MODERN GROUND IMPROVEMENT

TECHNIQUES FOR HIGHWAYS

Page 2: 1206765 634528654292080000

INTRODUCTION Transportation contributes to the

economic,industrial,social and cultural development of any country.

Transportation by road or highways is the only mode which could give maximum service to one and all.

When the soil on a project site cannot support the loads, ground improvement to increase strength, reduce compressibility, and enhance performance under applied loadings may be required.

The field of ground improvement techniques has been recognized as an important and rapidly expanding one.

Various methods are discussed below:

Page 3: 1206765 634528654292080000

METHODS FOR GROUND IMPROVEMENT

1. VERTICAL DRAINS

2. SOIL NAILING

3. STONE COLUMNS

4. VIBRO COMPACTION

5. DYNAMIC COMPACTION

6. VIBRO PIERS

Page 4: 1206765 634528654292080000

VERTICAL DRAINS These consist of a column of pervious material

placed in cylindrical vertical holes at sufficiently close spaces.

All drains should be connected at the ground surface to a drainage blanket.

Vertical drains accelerate consolidation by facilitating drainage of pore water.

Vertical drains are laid out in rows, staggered, or aligned to form patterns of equilateral triangles or squares.

Two types of drains are discussed below

Page 5: 1206765 634528654292080000

SAND DRAINS

• A sand drain is a simple process, employing a column of at least 10 inches in width augered into ground to be surcharged and consolidated.

• The column is then filled with sand and connected to a free-draining blanket of granular soil.

Page 6: 1206765 634528654292080000

WICK DRAINS

• A wick drain is usually about, 4 inches wide, 1/8-inch thick which acts as a high-permeability conduit for water to flow out of the soil and to the surface.

• Most common application of wick drains is for accelerating the settlement rate of compressible soils.

Page 7: 1206765 634528654292080000

SOIL NAILING

This ground reinforcement process uses steel tendons which are drilled and grouted into the soil to create a composite mass.

A shotcrete facing is typically applied.

Soil Nailing is an in situ technique for reinforcing, stabilizing and retaining excavations and deep cuts.

Soil nailing is not practical in:

1. Soft, plastic clays

2. Organics/Peat

3. Fills (rubble, cinder, ash, etc.)

Page 8: 1206765 634528654292080000

APPLYING SHOTCRETE

HOLES DRILLED THROUGH MACHINES

Page 9: 1206765 634528654292080000

SOIL NAILING

Page 10: 1206765 634528654292080000

STONE COLUMNS

• Also known as vibro-replacement or vibro-displacement, is a ground improvement process where vertical columns of compacted aggregate are formed through the soils to be improved.

• The vibrator first penetrates to the required depth by vibration and air or water jetting or by vibration alone.

• Gravel is then added at the tip of the vibrator and progressive raising and repenetration of the vibrator results in the gravel being pushed into the surrounding soil.

• The soil-column matrix results in an overall mass having a high shear strength and a low compressibility.

Page 11: 1206765 634528654292080000

STONE COLUMNS

Page 12: 1206765 634528654292080000

Click icon to add picture

Page 13: 1206765 634528654292080000

VIBRO COMPACTION

It is a ground improvement process for densifying loose sands to create stable foundation soils.

The action of the vibrator, usually accompanied by water jetting, reduces the inter-granular forces between the soil particles, allowing them to move into a denser configuration, typically achieving a relative density of 70 to 85 percent.

Compaction is achieved above and below the water table.

Page 14: 1206765 634528654292080000

PROCESS OF VIBRO COMPACTION

Page 15: 1206765 634528654292080000

DYNAMIC COMPACTION

Dynamic Compaction is the dropping of heavy weights on the ground surface to densify soils at depth.

It involves the repeated dropping of large steel tampers by means of crawler cranes.

Tampers typically range from 6 to 20 tons and are dropped from heights of about 40 to 80 feet.

Page 16: 1206765 634528654292080000

MACHINE WITH TAMPER COMPACTION BY TAMPER

Page 17: 1206765 634528654292080000

VIBRO PIERS

Vibro Piers, also known as aggregate piers, are typically installed to intermediate depths of 5 to 20 feet for the support of new loads.

Vibro Piers are quick to install and very effective at reinforcing the surrounding soil.

Typical Vibro Pier construction begins with pre-drilling a full-depth hole with a diameter that is equal to the final pier design diameter.

For soils in which the pre-drilled hole will not stay open, the bottom feed process can be used to avoid the need for casing.

Page 18: 1206765 634528654292080000

BOTTOM FEED PROCESS

AGGREGATE INTRODUCED THROUGH PREDRILLED HOLES

Page 19: 1206765 634528654292080000

CONCLUSION Though the term Ground Improvement has been

familiar to Civil Engineers, the design approach is still empirical, mostly based on past experience.

The Importance of Ground Improvement is immeasurable. Ground stability is a vital part of any construction project.

Method adopted to be applied on the field should be according to site condition and economical.

Application of Ground Improvement Techniques is not only cheaper but also reduce the construction time significantly.

Ground improvement technique also plays a vital role in the development of our mother land by 2020.

Page 20: 1206765 634528654292080000

REFERENCES K.R.Arora, (2005)"Soil Mechanics and

Foundation Engineering", Standard Publishers Distributors, Delhi.

www.haywardbaker.com . TerraSystems(Geotechnical Contracting Firm) . www.google.com Rembco Geotechnical Contractors Inc.

Page 21: 1206765 634528654292080000

THANK YOU