11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909
Transcript of 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909
7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 1/9
M
WorleyParsons
€rsNomicS
resources &
energy
KUWAIT OIL
COMPANY
1 1
C8972-00-|C-SPC-1
909 Rev 0
22,
June2012
LOWER
FARS
HEAVY OIL
DEVELOPMENT
FEED
WorleyParsons Canada Services Ltd.
Calgary
Division
Heavy Oil Business
Unit
54o
-
12'
Avenue SW
Calgary,
Alberta
T2R
OH4
Telephone;
(403)
508-5300
Facsimile:
(403)508-5301
www.worleyparsons.com
ABN
61 001 279812
@
Copyrlght
2010
WorleyParsons
:ffi
Addendum
To
KOG
Specification
lnstrumentation
For
Packaged Equipment
(015-JH-î909)
,/'
7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 2/9
M
WorleyParsons
frcnNomicS
resources
&.energy
KUWAITOIL GOMPANY
LOWER
FARS HEAVY
OIL DEVELOPMENT
ADDENÐUM
TO KOC
SPEC¡F¡CATION
TNSTRUMENTATION
FOR
PACKAGED
EQUIPMENT
(01
5-JH-1
909)
SYNOPSIS
This
document
presents
the
Addendum
to KOC Specification,
lnstrumentation For
Packaged
Equipment
(015-JH-1909) for
the
Kuwait
Oil
Company
Lower Fars
Heavy
Oil Development
Feed Project.
Disclaimer
This
document
is
conceptual
in nature
and
represents the
work
of
WorleyParsons
pertormed
to recognized
engineering
principtes
and
practices
appropriate
for
conceptual
engineering
work
and
the
terms
of reference
provided
by
WorleyParsons' contractual
Customer, Kuwait
Oil Company
(the'Customer').
Thís
document
may
not be
relied
upon for detailed implementation
or any
other
purpose
not specifically
identified
within
this
document.
This
document
is confidential
and
prepared
solely for
the use
of
the
Customer. The
contents
of this
document
may
not
be
used or
retied upon by
any
party
other than
the
Customer,
and
neither WorleyParsons,
ifs
sub
consultants
nor their
respective employees
assurne
any liability
for
any
reason,
including, but
not
timited to,
negligence, to any other
party
for
any information
or
representatìon
herein.
The extent of any
wananty or
guarantee
of this
documant
or the
information contained therein
in favour
of
the
Customer
is
timited
to the
warranty or
guarantee,
if any,
contained
in
the contract
between
the
Customer
and
WorleyParsons.
DOC.
NO.11
909 Rev
0
Addendum
to
JH-1909.doc
ffi
REV DESCRIFTION
11C8972-00-|C-SPG1909
Rev 0
Addsdum
io
JH-'1909.doc
c06123t2012
ORIGINATOR
REVIEW
WORLEYPARSONS
APPROVAL
CLIENT
OATE
APPROVAL
DATE
A
B
Pago
2 of
9
Jå i J,o--
ecr rê¡l lôr lnfoimâliôn
JnÐn12
G.
Ellaschuk
/.
-
Sêrcmlth
qc[êd fôr Ann6vC
.lù1 10
2(n2
Þrrmêll
D
Pumâll
. Ellaschuk. Sêxsmlth
ssu6d for Rsvlôw
MA
h2Ê
20Jt
lq<,rÂd fôr
en¡'arl
(ìhtrl
rb3
tvl
.
Tallsr
Sâxsñ¡lh
ù
7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 3/9
WorleyParsons
resources & energy
KUWAIT OIL
COMPANY
LOWER
FARS
HEAVY OIL
DEVELOPMENT
ADDENDUM
TO
KOC SPECIFICATION
ffic*NomicS
TNSTRUMENTATION
FOR
PACKAGEÐ
EQUIPMENT
(01
5-JH-1909)
This addendum
shall apply to
KOC
Specification
lnstrumentation of
Packaged
Equipment
(015-JHre0e):
Section
1.0
-
SCOPE
Sectlon
1.3:
¡
Renumber
the third
paragraph
as
1.3
Section
2.0
-
STANDARD
SPEGIFICATIONS
Sub-Section 2.2.1:
r
Change 2.2.1
to
2.'l.1
¡
Delete the
following
references
to the
superseded
KOC specifications:
015-AH-1001
Basic Design
Criteria
015-AH-1002
lnternationalCodes
and Standards
015-JH-1901
lnstrument
Engineering
Basic Data
015-JH-1902
lnstrument
Ðesign
015-JH-1905
Emergency
Shutdown
Panel
015-JH-1904
Distributed
ControlSystems
015-JH-1906
Fire and Gas
Panol
015-JH-1907
Motor-Operated
Valves
015-JH-1908
lnstrument
lnstallation
015-JH-1912
lnstrument
Cables
015-KH-1902
Spare
Parts
and Maintenance
Requirements
015-NH-1104
Plant Equipment
Noise Control
015-UH-1001
Packing,
Marking and
Documentation
015-XH-1005
Shop and
Field Painting
015-YH-1001
Fire and
Gas
Detection Equipment
1
1CSS72{0jC-SPC-1909
R€v
0 Add€ndum
to
JH-1909.doc
Pag€ 3
of
I
*
t-
.v
o
z
06t2312012
r/¿
7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 4/9
M
WorleyParsons
resources
energy
KUWAIT
OIL
COMPANY
LOWER FARS HEAVY
OIL DEVELOPMENT
ADDENDUM TO
KOC SPECIFICATION
ËesNomicS
INSTRUMENTATION
FOR PACKAGED
EQUIPMENT
(O
15-JH-1909)
Add the
following references
to
the updated
KOC standards:
KOC-|-001
KOC Standard
for lnstrumentation
and
Control System
Design
KOC-|-002
KOC Standard
for
lnstrument
lnstallation
KOC-I-005
KOC Recommended Practise
for
Fire
and Gas System
Panels
KOC-¡-004
KOC Standard
for
Shutdown
Systems
KOC-I-010
KOC
Standard
for
Control
and Shutdown
Valves
KOC-|-O11
KOC Standard
for
lnstrument Cables
KOC-|-O17
KOC-I-O17
KOG
Recommended
Practicefor
lmplementation
of Safety
lnstrumented
Functions
KOC-G-004
KOC
Standard
for
Packing,
Marking
and
Documentation
KOC-G-007
KOC Standard
for
Basic Design
Data
KOC-G-009
KOC Standard
for Spare
Parts and
Maintenance
Data
KOC-G-012
KOC Standard
for
Plant Equipment
ldentification,
Nameplates
and Pipeline
Markers
KOC-P-001
KOC
Standard
for
Painting and Coating
of
External
MetalSurfaces
KOC-L-006
KOC Standard
for
Fire
and Gas Detection
Equipment
KOC-L-030
KOC Standard
for Plant and
Equipment
Noise Control
KOC-E-O13
KOC
Standard
for Motor
Operated
Valve
Actuators
Add
the
following
project
specifications:
11C8972-'10-IC-SPC-001
ControlSystemSpecification
11C8972-00-|C-SPC-0001
Project Specific
Criteria to
KOC Standard
for
I nstrumentation
and Co
ntrol
System
Design
(KOC-|-001
)
11C8972-00-|C-SPC-0004
Project Specific
Criteria to KOC
Standard
for
Shutdown
Systems
(KOC-l-004)
'11C8972-00-|C-SPC.1g09
Rev 0
Addendum lo
JHl909.doc
Pago
4
ot
9
a
a
c08t2u2012
8a3s
rft
7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 5/9
M
llUorleyParsons
ücçNomicS
m
esources & energy
KUWAIT
OIL COMPANY
LOWER
FARS
HEAVY OIL DEVELOPMENT
ADDENDUM
TO
KOC SPEC¡FICATION
TNSTRUMENTATION
FOR
PAC
KAGED
EQUIPMENT
(0
r
5-JH-1 909)
1 1 C897
2-00-rC-S
PC-00
1
0
1 1
C8972-00-lC-SPC-001
1
1
1
C8972-00-¡C-SPC-1
903
I 1 C8972-00-IC-SPC-1
91
1
1 1 C8972-00-EL-SPC-001
9
Project Specific
Criteria to
KOC
Standard
for Control
and Shutdown
Valves
(KOC-I-O10)
Project
Specific Criteria
to
KOC Standard
for lnstrument
Cables
(KOC-I-011)
Addendum to KOC Specification for General lnstruments
(015.JH-1903)
Addendum
to
KOC Specification
for Standard
Auxiliary
Control
Room Cabinets
(015-JH-191
1)
Project
Specifíc
Criteria to
KOC Standard
for Motor
Operated
Valve Actuators
(KOC-E-O1
3)
Section
2.2:
Revíse to:
A non-inclusive
list of
applicable codes
and standards
is
to be
found
in
the
Engineering
Group
Specification
entitled
KOC
Standard
for
lnstrumentation
and
Control System
Design
(KOC-|-OO1).
Sectlon
2.5:
o
Add a new
item:
ln any document
where
reference
is made to a
KOC specification
or standard,
then the
reference automatically
includes the
content
of
the
respective
addendum
or
project
specific
criteria
for that specification
or standard.
Sectign
3.0
-
SERVICE
GONDITIONS
Section 3.2:
Revise
to:
lnstrument
systems
shall
in all
respects be
suitable for continuous
operation
in
the service
conditions stated
in
the
Engineering
Group
Specification
entitled
KOC
Standard
for
Basic
Design
Data
(KOC-G-007).
I
1
C807240lC.SPC-1909
Rov 0
Add€rìdum
to
JH-1
909.doo
c
0612312012
Page
5 of
I
a
a
*
z
tr
o
ú
(,
r/t
7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 6/9
WorleyParsons
resources
& energy
ficoNomicS
ffi
KUWAIT
OIL
COMPANY
LOWER
FARS
HEAVY
OIL DEVELOPMENT
ADDENDUM
TO
KOC
SPECIF¡CATION
r
NSTRUMENTATION
FOR
PACKAGED EQUIPMENT
(01
5.rH-l
909)
Section
4.0
-
BASIC
ENGINEERING
REQUIREMEIIITS
Sub-Section
4.1.4:
Section
4.2:
o
Replace
DCS'and
SSLS
with PCS'throughout
this
section
Sub-Section
4.2.1:
Sub-Section
4.2.2:
Sub-Section
4.2.4:
Add
Section 4.1.4 and
the following
statement:
All material and equipment shall be new and certified as such. lnstrumentation and control
system shall
be
fully
assembled,
píped
and wired.
lnstruments that
require
field installation
and items
that were
removed and
shipped
loose
shall
be
identified
on the drawings,
packing
lists,
and on the item
itself.
Revise the
first
paragraph
as
follows:
Whenever
practical,
KOC requires
the
Process Control System
(PCS)
to carry
out
Start-Up/Shut-Down
functions
(other
than safety
functions), analogue
control,
status and
alarm
displays.
a
Change:
Engineering
Group
Specification entitled
lnstrument
Design
(Number
015.1H-1902)
to
KOC
Standard
for
lnstrumentation
and Control
System
Design
(KOC-I'001).
a
Item
b) Replace:
Emergency Shutdown
Panel
(Number
015-JH-1905)
with
KOC
Standard
for Shutdown
Systems
(KOC-l-004I'.
Add
the
following
sentences:
A
redundant network
connection
to the
PCS shall be
provided.
Protocol must
be specified
and
approved
by KOC. Selected
shall
preserve
order of
incident time stamping.
Psgo
6 ot
I
a
1 1
C8972-00-|C-SPC-1909
Rev 0
Addendum
to
JH-1909.doc
c0612u2012
z
*
o
ú
,f
Ct
rft
7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 7/9
M
WorleyParsons
6cnNomicS
resources
&
energy
KUWAIT OIL COMPANY
LOWER
FARS HEAVY OIL
DEVELOPMENT
ADDENDUM
TO
KOC
SPECIFICATION
INSTRUMENTATION
FOR
PACKAGED
EQUIPMENT
(01
5.JH.1
909)
Programming,
configuration,
programming
tool, software
and licenses shall
be
provided.
All
packaged
equipment
safety
loops must
meet SIL
requirements and be
in
compliance
with
KOC Recommended Practice
for
lmplementation
of Safety
lnstrumented
Functions
(srF)
(Koc-r-017)'.
lnputs
to shutdown
system shall be
from analogue
transmitters.
Sub-Section
4.2.5:
r
ltem a)
Add the following
sentences:
A network
connection shall
be
provided.
Protocol
must be specified
and
approved
by KOC.
Programming, configuration,
programming
tool, software and
licenses shall be
provided.
Sub-Section
4.3.1:
.
Add the
following sentence:
All
on-skid
inslrumentation
shall be
provided
in
accordance
with KOC Standards
and
Specifications
KOC-I-001,
KOC-I-002,
KOC-I-011,
01
5-JH-1903.
All
on-skid controlvalves
shall be
provided
in accordance
with KOC
standard
KOC
Standard
for Control and
Shutdown
Valves
(KOC-I-O10) .
All instrument and control
valve
process
conneclions shall conform
to the
piping
specification.
Section
5.0
-
CONSTRUGTION
REQUIREMENTS
Section 5.2:
Replace with:
The
tag numbering
system
for
the
package
will be
dictated by the
project.
All instruments
on the
package
P&lD shall be allocated
a tag
number
in
accordance
with
the
same
procedure
used
for the
main facility.
ffi
a
74
Psgo
7
of
I
*
z
R
11c8972{0lc-sPcr909
Rev
0 Add€ndum
to
JH{909.doc
cút23t2012
d¿
7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 8/9
WorleyParsons
€rnNomicS
resources & energy
KUWAITOIL COMPANY
LOWER
FARS
HEAVY
OIL DEVELOPMENT
AODENDUM
TO
KOC
SPECIFICATION
TNSTRUMENTATION
FOR
PACKAGED
EQUIPMENT
(01
5-JH-1 909)
Sub-Sectlon
5.3.2:
Sub-Sectlon
5.3.3:
Sectlon 5.5:
Sub-Section
5.5.2:
Section
6.0
-
PERFORMANGE
REQUIREMENTS
Sub-Section
6.3.3:
a
Replace:
lnstrument
lnstallation
(Number
015-JH-1908)
with KOC
Standard for
lnstrument
lnstallatíon
(KOC-l-002)
a
Replace:
lnstrument lnstallation
(Number
015-JH-1908)
with
KOC
Standard
for lnstrument
lnstallation
(KOC-l-002)'
1 ltem
(a)
Replace:
lnstrument
lnstallation
(Number
015-JH-1908)
with'KOC
Standard
for lnstrument
lnstallation
(KOC-l-002)
a
Item
(d)
Rewrite:
The
Contractor
shall
provide plant
equipment
identification
for
each
instrument as
per
KOC
Standard for Plant
Equipment ldentification,
Nameplates and
Pipeline Markers
(KOC-G-O12).
The
Contractor
shall
manufacture and fit tag bearing the allocated
numbers
to each instrument.
Item
(f.)
Replace:
Shop
and
Field Painting
(Number
015-XH-1005)'with
KOC
Standard for Painting and
Coating of
External Metal Surfaces
(KOC-P-001)
Page
I
ofg
a
o
'f
*
z
d
o
ú
1
1C8972 00JC-SPG1909
Rev 0
Addendum
to
JH-1909.doc
c06t2u2012
&
7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909
http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 9/9
M
WorleyParsons
GcsNomicS
,m
resources
& energy
KUWAITOIL
GOMPANY
LOWER
FARS
HEAVY OIL
DEVELOPMENT
ADDENDUM TO
KOC SPECIFIGATION
TNSTRUMENTATTON
FOR
PACKAGED
EQUIPMENT
(0
r
5-JH-1 909)
Section
7.0
-
PACKING.
MARKING
AND
DOGUMENTATION
r
Replace:
Packing, Marking
and
Documentation
(Number
015-UH-1001)
with
KOC
Standard
for
Packing, Marking
and
Documentation
(KOC-G-004)'
Section
8.0
-
SPARE PARTS
AND MAINTENANCE
REQUIREMENTS
Replace:
Spare Parts and
Maintenance
Requirements
(Number
015-KH-1902)
with
KOC
Standard
for
Spare
Parts
and Maintenance
Data
(KOC-G-009)
a
1
1C8972{0-|C-SPC-1909
Rev 0
Addendum to JH-1gog.doc
c06l23l2a12
*
z
f
o
ú
(,
Poge
9 of
I
r//