The Exchange is a multi use, mixed program building. TheExchanges main principle is based upon the interaction betweencreative professionals and the general public. The idea is basedon the intertwining of three programmtic typologies: Showcase,Exchange and Production, and the benefits which can be drawnfrom this system.
The buildings form is a functional expression of the behaviour of soilparticles during liquefaction. Through utilising its natural verticalprocess as a circulation language and a way to arrange space TheExchange principle is meshed with the liquefaction properties togenerate a concept based around changing conditions.
The site connects High Street to Hereford Street, within the compactcore of the Christchurch Central Business District. The conceptdraws its potential from a previous laneway location, asserting theimportance of the development and reopening of these iconic sites
throughout the city.
The structure terminates at the north and south facades withcantilevered segments over the streets. The building is bound onthe west and east by neighbouring buildings. The building is a steelstructural grid of columns and beams, with two r einforced concreteservice cores and a sandblasted glass curtain wall facade.
The ground floor provides a largely open, uninterrupted space forconvenient pedestrian access between the two main roads. Coupledwith open-plan concept retail space, the ground floor aims to makeuse of a potentially high level of pedestrian traffic and entice visitorsup through the buildings higher levels.
The first and second levels have spaces for both work, productionand the exhibition of the various creative projects generated by thetenants. The idea is to have flexible space so that it can be used fora range of purposes depending on the event that day or night.
-
7/30/2019 121014 Soil Book Jw
3/26
-
7/30/2019 121014 Soil Book Jw
4/26
-
7/30/2019 121014 Soil Book Jw
5/26
8
DENSE SEDIMENT
SATURATED LOOSE SEDIMENT
LIQUEFACTIONBEFORE EARTHQUAKE
The young sediment Christchurch is built on means the city is prone to the effects ofliquefaction during an earthquake event. Liquefaction variation is determined by theepicentre location, magnitude, depth, duration and geological conditions.Flat areas such as this, where the water table sits only a few meters under the surface,release a build up of pressure through s and boils and waterspouts in many areas andin lateral spreading and cracking near rivers. This occurs as waters are removed fromthe lower lying saturated loose sediment underground during the shaking. The wateris forced up through weak points in the denser sediment just below the surface. Asthis occurs the loss of water in the lower layers gives way to compaction, producing avariety of effects to the natural and built environment.
-
7/30/2019 121014 Soil Book Jw
6/26
10
SOILTHE GEOLOGY OF CHRISTCHURCH
BASALT FLOWSANDESITE
POST-GLACIAL ALLUVIUM AND DUNE SANDGREYWACKE AND AGRILLITEFLOW RHYOLITE, BRECCIA AND OBSIDIANSANDSTONE, SILTSTONE AND CLAYSTONE
DIAGRAM: AMANDA NAKARMI
-
7/30/2019 121014 Soil Book Jw
7/26
-
7/30/2019 121014 Soil Book Jw
8/26
14
LIQUEFACTIONSIMULATOR
-
7/30/2019 121014 Soil Book Jw
9/26
16
SEQUENCE IN SECTION: 5s INTERVALS
SOIL CONDITIONS (LIQUEFACTION PRONE)
LOWER: LOOSELY PACKED AND SATURATED SOIL.UPPER: COMPACTED, FINER SOIL
LIQUEFACTIONSIMULATION
-
7/30/2019 121014 Soil Book Jw
10/26
18
LATERAL SPREADING
Soil particles spread laterally under seismicstress, transferring volume from high areasto lower areas, especially near rivers andother bodies of water.
GROUNDWATER PRESSURE
As the soil compacts groundwater is forcedout of the saturated particles, surgingupwards and breaking through the densetop layer soil.
SAND BOILS / WATER FOUNTAINS
Resulting from the increase in groundwaterpressure, sand boils and water fountainsoccur through fissures in the surface layer.
GROUND SETTLEMENT
Over the duration of an earthquake theearth subsides as the seismic wavescompact and densify the loose, saturatedsecond layer soil.
LIQUEFACTIONEFFECTS
-
7/30/2019 121014 Soil Book Jw
11/26
20
SEQUENCE IN SECTION: 5s INTERVALS
< HIGH RATE OF CHANGE >
< LOW RATE OF CHANGE >
LIQUEFACTIONRATE OF CHANGE
-
7/30/2019 121014 Soil Book Jw
12/26
-
7/30/2019 121014 Soil Book Jw
13/26
24
HAGLEY
AVEN
UE
SELWYNSTREET
DEANS
A
VE
RICCARTONAVENUE
WALLACESTREET
STEWARTSTREET
MONTREALSTREET
ROLLESTONAVENUE
CAMBRIDGETERRACE
VICTORIASTREET
OXFO
RDTERR
ACE
CRANMERSQUARE
HAGLEYPARK
LATIMERSQUARE
DURHAMSTREET
MOORHOUSE AVENUE
FITZGERALDAVENUE
COLOMBOSTREET
MANCHESTERSTREET
MADRASSTREET
BARBADOESSTREET
SAINT ASAPH STREET
TUAMSTREET
CASHELSTREET
LICHFIELDSTREET
HEREFORDSTREET
WORCESTER STREET
GLOUCESTER STREET
ARMAGH STREET
CHESTER STREET
KILMORE STREET
PETERBOROUGH STREET
SALISBURYSTREET
BEALEYAVENUE
PARKTERRACE
HARPER
AVENUE
FERRYROAD
ATIGU
AST
REE
T
D
9
HI G H
S T RE E T
CBD BLUEPRINTSITE PROPOSAL
-
7/30/2019 121014 Soil Book Jw
14/26
26
SITE CONTEXTPEDESTRIAN CONNECTIONS
HEREFORD STREET
850SQM
RETAILPRECINCT [200m]24HOUR CHRISTCHURCH[350m]AVON RIVER [450m]
RESEDENTIALDEVELOPMENT [200m]STADIUM [550m]
THEFRAME[200m]LATIMER SQUARE[400m]
BUSINTERCHANGE[350m]
INNOVATIONPRECINCT[200m
]
AVON RIVER [300m]ARTGALLERY [750m]HAGLEYPARK(850m]CANTERBURYMUSEUM [950m]
CATHEDRALSQUARE [150m]
CASHEL STREET
HIGHSTREET
-
7/30/2019 121014 Soil Book Jw
15/26
28
PROGRAMEXCHANGE PRINCIPLES
EXCHANGEPRODUCTION SHOWCASE
OFFICE
WORKSHOP
REHEAR
SAL
BAR/CLUB
C
AFE
SHOP
EXHIBT
ION
PERFORMANCE
DISP
LAY
NON PUBLIC PUBLIC
INTERACTION PRESENTATIONDEVELOPMENT PRODUCTION PUBLICATION
-
7/30/2019 121014 Soil Book Jw
16/26
CIRCULATION
-
7/30/2019 121014 Soil Book Jw
17/26
32
CIRCULATIONLIQUEFACTION + EXCHANGE
SPREAD COMPACT SURGE ERUPT
CIRCULATION CONCEPT
-
7/30/2019 121014 Soil Book Jw
18/26
34
CIRCULATION CONCEPTVERTICAL EXCHANGE SYSTEM
PRODUCTION
EXCHANGE
SHOWCASE
PRODUCTION
EXCHANGE
SHOWCASE
PRODUCTION
EXCHANGE
SHOWCASE
SERVICES
&ACCESS
SERVICES
&ACCESS
SERVICES
&ACCESS
EXHIBITION
RETAIL
GALLERY
RETAIL
REHEARSAL
CATWALK
OFFICE
BAR / CLUB
BAR/CLUB
OFFICE
WORKSHOP
CINEMA
RETAIL
AUDITORIUM
GALLERY
RETAIL
RETAIL
SERVICES
&ACCESS
SERVICES
&ACCESS
SERVICES
&ACCESS
SERVICES
&ACCESS
SERVICES
&ACCESS
SERVICES
&ACCESS
I
I
CIRCULATION DESIGN
-
7/30/2019 121014 Soil Book Jw
19/26
36
OFFICE
WORKSHOP
REHEARSAL
BAR/CLUB
CAFE
STORE
EXHIBTION
PERFORMANCE
DISPLAY
INTERACTION
PRESENTATION
DEVELOPMENT
PRODUCTION
PUBLICATION
NON-PUBLIC
PUBLIC
SPREAD
COMPACT
SURGE
ERUPT
PRODUCTION
EXCHANGE
SHOWCASE
CIRCULATION DESIGNVERTICAL EXCHANGE SYSTEM
CIRCULATION DESIGN
-
7/30/2019 121014 Soil Book Jw
20/26
38
CIRCULATION DESIGNPROGRAM MASSING
SERVICES
- Service Core [2]- Elevator Shaft [4]- Mens Toilet [6]- Womens Toilet [6]
- Stairwell [4]
CIRCULATION
- Open Passages [5]SHOWCASE
- Exhibition Hall [1]- Exhibition Corridor [1]
- Informal Cinema [1]
FLOOR PLAN
-
7/30/2019 121014 Soil Book Jw
21/26
40
FLOOR PLANGROUND LEVEL
10000
OPEN COURTYARD SPACE
WC WC
WC
WC
100005000
5000
5000
5000
5000
5000
10000
10000
10000
1
JIHGFE
D
C
B
A
2
3
4
CONCEPTSTALLS
SERVICES CORESERVIC
ESCORE
SCALE | 1:200
FLOOR PLAN
-
7/30/2019 121014 Soil Book Jw
22/26
42
FLOOR PLANSECOND LEVEL
SCALE | 1:200
10000 100005000
5000
5000
5000
5000
5000
10000
10000
10000
1
JIHGE
D
C
B
A
2
3
4
F
KITCHEN / LOUNGE OPEN-PLAN STUDIO
PRIVATE STUDIO WC WC
WC
WC
PRIVATESTU
DIO
EXHIBITIO
NSPACE
SERVICES CORESERVICESC
ORE
SECTION
-
7/30/2019 121014 Soil Book Jw
23/26
44
SECTIONLONGITUDINAL
HEREFORD STREET
-
7/30/2019 121014 Soil Book Jw
24/26
46
GROUND FLOOR
-
7/30/2019 121014 Soil Book Jw
25/26
48
SECOND FLOOR
-
7/30/2019 121014 Soil Book Jw
26/26
50