WAT
ER S
OURC
ENCR RISERHE
SINK COUNTER
GVCV
25mm GICWL
25mm
GI
CWL
19mm
GI
CWL
19mm GICWL
19mm GICWL
WCURLAVWC
CSUPCV
GV
UP GV
6574 3 21 8
SHE
FFF SINK COUNTER
STORISER
19mm GICWL
19mm GICWL
31 2
WCWCWC
19mm
GI
CWL
RISER
19mm GICWL
19mm
GI
CWL
19mm GICWL
3 2 1
CS
WCWCUR
1 19mm GICWL RISER
SCHEDULE OF FINISHES
19mm GATE VALVE2
19mm GICWL3
4 25mm GICWL
STAINLESS WATER TANK (125 GAL CAPACITY)564 GAL CAP. STAINLESS PRESSURE TANK6
1.5 HP BOOSTER PUMP7
IMAGINARY LINE OF PUMP HOUSING8
GROUND FLOOR FEMALE TOILET GROUND FLOOR MALE TOILET SEC. & 3RD FEMALE TOILET SEC. & 3RD MALE TOILET
PRC NO. :PTR NO. :
TIN :DATE :
CHIEF, ARCHITECTURAL DIVISIONEMMANUEL P. CUNTAPAY
BUREAU OF DESIGN, DPWHSANITARY ENGINEERELIAS MELQUIADES EMEL B. CUBA II
CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :
SOFIA T. SANTIAGOOIC, DIRECTOR III
RAMON C. BACANIUNDERSECRETARY OIC, DIRECTOR IVGILBERTO S. REYES
APPROVED FOR ACCREDITATION : CONCURRED :
LOCATION :
PROJECT TITLE :
NOTE:
DATE :
ENCODED BY:
CHECKED BY:
PROJECT NO:
DESIGNED BY:
MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT ANDALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.
DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :
OWNER :
REP. ACT 545
SHEET NO:
BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NR
EENI
GNE
EC
ROF O
TIN
OM
&
TNSES
EMS
EF
ATS
T
GN
M
A
TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL
IC of
the PHILIPPIN
ES
DE
PARTMENT OF E
DUCA
TIO
N
MERALCO AVENUE, PASIG CITY
REPUBLIC OF THE PHILIPPINES
IR
K
S
MCMXCIX
AG ,I
Max C
01 03
01-002
AZB
-
C O R R I D O R
25mm GI
CWL
19mm GI
CWL19mm GICWL
25mm GICWLRISER WC
GV SS
SD
WC
1
UP
UP
UPRAMP
LAVWC
4
UP
UR
19mm GICWL
25mm GICWL
RAMP
WCNCR
GVCVUP
CS
WC
19mm GICWL19mm
GICWL
25mm GI
CWL
CVGV
SINK COUNTER
HERISER
FROM WAT
ER SOURC
E
GVUP
LAV
FF
F
F
F
25mm GICWL
FF19mm GICWL
19mm GICWL
RISER
19mm GI
CWL
RISER
SINK COUNTER
19mm GI
CWL
STOSHE
19mm GICWL
19mm GICWL
FF19mm GICWL
19mm GICWL
19mm GI
CWL
RISER
SINK COUNTER
19mm GI
CWL
STOSHE
19mm GICWL
19mm GICWL
WATER SYSTEM ISOMETRIC DIAGRAM
FROM PRESSURE TANK
FF
F
F
FF
FF
F
WCWC
UR
WCWC
UR
WCWC
WC
WC
WCWC
19mm GICWL
19mm GICWL
19mm
GI
CWL
19mm
GI
CWL
25mm GI
CWL
19mm GI
CWL19mm GICWL
25mm GICWLRISER WC
GV SS
SD
WC
1
LAVWC
F
RISER
SINK COUNTER
19mm GI
CWL
STOSHE
19mm GICWL
19mm GICWL
RISER
SINK COUNTER
19mm GI
CWL
STOSHE
19mm GICWL