12.11.19 Blue Heron Elementary School-Construction ...
Transcript of 12.11.19 Blue Heron Elementary School-Construction ...
11/22/2019
1
BLUE HERON ELEMENTARY SCHOOLCONSTRUCTION DOCUMENT PRESENTATION
Presenters:Mr. Bradley Ahalt – FCPS Senior Project Manager
Mr. Scott Moir, AIA – GWWO Architects Project Manager
Division of OperationsDecember 11, 2019
© 2019 FCPS/GWWO Architects
Division of Operations© 2019
AGENDA Project Goals | Objectives General Project Information Project Site Development Floor Plan Development Renderings Project Schedule Questions
11/22/2019
2
Division of Operations© 2019
PROJECT GOALS | OBJECTIVES Establish regularity; promote flexibility. Emphasize standardization. Ease site adaptability. Pursue a compact footprint. Utilize cost-effective solutions. Maximize durability and sustainability. Create safe and enriching learning environment.
Division of Operations© 2019
GENERAL PROJECT INFORMATION New School in New Market, Maryland
+/- 15 Acre Site Part of Hamptons West PUD Partial Two-Story Building Structural Steel Frame/Brick Cladding
State Rated Capacity: 705 students* Project Size: 92,250 GSF*
Net-to-Gross Efficiency: 70.13%*Base Bid
11/22/2019
3
Division of Operations© 2019
PROJECT SITE
*BLUE HERON
ELEMENTARY SCHOOL
*FCPS
Division of Operations© 2019
PROJECT SITE
*PLAYING
FIELD
Vehicular Circulation• 134 On-Site Parking Spaces
• 31 On-Street Parking Spaces
• 32 Car Drop-Off/Pick-Up Queuing Spaces (Stacked)
• 12 Bus Spaces (Stacked)
Three (3) Playgrounds (PG)
One (1) Paved Play Court
One (1) 240’ x 150’ Multi-Use Playing Field
Two (2) Specimen Trees Preserved
Copyright 2019GWWO Architects/MK Consulting Engineers/Harris Smariga & Assoc
PARKING
PARKING
BUS ENTRYLower Level: el. +/- 513.6’
MAIN ENTRYUpper Level: el. +/- 529.6’
SERVICE AREAUpper Level: el. +/- 529.6’*
PG
PGPG
PAVED COURT
11/22/2019
4
Division of Operations© 2019
CAFETERIA
OPENTO
BELOW
GYMNASIUM
UPPER LEVEL FLOOR PLAN
MAIN ENTRY
SERVICEENTRY
SP INSTENTRY
Classroom
Pre-K/Kindergarten
Creative Classroom
Learning Support
Maintenance
Circulation
Media Center
Building Support
Cafeteria/Stage
Gymnasium
Administration
Health Suite
Specialty Program
COLLABSPACE
KITCHEN
STAGE
SERVICEDRIVE
BUILDING AREA BASE BID W/ ADD ALT 01LOWER LEVEL 30,585 GSF 30,585 GSFUPPER LEVEL 61,665 GSF 64,500 GSF
TOTAL AREA 92,250 GSF 95,085 GSFPROGRAM AREA 66,546 NSF 66,546 NSFEFFICIENCY 70.13% 69.99%
Division of Operations© 2019
UPPER LEVEL ABOVE+16.00’
MEDIACENTER
LOWER LEVEL FLOOR PLANBUS
ENTRYClassroom
Pre-K/Kindergarten
Creative Classroom
Learning Support
Maintenance
Circulation
Media Center
Building Support
Cafeteria/Stage
Gymnasium
Administration
Health Suite
Specialty Program
PLAYGROUNDS
PLAYGROUNDS
BUILDING AREA BASE BID W/ ADD ALT 01LOWER LEVEL 30,585 GSF 30,585 GSFUPPER LEVEL 61,665 GSF 64,500 GSF
TOTAL AREA 92,250 GSF 95,085 GSFPROGRAM AREA 66,546 NSF 66,546 NSFEFFICIENCY 70.13% 69.99%
11/22/2019
5
Division of Operations© 2019
EXTERIOR RENDERING
VIEW OF MAIN ENTRY
Division of Operations© 2019
EXTERIOR RENDERING
VIEW OF BUS ENTRY
11/22/2019
6
Division of Operations© 2019
INTERIOR RENDERING
“MAIN STREET” CORRIDOR FROM ENTRY LOBBY
Division of Operations© 2019
INTERIOR RENDERING
CAFETERIA
11/22/2019
7
Division of Operations© 2019
INTERIOR RENDERING
UPPER LEVEL COLLABORATIVE LEARNING COMMONS
Division of Operations© 2019
INTERIOR RENDERING
UPPER LEVEL MAIN STAIR LOBBY
11/22/2019
8
Division of Operations© 2019
INTERIOR RENDERING
BUS ENTRY LOBBY
Division of Operations© 2019
INTERIOR RENDERING
MEDIA CENTER
11/22/2019
9
Division of Operations© 2019
INTERIOR RENDERING
TYPICAL CLASSROOM WING CORRIDOR
Division of Operations© 2019
INTERIOR RENDERING
TYPICAL CLASSROOM ENTRY ALCOVE
11/22/2019
10
Division of Operations© 2019
INTERIOR RENDERING
TYPICAL CLASSROOM
Division of Operations© 2019
INTERIOR RENDERING
TYPICAL CLASSROOM