122543829-dpwh

21

description

PDF

Transcript of 122543829-dpwh

  • PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    PERSPECTIVE VIEW, TABLE OF CONTENTS9A-1

    GROUND, TYP. 2nd & 3rd FLOOR PLAN, FINISHESFRONT, REAR ELEVATIONS

    TOILETS, STAIRS & RAMP DETAIL

    RIGHT, LEFT ELEV., LONGITUDINAL & CROSS SECTION

    TOILET SECTION DETAILS, FACADE PEDIMENTS

    PERSPECTIVE VIEW & TABLE OF CONTENTSA-1

    A-2

    A-3

    A-6

    A-5

    A-4

    A-7

    S-1

    S-2

    S-3

    S-4PERSPECTIVE VIEW1A-1 SCALE : N T S

    P-1

    P-2

    THIRD FLOOR REFLECTED CEILING & ROOF PLAN

    STAIR, HANDRAIL & MISC. DETAILSA-8

    E-1 GENERAL NOTES, SINGLE LINE DIAGRAM,LOAD SCHEDULE, LEGEND & RISERDIAGRAM

    E-2 GROUND & TYP. 2nd & 3rd FLOOR POWERLAYOUT

    E-3 GROUND & TYP. 2nd & 3rd FLOOR LIGHTINGLAYOUT

    P-5 SEPTIC TANK, CATCH BASIN & COVERDETAILS, NOTES, LEGEND, DESIGN CRITERIA

    FOUNDATION PLAN, DET. OF FOOTING, TIEBEAM, STAIR ON GRADE & RAMP, ELEV. OF

    COL. SCH. FOOTING & COLUMN

    2nd & 3RD FLOOR FRAMING PLAN, TYP. DET.OF BEAM & SLAB, SCH. OF BEAMS & SLABS

    STAIR PLAN & SECTION DETAIL, MISC. DETAILSROOF FRAMING PLAN, TRUSS DIAGRAM DETAILS

    OF STEEL CONNECTION

    DOOR & WINDOW SCHEDULE, DETAIL OF STEELCASEMENTA-9

    DRAINAGE AND SANITARY SYSTEM LAYOUT

    DARINAGE AND SANITARY SYSTEMISOMETRIC VIEW

    WATER SYSTEM ISOMETRIC DIAGRAM

    WATER SYSTEM LAYOUTP-3

    P-4

    ELECTRICAL

    STRUCTURAL

    ARCHITECTURAL

    ENGINEER/BUILDING OFFICIALOFFICE OF THE CITY/MUNICIPAL

    MECHANICAL

    ELECTRICAL

    SANITARY

    STRUCTURAL

    ARCHITECTURAL

    LAND USE & ZONING

    LINE & GRADE

    DISTRICT/CITY/MUNICIPALITY

    TABLEOFCONTENTS

  • PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    GROUND FLOOR PLANSCALE :

    1A-2 1 : 100 METERS

    9A-2

    TYPICAL 2nd & 3rd FLOOR PLAN2A-2 SCALE : 1 : 100 METERS

    C O R R I D O R

    UP UP

    C O R R I D O R

    GROUND, 2nd & 3rd TYPICAL FLOOR PLAN, FINISHES

    25mmDEP

    WF1

    25mmDEP

    FL1

    BLAC

    KBO

    ARD

    BAS

    E

    WF1

    FL1

    W1

    W1

    W2

    W2D

    1D

    1

    25mmDEP

    WF1

    25mmDEP

    FL1

    BLAC

    KBO

    ARD

    BAS

    E

    WF1

    FL1

    W1

    W1

    W2

    W2D

    1D

    1

    25mmDEP

    WF1

    25mmDEP

    FL1

    BLAC

    KBO

    ARD

    BAS

    E

    WF1

    FL1

    W1

    W1

    W2

    W2D

    1D

    1

    25mmDEP

    WF1

    25mmDEP

    FL1

    BLAC

    KBO

    ARD

    BAS

    E

    WF1

    FL1

    W1

    W1

    W2

    W2D

    1D

    1

    25mmDEP

    WF1

    25mmDEP

    FL1

    BLAC

    KBO

    ARD

    BAS

    E

    WF1

    FL1

    W1

    W1

    W2

    W2D

    1D

    1

    4500 4500

    CLASSROOM

    2 3 4

    1

    4500 4500

    CLASSROOM

    5 6

    2

    4500 4500

    CLASSROOM

    9 10

    4

    4500 4500

    CLASSROOM

    11 12

    5

    C O R R I D O R

    WF2 WF2 WF2

    WF2 WF2 WF2

    25mmDEP

    WF1

    25mmDEP

    FL1

    BLA

    CKB

    OAR

    D B

    ASE

    WF1

    FL1

    W1

    W1

    W2

    W2D

    1D

    1

    25mmDEP

    WF1

    25mmDEP

    FL1

    BLA

    CKB

    OAR

    D B

    ASE

    WF1

    FL1

    W1

    W1

    W2

    W2D

    1D

    1

    25mmDEP

    WF1

    25mmDEP

    FL1

    BLA

    CKB

    OAR

    D B

    ASE

    WF1

    FL1

    W1

    W1

    W2

    W2D

    1D

    1

    25mmDEP

    WF1

    25mmDEP

    FL1

    BLA

    CKB

    OAR

    D B

    ASE

    WF1

    FL1

    W1

    W1

    W2

    W2D

    1D

    1

    25mmDEP

    WF1

    25mmDEP

    FL1

    BLA

    CKB

    OAR

    D B

    ASE

    WF1

    FL1

    W1

    W1

    W2

    W2D

    1D

    1

    CONCRETE SUNBREAKER

    LINE OF SUNBREAKER

    A-63

    LINE OF ROOF FORTHIRD FLOOR

    A-62

    A-64

    A-61

    A-71

    A-810

    9000

    LANDING LANDING

    LANDINGLANDING

    163

    STO STO

    7000

    9500

    1500

    2500

    B

    C

    DN

    1090

    140060

    0

    200x200mmVITRIFIED FLOORTILES (UNGLAZED)

    A

    4500

    960 960 1200

    SHE

    SINK COUNTER D-2

    D-2

    D-4

    W3

    D-4 D-4

    STO

    W4

    1

    955

    7000

    9500

    1500DN

    2500

    4500

    1000 10002075

    SINK COUNTER

    W3

    HED-4

    D-2

    2000

    WCURINAL

    D-4

    600

    200x200mmVITRIFIED UNGLAZEDFLOOR TILES

    WC

    1400

    13

    7000

    3850

    RAMP

    1200

    3600 1700

    2500

    UP

    D-3a

    1500 UP

    2000

    3150

    4500

    W4

    D-3

    NCR

    W3

    HE

    SINK COUNTER

    D-4

    13

    URINALLAVWC WC

    D-2

    W3

    SINK COUNTER

    1750

    1700

    SD

    1400

    200x200mm VITRIFIEDFLOOR TILES

    (UNGLAZED)

    1

    3625

    3600

    UPRAMP

    1200

    1500D-3a

    UP

    850 850

    WF3

    W4

    D-3SHE

    D-4 D-4

    2000

    1200

    1525

    A-43

    A-44

    A-43

    A-44

    650

    4500 4500

    7

    4500

    8

    1700 850

    54000

    CLASSROOM3

    WITH GROOVES

    SCHEDULE OF FINISHES

    - PLAIN CEMENT FLOOR FINISH

    - PLAIN CEMENT FLOOR ROUGH

    ( UNGLAZED )- 200X200 VITRIFIED FLR TILES

    WF2

    WF1

    WF3

    WALLS :

    FL3

    FLOORS :

    FL1

    FL2

    - 100 MM THK. CHB W/ PLAIN CEMENT PLASTER FIN (PAINT) 50mm G.I. PIPE FOR HANDRAIL

    - 200X200 VITRIFIED WALL TILES (GLAZED)

    - 150 MM THK. CHB W/ PLAIN CEMENT PLASTER FIN (PAINT)

    FL1

    4500 4500

    CLASSROOM

    2 3

    6

    WF1FL1

    4500 4500

    CLASSROOM

    4 5

    7

    WF1FL1

    4500 4500

    CLASSROOM

    6 7

    8

    WF1FL1

    4500 4500

    CLASSROOM

    8 9

    9

    WF1FL1

    4500 4500

    CLASSROOM

    10 11 12

    10

    WF1

    54000

    1750

    SS

    HCR

    425

    425425

    PIPE CHASE

    PIPE CHASE

    PIPE CHASE

    PIPE CHASE

    425 650 773

    A-71

    385025

    00

    C

    B

    A

    3150

    9500

  • PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    9925

    THIRD FLOOR LEVEL

    NAT. GRD. LN.GROUND FLOOR LEVEL

    320032

    532

    00

    REAR ELEVATION1 : 100 METERS

    2A-3 SCALE :

    A-39

    APEX LINE OF TRUSS

    TOP OF ROOF BEAM

    2500

    1 : 100 METERS

    FRONT ELEVATIONSCALE :A-31

    D-1W-2D-1

    W-2

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

    GM

    A

    C A RE

    S

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1W-2D-1

    W-2D-1W-2D-1

    W-2D-1W-2D-1G

    MA

    C A RE

    S

    1

    SECOND FLOOR LEVEL

    3200

    FRONT, REAR ELEVATIONS

    13

    CONCRETE SUN BREAKER(SEE DETAIL)

    PLAIN CEMENT PLASTERPAINT FINISH

    GA#26 PL. G.I. GUTTER ON12x300mm FIBER CEMENT

    FASCIA BD. (PAINT FINISH)

    GA#26 CORR. G.I. ROOFINGSHEET (PAINT FIN.)

    13

    GA. #26 CORR. G.I.ROOFING SHEET (PAINTFINISH)

    GA. #26 PLAIN G.I.GUTTER ON12x300mm FIBER

    CEMENT FASCIA BD.(PAINT FINISH)

    100 MM THK. CHBRAILING W/50mm

    G.I. PIPE RAILING

    32mm G.I. PIPEHANDRAIL WITH 32mm

    VERT. SUPPORT @ 600mmO.C. (PAINT FINISH)

    D-2

    D-2

    D-2

    1

    9925

    SECOND FLOOR LEVEL

    NAT. GRD. LN.GROUND FLOOR LEVEL

    320032

    532

    00

    APEX LINE OF TRUSS

    TOP OF ROOF BEAM

    2500

    THIRD FLOOR LEVEL

    3200

    D-2

    D-2

    D-2

    W3

    W3

    W4

    W4

    W3

    W4

    W3

    W4

    W3

    2985

    W3

    815

    D-3A D-3A

    1112

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    W1

    W1

    W1

    W1

    W1

    W1

    910

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    W1

    W1

    W1

    W1

    W1

    W1

    78

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    W1

    W1

    W1

    W1

    W1

    W1

    56

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    W1

    W1

    W1

    W1

    W1

    W1

    34 2

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    FF F F F

    W1

    W1

    W1

    W1

    W1

    W1

    2 3 4 5 6 7 8 9 10 11 12

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

    W-2D-1

  • PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    1242

    5

    3200

    2500

    3200

    NAT. GRD. LN.GROUND FLOOR LEVEL

    325

    3200

    SECOND FLOOR LEVEL

    LONGITUDINAL SECTION4A-4 SCALE : 1 : 100 METERS

    THIRD FLOOR LEVEL

    NAT. GRD. LN.GROUND FLOOR LEVEL

    9925

    320032

    532

    00

    CLASSROOM

    A-43

    1 CORRIDOR

    CROSS SECTION1 : 100 METERSSCALE :

    CLASSROOM

    W-1

    W-1

    10 CORRIDOR

    D-1

    9A-4

    APEX OF TRUSS

    600

    THIRD FLOOR LEVEL

    TOP OF TRUSS

    TOP OF ROOF BEAM

    CBA7000

    95001000

    2500

    SEE TRUSS DETAIL

    RIGHT SIDE ELEVATION1A-4 SCALE : 1 : 100 METERS

    9925

    320032

    0032

    5 NAT. GRD. LN.GROUND FLR. LVL.

    SECOND FLR. LVL.

    TOP OF ROOF BEAM

    APEX LINE OF TRUSS

    C B A

    1100

    1000

    LEFT SIDE ELEVATION2A-4 SCALE : 1 : 100 METERS

    1000

    CBA

    1 2

    2500

    TOP OF ROOF BEAM

    CLASSROOM

    W-1

    6 CORRIDORSECOND FLOOR LEVEL

    3200

    3200

    THIRD FLR. LVL.

    RIGHT & LEFT SIDE ELEV., LONGITUDINAL & CROSSSECTION

    2 3

    THIRD FLOOR LEVEL

    NAT. GRD. LN.GROUND FLOOR LEVEL

    9925

    320032

    532

    00

    TOP OF TRUSS

    TOP OF ROOF BEAM

    SECOND FLOOR LEVEL

    3200

    600

    12 1311

    SEE STRUCTURAL DETAIL

    W3

    W4

    200x200mmVITRIFIED WALLTILES (GLAZED)

    CONCRETESUNBREAKER (SEEDETAIL)

    32mm GI PIPE HANDRAILw/32mm VERT. SUPPORT@600mm O.C. (PAINT FIN.)

    GA#26 CORR. G.I.ROOFING SHEET(PAINT FIN.)

    GA#26 PLAIN G.I. GUTTERON 12x300mm FIBERCEMENT FASCIA BOARD(PAINT FIN.)

    PLAIN CEMENT PLASTERWALL PAINT FIN.

    CONCRETESUNBREAKER (SEE

    DETAIL)

    GA#26 CORR. G.I.ROOFING SHEET(PAINT FIN.)

    GA#26 G.I. GUTTERON 12x300mmFIBER CEMENTFASCIA BOARD(PAINT FIN.)

    PLAIN CEMENT PLASTERWALL PAINT FIN.

    38mm G.I. PIPEHANDRAIL

    w/32mm VERT.SUPPORT @600mmO.C. (PAINT FIN.)

    GA#26 CORR. G.I.ROOFING SHEET

    (PAINT FIN.)

    CONCRETESUNBREAKER(SEE DETAIL)

    FEMALETOILET

    FEMALETOILET

    FEMALETOILET

    STORAGE

    STORAGE

    W3 W4

    W3

    W4

    MALETOILET

    MALETOILET

    MALETOILET

    W4

    200x200mmVITRIFIED WALLTILES (GLAZED)

    W3

    W3

    EXPOSED CEILING UNDERSLAB PAINT FIN.

    EXPOSED CEILING UNDERSLAB PAINT FIN.

    WC WCCSLAV

    3mm THK. FASCIALMIRROR ON AL.FRAME

    50mm G.I. PIPERAILING PAINT FIN.

    1100

    D-1

    D-1

    840

    900

    200

    900

    900

    W3

    6mm THK. MARINE PLYWOODCEILING FOR ALL TOILET ON

    50x50mm CEILING JOIST@600mm ON CENTERBOTHWAYS w/10mm BAR

    HANGER @1200mm OC.BOTHWAYS EMBEDDED ON

    CONC. SLAB

    300

    3200

    3200

    3225

    TOP OF ROOF BEAM

    3rd FLOOR TOILET LEVEL

    2nd FLOOR TOILET LEVEL

    GROUND FLOOR TOILETLEVEL

    1100 200 200

    CLASSROOM

    CLASSROOM

    CLASSROOM

    F F F F

    F F F F

    F F F F

    F F F F

    F F F F

    F F F F

    W1

    W1

    W1W

    1

    W1

    W1 CLASSROOM

    CLASSROOM

    CLASSROOM

    F F F F

    F F F F

    F F F F

    F F F F

    F F F F

    F F F F

    W1

    W1

    W1W

    1

    W1

    W1 CLASSROOM

    CLASSROOM

    CLASSROOM

    F F F F

    F F F F

    F F F F

    F F F F

    F F F F

    F F F F

    W1

    W1

    W1W

    1

    W1

    W1 CLASSROOM

    CLASSROOM

    CLASSROOM

    F F F F

    F F F F

    F F F F

    F F F F

    F F F F

    F F F F

    W1

    W1

    W1W

    1

    W1

    W1 CLASSROOM

    CLASSROOM

    CLASSROOM

    F F F F

    F F F F

    F F F F

    F F F F

    F F F F

    F F F F

    W1

    W1

    W1W

    1

    W1

    W1

    3

    11

    6

    1

    5 6

    12

    7

    4 7

    13

    8

    9

    14

    9

    4

    8 11 12

    15

    10

    5

    10

    2500

    815

    2500

    10A-8

  • PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    ROOF PLANSCALE :A-52

    1 : 100 METERS

    THIRD FLOOR REFLECTED CEILING PLAN1A-5 SCALE : 1 : 100 METERS

    100010

    0025

    00

    c

    b

    A

    A-8

    600

    13

    600

    THIRD REFLECTED CEILING, ROOF PLAN9A-5

    9000

    4500

    700025

    00

    4500

    9000

    1 324500

    9000

    4500

    4 54500

    6 74500

    8 134500600 4500 600

    LN. OF STRUCTURE

    RD RD

    100010

    00

    B

    C

    A

    1

    4500

    9000

    4500

    2 3 4

    GA#26 CORR. G.I. SHEETROOFING (PAINT FIN.)

    GA#26 PLAIN G.I. RIDGEROLL (PAINT FIN.)

    GA#26 PLAIN G.I. FLASHING(PAINT FIN.)

    9000

    4500

    94500

    109000

    4500

    114500

    12

    SLOPE

    SLOPE

    SLOPE

    SLOPE

    CEILING VENTILATION (SEEDETAIL)

    GA#26 PLAIN GI GUTTER ON12x300mm FIBER CEMENT FASCIA

    BOARD (PAINT FIN.)

    6mm THK. ORD. PLYWOOD CEILING ON50x50mm CEILING JOIST @600mm OCBOTH WAYS (PAINT FIN.)

    LIGHTING FIXTURES

    6mm THK. MARINE PLYWOODCEILING ON 50x50mm CEILING

    JOIST @600mm OC BOTH WAYS(PAINT FIN.)

    A-77

    CONCRETE PARAPET

    CONCRETE PARAPETGA#26 G.I. GUTTER ON12x300mm FIBER CEMENT

    FASCIA BOARD (PAINT FIN.)

    GA#26 G.I. GUTTER ON12x300mm FIBER CEMENT

    FASCIA BOARD (PAINT FIN.)

    4500 4500

    9000

    4500

    5 6

    4500

    9000

    4500

    9 10

    4500

    9000

    4500

    11 124500

    RD RD RD RD RD RD RD RD RD RD RD

    200 RD RD RD RD RD RD RDRD RD RD RD RD

    MANHOLE MANHOLE

    7000

    4500

    9000

    4500

    7 8

  • PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    5b DETAIL SECTIONA-6 SCALE 1:10 M

    700

    900

    100

    200

    SPOT DETAILSCALEA-6 1:5 M

    100X100 CONCRETESKIRTING

    100

    150 1

    00

    5b1DET. ELEVATION OF RAMPA-6

    5SCALE 1:50 M

    20070

    0900

    20070

    0 900

    1200

    300

    32mm G.I. PIPE HANDRAILWITH 32mm VERT. SUPPORT @600mm O.C. (PAINT FINISH)

    NONSKID PLAIN CEMENT FLOORFINISH W/ GROOVE LINES

    GROUND FLOORGROUND FLOOR

    TYP. 2nd & 3rd FLOORTYP. 2nd & 3rd FLOOR

    TOILETS, STAIR & RAMP PLAN ANDRAMP DETAIL

    32 mm G.I PIPEVERTICAL SUPPORT @600mm ON CENTERPROVIDE 12mm STEEL

    DOWELS (PAINT FIN.)

    32mm G.I. PIPEHANDRAIL WITH 32mm

    VERT. SUPPORT @600mmO.C. (PAINT FINISH)

    32 mm G.I PIPEVERTICAL SUPPORT@600mm ON CENTERPROVIDE 12mm STEEL

    DOWELS (PAINT FIN.)

    NONSKID PLAIN CEMENTFLOOR FINISH W/

    GROOVE LINES

    W3

    4500

    SINK COUNTER

    1750

    1700

    600

    9500

    385025

    00

    C

    B

    A

    SD

    3150

    1400

    200x200mm VITRIFIEDFLOOR TILES

    (UNGLAZED)

    1

    3600

    UPRAMP

    1200

    1500

    D-3aUP

    WF3

    W4

    D-3SHE

    D-4 D-4

    2000

    5000

    7000

    3850

    RAMP

    1200

    3600 1700

    2500

    UP

    D-3a1500 UP

    2000

    3150

    10251700CLEAR

    888

    4500

    W4

    D-3

    NCR

    W3

    HE

    SINK COUNTER

    D-4

    13

    7000

    9500

    1500

    2500

    B

    C

    DN

    1090

    140060

    0

    200x200mmVITRIFIED FLOORTILES (UNGLAZED)

    A

    4500

    960955 960 1200

    SHE

    SINK COUNTERD-2

    D-2

    D-4

    W3

    D-4 D-4

    STO

    W4

    1

    7000

    9500

    1500

    DN

    2500

    4500

    1000 13002100

    SINK COUNTER

    W3

    HED-4

    D-2

    1500

    WCURINAL

    D-4

    600

    200x200mmVITRIFIED UNGLAZEDFLOOR TILES

    WC

    1400

    13

    1

    2

    3

    4 16

    5 15

    6 14

    7 13

    8 12

    9 11

    10

    A-85

    A-812

    D-2

    WC WCWCWC WCLAV

    WC

    38mm STAINLESSSTEEL GRAB BAR

    19

    18

    17

    16

    5 15

    6 14

    7 13

    8 12

    9 11

    10

    1

    2

    3

    416

    515

    614

    713

    812

    911

    10

    19

    18

    17

    416

    515

    614

    713

    812

    911

    10

    WCLAV URINAL WC

    38mm STAINLESSSTEEL GRAB BAR

    A-89

    9-ST

    EPS@

    300m

    m =

    270

    013

    37

    1360 1359

    8-ST

    EPS@

    300m

    m =

    240

    013

    37

    200x200mmVITRIFIED UNGLAZEDFLOOR TILES

    STO.

    STO.

    D-2

    2 2

    1212

    3600 1700

    A-65a

    SPOT DETAIL5aA-6 SCALE 1:50 M

    NON-SKID PLAIN CEMENT FLO

    OR CEMEMNT FINISH

    100 100

    6mm

    TYPICAL

    6mm 6mm

    A-65b

    A-65b1

    4A-6 SCALE : 1:50

    MALE TOILET PLAN DETAILM

    3A-6 SCALE : 1:50

    MALE TOILET PLAN DETAILM

    2A-6 SCALE : 1:50

    FEMALE TOILET PLANDETAIL

    M

    1A-6 SCALE : 1:50

    FEMALE TOILET PLANDETAIL

    M

    9A-6

    1075 850 850 1725

    2000

    3000

    1574A-81

    A-81

    425425

  • PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    TOILET SECTION DETAILS9A-7

    150

    URINAL

    300

    1625

    1525

    10032

    00

    CLASSROOM LVL.TOILET LVL.

    2ND FLR. LVL.

    50

    3200

    4500

    21

    300

    1600

    1650

    3250

    CLASSROOM LVL.TOILET LVL.

    2ND FLR. LVL.

    5026

    95

    3200

    4549

    1312

    1A-7

    DET. SECTION OF FEMALE TOILETSSCALE 1:50 M

    6A-7

    MOUNTING FIXTURES OF MALE TOILETSCALE 1:50 M

    FIN. GRD. LN.TOILET LVL.

    FIN. GRADE LN.TOILET LVL.

    500500

    SD

    200

    600

    3mm THK. FASCIALMIRROR ON AL. FRAMING

    200x200mm VITRIFIEDWALL TILES (GLAZED)

    CONC. COUNTER

    800

    600

    300

    PLAIN CEM. PLASTERPAINT FIN.

    PLAIN CEM. PLASTEREDPAINT FIN.

    200x200mm GLAZEDWALL TILES

    COUNTER SINK DET. PLAN

    600

    1900

    200x200mm VITRIFIEDGLAZED TILES

    5A-7

    DETAIL SECTIONSCALE 1:20 M

    200x200mm VITRIFIEDGLAZED WALL TILES

    600

    70

    100

    100

    15 25

    50 300200

    150

    URINAL

    WC

    38 STAINLESS STEELGRAB BAR

    300

    3RD FLR. LVL.

    3200

    TOP OF BEAM LVL.

    3225

    1625

    3005

    032

    00

    4500

    2 1

    900

    FIN. GRD. LN.

    CORRIDOR LVL.TOILET LVL.

    325

    3200

    320016

    0016

    00

    450450

    200200

    2A-7

    DET. SECTION OF MALE TOILETSSCALE 1:50 M

    FEMALETOILET

    FEMALETOILET

    FEMALETOILET

    STORAGE

    STORAGE

    W3

    W4

    W3

    W4

    W3

    W4

    MALETOILET

    MALETOILET

    MALETOILET

    W3

    WC 78

    0

    3A-7

    DETAIL OF COUNTER SINKSCALE 1:20 M

    DETAIL SECTIONSCALE 1:20 M

    DET. SECTIONSCALE 1:20 M

    LAV

    WC

    W3

    W3

    WC WC WC

    WC WC WC

    1600

    A-88

    1000

    1600

    1800

    100

    200 20060

    PLAIN CEMENT PLASTERPAINT FINISH

    200x200mmVITRIFIED WALLTILES ( GLAZED )

    CORRIDOR LVL.

    W3

    W3

    6mm THK. MARINEPLYWOOD CEILING ON

    50x50mm CEILING JOIST@600mm OC BW.w/10mm BAR HANGEREMBEDDED ON SLAB

    @1200mm OC. BW.

    150

    TOILET LVL.

    TOILET LVL.

    GROUND FLOOR

    2nd FLOOR

    3rd FLOOR

    TOP OF ROOF BEAM

    1319

    5

    650

    9425

    9000

    1000

    1000

    1000

    802

    654

    39214

    52

    40

    1000

    1000

    1000

    1000

    1000

    1000

    650

    4175

    65080

    500

    268

    654

    80

    1525

    650

    150

    650

    350

    150mM THK. CHBPLASTER FIN. w/40mm

    GROOVE @1040mm OC &10mm REINF. BAR

    @600mm OC. BW.PLASTERED PAINT FIN.

    150mm THK. CHBPLASTERED PAINT FIN.

    150mm CHB

    G

    MA

    C AR

    E

    S

    CONCRETE COLUMN

    3315

    100010

    0010

    0 0

    40

    1000

    1000

    100010

    0010

    0010

    00

    DET. SECTION

    CEM. PLASTERED FIN.6" THK CHB PEDIMENT

    1525

    A-7 SCALE7a

    783

    200

    1:50 M

    TOP OF ROOF BEAM

    320032

    0032

    00

    6aA-7

    DET. OF FACADE PEDIMENTSCALE 1:50 M

    7A-7

    3919

    DET. SECTIONSCALE 1:20 M

    7bA-7

    4A-7

    7aA-7

    7bA-7

    6aA-7

    (PROVIDE MANHOLE)

    1500

    FFLFFL

    1002

    84

    800

    183

    100

    1500

    650R746

    FFL

    300

    300

    PIPE CHASE

    PIPE CHASE

    PIPE CHASE

  • PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    SUN BREAKER DETAILSCALE :

    10A-8 1:20 MTYPICAL DETAIL OFBALCONY RAILING

    SCALE

    9A-8 AS SHOWN

    1:50 MSECTION

    700

    SCALE

    C15

    0

    100mm CHB CONC.

    50THIRD FLOOR LEVEL

    RAILING W/ PLAIN CEM.PLASTER PAINT FIN.

    SCALE 1:20 MSPOT DET.

    EVERY 1200mmPAINT FINISH

    W/ 25mm SQ. BARSTEEL BRACKET @

    SCHED. 40 RAILING 50mm B.I. PIPE

    C

    200

    CEILING VENT DETAILA-8

    13SCALE : 1 : 10 M

    PLAN

    275

    275

    325 5050

    575 575

    1150

    25x25mm WOOD VENTPROVIDE INSECT SCREEN

    DAMP PROOFING DET.NOT

    8A-8 SCALETO

    GRAVEL BEDDINGDAMP PROOFING

    POLYETHYLENE SHEET

    CONCRETE SLAB

    50

    175

    SPOT DETAIL1:5 M

    4A-8 SCALE

    50

    9A-8

    5A-8

    5090

    0

    900

    HANDRAIL DETAIL

    1:5 M

    HANDRAIL @150mm O.C.WELDED TO G.I. PIPE19mm SQUARE BAR

    175

    100

    7A-8 SCALE

    50

    SCALE

    3A-8 1:5 M

    300

    2A-8

    16816

    8

    50

    1:20 M

    DETAIL SECTIONSCALE

    LANDING F.F.L.

    ANCHORED @ R.C. STAIR

    SCHEDULE 4050mm% G.I. PIPE

    (PAINT FINISH)

    A-83

    W A

    L L

    6A-8CRASH RAILING

    SCALE 1:20 M

    ANCHORED @ R.C. STAIR150

    SPOT DETAIL1:20 MSCALE

    200

    5050mm G.I. PIPESCHEDULE 40(PAINT FINISH)

    19mm SQUARE BARWELDED TO G.I. PIPEHANDRAIL @150mm O.C.

    50mm G.I. PIPESCHEDULE 40(PAINT FINISH)

    19mm SQUARE BAR@150mm O.C. WELDED

    TO G.I. PIPE HANDRAIL(PAINT FIN.)

    50mm G.I. PIPESCHEDULE 40(PAINT FINISH)

    19mm SQUARE BAR @150mmO.C. WELDED TO G.I. PIPE

    HANDRAIL (PAINT FIN.)

    50mm G.I. PIPESCHEDULE 40PAINT FINISH

    19 mm SQUARE BARANCHORED TO THEWALL (PAINT FIN.)

    50mm G.I. PIPESCHEDULE 40(PAINT FINISH)

    19 mm SQUARE BARANCHORED TO THEWALL (PAINT FIN.)

    38mm STAINLESSSTL. GRAB BAR

    7000

    200x200mm VITRIFIEDGLAZED WALL TILES

    1625

    3200

    FINISHED GRADE LINE

    320032

    5

    6

    STORAGE

    3800

    SECTION OF STAIR

    2000

    1A-8 SCALE

    FEMALE

    1:50 M

    32

    45

    CORRIDOR1

    10W-4 1211

    1415

    13

    98

    7

    CORRIDOR

    7000A

    2500

    B C

    50mm % G.I. PIPESCHEDULE 40 PAIN. FIN.

    SCHEDULE 40 PAIN. FIN.50mm % G.I. PIPE

    320032

    00

    CORRIDOR

    TOP OF ROOF BEAM

    STAIR, HANDRAIL & MISC. DETAILS

    D3

    900

    FR. 25x75mmWD.FRAME S4S KD

    TANG.

    1125

    1617

    1819

    6

    32

    45

    1

    10

    1211

    1415

    13

    98

    7

    1617

    1819

    1200

    100

    10mm @250mmON CENTER

    675

    100

    12x12mm GROOVE

    BEAM REBARS SEESTRUCTURAL DETAIL

    25x25 mmWOOD VENTPROVIDE INSECT

    SCREEN

    D4

    W-4

    W-4

    D4

    19mm SQUARE BARRAILING @150mm O.C.

    WELDED TO G.I. PIPE

    50mm G.G. PIPE SCH.40 (PAINT FIN.)

    900

    168

    50 300

    950

    A-814

    1 : 10 MSCALE :

    A-814

    A-82

    SPOT DETAIL(CRASH RAILING)

    SPOT DETAIL(CEILING VENT.)50mm G.I. PIPESCHEDULE 40 PAIN. FIN.

    25x25x2mm THK.ANGULAR BARNOSING

    6mm THK. MARINE PLYWOODCEILING ON 50x50mm CEILING.

    JOISTS @600mm O.C. B/W(PAINT FIN.)

    15015

    015

    0

    200x200mm VITRIFIEDGLAZED WALL TILES

    200x200mm VITRIFIEDGLAZED WALL TILES

    LAV

    WCCS

    WCCS

    WCCS

    25x25x2mm THK.ANGULAR BARNOSING

    9-RI

    SERS

    @16

    8mm=

    1512

    mm

    10-

    RISE

    RS@

    168m

    m=

    1680

    mm

    9-RI

    SERS

    @16

    8mm=

    1512

    mm

    GROUND FLOORTOILET FIN. LINE

    SECOND FLOORTOILET FIN. LINE

    THIRD FLOORTOILET FIN. LINE

    6mm THK. MARINE PLYWOODCEILING ON 50x50mm CEILING

    JOIST @600mm 0N CENTERBOTHWAYS W/ 10mm BARHANGER @1200mm OC. BW.

    CONC. BEAM

    QUARTER ROUNDMOULDING

    6mm THK. ORD.PLYWD. CEILING(PAINT) ON 50x50mm

    CLG. JST. @600mmOC BW

    SEE TRUSS DET.

    6mm THK. MARINE PLYWD.CEILING (PAINT) ON 50x50mm

    CLG. JST. @600mm OC BW

    SPOT DETAILA-8

    12SCALE 1 : 10 M

    LANDING

    LANDING5A-8

    EAVES SECTIONA-4

    5SCALE 1 : 20 M

    38mm TEKSCREWC-PURLIN (SEE STRUC'LDETAIL)

    SAG ROD SEESTRUCTURAL DETAIL

    GA 26 GI GUTTERPAINT FIN.

    GA 26 GI STRAP

    BASKET STRAINER

    75mm PVCDOWNSPOUT PAINT

    FINISH

    CEILING VENT (SEEDETAIL)

    6mm THK. MARINEPLYWOOD CEILING ON

    50x50mm CEILINGJOIST @600mm BW

    1000

    6mm THK. ORD.PLYWOOD CEILING W/

    6mm GROOVE ON50x50mm CEILINGJOIST @600mm BW

    (PAINT FIN.)

    ROOFBEAM

    TOP CHORD SEESTRUCTURAL DETAIL

    5AA-4

    GA 26 GI GUTTERPAINT FIN.

    GA 26 GI STRAP

    BASKET STRAINER

    75mm PVCDOWNSPOUT PAINT

    FINISH

    6mm THK. MARINEPLYWOOD CEILING ON

    50x50mm CEILINGJOIST @600mm BW

    12x300mm FIBER CEMENTFASCIA BOARD FIX W/METAL

    SCREW ON STL. FRAME PAINTFINISH

    20x20X2mm ANGULARBAR FOR FASCIA BOARD

    FRAME COATED WITHPRIMER

    GA 26 CORR. G.I.ROOFING SHT. PAINT FIN.

    COPPER RIVET

    38mm TEKSCREW

  • PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    PRC NO. :

    PTR NO. :

    TIN :

    DATE :

    CHIEF, ARCHITECTURAL DIVISION

    EMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWH

    ALBERT Z. DE BELEN

    0010990 149 460 161ARCHITECT IV

    27 OCT. 2002

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGO

    OIC, DIRECTOR III

    RAMON C. BACANI

    UNDERSECRETARYOIC, DIRECTOR IV

    GILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND

    ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NREENI

    GNEECROF OTINOM&TN

    SESEMS

    EF

    ATS

    T

    GN

    MA

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL ICof the PHI L I PPINES

    DEPA RTMENT OF ED

    UC

    A T

    I ON

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG,I

    Max C

    01 03

    THREE STOREYFIFTEEN CLASSROOM

    SCHOOL BUILDINGA-1

    8PERSPECTIVE VIEWTABLE OF CONTENTS

    01-002

    AZB

    SCHEDULE OF DOORS & WINDOWSSCALE :

    1A-9

    2400

    2100

    D-1

    FFL

    CLASSROOM

    900

    300

    1 : 50 METERS

    TOILET (CUBICLE)

    300

    1500 12

    002100

    2100

    D-2 TOILET D-3

    300

    TOILET (DISABLED)

    800

    D-4

    800 900

    600

    TANGUILE PANEL DOOR ON 50X150mm YACAL/GUIJO JAMB W/ FIXED

    CLEAR GLASS TRANSOM COMPLETEWITH HARDWARE AND ACCESSORIES

    HOLLOW CORE FLUSH TYPE SWINGDOOR ON 50x50mm YACAL GUIJO

    JAMB W/ MARINE PLYWOOD FACINGINSIDE AND ORDINARY OUTSIDE

    COMPLETE W/ HARDWARE ANDACCESSORIES

    HOLLOW CORE FLUSH TYPE SWINGDOOR ON 50x150mm GUIJO/YACAL

    JAMB w/MARINE PLYWOOD FACINGINSIDE AND ORDINARY OUTSIDE

    COMPLETE W/ HARDWARE ANDACCESSORIES PROVIDE KICK PLATE

    SWING DOOR ON 50X100YACAL/GUIJO DOOR JAMBCOMPLETE WITH HARDWARE

    ACCESSORIES

    STAINLESS STL.KICKING PLATE

    800

    D-3a

    LOUVER DOOR ON 50X100YACAL/GUIJO DOOR JAMBCOMPLETE WITH HARDWARE

    ACCESSORIES

    1 : 20 METERS

    202

    20

    6020

    20 2 20

    60 20

    20 2 20

    60 20

    7

    3

    10

    GLAZING CLIP

    TYP. STEEL CASEMENT TYPE (W-1)2A-9 SCALE :

    1 : 10 METERS

    HORIZONTAL DETAIL SECTION4A-9 SCALE :

    3532

    SEALANT

    3x35mm Z-BAR

    PUTTY

    CLEAR GLASS

    HINGE

    MULLION

    SPOT WELDFRAMEMEETING RAIL

    25

    25

    WINDOW JAMB

    WINDOW JAMB

    FULL WELD

    FULL WELD

    10mm BAR

    PVC PIPE

    10mm BAR

    PVC PIPE

    SEALANTZ-BAR FRAME

    CLEAR GLASS

    PUTTY

    I-BAR MULLION

    SPOT WELD

    Z-BAR

    ANGLE PIN

    CHB GROUT

    WINDOW JAMB

    25

    25

    25

    25

    16

    1.6

    35

    ANGLE PIN

    1 : 10 METERS

    VERTICAL DETAIL SECTION3A-9 SCALE :

    10mm BAR

    PVC PIPE

    SEALANT

    SEALANTBEAM

    3x25mm Z-BAR

    PUTTY

    CLEAR GLASS

    FRAME

    3x25mm Z-BAR

    TRANSOMBAR

    1.6x35mm CONT.WEATHERING

    HINGES

    CLEAR GLASS

    GLAZING PIN

    PUTTY

    VENTHINGE

    WELD GROUT

    WINDOW SILLANGLE PIN

    CHB

    FRAME

    4 5 6

    1 2 3

    9

    8

    7

    9

    8

    7456

    123

    4EQ. PARTS=4000

    1200

    30015

    00

    F F F F

    2400

    1100

    3 EQUAL PARTS = 2000

    600

    900

    120024

    00

    4EQ. PARTS4000

    300

    40030

    0

    2400

    2400

    600

    600

    9502 EQUAL PARTS =2000

    FF F F F

    W-1 CLASSROOM

    STEEL CASEMENT WINDOW WITH FIX GLASS

    W-2 CLASSROOM

    JALOUSIE WINDOWS WITH CLEAR GLASSBLADES ON STANDARD ALUMINUM CASING

    ON 50X150mm YACAL/GUIJO JAMBCOMPLETE WITH HARDWARE AND

    ACCESSORIES & STEEL GRILLS ON 300mmFROM FLOOR FIN.

    W-3 TOILET

    STEEL AWNING WINDOW

    W-4 TOILET

    STEEL AWNING WINDOW

    9A-9DOOR & WINDOW SCHEDULE, DETAIL

    OF STEEL CASEMENT

    MANUAL LOCK

    2100

    2000

    1800

    RQD: 30 SETSLOC: REAR ELEVATION

    1000 1000 1000 1000

    1000

  • FIRE ALARM

    2-2.0mm TWIN 15MMOC

    NOT TO SCALE NOT TO SCALE

    150AT, 225AF, 2P, 230V AC

    GROUND ROD16mm x 2.40m

    COPPERWELD

    GROUND TERMINAL

    2

    OI

    SINGLE LINE DIAGRAM

    #14mm BARE COPPER WIRE18

    00 m

    m

    METERING CONDUIT

    RISER DIAGRAM

    ELECTRICALGROUND FLOOR LINE

    FIN. GRADE LINE

    KWHR METER

    1-8.0mm BARE COPPER WIRE

    16MMO x 240MM LENGTHGROUNDING ROD COPPERWELD

    2

    IN 15mmO C

    RATING: 20AT, 50AF,

    IN 15MMORSC

    ENCLOSED ACB

    3-3.5mm THW

    230V, 2P

    1500

    mm

    2

    FA

    F

    2

    IN 40MMORSC2-50mm THW

    TO LINE SIDE OF LP

    B

    GENERAL NOTESSINGLE LINE DIAGRAM

    LEGENDLOAD SCHEDULERISER DIAGRAM

    E-13

    VIBRATING BELL

    2-2.0mm TWIN 15MMOC

    2

    2

    TO NEAREST C.O.

    B

    d. FIRE ALARM STATION OUTLET - 1.50 M. ABOVE FINISH FLOOR

    f. FIRE ALARM & VIBRATING BELL - 0.30 M BELOW CEILING LINE

    e. PUSH BUTTON OUTLET - 1.20 M ABOVE FINISH FLOOR

    c. PANELBOARD - 1.50 M ABOVE FINISH FLOOR b. CONVENIENCE OUTLET - 0.30 M ABOVE FINISH FLOOR.

    POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE REQUIREMENT.

    a. LIGHT SWITCH - 1.20 M ABOVE FINISH FLOOR

    8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS :

    7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND

    20

    20

    20

    20 20

    20

    20

    20

    - SERVICE ENTRANCE

    - ENCLOSED AIR CIRCUIT BREAKER- FIRE ALARM CONTROL PANEL

    - VIBRATING BELL OUTLET- FIRE ALARM STATION OUTLET

    - SERVICE METER

    - PUSH BUTTON

    - FIRE ALARM BELL

    PANEL LP

    M

    FA

    F

    BB PROTECTION: 150 AT, 225 AF, 2P, 230 V

    FEEDER:

    BUILDING WALL

    2ND FLOOR LINE

    OVERHEAD SERVICE ENTRANCECONNECTED TO 220V AC, 1O,

    2 WIRE, 60 Hz FITTED WITH40mm O TYPE "F" CONDULET

    2-50mm THW IN 40mm C230 V

    2

    & THIRD FLOOR @ SECOND FLOOR TO SIMILAR OUTLET

    THE ELECTRICAL WORKS SHALL BE DONE UNDER THE IMMEDIATE

    THE RULES AND REGULATION OF THE LOCAL ENFORCING AUTHORITYOF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC).

    6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED

    - POLYVINYL CHLORIDE CONDUIT- INTERMEDIATE METALLIC CONDUIT

    SIZE OF WIRE FOR POWER AND LIGHTING CIRCUIT HOMERUN SHALL BE "THW" UNLESS OTHERWISE INDICATED IN THE PLAN. THE MINIMUM 4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE

    3.5mm AND INSULATED FOR 600 VOLTS. SMALLEST RACEWAY SHALL BE 15mm TRADE/NOMINAL SIZE.

    b. LIGHTING, POWER RECEPTACLE

    TYPE WITH FACTORY KNOCKOUTS.

    3. WIRING METHOD SHALL BE AS FOLLOWS :

    TYPE FOR THE PARTICULAR LOCATION AND PURPOSE OF USAGE.

    5. ALL OUTLET BOXES SHALL BE GALVANIZED GAGE NO. 16 DEEP

    2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2-WIRE,

    AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY.

    SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER.

    O2

    I

    BRANCH CKT., & AUXILIARY

    a. FEEDERS AND RISERS

    230 V AC, 60 Hz.

    SCH. 40

    GENERAL NOTESTHESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH

    CIRCUIT BREAKER

    IL @ 80% D.F. = 21940 x 80% x 1.25 = 95.4 A

    - EXHAUST FAN OUTLET, SINGLE, GROUNDING TYPE 10 AMPS, 250 VOLT WITH MODERN PLATE COVER

    - RACEWAY CONDUIT CONCEALED IN CEILING- RACEWAY CONDUIT CONCEALED UNDER FLOOR

    10 AMPS, 250 VOLT WITH MODERN PLATE COVER- DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE

    - EXHAUST FAN SWITCH- FAN CONTROL SWITCH

    - ONE GANG DEVICE SWITCH- TWO GANG DEVICE SWITCH

    - THREE WAY DEVICE SWITCH- THREE GANG DEVICE SWITCH

    - CKT. BREAKER, RATING AS INDICATED

    - HOMERUN DIRECT TO PANELBOARD

    - PANELBOARD

    EF

    LP

    EFSSf

    abSS/S

    S 3WScde

    a

    - CEILING LIGHT OUTLET- 2 x 40 WATTS FLUORESCENT LAMP- CEILING FAN OUTLET

    SYMBOL

    2

    DESCRIPTION

    LOADNO. DESCRIPTION

    LIGHTING OUTLET

    LIGHTING OUTLET

    LIGHTING OUTLET

    CONVENIENCE OUTLET

    10

    9

    11

    8

    5

    4

    6

    7

    2

    3

    1

    1500

    1260

    17601260

    10002

    20202230230

    202230

    230 2 20

    10001500

    17601260

    1860

    1260 230230

    230230

    22

    2020

    220202

    VOLT230230230

    POLE222

    202020

    AT

    LOAD SCHEDULE

    MOUNTING: FLUSH

    CKT. VA WIRE & CONDUIT SIZE

    3-3.5mm THW IN 15mm C3-3.5mm THW IN 15mm C

    2

    5050 2

    50

    503-3.5mm THW IN 15mm C

    3-3.5mm THW IN 15mm C3-3.5mm THW IN 15mm C

    3-3.5mm THW IN 15mm C3-3.5mm THW IN 15mm C

    3-3.5mm THW IN 15mm C3-3.5mm THW IN 15mm C

    2

    2

    2

    2

    2

    2

    2

    50505050

    AF505050

    150AT, 225AF, 2P, 230VMAIN :PANELBOARD: LP

    TYPE: BOLT-ON

    15

    16

    14

    13

    TOTALS P A R E

    LIGHTING OUTLET 3-3.5mm THW IN 15mm C3-3.5mm THW IN 15mm C20

    2020

    20

    230230230150021940

    12601260

    2

    22

    2301000 2

    505050 250 2LIGHTING OUTLET

    LIGHTING OUTLET

    1500 230 2 20 503-3.5mm THW IN 15mm C3-3.5mm THW IN 15mm C

    3-3.5mm THW IN 15mm C

    2

    2

    2

    12

    3-3.5mm THW IN 15mm C2

    LIGHTING OUTLETLIGHTING OUTLET

    LIGHTING OUTLET

    CONVENIENCE OUTLET

    CONVENIENCE OUTLET

    CONVENIENCE OUTLET

    CONVENIENCE OUTLET

    CONVENIENCE OUTLET

    F

    B

    FIRE ALARM

    IN 15MMOC4-2.0mm TW

    20

    20

    20

    20

    20

    20

    20

    20

    1

    3

    5

    7

    9

    11

    13

    15 16

    14

    12

    10

    8

    6

    4

    2

    PRC NO. :PTR NO. :

    TIN :DATE :

    ENGINEER IIIVENERANDO D. SAHAGUN

    CHIEF, ELECTRICAL DIVISIONBUREAU OF DESIGN, DPWH

    FE M. BARRIENTOS

    THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANTFROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILUREOF THE SAME DUE TO FAULTY DESIGN.

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGOOIC, DIRECTOR III

    RAMON C. BACANIUNDERSECRETARY OIC, DIRECTOR IVGILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT ANDALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NR

    EENI

    GNE

    EC

    ROF O

    TIN

    OM

    &

    TNSES

    EMS

    EF

    ATS

    T

    GN

    M

    A

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL

    IC of

    the PHILIPPIN

    ES

    DE

    PARTMENT OF E

    DUCA

    TIO

    N

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG ,I

    BNA

    01 03

    01-002

    BNA

  • 45009000

    4500

    45009000

    4500

    45009000

    4500

    45009000

    4500

    450090004500

    4500

    SCALE : 1 : 100 METERS

    UP UP

    450090004500

    450090004500

    450090004500

    SCALE : 1 : 100 METERS

    CHAL

    KBOA

    RDCH

    ALKB

    OARD

    450090004500

    4500

    c a

    1

    Sabc

    i

    CLASSROOM

    ac

    CLASSROOM CLASSROOM CLASSROOM CLASSROOM

    CLASSROOM

    a

    1

    CLASSROOM

    a

    EFSEF

    2

    d2

    i

    SdeSfgShi

    i2

    d2

    Sabc

    Sab

    i Shi Sfg Sde

    LIGHTING LAYOUT3E-2

    9500

    DN

    4500

    SHESINK COUNTER

    STO

    DN

    4500

    HE

    RAMPUP

    UP

    NCRHE

    4500

    SD

    UPRAMP

    1500UP

    SHE SS

    SS SS

    SS

    EFEFS

    S

    S

    SS

    EF EFS

    2

    S

    2

    S

    S

    EFS EF

    b

    b

    c

    c

    450090004500

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    Sabc

    Sabc SFSabc

    Sabc

    abc

    c b a

    abc

    c b a

    abc

    c b a

    abc

    c b a

    h1 1

    gh1 1

    fg1 1

    ef1 1

    de1

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    2

    F

    F

    b

    b

    c b

    c b

    F

    Sabc SF F

    a

    c b

    c b

    F

    Sabc F

    a

    c b

    c b

    F

    Sabc F

    a

    c b

    c b

    F

    Sabc F

    a

    1

    h g1

    h1

    f1g

    1

    e1

    f1

    d1

    e1

    aa a a

    3.0000

    PRC NO. :PTR NO. :

    TIN :DATE :

    ENGINEER IIIVENERANDO D. SAHAGUN

    CHIEF, ELECTRICAL DIVISIONBUREAU OF DESIGN, DPWH

    FE M. BARRIENTOS

    THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANTFROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILUREOF THE SAME DUE TO FAULTY DESIGN.

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGOOIC, DIRECTOR III

    RAMON C. BACANIUNDERSECRETARY OIC, DIRECTOR IVGILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT ANDALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NR

    EENI

    GNE

    EC

    ROF O

    TIN

    OM

    &

    TNSES

    EMS

    EF

    ATS

    T

    GN

    M

    A

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL

    IC of

    the PHILIPPIN

    ES

    DE

    PARTMENT OF E

    DUCA

    TIO

    N

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG ,I

    BNA

    01 03

    01-002

    BNA

  • SCALE : 1 : 100 METERS

    SCALE : 1 : 100 METERS

    C O R R I D O R

    UP UP

    45009000

    4500

    45009000

    4500

    450090004500

    450090004500

    450090004500

    C O R R I D O R

    4500

    45009000

    4500

    450090004500

    450090004500

    45004500

    90004500

    REFER TO RISER DIAGRAMOVERHEAD SERVICE ENTRANCE

    TO LINE SIDE OF DPRATING: 220 V, 2P, 20AT, 50AFENCLOSED AIR CIRCUIT BREAKER

    DPA

    M

    FA

    45009000

    4500

    TO C.O.

    B

    TO FA

    E-3POWER LAYOUT

    3

    4500

    SD

    UPRAMP

    1500UP

    SHE

    RAMPUP

    UP

    NCRHE

    DN

    4500

    HE

    9500

    DN

    4500

    SHESINK COUNTER

    STO

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    M

    DPB/DB

    CTO

    FA

    B

    Sf Sf Sf Sf Sf

    TO FAB

    Sf Sf Sf Sf Sf

    TO C.O.

    B

    TO FA

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    TO F

    A

    B

    Sf Sf Sf Sf Sf

    TO FAB

    Sf Sf Sf Sf Sf

    PRC NO. :PTR NO. :

    TIN :DATE :

    ENGINEER IIIVENERANDO D. SAHAGUN

    CHIEF, ELECTRICAL DIVISIONBUREAU OF DESIGN, DPWH

    FE M. BARRIENTOS

    THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANTFROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILUREOF THE SAME DUE TO FAULTY DESIGN.

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGOOIC, DIRECTOR III

    RAMON C. BACANIUNDERSECRETARY OIC, DIRECTOR IVGILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT ANDALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NR

    EENI

    GNE

    EC

    ROF O

    TIN

    OM

    &

    TNSES

    EMS

    EF

    ATS

    T

    GN

    M

    A

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL

    IC of

    the PHILIPPIN

    ES

    DE

    PARTMENT OF E

    DUCA

    TIO

    N

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG ,I

    BNA

    01 03

    01-002

    BNA

  • 150 mm CDP sloped @ 2%

    SEPTICTANKLINE

    150 mm CDP sloped @ 2%

    100mm PVCSP

    15

    0 m

    m

    CD

    P s

    loped

    @ 2

    %

    150 mm CDP sloped @ 2%

    20

    0 m

    m

    CD

    P s

    loped

    @ 2

    %

    TO MAIN DRAINSYSTEM

    RAMPUP

    150 mm CDP sloped @ 2%

    15

    0 m

    m

    CD

    P s

    loped

    @ 2

    %

    FD

    CSFCSFCOCO

    75mm PVCWPSD

    UP

    10

    0m

    m

    PVC

    WP

    CO

    FDWC

    FDWCSS

    100mm PVCSP

    LAVWCFD

    150 mm CDP sloped @ 2%

    P-11

    SCALE :

    UP

    150 mm CDP sloped @ 2% 150 mm CDP sloped @ 2%

    100mmCO

    150 mm CDP sloped @ 2%

    C O R R I D O R

    UP

    1 : 100 METERS

    100mmCO

    CO

    150 mm CDP sloped @ 2%

    100mm PVCSP

    CO

    CO

    DN

    FDWC WC

    75mm PVCWP

    100mm PVCSP

    75m

    m

    PVCW

    P

    75mm PVCWP

    CO

    CSFCSF

    FD

    CSFCO

    SHE

    FDWC FD

    100mm PVCSPTO SEWER

    100mmCO

    2P-1 SCALE : 1 : 100 METERS

    15

    0 m

    m

    CD

    P s

    loped

    @ 2

    %

    150 mm CDP sloped @ 2%

    RAMPUP

    20

    0 m

    m

    CD

    P s

    loped

    @ 2

    %

    TO MAIN DRAINSYSTEM

    FD

    CO

    100mm PVCWP

    HE

    150 mm CDP sloped @ 2%

    100mm PVCSP

    LAVFDWC

    CO

    NCR

    15

    0 m

    m

    CD

    P s

    loped

    @ 2

    %

    100m

    m

    PVCW

    P

    CB

    CSFCSF

    CO

    UP

    UR

    WCFD

    CO

    CO

    UR

    FD

    CSF

    CO

    CSFCSF

    WCWC

    DN

    CO

    CO

    75m

    m

    PVCW

    P

    100mm PVCSP

    75mm PVCWP

    CB CB

    CB

    CB CB CB

    CB CB

    CB

    CB CB

    CB CB

    CB CB

    CB

    DRAINAGE AND SANITARY SYSTEM LAYOUT 5P-1

    FDFD

    CO CO

    8850

    75mm PVCWP

    100mm PVC MAIN SOIL STACK PIPE

    75mm PVC MAIN VENT STACK

    100mm PVC MAIN WASTE STACKPIPE

    75mm PVC MAIN VENT PIPE

    100mm PVC MAIN

    100mm PVC MAIN

    75mm PVC MAIN

    SOIL STACK

    VENT STACK

    WASTE STACK

    CO CO

    100mm PVCWPCO

    PRC NO. :PTR NO. :

    TIN :DATE :

    CHIEF, ARCHITECTURAL DIVISIONEMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWHSANITARY ENGINEERELIAS MELQUIADES EMEL B. CUBA II

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGOOIC, DIRECTOR III

    RAMON C. BACANIUNDERSECRETARY OIC, DIRECTOR IVGILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT ANDALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NR

    EENI

    GNE

    EC

    ROF O

    TIN

    OM

    &

    TNSES

    EMS

    EF

    ATS

    T

    GN

    M

    A

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL

    IC of

    the PHILIPPIN

    ES

    DE

    PARTMENT OF E

    DUCA

    TIO

    N

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG ,I

    Max C

    01 03

    01-002

    mmC

  • 100m

    m PV

    CSP

    150 mm CDP sloped @ 2%

    FD

    CO

    CO

    75mm

    PV

    CWP

    SD100mm PVCWP

    RISER

    CO

    CO

    FDWCFD

    WC

    SS

    CO LAV

    WCFD

    150 m

    m CD

    P slop

    ed @

    2%

    50mm

    PV

    CBV

    50mm

    PV

    CBV

    CB

    CS

    CS

    FD COCO

    WC

    100m

    m PV

    CSP

    SHE

    SINK C

    OUNTERRIS

    ERCO

    FD

    CO75

    mm

    PVCW

    P

    75mm

    PV

    CHD

    75mm

    PV

    CWP

    FD

    FD CSCS

    CS50mm

    PV

    CBV

    50mm

    PV

    CBV

    DN

    FD COCO

    WC

    WC

    100m

    m PV

    CSP

    SHE

    SINK C

    OUNTERRIS

    ERCO

    FD

    CO75

    mm

    PVCW

    P

    75mm

    PV

    CWP

    75mm

    PV

    CWP

    FD

    FD CSCS

    CS50mm

    PV

    CBV

    50mm

    PV

    CBV

    2ND FLR

    3RD FLR

    CB

    CB

    PIPE C

    HASE

    PIPE C

    HASE

    CO

    FD

    CO

    100m

    m PV

    CWP

    150 m

    m CD

    P slop

    ed @

    2%

    100m

    m PV

    CSP

    LAV

    FD

    WC

    CO

    NCR

    CS COUR

    WCFD

    CO

    RISER

    50mm

    PV

    CBV

    50mm PVCBV

    CB

    CSCS

    DN

    CO

    UR

    CO

    CO CO75

    mm

    PVCW

    P

    100m

    m PV

    CSP

    75mm

    PV

    CWP

    RISER

    FD

    WC

    WC

    CSCS

    50mm

    PV

    CBV

    50mm PVCBV

    50mm

    PV

    CBV

    CO

    UR

    CO

    CO CO75

    mm

    PVCW

    P

    100m

    m PV

    CSP

    75mm

    PV

    CWP

    RISER

    FD

    WC

    WC

    CS

    CS

    50mm

    PV

    CBV

    50mm PVCBV

    50mm

    PV

    CBV

    CB

    PIP[E C

    HASE

    PIP[E C

    HASE

    DS

    FD

    75m

    m

    PVC

    DS

    DS

    150 m

    m CD

    P slop

    ed @

    2%

    SEPT

    IC

    TANK

    LINE

    150 m

    m CD

    P slop

    ed @

    2%

    100m

    m PV

    CSP

    150 m

    m CD

    P slop

    ed @

    2%

    200 mm CDP sloped @ 2%

    TO M

    AIN D

    RAIN

    SYST

    EM

    CB

    CB

    RAMPUP

    150 mm CDP sloped @ 2%

    FD

    CO

    CO

    75mm

    PV

    CWP

    SD100mm PVCWP

    RISER

    CO

    CO

    FDWCFD

    WC

    SS

    CO LAV

    WCFD

    150 m

    m CD

    P slop

    ed @

    2%

    CB

    CB

    UP150 mm

    CDP

    sloped

    @ 2%

    150 m

    m CD

    P slop

    ed @

    2%10

    0mm

    CO

    150 m

    m CD

    P slop

    ed @

    2%

    C O

    R

    R I

    D

    O

    R

    CB

    UP

    CB

    150 m

    m CD

    P slop

    ed @

    2%

    100m

    m

    CO

    CO

    150 m

    m CD

    P slop

    ed @

    2%

    100m

    m PV

    CSP

    100m

    m PV

    CSP

    TO SE

    WER

    100m

    m

    CO

    150 mm CDP sloped @ 2%

    150 m

    m CD

    P slop

    ed @

    2%

    RAMPUP

    200 mm CDP sloped @ 2%

    TO M

    AIN D

    RAIN

    SYST

    EM

    CB

    FD

    CO

    100m

    m PV

    CWP

    150 m

    m CD

    P slop

    ed @

    2%

    100m

    m PV

    CSP

    LAV

    FD

    WC

    CO

    NCR

    CS COUR

    WCFD

    CO

    RISER

    50mm

    PV

    CBV

    50mm

    PV

    CBV

    50mm

    PV

    CBV

    50mm PVCBV

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CO

    FD

    FD

    DS

    CSCS

    CS

    CS

    FD COCO

    WC

    100m

    m PV

    CSP

    SHE

    SINK C

    OUNTERRIS

    ERCO

    FD

    CO75

    mm

    PVCW

    P

    75mm

    PV

    CHD

    75mm

    PV

    CWP

    FD

    FD CSCS

    CS50mm

    PV

    CBV

    50mm

    PV

    CBV

    DN

    CO

    UR

    CO

    CO CO75

    mm

    PVCW

    P

    100m

    m PV

    CSP

    75mm

    PV

    CWP

    RISER

    FD

    WC

    WC

    CSCS

    50mm

    PV

    CBV

    50mm PVCBV

    50mm

    PV

    CBV

    DN

    FD COCO

    WC

    WC

    100m

    m PV

    CSP

    SHE

    SINK C

    OUNTERRIS

    ERCO

    FD

    CO75

    mm

    PVCW

    P

    75mm

    PV

    CWP

    75mm

    PV

    CWP

    FD

    FD CSCS

    CS50mm

    PV

    CBV

    50mm

    PV

    CBV

    CO

    UR

    CO

    CO CO75

    mm

    PVCW

    P

    100m

    m PV

    CSP

    75mm

    PV

    CWP

    RISER

    FD

    WC

    WC

    CS

    CS

    50mm

    PV

    CBV

    50mm PVCBV

    50mm

    PV

    CBV

    2ND FLR

    3RD FLR

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    DRANAIGE & SANITARY SYSTEMISOMETRIC VIEW

    P-25

    PIPE C

    HASE

    PIPE C

    HASE

    PIP[E C

    HASE

    PIP[E C

    HASE

    CO

    FD

    FD

    75m

    m

    PVC

    DS

    DS

    CO

    FD

    FD

    75m

    m

    PVC

    DS

    DS

    CO

    FD

    FD

    75m

    m

    PVC

    DS

    DS

    CO

    FD

    FD

    75m

    m

    PVC

    DS

    DS

    CO

    FD

    FD

    75m

    m

    PVC

    DS

    DS

    CO

    FD

    FD

    75m

    m

    PVC

    DS

    DS

    CO

    75m

    m

    PVC

    DS

    DS

    CO

    75m

    m

    PVC

    DS

    DS

    CO

    75m

    m

    PVC

    DS

    DS

    CO

    75m

    m

    PVC

    DS

    DS

    CO

    75m

    m

    PVC

    DS

    DS

    150 mm CDP sloped @ 2%ISOMETRIC PLUMBING LAYOUT

    NOT TO SCALE

    ISOMETRIC PLUMBING LAYOUT

    ISOMETRIC PLUMBING LAYOUT - MALE TOILET

    - FEMALE TOILET2P-2

    1P-2

    3P-2

    PRC NO. :PTR NO. :

    TIN :DATE :

    CHIEF, ARCHITECTURAL DIVISIONEMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWHSANITARY ENGINEERELIAS MELQUIADES EMEL B. CUBA II

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGOOIC, DIRECTOR III

    RAMON C. BACANIUNDERSECRETARY OIC, DIRECTOR IVGILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT ANDALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NR

    EENI

    GNE

    EC

    ROF O

    TIN

    OM

    &

    TNSES

    EMS

    EF

    ATS

    T

    GN

    M

    A

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL

    IC of

    the PHILIPPIN

    ES

    DE

    PARTMENT OF E

    DUCA

    TIO

    N

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG ,I

    Max C

    01 03

    01-002

    AZB

  • RAMPUP

    UP

    WC

    F SD

    SS

    F

    GV WC WCLAV

    SCALE :

    UP

    1P-3

    C O R R I D O R

    1 : 100 METERS

    UP

    FROM

    WAT

    ER S

    OURC

    E

    RAMPUP

    UP

    NCR RISERHE

    SINK COUNTER

    DN

    SHE

    FFF SINK COUNTER

    STO

    SCALE :

    2P-3 1 : 100 METERS

    DN

    RISERRISER

    RISER

    GVCV

    25mm GICWL

    25mm

    GI

    CWL

    19mm

    GI

    CWL

    19mm GICWL

    25mm GICWL

    19mm GICWL

    19mm

    GI

    CWL

    25mm

    GI

    CWL

    19mm GICWL

    19mm GICWL

    19mm GICWL

    19mm GICWL

    19mm

    GI

    CWL

    19mm GICWL

    WCURLAVWC

    CSUPCV

    GV

    UP GV

    WATER SYSTEM LAYOUT

    6574 3 214321

    4

    3 2 1

    8

    31 2

    3P-3 SCALE : 1 : 20 METERS

    CS

    WCWCURWCWCWC

    19mm

    GI

    CWL

    WC

    F SD

    SS

    F

    GV WC WCLAV

    RISER

    25mm GICWL

    19mm GICWL

    19mm

    GI

    CWL

    25mm

    GI

    CWL

    4321

    FROM

    WAT

    ER S

    OURC

    ENCR RISERHE

    SINK COUNTER

    GVCV

    25mm GICWL

    25mm

    GI

    CWL

    19mm

    GI

    CWL

    19mm GICWL

    19mm GICWL

    WCURLAVWC

    CSUPCV

    GV

    UP GV

    6574 3 21 8

    SHE

    FFF SINK COUNTER

    STORISER

    19mm GICWL

    19mm GICWL

    31 2

    WCWCWC

    19mm

    GI

    CWL

    RISER

    19mm GICWL

    19mm

    GI

    CWL

    19mm GICWL

    3 2 1

    CS

    WCWCUR

    1 19mm GICWL RISER

    SCHEDULE OF FINISHES

    19mm GATE VALVE2

    19mm GICWL3

    4 25mm GICWL

    STAINLESS WATER TANK (125 GAL CAPACITY)564 GAL CAP. STAINLESS PRESSURE TANK6

    1.5 HP BOOSTER PUMP7

    IMAGINARY LINE OF PUMP HOUSING8

    GROUND FLOOR FEMALE TOILET GROUND FLOOR MALE TOILET SEC. & 3RD FEMALE TOILET SEC. & 3RD MALE TOILET

    PRC NO. :PTR NO. :

    TIN :DATE :

    CHIEF, ARCHITECTURAL DIVISIONEMMANUEL P. CUNTAPAY

    BUREAU OF DESIGN, DPWHSANITARY ENGINEERELIAS MELQUIADES EMEL B. CUBA II

    CONSULTANT / DESIGNER REVIEWED BY: RECOMMENDING APPROVAL :

    SOFIA T. SANTIAGOOIC, DIRECTOR III

    RAMON C. BACANIUNDERSECRETARY OIC, DIRECTOR IVGILBERTO S. REYES

    APPROVED FOR ACCREDITATION : CONCURRED :

    LOCATION :

    PROJECT TITLE :

    NOTE:

    DATE :

    ENCODED BY:

    CHECKED BY:

    PROJECT NO:

    DESIGNED BY:

    MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT ANDALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

    DEPARTMENT OF EDUCATIONDepEDSHEET CONTENTS :

    OWNER :

    REP. ACT 545

    SHEET NO:

    BUREAU OF DESIGN, DPWH BUREAU OF DESIGN, DPWH DEPATMENT OF EDUCATION (DepED)NR

    EENI

    GNE

    EC

    ROF O

    TIN

    OM

    &

    TNSES

    EMS

    EF

    ATS

    T

    GN

    M

    A

    TASK FORCE ENGINEERING, ASSESSMENT AND MONITORINGDEPARTMENT OF EDUCATION (DepED)REPUBL

    IC of

    the PHILIPPIN

    ES

    DE

    PARTMENT OF E

    DUCA

    TIO

    N

    MERALCO AVENUE, PASIG CITY

    REPUBLIC OF THE PHILIPPINES

    IR

    K

    S

    MCMXCIX

    AG ,I

    Max C

    01 03

    01-002

    AZB

  • C O R R I D O R

    25mm GI

    CWL

    19mm GI

    CWL19mm GICWL

    25mm GICWLRISER WC

    GV SS

    SD

    WC

    1

    UP

    UP

    UPRAMP

    LAVWC

    4

    UP

    UR

    19mm GICWL

    25mm GICWL

    RAMP

    WCNCR

    GVCVUP

    CS

    WC

    19mm GICWL19mm

    GICWL

    25mm GI

    CWL

    CVGV

    SINK COUNTER

    HERISER

    FROM WAT

    ER SOURC

    E

    GVUP

    LAV

    FF

    F

    F

    F

    25mm GICWL

    FF19mm GICWL

    19mm GICWL

    RISER

    19mm GI

    CWL

    RISER

    SINK COUNTER

    19mm GI

    CWL

    STOSHE

    19mm GICWL

    19mm GICWL

    FF19mm GICWL

    19mm GICWL

    19mm GI

    CWL

    RISER

    SINK COUNTER

    19mm GI

    CWL

    STOSHE

    19mm GICWL

    19mm GICWL

    WATER SYSTEM ISOMETRIC DIAGRAM

    FROM PRESSURE TANK

    FF

    F

    F

    FF

    FF

    F

    WCWC

    UR

    WCWC

    UR

    WCWC

    WC

    WC

    WCWC

    19mm GICWL

    19mm GICWL

    19mm

    GI

    CWL

    19mm

    GI

    CWL

    25mm GI

    CWL

    19mm GI

    CWL19mm GICWL

    25mm GICWLRISER WC

    GV SS

    SD

    WC

    1

    LAVWC

    F

    RISER

    SINK COUNTER

    19mm GI

    CWL

    STOSHE

    19mm GICWL

    19mm GICWL

    RISER

    SINK COUNTER

    19mm GI

    CWL

    STOSHE

    19mm GICWL