8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
1/16
May2012
1209ColoradoSpringsUtilities
ProcurementAuditReport
O
FFICE
OF
THE
CITY
AUDITO
R
C
O
LO
RADO
SPRIN
GS,
CO
LO
RADO
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
2/16
PurposeThepurposeofthisauditwastoevaluatewhethertheColoradoSprings
Utilitiesprocurementprocessprovidedreasonableassurancethatbest
valuewasobtainedforgoodsandservices,determinecompliancewith
ColoradoSpringsUtilitiespoliciesandprocedures,andreviewtheadequacy
ofinternal
controls.
ManagementResponseManagementwasgenerallyinagreementwithourrecommendations.
Responsescanbefoundintheattachedreport.
O FF ICE O F THE C I TY AUDITOR COLORADO S PR INGS , COLORADO
1209
Colorado
Springs
Utilities
ProcurementAuditMay2012
HighlightsOurauditperiodincludedpurchaseordersandcontractsexecutedfrom
January1throughDecember31, 2010. Weconcludedthatoverall,the
controlsintheprocurementprocessprovidedreasonableassurancethat
bestvaluewasobtainedforgoodsandservices,compliancewithinternal
policiesandprocedureswasachieved,andresourcesweresafeguarded.
ColoradoSpringsUtilitiesissuedapproximately$22.4millioninstandard
purchaseordersin2010andmaintainedapproximately$968millionin
standardcontracts.
Colorado
Springs
Utilities
issued
approximately
$223
millionpurchaseorderreleasesonthesecontracts. Procurementand
ContractServices,whichreportstotheFinancialServicesorganization,had
primaryresponsibilityforprocurementofgoodsandservices. Additionally,
someprocurementdutieswereperformedbyOperationspersonnelin
MaterialsManagement.EnergyServicesnegotiatedandenteredintofuel
contractsonbehalfofColoradoSpringsUtilities.
Ourmethodologyincludeddetailtestingofasampleofvarioustypesof
purchasesandcontractstodeterminecompliancewithpoliciesand
procedures,asfollows:
Reviewedasample
of
Contracts
and
Solicitations
to
ensure
bid
solicitationsfollowedpolicyandselectionofbestvaluewas
documented,(Continued on page 2)
Recommendations1. Contractsandamendments
exceedinggiventermsor
dollaramountsshould
requireapprovalbysenior
managementin
addition
to
theEnergyServicesOfficer.
2. WaterServicespersonnel
shouldreviewtheduties
assignedtotheinventory
specialistintheWater
ServicesDivision.
3. ColoradoSpringsUtilities
shouldreviewaccesslevels
toensurethatdollarlimits
areinaccordancewith
policyandconsistentwith
limitsassignedto
supervisors.
OpportunityforImprovement1. MaterialsManagement
shouldconsiderreinstating
theprocesstotrackvendor
performance. Procurement
andContractServices
shouldconsider
the
cost
benefitoftrackingvendor
performancedataina
standardizedformatfor
considerationinfuture
contractingdecisions.
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
3/16
1209ColoradoSpringsUtilitiesProcurementAudit
May2012
CityCouncilsOfficeoftheCityAuditor
CityHall 107NorthNevadaAvenue Suite200 MailCode1542
ColoradoSpringsCO809011575
Tel7193855991 Fax7193855699 ReportingHotline 7193852387
www.SpringsGov.com/OCA
Reviewedasampleofchangeorderstoensureproper
documentationandapproval,
Reviewedasampleofsolesourcejustificationsforproper
documentationandapproval,and
Testedtodeterminethatgoodsandserviceswererequisitioned
andapprovedinaccordancewithpolicy.
Ourtestingindicatedcompliancewithpoliciesandproceduresin
placerelatedtoprocurement.
Wenoted
that
Energy
Supply
contracts
did
not
require
review
and
approvaloutsidetheEnergyServicesDivision. Additionally,we
notedsegregationofdutiesrisksexistedforprocurementactivities
performedbyStoreroompersonnelintheWaterServicesDivision.
(Highlights continued from page 1)
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
4/16
OFFICEOFTHECITYAUDITORPUBLICREPORT
CityCouncilsOfficeoftheCityAuditor
Date: May9,2012
To: PresidentHenteandPresidentProTemMartin,MembersofCityCouncil
Re: 1209ColoradoSpringsUtilitiesProcurement
WeconductedanauditofColoradoSpringsUtilitiesProcurementaspartofourregularcycleofaudits. Our
auditfocusedontheperiodfromJanuary1,2010throughDecember31,2010.
ThepurposeofthisauditwastoevaluatewhethertheColoradoSpringsUtilitiesprocurementprocess
providedreasonableassurancethatgoodsandserviceswereobtainedatbestvaluefortheorganization
whileadequatelysafeguardingresources. WealsoevaluatedwhetherColoradoSpringsUtilities
compliedwiththeinternalpoliciesandproceduresinplaceforacquiringgoodsandservices.
Weconcludethatoverall,procurementprocessesensure1)goodsandserviceswereacquiredatbest
valuefortheorganization,2)policiesandproceduresinplacewerefollowed,and3)controlswere
adequatetoensuresafeguardingofresources. Wemadethreeobservationsrelatedtosegregationof
dutiesandinternalcontrols. Wehavelistedourrecommendationsrelatedtotheseobservationsinthe
attachedreport.
WewouldliketothankColoradoSpringsUtilitiesProcurementandContractServicesfortheirtimeand
helpincompletingthisaudit.
Asalways,feelfreetocontactmeifyouhaveanyquestions.
Sincerely,
DennyNester,MBA,CPA,CIA,CGFM,CFE,CGAP
CityAuditor
Cc: JerryForte,ColoradoSpringsUtilitiesChiefExecutiveOfficer
GaryBostrom,ChiefWaterServicesOfficer
BillCherrier,ChiefPlanningandFinancialOfficer
Carl
Cruz,
Chief
Customer
and
Corporate
Services
Officer
BruceMcCormick,ChiefEnergyServicesOfficer
LeahAsh,GeneralManager,Distribution,CollectionandTreatment
DedeJones,GeneralManager,FinancialServices
GeorgeLuke,GeneralManager,EnergySupply
MasonParsaye,GeneralManager,EnergyConstruction,OperationsandMaintenance
DawnRoth,GeneralManager,InformationTechnologyServices
CityHall 107NorthNevadaAvenue Suite200 MailCode1542
ColoradoSpringsCO809011575
Tel7193855991 Fax7193855699 ReportingHotline 7193852387
www.SpringsGov.com/OCA
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
5/16
OfficeoftheCityAuditor
PublicReport
Cc(Continued):
MicheleFujimoto,Manager,FuelandMaterials
William
Lopez,
Jr.,
Manager,
Resource
Technology
Services
GregMitchell,Manager,EnergySupportServices
EliNovakovich,Manager,ProcurementandContractServices
DavidMaier,Manager,EnterpriseRiskManagementServices
PatriciaVanMeter,SeniorAnalyst,EnterpriseRiskManagement
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
6/16
OFFICEOFTHECITYAUDITORPUBLICREPORT
ReportDetails................................................................................................................................................................1
Purpose......................................................................................................................................................................1
Scopeandmethodology............................................................................................................................................1
Background................................................................................................................................................................1
Conclusion.................................................................................................................................................................3
Observations,RecommendationsandResponses.........................................................................................................4
Observation1EnergySupplycontractsdidnotrequirereviewandapprovaloutsidetheEnergyServices
Division......................................................................................................................................................................
4
Observation2 SegregationofdutiesrisksexistedintheWaterServicesDivision..................................................5
Observation3Sixemployeeshadhighersystemrequisitionlimitsthantheirsupervisor.....................................7
Opportunityforimprovement.......................................................................................................................................8
Opportunity1Vendorperformancewasnottrackedandreported......................................................................8
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
7/16
ColoradoSpringsUtilities
Procurement
OfficeoftheCityAuditor
REPORT DETAILS
PURPOSE
WeperformedanauditofColoradoSpringsUtilitiesprocurementfunctionaspartofourregularcycle
audits. Thepurposeofthisauditwastoevaluatewhethertheprocurementprocessprovided
reasonableassurancethatbestvaluewasobtainedforgoodsandservices,anddeterminecompliance
withinternalpoliciesandprocedures. Wealsoreviewedtheadequacyofinternalcontrolsover
procurement.
SCOPEANDMETHODOLOGY
Thescopeoftheauditincludedreviewingtheprocessesusedin1)initiatingandapprovingpurchases
andcontracts,
2)
soliciting
bids
and
prices,
and
3)
processing
purchase
orders.
We
assessed
controls
in
placeintheResourceManagementSystem(RMS)aswellassegregationofdutiesrelatedto
procurementwithintheorganization. Ourauditincludedpurchaseordersandcontractsexecutedfrom
January1throughDecember31,2010.
Ourmethodologyincludeddetailtestingofasampleofvarioustypesofpurchasesandcontractsto
determinecompliancewithpoliciesandprocedures. Weobtainedanunderstandingoftheinternal
controlstructurebyreviewingprocurementpoliciesandconductinginterviewswithmanagement. Our
testsincludedreviewsforcompliancewithpolicyandproceduresasfollows:
ReviewedasampleofContractsandPurchaseOrderstoensurebidsolicitationsfollowedpolicyand
selection
of
best
value
bid
or
proposal
to
the
organization
was
properly
documented,
Reviewedasampleofchangeorderstoensureproperdocumentationandapproval, Reviewedasampleofsolesourcejustificationsforproperdocumentationandapproval,and Testedtodeterminethatgoodsandserviceswererequisitionedandapprovedinaccordance
withpolicy.
Ourtestingindicatedcompliancewithpoliciesandproceduresinplacerelatedtoprocurement.
InadditiontoprocurementactivitiesprocessedbytheProcurementandContractServicessection,we
inquiredofColoradoSpringsUtilitiesmanagersthroughouttheorganizationtoidentifyanysignificant
procurementactivities
conducted
by
other
groups
in
the
organization
and
included
these
in
our
scope.
BACKGROUND
TheOfficeoftheCityAuditorpreviouslyperformedanauditofColoradoSpringsUtilitiesprocurement
forthesixmonthsendedJanuary1toJune30,2007,whichwasissuedNovember12,2008. Some
issueshadbeenresolvedwhenweperformedfollowupproceduresin2009. Threerecommendations
Page1of8
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
8/16
ColoradoSpringsUtilities
Procurement
OfficeoftheCityAuditor
weretobeimplementedwhentheprocurementsoftwarewasupgraded. TheCityAuditorsOffice
notedtheserecommendationshadbeenimplementedwhenfollowupwasperformedin2010.
Procurementand
Contract
Services
(PCS),
which
reports
to
the
Financial
Services
organization,
had
primaryresponsibilitytoprocuregoodsandservicesonbehalfofColoradoSpringsUtilities.
Additionally,theMaterialsManagementgroupswithintheEnergyServicesDivisionhadtheauthorityto
procuregoodsandservicesunderstandard(nonblanket)purchaseordersupto$50,000. Storeroom
personnelintheDistribution,CollectionandTreatmentDepartmentwithintheWaterDivisionalsohad
theauthoritytocreateandapprovepurchaseordersforgoodsandservicesupto$50,000.
FuelandMaterialsManagementpersonnelwithintheEnergyServicesDivisionnegotiatedandentered
intoshortandlongtermcontractsforcoalandoilonbehalfoftheorganization. ThePortfolio
ManagementDepartmentwithinEnergyServicesnegotiatedandexecutedcontractsfornaturalgas
suppliesforColoradoSpringsUtilities.
Underpolicyandproceduresinplace,goodsandservicescouldbeobtainedonaonetimebasisorby
issuingareleaseagainstablanketorderforgoodsorservices. Contracttermsweregenerallyforthree
years,withtwooneyearrenewaloptions. Contractsorblanketorderscouldberenewedforan
additionaltermifrequestedbytheColoradoSpringsUtilitiesbusinessunitandapprovedby
ProcurementandContractServices.
Quotationswererequiredforpurchasesover$10,000notcoveredunderblanketpurchaseordersor
contracts. ColoradoSpringsUtilitiespolicyrequiredthattherequestordocumentandobtainapproval
forinstancesinwhichbidsorquotationswouldnotbeobtainedforpurchasesofgoodsorservices,
knownassolesourcepurchases. Accordingtopolicy,solesourcepurchaseswereallowedwhenonly
onesource
for
the
product
or
service
existed,
or
conditions
such
as
abusiness
need
to
standardize
equipment,orwhenreplacementpartswereavailableonlyfromtheoriginalequipmentmanufacturer.
ThesesolesourcepurchasesweresummarizedinamonthlyreporttoColoradoSpringsUtilitiesOfficers.
ColoradoSpringsUtilitiesissuedapproximately$22.4millioninstandardpurchaseordersin2010and
maintainedapproximately$968millioninactivecontracts. CSUissuedcloseto$223millionpurchase
orderreleasesonthesecontracts.
Asstatedinthepurposesectionofthereport,thisauditwasperformedasaregularcycleauditofmajor
businessprocesses. TheCityAuditorsOfficealsoperformsongoingauditsofprocurementactivities
relatedtotheSouthernDeliverySystemConstructionProject. PleaserefertoReport1122SDS Project
Monitoring Reportforprocurement
related
observations,
which
were
not
included
here.
Page2of8
http://www.springsgov.com/units/cityauditor/files/2011/11_22%20SDS%20FINAL%20REPORT.pdfhttp://www.springsgov.com/units/cityauditor/files/2011/11_22%20SDS%20FINAL%20REPORT.pdfhttp://www.springsgov.com/units/cityauditor/files/2011/11_22%20SDS%20FINAL%20REPORT.pdfhttp://www.springsgov.com/units/cityauditor/files/2011/11_22%20SDS%20FINAL%20REPORT.pdf -
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
9/16
ColoradoSpringsUtilities
Procurement
OfficeoftheCityAuditor
CONCLUSION
Weconcludethatoverall, thecontrolsintheprocurementprocessprovided reasonableassurancethat
1)best
value
was
obtained
for
goods
and
services,
2)
compliance
with
internal
policies
and
procedures
wasachieved,and3)resourcesweresafeguarded. However,duringthecourseofouraudit,we
identifiedareaswhereimprovementscouldbemadetofurtherstrengthencontrols. Theseareasare
detailedonthepagesthatfollow.
Page3of8
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
10/16
ColoradoSpringsUtilities
Procurement
OfficeoftheCityAuditor
OBSERVATIONS, RECOMMENDATIONS ANDRESPONSES
OBSERVATION
1
ENERGY
SUPPLY
CONTRACTS
DID
NOT
REQUIRE
REVIEW
AND
APPROVAL
OUTSIDETHEENERGY SERVICESDIVISION
TheFuelandMaterialsManagementDepartmentwithintheEnergyServicesDivisionnegotiatedand
enteredintolongtermcoalcontractsonbehalfofColoradoSpringsUtilities. Duringourauditperiod,
theEnergySupplyGeneralManagerwasauthorizedtoenterintoanycontracthavingatermoftwo
yearsorless. ContractswithtermsovertwoyearscouldbeapprovedbytheEnergyServicesOfficer.
WeunderstandthatmanagementoutsideoftheEnergyServicesDivisionwasawareofsignificant
contractingactivitiesthroughinformalprocesses;however,additionalapprovalsforcontractsexceeding
agivendollaramountortermwerenotrequired. ProcurementandContractServicesdidnot
participatein
the
solicitation
or
negotiation
process
for
long
term
fuel
contracts.
RequiringreviewsandapprovalsofmanagementoutsidetheEnergyServicesDivisionforsignificant
contractsandamendmentswouldhelpensureindependentandobjectiveevaluationthatfullyconsiders
potentialrisksandbenefitstotheorganization.
AUDITORSRECOMMENDATION ContractsandamendmentsexceedingtermsordollaramountstobespecifiedbyColoradoSprings
UtilitiesmanagementshouldrequireapprovalbyseniormanagementinadditiontotheEnergyServices
Officer.
COLORADO SPRINGSUTILITIESRESPONSE
ColoradoSpringsUtilities,specificallyEnterpriseRiskManagementandProcurementandContract
Services,agreeswiththisrecommendation.However,anEnterprisewidepolicyiscurrentlynotinplace
forhighvaluecontracts,whichwouldincludecoalcontracts.Anewpolicyiscurrentlyunder
developmentthatincludesprovisionsrelatingtoauthorizationlevelsandexecutionresponsibilities.This
policyisexpectedtobeapprovedandinplaceduring2012.Untilthenewpolicyisfinalized,wecannot
requireindividualDivisionswithhighvaluecontractstocomplywiththeCityAuditors
recommendation. Intheinterim,theEnergyServicesDivisionwillcontinuetocomplywiththeexisting
RiskManagementPolicy,whichwasdevelopedandapprovedbytheOfficerteam.ColoradoSprings
Utilitiesacknowledgestherisksassociatedwithenergycommoditiespurchases,andtheEnergyServices
Divisionhasdevelopedadditionalpoliciesandprocedurestomitigatesuchrisks.However,providing
additionaltransparencyonlargervaluecontractswillensureobligationspotentiallyimpactingother
areasoftheorganizationareidentifiedandunderstood.
Page4of8
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
11/16
ColoradoSpringsUtilities
Procurement
OfficeoftheCityAuditor
OBSERVATION2 SEGREGATIONOF DUTIES RISKS EXISTED IN THEWATERSERVICES
DIVISION
Segregationof
duties
involves
separating
certain
areas
of
responsibility
and
duties
in
an
effort
to
reduce
thepossibilityoffraudandunintendedmistakes. Managementshouldestablishprocedurestoseparate
dutiesandresponsibilitiesofpersonnelwhocreatepurchaseorders,performareceivingfunctionfor
goodsorservices,andauthorizepayment.
Aspartofouraudit,weexaminedtheprocessesforrequisitioning,ordering,receiving,andprocessing
paymentsforgoodsandservices. Managementshouldbeawarethatthelackofsegregationofduties
increasestheriskthatemployeescouldpurchasegoodsorservicesforpersonaluse.
IntheDistributionandCollectionTreatmentDepartmentwithintheWaterServicesDivision,wenoted
thattheprocurementassociatehadtheabilitytocreateandapprovearequisitionforstockornonstock
goods,create
and
approve
releases
against
blanket
orders,
or
create
and
approve
standard
(non
blanket)purchaseordersupto$50,000,andhadtheabilitytoreceivetheseitemsinthesystemand
issuematerials. Thisemployeecouldperformcyclecounts,butcouldnotmakeinventoryadjustments.
WeunderstandthatstaffislimitedintheWaterServicesDivisionStoreroomandsomesystemaccess
wasassignedtotheProcurementAssociatetoallowbackupintheeventtheMaterialsTechnicianwas
notavailable. However,theemployeehadtheabilitytorequisition,procure,receive,andissue
materialswithoutinvolvementfromasecondperson.
AUDITORSRECOMMENDATION Water
Services
Group
Management
should
review
the
duties
assigned
to
the
procurement
associate
in
theWaterServicesDivision. Segregationofdutieswouldbeimprovedifanotheremployeewas
requiredtoapproverequisitions,approvepurchaseorders,oracknowledgereceiptofgoodsorservices
orderedbytheProcurementAssociateSpecialist. Managementshouldevaluatethenecessityof
allowingtheProcurementAssociatetocreateandapprovestandardpurchaseorders.
COLORADOSPRINGSUTILITIESRESPONSE
ColoradoSpringsUtilitiesagreeswiththisrecommendation.TheobservationsarerelatedtotheLas
VegasWarehousefacilitywhichprovidesstoreroomservicesfortheDistribution,Collectionand
Treatment
Department.
The
following
system
security
authorizations
and
procedures
were
changed
as
ofJanuary12,2012.
1. TheProcurementAssociatecannolongerreceivematerials.ThisauthorizationwasgrantedseveralyearsagotocovertheMaterialsTechniciansdutieswhenoutofoffice.Theprocedural
changewillbetotrainPlannerAnalyststoperformreceivingdutieswhenevertheMaterials
Technicianisoutofofficeforaweekormore.
Page5of8
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
12/16
ColoradoSpringsUtilities
Procurement
OfficeoftheCityAuditor
2. TheProcurementAssociatewillnotbeallowedtoperformcyclecounts;however,thisindividualwillmaketheinventorybalanceadjustments.TheMaterialsTechnicianwillcontinuetoperform
thecyclecounts,butwillnolongermakeinventorybalanceadjustments.
3. TheLasVegasWarehouseProcurementAssociatessecurityauthorizationwithintheMaximosystemforstandardpurchaseordersnowmatchesotherProcurementAssociatesacrossthe
organization.
4. TheLasVegasWarehouseSupervisorsMaximosecurityauthorizationsnowmatchtheotherWarehouseSupervisorsacrosstheorganization.Theproceduralchangewillrequirethatwhen
theWarehouseSupervisorisoutofoffice,theGeneralManageroftheDistribution,Collection
andTreatmentDepartmentwillbethenextresponsibleapproverasneeded.Ifapprovalsare
requiredbytheGeneralManager,itwillrequireasecurityauthorizationchangerequesttothe
Maximosecurityworkgroup.
Page6of8
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
13/16
ColoradoSpringsUtilities
Procurement
OfficeoftheCityAuditor
OBSERVATION3 SI XEMPLOYEES HADHIGHER SYSTEM REQUISITION LIMITSTHAN THEIR
SUPERVISOR
Sixinstanceswerenotedduringourauditinwhichanemployeesmanagerhadlowerrequisitionlimits
thanoneoftheemployeesreportingtothemanager. Thenumberofemployeeswithhigherlimitsthan
theirmanagerhadimprovedsincetheprioraudit,where21instanceswerereported. Requisitions
wouldbesubjecttosupervisoryapproval,regardlessofthemanagersapprovallimits.Althoughthe
numberofinstanceswasnotsignificantincomparisontotheuserpopulation,theseinstancesindicated
thatrequisitionlimitsmaynotbesubjecttoreviewonaregularbasis.
AUDITORSRECOMMENDATION
ColoradoSprings
Utilities
should
put
in
place
areview
of
access
levels
to
ensure
that
requisition
dollar
limitsareinaccordancewithpolicyandareconsistentwithlimitsassignedtosupervisors. Additionally,
ColoradoSpringsUtilitiesshouldensurethatrequisitionlimitsarereviewedforappropriatenessand
consistencywiththesupervisorslimitswhenanemployeechangespositionswithintheorganization.
Thisassurancecouldbeaccomplishedbyaddingrequisitiondollarlimitstostandarddocumentssuchas
checklistscompletedforpositionchanges.
COLORADOSPRINGSUTILITIES RESPONSE
ColoradoSpringsUtilitiesagreeswiththisrecommendation.InformationTechnology(IT)has
implementedaquarterlyreviewprocesstoverifythesystemprocurementlevelsfor
appropriateness.Exceptionreportsdevelopedwillidentifyapprovallimitanomaliesbetweenemployee
andsupervisorlevels.AuthorizedITpersonnelwillmakeanycorrectionsorupdatesneeded,basedon
theestablishedprocurementlimitswhicharedefinedbyposition/role.Thesereportswillbeexecuted
onorbeforethe15thdaypriortothelastdayofeachquarter.InformationTechnologyhasalso
implementedamodificationtothePersonnelActionprocess,whichnowrequiresITpersonnelto
evaluateandmodifytheprocurementlimitsasdefinedbytheemployeesnewrole.ThePersonnel
ActionprocessisacomponentoftheautomatedHumanResourcesnotificationsystemforpersonnel
changes.Occasionallyuniquecircumstancesmayrequireadeviationfromtheestablishedprocurement
limits;however,anoversightprocessisinplacetoaddressthesesituationsasdocumentedinQBD
#12928,
Change
Individual
Purchase
Requisition
or
Release
PO
Limits.
Expected
date
for
completion
is
June30,2012.
Page7of8
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
14/16
ColoradoSpringsUtilities
Procurement
OfficeoftheCityAuditor
OPPORTUNITY FORIMPROVEMENT
OPPORTUNITY
1
VENDOR
PERFORMANCE
WAS
NOT
TRACKED
AND
REPORTED
Asnotedinthebackgroundtothisreport,mostprocurementactivitiesfortheorganizationare
performedbyProcurementandContractServices. TheMaterialsManagementfunctionwithinEnergy
ServicesmaintainsstoreroomsandalsoperformssomeprocurementactivitiesfortheEnergyServices
Division.
MaterialsManagementpreviouslyhadaprocessinplacetocapturevendorperformancedatarelatedto
stockandnonstockitemsfortenvendorsfromwhichthemostpurchasesweremade. Datatracked
includedtimelinessofdelivery,errors,andcustomerserviceissues. Thisdatawasutilizedin
performanceimprovement
discussions
with
vendors.
At
the
time
of
our
review,
Materials
Management
hadnotbeengatheringvendorperformancedataforapproximatelyoneyearduetoapositionvacancy.
VendorperformanceiscurrentlynotdocumentedortrackedonanongoingbasisbytheProcurement
andContractServicesDepartmentwithinColoradoSpringsUtilities. ProcurementandContractServices
enteredanyreportsreceivedofvendorperformanceissuesintoadatabase. However,otherthanthe
MaterialsManagementtrackingnotedabove,theorganizationdidnothaveaprocesstoobtainvendor
performancedatafromendusersinastandardformatforuseinfutureprocurementdecisions.
AUDITORSRECOMMENDATION TheMaterialsManagementgroupwithinEnergyServicesshouldconsiderreinstatingtheprevious
processtotrackvendorperformance. ProcurementandContractServicesshouldconsiderthecost
benefitofobtainingvendorperformancedatainastandardizedformatsothatperformancecanbe
appropriatelyconsideredinfuturecontractingdecisions.
COLORADOSPRINGSUTILITIES RESPONSE
ColoradoSpringsUtilitiespartiallyagreeswiththisrecommendation.ManagementoftheEnergy
Construction,OperationsandMaintenanceDepartment(ECOM)isinagreementwiththeCityAuditor's
recommendationconcerningvendorperformancetracking.ECOM'sMaterialsManagementemployees
willreinstatethepreviousprocesstotrackvendorperformancebeginninginJuly2012.Thisprocesswill
beperformed
on
our
top
eight
to
ten
suppliers
by
the
end
of
2012,
and
repeated
with
each
supplier
severaltimesduring2013. Datathatwillbetrackedandsharedwiththesekeysupplierswillinclude
timelinessofdelivery,errors,customerserviceissues,anddiscussionsconcerninghowtheycanimprove
theirservicesandprocesses. ECOM'sMaterialsManagementwillalsorequestinputfromthese
suppliersonhowColoradoSpringsUtilitiescanimproveourcommunications,forecastingandresponses
totheirquestionsorneeds.
Page8of8
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
15/16
ColoradoSpringsUtilities
Procurement
OfficeoftheCityAuditor
Page9of8
ProcurementandContractServices(PCS)doesnotbelievetherewouldbeabenefitinadoptinganew
processusingastandardizedformatformanagingvendorperformance.Theadministrativeburden
wouldbesignificantforProjectManagers,aswellasContractingAgents.Asacontractingdepartment,
PCSmanagesperformancecontemporaneouslyvianumeroustoolsincluding:curenotices,terminations
(bothforperformanceandforconvenience),suspensions,disqualifications,bidderprequalificationand
lawsuits allofwhichwereusedin2011.Furthermore,vendorpastperformancemaybeconsideredin
thesolicitationprocess. Uniquejobs(workscopes)requiredofvendorsmakesimplestandardization
difficult.Ifresourcesbecomeavailable,PCSwillconsideradoptingaperformancemanagementtoolas
recommendedbytheCityAuditor.
-
8/13/2019 12-09 Colorado Springs Utilities Procurement Audit Report
16/16
AboutourOffice
ThemissionoftheOfficeoftheCityAuditoristoprovideCityCouncilwithanindependent,
objectiveandcomprehensiveauditingprogramforoperationsoftheCity. Ourauditing
programincludes:
Evaluatingtheadequacyoffinancialcontrols,recordsandoperations
Evaluatingtheeffectivenessandefficiencyoforganizationaloperations
ProvidingCouncil,managementandemployeesobjectiveanalysis,appraisals,and
recommendationsforimprovingsystemsandactivities
TheOfficeoftheCityAuditorisresponsibleforauditingthesystemsusedbytheCityof
ColoradoSprings
and
its
enterprises,
including
Colorado
Springs
Utilities
and
Memorial
Health
System. Weperformavarietyofauditsfortheseentities,includingfinancialaudits,
performanceaudits,contractaudits,constructionaudits,andinformationsystemaudits. We
alsoperformfollowuponaperiodicbasistomonitorandensuremanagementactionshave
beeneffectivelyimplemented.
AuthorizationandOrganizationalPlacement
OurauditsareconductedundertheauthorityofChapter1,Article2,Part7oftheColorado
SpringsCityCode,andmorespecificallyparts703,705and706oftheCode. TheOfficeofthe
CityAuditorisstructuredinamannertoprovideorganizationalindependencefromthe
entitiesitaudits. ThisindependenceisaccomplishedbytheCityAuditorbeingappointedby
andreporting
directly
to
the
City
Council.
AuditStandards
TheauditwasconductedinamannerthatmeetsorexceedstheInternationalStandardsfor
theProfessionalPracticeofInternalAuditing,apartoftheProfessionalPracticesFramework
promulgatedbytheInstituteofInternalAuditors,withtheexceptionoftherequirements
understandards1312and1321toobtainanexternalqualityassurancereviewonceeveryfive
years. Wedonotbelievethisnoncomplianceimpactedthequalityofouraudit.
Theauditincludedinterviewswithappropriatepersonnelandincludedsuchtestsofrecords
andothersupportingdocumentationasdeemednecessaryinthecircumstances. We
reviewedthe
internal
control
structure
and
compliance
tests
were
performed.
Sufficient
competentevidentialmatterwasgatheredtosupportourconclusions.
CityHall 107NorthNevadaAvenue Suite200 MailCode1542