12 Queen’s Road Central - shacombank.com.hk · 12 Queen’s Road Central Road Ice House Street al...
Transcript of 12 Queen’s Road Central - shacombank.com.hk · 12 Queen’s Road Central Road Ice House Street al...
12 Queen’s Road Central
Lower Albert Road
Ice H
ouse
Stree
t
Queen’s Road Central
Lower A
lbert Road
Chater House
Prince’s Building
HSBC Headquarters
Building
Ice H
ouse Str
eet
Ice
Hou
se S
treet
Chater Road
Queen’s Road Central
Duddell St
reet
Wyn
dham
Stre
et
Des Voeux Road Central
Pedder
Stree
t
On Lan Street
Stanley Street
Standard Chartered
Bank Building
The Galleria
Entertainment Building
Mandarin Oriental - Hong Kong
Wheelock House
World Wide House
Des Voeux Road Central
The Landmark
The Landmark Mandarin Oriental
Hotel
Central Building
Bank of East Asia Building
York House
Gloucester Tower
China Building
LHT Tower
Central Tower
Ice House Street Queen’s Road Central
Central Government
Offices
Alexandra House
A Prominent Location
This location map is for reference only and not to scale. Main Access to CentralTram Route
Airport Express Hong Kong Station
Disclaimer
All information contained herein (“Information”) is for reference purpose only. While the Landlord has used its best endeavour to ensure the Information is accurate and correct at the time of printing, neither the Landlord or the Leasing Agents accept any responsibilities for the accuracy and correctness of the Information, nor does the Information constitute or form part of an offer or contract for the lease. The Landlord reserves the right to change the Information without notice. All figures stated herein are subject to final survey. The Landlord reserves the right to alter the specification, design and layout of the development as referred to herein without prior notice.
www.shacombank.com.hk
The Landlord Leasing Hotline
2842 45012151 3335
Printed in July 2015 by Shanghai Commercial Bank Limited
Abercrombie & Fitch
Hugo Boss
Masterp
iece B
y King
Fook
Folli FollieBaldinini
Marks & Spencer
GUCCI
Harvey
Nichols
Patek Philippe
Lanvin
Blancpa
in
Longc
hamp
Shan
ghai
Tang
Brunello
Cucinel
li
Joyce
Emper
or Watc
h & Jew
ellery
Club Monac
oHermes
Gieves & Hawkes
Philip
p Plei
n
Coach
MCM
Mercedes-B
enz
Tiffany & Co.
Louis
Vuitton
GAP
12 Queen’s Road Central
Audemars
Piguet
Iconic Green Building with a Prestigious AddressA stunning new office tower that is destined to be among the most coveted addresses in the city: the Shanghai Commercial Bank Tower at 12 Queen’s Road Central. Just 2 minutes’ walk from the MTR Central Station, the tower lies at the centre of the city’s transportation network.
Shanghai Commercial Bank Tower’s bold architecture stands out from its surroundings, though it remains in harmony within the urban scene. The distinctive curve along its façade forms a dramatic corner which aligns directly with the axis of the street, then continues down from the tower to create the imposing grand entrance. The curve echoes the properties of the street, while breaking away from the wall of buildings that comprise Queen’s Road Central.
The tower reflects a refined model of modern concepts of office space with banking hall and retail shops. It is set back slightly from the street to create a more defined space for pedestrians. Shops project a more lively activity at ground level. The inviting public spaces and ample pedestrian access invites the entire metropolis to experience the exceptional milieu that the tower creates.
Aiming to achieve the BEAM Plus Gold Certificate after completion, the architects have spared no effort to lessen the environmental impact of the tower with the latest green practices and cutting edge technologies. Four high speed passenger lifts serve 25 floors, each of which offers more than 4,000 sq.ft. of lettable area. Generous 2.8m ceiling heights and raised floors add to the appeal of this exceptional tower. For added peace of mind, tenants enjoy full security and surveillance systems.
Professional ConsultantsARCHITECTURALRocco Design Architects Limited
Rocco Design Architects Limited is an international awards winning architect firm with global footprints. Their works have been consistently awarded globally, including a First Prize Award for the L’Opéra de la Bastille international competition in 1983, ARCASIA Gold Medals in 1994 and 2003, the Chicago Athenaeum Architectural Awards in 2006, 2011 and 2013, the Kenneth F. Brown Award in 2007, and the World Architecture Festival category winner in 2011.
Main Construction ContractorGammon Engineering & Construction Company
The main construction contractor, Gammon Engineering & Construction Company Limited, is a leading regional construction company that delivers high quality projects.
STRUCTURAL & GEOTECHNICALENGINEERING CONSULTANTOve Arup & Partners Hong Kong Limited
FAÇADE CONSULTANTOve Arup & Partners Hong Kong Limited
BUILDING SERVICES CONSULTANTMott MacDonald Hong Kong Limited
QUANTITY SURVEYING CONSULTANTLangdon & Seah Hong Kong Limited
BEAM PLUS CONSULTANTBusiness Environment Council Limited
CURTAIN WALL SUB-CONTRACTORYKK AP Façade Hong Kong Limited
PROPERTY MANAGEMENTJones Lang LaSalle
Jones Lang LaSalle is a pioneer of property management in Hong Kong and a world renowned professional services firm. Jones Lang LaSalle has tailored its property management processes specifically for the Shanghai Commercial Bank Tower.
Iconic Green Building with a Prestigious AddressA stunning new office tower that is destined to be among the most coveted addresses in the city: the Shanghai Commercial Bank Tower at 12 Queen’s Road Central. Just 2 minutes’ walk from the MTR Central Station, the tower lies at the centre of the city’s transportation network.
Shanghai Commercial Bank Tower’s bold architecture stands out from its surroundings, though it remains in harmony within the urban scene. The distinctive curve along its façade forms a dramatic corner which aligns directly with the axis of the street, then continues down from the tower to create the imposing grand entrance. The curve echoes the properties of the street, while breaking away from the wall of buildings that comprise Queen’s Road Central.
The tower reflects a refined model of modern concepts of office space with banking hall and retail shops. It is set back slightly from the street to create a more defined space for pedestrians. Shops project a more lively activity at ground level. The inviting public spaces and ample pedestrian access invites the entire metropolis to experience the exceptional milieu that the tower creates.
Aiming to achieve the BEAM Plus Gold Certificate after completion, the architects have spared no effort to lessen the environmental impact of the tower with the latest green practices and cutting edge technologies. Four high speed passenger lifts serve 25 floors, each of which offers more than 4,000 sq.ft. of lettable area. Generous 2.8m ceiling heights and raised floors add to the appeal of this exceptional tower. For added peace of mind, tenants enjoy full security and surveillance systems.
Professional ConsultantsARCHITECTURALRocco Design Architects Limited
Rocco Design Architects Limited is an international awards winning architect firm with global footprints. Their works have been consistently awarded globally, including a First Prize Award for the L’Opéra de la Bastille international competition in 1983, ARCASIA Gold Medals in 1994 and 2003, the Chicago Athenaeum Architectural Awards in 2006, 2011 and 2013, the Kenneth F. Brown Award in 2007, and the World Architecture Festival category winner in 2011.
Main Construction ContractorGammon Engineering & Construction Company
The main construction contractor, Gammon Engineering & Construction Company Limited, is a leading regional construction company that delivers high quality projects.
STRUCTURAL & GEOTECHNICALENGINEERING CONSULTANTOve Arup & Partners Hong Kong Limited
FAÇADE CONSULTANTOve Arup & Partners Hong Kong Limited
BUILDING SERVICES CONSULTANTMott MacDonald Hong Kong Limited
QUANTITY SURVEYING CONSULTANTLangdon & Seah Hong Kong Limited
BEAM PLUS CONSULTANTBusiness Environment Council Limited
CURTAIN WALL SUB-CONTRACTORYKK AP Façade Hong Kong Limited
PROPERTY MANAGEMENTJones Lang LaSalle
Jones Lang LaSalle is a pioneer of property management in Hong Kong and a world renowned professional services firm. Jones Lang LaSalle has tailored its property management processes specifically for the Shanghai Commercial Bank Tower.
BASEMENTApprox. 7,507 sq.ft. gross Approx. 8,244 sq.ft. gross Approx. 4,366 sq.ft. lettable per floorApprox. 5,255 sq.ft. gross Approx. 4,236 sq.ft. lettable per floor
*Flat Roof on 22/F only
1ST FLOORGROUND FLOOR 14TH - 21ST FLOOR 22ND - 25TH FLOOR
Retail Specifications Retail Specifications Office Specifications
Efficient Layouts
Queen’s Road Central Queen’s Road Central
N N N
G/F
Basement
1/F Gross Area: 5,255 sq.ft.
Gross Area: 8,244 sq.ft.
Gross Area: 7,507 sq.ft.
2/F SCB (Bank Hall) / Office Lift Lobby
For Lease (Retail)
Wealth Management
Safe Deposit Box
SCB
Mechanical Floor
SCB
SCB
Roof with Building Services
For Lease (Office)Lettable Area: 4,366 sq.ft.
For Lease (Office)Lettable Area: 4,236 sq.ft.
3/F
4/F
5/F
6/F
7/F
8/F
9/F
10/F
11/F
12/F
14/F
15/F
16/F
17/F
18/F
19/F
20/F
21/F
22/F
23/F
24/F
25/F
26/F
27/F
Roof
Section Plan
Duddell Street
Queen’s Road Central
RETAIL RETAIL RETAIL OFFICE OFFICE
Basement G/F 1/F 14/F - 21/F 22/F - 26/F
DisableLav.
F.S. TransferPump Room
Water TransferPump Room
Lift Pit
Shop
Meter Room
P.D.
H.R.
W.M.C.
MaleLav.
FemaleLav.
Fireman’sLift Lobby
H.R.
UP
UPUP
UP
Refuse Storage &Material Recovery
ChambersCaretaker’s Room
P.D.
MeterRoom
F.S. ControlRoom
UP
UP
UP
UP
UP to 2/F
DN
DN
UP DN
ShopStore
Store
CableRiserRoom
GasChamber
H.R.
ATM Service
Elv.RoomP.D.
P.D.
OfficeEntrance
P.D.
H.R.
Fireman’sLift Lobby
H.R.
15 m
N N N N N
Transformer Room
H.V. SwitchRoom
SwitchRoom Lift Pit
Lift Pit
Shop
P.D.
Fresh AirDuct
P.D.
P.D.
UPUPDNDN
P.D.
P.D.
Elv.Room
MeterRoom Store
DisableLav.
Fireman’sLift Lobby
19 m
H.R.
H.R.
DN
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
P.D.
Office
MeterRoom AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
Flat Roof(For 22/F Only)
P.D.
Office
MeterRoom
Elv.Room
AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
Elv.Room
Basement G/F 1/F 14/F - 21/F 22/F - 26/F
DisableLav.
F.S. TransferPump Room
Water TransferPump Room
Lift Pit
Shop
Meter Room
P.D.
H.R.
W.M.C.
MaleLav.
FemaleLav.
Fireman’sLift Lobby
H.R.
UP
UPUP
UP
Refuse Storage &Material Recovery
ChambersCaretaker’s Room
P.D.
MeterRoom
F.S. ControlRoom
UP
UP
UP
UP
UP to 2/F
DN
DN
UP DN
ShopStore
Store
CableRiserRoom
GasChamber
H.R.
ATM Service
Elv.RoomP.D.
P.D.
OfficeEntrance
P.D.
H.R.
Fireman’sLift Lobby
H.R.
15 m
N N N N N
Transformer Room
H.V. SwitchRoom
SwitchRoom Lift Pit
Lift Pit
Shop
P.D.
Fresh AirDuct
P.D.
P.D.
UPUPDNDN
P.D.
P.D.
Elv.Room
MeterRoom Store
DisableLav.
Fireman’sLift Lobby
19 m
H.R.
H.R.
DN
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
P.D.
Office
MeterRoom AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
Flat Roof(For 22/F Only)
P.D.
Office
MeterRoom
Elv.Room
AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
Elv.Room
Basement G/F 1/F 14/F - 21/F 22/F - 26/F
DisableLav.
F.S. TransferPump Room
Water TransferPump Room
Lift Pit
Shop
Meter Room
P.D.
H.R.
W.M.C.
MaleLav.
FemaleLav.
Fireman’sLift Lobby
H.R.
UP
UPUP
UP
Refuse Storage &Material Recovery
ChambersCaretaker’s Room
P.D.
MeterRoom
F.S. ControlRoom
UP
UP
UP
UP
UP to 2/F
DN
DN
UP DN
ShopStore
Store
CableRiserRoom
GasChamber
H.R.
ATM Service
Elv.RoomP.D.
P.D.
OfficeEntrance
P.D.
H.R.
Fireman’sLift Lobby
H.R.
15 m
N N N N N
Transformer Room
H.V. SwitchRoom
SwitchRoom Lift Pit
Lift Pit
Shop
P.D.
Fresh AirDuct
P.D.
P.D.
UPUPDNDN
P.D.
P.D.
Elv.Room
MeterRoom Store
DisableLav.
Fireman’sLift Lobby
19 m
H.R.
H.R.
DN
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
P.D.
Office
MeterRoom AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
Flat Roof(For 22/F Only)
P.D.
Office
MeterRoom
Elv.Room
AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
Elv.Room
Basement G/F 1/F 14/F - 21/F 22/F - 26/F
DisableLav.
F.S. TransferPump Room
Water TransferPump Room
Lift Pit
Shop
Meter Room
P.D.
H.R.
W.M.C.
MaleLav.
FemaleLav.
Fireman’sLift Lobby
H.R.
UP
UPUP
UP
Refuse Storage &Material Recovery
ChambersCaretaker’s Room
P.D.
MeterRoom
F.S. ControlRoom
UP
UP
UP
UP
UP to 2/F
DN
DN
UP DN
ShopStore
Store
CableRiserRoom
GasChamber
H.R.
ATM Service
Elv.RoomP.D.
P.D.
OfficeEntrance
P.D.
H.R.
Fireman’sLift Lobby
H.R.
15 m
N N N N N
Transformer Room
H.V. SwitchRoom
SwitchRoom Lift Pit
Lift Pit
Shop
P.D.
Fresh AirDuct
P.D.
P.D.
UPUPDNDN
P.D.
P.D.
Elv.Room
MeterRoom Store
DisableLav.
Fireman’sLift Lobby
19 m
H.R.
H.R.
DN
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
P.D.
Office
MeterRoom AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
Flat Roof(For 22/F Only)
P.D.
Office
MeterRoom
Elv.Room
AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
Elv.Room
Basement G/F 1/F 14/F - 21/F 22/F - 26/F
DisableLav.
F.S. TransferPump Room
Water TransferPump Room
Lift Pit
Shop
Meter Room
P.D.
H.R.
W.M.C.
MaleLav.
FemaleLav.
Fireman’sLift Lobby
H.R.
UP
UPUP
UP
Refuse Storage &Material Recovery
ChambersCaretaker’s Room
P.D.
MeterRoom
F.S. ControlRoom
UP
UP
UP
UP
UP to 2/F
DN
DN
UP DN
ShopStore
Store
CableRiserRoom
GasChamber
H.R.
ATM Service
Elv.RoomP.D.
P.D.
OfficeEntrance
P.D.
H.R.
Fireman’sLift Lobby
H.R.
15 m
N N N N N
Transformer Room
H.V. SwitchRoom
SwitchRoom Lift Pit
Lift Pit
Shop
P.D.
Fresh AirDuct
P.D.
P.D.
UPUPDNDN
P.D.
P.D.
Elv.Room
MeterRoom Store
DisableLav.
Fireman’sLift Lobby
19 m
H.R.
H.R.
DN
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
P.D.
Office
MeterRoom AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
Flat Roof(For 22/F Only)
P.D.
Office
MeterRoom
Elv.Room
AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
Elv.Room
TYPICAL FINISHED FLOOR TO CEILING HEIGHT• Approx. 2.8 m (9 ft 2 in)
clear ceiling height
RAISED FLOOR VOID• Overall height of raised floor in
approx.150 mm (6 in) with approx.100 mm (4 in) clear void
OFFICE FLOOR LOADING• Approx. 3 kPa (62.7 lbs / sq.ft.)
POWER SUPPLY• Average 42 A TPN for each
office floor
AIR CONDITIONING• Variable Air Volume system (VAV)
TENANTS’ STANDBY ELECTRICAL PROVISION• A 700 kVA emergency generator
is provided for tenants’ essentialapplications and equipment
COMPUTER ROOM COOLING• Dedicated 24-hour chilled water
supply with backup generator
TELECOMMUNICATIONS PROVISIONS• Single lead-in• Cable containment for FTNS
operators’ Cat.5 and fibreoptic cabling
LIFTS• Four high speed passenger lifts and
one service lift• Average waiting time less than
25 seconds
CURTAIN WALL• Double-glazed clear insulated glass
unit coated with high performancelow-e coatings
• Curtain wall glass panels withceramic frit at the lower portion /Spandrel at lower portion consist ofinsulation layer
SECURITY• Full security surveillance
control system• Card Key system incorporated with
the passenger lifts for controlling access to each office floor after office hour
TOTAL POWER SUPPLY• 500 A TPN
TOTAL COOLING CAPACITY• 426 kw
PROMINENT SHOP FRONT FACING QUEEN’S ROAD CENTRAL• Approx. 15 m (49 ft 3 in) to 19 m (62 ft 4 in) wide
HIGH FLOOR TO FLOOR CEILING HEIGHT• Approx. 4.4 m (14 ft 5 in)
RETAIL FLOOR LOADING• 5 kPa (104.4 lbs / sq.ft.)
PREMIUM FLAGSHIP RETAIL SPACE• Prestigious address at 12 Queen’s
Road Central• Approx. 21,006 sq.ft. gross of premium
retail space
BASEMENTApprox. 7,507 sq.ft. gross Approx. 8,244 sq.ft. gross Approx. 4,366 sq.ft. lettable per floorApprox. 5,255 sq.ft. gross Approx. 4,236 sq.ft. lettable per floor
*Flat Roof on 22/F only
1ST FLOORGROUND FLOOR 14TH - 21ST FLOOR 22ND - 25TH FLOOR
Retail Specifications Retail Specifications Office Specifications
Efficient Layouts
Queen’s Road Central Queen’s Road Central
N N N
G/F
Basement
1/F Gross Area: 5,255 sq.ft.
Gross Area: 8,244 sq.ft.
Gross Area: 7,507 sq.ft.
2/F SCB (Bank Hall) / Office Lift Lobby
For Lease (Retail)
Wealth Management
Safe Deposit Box
SCB
Mechanical Floor
SCB
SCB
Roof with Building Services
For Lease (Office)Lettable Area: 4,366 sq.ft.
For Lease (Office)Lettable Area: 4,236 sq.ft.
3/F
4/F
5/F
6/F
7/F
8/F
9/F
10/F
11/F
12/F
14/F
15/F
16/F
17/F
18/F
19/F
20/F
21/F
22/F
23/F
24/F
25/F
26/F
27/F
Roof
Section Plan
Duddell Street
Queen’s Road Central
RETAIL RETAIL RETAIL OFFICE OFFICE
Basement G/F 1/F 14/F - 21/F 22/F - 26/F
DisableLav.
F.S. TransferPump Room
Water TransferPump Room
Lift Pit
Shop
Meter Room
P.D.
H.R.
W.M.C.
MaleLav.
FemaleLav.
Fireman’sLift Lobby
H.R.
UP
UPUP
UP
Refuse Storage &Material Recovery
ChambersCaretaker’s Room
P.D.
MeterRoom
F.S. ControlRoom
UP
UP
UP
UP
UP to 2/F
DN
DN
UP DN
ShopStore
Store
CableRiserRoom
GasChamber
H.R.
ATM Service
Elv.RoomP.D.
P.D.
OfficeEntrance
P.D.
H.R.
Fireman’sLift Lobby
H.R.
15 m
N N N N N
Transformer Room
H.V. SwitchRoom
SwitchRoom Lift Pit
Lift Pit
Shop
P.D.
Fresh AirDuct
P.D.
P.D.
UPUPDNDN
P.D.
P.D.
Elv.Room
MeterRoom Store
DisableLav.
Fireman’sLift Lobby
19 m
H.R.
H.R.
DN
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
P.D.
Office
MeterRoom AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
Flat Roof(For 22/F Only)
P.D.
Office
MeterRoom
Elv.Room
AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
Elv.Room
Basement G/F 1/F 14/F - 21/F 22/F - 26/F
DisableLav.
F.S. TransferPump Room
Water TransferPump Room
Lift Pit
Shop
Meter Room
P.D.
H.R.
W.M.C.
MaleLav.
FemaleLav.
Fireman’sLift Lobby
H.R.
UP
UPUP
UP
Refuse Storage &Material Recovery
ChambersCaretaker’s Room
P.D.
MeterRoom
F.S. ControlRoom
UP
UP
UP
UP
UP to 2/F
DN
DN
UP DN
ShopStore
Store
CableRiserRoom
GasChamber
H.R.
ATM Service
Elv.RoomP.D.
P.D.
OfficeEntrance
P.D.
H.R.
Fireman’sLift Lobby
H.R.
15 m
N N N N N
Transformer Room
H.V. SwitchRoom
SwitchRoom Lift Pit
Lift Pit
Shop
P.D.
Fresh AirDuct
P.D.
P.D.
UPUPDNDN
P.D.
P.D.
Elv.Room
MeterRoom Store
DisableLav.
Fireman’sLift Lobby
19 m
H.R.
H.R.
DN
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
P.D.
Office
MeterRoom AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
Flat Roof(For 22/F Only)
P.D.
Office
MeterRoom
Elv.Room
AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
Elv.Room
Basement G/F 1/F 14/F - 21/F 22/F - 26/F
DisableLav.
F.S. TransferPump Room
Water TransferPump Room
Lift Pit
Shop
Meter Room
P.D.
H.R.
W.M.C.
MaleLav.
FemaleLav.
Fireman’sLift Lobby
H.R.
UP
UPUP
UP
Refuse Storage &Material Recovery
ChambersCaretaker’s Room
P.D.
MeterRoom
F.S. ControlRoom
UP
UP
UP
UP
UP to 2/F
DN
DN
UP DN
ShopStore
Store
CableRiserRoom
GasChamber
H.R.
ATM Service
Elv.RoomP.D.
P.D.
OfficeEntrance
P.D.
H.R.
Fireman’sLift Lobby
H.R.
15 m
N N N N N
Transformer Room
H.V. SwitchRoom
SwitchRoom Lift Pit
Lift Pit
Shop
P.D.
Fresh AirDuct
P.D.
P.D.
UPUPDNDN
P.D.
P.D.
Elv.Room
MeterRoom Store
DisableLav.
Fireman’sLift Lobby
19 m
H.R.
H.R.
DN
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
P.D.
Office
MeterRoom AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
Flat Roof(For 22/F Only)
P.D.
Office
MeterRoom
Elv.Room
AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
Elv.Room
Basement G/F 1/F 14/F - 21/F 22/F - 26/F
DisableLav.
F.S. TransferPump Room
Water TransferPump Room
Lift Pit
Shop
Meter Room
P.D.
H.R.
W.M.C.
MaleLav.
FemaleLav.
Fireman’sLift Lobby
H.R.
UP
UPUP
UP
Refuse Storage &Material Recovery
ChambersCaretaker’s Room
P.D.
MeterRoom
F.S. ControlRoom
UP
UP
UP
UP
UP to 2/F
DN
DN
UP DN
ShopStore
Store
CableRiserRoom
GasChamber
H.R.
ATM Service
Elv.RoomP.D.
P.D.
OfficeEntrance
P.D.
H.R.
Fireman’sLift Lobby
H.R.
15 m
N N N N N
Transformer Room
H.V. SwitchRoom
SwitchRoom Lift Pit
Lift Pit
Shop
P.D.
Fresh AirDuct
P.D.
P.D.
UPUPDNDN
P.D.
P.D.
Elv.Room
MeterRoom Store
DisableLav.
Fireman’sLift Lobby
19 m
H.R.
H.R.
DN
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
P.D.
Office
MeterRoom AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
Flat Roof(For 22/F Only)
P.D.
Office
MeterRoom
Elv.Room
AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
Elv.Room
Basement G/F 1/F 14/F - 21/F 22/F - 26/F
DisableLav.
F.S. TransferPump Room
Water TransferPump Room
Lift Pit
Shop
Meter Room
P.D.
H.R.
W.M.C.
MaleLav.
FemaleLav.
Fireman’sLift Lobby
H.R.
UP
UPUP
UP
Refuse Storage &Material Recovery
ChambersCaretaker’s Room
P.D.
MeterRoom
F.S. ControlRoom
UP
UP
UP
UP
UP to 2/F
DN
DN
UP DN
ShopStore
Store
CableRiserRoom
GasChamber
H.R.
ATM Service
Elv.RoomP.D.
P.D.
OfficeEntrance
P.D.
H.R.
Fireman’sLift Lobby
H.R.
15 m
N N N N N
Transformer Room
H.V. SwitchRoom
SwitchRoom Lift Pit
Lift Pit
Shop
P.D.
Fresh AirDuct
P.D.
P.D.
UPUPDNDN
P.D.
P.D.
Elv.Room
MeterRoom Store
DisableLav.
Fireman’sLift Lobby
19 m
H.R.
H.R.
DN
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
P.D.
Office
MeterRoom AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
DisableLav.
MaleLav.
FemaleLav.
H.R.
UP
UP
DN
DN
P.D.
H.R.
Flat Roof(For 22/F Only)
P.D.
Office
MeterRoom
Elv.Room
AHU. Room P.D.
Fireman’sLift Lobby
LiftLobby
Elv.Room
TYPICAL FINISHED FLOOR TO CEILING HEIGHT• Approx. 2.8 m (9 ft 2 in)
clear ceiling height
RAISED FLOOR VOID• Overall height of raised floor in
approx.150 mm (6 in) with approx. 100 mm (4 in) clear void
OFFICE FLOOR LOADING• Approx. 3 kPa (62.7 lbs / sq.ft.)
POWER SUPPLY• Average 42 A TPN for each
office floor
AIR CONDITIONING• Variable Air Volume system (VAV)
TENANTS’ STANDBY ELECTRICAL PROVISION• A 700 kVA emergency generator
is provided for tenants’ essential applications and equipment
COMPUTER ROOM COOLING• Dedicated 24-hour chilled water
supply with backup generator
TELECOMMUNICATIONS PROVISIONS• Single lead-in • Cable containment for FTNS
operators’ Cat.5 and fibre optic cabling
LIFTS• Four high speed passenger lifts and
one service lift• Average waiting time less than
25 seconds
CURTAIN WALL• Double-glazed clear insulated glass
unit coated with high performance low-e coatings
• Curtain wall glass panels with ceramic frit at the lower portion / Spandrel at lower portion consist of insulation layer
SECURITY• Full security surveillance
control system• Card Key system incorporated with
the passenger lifts for controlling access to each office floor after office hour
TOTAL POWER SUPPLY• 500 A TPN
TOTAL COOLING CAPACITY• 426 kw
PROMINENT SHOP FRONT FACING QUEEN’S ROAD CENTRAL• Approx. 15 m (49 ft 3 in) to 19 m (62 ft 4 in) wide
HIGH FLOOR TO FLOOR CEILING HEIGHT• Approx. 4.4 m (14 ft 5 in)
RETAIL FLOOR LOADING• 5 kPa (104.4 lbs / sq.ft.)
PREMIUM FLAGSHIP RETAIL SPACE• Prestigious address at 12 Queen’s
Road Central• Approx. 21,006 sq.ft. gross of premium
retail space