11/22/2019 1 BLUE HERON ELEMENTARY SCHOOL CONSTRUCTION DOCUMENT PRESENTATION Presenters: Mr. Bradley Ahalt – FCPS Senior Project Manager Mr. Scott Moir, AIA – GWWO Architects Project Manager Division of Operations December 11, 2019 © 2019 FCPS/GWWO Architects Division of Operations © 2019 AGENDA Project Goals | Objectives General Project Information Project Site Development Floor Plan Development Renderings Project Schedule Questions

Transcript of 12.11.19 Blue Heron Elementary School-Construction ...

11/22/2019

1

BLUE HERON ELEMENTARY SCHOOLCONSTRUCTION DOCUMENT PRESENTATION

Presenters:Mr. Bradley Ahalt – FCPS Senior Project Manager

Mr. Scott Moir, AIA – GWWO Architects Project Manager

Division of OperationsDecember 11, 2019

© 2019 FCPS/GWWO Architects

Division of Operations© 2019

AGENDA Project Goals | Objectives General Project Information Project Site Development Floor Plan Development Renderings Project Schedule Questions

11/22/2019

2

Division of Operations© 2019

PROJECT GOALS | OBJECTIVES Establish regularity; promote flexibility. Emphasize standardization. Ease site adaptability. Pursue a compact footprint. Utilize cost-effective solutions. Maximize durability and sustainability. Create safe and enriching learning environment.

Division of Operations© 2019

GENERAL PROJECT INFORMATION New School in New Market, Maryland

+/- 15 Acre Site Part of Hamptons West PUD Partial Two-Story Building Structural Steel Frame/Brick Cladding

State Rated Capacity: 705 students* Project Size: 92,250 GSF*

Net-to-Gross Efficiency: 70.13%*Base Bid

11/22/2019

3

Division of Operations© 2019

PROJECT SITE

*BLUE HERON

ELEMENTARY SCHOOL

*FCPS

Division of Operations© 2019

PROJECT SITE

*PLAYING

FIELD

Vehicular Circulation• 134 On-Site Parking Spaces

• 31 On-Street Parking Spaces

• 32 Car Drop-Off/Pick-Up Queuing Spaces (Stacked)

• 12 Bus Spaces (Stacked)

Three (3) Playgrounds (PG)

One (1) Paved Play Court

One (1) 240’ x 150’ Multi-Use Playing Field

Two (2) Specimen Trees Preserved

Copyright 2019GWWO Architects/MK Consulting Engineers/Harris Smariga & Assoc

PARKING

PARKING

BUS ENTRYLower Level: el. +/- 513.6’

MAIN ENTRYUpper Level: el. +/- 529.6’

SERVICE AREAUpper Level: el. +/- 529.6’*

PG

PGPG

PAVED COURT

11/22/2019

4

Division of Operations© 2019

CAFETERIA

OPENTO

BELOW

GYMNASIUM

UPPER LEVEL FLOOR PLAN

MAIN ENTRY

SERVICEENTRY

SP INSTENTRY

Classroom

Pre-K/Kindergarten

Creative Classroom

Learning Support

Maintenance

Circulation

Media Center

Building Support

Cafeteria/Stage

Gymnasium

Administration

Health Suite

Specialty Program

COLLABSPACE

KITCHEN

STAGE

SERVICEDRIVE

BUILDING AREA BASE BID W/ ADD ALT 01LOWER LEVEL 30,585 GSF 30,585 GSFUPPER LEVEL 61,665 GSF 64,500 GSF

TOTAL AREA 92,250 GSF 95,085 GSFPROGRAM AREA 66,546 NSF 66,546 NSFEFFICIENCY 70.13% 69.99%

Division of Operations© 2019

UPPER LEVEL ABOVE+16.00’

MEDIACENTER

LOWER LEVEL FLOOR PLANBUS

ENTRYClassroom

Pre-K/Kindergarten

Creative Classroom

Learning Support

Maintenance

Circulation

Media Center

Building Support

Cafeteria/Stage

Gymnasium

Administration

Health Suite

Specialty Program

PLAYGROUNDS

PLAYGROUNDS

BUILDING AREA BASE BID W/ ADD ALT 01LOWER LEVEL 30,585 GSF 30,585 GSFUPPER LEVEL 61,665 GSF 64,500 GSF

TOTAL AREA 92,250 GSF 95,085 GSFPROGRAM AREA 66,546 NSF 66,546 NSFEFFICIENCY 70.13% 69.99%

11/22/2019

5

Division of Operations© 2019

EXTERIOR RENDERING

VIEW OF MAIN ENTRY

Division of Operations© 2019

EXTERIOR RENDERING

VIEW OF BUS ENTRY

11/22/2019

6

Division of Operations© 2019

INTERIOR RENDERING

“MAIN STREET” CORRIDOR FROM ENTRY LOBBY

Division of Operations© 2019

INTERIOR RENDERING

CAFETERIA

11/22/2019

7

Division of Operations© 2019

INTERIOR RENDERING

UPPER LEVEL COLLABORATIVE LEARNING COMMONS

Division of Operations© 2019

INTERIOR RENDERING

UPPER LEVEL MAIN STAIR LOBBY

11/22/2019

8

Division of Operations© 2019

INTERIOR RENDERING

BUS ENTRY LOBBY

Division of Operations© 2019

INTERIOR RENDERING

MEDIA CENTER

11/22/2019

9

Division of Operations© 2019

INTERIOR RENDERING

TYPICAL CLASSROOM WING CORRIDOR

Division of Operations© 2019

INTERIOR RENDERING

TYPICAL CLASSROOM ENTRY ALCOVE

11/22/2019

10

Division of Operations© 2019

INTERIOR RENDERING

TYPICAL CLASSROOM

Division of Operations© 2019

INTERIOR RENDERING

TYPICAL CLASSROOM

11/22/2019

11

Division of Operations© 2019

PROJECT SCHEDULE

PHASE DURATION

Construction Documents July 2019 – December 2019

Issued for Bid January 2020

Contracts/Construction February 2020 – June 2021

Staff Occupancy June 2021

Student Occupancy August 2021

Division of Operations© 2019