VAUGHAN CONCORD GO CENTRE SECONDARY PLAN – Public Meeting #1 BACKGROUND Stormwater

Transcript of 121107 PUBLIC MEETING1 FINAL website low res · Title: 121107_PUBLIC MEETING1_FINAL_website_low...

Page 1: 121107 PUBLIC MEETING1 FINAL website low res · Title: 121107_PUBLIC MEETING1_FINAL_website_low res.pptx Author: Emma West Created Date: 11/14/2012 12:14:19 PM

VAUGHAN CONCORD GO CENTRE SECONDARY PLAN – Public Meeting #1

BACKGROUND Stormwater

Page 2: 121107 PUBLIC MEETING1 FINAL website low res · Title: 121107_PUBLIC MEETING1_FINAL_website_low res.pptx Author: Emma West Created Date: 11/14/2012 12:14:19 PM

VAUGHAN CONCORD GO CENTRE SECONDARY PLAN – Public Meeting #1

Background Review –Stormwater 3 •  Development constraints

associated with the tributaries, including the TRCA regulation limits.

•  The north parcel top of bank has been staked and resulted in a refinement of the floodlines

•  Observations of flooding along Highway 7 towards the western limit of study area