121515 AECOM Duke Energy Conceptual Closure Plan Final
Transcript of 121515 AECOM Duke Energy Conceptual Closure Plan Final
EXISTING ROAD
EXISTING ROAD
EXISTING ROAD
EXISTINGGRAVELROAD
EXISTING 30"RCP CULVERT
EXISTING 48"CMP CULVERT
C-101
C-107
C-103
C-104
B-111
B-102
B-104
B-102
B-110
B-103
B-105
L-4
L-5
L-6
L-7
L-8
L-9
P-102
P-101
MW-26SMW-26D
MW-27SMW-27D
MW-17DMW-17
EXISTING ROAD
EXISTING ROAD
EXISTING ROAD
EXISTING ROAD
EXISTINGGRAVEL
ROAD
EXISTING
ROAD
EXISTING
ROAD
EXISTING ROAD
EXISTING 30"
RCP CULVERT
EXISTING 48"
CMP CULVERT
EXISTING 54"
CMP CULVERT
100 YEAR
FLOODPLAINC-101
C-107
C-103
C-104
C-108
C-106
C-109
B-111
B-102
B-104
B-102
B-110
B-103
B-105
B-108
L-1
L-2
L-3
L-4
L-5
L-6
L-7
L-8
L-9
P-102
P-101
MW-26SMW-26D
MW-27SMW-27D
MW-17DMW-17
MW-5
MW-18MW-18D
MW-12
MW-11SMW-11D
MW-9
%$ &$ '$B3=B6A7=163A
% & '
DWG SIZE @3C7A7>=
4>@
DRAWING NO.
B7B;3
FILENAME:
2D5 BE?3.
8>0 =>.
2/B3.
A1/;3. 23A.
24B@.
1692.
3=5@.
/??2.
/
4
3
2
1
0
& ' ( ) + , -*
( ) + , - %$*
/
4
1
0
24.0"x36.0"ARCH D
D#A# ;33 AB3/< AB/B7>=
0
*$('&*(*
%&"%)"&$%)
/@A
@3C7A7>=
0
0
<;A
9@/
4<
82?
CONSTRUCTION SEQUENCE(CONT.)
05B
;4-=1 % " =1/980-<B -=4 .-=58 /69=?<1 -80 6-802566 /98=><?/>598
1. REMOVE PRIMARY AND SECONDARY ASH BASIN OUTLET STRUCTURES AND PLUG/GROUT EXISTING PRIMARY AND SECONDARYOUTLET PIPES (STRUCTURE DECOMMISSIONING)
2. DEWATER REMAINING FREE STANDING WATER FROM SECONDARY ASH BASIN3. EXCAVATE SECONDARY ASH BASIN AND STAGE MATERIALS4. VERIFY ASH REMOVAL WITHIN SECONDARY ASH BASIN5. BEGIN EXCAVATION AND REGRADING FOR LANDFILL BASE CONSTRUCTION6. COMPLETE CONSTRUCTION OF STORMWATER MANAGEMENT CONTROLS AROUND LANDFILL EXTERIOR7. OBTAIN SECONDARY ASH BASIN DAM BREACH PERMIT8. CONSTRUCT LANDFILL BASE PERIMETER BERM9. COMPLETE LANDFILL CONSTRUCTION
;4-=1 & " ;<57-<B -=4 .-=58 -80 =><?/>?<-6 2566 -<1- /69=?<1 =5>1 <1=>9<->598
1. REMOVE CONTACT WATER FROM PRIMARY ASH BASIN TO FACILITATE ASH REMOVAL2. BEGIN EXCAVATION OF STRUCTURAL FILL AREA MATERIALS AND HAUL TO LANDFILL3. BEGIN PRIMARY ASH BASIN EXCAVATION, CONDITIONING, PLACEMENT AND COMPACTION IN LANDFILL4. IMPROVE / BUTTRESS DIVIDER DIKE AS NEEDED DURING LANDFILL CONSTRUCTION5. EXCAVATE REMAINING ASH IN STRUCTURAL FILL AREA6. EXCAVATE REMAINING ASH IN PRIMARY ASH BASIN7. REGRADE THE AREA OF THE PRIMARY ASH BASIN AND INSTALL POST-CONSTRUCTION STORMWATER CONTROLS8. LOWER PRIMARY ASH BASIN DAM TO 690-FT EL., AND USE SOILS FOR LANDFILL FINAL COVER CONSTRUCTION9. CONSTRUCT CAP LINER SYSTEM OVER LANDFILL AREA10. COMPLETE CONSTRUCTION OF POST-CLOSURE STORMWATER MANAGEMENT SYSTEM IN THE FORMER PRIMARY ASH BASIN11. REMOVE WASTEWATER TREATMENT SYSTEM
%
$
$
'
&
)
*
*
$
'
$$
&
%
'
(
9?>2-66 ##'
&
(
*
+
,
$#
PRIMARY ASHBASIN ACTIVE
&
& $#
$#
)
;4-=1 & " ;<57-<B -=4 .-=58 -80 =><?/>?<-6 2566 -<1- /69=?<1 -80 =5>1 <1=>9<->598 " ;6-8 @51A8>=
;4-=1 % " =1/980-<B -=4 .-=58 /69=?<1 -80 6-802566 .-=1 /98=><?/>598 " ;6-8 @51A8>=
LANDFILL (ACTIVE)
STRUCTURAL FILLAREA (CLOSED)
PRIMARY ASHBASIN (CLOSED)
LANDFILL LINER LIMIT
SECONDARY ASH BASINCLEAN CLOSURE EXTENT
CONCEPTUAL PLANS
613180
EXISTING TRANSMISSION TOWER
EXISTING TRANSMISSION POLE
EXISTING TRANMISSION LINE
EXISTING ROAD
EXISTING RIP RAP
EXISTING VEGETATION
EXISTING SLUICE AND PROCESS PIPE
EXISTING MONITORING WELL
EXISTING PIEZOMETER
EXISTING TREE LINE
EXISTING WETLAND
EXISTING RAIL TRACKS
EXISTING PROPERTY BOUNDARY
EXISTING ASH MANAGEMENT AREA BOUNDARY
PROPOSED LANDFILL LINER LIMITS
PROPOSED STORMWATER MANAGEMENT DITCH
100-YR FLOODPLAIN
+
+
+
)
REV
CONCEPTUAL CLOSURE PLAN — PRIMARY ASH BASIN,SECONDARY ASH BASIN AND STRUCTLIRAL FILL AREA
&ENERGY.DUKE
TOPOGRAPHY DEPICTED ON THIS DRAWING BASED ON PUHUCLY AVAILABLE 2OU LIDAR, BATHYMETRIC DATA BASED ON DATA COLLECTED BY WSP GROUP ON DECEMBER U, 2014
EXISTING SLUICEAND PROCESS PIPES
EXISTING ROAD
EXISTING ROAD
EXISTING ROAD
EXISTING ROAD
EXISTING ROAD
EXISTINGGRAVELROAD
EXISTINGOUTLETSTRUCTURE
EXISTINGOUTLETSTRUCTURE
EXISTINGROAD
EXISTING ROAD
EXISTINGROAD
EXISTING ROAD
EXISTING 30"RCP CULVERT
EXISTING 48"CMP CULVERT
EXISTING 54"CMP CULVERT
EXISTINGCULVERT
EXISTING 54"CMP CULVERT
EXISTINGMANHOLE
EXISTING SLUICEAND PROCESS PIPES
EXISTING SLUICEAND PROCESS PIPES
100 YEARFLOODPLAIN
100 YEARFLOODPLAIN
WETLAND 41.09 ACRE WETLAND 14
0.11 ACRE
WETLAND 60.02 ACRE
WETLAND 70.07 ACRE
WETLAND 80.02 ACRE
WETLAND 90.01 ACRE
WETLAND 100.17 ACRE
WETLAND 110.29 ACRE
WETLAND 120.14 ACRE
WETLAND 130.02 ACRE
WETLAND 50.05 ACRE
C-101
C-107
C-103
C-104
C-108
C-106
C-109
B-111
B-102
B-104
B-102
B-110
B-103
B-105
B-108
L-1
L-2
L-3
L-4
L-5
L-6
L-7
L-8
L-9
P-102
P-101
MW-26SMW-26D
MW-27SMW-27D
MW-17DMW-17
MW-5
MW-18MW-18D
MW-12
MW-11SMW-11D
MW-9
MW-9MMW-9D
%$ &$ '$B3=B6A7=163A
% & '
DWG SIZE @3C7A7>=
4>@
DRAWING NO.
B7B;3
FILENAME:
2D5 BE?3.
8>0 =>.
2/B3.
A1/;3. 23A.
24B@.
1692.
3=5@.
/??2.
/
4
3
2
1
0
& ' ( ) + , -*
( ) + , - %$*
/
4
1
0
24.0"x36.0"ARCH D
D#A# ;33 AB3/< AB/B7>=
0
*$('&*(*
%&"%)"&$%)
/@A
@3C7A7>=
0
0
<;A
9@/
4<
82?
SITE PLAN
AS SHOWN
06
PRIMARY ASH BASIN
SECONDARY ASH BASIN(CONCEPTUAL LANDFILL AREA)
STRUCTURAL FILL AREA
()+$*"
1. THIS DRAWING DETAILS THE OVERALL SITE INTENT FOR THIS PROJECT INCLUDING RELOCATION OFASH INTO THE PROPOSED LANDFILL AND CLOSURE BY REMOVAL OF FORMER ASH MANAGEMENTUNITS.
2. CONTRACTOR TO CONSTRUCT WASTEWATER TREATMENT FACILITY IN ACCORDANCE WITHTREATMENT REQUIREMENTS OF CLOSURE PLAN DOCUMENTS AND ASSOCIATED PERMITREQUIREMENTS.
3. THE PRIMARY ASH BASIN, SECONDARY ASH BASIN AND STRUCTURAL FILL AREA WILL BE CLOSED BYREMOVAL.
4. ROAD LOCATIONS SHOWN ARE APPROXIMATE AND EXACT LOCATIONS CAN CHANGE DUE TO FIELDCONDITIONS.
&$%$(#
EXISTING TOPOGRAPHIC CONTOUR
EXISTING TRANSMISSION TOWER
EXISTING TRANSMISSION POLE
EXISTING TRANSMISSION LINE
EXISTING ROAD
EXISTING RIP RAP
EXISTING VEGETATION
EXISTING SLUICE AND PROCESS PIPE
EXISTING MONITORING WELL
EXISTING PIEZOMETER
EXISTING TREE LINE
EXISTING WETLAND
EXISTING RAIL TRACKS
EXISTING PROPERTY BOUNDARY
EXISTING ASH AREA MANAGEMENT BOUNDARY
EXISTING ASH AREA MANAGEMENT BOUNDARY(DASHED WHERE INFERRED)
PROPOSED ROAD
APPROXIMATE LANDFILL LINER LIMITS
46 15
66 15
66 15
PROPOSEDLAYDOWN AREA
CONCEPTUAL PLANS
66 15
66 15
REY
H
CONCEPTUAL CLOSURE PLAN — PRIMARY ASH BASIN,SECONDARY ASH BASIN AND STRUCTURAL FILL AREA
SCALE: I"=2OO'ENERGY.
f DuKE
IOPDGRAPHY DEPICTED ON THIS DRAWING BASED DN PUBLICLY AVAILABLE 2DII CIGAR, BATHYMETRIC DATA BASED ON DATA CDUUEC TED BY WSP GROUP ON DECEMBER 11, 2014
EXISTINGOUTLETSTRUCTURE
EXISTINGOUTLETSTRUCTURE
EXISTING ROAD
EXISTING ROAD
EXISTING ROAD
EXISTINGCULVERT
EXISTINGMANHOLE
EXISTING 30"RCP CULVERT
EXISTING 48"CMP CULVERT
EXISTING 54"CMP CULVERT
EXISTING 54"CMP CULVERT
WETLAND 41.09 ACRE WETLAND 14
0.11 ACRE
WETLAND 60.02 ACRE
WETLAND 70.07 ACRE
WETLAND 80.02 ACRE
WETLAND 90.01 ACRE
WETLAND 100.17 ACRE
WETLAND 110.29 ACRE
WETLAND 120.14 ACRE
WETLAND 130.02 ACRE
WETLAND 50.05 ACRE
100 YEARFLOODPLAIN
100 YEARFLOODPLAINC-101
C-107
C-103
C-104
C-108
C-106
C-109
B-111
B-102
B-104
B-102
B-110
B-103
B-105
B-108
L-1
L-2
L-3
L-4
L-5
L-6
L-7
L-8
L-9
P-102
P-101
MW-26SMW-26D
MW-27SMW-27D
MW-17DMW-17
MW-5
MW-18MW-18D
MW-12
MW-11SMW-11D
MW-9
MW-9MMW-9D
%$ &$ '$B3=B6A7=163A
% & '
DWG SIZE @3C7A7>=
4>@
DRAWING NO.
B7B;3
FILENAME:
2D5 BE?3.
8>0 =>.
2/B3.
A1/;3. 23A.
24B@.
1692.
3=5@.
/??2.
/
4
3
2
1
0
& ' ( ) + , -*
( ) + , - %$*
/
4
1
0
24.0"x36.0"ARCH D
D#A# ;33 AB3/< AB/B7>=
0
*$('&*(*
%&"%)"&$%)
/@A
@3C7A7>=
0
0
<;A
9@/
4<
82?
SITE PREPARATION PLAN
1" = 200'
07
PRIMARYASH BASIN
SECONDARYASH BASIN
STRUCTURALFILL AREA
()+$*"
1. REFER TO EROSION AND SEDIMENT CONTROL DETAILS SHEET FOR FURTHER INFORMATION ON EROSIONAND SEDIMENT CONTROL FOR SITE USE.
2. WETLANDS TO BE MARKED WITH ORANGE CONSTRUCTION FENCING.
3. REMOVED TREES TO BE CHIPPED AND STOCKPILED AT OWNER APPROVED LOCATION.
4. REMOVED SLUICE AND PROCESS PIPING TO BE RECYCLED AT OWNER APPROVED LOCATION.
5. ASSOCIATED CONCRETE FOUNDATIONS AND OTHER UNUSABLE DEMOLITION REMAINS TO BE DISPOSED OFAT OWNER APPROVED LOCATION.
6. CONTRACTOR TO IMPROVE ACCESS ROADS AS NECESSARY FOR CONSTRUCTION EQUIPMENT.
7. PRIMARY AND SECONDARY OUTLET STRUCTURES WILL REMAIN IN OPERATION UNTIL WATER LEVELELEVATIONS REACH DESIRED LEVEL. SEE PRIMARY AND SECONDARY ASH BASIN EXCAVATION ANDDEWATERING PLANS FOR FURTHER INFORMATION.
PROPOSEDLAYDOWN AREA
47 15
67 15
67 15
17 15
CONCEPTUAL PLANS
&$%$(#
EXISTING TOPOGRAPHIC CONTOUR
EXISTING TRANSMISSION TOWER
EXISTING TRANSMISSION POLE
EXISTING TRANSMISSION LINE
EXISTING ROAD
EXISTING RIP RAP
EXISTING VEGETATION
EXISTING SLUICE AND PROCESS PIPE
EXISTING MONITORING WELL
EXISTING PIEZOMETER
EXISTING TREE LINE
EXISTING WETLAND
EXISTING RAIL TRACKS
EXISTING PROPERTY BOUNDARY
EXISTING ASH AREA MANAGEMENT BOUNDARY
EXISTING ASH AREA MANAGEMENT BOUNDARY(DASHED WHERE INFERRED)
PROPOSED ROAD
PROPOSED TREE REMOVAL
PROPOSED ROAD REMOVAL
67 15
67 15
REV
I,,ll,,)) Ej lr!i
~V ~ TO ~/&PRO-
(~-,
„=: ~)i~/~~+
EX. ACCESS ROAD
)iPERMIT REQUIRED
ESIZZ3
l)))'EMOVE
AND ~ISPOSE 01 EXISPROCESS PIPING AND ASSOCIA
tt(r(((((((((LC(CC~~~~~w" I; (FHl=CONCEPTUAL CLOSURE PLAN — PRIMARY ASH BASIN,SECONDARY ASH BASIN AND STRUCTUIRAL FILL AREA
SCALE: I"=200'ENERGY.
f DUKE
TOPOGRAPHY DEPICTED ON THIS DRAWING BASED ON PUBUCLY AVAILABLE 20U UIDAR, BATHYMETRIC DATA BASED ON DATA COLLECTED BY WSP GROUP ON DECEMBER U, 2014
EXISTINGOUTLETSTRUCTURE
WETLAND 41.09 ACRE WETLAND 14
0.11 ACRE
WETLAND 60.02 ACRE
WETLAND 70.07 ACRE
WETLAND 80.02 ACRE
WETLAND 90.01 ACRE
WETLAND 100.17 ACRE
WETLAND 110.29 ACRE
WETLAND 120.14 ACRE
WETLAND 130.02 ACRE
WETLAND 50.05 ACRE
100 YEARFLOODPLAIN
100 YEARFLOODPLAINC-101
C-107
C-103
C-104
C-108
C-106
C-109
B-111
B-102
B-104
B-102
B-110
B-103
B-105
B-108
L-1
L-2
L-3
L-4
L-5
L-6
L-7
L-8
L-9
P-102
P-101
MW-26SMW-26D
MW-27SMW-27D
MW-17DMW-17
MW-5
MW-18MW-18D
MW-12
MW-11SMW-11D
MW-9
MW-9MMW-9D
%$ &$ '$B3=B6A7=163A
% & '
DWG SIZE @3C7A7>=
4>@
DRAWING NO.
B7B;3
FILENAME:
2D5 BE?3.
8>0 =>.
2/B3.
A1/;3. 23A.
24B@.
1692.
3=5@.
/??2.
/
4
3
2
1
0
& ' ( ) + , -*
( ) + , - %$*
/
4
1
0
24.0"x36.0"ARCH D
D#A# ;33 AB3/< AB/B7>=
0
*$('&*(*
%&"%)"&$%)
/@A
@3C7A7>=
0
0
<;A
9@/
4<
82?
PRE-CONSTRUCTION STORMWATERMANAGEMENT PLAN
AS SHOWN
08
PRIMARYASH BASIN
SECONDARYASH BASIN
STRUCTURALFILL AREA
&$%$(#
EXISTING TOPOGRAPHIC CONTOUR
EXISTING TRANSMISSION TOWER
EXISTING TRANSMISSION POLE
EXISTING TRANSMISSION LINE
EXISTING ROAD
EXISTING RIP RAP
EXISTING VEGETATION
EXISTING WETLAND
EXISTING PIEZOMETER
EXISTING MONITORING WELL
EXISTING TREE LINE
EXISTING RAIL TRACKS
EXISTING PROPERTY BOUNDARY
EXISTING ASH MANAGEMENT AREA BOUNDARY
EXISTING ASH MANAGEMENT AREA BOUNDARY(DASHED WHERE INFERRED)
PROPOSED ROAD
PROPOSED STORMWATER DITCH
PROPOSED ROCK CHECK DAM
PROPOSED SEDIMENT TRAP
()+$*"
1. CONTRACTOR TO CONSTRUCT DITCHES IN ACCORDANCE WITH DITCH CONSTRUCTION DETAIL ONCONCEPTUAL STORMWATER MANAGEMENT CONTROLS SHEET.
2. CONTRACTOR TO CONSTRUCT ROCK CHECK DAMS IN ACCORDANCE WITH SCDHEC BMP SC-04.REFER TOEROSION AND SEDIMENT CONTROLS DETAIL SHEET FOR FURTHER INFORMATION. ROCK CHECK DAMSSHALL BE CONSTRUCTED AT APPROXIMATELY EVERY 300' ALONG PROPOSED DITCHES.
3. CONTRACTOR TO CONSTRUCT SEDIMENT TRAPS IN ACCORDANCE WITH SCDHEC BMP SC-02.REFER TOEROSION AND SEDIMENT CONTROLS DETAILS SHEET FOR FURTHER INFORMATION.
4. ALL CONSTRUCTION AREAS WITH THE POTENTIAL FOR SEDIMENT-LADEN RUN-OFF SHALL USE SILT FENCESAS NECESSARY TO CONTROL STORMWATER RUN-OFF. REFER TO THE EROSION AND SEDIMENT CONTROLDETAILS SHEET FOR FURTHER INFORMATION ON SILT FENCES.
38 15
38 15
38 15
78 15
98 16
118 16
88 15
88 15
128 16
128 16
88 15
CONCEPTUAL PLANS
108 16
138 16
108 16
138 16
108 16
138 16
108 16
138 16
108 16
138 16
REY
CONCEPTUAL CLOSURE PLAN — PRIMARY ASH BASIN,SECONDARY ASH BASIN AND STRIJCTURAL FILL AREA
SCALE: I"=2OO'ENERGY.DUKE
IOPDGRAPHY DEPICTED ON THIS DRAWING BASED DN PUBLICLY AVAILABLE 2DII LIOAR, BATHYMETRIC DATA BASED ON DATA CDLLEC TED BY WSP GROUP ON DECEMBER 11, 2014
100 YEARFLOODPLAIN
100 YEARFLOODPLAIN
%$ &$ '$B3=B6A7=163A
% & '
DWG SIZE @3C7A7>=
4>@
DRAWING NO.
B7B;3
FILENAME:
2D5 BE?3.
8>0 =>.
2/B3.
A1/;3. 23A.
24B@.
1692.
3=5@.
/??2.
/
4
3
2
1
0
& ' ( ) + , -*
( ) + , - %$*
/
4
1
0
24.0"x36.0"ARCH D
D#A# ;33 AB3/< AB/B7>=
0
*$('&*(*
%&"%)"&$%)
/@A
@3C7A7>=
0
0
<;A
9@/
4<
82?
POST-CLOSURE STORMWATERMANAGEMENT PLAN
AS SHOWN
09
&$%$(#
EXISTING TOPOGRAPHIC CONTOUR
EXISTING TRANSMISSION TOWER
EXISTING SOIL ROAD
EXISTING GRAVEL ROAD
EXISTING RIP RAP
EXISTING VEGETATION
EXISTING WETLAND
EXISTING MONITORING WELL
EXISTING PIEZOMETER
EXISTING TREE LINE
EXISTING RAIL TRACKS
EXISTING PROPERTY BOUNDARY
PROPOSED ROAD IMPROVEMENTS
PROPOSED ROAD
PROPOSED LANDFILL LINER LIMITS
PROPOSED STORMWATER DITCH
()+$*"
1. THIS DRAWING REFLECTS CONCEPTUAL STORMWATER MANAGEMENT AT POST-CLOSURE CONDITIONS.
2. THE POST-CONSTRUCTION STORMWATER MANAGEMENT CONTROLS ARE CONCEPTUAL AND BASED ONPRELIMINARY CALCULATIONS. THESE CONTROLS ARE SUBJECT TO REVISION AS THE DESIGN DEVELOPS.
109 16
139 16
109 16
139 16
109 16
139 16
109 16
139 16
CONCEPTUAL PLANS
REY
CONCEPTUAL CLOSURE PLAN — PRIMARY ASH BASIN,SECONDARY ASH BASIN AND STRIJCTURAL FILL AREA
SCALE: I"=2OO'ENERGY.
f DUKE
IOPDGRAPHY DEPICTED ON THIS DRAWING BASED DN PUBLICLY AVAILABLE 2DII LIOAR, BATHYMETRIC DATA BASED ON DATA CDLLEC TED BY WSP GROUP ON DECEMBER 11, 2014
EXISTINGOUTLETSTRUCTURE
EXISTINGOUTLETSTRUCTURE
%$%$ &$&$ '$'$B3=B6A7=163A
% & '
DWG SIZE @3C7A7>=
4>@
DRAWING NO.
B7B;3
FILENAME:
� (� � &)#� �
� "� � !"�
2/B3.
A1/;3. 23A.
24B@.
1692.
3=5@.
/??2.
/
4
3
2
1
0
& ' ( ) + , -*
( ) + , - %$%$*
/
4
1
0
24.0"x36.0"ARCH D
(� %� � � � � � %&� � � %&� &� "!
0
*$('&*(*
%&"%)"&$%)
/@A
0
0
<;A
9@/
4<4<
82?
SECONDARY ASH BASIN EXCAVATIONAND CONCEPTUAL DEWATERING PLAN
AS SHOWN
1010
CONTRACTOR STAGING ANDMATERIAL STORAGE AREA(GRADE TO WORKING SLOPE)
NOTES:
1.1. NO ASH EXCAVATION SHALL BEGIN UNTIL THE SAFETY AND DEWATERING PLANS ARE SUBMITTED BY THE CONTRACTOR,APPROVED BY DUKE ENERGY AND A THOROUGH READINESS REVIEW IS CONDUCTED. ASH EXCAVATION SHALL ONLY OCCURUNDER CONDITIONS WHERE SAFETY OF CONSTRUCTION PERSONNEL CAN BE ASSURED.
2.2. DEWATERING PLAN IS CONCEPTUAL AND FIELD CONDITIONS MAY REQUIRE CHANGES TO THE PLAN AS SHOWN. CONTRACTORTO REMOVE ASH AS NECESSARY TO ATTAIN CLOSURE BY REMOVAL. CLOSURE BY REMOVAL SHALL BE DEFINED ASEXCAVATION UNTIL VISUAL CONFIRMATION THAT ALL ASH AND COMINGLED ASH/SOIL HAS BEEN REMOVED.
3.3. CONTRACTOR TO EXCAVATE AND MAINTAIN A PERIMETER DITCH AROUND THE EDGE OF THE SECONDARY ASH BASIN. MAXIMUMALLOWABLE DEPTH OF 10'. PERIMETER DITCH SHALL BE MAINTAINED TO ALLOW FOR DRAINAGE TO THE EXCAVATION LOWPOINT. ADDITIONAL DITCHES SHALL BE INSTALLED AS NECESSARY TO FACILITATE DRAINAGE TO PERIMETER RIM DITCH.
4.4. CONTRACTOR TO INSTALL TEMPORARY STORMWATER AND DIVERSION CONTROLS AS NECESSARY TO DIRECT WATER TO THEEXCAVATION LOW POINT AND AROUND EXCAVATION AREA.
5.5. GENERAL PROGRESSION OF ASH EXCAVATION IS FROM HIGHER ELEVATIONS AND ASH BASIN PERIMETER TOWARDS SUMPAREA AS SHOWN. PROGRESSION MAY VARY BASED ON FIELD CONDITIONS.
21010151515
31010 1515
71010 1515
51010 1515
REMOVE
6.6. ASH LOCATIONS AND ASH THICKNESS WITHIN THE SECONDARY ASH BASIN ARE UNKNOWN. ASH LOCATION SHOWN ONTHIS DRAWING IS APPROXIMATE BASED ON SECONDARY ASH BASIN BOTTOM SLOPE AND OUTLET LOCATION.CONTRACTOR SHALL ASSESS ASH LOCATION AND THICKNESS PRIOR TO REMOVAL. CONTRACTOR TO CONDITION DRYASH AS NECESSARY FOR ULTIMATE PLACEMENT IN THE LANDFILL.
7.7. CONTRACTOR TO MANAGE CONTACT WATER IN THE ASH BASIN THROUGHOUT CONSTRUCTION AND TREAT (ASNECESSARY) TO THE STANDARDS AS DESCRIBED IN THE CLOSURE PLAN, TECHNICAL SPECIFICATIONS ANDAPPLICABLE NPDES PERMIT LIMITS.
8.8. ASH EXCAVATION SHALL PROCEED INCREMENTALLY IN NOMINAL 10-FT MAXIMUM INCREMENTS OR DEPTHS REQUIREDTO MAINTAIN SAFETY AND STABILITY OF ASH.
9.9. CONTRACTOR TO REMOVE AND DISPOSE OF SECONDARY OUTLET STRUCTURES UPON COMPLETION OFSTORMWATER REMOVAL.
CONCEPTUAL PLANS
81010 1515
81010 1515
31010 1515
31010 1515
31010 1515
%#$#'"
EXISTING TOPOGRAPHIC CONTOUR
EXISTING TRANSMISSION TOWER
EXISTING TRANSMISSION POLE
EXISTING TRANSMISSION LINE
EXISTING ROAD
EXISTING RIP RAP
EXISTING VEGETATION
EXISTING WETLAND
EXISTING PIEZOMETER
EXISTING MONITORING WELL
EXISTING TREE LINE
EXISTING RAIL TRACKS
EXISTING PROPERTY BOUNDARY
PROPOSED STORMWATER DITCH
CONTACT WATER CONVEYANCE TOWASTEWATER TREATMENT FACILITY
SILT FENCE
PROPOSED ROCK CHECK DAM
TEMPORARY STORMWATER DIVERSION CONTROL
DEWATERING TRENCHES
GENERAL DEWATERING FLOW DIRECTION
APPROXIMATE ASH LOCATION
CONCEPTUAL CLOSURE PLAN — PRIMARY ASH BASIN,SECONDARY ASH BASIN AND STRUCTURAL FILL AREA
I 8 ENERGY.f OuKE
SCALE: I" 100'OPOGRAPHY
DEPICTED ON THIS DRAWING BASED ON PUBLICLY AVAILABLE 2011 UDAR, BATNYMEWWC DATA BASED ON DATA IXILLECTED BY WSP GROUP ON DECEMBER 11, 2014