11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th...

44
Prof. Narcis Cardona Univ. Politecnica Valencia iTEAM Research Institute 11th Management Committee Meeting Krakow, Poland 23-26 Sept 2014 Cooperative Radio Communications for Green Smart Environments

Transcript of 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th...

Page 1: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014 5th Management Committee & Technical Meeting. Bristol, UK, 24-26 Sept 2012

Prof. Narcis Cardona

Univ. Politecnica Valencia

iTEAM Research Institute

11th Management

Committee Meeting

Krakow, Poland 23-26 Sept 2014

Cooperative Radio Communications for Green Smart Environments

Page 2: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

2. Adoption of the Agenda

Tue 23-Sept-2014

Special Session on "Links on-the-fly Technology for Robust, Efficient

and Smart Communication in Unpredictable Environments“

• Dr Hicham Khalife "RESCUE project general view, goals and

objectives, and current status“

• Prof. Tadashi Matsumoto "Tutorial on backbone theories and

experiments of RESCUE“

• Christian Schneider "Tutorial on OTA and Field Measurement

based performance verification techniques"

Page 3: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

2. Adoption of the Agenda

Wed 24-Sept-2014

PLENARY

1. Opening formalities

2. Adoption of the Agenda

3. Approval of the Minutes of the last MCM

4. Status of the Action a) Non-COST members

b) STSMs

c) Next meetings and activities

d) Final Book status

e) Follow-up

5. Grant Holder Report

6. Invited talks from Dr. Roman Łapszow and Prof. Tad Matsumoto

7. Presentation and discussion of technical documents // WGs sessions

Page 4: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

2. Adoption of the Agenda

Thu 25-Sept-2014

9:00 Special Session in memoriam to Michal Makowiak

(Technical PLENARY)

• Luis Correia. Michal, “who he was” and his activities

• Ramona Rosini, “Channel Modelling Approach and Propagation

Aspects for Out-of-Body Communications”

• Slawomir Ambroziak: TD(14)11015 "Measurement and Analysis

of the Radio Wave Polarisation in Off-Body Communications in

Indoor Environment“

• Alain Sibille: “Statistical aspects pertaining to interactions

between humans and antennas in the context of Wireless

Networks”

• Narcis Cardona: TD(14)11051 “IC1004 Perspective on Future

Wireless Body Scenarios”

11:00

7. (con’t) Presentation and discussion of technical documents // WGs

and TWGs sessions

Page 5: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

2. Adoption of the Agenda

Fri 26-Sept-2014

7. (cont’d) Presentation and discussion of TDs // Working Groups

11:00 PLENARY

8. Reports from Group Chairs

9. Final Book status

Publisher, writing calendar, List of section editors

10. Dissemination and Training activities,

Workshop / TS on Vehicular Comms

11. Liaison rapporteurs to International Bodies and Projects

12. Future meetings

13. Follow-up proposal

14. AOB

End of meeting by 13:00

Page 6: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

3. Approval of the Minutes of the last MCM

Minutes are available under …\\official documents and

after MC approval also under ...\meetings

The PDF file contains hyperlinks to WGs Minutes and

other documents like reports from liaisons rapporteurs,

etc.

--> Approval?

Page 7: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Number of signatories countries: 29

Number of COST country entities (institutes, etc.) currently participating: 133

Number of COST Near Neighbour Countries: 1 (Montenegro)

Number of COST International Partner Countries: 6

Number of non-COST entities (institutes, etc.) currently participating: 16 (+3)*

Number of MC Members: 54 (+ Chair)

Number of registered experts so far: > 600

4. Status of the Action

ESR ~55%

6WG chairs

Female ~16%

2WG chairs

* Samsung Korea, Huawei Technologies, Qualcomm

Page 8: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

4. Status of the Action

Page 9: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

4. Status of the Action

Data provided by COST Office

Page 10: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Progress Report

@ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April 2014:

4. Status of the Action

Among other aspects, it were highlighted

1. The high impact of IC004 scientific dissemination

2. Reaching the Action objectives for the 3rd year (as

for April’14):

3. The positioning of IC1004 in the H2020 future

framework research views (>3800 DLs of WP)

4. The high percentage of Industry participation

http://www.ic1004.org/cgi-bin/awstats.pl

Page 11: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Current Non-COST Members (16 + 3):

4. Status of the Action

No longer possible to include new non-COST participants officially (entered the last year term of the Action)

Samsung Korea Accepted to attend and participate to technical meetings

Qualcomm (contributing to this meeting) intends to participate to the end of the Action APPROVE from MC ?

Huawei intended to participate to Dublin and Valencia

Page 12: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

CALL for STSMs

Period: 17th November – 28th February

Application Deadline: (6 weeks prior to the STSM start)

Procedure

applicant fulfill form at eCOST tool:

https://e-services.cost.eu/stsm

and sends it to Chairman and Host Institution

Evaluation

•Applications will be evaluated by Evaluation Panel

including at least three among all WGs Chairs.

Guidelines @ www.cost.eu

4. Status of the Action

Page 13: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

12th MCM

28-30 Jan 2015, Dublin

Local Organiser: Connor Brennan

+ Training Workshop on Vehicular Communications (26-27-Jan)

Final Meeting & Workshop

(tentative dates) 5-8 May 2015, Valencia

Local Organiser: Narcis Cardona

Future meetings and workshops

4. Status of the Action

Page 14: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Final Meeting & Workshop

(tentative dates) 5-8 May 2015, Valencia

Local Organiser: Narcis Cardona

Future meetings and workshops

4. Status of the Action

VTC- Glasgow, 11-14

3GPP RAN4 Japan 25-29

EuCAP Lisbon, 12-17 April

European Wireless, Budapest 20-22

URSI AT-RASC, Gran Canaria 18-22

Page 15: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Who

Today Ghent Editor Launch process, approve calendar

5-Feb-2014 Ferrara MC

Selection of topics, ToC proposal (Chapters) Appoint Chapter editors Approval of EB, ToC and CE

CE Definition sections and SE

E Contact Publishers

EB

EB

TD to chapters map

Definition of edition Guidelines Subjected to publisher

May-14 Aalborg MC

CE

Approval of ToC+sections + TD to Chapters map

Identify Section Editors

E

E

CE

Send proposal to publishers

Circulate Edition guidelines

TDs to Sections map

All/SE Start contributions

Sep-26 11th MCM MC

TD sections mapping, review status

Approve publisher

OCT-14 EB Editorial Board Meeting

Approve TDs mapping,

Edition Guidelines.

Jan-15 All First Draft ready, Request for comments

Feb-15 12th MCM MC Approval First draft

Final Book. Calendar

4. Status of the Action

Page 16: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Reminder on Travel and Reimbursement issues

NEW Procedure @ eCOST

COST Office has introduced a Strong Authentication feature in e-COST, enabling Online

Travel Reimbursement Request (OTRR) forms to be submitted fully online. The new

feature is based on the release of 'One Time Passwords' similar to those used by some e-

banking systems.

The Online Travel Reimbursement Request (OTRR) allows each participant to directly

encode into e-COST the expenses incurred in relation to the attendance of COST Action

meetings, as well as to submit the supporting documents linked to the request, by

scanning them and attaching them to the Online Travel Reimbursement Request (OTRR).

=> no need to hand the form over during the MC meeting or send the hard copy by post

The OTRR is to be submitted only after the meeting took place. After the participant has

encoded the relevant expenses and uploaded the supporting documents, the participant will

be able to authenticate him/herself by providing the InWebo password, and submit the claim.

4. Status of the Action. Reimbursement

Page 17: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Travel and Reimbursement issues

NEW Procedure @ eCOST

The steps to be performed in order to submit your travel reimbursement request :

Before the meeting

Step 1, the participant is asked to accept or decline the invitation received by email (the

usual e-cost invitation email)

Before or after the meeting

Step 2, the participant can start to fill in the claim

Step 3, the participant can encode the expenses

Only after the meeting

Step 4, the participant is asked to select a bank account

Step 5, the participant can submit the claim

AP Upload your docs and submit claim by 15th October

4. Status of the Action. Reimbursement

Page 18: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

ATTENDANCE LISTS:

Please sign the

GENERAL ATTENDANCE LIST PER DAY

(including Tuesday if you attended the afternoon session)

&

ONE attendance list for

EVERY WG/SWG/TWG you attend

Page 19: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

5. Report from Grant Holder

Type of expenditure Proposed Details

1. Meetings and WS 122.300,00

EuCNC 2014 Workshops

Krakow MCM

Vehicular Com. Workshop

Dublin MCM

Valencia Final Meeting &WS

2. STSMs 10.000,00 8 to 10 STSMs

3. Training schools 24.600,00 2 TSs, possibly joint

Grants for 20 to 30 trainees each

Average 8 speakers per TS

4. Dissemination/ Publicat.s 1.500,00 Web page (&server)

maintenance

5. Others 730,43 Bank fees, post, etc.

Secretariat - 15% of sum(1:6) 23.869,57

TOTAL 183.000,00

BUDGET for 4th year term

Page 20: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

WG 1 2, 9, 22, 24, 25, 28, 29, 30, 47, 50, 52, 54, 56, 61,

65

(15)

WG 2 34, 38, 39, 45, 57 (5)

WG 3 6, 10, 18, 21, 23, 26, 27, 36, 49 (9)

SWG 1.1 42, 43, 44, 48 (4)

SWG 1.2 (0)

SWG 2.1 4, 19, 41 (3)

TWG-B 1, 8, 15, 40, 51, 53, 55, 60, 64 (9)

TWG-V 7, 11, 12, 13, 16, 17, 46, 58 (8)

TWG-U 5, 53 (2)

TWG-i 14, 20, 31, 32, 37, 59, 63, 66 (8)

TWG-O 3, 35 (2)

withdrawn 62 (1)

TDs

allocation

to WGs

6. Presentation and Discussion of

Technical Documents

Page 21: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

WGs sessions Schedule

6. Presentation and Discussion of

Technical Documents

Wed 24th TD# sum Thu 25th TD# sum Fri 26th TD# sum ROOM

9:00 9:00 9:00 WG1 + 1.2 DISC (book) A

TWG-B 1, 60 (in-body) +DISC 2 B

TWG-O +1.1 3,35 DISC 2 C

10:45 10:45 10:30

11:00 11:00 WG1 2, 25, 29, 30 4 11:00

11:40 WG1 22, 61 2 TWG-V 11, 16, 58 (system)+DISC 3

WG2 38, 39 2

12:30 WG3 26,27 2 12:30

13:00

13:30 WG1 52, 24, 50, 65, 9 5 13:30 TWG-i 63, 31, 32, 66 (mm) +DISC 4

WG2 34, 45, 57 +DISC 3 TWG-B 8, 40, 53, 55, 64 (on-Body) 5 End of meeting

WG3 6,10,23,49,21 5 TWG-U 5, 33+DISC 2

15:30 15:30

16:00 WG1 47, 54, 56, 28 4 16:00 SWG 1.1 42,43,44,48 4

SWG2.1 4, 19, 41 3 TWG-V 7, 12, 13, 46, 17 (channel) 5

WG3 18, 36+DISC 2 TWG-i 14, 20, 37, 59 (loc) 4

17:30 17:30

scheduled 28 scheduled 33

17:45 17:45

MC PLENARY

Lunch

Editorial Board social event departure

Coffee

COST IC1004. 11th MCM and Technical Meeting

Opening, MC PLENARY

+Invited Talk (Dr. Lapszow)

Special Session on Body Area

Communications dedicated to Michal

Mackowiak

TDs: 51, 15 + invited 2

Coffee Coffee

Invited Talk (Prof. Matsumoto)

Lunch Lunch

Page 22: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

TOPICS TO DISCUSS during WG sessions

• Book

• Mapping of new TDs

• Final list of Sections/Editors

• Detailed list of contents

• Activities for the 4th year term:

• Training schools, tutorials budget available

• STSMs, room for 5-6

• Special sessions, conferences,… any new offer?: report

to (or email) Narcis during the meeting

• Follow-up topics

6. Presentation and Discussion of

Technical Documents

Page 23: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

...MC Plenary continues on Friday at 11:00

Attendance lists from WGs/SWGs/SIGs:

Have you signed the

GENERAL ATTENDANCE LIST?

No signature, no reimbursement…

Page 24: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Plenary session

Resume at

11:15

Attendance lists from WGs/SWGs/SIGs:

Did you sign the general attendance list for

the days you have attended?

No signature, no reimbursement…

Page 25: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

MCM PLENARY, 2nd part

8. Reports from Group Chairs

9. Final Book status

Publisher, writing calendar, List of section editors

10. Dissemination and Training activities,

Workshop / TS on Vehicular Comms

11. Liaison rapporteurs to International Bodies and Projects

12. Future meetings

13. Follow-up proposal

14. AOB

End of meeting by 13:00

Lunch

Page 26: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

•Disciplinary Working Groups:

• WG1: Claude Oestges, U.C.L. (BE)

• SWG1.1: Buon Kiong Lau (SE)

• SWG1.2: Tommi Jämsä

• WG2: Alister Burr, U.York (UK)

• SWG2.1: Jan Sykora (CZ)

• WG3: Silvia Ruiz, U.P.C. (ES)

•Topical Working Groups Coordinator:

• TWGC: Alain Sibille, Telecom ParisTech (FR)

8. Reports from WG Chairs

Page 27: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

• Vehicular Environment, TWG-V

Levent Ekiz (DE), Erik Strom (SE)

• Body Environment, TWG-B

Raffaele D’Errico (FR), Kamya Yazdandoost (JP)

• Urban Environment, TWG-U

Sana Salous (UK), Denis Rose (DE)

• Indoor Environment, TWG-I

Pawel Kulakowski (PL), Klaus Vitrisal (AT)

• MIMO-OTA Testing, TGW-O

Gert Pedersen (DK), Wim Kotterman (DE)

8. Reports from WG Chairs

Page 28: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Who

Today Ghent Editor Launch process, approve calendar

5-Feb-2014 Ferrara MC

Selection of topics, ToC proposal (Chapters) Appoint Chapter editors Approval of EB, ToC and CE

CE Definition sections and SE

E Contact Publishers

EB

EB

TD to chapters map

Definition of edition Guidelines Subjected to publisher

May-14 Aalborg MC

CE

Approval of ToC+sections + TD to Chapters map

Identify Section Editors

E

E

CE

Send proposal to publishers

Circulate Edition guidelines

TDs to Sections map

All/SE Start contributions

Sep-26 11th MCM MC TD sections mapping, section editors, review status

OCT-14 EB

Approve TDs mapping,

Edition Guidelines

Approve publisher

Launch writing

Jan-15 All First Draft ready, Request for comments

Feb-28 MC Approval First draft

9. Final Book.

Page 29: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

9. Final Book.

• Publisher

• Narcis contacted Editors: Springer, Academic Press, Cambridge Univ.

Press, Elsevier, CRC and Wiley.

• Every publisher offers free copies and electronic version of the book, so

printed+eBook edition is assumed for any publisher we select. Selection

of publisher during Aalborg meeting if there is sufficient information.

• COST Office provides a separate budget for the book, upon application

from the Action. Chairman to apply by 30th November.

• Editorial Board meeting by 20th OCT • Approve TDs mapping,

• Edition Guidelines

• Approve publisher

• Launch writing

Page 30: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

9. Final Book. ToC

COST IC1004 FINAL BOOK Table of Contents 1. Intro- Scenarios, environments, evolution (Narcis)

2. Urban Radio Access Networks (S.Salous)

Introduction (Sana Salous)

Radio propagation in urban scenarios

Radio Propagation measurement (G. Dahman)

Ray optical models (A. Navarro)

Urban reference scenarios

Hannover scenario (D. Rose)

Simulator for urban environments (T. Werthann)

Conclusion (Sana Salous)

3. Indoor Wireless Communications Systems (K. Haneda )

Introduction (Katsu Haneda)

Indoor Channel Modeling (more specific title?) (Enrico Vittuci)

Indoor Radio Link Analysis and Field Tests (W. Joseph?)

Techniques and models for indoor localization (P. Kulakowski, K.Witrisal)

Millimeter-wave radios: measurements, modelling and applications (J.M. Molina, K.Gustavsson)

4. Vehicular Communications Environments (L.Ekiz)

Intoduction (L.Ekiz)

Radio Channel Measurement, Characterization, and Modeling

Antennas for vehicular communications

Communication Systems

Summary and Outlook

Page 31: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Newsletter

Editor: Prof. Alain Sibille

Welcome to distribute the link among your professional contacts:

http://www.ic1004.org/index.php?page=newsletter

10. Dissemination and Training activities

Page 32: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

• Training Workshop:

“Methods and Metrics for Measuring Vehicular Communication

Performance”

Venue: Dublin (Co-located with 12th MCM)

Dates: 1 ½ days 26-27 JAN 2015

Organisers: Levent Ekiz, Erik Strom.

Attendees: about 45 (20 ESR & students)

http://www.ic1004.org/training-schools

IC1004 support: Trainers travel costs, 20 grants for PhD and ESRs,

organisational support

10. Dissemination and Training activities; TSs

Page 33: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Training Workshop

Tentative title: Methods and Performance Metrics for Assessing Vehicular Communication Systems • To be held in conjunction with MCM in Dublin, tentative dates for

workshop: Jan. 26 (half day) until Jan. 27 (full day) • Objective: to explore the pros and cons of different options for assessing

performance of V2X communication, with emphasis on antenna systems

• Scope: cellular, Wi-Fi, and 802.11p (ITS-G5) are in scope.

• After attending the training school the attendees should be able to make an informed choice on what methods and metrics are preferable for the application at hand.

• Potentially, the outcome would be published as a white paper

10. Dissemination and Training activities; TSs

Page 34: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

10. Dissemination and Training activities

Page 35: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

10. Dissemination and Training activities

Page 36: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

10. Dissemination and Training activities

Page 37: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

0

10. Dissemination and Training activities

Page 38: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

+About 50 conferences/courses/events with COST participants

involved in organisation; announced at (www.ic1004.org)

...all under www.ic1004.org//announcements

Any offer for Workshop, Special Session,

Training School, Tutorial, … is welcome at any

time during the Action

[email protected]

10. Dissemination and Training activities

Page 39: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

• Buon Kiong Lau , COST VISTA

• Sana Salous, Vice-Chair of URSI C

• Istvan Szini, CTIA

• Moray Rumney, 3GPP RAN4

• Fernando Velez, COST IC905, COST TERRA

• Haibin Zhang, GreenTouch

• Alister Burr, FP7 Diwine

• Alain Sibille, FP7 Lexnet

• Tommi Jämsä, Narcis Cardona, FP7 METIS

• Roberto Verdone, Newcom#, EurACON

• …

• Others?

11. Liaisons to other Bodies/Projects

Rapporteurs are kindly asked to report at

plenaries and to send a short written report.

Please send your reports to Secretary

by OCT 30th

Page 40: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Training Workshop on Vehicular Communications

26-27 Jan 2015, Dublin (co-located with 12th MCM)

12th MCM

28-30 Jan 2015, Dublin

Local Organiser: Connor Brennan

Training School on Cooperative Radio Access Networks

April 2015, Luxembourg

Organisers: Simon Chazinotas, Sikvia Ruia

Final meeting & Workshop

5-8 May 2015, Valencia

Local Organiser: Narcis Cardona

12. Future meetings and workshops

Page 41: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Any other business?

AoB

Page 42: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

AP WHAT WHO WHOM WHEN

11.1 Complete

reimbursement

procedure on-line

Those entitled to

(MC members+

substitutes)

eCOST 15-OCT

11.2 Send Minutes of

Group Meetings

Group Chairs Chair 30-OCT

11.3 Liaisons: send

reports

Rapporteurs Secretary 30-OCT

11.4 Send STSM Applic. Those interested eCOST

+Chair

Open (6

weeks

advance)

Action Points

Action Points after 11th MCM:

Page 43: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

Action Points after 11th MCM:

AP WHAT WHO WHOM WHEN

11.5 Register to 12th

MCM

attendees website 12-Jan

11.6 Request TD number authors website 12-Jan

11.7 Entitle substitutions MC Secretary 12-Jan

11.8 Submit full TD Authors after after

11.5+11.6

website 19-Jan

11.9 Book flights for

Dublin meeting

attendees - ASAP

Action Points

Page 44: 11th Management Committee Meeting Krakow, Polandic1004.org/uploads/Meetings/XI MC - Krakow/11th MCM... · @ Annual Progress Conference of the ICT Domain, Kosice (Slovakia) 23-24 April

11th Management Committee Meeting. Krakow (Poland), 24-26 September 2014

THANK YOU ! See you in Dublin,

Jan 28-30

Cooperative Radio Communications for Green Smart Environments